Document
DOCD Air Quality Screening Checklist
ICR 201108-1010-003 · OMB 1010-0151 · Object 26960401.
This document may belong to an older filing. More recent activity for OMB 1010-0151:
Document Viewer [xls]
Document Metadata
| File Type | application/vnd.ms-excel |
|---|---|
| File Title | DOCD Air Quality Screening Checklist |
| Last Modified By | Calc |
| File Modified | 2011-08-24 |
| File Created | 2026-10-04 |
| Conversion State | complete |
Extracted Text
DOCD AIR QUALITY SCREENING CHECKLIST COMPANY AREA BLOCK LEASE PLATFORM WELL COMPANY CONTACT TELEPHONE NO. REMARKS LEASE TERM PIPELINE CONSTRUCTION INFORMATION: YEAR NUMBER OF TOTAL NUMBER OF CONSTRUCTION DAYS PIPELINES 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 BOEMRE FORM 0139 (Mo/Year- Supersedes all previous versions of this form which may not be used). Page 1 of 8 OMB Control No. 1010-0151 OMB Approval Expires: Mo/Dy/Year AIR EMISSIONS CUMPUTATION FACTORS Fuel Usage Conversion Factors Equipment/Emission Factors Natural Gas Turbines SCF/hp-hr 9.524 units PM Natural Gas Engines SCF/hp-hr 7.143 Diesel Recip. Engine GAL/hp-hr 0.0483 NOx VOC CO REF. DATE 0.00247 0.00185 0.00185 0.00185 1.3 10.9 11.8 10 0.01 0.43 0.72 0.14 0.83 1.5 1.6 8.6 AP42 3.2-1& 3.1-1 10/96 AP42 3.2-1 10/96 AP42 3.2-1 10/96 AP42 3.2-1 10/96 AP42 3.3-1 10/96 AP42 3.4-1 10/96 AP42 1.3-12,14 9/98 AP42 1.4-1, 14-2, & 14-3 7/98 gms/hp-hr gms/hp-hr gms/hp-hr gms/hp-hr Diesel Recip. < 600 hp. Diesel Recip. > 600 hp. Diesel Boiler gms/hp-hr gms/hp-hr lbs/bbl 1 0.32 0.084 1.468 1.468 2.42 14 11 0.84 1.12 0.33 0.008 3.03 2.4 0.21 NG Heaters/Boilers/Burners NG Flares Liquid Flaring Tank Vapors Fugitives Glycol Dehydrator Vent Gas Venting lbs/mmscf lbs/mmscf lbs/bbl lbs/bbl lbs/hr/comp. lbs/mmscf lbs/scf 7.6 0.593 0.593 6.83 100 71.4 2 5.5 60.3 0.01 0.03 0.0005 6.6 0.0034 84 388.5 0.21 Sulphur Content Source Fuel Gas Diesel Fuel Produced Gas( Flares) Produced Oil (Liquid Flaring) Value 3.33 0.4 3.33 1 DATE 4/76 & 8/84 SOx NG Turbines NG 2-cycle lean NG 4-cycle lean NG 4-cycle rich 0.42 REF. AP42 3.2-1 Units ppm % weight ppm % weight BOEMRE FORM 0139 (Mo/Year - Supersedes all previous versions of this form which may not be used). Page 2 of 8 AP42 11.5-1 9/91 AP42 1.3-1 & 1.3-3 9/98 E&P Forum 1/93 API Study 12/93 La. DEQ 1991 AIR EMISSIONS CALCULATIONS - FIRST YEAR COMPANY AREA BLOCK LEASE PLATFORM WELL CONTACT PHONE REMARKS #REF! OPERATIONS DRILLING EQUIPMENT Diesel Engines Nat. Gas Engines Burners PRIME MOVER>600hp diesel PRIME MOVER>600hp diesel PRIME MOVER>600hp diesel PRIME MOVER>600hp diesel BURNER diesel AUXILIARY EQUIP<600hp diesel VESSELS>600hp diesel(crew) VESSELS>600hp diesel(supply) VESSELS>600hp diesel(tugs) RATING MAX. FUEL ACT. FUEL HP GAL/HR GAL/D HP SCF/HR SCF/D MMBTU/HR SCF/HR SCF/D 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 RUN TIME MAXIMUM POUNDS PER HOUR ESTIMATED TONS HR/D 0 0 0 0 0 0 0 0 0 DAYS 0 0 0 0 0 0 0 0 0 PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VOC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VOC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PIPELINE INSTALLATION PIPELINE LAY BARGE diesel SUPPORT VESSEL diesel PIPELINE BURY BARGE diesel SUPPORT VESSEL diesel VESSELS>600hp diesel(crew) VESSELS>600hp diesel(supply) 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 FACILITY INSTALLATION DERRICK BARGE diesel MATERIAL TUG diesel VESSELS>600hp diesel(crew) VESSELS>600hp diesel(supply) 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PRODUCTION RECIP.<600hp diesel RECIP.>600hp diesel SUPPORT VESSEL diesel TURBINE nat gas RECIP.2 cycle lean nat gas RECIP.4 cycle lean nat gas RECIP.4 cycle rich nat gas BURNER nat gas MISC. TANKFLAREPROCESS VENTFUGITIVESGLYCOL STILL VENTOIL BURN GAS FLARE 0 0 0 0 0 0 0 0 BPD 0 0 0 0 0 0 0 0 0.00 SCF/HR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 COUNT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DRILLING WELL TEST 0 0 0.0 0 0 0 0 0 0 1999 YEAR TOTAL EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES 0.0 BOEMRE FORM 0139 (Mo/Year - Supersedes all previous versions of this form which may not be used). Page 3 of 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 AIR EMISSIONS CALCULATIONS - SECOND YEAR COMPANY AREA BLOCK LEASE PLATFORM WELL CONTACT PHONE REMARKS #REF! OPERATIONS DRILLING EQUIPMENT Diesel Engines Nat. Gas Engines Burners PRIME MOVER>600hp diesel PRIME MOVER>600hp diesel PRIME MOVER>600hp diesel PRIME MOVER>600hp diesel BURNER diesel AUXILIARY EQUIP<600hp diesel VESSELS>600hp diesel(crew) VESSELS>600hp diesel(supply) VESSELS>600hp diesel(tugs) RATING MAX. FUEL ACT. FUEL HP GAL/HR GAL/D HP SCF/HR SCF/D MMBTU/HR SCF/HR SCF/D 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 RUN TIME MAXIMUM POUNDS PER HOUR ESTIMATED TONS HR/D 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 DAYS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VOC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VOC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PIPELINE INSTALLATION PIPELINE LAY BARGE diesel SUPPORT VESSEL diesel PIPELINE BURY BARGE diesel SUPPORT VESSEL diesel VESSELS>600hp diesel(crew) VESSELS>600hp diesel(supply) 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0.00 0.00 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 FACILITY INSTALLATION DERRICK BARGE diesel MATERIAL TUG diesel VESSELS>600hp diesel(crew) VESSELS>600hp diesel(supply) 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PRODUCTION RECIP.<600hp diesel RECIP.>600hp diesel SUPPORT VESSEL diesel TURBINE nat gas RECIP.2 cycle lean nat gas RECIP.4 cycle lean nat gas RECIP.4 cycle rich nat gas BURNER nat gas MISC. TANKFLAREPROCESS VENTFUGITIVESGLYCOL STILL VENTOIL BURN GAS FLARE 0 0 0 0 0 0 0 0 BPD 0 0 0 0 0 0 0 0 0.00 SCF/HR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 COUNT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DRILLING WELL TEST 0 0 0.0 0 0 0 0 0 0 2000 YEAR TOTAL EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES 0.0 BOEMRE FORM 0139 (Mo/Year - Supersedes all previous versions of this form which may not be used). Page 4 of 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 AIR EMISSIONS CALCULATIONS - THIRD YEAR COMPANY AREA BLOCK LEASE PLATFORM WELL CONTACT PHONE REMARKS #REF! OPERATIONS DRILLING EQUIPMENT Diesel Engines Nat. Gas Engines Burners PRIME MOVER>600hp diesel PRIME MOVER>600hp diesel PRIME MOVER>600hp diesel PRIME MOVER>600hp diesel BURNER diesel AUXILIARY EQUIP<600hp diesel VESSELS>600hp diesel(crew) VESSELS>600hp diesel(supply) VESSELS>600hp diesel(tugs) RATING MAX. FUEL ACT. FUEL HP GAL/HR GAL/D HP SCF/HR SCF/D MMBTU/HR SCF/HR SCF/D 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 RUN TIME MAXIMUM POUNDS PER HOUR ESTIMATED TONS HR/D 0 0 0 0 0 0 0 0 0 DAYS 0 0 0 0 0 0 0 0 0 PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VOC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VOC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PIPELINE INSTALLATION PIPELINE LAY BARGE diesel SUPPORT VESSEL diesel PIPELINE BURY BARGE diesel SUPPORT VESSEL diesel VESSELS>600hp diesel(crew) VESSELS>600hp diesel(supply) 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 FACILITY INSTALLATION DERRICK BARGE diesel MATERIAL TUG diesel VESSELS>600hp diesel(crew) VESSELS>600hp diesel(supply) 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PRODUCTION RECIP.<600hp diesel RECIP.>600hp diesel SUPPORT VESSEL diesel TURBINE nat gas RECIP.2 cycle lean nat gas RECIP.4 cycle lean nat gas RECIP.4 cycle rich nat gas BURNER nat gas MISC. TANKFLAREPROCESS VENTFUGITIVESGLYCOL STILL VENTOIL BURN GAS FLARE 0 0 0 0 0 0 0 0 BPD 0 0 0 0 0 0 0 0 0.00 SCF/HR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 COUNT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DRILLING WELL TEST 0 0 0.0 0 0 0 0 0 0 2001 YEAR TOTAL EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES 0.0 BOEMRE FORM 0139 (Mo/Year - Supersedes all previous versions of this form which may not be used). Page 5 of 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 AIR EMISSIONS CALCULATIONS - FOURTH YEAR COMPANY AREA BLOCK LEASE PLATFORM WELL CONTACT PHONE REMARKS #REF! OPERATIONS DRILLING EQUIPMENT Diesel Engines Nat. Gas Engines Burners PRIME MOVER>600hp diesel PRIME MOVER>600hp diesel PRIME MOVER>600hp diesel PRIME MOVER>600hp diesel BURNER diesel AUXILIARY EQUIP<600hp diesel VESSELS>600hp diesel(crew) VESSELS>600hp diesel(supply) VESSELS>600hp diesel(tugs) RATING MAX. FUEL ACT. FUEL HP GAL/HR GAL/D HP SCF/HR SCF/D MMBTU/HR SCF/HR SCF/D 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 RUN TIME MAXIMUM POUNDS PER HOUR ESTIMATED TONS HR/D 0 0 0 0 0 0 0 0 0 DAYS 0 0 0 0 0 0 0 0 0 PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VOC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VOC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PIPELINE INSTALLATION PIPELINE LAY BARGE diesel SUPPORT VESSEL diesel PIPELINE BURY BARGE diesel SUPPORT VESSEL diesel VESSELS>600hp diesel(crew) VESSELS>600hp diesel(supply) 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 FACILITY INSTALLATION DERRICK BARGE diesel MATERIAL TUG diesel VESSELS>600hp diesel(crew) VESSELS>600hp diesel(supply) 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PRODUCTION RECIP.<600hp diesel RECIP.>600hp diesel SUPPORT VESSEL diesel TURBINE nat gas RECIP.2 cycle lean nat gas RECIP.4 cycle lean nat gas RECIP.4 cycle rich nat gas BURNER nat gas MISC. TANKFLAREPROCESS VENTFUGITIVESGLYCOL STILL VENTOIL BURN GAS FLARE 0 0 0 0 0 0 0 0 BPD 0 0 0 0 0 0 0 0 0.00 SCF/HR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 COUNT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DRILLING WELL TEST 0 0 0.0 0 0 0 0 0 0 2002 YEAR TOTAL EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES 0.0 BOEMRE FORM 0139 (Mo/Year - Supersedes all previous versions of this form which may not be used). Page 6 of 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 AIR EMISSIONS CALCULATIONS - FIFTH YEAR COMPANY AREA BLOCK LEASE PLATFORM WELL CONTACT PHONE REMARKS #REF! OPERATIONS DRILLING EQUIPMENT Diesel Engines Nat. Gas Engines Burners PRIME MOVER>600hp diesel PRIME MOVER>600hp diesel PRIME MOVER>600hp diesel PRIME MOVER>600hp diesel BURNER diesel AUXILIARY EQUIP<600hp diesel VESSELS>600hp diesel(crew) VESSELS>600hp diesel(supply) VESSELS>600hp diesel(tugs) RATING MAX. FUEL ACT. FUEL HP GAL/HR GAL/D HP SCF/HR SCF/D MMBTU/HR SCF/HR SCF/D 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 RUN TIME MAXIMUM POUNDS PER HOUR ESTIMATED TONS HR/D 0 0 0 0 0 0 0 0 0 DAYS 0 0 0 0 0 0 0 0 0 PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VOC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VOC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PIPELINE INSTALLATION PIPELINE LAY BARGE diesel SUPPORT VESSEL diesel PIPELINE BURY BARGE diesel SUPPORT VESSEL diesel VESSELS>600hp diesel(crew) VESSELS>600hp diesel(supply) 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 FACILITY INSTALLATION DERRICK BARGE diesel MATERIAL TUG diesel VESSELS>600hp diesel(crew) VESSELS>600hp diesel(supply) 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PRODUCTION RECIP.<600hp diesel RECIP.>600hp diesel SUPPORT VESSEL diesel TURBINE nat gas RECIP.2 cycle lean nat gas RECIP.4 cycle lean nat gas RECIP.4 cycle rich nat gas BURNER nat gas MISC. TANKFLAREPROCESS VENTFUGITIVESGLYCOL STILL VENTOIL BURN GAS FLARE 0 0 0 0 0 0 0 0 BPD 0 0 0 0 0 0 0 0 0.00 SCF/HR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 COUNT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DRILLING WELL TEST 0 0 0.0 0 0 0 0 0 0 2003 YEAR TOTAL EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES 0.0 BOEMRE FORM 0139 (Mo/Year - Supersedes all previous versions of this form which may not be used). Page 7 of 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 AIR EMISSIONS CALCULATIONS COMPANY AREA BLOCK LEASE PLATFORM Emitted WELL Substance Year 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 Allowable PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VOC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 BOEMRE FORM 0139 (Mo/Year - Supersedes all previous versions of this form which may not be used). CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Page 8 of 8