In the next ICR,
PHMSA is asked to include a plan to address data quality problems
identified in the RIA for the enhanced tank car standards final
rule. In addition, DOT is asked to provide OMB by no later than the
date this approval expires one of the following: a joint PHMSA-FRA
plan, coordinated with OST, to create a single system for
electronically reporting accident information involving trains,
pipelines, and hazardous materials and eliminates duplicative
reporting requirements and redundant agency IT systems to the
extent feasible OR a joint PHMSA-FRA report, coordinated with OST,
indicating the reasons why developing such a plan is neither
consistent with the PRA’s purposes nor otherwise in the public’s
interest, and the process used to arrive at this conclusion, and
the extent public stakeholders were consulted. As part of the plan,
PHMSA and FRA may explore whether additional or modified
information should be collected to improve execution of agency
missions and the utility of the information collected, consistent
with the PRA. OMB plans to add these terms of clearance to all
relevant PHMSA and FRA accident reporting collections, as
appropriate.
Inventory as of this Action
Requested
Previously Approved
12/31/2016
36 Months From Approved
12/31/2015
17,810
0
17,810
23,746
0
23,746
0
0
0
Carriers of hazardous materials
provide reports of accidents/ incidents in transportation. These
reports are used for revisions of the hazardous materials standards
and assessment of carriers of hazardous materials in
transportation.
US Code:
49 USC 5101-5127 Name of Law: Hazardous Materials Regulations
(HMR: 49 CFR 171-180)
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.