In accordance
with 5 CFR 1320, the information collection is approved for three
years. In future collections, costs and time burden estimates
should be rounded to the appropriate number of significant digits.
If "reading instructions" are provided as potential time or cost
burdens, then the location of the instructions or the instructions
themselves should be provided. Also, the burden for refreshing on
instructions should be included, as appropriate. Any detailed
tables should be provided in excel format along with or in lieu of
detailed tables provided within the supporting statement.
Inventory as of this Action
Requested
Previously Approved
04/30/2018
36 Months From Approved
04/30/2015
300
0
300
33,912
0
33,912
5,240,000
0
5,240,000
Owners and operators must notify EPA
of construction modification startups, shutdowns, malfunctions, and
data and results of performance test. Owners/operators must
continually monitor and record temperature in specified pollution
control devices. EPA determines parameters to be recorded in other
control devices upon description of that device by the
source.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.