NESHAP for Area Sources: Electric Arc Furnace Steelmaking Facilities (40 CFR part 63, subpart YYYYY) (Renewal)

ICR 201408-2060-014

OMB: 2060-0608

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement B
2015-06-03
Supporting Statement A
2015-06-03
IC Document Collections
ICR Details
2060-0608 201408-2060-014
Historical Active 201106-2060-003
EPA/OAR 2277.04
NESHAP for Area Sources: Electric Arc Furnace Steelmaking Facilities (40 CFR part 63, subpart YYYYY) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved with change 06/03/2015
Retrieve Notice of Action (NOA) 08/29/2014
In accordance with 5 CFR 1320, the information collection is approved for three years. In future collections, costs and time burden estimates should be rounded to the appropriate number of significant digits. If "reading instructions" are provided as potential time or cost burdens, then the location of the instructions or the instructions themselves should be provided. Also, the burden for refreshing on instructions should be included, as appropriate. Any detailed tables should be provided in excel format along with or in lieu of detailed tables provided within the supporting statement.
  Inventory as of this Action Requested Previously Approved
06/30/2018 36 Months From Approved 06/30/2015
203 0 182
1,417 0 1,481
0 0 0

The affected entities are subject to the General Provisions of the NESHAP at 40 CFR Part 63, Subpart A, and any changes, or additions specified at 40 CFR Part 63, Subpart YYYYY. Owners or operators of the affected facilities must submit a one-time-only report of any physical or operational changes, initial performance tests, and periodic reports and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Reports addressing 1) the number of mercury switches removed or the weight of mercury recovered from the switches and properly managed, the estimated number of vehicles processed, an estimate of the percent of mercury switches recovered, and a certification that the recovered mercury switches were recycled at RCRA-permitted facilities, and 2) the control of contaminants from scrap according to the requirements in §63.10(e) are required semiannually.

None
None

Not associated with rulemaking

  78 FR 35023 06/11/2013
79 FR 49513 08/27/2014
No

1
IC Title Form No. Form Name
NESHAP for Area Sources: Electric Arc Furnace Steelmaking Facilities (Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 203 182 0 0 21 0
Annual Time Burden (Hours) 1,417 1,481 0 0 -64 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
There is a decrease in the respondent burden and an increase in Agency burden. These changes occurred due to the following adjustment: 1) This ICR revises the number of respondents from 91 to 87 based on input provided from industry trade association; and 2) This ICR corrects the frequency of semiannual report review from one to two in Table 2. This correction results in an increase in the estimated Agency burden.

$7,515
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
08/29/2014


© 2024 OMB.report | Privacy Policy