EIA-923 Power Plant Operations Report

Electricity Data Program

923 Form for 2013 Oct 23

Electric Power Surveys

OMB: 1905-0129

Document [docx]
Download: docx | pdf



Form EIA-923

POWER PLANT

OPERATIONS REPORT

Year: 2013

Form Approval: OMB No. 1905-0129

Approval Expires: 10/31/2013

Burden: 2.7 Hours

N


OTICE: This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law. For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions. Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction.

SCHEDULE 1. IDENTIFICATION

S


urvey Contact

First Name: ______________________________________ Last Name: ____________________________________

Title: ___________________________________________

Telephone (include extension): _______________________ Fax: __________________________________________

Email: __________________________________________

Address: ________________________________________ City: __________________________________________

State: ___________________________________________ Zip: ___________________________________________


Supervisor of Contact Person for Survey

First Name: ______________________________________ Last Name: ____________________________________

Title: ___________________________________________

Telephone (include extension): _______________________ Fax: __________________________________________

Email: __________________________________________

Address: ________________________________________ City: __________________________________________

State: ___________________________________________ Zip: ___________________________________________



Report For

Company Name: ___________________________________________

Plant Name: _______________________________________________ Regulated Yes No

Plant ID: ___________ Plant County: ___________________________ CHP Yes No

AShape1 ddress: __________________________________________________ CHP Efficiency %

City: ___________________________ State: __________________ Zip Code: ____________

Reporting Month/Year: _______________________________________



Contacts

For questions related to E-filing: [email protected], 202-586-9595

For questions about the data requested on this form, contact one of the survey managers below, preferably by email at [email protected].

Schedules 1 and 4: Chris Cassar, 202-586-5448

Schedule 2: Rebecca Peterson, 202-586-4509

Schedules 3 and 5: Ron Hankey, 202-586-2630

Schedules 6, 7, and 8: Channele Wirman, 202-586-5356

EIA-923 Fax:  202-287-1938




SCHEDULE 2. PAGE 1.  COST AND QUALITY OF FUEL PURCHASES – PLANT LEVEL
CONTRACT INFORMATION, RECEIPTS, AND COSTS

For coal-fueled plants 50 megawatts and above; and for plants fueled by natural gas, petroleum coke, distillate fuel oil, and residual fuel oil 200 megawatts and above.


No Receipts (If applicable, please check.)

Is there a fuel tolling agreement in place for this plant? (If applicable, please check.)


Contract Information

Receipts

Cost per Unit

Cost per Unit

Fuel Supplier Name




Contract Type

Contract
Expiration Date




Energy Source

Quantity
Purchased

(solids in tons, liquids in barrels, gases in Mcf)

Total Delivered Cost

(cents per MMBtu, to the nearest
0.1)

Commodity Cost (Coal, Natural Gas) (cents per MMBtu,
to the nearest
0.1)


 

 

 

 





 

 

 

 

 

 

 


 

 

 

 

 

 

 


 

 

 

 

 

 

 


 

 

 

 

 

 

 


 

 

 

 

 

 

 


 

 

 

 

 

 

 


 

 

 

 

 

 

 


 

 

 

 

 

 

 


 

 

 

 

 

 

 


 

 

 

 

 

 

 




SCHEDULE 2. PAGE 2.  COST AND QUALITY OF FUEL PURCHASES – PLANT LEVEL

QUALITY OF FUEL AND TRANSPORTATION

For coal-fueled plants 50 megawatts and above; and for plants fueled by natural gas, petroleum coke, distillate fuel oil, and residual fuel oil 200 megawatts and above.




Purchases


Quality of Fuel as Received

Fuel Transportation

Carried Forward from Schedule 2. Page 1.

All Fuels

Coal, Pet Coke, and RFO

Coal and Pet Coke

Coal Only

Natural Gas

Coal, Pet Coke,
and Oil

Fuel Supplier Name


Contract Type


Energy

Source


Quantity
Purchased


Heat
Content

(MMBtus to nearest 0.001)

Sulfur
Content

(percent weight to nearest 0.01)

Ash
Content

(percent weight to nearest 0.1)

Mercury Content

(ppm to nearest 0.001 or enter 9 if not available)

Firm or Interruptible

Predominant Mode

(Mode used to transport fuel over the longest distance)

Secondary Mode

(Mode used to transport fuel over the second-longest distance)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 












 

 

 

 

 

 

 

 

 

 

 

50

4

8

3

13

6

6

6

1

2

2




SCHEDULE 2. PAGE 3.  COST AND QUALITY OF FUEL PURCHASES – PLANT LEVEL

COAL MINE INFORMATION

For coal-fueled plants 50 megawatts and above; and for plants fueled by natural gas, petroleum coke, distillate fuel oil, and residual fuel oil 200 megawatts and above.





Purchases Information


Coal Mine Information

Carried Forward from Schedule 2. Page 1.

Coal Mine State

Coal Mine MSHA ID

Coal
Mine
Type

Coal
Mine
Name

Coal Mine County

(for imported coal, enter IMP)

Fuel Supplier Name

Contract Type

Energy Source

Quantity Purchased

 

 

 

 


 

 



 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

50

4

8

3

8

40

3

2

5




SCHEDULE 3. PART A.  BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED

PLANTS — FUEL CONSUMPTION



This schedule must be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers or, for HRSGs, in duct burners. If no fuel is consumed for the HRSG at combined-cycle plants, report zero. Do not leave blank. Report consumption in combustion turbines or IC engines on SCHEDULE 3. PART B.

For those plants that report annually, Schedules 3A and 5A must be reported for each month.

If this does not apply, go to SCHEDULE 3. PART B.

Complete a separate row for each Boiler ID.

Did any boiler produce steam for purposes other than electric power generation during this reporting period?
(If applicable, please check.)




Prime Mover Code



Boiler ID



Boiler Status

Energy Source

(See Table 8 on pages
22 through
23 in the
Instructions.)

Quantity
Consumed

(Enter zero when a fuel has no consumption for this
reporting period)

Type of Physical Units

(tons, barrels, or Mcf)

Average Heat Content

(as burned, to nearest 0.001 MMBtu per ton, barrel, or Mcf)

Sulfur Content

(coal, pet coke, RFO, and WO, to nearest 0.01%)

Ash Content

(coal and PC only, to nearest 0.1%)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


If you reported the category of OTH, OBS, OBG, OBL, or OG in the Energy Source column, please identify the category and specific fuel name below. For example, “The OBG gas is methane.”

_ ___________________________________________________________________________________.





SCHEDULE 3. PART B.  FUEL CONSUMPTION – PRIME MOVER LEVEL



Report fuel consumed by plants with organic-fueled steam and combined-cycle steam capacity under 10 MW, and all combustion turbines, IC engines, fuel cells, pumped storage hydroelectric units and compressed air units.  Aggregate quantity consumed for prime movers of a single type. In other words, all natural gas consumed by all combustion gas turbines should be reported as one number. Report pumping energy in megawatthours for pumped-storage plants and compressed air units.

 Complete a separate row for each Prime Mover Type. (See Table 7 of the instructions.).

Was steam produced for purposes other than electric power generation during this reporting period?
(If applicable, please check.)

Prime Mover Code

Energy Source

(See Table 8 in the instructions.)

Quantity Consumed (Enter zero when a fuel has no consumption for this reporting period.)

Type of Physical Units

(tons, barrels, or Mcf)

Average Heat Content

(MMBtu per ton, barrel, or Mcf)























If Energy Source is OTH, OBS, OBG, OBL, or OG, please specify_________________________________________________

__________________________________________________________________________________________________







S


CHEDULE 4.  FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND DATA BALANCE

For Coal, Oil, and Natural Gas Plants

Report stocks for the following fuels:

Coal (tons)

Residual oil (No. 5 and No. 6 fuel oils) (barrels)

Distillate-type oils (including diesel oil, No. 2 oil, jet fuel and kerosene) (barrels)

Petroleum coke (tons)

Include back-up fuels.

Include start-up and flame-stabilization fuels.

Do not report stocks for waste coal, natural gas, or wood waste. Do enter a comment if the natural gas balance does not equal zero.

Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site. Each central storage site must be reported separately. New sites should be indicated in the Comment Section, located in SCHEDULE 9 of this form.

Enter zero if the plant has no stocks. Do not leave blank.

Enter adjustments to stocks. An adjustment can be positive or negative. See instructions for additional information. Provide a
comment to explain adjustments in the adjustments grid.

Enter a comment if the balance does not equal zero in the balance grid.

Energy Source (See Table 8 in the Instructions.)

Type of Physical Units

(tons, barrels, or Mcf)

Previous Month’s Ending Stocks

(1)

Current Month’s Receipts (2)

Current Month’s Consumption

(3)

Ending Stocks (4)

Adjustment to Stocks* (5)

Balance** (6) 4=(1+2-3+5)

















*Explain any adjustments below.

Adjustment

(from Column 5 above)

Energy Source

Explanation







**Previous Month’s Stocks plus Receipts minus Consumption plus (or minus) Adjustment should equal Ending Stocks. The balance will appear in column (6). If the balance is not zero, provide an explanation below.  

Balance

(from Column 6 above)

Energy Source

Explanation







S



CHEDULE 5. PART A.  GENERATOR INFORMATION FOR STEAM-ELECTRIC

ORGANIC-FUELED PLANTS


This schedule must be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above. Report generation for all other types of prime movers (combustion turbines, IC engines, wind, or hydro-electric turbines, and compressed air units.), and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear, solar, geothermal, or other energy sources on SCHEDULE 5. PARTS B or C. Generation reported on SCHEDULE 5, Part A corresponds to the fuel consumption reported on SCHEDULE 3. Part A.

Industrial or Commercial Sector plants may report gross generation ONLY if net generation is not measured (see instructions for
definition of net generation).

Complete a separate row for each Generator ID. See Generator ID information in the instructions for Schedule 5. Part A.

Prime Mover Code

Generator ID

Generator Status

Gross Generation

(MWh)

Net Generation

(MWh)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 






 

 

 

 

 

 

 

 

 

 





S



CHEDULE 5. PART B. PRIME MOVER LEVEL GENERATION



This schedule must be completed ONLY by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts, by combined-cycle plants whose steam portion of the operation is under 10 MW, and all IC engines, fuel cells, combustion turbines, pumped-storage hydroelectric turbines, and compressed air units. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3. Part B.

In the applicable Gross Generation or Net Generation cell, enter the aggregate generation for prime movers of a single type. For example, enter the total generation from all combustion turbines. Industrial or Commercial Sector plants may report gross generation ONLY if net generation is not measured (see instructions for definition of net generation).

Complete a separate row for each Prime Mover Type. (See Table 7 of the instructions.)

Prime Mover Code

Gross Generation

(MWh)

Net Generation

(MWh)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 












S


CHEDULE 5. PART C.  GENERATION FROM NUCLEAR AND OTHER NONCOMBUSTIBLE ENERGY SOURCES


This schedule must be completed by all nuclear plants and by all wind, solar, geothermal, hydroelectric, or other plants where the energy source is noncombustible, such as purchased steam or waste heat. No fuel consumption is required for these types of plants. Report generation by energy source for nuclear, wind, solar, geothermal, conventional hydroelectric and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant. All combined-cycle generation is reported on SCHEDULE 5. PART A or B. Report nuclear data by generating unit.

In the applicable Gross Generation or Net Generation cell, enter the aggregate generation for prime movers of a single type. For example, enter the total generation from all combustion turbines. Industrial or Commercial Sector plants may report gross generation only if net generation is not measured (see instructions for definition of net generation).

Complete a separate row for each Prime Mover Type. (See Table 7 of the instructions.)

Prime Mover Code

Energy Source

Unit Code (nuclear)

Gross Generation

(MWh)

Net Generation

(MWh)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 










SCHEDULE 6.  NONUTILITY ANNUAL SOURCE AND DISPOSITION OF ELECTRICITY


SCHEDULE 6 collects calendar year data (no monthly detail).


Report all generation in megawatthours (MWh) rounded to a whole number.

Source of Electricity

Disposition of Electricity

(1) Gross Generation (Annual)

 

(4) Station Use

 

(2) Other Incoming Electricity

 

(5) Direct Use (Industrial and Commercial Sector Plants, both CHP and non-CHP)

 

 

 

(6) Total Facility Use (4 + 5)

 

(7) Retail Sales to Ultimate Customers

 

(8) Sales for Resale

 

(9) Other Outgoing Electricity

 

(3) Total Sources (1 + 2)

 

(10) Total Disposition (6 + 7 + 8 + 9)

 

Total Sources must equal Total Disposition (3 = 10)

















S



CHEDULE 7.  ANNUAL REVENUES FROM SALES FOR RESALE


SCHEDULE 7 must be completed by respondents who entered a positive amount on SCHEDULE 6, Disposition of Electricity, Item 8, Sales for Resale.


Sales for Resale is energy supplied to other electric utilities, cooperatives, municipalities, Federal and State electric agencies, power marketers, or other entities for resale to end-use consumers.

Annual Revenues from Sales for Resale (in thousand dollars): ____________________






































SCHEDULE 8. ANNUAL ENVIRONMENTAL INFORMATION

SCHEDULE 8. PARTS A through F are filed annually by thermoelectric power plants (organic fueled, nuclear, and combined-cycle) with a total steam turbine capacity of 10 megawatts and above.   Plants with a total steam turbine capacity of 10 megawatts to less than 100 MW file only Parts C, E, and F.   


SCHEDULE 8. PART A.  ANNUAL BYPRODUCT DISPOSITION



E


nter the quantity of combustion byproducts for the year by type of disposal (to nearest 0.1 thousand tons). Report sales of steam in million Btu (MMBtu). If actual data are not available, provide an estimated value.


NO BYPRODUCTS


Byproduct

Disposal

Sale or Beneficial Use

Storage

Total

On-Site

Landfill

On-Site

Ponds

Disposal

Off-site

Sold

Used

On-site

Used

Off-site

Stored On-site

Stored Off-site


Fly ash from standard boiler/PCD units










Fly ash from units with dry FGD










Fly ash from FBC units










Bottom ash from standard boiler units










Bottom (bed) ash from FBC units










FGD Gypsum










Other FGD byproducts










Ash from coal gasification (IGCC) units










Other (specify via footnote on SCHEDULE 9)










Steam Sales (MMBtu)















SCHEDULE 8. PART B.  FINANCIAL INFORMATION RELATED TO COMBUSTION BYPRODUCTS

If actual data are not available, provide an estimated value.

Operation and Maintenance (O&M) Expenditures During Year (Thousand Dollars)

Type

(1)

Fly Ash

(2)

Bottom Ash

(3)

Flue Gas
Desulfurization

(4)

Water Pollution Abatement

(5)

Other Pollution Abatement

(6)

Total

(1 + 2 + 3 + 4 + 5)

Collection

 

 

 

 

 

 

Disposal

 

 

 

 

 

 

Other

 

 

 

 

 

 

Capital Expenditures for New Structures and Equipment During Year, Excluding Land and Interest Expense
(Thousand Dollars)

Type

(7)

Air Pollution Abatement

(8)

Water Pollution
Abatement

(9)

Solid/Contained Waste

(10)

Other Pollution Abatement

Amount

 

 

 

 

Byproduct Sales Revenue During Year
(Thousand Dollars)

Type

(11)

Fly Ash

(12)

Bottom Ash

(13)

Fly and Bottom Ash Sold
Intermingled

(14)

Flue Gas Desulfurization Byproducts

(15)

Other Byproduct Revenue

(16)

Total

(11+12+13+14+15)

Amount

 

 

 

 

 

 







S



CHEDULE 8. PART C.  BOILER INFORMATION NITROGEN OXIDE EMISSION CONTROLS


Complete a separate row for each boiler. 

Note: The Boiler ID must match the Boiler ID as reported on Form EIA-860, "Annual Electric Generator Report."

No NOx Controls

Boiler ID

NOx Control In-Service (hours)

NOx Emission Rate (lbs/MMBtu)

Entire Year

May through September

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 







Form EIA-923

POWER PLANT OPERATIONS REPORT

Year: 2013

Form Approved: OMB No. 1905-0129
Approval Expires: 10/31/2013
Burden: 2.7 hrs

Plant Name: _____________________________________________________________________________________________________________________

Plant ID: ________________________________________


State: __________________________

Reporting Year: _______________________


SCHEDULE 8. PART D.  MONTHLY COOLING SYSTEM INFORMATION


Reporting Month:__________________


Note: All steam-electric plants of 100 MW nameplate capacity or greater, including combined-cycle plants and nuclear power plants, must respond to this schedule. Cooling System ID must match the ID as reported on Form EIA-860, "Annual Electric Generator Report.” Complete a separate page for each month. Complete a separate row for each cooling system.

Cooling System ID or Plant

Cooling System Status

Monthly Amount of Chlorine Added to Cooling Water (1000 lbs to nearest 0.001)

Hours in Service

Average Monthly Rate of Cooling Water
(in cubic feet per second, to the nearest 0.1 ft
3)

Cooling Water Temperature

(degrees Fahrenheit)


Diversion

Withdrawal

Discharge

Consumption

Measured or Estimated?


Average Monthly Temperature at Intake


Maximum Temperature for the Month at Intake


Average Monthly Temperature at Discharge


Maximum Temperature for the Month at Discharge

Measured or Estimated?


 

 


 

 

 



 

 

 


 


 

 


 

 

 



 

 

 


 


 

 


 

 

 



 

 

 


 


 

 


 

 

 



 

 

 


 


 

 


 

 

 



 

 

 


 


 

 


 

 

 



 

 

 


 



Form EIA-923

POWER PLANT OPERATIONS REPORT

Year: 2013

Form Approved: OMB No. 1905-0129
Approval Expires: 10/31/2013
Burden: 2.7 hrs

Plant Name: ___________________________________________________________________________________________________________________

Plant ID: ________________________________________

State: __________________________

Reporting Year: _____________________________

SCHEDULE 8. PART E.  FLUE GAS PARTICULATE COLLECTION INFORMATION

Does not apply.

Complete a separate row for each flue gas particulate collector.

Flue Gas Particulate Collector ID

FGP Collector Status

Hours in Service

Typical Particulate
Emissions Rate

(to the nearest 0.01 lb/MMBtu)

Removal Efficiency of Particulate Matter (nearest 0.1% by weight)

At Annual Operating
Factor

At 100% Load or Tested Efficiency

Date of Most Recent
Efficiency Test (e.g., 12-2005)






















































Form EIA-923

POWER PLANT OPERATIONS REPORT

Year: 2013

Form Approved: OMB No. 1905-0129
Approval Expires: 10/31/2013
Burden: 2.7 hrs

Plant Name: _____________________________________________________________________________________________________________________

Plant ID: __________________________________

State: __________________________

Reporting Year: ___________________________________

SCHEDULE 8. PART F.  FLUE GAS DESULFURIZATION UNIT INFORMATION – ANNUAL OPERATIONS

Does not apply.

Note: Flue Gas Desulfurization ID must match the ID as reported on Form EIA-860, "Annual Electric Generator Report.”

Complete a separate row for each Flue Gas Desulfurization Unit.

ANNUAL OPERATIONS

Flue Gas Desulfurization Unit ID

FGD Unit Status

Hours In-Service

Quantity of FGD Sorbent Used
(to the nearest 0.1 thousand tons)

Electrical Energy Consumption (MWh)

Removal Efficiency of Sulfur Dioxide (nearest 0.1% by wt)

At Annual Operating Factor

At 100% Load or Tested Efficiency

Date of Most Recent Efficiency Test (e.g., 12-2005)

























OPERATION AND MAINTENANCE EXPENDITURES DURING YEAR, EXCLUDING ELECTRICITY (THOUSAND DOLLARS)

Flue Gas Desulfurization Unit ID

Feed Materials and Chemicals

Labor and
Supervision

Waste Disposal

Maintenance, Materials, and All Other Costs

Total





















S


CHEDULE 9. COMMENTS


Comment Section: Explain any unusual values, occurrences, or changes in ownership.

Schedule

Part

Item

Comment

 

 

 

 

Changes in Ownership

(Provide name of purchaser and date sold.)

 

















1



File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File TitlePURPOSE
AuthorM. Isabel Ramos
File Modified0000-00-00
File Created2021-01-30

© 2024 OMB.report | Privacy Policy