1219-0124 Supporting Statement 2014 Final

1219-0124 Supporting Statement 2014 Final.doc

Health Standards for Diesel Particulate Matter Exposure in Underground Coal Mines

OMB: 1219-0124

Document [doc]
Download: doc | pdf

1219-0124



1/2014

SUPPORTING STATEMENT


Information Collection Title: Health Standards for Diesel Particulate Matter Exposure (Underground Coal Mines)


Authorities: 30 CFR §§ 72.510(a) and (b), 72.520(a) and (b)


Collection Instruments(s): None



A. JUSTIFICATION


1. Explain the circumstances that make the collection of information necessary. Identify any legal or administrative requirements that necessitate the collection. Attach a copy of the appropriate section of each statute and regulation mandating or authorizing the collection of information.


Under Section 101(a) of the Federal Mine Safety and Health Act of 1977 (Mine Act), the Secretary of Labor shall develop, promulgate, and revise as may be appropriate, improved mandatory health or safety standards for the protection of life and prevention of injuries in coal or other mines. In addition, Section 103(h) of the Mine Act mandates that mine operators keep any records and make any reports that are reasonably necessary for the Mine Safety and Health Administration to perform its duties under the Mine Act.


MSHA established standards and regulations for diesel-powered equipment in underground coal mines that provide additional important protection for coal miners who work on and around diesel-powered equipment. The standards were designed to reduce the risks to underground coal miners of serious health hazards that are associated with exposure to high concentrations of diesel particulate matter. The standards contain information collection requirements for underground coal mine operators in §§ 72.510(a) & (b), 72.520(a) & (b).


Section 72.510(a) requires underground coal mine operators to provide annual training to all miners who may be exposed to diesel emissions. The training must include health risks associated with exposure to diesel particulate matter; methods used in the mine to control diesel particulate concentrations; identification of the personnel responsible for maintaining those controls; and actions miners must take to ensure controls operate as intended.


Section 72.510(b) requires underground coal mine operators to keep a record of the training for one year.


Section 72.520(a) and (b) requires underground coal mine operators to maintain an inventory of diesel powered equipment units together with a list of information about any unit’s emission control or filtration system. The list must be updated within 7 calendar days of any change.


Part 7, Part 36, and 72.503(d). As a result of 72.503(d) which requires all permissible equipment to have after-treatment or filtration devices, diesel manufacturers are required to amend existing diesel machine approval applications under Part 7 or Part 36. Few machine approvals are approved under Part 36, while most machine approvals are approved under Part 7.



2. Indicate how, by whom, and for what purpose the information is to be used. Except for a new collection, indicate the actual use the agency has made of the information received from the current collection.


The information collection is provided to the MSHA inspector and used by the agency to monitor the mine operator’s compliance with the health standard and to provide useful information to mine operators and miners’ representatives about the affected standards.


3. Describe whether, and to what extent, the collection of information involves the use of automated, electronic, mechanical, or other technological collection techniques or other forms of information technology, e.g. permitting electronic submission of responses, and the basis for the decision for adopting this means of collection. Also describe any consideration of using information technology to reduce burden.


Mine operators have the option of providing the inventory via MSHA’s web page or they may submit the information in writing to MSHA. MSHA has information available on-line to aid mine operators in maintaining and updating the inventory found at https://lakegovprod3.msha.gov/DieselInventory/ViewDieselInventoryExternal.aspx by clicking on view national inventory. In addition, the MSHA standards afford the mine operator the flexibility to retain the information in whatever format/method they choose that reasonably conveys the inventory.


4. Describe efforts to identify duplication. Show specifically why any similar information already available cannot be used or modified for use for the purposes described in Item 2 above.


No similar or duplicate information exists.


5. If the collection of information impacts small businesses or other small entities (Item 5 of OMB Form 83-I), describe any methods used to minimize burden.


This information collection does not have a significant impact on a substantial number of small entities. However, MSHA has made available various links on our web-site specific to diesel matters. On our homepage at www.msha.gov, there are sites making available compliance materials and other information on diesel particulate.


  1. Describe the consequence to Federal program or policy activities if the collection is not conducted or is conducted less frequently, as well as any technical or legal obstacles to reducing burden.


The information collection requirements are essential for helping to protect miners’ health and safety while working in areas of the underground mine where diesel-powered equipment is being operated. The information also serves as a means of verifying compliance with the standards and also informs mine operators and miners’ representatives of safety and health conditions in a miner’s workplace. Reduction of these information collection requirements would increase the likelihood that unsafe and unhealthy conditions could go undetected and uncorrected in underground coal mines that use diesel-powered equipment.


7. Explain any special circumstances that would cause an information collection to be conducted in a manner:

* requiring respondents to report information to the agency more often than quarterly;

* requiring respondents to prepare a written response to a collection of information in fewer than 30 days after receipt of it;

* requiring respondents to submit more than an original and two copies of any document;

* requiring respondents to retain records, other than health, medical, government contract, grant-in-aid, or tax records for more than three years;

* in connection with a statistical survey, that is not designed to produce valid and reliable results that can be generalized to the universe of study;

* requiring the use of a statistical data classification that has not been reviewed and approved by OMB;

* that includes a pledge of confidentiality that is not supported by authority established in statute or regulation, that is not supported by disclosure and data security policies that are consistent with the pledge, or which unnecessarily impedes sharing of data with other agencies for compatible confidential use; or

* requiring respondents to submit proprietary trade secret, or other confidential information unless the agency can demonstrate that it has instituted procedures to protect the information’s confidentiality to the extent permitted by law.


This collection of information is consistent with the guidelines in 5 CFR 1320.5.


8. If applicable, provide a copy and identify the date and page number of publication in the Federal Register of the agency’s notice, required by 5 CFR 1320.8(d), soliciting comments on the information collection prior to submission to OMB.


MSHA published a 60-day Federal Register notice on September 3, 2013 (78 FR 54279). MSHA received no comments.


9. Explain any decision to provide any payment or gift to respondents, other than remuneration of contractors or grantees.


MSHA does not provide payments or gifts to respondents.


10. Describe any assurance of confidentiality provided to respondents and the basis for the assurance in statue, regulation, or agency policy.


There is no assurance of confidentiality provided to respondents.


11. Provide additional justification for any questions of a sensitive nature, such as sexual behavior and attitudes, religious beliefs, and other matters that are commonly considered private. This justification should include the reasons why the agency considers the questions necessary, the specific uses to be made of the information, the explanation to be given to persons from whom the information is requested, and any steps to be taken to obtain their consent.


There are no questions of a sensitive nature.


12. Provide estimates of the hour burden of the collection of information. The statement should:


  • Indicate the number of respondents, frequency of response, annual hour burden, and an explanation of how the burden was estimated. Unless directed to do so, agencies should not conduct special surveys to obtain information on which to base hour burden estimates. Consultation with a sample (fewer than 10) of potential respondents is desirable. If the hour burden on respondents is expected to vary widely because of differences in activity, size, or complexity, show the range of estimated hour burden, and explain the reasons for the variance. Generally, estimates should not include burden hrs. for customary and usual business practices.


  • If this request for approval covers more than one form, provide separate hour burden estimates for each form and aggregate the hour burdens in Item 13 of OMB Form 83-I.


  • Provide estimates of annualized cost to respondents for the hour burdens for collections of information, identifying and using appropriate wage rate categories. The cost of contracting out or paying outside parties for information collection activities should not be included here. Instead, this cost should be included in Item 14.


Shown are the burden hrs. and related costs that are borne by underground coal mine operators that use diesel-powered equipment. The following hourly wage rates for underground coal mines are from the U.S. Coal Mines Salaries, Wages, and Benefits - 2012 Survey Results, InfoMine USA, Inc. and were used to determine burden hour costs: supervisor wage rate of $97.60, coal miner wage rate of $40.56, and clerical worker wage rate of $28.05.



Section 72.510, Miner Health Training

This section requires that all miners who can reasonably be expected to be exposed to diesel emissions on mine property be trained annually in accordance with § 72.510(a). Training will occur at 206 mines and 25,710 miners will be trained.


A supervisor earning $97.60 per hour will take 5 minutes (0.0833 hrs.) to instruct a clerical worker concerning the training. A clerical worker earning $28.05 per hour will take 15 minutes (0.25 hrs.) in each mine (includes listening to supervisor’s instructions) to make arrangements concerning the required training. In addition, the clerical worker will take 1 minute (0.0167 hrs.) to record each trainee in a computer file. Each trainee earning $40.56 per hour will take 20 seconds (0.0056 hrs.) to sign a registration sheet, which will also serve as a record.


Record-keeping burden hrs

1 Supervisor at each mine (206) instructs clerical workers. 206 mines x 0.08333 hrs. per mine = 17 hrs.

Clerical prep at 206 mines x 0.25 hrs. per mine = 52 hrs.

Clerical registration of 25,710 miners x 0.0167 hrs. per miner = 429 hrs.

25,710 miners signing x 0.0056 hrs. per miner = 144 hrs.


Costs

17 Supervisor Hrs. at $97.60 per hour = $ 1,659

481 Clerical Hrs. x $28.05 per hour = $13,492

144 Trainee Hrs. x $40.56 per hour = $ 5,841






Section 72.520, Diesel Equipment Inventory

Section 72.520 requires underground coal mine operators to maintain a list of diesel powered equipment units, together with information about any unit’s emission control or filtration system. This list must be updated within 7 days of any change.


Mine operators can obtain general information on approved engines from manufacturers or MSHA (via MSHA’s website). Annually, it will take a mine supervisor earning $97.60 per hour about 2 minutes (0.0333 hrs.) to perform this task for each change that is required. Each year, it is estimated that changes will be required for approximately one sixth of the inventory, 895 diesel machines.


Record-keeping burden hrs.

895 changes x 0.0333 hrs. per change = 30 hrs.

30 hrs. x $97.60 per hour = $2,928


In addition, mine operators can obtain machine-specific information (e.g. serial numbers) from maintenance files or similar records. Collecting and recording this information will take a miner earning $40.56 per hour an average of 2 minutes (0.03333 hrs.) per machine. Annually, 895 diesel machines will have these changes.


Record-keeping burden hrs.

895 changes x 0.0333 hrs. per change = 30 hrs.

30 hrs. x $40.56 per hr. = $1,217


The mine operator must transmit electronically or send a copy of the diesel inventory list to the appropriate MSHA District Manager and provide a copy to the miner representative. Nearly all mine operators transmit their diesel inventory lists electronically; therefore, the burden is de minimis.


For those inventories submitted by mail, a clerical worker must copy the list, send the list to the District Manager, and provide a copy to the miner’s representative. It will take a clerical worker earning $28.05 per hour 5 minutes (0.0833 hrs.) per machine to perform these functions. MSHA estimates only a few mine operators will submit their inventories by mail.


Reporting burden hrs.

9 inventory changes x 0.0833 hrs. per machine = 1 hr.

1 hour x $28.05 per hr. = $28


Total Cost

72.510 $20,992

72.520 $ 4,173

$25,165


ANNUAL BURDEN

Type of Respondent

Form/Regulation

No. of Respon-dents

No. of Respon-ses per Respon-dent

Total No. of Responses (rounded)

Avg. Burden per Response

(in hours)


Total Annual Burden (in hours/ rounded to whole numbers)

Business or other for-profit

72.510 (Supervisor Instruction)

206

1

206

.08333 hrs

(5 minutes)

17 (record-keeping hrs.)

Business or other for-profit

72.510 (Clerical Prep)

206

1

206

.25 hrs

(15 minutes)

52

(record-keeping hrs.)

Business or other for-profit

72.510 (Clerical Registration of Miners)

25,710

1

25,710

.0167 hrs.

(1 minute)

429

(record-keeping hrs.)

Business or other for-profit

72.510 (Miners Signing of Record)

25,710

1

25,710

.0056 hrs

(.333 minutes)


144

(record-keeping hrs.)

Business or other for-profit

72.520 (Diesel Machine Changes/ Emission Control or Filtration


895

1

895

.0333 hrs.

(2 minutes)

30

(record-keeping hrs.)

Business or other for-profit

72.520 (Diesel Machine-Specific Information and Maintenance Changes)


895

1

895

.0333 hrs.

(2 minutes)

30

(record-keeping hrs.)

Business or other for-profit

72.520 (Clerical Copy and Send of Inventory Changes)

9

1

9

.0833 hrs.

(5 minutes)

1

(reporting hrs.)

Total




53,631


703




13. Provide an estimate of the total annual cost burden to respondents or recordkeepers resulting from the collection of information. (Do not include the cost of any hour burden shown in Items 12 and 14).


The cost estimate should be split into two components: (a) a total capital and start-up cost component (annualized over its expected useful life); and (b) a total operation and maintenance and purchase of services component.

The estimates should take into account costs associated with generating, maintaining, and disclosing or providing the information. Include descriptions of methods used to estimate major cost factors including system and technology acquisition, expected useful life of capital equipment, the discount rate(s), and the time period over that costs will be incurred. Capital and start-up costs include, among other items, preparations for collecting information such as purchasing computers and software; monitoring, sampling, drilling and testing equipment; and record storage facilities.


If cost estimates are expected to vary widely, agencies should present ranges of cost burdens and explain the reasons for the variance. The cost of purchasing or contracting out information collection services should be a part of this cost burden estimate. In developing cost burden estimates, agencies may consult with a sample of respondents (fewer than 10), utilize the 60-day pre-OMB submission public comment process and use existing economic or regulatory impact analysis associated with the rulemaking containing the information collection, as appropriate.


Generally, estimates should not include purchases of equipment or services, or portions thereof, made: (1) prior to October 1, 1995, (2) to achieve regulatory compliance with requirements not associated with the information collection, (3) for reasons other than to provide information or keep records for the government, or (4) as part of customary and usual business or private practices.



Section 72.520

Underground coal mine operators that use diesel powered equipment will need to update their list of diesel equipment and make a copy of this updated list and send it to the appropriate MSHA District Manager. Also a copy will need to be made of the updated list and given to the representative of the miners. On average, the updated initial list is estimated to be 2 pages for each mine. The list is updated each time a change is made to the diesel equipment inventory. Nearly all mine operators transmit their diesel inventory lists electronically; therefore, the cost is de minimis.


On average, 9 inventories are estimated to occur annually. The cost per change is estimated to be $1.03; $0.60 for copying ($0.15 x 2 pgs. X 2 copies) and $0.43 for postage to mail a copy of the list to the appropriate MSHA District Manager.


9 inventory changes x $1.03 per change = $9



ANNUAL BURDEN COST TO RESPONDENTS OR RECORDKEEPERS

Type of Respondent

Form/Regulation

Total Cost

Business or other for-profit

72.510 (Supervisor Instruction)

0

Business or other for-profit

72.510 (Clerical Prep)

0

Business or other for-profit

72.510 (Clerical Registration of Miners)

0

Business or other for-profit

72.510 (Miners Signing of Record)

0

Business or other for-profit

72.520 (Diesel Machine Changes/ Emission Control or Filtration


0

Business or other for-profit

72.520 (Diesel Machine-Specific Information and Maintenance Changes)


0

Business or other for-profit

72.520 (Clerical Copy and Send of Inventory Changes)

$9.00

TOTAL


$9.00




14. Provide estimates of annualized cost to the Federal government. Also provide a description of the method used to estimate cost, which should include quantification of hrs. , operational expenses (such as equipment, overhead, printing, and support staff), and any other expense that would not have been incurred without this collection of information. Agencies also may aggregate cost estimates from Items 12, 13, and 14 in a single table.


There is no cost to the Federal government for this information collection.


15. Explain the reasons for any program changes or adjustments reported in Items 13 or 14 of the OMB Form 83-I.


There have been no program changes. The number of respondents, responses, and burden hrs. has increased due to the increase in both the number of mines and the number of diesel powered equipment reported in the inventory. A significant number of mine operators will submit their inventories electronically; therefore, there was a decrease in the number of inventories submitted by mail. Additionally, the cost to manufacturers to amend existing approvals was removed to eliminate duplication; it is already covered by existing OMB collection 1219-0066. The removal of this cost accounts for almost all of the $6,416 decrease in cost ($6,425 to $9).

Current:

TOTAL BURDEN HRS. : 703

TOTAL RESPONDENTS: 206

TOTAL RESPONSES: 53,631

TOTAL RESPONDENT COST: $9


Previous:

TOTAL BURDEN HRS. : 740

TOTAL RESPONDENTS: 165

TOTAL RESPONSES: 42,331

TOTAL RESPONDENT COST: $6,425



16. For collections of information whose results will be published, outline plans for tabulation, and publication. Address any complex analytical techniques that will be used. Provide the time schedule for the entire project, including the beginning and ending dates of the collection of information, completion of report, publication dates, and other actions.


MSHA does not intend to publish the results of this information collection.


17. If seeking approval to not display the expiration date for OMB approval of the information collection, explain the reasons that display would be inappropriate.


MSHA is not seeking approval not to display the expiration date for OMB approval of this information collection.


18. Explain each exception to the certification statement identified in Item 19, “Certification for Paperwork Reduction Act Submissions,” of OMB Form 83-I.


There are no certification exceptions identified with this information collection.


B. COLLECTIONS OF INFORMATION EMPLOYING STATISTICAL METHODS


The collection of this information does not employ statistical methods.

11



File Typeapplication/msword
Authortarr-jane
Last Modified ByBouchet, Nicole - MSHA
File Modified2014-01-23
File Created2014-01-17

© 2024 OMB.report | Privacy Policy