NESHAP for Beryllium (40 CFR part 61, subpart C) (Renewal)
Extension without change of a currently approved collection
No
Regular
Approved without change
03/07/2011
12/10/2010
table that charts list comparision
Inventory as of this Action
Requested
Previously Approved
03/31/2014
36 Months From Approved
03/31/2011
166
0
166
2,627
0
2,627
35,000
0
35,000
The sources subject to this rule (i.e., extraction plants, ceramic plants, foundries, incinerators, propellant plants and machine shops which process beryllium and its derivatives) complying with the one-time only stack test, would be required to submit initial notifications and a one-time report with the emission limit determination. The sources complying with the alternative ambient air quality limit by operating a continuous monitor in the vicinity of the affected facility are required to submit a monthly report of all measured concentrations. Records shall be retained for two years.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.