In order to prevent occupational
injuries resulting from falls of roofs, faces, and ribs, which are
a leading cause of injuries and death in underground coal mines,
all underground coal mine operators are required to develop and
submit roof control plans to MSHA for evaluation and approval.
These plans are evaluated to determine if they are adequate for
prevailing mining conditions.
Respondents: The number of
underground coal mines requiring roof control plans decreased 64
from 613 to 549. Responses: The number of new roof control plans
increased from 296 to 382; the number of plan revisions increased
from 1,108 to 1,255; and the number of unplanned roof falls and
coal or rock bursts decreased from 2,112 to 1,514. This is an
overall reduction in the number of responses of 598 (3,516
3,151). Burden Hours: The total number of burden hours increased
2,751 hours from 12,813 hours to 15,564 hours. Most of the increase
in hours was a result of more new roof control plans being
developed; these require a greater number of hours to complete than
revisions to existing plans. Burden Costs: Costs for this
submission increased by $1,165 from the 2009 estimate ($7,020 to
$8,185) due to an increase in the number of plans submitted.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.