OMB83 Change Worksheet

HSLS-09 HS Transcript and 2013 Update FS Responsive Design Change Sheet 2013-05-09.pdf

High School Longitudinal Study of 2009 (HSLS:09) High School Transcript and 2013 Update Full Scale Study and Panel Maintenance

OMB83 Change Worksheet

OMB: 1850-0852

Document [pdf]
Download: pdf | pdf
PAPERWORK REDUCTION ACT
CHANGEWORKSHEET
High School Longitudinal Study of 2009 (HSLS:09) High School Transcript and 2013 Update
Full Scale Study and Panel Maintenanc€ Responsive Design Change Request
OIB Cont ol Numb€r
U.S. Departnent

oi

1850 0852 v.12

Education. lnstrtute ofEducar:ron Scicnccs
Ent6r only ilerrrs tlat change
Current Record

Asancy tom numb6(3)

NA

NA

Numb€rof Espondsnt

22,476

22,475

Total shnuel rosponses
P6.c€nt of the.e E.pmses

34,184

34,183

1007"

8570

9,975

8,161

Annual reporting and
k€€ping hour burdgn

Ecdd

@llact.d sl€ctrcnically

I 414
In

Epl.naUm otdiff€rsnco

ihe last, phase 6 ofthe data

colleciion, all non respondents will
be offered an abbreviated version ol
the uDdaie auest onfaire.

ProgFm chsng€

1,81,1

i)
Annual reporting and record
k66pinO cct buRl€n (jn thoGands

NA

Totel snnusliud capitalrsta.tup

Totrl ennu.l

ccts (O&il)

Total annualized cGi requ4ted

N\

NA
NA
N-\

Erplanaf on of dafie.€nc€

NA
NA

PrcqEm chang€

The High School Longitudinal Study of2009 (HSLS:09) is a nationally rcpresentative, longitudinalstudy
ofmore than 20,000 ninth graders in 944 schools who will be followed thfough theirsecondary and
postsecondary yeals. The main study sludents were re-suNeyed in 2012 when most were high school
1'lth graders. The study focuses on understanding students' lrajectodes from the beginning of high
schoo, into postsecondary education orthe workforce and beyond. What students decide to pursue
when, why, and how arc crucial queslions for HSLS:09, especially, but not solely, in regards to science,
technology. engineering, and math (STE[,) cou.ses, majols, and etfeers. This submission amends the
clearance obtained on April 19, 2013, forthe 2013 update of HSLS:09 high school students who were
in gth grade in the base year (June 2013 - Oc{ober 2013), collection of their high school lranscripts
(Seplember 2013 - lvlay 2014), and 2nd follow-up sample panel maintenance (FT: belween 2012
Update & 2FU - Fall 2013; lvlain Study: between 2013 Update and 2FU - Fall 2014). The change
rcquest provides a rcvised plan for responsive design modelto be used in the 2013 update study and a
conesoondinq incentive plan.
Signatr,.e of S6nid Ofiioial

d

lo",,u*,4L"*

FTh't fom 6snn.n t'. u:.d l..tt.rxl

oflB s3-c

\fav 9.2011


File Typeapplication/pdf
File Modified0000-00-00
File Created2013-05-10

© 2024 OMB.report | Privacy Policy