FERC-725S (Final Rule in RM14-1), Mandatory Reliability Standards: EOP-010-1

ICR 201406-1902-012

OMB: 1902-0270

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2014-10-30
Supplementary Document
2014-06-25
Supplementary Document
2014-06-25
Supplementary Document
2014-06-25
Supplementary Document
2014-01-23
Supplementary Document
2014-01-23
Supplementary Document
2014-01-23
Supplementary Document
2014-01-23
IC Document Collections
IC ID
Document
Title
Status
210118
Modified
ICR Details
1902-0270 201406-1902-012
Historical Active 201401-1902-002
FERC FERC-725S
FERC-725S (Final Rule in RM14-1), Mandatory Reliability Standards: EOP-010-1
New collection (Request for a new OMB Control Number)   No
Regular
Approved with change 10/30/2014
Retrieve Notice of Action (NOA) 06/25/2014
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
10/31/2017 36 Months From Approved
199 0 0
3,980 0 0
0 0 0

In Docket RM14-1 the Commission approves Reliability Standard EOP-010-1. The North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization (ERO), submitted the proposed Reliability Standard for Commission approval in response to a Commission directive in Order No. 779. The Reliability Standard is designed to mitigate the effects of geomagnetic disturbances (GMDs) on the Bulk-Power System by requiring responsible entities (reliability coordinators and transmission operators) to implement and maintain Operating Plans and Operating Procedures or Processes.

US Code: 16 USC 824o Name of Law: The Energy Policy Act of 2005
  
None

1902-AE80 Final or interim final rulemaking 79 FR 35911 06/25/2014

Yes

1
IC Title Form No. Form Name
Reliability Standard EOP-010-1

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 199 0 0 199 0 0
Annual Time Burden (Hours) 3,980 0 0 3,980 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
Yes
Miscellaneous Actions
No
The new burden is the result of the requirements to develop and maintain GMD operating procedures and processes. The Commission finds these requirements necessary to ensure that responsible entities have Operating Plans and Operating Procedures or Processes in place to mitigate the effects of geomagnetic disturbances on the Bulk-Power System.

$5,092
No
No
No
No
No
Uncollected
Michael Gandolfo 202 502-6817

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
06/25/2014


© 2024 OMB.report | Privacy Policy