Download:
pdf |
pdfRenewable Fuel Standard (RFS2) Report Instructions
OMB Control No. 2060-0640
RFS2 Production Outlook Report
Issued Date: 08/6/2010
Revised Date: 08/25/2010
Report Form ID: RFS0900
The RFS0900 RFS2 Production Outlook Report is required for registered RIN generating renewable fuel
producers and importers to provide expected renewable fuel production or imports at each registered and
planned facility, pursuant to §80.1449.
The report is used to submit renewable fuel volume production and import expectations, and RIN
generation expectations. Parties are required to provide renewable fuel volumes and RINs on separate
rows of this report. Parties may only report one D code and fuel type per row, but may report multiple
feedstocks per row.
This report is due annually: For 2010, the due date is September 1, and for every year following 2010,
the due date is March 31.
Please check the RFS reporting web site for updated instructions and templates:
http://epa.gov/otaq/regs/fuels/rfsforms.htm
For information on submitting this report using EPA’s Central Data Exchange (CDX) visit:
http://epa.gov/otaq/regs/fuels/cdxinfo.htm
Field
No.
1.
Field Name
Report Form ID
Units
Field Formats, Codes, & Special Instructions
AAAAAAA; Character.
RFS0900: Form ID for the RFS2 Production Outlook
Report
2.
Report Type
A; Character. Indicate whether this is the original report
or a resubmission. Submit only one Original report,
submit any corrections or updates as Resubmission(s):
O: Original
R: Resubmission
3.
CBI
A; Character. Specify if the data contained within the
report is being claimed as Confidential Business
Information (CBI) under 40 CFR Part 2, subpart B:
Y: Confidential Business Information
N: Non-Confidential Business Information
4.
Report Date
MM/DD/YYYY; Date. Enter the date the original or
resubmitted report is submitted.
5.
Report Year
YYYY; Character. Indicate the compliance period (year)
of the report.
6.
Company/Entity ID
9999; Number. Enter the four-digit, EPA-assigned
company/entity ID.
#### : The four digit EPA-assigned company ID
Page 1
Renewable Fuel Standard (RFS2) Report Instructions
OMB Control No. 2060-0640
RFS2 Production Outlook Report
Issued Date: 08/6/2010
Revised Date: 08/25/2010
Report Form ID: RFS0900
Field
No.
Field Name
Units
Field Formats, Codes, & Special Instructions
7.
Company Name
AAAAAAA…; Character (125 Max). The reporting
party’s name (Your company name).
8.
Facility ID
9.
Report Information
Type
99999; Number. Producers and Importer who generate
RINs must reference individual facility ID numbers.
Please include all preceding zeros in five digit facility ID
numbers.
##### : The five digit EPA-assigned facility ID
99999: If facility is unregistered and still in planning
stage
AAA; Character. Indicate the report information type for
the specific row of data:
VOL: Volume Information
RIN: RIN quantity Information
10.
Fuel D Code
9; Number. Indicate the Fuel D Code. Only one D code
may be entered per row.
3: Cellulosic biofuel
4: Biomass-based diesel
5: Advanced biofuel
6: Renewable fuel
7: Cellulosic diesel
NA: At least one of the following:
No LCA - No D Code assigned,
Volume Exceeds Baseline and does not qualify
for a D code, or
VOL entered in line 9
Page 2
Renewable Fuel Standard (RFS2) Report Instructions
OMB Control No. 2060-0640
RFS2 Production Outlook Report
Report Form ID: RFS0900
Field
No.
11.
Field Name
Fuel Type
Units
Issued Date: 08/6/2010
Revised Date: 08/25/2010
Field Formats, Codes, & Special Instructions
999; Number. Indicate code corresponding to the Fuel
Type. Only one Fuel Type may be entered per row.
20: Biodiesel (EV 1.5)
21: Biodiesel (EV 1.6)
80: Biogas
70: Butanol
30: Cellulosic Diesel
60: Cellulosic Ethanol
90: Cellulosic Jet Fuel
100: Cellulosic Heating Oil
110: Cellulosic Naphtha
10: Non-cellulosic Ethanol
140: Non-cellulosic Jet Fuel
40: Non-ester Renewable Diesel (EV 1.7)
41: Non-ester Renewable Diesel (EV 1.6)
130: Naphtha
150: Heating Oil (EV 1.6)
151: Heating Oil (EV 1.1)
152: Heating Oil (EV 1.2)
888: Other
12.
Other Fuel Type
Description
AAAA…; Character (125 max). If “888” is listed in line 11,
enter a description of the fuel type. If not applicable, enter
“NA.”
Page 3
Renewable Fuel Standard (RFS2) Report Instructions
OMB Control No. 2060-0640
RFS2 Production Outlook Report
Report Form ID: RFS0900
Field
No.
13.
Field Name
Feedstock(s)
Units
Issued Date: 08/6/2010
Revised Date: 08/25/2010
Field Formats, Codes, & Special Instructions
999; Number. Indicate code(s) corresponding to the
feedstock(s) for fuel. If entering in multiple feedstocks,
please separate feedstock codes by “#” :
Biodiesel and/or Non-ester Renewable Diesel
230: Algal Oil
200: Non-food grade corn oil
240: Oil from Annual Covercrops
210: Soybean Oil
160: Waste Oils/Fasts/Greases
Cellulosic (Diesel, Ethanol, Heating Oil, Jet Fuel, and/or
Naphtha)
70: Cellulosic Biomass – Agricultural Residues
250: Cellulosic Biomass – Annual Cover Crops
260: Cellulosic Biomass - Forest Product Residues
270: Cellulosic Biomass - Forest Thinnings
90: Cellulosic Biomass – Miscanthus
220: Cellulosic Biomass - Separated Municipal Solid
Waste
280: Cellulosic Biomass - Separated Food Wastes
140: Cellulosic Biomass - Separated Yard Wastes
290: Cellulosic Biomass – Slash
80: Cellulosic Biomass – Switchgrass
Ethanol and/or Butanol
300: Starch - Agricultural Residues
310: Starch - Annual Covercrops
10: Starch – Corn
120: Sugarcane
Biogas
320: Manure Digesters
330: Landfills
340: Sewage and Waste Treatment Plants
Ethanol, Renewable Diesel, Heating oil, Jet Fuel, and/or
Naphtha
350: Non-Cellulosic Portions of Separated Food Wastes
Other
888: Other
Page 4
Renewable Fuel Standard (RFS2) Report Instructions
OMB Control No. 2060-0640
RFS2 Production Outlook Report
Report Form ID: RFS0900
Field
No.
14.
Field Name
Other Feedstock
Description
Units
Issued Date: 08/6/2010
Revised Date: 08/25/2010
Field Formats, Codes, & Special Instructions
AAAA…; Character (125 max). If feedstock is not listed
and “888” is listed in line 14, enter a description of the
feedstock. If not applicable, enter “NA.”
Page 5
Renewable Fuel Standard (RFS2) Report Instructions
OMB Control No. 2060-0640
RFS2 Production Outlook Report
Report Form ID: RFS0900
Field
No.
15.
Field Name
Production
Process
Units
Issued Date: 08/6/2010
Revised Date: 08/25/2010
Field Formats, Codes, & Special Instructions
999; Number: Indicate code corresponding to the
Production Process. Only one Production Process may
be entered per row.
Biodiesel (mono-alkyl ester) and/or Renewable Bio-OilDiesel
180: Transesterification, Dedicated Renewable Biomass
Facility
870: Transesterification, Co-processing Facility
Cellulosic (Diesel, Ethanol, Heating Oil, Jet Fuel, and/or
Naptha)
280: Cellulosic Production Process
290: Fischer-Tropsch Process
Ethanol and/or Butanol
300: Dry Mill, Biogas Fired (50% or less of DGS dried
annually)
310: Dry Mill, Biogas Fired (CHP, 65% or less of DGS
dried annually)
320: Dry Mill, Biogas Fired (CHP, Corn Oil Fractionation)
330: Dry Mill, Biogas Fired (CHP, Corn Oil Fractionation,
Corn Oil Extraction)
340: Dry Mill, Biogas Fired (CHP, Corn Oil Fractionation,
Corn Oil Extraction, Membrane Separation)
350: Dry Mill, Biogas Fired (CHP, Corn Oil Fractionation,
Corn Oil Extraction, Membrane Separation, Raw Starch
Hydrolysis)
360: Dry Mill, Biogas Fired (Corn Oil Extraction, 65% or
less of DGS dried annually)
370: Dry Mill, Biogas Fired (Corn Oil Extraction,
Membrane Separation)
380: Dry Mill, Biogas Fired (Corn Oil Extraction,
Membrane Separation, Raw Starch Hydrolysis)
390: Dry Mill, Biogas Fired (Corn Oil Fractionation, 65% or
less of DGS dried annually)
400: Dry Mill, Biogas Fired (Corn Oil Fractionation, Corn
Oil Extraction)
410: Dry Mill, Biogas Fired (Corn Oil Fractionation, Corn
Oil Extraction, Membrane Separation)
Page 6
Renewable Fuel Standard (RFS2) Report Instructions
OMB Control No. 2060-0640
RFS2 Production Outlook Report
Report Form ID: RFS0900
Field
No.
15.
Field Name
Production
Process (ctd.)
Units
Issued Date: 08/6/2010
Revised Date: 08/25/2010
Field Formats, Codes, & Special Instructions
420: Dry Mill, Biogas Fired (Corn Oil Fractionation, Corn
Oil Extraction, Membrane Separation, Raw Starch
Hydrolysis)
430: Dry Mill, Biogas Fired (Membrane Separation, 65%
or less of DGS dried annually)
440: Dry Mill, Biogas Fired (Membrane Separation, Raw
Starch Hydrolysis)
450: Dry Mill, Biogas Fired (Raw Starch Hydrolysis, 65%
or less of DGS dried annually)
460: Dry Mill, Biomass Fired (50% or less of DGS dried
annually)
470: Dry Mill, Biomass Fired (CHP, 65% or less of DGS
dried annually)
480: Dry Mill, Biomass Fired (CHP, Corn Oil
Fractionation)
490: Dry Mill, Biomass Fired (CHP, Corn Oil Fractionation,
Corn Oil Extraction)
500: Dry Mill, Biomass Fired (CHP, Corn Oil Fractionation,
Corn Oil Extraction, Membrane Separation)
510: Dry Mill, Biomass Fired (CHP, Corn Oil Fractionation,
Corn Oil Extraction, Membrane Separation, Raw Starch
Hydrolysis)
520: Dry Mill, Biomass Fired (Corn Oil Extraction, 65% or
less of DGS dried annually)
530: Dry Mill, Biomass Fired (Corn Oil Extraction,
Membrane Separation)
540: Dry Mill, Biomass Fired (Corn Oil Extraction,
Membrane Separation, Raw Starch Hydrolysis)
550: Dry Mill, Biomass Fired (Corn Oil Fractionation, 65%
or less of DGS dried annually)
560: Dry Mill, Biomass Fired (Corn Oil Fractionation, Corn
Oil Extraction)
570: Dry Mill, Biomass Fired (Corn Oil Fractionation, Corn
Oil Extraction, Membrane Separation)
580: Dry Mill, Biomass Fired (Corn Oil Fractionation, Corn
Oil Extraction, Membrane Separation, Raw Starch
Hydrolysis)
Page 7
Renewable Fuel Standard (RFS2) Report Instructions
OMB Control No. 2060-0640
RFS2 Production Outlook Report
Report Form ID: RFS0900
Field
No.
15.
Field Name
Production
Process (ctd.)
Units
Issued Date: 08/6/2010
Revised Date: 08/25/2010
Field Formats, Codes, & Special Instructions
590: Dry Mill, Biomass Fired (Membrane Separation, 65%
or less of DGS dried annually)
600: Dry Mill, Biomass Fired (Membrane Separation, Raw
Starch Hydrolysis)
610: Dry Mill, Biomass Fired (Raw Starch Hydrolysis, 65%
or less of DGS dried annually)
620: Dry Mill, Natural Gas Fired (50% or less of DGS
dried annually)
20: Dry Mill, Natural Gas Fired (CHP, 65% or less of DGS
dried annually)
630: Dry Mill, Natural Gas Fired (CHP, Corn Oil
Fractionation)
640: Dry Mill, Natural Gas Fired (CHP, Corn Oil
Fractionation, Corn Oil Extraction)
650: Dry Mill, Natural Gas Fired (CHP, Corn Oil
Fractionation, Corn Oil Extraction, Membrane Separation)
660: Dry Mill, Natural Gas Fired (CHP, Corn Oil
Fractionation, Corn Oil Extraction, Membrane Separation,
Raw Starch Hydrolysis)
670: Dry Mill, Natural Gas Fired (Corn Oil Extraction, 65%
or less of DGS dried annually)
680: Dry Mill, Natural Gas Fired (Corn Oil Extraction,
Membrane Separation)
690: Dry Mill, Natural Gas Fired (Corn Oil Extraction,
Membrane Separation, Raw Starch Hydrolysis)
700: Dry Mill, Natural Gas Fired (Corn Oil Fractionation,
65% or less of DGS dried annually)
710: Dry Mill, Natural Gas Fired (Corn Oil Fractionation,
Corn Oil Extraction)
720: Dry Mill, Natural Gas Fired (Corn Oil Fractionation,
Corn Oil Extraction, Membrane Separation)
730: Dry Mill, Natural Gas Fired (Corn Oil Fractionation,
Corn Oil Extraction, Membrane Separation, Raw Starch
Hydrolysis)
740: Dry Mill, Natural Gas Fired (Membrane Separation,
65% or less of DGS dried annually)
750: Dry Mill, Natural Gas Fired (Membrane Separation,
Raw Starch Hydrolysis)
Page 8
Renewable Fuel Standard (RFS2) Report Instructions
OMB Control No. 2060-0640
RFS2 Production Outlook Report
Report Form ID: RFS0900
Field
No.
Field Name
15.
Production
Process (ctd.)
16.
Next Calendar
January
Production/
Generation
(Current year+1)
Units
Gallons or
RINs
Issued Date: 08/6/2010
Revised Date: 08/25/2010
Field Formats, Codes, & Special Instructions
760: Dry Mill, Natural Gas Fired (Raw Starch Hydrolysis,
65% or less of DGS dried annually)
770: Wet Mill, Biomass Fired
780: Wet Mill, Biogas Fired
790: Fermentation (Sugarcane only)
800: Fermentation using biomass for process energy
810: Fermentation using natural gas for process energy
820: Fermentation using biogas for process energy
830: Grandfathered (Dry Mill, Biogas Fired)
110: Grandfathered (Dry Mill, Biomass Fired)
60: Grandfathered (Dry Mill, Coal Fired)
10: Grandfathered (Dry Mill, Natural Gas Fired)
840: Grandfathered (Wet Mill, Biogas Fired)
140: Grandfathered (Wet Mill, Biomass Fired)
130: Grandfathered (Wet Mill, Coal Fired)
120: Grandfathered (Wet Mill, Natural Gas Fired)
Other
888: Grandfathered (other)
Non-ester Renewable Diesel
200: Hydrotreating, Dedicated Renewable Biomass
Facility
190: Hydrotreating, Co-processing Facility
Biogas
850: Biogas Production
Ethanol, Renewable Diesel, Heating oil, Jet Fuel, and/or
Naphtha
860: Eligible Renewable Fuels From Non-Cellulosic
Portions of Separated Food Wastes Process
99999999; Number. Indicate the volume of renewable
fuel expected to be produced or imported, or RIN
generation expected, in January of the next calendar year.
If VOL entered in line 9, indicate the volume of renewable
fuel expected to be produced or imported in gallons.
If RIN entered in line 9, indicate the RIN quantity expected
to be generated by the producer or importer.
Page 9
Renewable Fuel Standard (RFS2) Report Instructions
OMB Control No. 2060-0640
RFS2 Production Outlook Report
Report Form ID: RFS0900
Field
No.
Issued Date: 08/6/2010
Revised Date: 08/25/2010
Field Name
Units
17.
Next Calendar
February
Production/
Generation
(Current year+1)
Gallons or
RINs
18.
Next Calendar
March Production/
Generation
(Current year+1)
Gallons or fuel expected to be produced or imported, or RIN
RINs
generation expected, in March of the next calendar year.
Next Calendar
April Production/
Generation
(Current year+1)
Gallons or fuel expected to be produced or imported, or RIN
RINs
generation expected, in April of the next calendar year.
20.
Next Calendar May
Production/
Generation
(Current year+1)
Gallons or
RINs
21.
Next Calendar
June Production/
Generation
(Current year+1)
Gallons or fuel expected to be produced or imported, or RIN
RINs
generation expected, in June of the next calendar year.
19.
Field Formats, Codes, & Special Instructions
99999999; Number. Indicate the volume of renewable
fuel expected to be produced or imported, or RIN
generation expected, in February of the next calendar
year.
If VOL entered in line 9, indicate the volume of renewable
fuel expected to be produced or imported in gallons.
If RIN entered in line 9, indicate the RIN quantity expected
to be generated by the producer or importer.
99999999; Number. Indicate the volume of renewable
If VOL entered in line 9, indicate the volume of renewable
fuel expected to be produced or imported in gallons.
If RIN entered in line 9, indicate the RIN quantity expected
to be generated by the producer or importer.
99999999; Number. Indicate the volume of renewable
If VOL entered in line 9, indicate the volume of renewable
fuel expected to be produced or imported in gallons.
If RIN entered in line 9, indicate the RIN quantity expected
to be generated by the producer or importer.
99999999; Number. Indicate the volume of renewable
fuel expected to be produced or imported, or RIN
generation expected, in May of the next calendar year.
If VOL entered in line 9, indicate the volume of renewable
fuel expected to be produced or imported in gallons.
If RIN entered in line 9, indicate the RIN quantity expected
to be generated by the producer or importer.
99999999; Number. Indicate the volume of renewable
If VOL entered in line 9, indicate the volume of renewable
fuel expected to be produced or imported in gallons.
If RIN entered in line 9, indicate the RIN quantity expected
to be generated by the producer or importer.
Page
10
Renewable Fuel Standard (RFS2) Report Instructions
OMB Control No. 2060-0640
RFS2 Production Outlook Report
Report Form ID: RFS0900
Field
No.
22.
23.
24.
25.
26.
Issued Date: 08/6/2010
Revised Date: 08/25/2010
Field Name
Units
Field Formats, Codes, & Special Instructions
99999999; Number. Indicate the volume of renewable
fuel expected to be produced or imported, or RIN
generation expected, in July of the next calendar year.
If VOL entered in line 9, indicate the volume of renewable
fuel expected to be produced or imported in gallons.
If RIN entered in line 9, indicate the RIN quantity expected
to be generated by the producer or importer.
Next Calendar July
Production/
Generation
(Current year+1)
Gallons or
RINs
Next Calendar
August Production/
Generation
(Current year+1)
Gallons or fuel expected to be produced or imported, or RIN
RINs
generation expected, in August of the next calendar year.
Next Calendar
September
Production/
Generation
(Current year+1)
Gallons or fuel expected to be produced or imported, or RIN
RINs
generation expected, in September of the next calendar
Next Calendar
October
Production/
Generation
(Current year+1)
Gallons or fuel expected to be produced or imported, or RIN
RINs
generation expected, in October of the next calendar year.
Next Calendar
November
Production/
Generation
(Current year+1)
Gallons or fuel expected to be produced or imported, or RIN
RINs
generation expected, in November of the next calendar
99999999; Number. Indicate the volume of renewable
If VOL entered in line 9, indicate the volume of renewable
fuel expected to be produced or imported in gallons.
If RIN entered in line 9, indicate the RIN quantity expected
to be generated by the producer or importer.
99999999; Number. Indicate the volume of renewable
year.
If VOL entered in line 9, indicate the volume of renewable
fuel expected to be produced or imported in gallons.
If RIN entered in line 9, indicate the RIN quantity expected
to be generated by the producer or importer.
99999999; Number. Indicate the volume of renewable
If VOL entered in line 9, indicate the volume of renewable
fuel expected to be produced or imported in gallons.
If RIN entered in line 9, indicate the RIN quantity expected
to be generated by the producer or importer.
99999999; Number. Indicate the volume of renewable
year.
If VOL entered in line 9, indicate the volume of renewable
fuel expected to be produced or imported in gallons.
If RIN entered in line 9, indicate the RIN quantity expected
to be generated by the producer or importer.
Page
11
Renewable Fuel Standard (RFS2) Report Instructions
OMB Control No. 2060-0640
RFS2 Production Outlook Report
Report Form ID: RFS0900
Field
No.
Issued Date: 08/6/2010
Revised Date: 08/25/2010
Field Name
Units
Field Formats, Codes, & Special Instructions
99999999; Number. Indicate the volume of renewable
fuel expected to be produced or imported, or RIN
generation expected, in December of the next calendar
year.
If VOL entered in line 9, indicate the volume of renewable
fuel expected to be produced or imported in gallons.
If RIN entered in line 9, indicate the RIN quantity expected
to be generated by the producer or importer.
27.
Next Calendar
December
Production/
Generation
(Current year+1)
Gallons or
RINs
28.
Production/
Generation for the
Second Future
Calendar Year
(Current year+2)
Gallons or renewable fuel expected to be produced or imported, or
RINs
RIN generation expected.
99999999; Number. Indicate the additional volume of
If VOL entered in line 9, indicate the volume of renewable
fuel expected to be produced or imported for the second
future calendar year.
If RIN entered in line 9, indicate the RIN quantity expected
to be generated by the producer or importer for the
second future calendar year.
29.
Production/
Generation for the
Third Future
Calendar Year
(Current year+3)
99999999; Number. Indicate the additional volume of
Gallons or renewable fuel expected to be produced or imported, or
RINs
RIN generation expected.
If VOL entered in line 9, indicate the volume of renewable
fuel expected to be produced or imported for the third
future calendar year.
If RIN entered in line 9, indicate the RIN quantity expected
to be generated by the producer or importer for the third
future calendar year.
30.
Production/
Generation for the
Fourth Future
Calendar Year
(Current year+4)
99999999; Number. Indicate the additional volume of
Gallons or renewable fuel expected to be produced or imported, or
RINs
RIN generation expected.
If VOL entered in line 9, indicate the volume of renewable
fuel expected to be produced or imported for the fourth
future calendar year.
If RIN entered in line 9, indicate the RIN quantity expected
to be generated by the producer or importer for the fourth
future calendar year.
Page
12
Renewable Fuel Standard (RFS2) Report Instructions
OMB Control No. 2060-0640
RFS2 Production Outlook Report
Report Form ID: RFS0900
Field
No.
31.
Field Name
Units
Production/
Generation for the
Fifth Future
Calendar Year
(Current year+5)
Gallons or
RINs
Issued Date: 08/6/2010
Revised Date: 08/25/2010
Field Formats, Codes, & Special Instructions
99999999; Number. Indicate the additional volume of
renewable fuel expected to be produced or imported, or
RIN generation expected.
If VOL entered in line 9, indicate the volume of renewable
fuel expected to be produced or imported for the fifth
future calendar year.
If RIN entered in line 9, indicate the RIN quantity expected
to be generated by the producer or importer for the fifth
future calendar year.
32.
Planned
Expansion Date
MM/DD/YYYY; Date. Please enter the projected date of
any planned facility expansion in the next five (5) calendar
years. If an expansion is unknown or not yet planned,
enter “NA”. If “RIN” entered in line 9, enter “NA”.
33.
Strategic Planning
Date
MM/DD/YYYY; Date. Please enter in the projected date
of any current strategic planning for any planned new
construction or expansion in the next five (5) calendar
years. If a potential strategic planning date is unknown or
not yet planned, enter “NA”. If “RIN” entered in line 9,
enter “NA”.
Description: Strategic planning occurs once upper
management has determined that a regulation will affect a
facility—it is at this stage that upper management decides
on a response to the regulation that will position the
company most advantageously relative to its competitors.
Input may include order-of-magnitude estimates of what
compliance costs could be; or, how the bottom line may
be affected if the decision is made not to comply and to
instead shift product into other markets. Specific planning
begins once management determines that, strategically,
compliance will be necessary and will require the
expenditure of significant capital. The decision to hire an
outside engineering firm may be made at this time. The
length of time required for this stage varies by facility or
company, depending on size, complexity, and the number
of facilities. It is nearly impossible to precisely project how
much time a specific refinery may need to complete this
stage.
Page
13
Renewable Fuel Standard (RFS2) Report Instructions
OMB Control No. 2060-0640
RFS2 Production Outlook Report
Report Form ID: RFS0900
Field
No.
34.
Field Name
Planning/Front-end
engineering Date
Units
Issued Date: 08/6/2010
Revised Date: 08/25/2010
Field Formats, Codes, & Special Instructions
MM/DD/YYYY; Date. Please enter the projected date of
any planning and front-end engineering that has taken
place or will take place for any planned new construction
or expansion in the next five (5) calendar years. If
planning/front-end engineering is unknown or not yet
planned, enter “NA”. If “RIN” entered in line 9, enter “NA”.
Description: Accurate and complete information is
gathered during this stage so that preliminary process
engineering work can proceed; and initial contacts made
with technology vendors to find the best, least expensive
technology options. Detailed engineering cannot begin
until this stage is mostly complete. The length of time
required for this stage varies by facility.
35.
Detailed
Engineering/
Permitting Date
MM/DD/YYYY; Date. Please enter the projected date of
any detailed engineering and permitting that has taken
place or will take place for any planned new construction
or expansion in the next five (5) calendar years. If
detailed engineering/permitting is unknown or not yet
planned, enter “NA”. If “RIN” entered in line 9, enter “NA”.
Description: Detailed engineering usually overlaps with
the preceding and the following stages, and includes
construction planning and procuring contracts (since
actual construction cannot be started until construction
permits are issued).
36.
Procurement/
Construction Date
MM/DD/YYYY; Date. Please enter the projected date of
any procurement and construction that has taken place or
will take place for any planned new construction or
expansion in the next five (5) calendar years. If a
procurement/ construction date is unknown or not yet
planned, enter “NA”. If “RIN” entered in line 9, enter “NA”.
Description: This stage necessarily overlaps with the
preceding stage. Procurement includes purchasing longlead items necessary for construction of a new facility;
once permits are issued, construction can begin in
earnest.
Page
14
Renewable Fuel Standard (RFS2) Report Instructions
OMB Control No. 2060-0640
RFS2 Production Outlook Report
Report Form ID: RFS0900
Field
No.
37.
Field Name
Commissioning/
Start-up Date
Units
Issued Date: 08/6/2010
Revised Date: 08/25/2010
Field Formats, Codes, & Special Instructions
MM/DD/YYYY; Date. Please enter the projected date of
any commissioning and start-up that has taken place or
will take place for any planned expansion or new
construction in the next five (5) calendar years. If a
commissioning/start-up date is unknown or not yet
planned, enter “NA”. If “RIN” entered in line 9, enter “NA”.
Description: Depending on the complexity of the project,
commissioning and startup usually happen together. A
critical part of commissioning and startup is the
Occupational Safety and Health Administration’s (OSHA)
“Process Hazard Analysis”, a very complicated and time
consuming, multi-part procedure that must be completed
and signed-off on before startup can proceed. For this,
accurate, final construction and as-built drawings,
including complete piping and instrument diagrams, must
be completed.
38.
Capital
Commitments
AAAAAAA…; Character (1000 max). Please enter in a
short narrative of all capital commitments for any planned
expansion or new facility. If no additional information,
enter “NA”. If “RIN” entered in line 9, enter “NA”.
39.
Additional
Comments/
Description
AAAAAAA…; Character (1000 max). Please enter in any
additional comments or planned expansion or
construction description. If no additional comments, enter
“NA”. If “RIN” entered in line 9, enter “NA”.
Sample report line:
RFS0900,O,Y,03/21/2011,2011,1234,”Sample Company Inc”, 23456, RIN,20,NA,210#230,NA,180,4,1,
15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 180000,
180000,180000,180000,NA,NA,NA,NA,NA,NA, NA, NA
Page
15
Renewable Fuel Standard (RFS2) Report Instructions
OMB Control No. 2060-0640
RFS2 Production Outlook Report
Report Form ID: RFS0900
Issued Date: 08/6/2010
Revised Date: 08/25/2010
Paperwork Reduction Act Statement
The public reporting and recordkeeping burden for this collection of information is disclosed in the
estimates of the individual report form instructions. Burden means the total time, effort, or financial
resources expended by persons to generate, maintain, retain, or disclose or provide information to or for
a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and
utilize technology and systems for the purposes of collecting, validating, and verifying information,
processing and maintaining information, and disclosing and providing information; adjust the existing
ways to comply with any previously applicable instructions and requirements; train personnel to be able to
respond to a collection of information; search data sources; complete and review the collection of
information; and transmit or otherwise disclose the information. An agency may not conduct or sponsor,
and a person is not required to respond to, a collection of information unless it displays a currently valid
OMB control number.
Send comments on the Agency's need for this information, the accuracy of the provided burden
estimates, and any suggested methods for minimizing respondent burden, including through the use of
automated collection techniques to the Director, Collection Strategies Division, U.S. Environmental
Protection Agency (2822), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB
control number in any correspondence. Do not send the completed form to this address.
Page
16
File Type | application/pdf |
File Title | RFS2 Production Outlook Report (Report Form ID RFS0900) -- Instructions (August 2010) |
Subject | renewable fuel standards, producer, rfs2, rfs1, rin, production, outlook.report, transactions, emts, rfs0900 |
Author | U.S. EPA |
File Modified | 2010-08-27 |
File Created | 2010-05-20 |