NESHAP for Metal Coil Surface Coating Plants (40 CFR Part 63, Subpart SSSS (Renewal)

ICR 201201-2060-007

OMB: 2060-0487

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2012-01-11
IC Document Collections
ICR Details
2060-0487 201201-2060-007
Historical Active 200806-2060-007
EPA/OAR 1957.06
NESHAP for Metal Coil Surface Coating Plants (40 CFR Part 63, Subpart SSSS (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 04/04/2012
Retrieve Notice of Action (NOA) 01/20/2012
  Inventory as of this Action Requested Previously Approved
04/30/2015 36 Months From Approved 04/30/2012
167 0 167
19,901 0 19,901
3,648 0 3,648

Owners or operators must submit notification reports upon construction or reconstruction of any metal coil surface coating plant. Semiannual reports for periods of operation during which the emission limitation has exceeded, or reports certifying that no exceedances have occurred, also are required. Owners and operators must submit notification reports upon the construction, reconstruction, or modification of any metal coil surface coating plant. Also, required is a one-time-only initial notification for new and reconstructed sources. Owners or operators of metal coil surface coating plants subject to the rule must maintain a file of these measurements, and retain the file for at least five years following the date of such measurements, maintenance reports, and records. All reports are sent to the delegated state or local authority. In the event that there is no such delegated authority, the reports are sent directly to the EPA regional office. This information is being collected to assure compliance with 40 CFR part 63, subpart SSSS, as authorized in section 112 and 114(a) of the Clean Air Act. The required information consists of emissions data and other information that have been determined to be private. An Agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB Control Number. The OMB Control Number for EPA's regulations listed in 40 CFR part 9 and 48 CFR chapter 15, are identified on the form and/or instrument, if applicable.

None
None

Not associated with rulemaking

  76 FR 26900 05/09/2011
77 FR 2976 01/20/2012
No

1
IC Title Form No. Form Name
NESHAP for Metal Coil Surface Coating Plants (40 CFR Part 63, Subpart SSSS)(Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 167 167 0 0 0 0
Annual Time Burden (Hours) 19,901 19,901 0 0 0 0
Annual Cost Burden (Dollars) 3,648 3,648 0 0 0 0
No
No

$22,056
No
No
No
No
No
Uncollected
Learia Williams 202 564-4113 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
01/20/2012


© 2024 OMB.report | Privacy Policy