Refineries Required Fields in ERT

Refineries_Required_Fields_in_ERT.xls

NSPS and NESHAP for Petroleum Refineries Sector Residual Risk and Technology Review (New Collection)

Refineries Required Fields in ERT

OMB: 2060-0657

Document [xlsx]
Download: xlsx | pdf
List of Required Data Entry Fields for Data Reported in the ERT



Setup / Test Plan Module
Note: Facility does not have to get test plan approved by the Agency, but ERT requires the test plan to be entered into the program before test results can be entered into the system.
Form: Facility/Tester
Field Name Field Optional or Required for ICR Test Request Note:
Facility Name Required Plant Name as reported in the Component 1 Reporting Tool.
Address Optional
City Optional
State/Zip Optional
Address Optional
City Optional
State/Zip Optional
Contact Optional
Phone Optional
Fax Optional
Email Optional
AFT Number Optional
Industry NAICS Optional
FRS Optional
Latitude Optional
Longitude Optional
Testing Company (TC) Required
TC Address Required
TC City Required
TC State/Zip Required
TC Contact Required
TC Phone Required
Form: Permit/SCC
Air Permit Number Required The code is the Facility ID provided in your the Section 114 letter and should be the same as the Facility ID you entered for this facility in the Component 1 Reporting Tool.
Permitted State Source ID/Name Source ID-Required Enter the unit ID that you provided for this unit in Component 1 and/or Component 2 of the ICR.
Name-Optional The name is optional.
The remainder of the Permit/SCC form Optional The remainder of this form, including the SCC section is optional.
Form: Regulations
Question 1, 2, and 3 Optional
Form: Process/APCD
Question 4a Required Required If required for your test, you should report the average heat input during the test run (mmBtu/hr); average fuel composition and feed rate during each test run; and average steam output (1000 lb steam/hour) during each test run. If a control device is installed you must also report control device operating or monitoring parameters during each test run (including, as appropriate to the control device, flue gas flow rate, pressure drop, scrubber liquor pH, scrubber liquor flow rate, sorbent type and sorbent injection rate), and process parameters (including, flue gas oxygen content (%), flue gas carbon dioxide content (%), flue gas moisture content (%), flue gas sampling point temperature (Deg F) and pressure (atm), standard temperature (Deg F) and pressure (atm), unit gross electrical output (MWe), unit net electric generation (MWh)).
Question 4b Required Required
Question 5a Required Required Listed below in Form: Attachments Source/Process Flow Diagram
Question 5b Required Required Required data entry fields for data reported in order of process flow. Add description and provide detailed description in section 5a. Each control device should have a target value, a unit of measure (UOM), and description of what the target value and the UOM represent. These values can be, for example, the guaranteed emission limits or performance guarantee provided by control device vendors. Examples would be NOx removal efficiency (in percent) for post combustion NOx controls, PM removal efficiency (in percent) for PM controls, or SO2 removal efficiency in percent for post combustion SO2 controls. For example, for an ESP, a user might enter: in UOM (Percent), in Target (99), and in Comments (PM removal Efficiency).
Form: Locations/Methods
Question 6 Required Location of test should be downstream from the last control device.
7a Required Each test should be at least comprised of three runs.
7b Required The units of measure for each method should match the units provided in the instructions included in Component 4.
Form: Methods Cont.
Questions 8-11 Required
Form: Audit/Calibrations
Questions 12-16 Required
Form: Schedule
Questions 17-19 Optional
Form: Signatures
All Questions Required
Test Data Module
All Questions Required
Form: Attachments
Source/Process Flow Diagram Required (as a part of the test report) Rather than attaching the these items to the ERT, they should be included in the test report submitted to the Refinery ICR website or to the ICR email address.
Alternate Method Request and Approval (Item 8) (optional)
EPA Method 1Location Supporting Documentation (Item 9) (optional)
Cyclonic Flow Absence Supporting Documentation (Item 10)
Pre-Test Meter Boxes/DGMs Calibrations
Post-Test Meter Boxes/DGMs Calibrations
Nozzles Calibrations
Pitots Calibrations
Thermocouples Calibrations
Sampling Locations Dimensions and Point Locations
Run Field Data Sheets
Moisture Recovery
Lab Data including calibrations and detection level determinations
Chain-of-Custody
Observer Comments
APCD Diagram
Test Data Review Module
All Questions Required
Test Report Module
All Questions for Report Signatures Form Required