Before this ICR is renewed, the agency should check the universe and burden estimates to make sure they are still accurate.
table that charts list comparision
Inventory as of this Action
Requested
Previously Approved
12/31/2016
36 Months From Approved
12/31/2013
1,070
0
1,070
68,447
0
68,447
0
0
0
The NSPS for Stationary Gas Turbines were proposed on October 3, 1977, and promulgated on September 10, 1979. Owners and operators of stationary gas turbines must submit a one-time-only notification of construction/reconstruction, modification, and startup date, initial performance test date, physical or operational changes, and demonstration of a continuous monitoring system. They also must provide a report on initial performance test result, monitoring results, and any excess emissions. Records must be maintained of: startups, shutdowns, and malfunctions; periods when the continuous monitoring system is inoperative; sulfur and nitrogen content of the fuel; fuel to water ratio; rate of fuel consumption; and ambient conditions. Semiannual reports are also required.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.