1135ss10_Tables

1135ss10_Tables.xls

NSPS for Magnetic Tape Coating Facilities (40 CFR part 60, subpart SSS) (Renewal)

1135ss10_Tables

OMB: 2060-0171

Document [xlsx]
Download: xlsx | pdf

Overview

TABLE 1
TABLE 2


Sheet 1: TABLE 1

Table 1:

Annual Respondent Burden and Cost for NSPS for Magnetic Tape Coating Facilities










(40 CFR part 60, subpart SSS) (Renewal)











0.869565


$98.20 $114.49 $48.53
REPORTING/RECORDKEEPING REQUIREMENT (A)
Respondent Hours per Occurence (Technical hours)
(B)
Number of Occurences per Respondent per Year
(C)
Hours per Respondent per Year
(C=A x B)
(D)
Number of Respondents per Year
(E)
Technical Hours per Year
@ $98.20
(E=C x D)
(F)
Management Hours per Year
@ $114.49
(F= E x 0.05)
(G)
Clerical Hours per Year
@ $48.53
(G= E x 0.1)
Total Labor Costs per Year
1. APPLICATIONS


N/A N/A N/A N/A N/A N/A N/A N/A
2. SURVEY AND STUDIES


N/A N/A N/A N/A N/A N/A N/A N/A
3. REPORTING REQUIREMENTS











A. Read Instructions

0.87 1 0.87 2 1.73913 0.087 0.17 $189.18

B. Required Activities










New Sources











Initial performance test 243.48 1 243.48 2 486.96 24.35 48.70 $52,969.90


Repeat of performance test
243.48 0.2 48.70 2 97.39 4.87 9.74 $10,593.98


Method 24 Testing
78.26 12 939.13 0.1 93.91 4.70 9.39 $10,215.62

C. Create Information

------------------------Included in 3B----------------------------

D. Gather Existing Information

------------------------Included in 3E----------------------------

E. Write Report










New Sources











Notification of construction/reconstruction/modification
1.74 1 1.74 1 1.74 0.09 0.17 $189.18


Notification of phys/operational change
6.96 1 6.96 2 13.91 0.70 1.39 $1,513.43


Notification of actual startup
1.74 1 1.74 2 3.48 0.17 0.35 $378.36


Notification of initial performance test
1.74 1 1.74 2 3.48 0.17 0.35 $378.36


Notification of CMS
1.74 1 1.74 2 3.48 0.17 0.35 $378.36


Report of performance test
------------------------Included in 3B----------------------------


Excess Emission Report
13.91 4 55.65 1.2 66.78 3.34 6.68 $7,264.44


Report of No Excess Emissions
6.96 2 13.91 4.8 66.78 3.34 6.68 $7,264.44


Report when Exceed Size Cutoff
1.74 1 1.74 0 0.00 0.00 0.00 $0.00




Total Reporting Hours by Labor Category 840 42 84

TOTAL REPORTING BURDEN






965.6 Hours $91,335
4. RECORDKEEPING REQUIREMENTS











A. Read Instructions

------------------------Included in 3A----------------------------

B.  Plan Activities

------------------------Included in 4C----------------------------

C. Implement Activities

------------------------Included in 3B----------------------------

D.  Develop Record System

N/A N/A N/A N/A N/A N/A N/A N/A

E.  Time to Enter Information











Records of startups, shutdowns, malfunctions, etc.
1.30 50 65.22 6 391.30 19.57 39.13 $42,565.10


Records of control device operating parameters
0.22 350 76.09 6 456.52 22.83 45.65 $49,659.28


Records of Projected/Actual Solvent Use
6.96 2 13.91 1.2 16.70 0.83 1.67 $1,816.11


Records for Monthly Liquid Material Balance
1.74 12 20.87 1.2 25.04 1.25 2.50 $2,724.17


Monthly Determination of Avg VOC Content
1.74 12 20.87 1.2 25.04 1.25 2.50 $2,724.17

F.   Train Personnel

N/A N/A N/A N/A N/A N/A N/A N/A

G.  Audits

N/A N/A N/A N/A N/A N/A N/A N/A




Total Reporting Hours by Labor Category 915 46 91

TOTAL RECORDKEEPING BURDEN






1,051.8 Hours $99,489






















TOTAL ANNUAL BURDEN






2,017 Hours $190,824












Assumptions:











Number of respondents per year = 6










Number of new lines per year = 2










Rate of failed performance tests = 20%










Assume 1 modification/reconstruction line over 5 years.










Assume 80% of sources have no excess emissions, and 20% have excess emissions.










Assume 20% of sources perform monthly liquid material balance.










Assume 20% of sources perform monthly VOC determination.










Assume 20% of sources report noncompliance each year.










Sheet 2: TABLE 2

Table 2:
Average Annual Agency Burden for NSPS for Magnetic Tape Coating Facilities









(40 CFR part 60, subpart SSS) (Renewal)










0.869565


$45.52 $61.36 $24.64
REPORTING/RECORDKEEPING REQUIREMENT (A)
EPA Hours per Occurence (Technical hours)
(B)
Number of Occurences per Plant per Year
(C)
EPA Hours per Year
(C=A x B)
(D)
Plants per Year
(E) Technical Hours per Year @ $45.52 (E=C x D) (F)
Management Hours per Year
@ $61.36
(F= E x 0.05)
(G)
Clerical Hours per Year
@ $24.64
(G= E x 0.1)

Costs per Year
INITIAL PERFORMANCE TESTS










New Plant
20.87 1 20.87 2 41.74 2.09 4.17 $2,130.87
REPEAT PERFORMANCE TEST









New Plant
20.87 0.2 4.17 2 8.35 0.42 0.83 $426.17
REPORT REVIEW










New Plant










Notification of construction 1.74 1 1.74 2 3.48 0.17 0.35 $177.57


Notification of actual startup 0.43 1 0.43 2 0.87 0.04 0.09 $44.39


Notification of initial test 0.43 1.2 0.52 2 1.04 0.05 0.10 $53.27


Review test results 6.96 1.2 8.35 2 16.70 0.83 1.67 $852.35


Excess emission report 6.96 4 27.83 1.2 33.39 1.67 3.34 $1,704.69


Report of no excess emissions 1.74 2 3.48 4.8 16.70 0.83 1.67 $852.35
TOTAL ANNUAL HOURS





122 6 12
SALARY BURDEN (per year)








$6,241.66
ANNUAL TRAVEL EXPENSES










(1 person x 1 plants/year x 3 d/plant x $100 per diem) + ($350 round trip/plant x 1 plant/yr) =






$650.00
TOTAL ANNUAL BURDEN






141 Hours $6,892











Assumptions:










Number of respondents per year = 6









Number of new plants (new lines at existing plants) per year: 2









Rate of failed performance tests: 20%









Assume 80% of sources have no excess emissions, and 20% have excess emissions.









Percentage of new plant visits: 10%








File Typeapplication/vnd.ms-excel
AuthorGGibson
Last Modified Byctsuser
File Modified2010-07-01
File Created2009-11-16

© 2024 OMB.report | Privacy Policy