EIA-923 Power Plant Operations Report

Electric Power Surveys

923

Electric Power Surveys

OMB: 1905-0129

Document [pdf]
Download: pdf | pdf
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

NOTICE: This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may
result in criminal fines, civil penalties and other sanctions as provided by law. For further information concerning sanctions and data
protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions. Title 18 USC
1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United
States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1. IDENTIFICATION
Survey Contact
First Name: ______________________________________

Last Name: ____________________________________

Title: ___________________________________________
Telephone (include extension): _______________________

Fax: __________________________________________

Email: __________________________________________
Address: ________________________________________

City: __________________________________________

State: ___________________________________________

Zip: ___________________________________________

Supervisor of Contact Person for Survey
First Name: ______________________________________

Last Name: ____________________________________

Title: ___________________________________________
Telephone (include extension): _______________________

Fax: __________________________________________

Email: __________________________________________
Address: ________________________________________

City: __________________________________________

State: ___________________________________________

Zip: ___________________________________________

Report For
Company Name: ___________________________________________
Plant Name: _______________________________________________

Regulated

□ Yes □ No

Plant ID: ___________ Plant County: ___________________________

CHP

□ Yes □ No

Address: __________________________________________________

CHP Efficiency

City: ___________________________

Zip Code: ____________

State: __________________

%

Reporting Month/Year: _______________________________________

Contacts
For questions related to E-filing:

[email protected]

202-586-9595

For questions about the data requested on this form:
Schedules 1 & 4:

Chris Cassar

[email protected]

202-586-5448

Schedule 2:

Rebecca Peterson

[email protected]

202-586-4509

Schedules 3 & 5:

Ron Hankey

[email protected]

202-586-2630

Schedules 6, 7, & 8:

Channele Wirman

[email protected]

202-586-5356

EIA-923 Fax:

202-287-1959 or 202-287-1960

EIA-923 Mailbox:

[email protected]

1

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: ____________________________________________________________________
Plant ID: _________________________________

State: ______

Reporting Month/Year: ____________________

SCHEDULE 2. PAGE 1. COST AND QUALITY OF FUEL PURCHASES – PLANT LEVEL
CONTRACT INFORMATION, RECEIPTS, AND COSTS
For fossil-fueled plants 50 megawatts and above

□ Is there a fuel tolling agreement in place for this plant? (If

□ No Receipts (If applicable, please check.)

applicable, please check.)

Contract Information

Fuel Supplier Name

Receipts

Contract
Contract
Type
Expiration Date

2

Energy
Source

Cost per Unit

Quantity
Total Delivered
Commodity Cost
Purchased
Cost
(Coal, Natural Gas)
(solids in tons, (cents per MMBtu, (cents per MMBtu,
to the nearest
to the nearest
liquids in barrels,
gases in Mcf)
0.1)
0.1)

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: ____________________________________________________________________
Plant ID: _________________________________

State: ______

Reporting Month/Year: ____________________

SCHEDULE 2. PAGE 2. COST AND QUALITY OF FUEL PURCHASES – PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above

Purchases

Quality of Fuel as Received

All Fuels

Carried Forward from Schedule 2. Page 1.

Fuel Supplier
Name

Contract
Type

Energy
Source

50

4

8

Coal, Pet
Coke,
RFO, and
WO

Sulfur
Heat
Content
Quantity
Content
(percent
Purchased (MMBtus to
weight to
nearest
nearest
0.001)
0.01)

3

13

6

3

Fuel Transportation

Coal and
Pet Coke

Coal Only Natural Gas

Ash
Content
(percent
weight to
nearest
0.1)

Predomin
Mercury
ant Mode
Content
(Mode
(ppm to
used to
nearest
Firm or
transport
0.001 or
Interruptible fuel over
enter 9 if
the
not
longest
available)
distance)

6

6

1

Coal, Pet Coke,
and Oil

2

Secondary
Mode
(Mode used
to transport
fuel over the
secondlongest
distance)

2

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: ____________________________________________________________________
Plant ID: _________________________________

State: ______

Reporting Month/Year: ____________________

SCHEDULE 2. PAGE 3. COST AND QUALITY OF FUEL PURCHASES – PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above

Purchases Information

Coal Mine Information

Carried Forward from Schedule 2. Page 1.

Fuel Supplier Name

Contract Type

Energy Source

Quantity
Purchased

50

4

8

3

4

Coal Mine State

Coal Mine
MSHA ID

Coal
Mine
Type

8

40

3

Coal
Mine
Name

Coal Mine
County
(for imported
coal, enter
IMP)

2

5

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: ____________________________________________________________________
Plant ID: _________________________________

State: ______

Reporting Month/Year: ____________________

SCHEDULE 3. PART A. BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED
PLANTS — FUEL CONSUMPTION

This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers, or for HRSGs in duct burners. If no fuel is consumed for the HRSG at combined cycle
plants, report zero. Do not leave blank. Report consumption in combustion turbines or IC engines on SCHEDULE 3. PART B.
If this does not apply, go to SCHEDULE 3. PART B.
Complete a separate row for each Boiler ID.

□

Did any boiler produce steam for purposes other than electric power generation during this reporting period?
(If applicable, please check.)

Energy Source

Prime
Mover Boiler ID
Code

Boiler
Status

(See Table 8
on pages
22 through
23 in the
Instructions.)

Quantity
Consumed
(Enter zero when
a fuel has no
consumption for
this
reporting period)

Type of
Physical
Units
(tons,
barrels,
or Mcf)

Average
Heat Content
(as burned, to
nearest 0.001
MMBtu per
ton, barrel, or
Mcf)

Sulfur
Content

Ash
Content

(coal, pet coke,
RFO, and WO,
to nearest
0.01%)

(coal and
PC only, to
nearest
0.1%)

If you reported the category of OTH, OBS, OBG, OBL, or OG in the Energy Source column, please identify the category and
specific fuel name below. For example, “The OBG gas is methane.”
_ ___________________________________________________________________________________.

5

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: ____________________________________________________________________
Plant ID: _________________________________

State: ______

Reporting Month/Year: ____________________

SCHEDULE 3. PART B. FUEL CONSUMPTION – PRIME MOVER LEVEL

Report fuel consumed by plants with organic-fueled steam and combined cycle steam capacity under 10 MW, and all combustion
turbines, IC engines, fuel cells, pumped storage hydroelectric units and compressed air units. Aggregate quantity consumed for
prime movers of a single type. In other words, all natural gas consumed by all combustion gas turbines should be reported as one
number. Report pumping energy in megawatthours for pumped-storage plants and compressed air units.
Complete a separate row for each Prime Mover Type. (See Table 7 of the instructions.).

□

Was steam produced for purposes other than electric power generation during this reporting period?
(If applicable, please check.)

Prime Mover Code

Energy Source

(See Table 8 on pages 22
through 23 in the
Instr
ctions.)

Quantity Consumed
(Enter zero when a fuel has
no consumption for this
reporting period.)

Type of
Physical Units

Average Heat
Content

(tons, barrels,
or Mcf)

(MMBtu
per ton, barrel,
or Mcf)

If you reported the category of OTH, OBS, OBG, OBL, or OG in the Energy Source column, please identify the category and
specific fuel name below. For example, “The OBG gas is methane.”

_________________________________________________________________________________________________

6

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: ____________________________________________________________________
Plant ID: _________________________________

State: ______

Reporting Month/Year: ____________________

SCHEDULE 4. FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND DATA BALANCE
For Coal, Oil, and Natural Gas Plants
Report stocks for the following fuels:
Coal (tons)
Residual oil (No. 5 and No. 6 fuel oils) (barrels)
Distillate-type oils (including diesel oil, No. 2 oil, jet fuel and kerosene) (barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame-stabilization fuels.
Do not report stocks for waste coal, natural gas, or wood waste. Do enter a comment if the natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site. Each
central storage site must be reported separately. New sites should be indicated in the Comment Section, located in SCHEDULE
9 of this form.
Enter zero if the plant has no stocks. Do not leave blank.
Enter adjustments to stocks. An adjustment can be positive or negative. See instructions for additional information. Provide a
comment to explain adjustments in the adjustments grid.
Enter a comment if the balance does not equal zero in the balance grid.
Energy Source
(See Table 8 in
the Instructions.)

Type of Physical
Units
(tons, barrels, or
Mcf)

Previous
Month’s Ending
Stocks
(1)

Current Month’s
Receipts (2)

Current Month’s
Consumption
(3)

Ending Stocks
(4)

Adjustment to
Stocks* (5)

Balance** (6)
4=(1+2-3+5)

*Explain any adjustments below.
Adjustment
(from Column 5 above)

Energy Source

Explanation

**Previous Month’s Stocks plus Receipts minus Consumption plus (or minus) Adjustment should equal Ending Stocks. The balance
will appear in column (6). If the balance is not zero, provide an explanation below.
Balance
(from Column 6 above)

Energy Source

Explanation

7

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: ____________________________________________________________________
Plant ID: _________________________________

State: ______

Reporting Month/Year: ____________________

SCHEDULE 5. PART A. GENERATOR INFORMATION FOR STEAM-ELECTRIC
ORGANIC-FUELED PLANTS

This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of
10 megawatts and above. Report generation for all other types of prime movers (combustion turbines, IC engines, wind, or hydroelectric turbines, and compressed air units.), and steam turbine plants with less than 10 megawatts total capacity or fueled by
nuclear, solar, geothermal, or other energy sources on SCHEDULE 5. PARTS B or C. Generation reported on SCHEDULE 5,
Part A corresponds to the fuel consumption reported on SCHEDULE 3. Part A.
Industrial or Commercial Sector plants may report gross generation ONLY if net generation is not measured (see instructions for
definition of net generation).
Complete a separate row for each Generator ID. See Generator ID information in the instructions for Schedule 5. Part A.

Prime
Mover
Code

Generator
ID

Generator
Status

Gross Generation
(MWh)

8

Net Generation
(MWh)

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: ____________________________________________________________________
Plant ID: _________________________________

State: ______

Reporting Month/Year: ____________________

SCHEDULE 5. PART B. PRIME MOVER LEVEL GENERATION

This schedule will be completed ONLY by steam-electric organic-fueled plants with a total steam turbine capacity less than 10
megawatts, by combined-cycle plants whose steam portion of the operation is under 10 MW, and all IC engines, fuel cells,
combustion turbines, pumped-storage hydroelectric turbines, and compressed air units. Generation reported on this schedule
corresponds to the fuel consumption reported on SCHEDULE 3. Part B.
In the applicable Gross Generation or Net Generation cell, enter the aggregate generation for prime movers of a single type. For
example, enter the total generation from all combustion turbines. Industrial or Commercial Sector plants may report gross
generation ONLY if net generation is not measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type. (See Table 7 of the instructions.)

Prime Mover Code

Gross Generation
(MWh)

9

Net Generation
(MWh)

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: ____________________________________________________________________
Plant ID: _________________________________

State: ______

Reporting Month/Year: ____________________

SCHEDULE 5. PART C. GENERATION FROM NUCLEAR AND OTHER NONCOMBUSTIBLE ENERGY SOURCES

This schedule will be completed by all nuclear plants and by all wind, solar, geothermal, hydroelectric, or other plants where the
energy source is noncombustible, such as purchased steam or waste heat. No fuel consumption is required for these types of
plants. Report generation by energy source for nuclear, wind, solar, geothermal, conventional hydroelectric and miscellaneous
sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant. All combined-cycle
generation is reported on SCHEDULE 5. PART A or B. Report nuclear data by generating unit.
In the applicable Gross Generation or Net Generation cell, enter the aggregate generation for prime movers of a single type. For
example, enter the total generation from all combustion turbines. Industrial or Commercial Sector plants may report gross
generation only if net generation is not measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type. (See Table 7 of the instructions.)

Prime
Mover
Code

Energy
Source

Unit Code
(nuclear)

Gross Generation
(MWh)

10

Net Generation
(MWh)

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

POWER PLANT OPERATIONS
REPORT

Plant Name: ____________________________________________________________________
Plant ID: _________________________________

State: ______

Reporting Month/Year: ____________________

SCHEDULE 6. NONUTILITY ANNUAL SOURCE AND DISPOSITION OF ELECTRICITY

SCHEDULE 6 collects calendar year data (no monthly detail).
Report all generation in megawatthours (MWh) rounded to a whole number.

Source of Electricity

Disposition of Electricity

(1) Gross Generation (Annual)

(4) Station Use

(2) Other Incoming Electricity

(5) Direct Use (Industrial and Commercial
Sector Plants, both CHP and non-CHP)
(6) Total Facility Use (4 + 5)
(7) Retail Sales to Ultimate Customers
(8) Sales for Resale
(9) Other Outgoing Electricity

(3) Total Sources (1 + 2)

(10) Total Disposition (6 + 7 + 8 + 9)
Total Sources must equal Total Disposition (3 = 10)

11

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: ____________________________________________________________________
Plant ID: _________________________________

State: ______

Reporting Month/Year: ____________________

SCHEDULE 7. ANNUAL REVENUES FROM SALES FOR RESALE

SCHEDULE 7 is to be completed by respondents who entered a positive amount on SCHEDULE 6, Disposition of Electricity, Item 8,
Sales for Resale.
Sales for Resale is energy supplied to other electric utilities, cooperatives, municipalities, Federal and State electric agencies, power
marketers, or other entities for resale to end-use consumers.

Annual Revenues from Sales for Resale (in thousand dollars): ____________________

12

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: ____________________________________________________________________
Plant ID: _________________________________

State: ______

Reporting Month/Year: ____________________

SCHEDULE 8. ANNUAL ENVIRONMENTAL INFORMATION
SCHEDULE 8. PARTS A through F are filed annually by thermoelectric power plants (organic fueled, nuclear, and combined cycle)
with a total steam turbine capacity of 10 megawatts and above (plants that reported on SCHEDULE 3. Part A and SCHEDULE 5 Part
A.). Plants with a total steam turbine capacity of 10 megawatts to less than 100 MW file only Parts C, E, and F.

SCHEDULE 8. PART A. ANNUAL BYPRODUCT DISPOSITION

Enter the quantity of combustion byproducts for the year by type of disposal (to nearest 0.1 thousand tons). Report sales of steam
in million Btu (MMBtu). If actual data are not available, provide an estimated value.

□

NO BYPRODUCTS

Disposal

Sale or Beneficial Use

Storage

Byproduct

Total
On-Site
Landfill

On-Site
Ponds

Disposal
Off-site

Fly ash from standard boiler/PCD
units
Fly ash from un
ts with dry FGD
Fly ash from FBC units
Bottom ash from standard boiler
units
Bottom (bed) ash from FBC units
FGD Gypsum
Other FGD byproducts
Ash from coal gasification (IGCC)
units
Other (specify via footnote on
SCHEDULE 9)
Steam Sales (MMBtu)

13

Sold

Used
On-site

Used
Off-site

Stored
O
-site

Stored
Off-site

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: ____________________________________________________________________
Plant ID: _________________________________

State: ______

Reporting Month/Year: ____________________

SCHEDULE 8. PART B. FINANCIAL INFORMATION RELATED TO COMBUSTION BYPRODUCTS

If actual data are not available, provide an estimated value.

Operation and Maintenance (O&M) Expenditures During Year (Thousand Dollars)

Type

(1)
Fly Ash

(2)
Bottom Ash

(3)
Flue Gas
Desulfurization

(4)
Water
Pollution
Abatement

(5)
Other Pollution
Abatement

(6)
Total
(1 + 2 + 3 + 4 + 5)

Collection
Disposal
Other
Capital Expenditures for New Structures and Equipment During Year, Excluding Land and Interest Expense
(Thousand Dollars)

Type

(7)
Air Pollution
Abatement

(8)
Water Pollution
Abatement

(9)
Solid/Contained Waste

(10)
Other Pollution Abatement

Amount
Byproduct Sales Revenue During Year
(Thousand Dollars)

Type

(11)
Fly Ash

(12)
Bottom Ash

(13)
Fly and Bottom
Ash Sold
Intermingled

Amount

14

(14)
Flue Gas
Desulfurization
Byproducts

(15)
Other
Byproduct
Revenue

(16)
Total
(11+12+13+14+15)

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: ____________________________________________________________________
Plant ID: _________________________________

State: ______

Reporting Month/Year: ____________________

SCHEDULE 8. PART C. BOILER INFORMATION NITROGEN OXIDE EMISSION CONTROLS

Complete a separate row for each boiler.
Note: The Boiler ID must match the Boiler ID as reported on Form EIA-860, "Annual Electric Generator Report."

□

No NOx Controls

NOx Emission Rate (lbs/MMBtu)
Boiler ID

NOx Control In-Service
(hours)
Entire Year

15

May through September

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: _____________________________________________________________________________________________________________________
Plant ID: ________________________________________

State: __________________________

Reporting Year: _______________________

SCHEDULE 8. PART D. MONTHLY COOLING SYSTEM INFORMATION
Reporting Month:__________________
Note: All steam-electric plants of 100 MW nameplate capacity or greater, including combined cycle plants and nuclear power plants, must respond to this schedule. Cooling System ID must
match the ID as reported on Form EIA-860, "Annual Electric Generator Report.” Complete a separate page for each month. Complete a separate row for each cooling system.

Cooling
System
ID or
Plant

Cooling
System
Status

Monthly
Amount
of
Chlorine
Added to
Cooling
Water
(1000 lbs)

Average Monthly Rate of Cooling Water
3
(in cubic feet per second, to the nearest 0.1 ft )
Hours in
Service
Diversion

Withdrawal

Discharge

Cooling Water
Temperature at Intake
(degrees Fahrenheit)

Measured or
Estimated? (If any
Average
Maximum
Consumption flow rate data was
Monthly
Temperature
estimated, select
Temperature for the Month
methodology.)

16

Cooling Water Temperature
at Discharge Outlet
(degrees Fahrenheit)

Average
Monthly
Temperature

Maximum
Temperature
for the Month

Measured or
Estimated? (If
any temperature
data was
estimated, select
methodology.)

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: ___________________________________________________________________________________________________________________
Plant ID: ________________________________________

State: __________________________

Reporting Year: _____________________________

SCHEDULE 8. PART E. FLUE GAS PARTICULATE COLLECTION INFORMATION

□ Does not apply.
Complete a separate row for each flue gas particulate collector.

Flue Gas
Particulate
Collector ID

FGP Collector
Status

Hours in
Service

Typical Particulate
Emissions Rate
(to the nearest 0.01
lb/MMBtu)

Removal Efficiency of Particulate Matter (nearest 0.1% by weight)

At Annual Operating
Factor

17

At 100% Load or
Tested Efficiency

Date of Most Recent
Efficiency Test (e.g., 12-2005)

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: _____________________________________________________________________________________________________________________
Plant ID: __________________________________

State: __________________________

Reporting Year: ___________________________________

SCHEDULE 8. PART F. FLUE GAS DESULFURIZATION UNIT INFORMATION – ANNUAL OPERATIONS
Note: Flue Gas Desulfurization ID must match the ID as reported on Form EIA-860, "Annual Electric Generator Report.”

□ Does not apply.

Complete a separate row for each Flue Gas Desulfurization Unit.
ANNUAL OPERATIONS

Flue Gas
Desulfurization Unit
ID

FGD Unit
Status

Hours InService

Quantity of FGD
Sorbent Used
(to the nearest 0.1
thousand tons)

Electrical Energy
Consumption
(MWh)

Removal Efficiency of Sulfur Dioxide (nearest 0.1% by wt)
At Annual Operating
Factor

At 100% Load or
Tested Efficiency

Date of Most Recent Efficiency
Test (e.g., 12-2005)

OPERATION AND MAINTENANCE EXPENDITURES DURING YEAR, EXCLUDING ELECTRICITY (THOUSAND DOLLARS)

Flue Gas
Desulfurization Unit
ID

Feed Materials
and Chemicals

Labor and
Supervision

Waste Disposal

18

Maintenance, Materials,
and All Other Costs

Total

U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)

POWER PLANT OPERATIONS
REPORT

Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours

Plant Name: ____________________________________________________________________
Plant ID: _________________________________

State: ______

Reporting Month/Year: ____________________

SCHEDULE 9. COMMENTS

Comment Section: Explain any unusual values, occurrences, or changes in ownership.

Schedule

Part

Item

Comment

Changes in Ownership
(Provide name of purchaser and date sold.)

19


File Typeapplication/pdf
File TitleAppendix C
AuthorGrace Sutherland
File Modified2010-09-30
File Created2010-09-30

© 2024 OMB.report | Privacy Policy