Information Collection Request

30 CFR Parts 816 and 817 - Permanent Program Performance Standards - Surface and Underground Mining Activities

ICR 201409-1029-002 · OMB 1029-0047 · Historical Active

Forms and Documents
DocumentTypeStatusAvailability
Justification for 2008 SBZ Vacatur Rule.docx Justification for No Material/Nonsubstantive Change Uploaded 2014-09-29 Available
816&817.30.2011.pdf Supplementary Document Uploaded 2011-10-19 Available
816-817.SS.DRICE.2011.doc Supporting Statement A Uploaded 2011-10-07 Available
816-817.60.2011.pdf Supplementary Document Uploaded 2011-09-09 Repair queued
Section 720.doc Supplementary Document Uploaded 2002-10-17 Available
Section 517.doc Supplementary Document Uploaded 2006-10-27 Available
Section 516.doc Supplementary Document Uploaded 2002-12-17 Repair queued
Section 515.doc Supplementary Document Uploaded 2005-03-15 Available
Part 817.doc Supplementary Document Uploaded 2003-10-01 Available
Part 816.doc Supplementary Document Uploaded 2006-11-06 Available
IC Document Collections
IC IDCollectionTypeStatusForm
46454 816 & 817.151 - Primary roads. (Industry) Unchanged
46452 816 & 817.131 - Cessation of operations: Temporary. (Industry) Unchanged
46447 817.122 - Subsidence control: Public notice. (Industry) Unchanged
46446 817.121 - Subsidence control. (Industry) Unchanged
46445 816 & 817.116 - Revegetation: Standards for success. (SRAs) Unchanged
46443 816 & 817.116 - Revegetation: Standards for success. (Industry) Unchanged
46441 816 & 817.83 - Coal mine waste: Refuse piles. (Industry) Unchanged
46438 817.71 - Disposal of excess spoil for underground mines: General requirements. (Industry) Unchanged
46431 816.71 - Disposal of excess spoil for surface mines: General requirements. (Industry) Unchanged
46429 816 & 817.67 - Use of explosives: Control of adverse effects. (Industry) Unchanged
46428 816 & 817.64 - Use of explosives: Blasting schedule. (Industry) Unchanged
46427 816 & 817.62 - Use of explosives: Preblasting survey. (Industry) Unchanged
46423 816 & 817.49 - Impoundments - New permits. (Industry) Unchanged
46328 816 & 817.43 - Diversions. (Industry) Modified
38245 816 & 817.41 - Hydrologic-balance protection. (Industry) Unchanged
213214 816 & 817.57 - Hydrologic balance: Stream buffer zones (SRAs) New
213213 816 & 817.57 - Hydrologic balance: Stream buffer zones (Industry) New
199130 816 & 817.81 - Coal mine waste: General requirements. (Industry) Unchanged
199128 816 & 817.49 - Impoundments - Pre-existing. (Industry) Unchanged
186679 816 & 817.43 - Diversions. (SRAs) Modified
ICR Details
1029-0047 201409-1029-002
Historical Active 201108-1029-001
DOI/OSMRE Parts 816 & 817 - change
30 CFR Parts 816 and 817 - Permanent Program Performance Standards - Surface and Underground Mining Activities
No material or nonsubstantive change to a currently approved collection   No
Regular
Approved without change 10/14/2014
Retrieve Notice of Action (NOA) 10/07/2014
  Inventory as of this Action Requested Previously Approved
12/31/2014 12/31/2014 12/31/2014
361,703 0 361,266
1,817,181 0 1,813,063
9,530,284 0 9,506,784

Sections 515 and 516 of the Surface Mining Control and Reclamation Act of 1977 provide that permittees conducting coal mining operations shall meet all applicable performance standards of the Act. The information collected is used by the regulatory authority in monitoring and inspecting surface coal mining activities to ensure that they are conducted in compliance with the requirements of the Act.

US Code: 30 USC 1201 et. seq. Name of Law: Surface Mining Control and Reclamation Act of 1977
  
None

Not associated with rulemaking

  76 FR 46840 08/03/2011
76 FR 64972 10/19/2011
No

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 361,703 361,266 0 437 0 0
Annual Time Burden (Hours) 1,817,181 1,813,063 0 4,118 0 0
Annual Cost Burden (Dollars) 9,530,284 9,506,784 0 23,500 0 0
Yes
Miscellaneous Actions
Yes
Changing Regulations
OSMRE is submitting this change notice due to the U.S. District Court for the District of Columbia's ruling on February 20, 2014, which vacated the stream buffer zone rule that we published December 12, 2008 (73 FR 75814). The court remanded the matter to us for further proceedings consistent with the decision. In relevant part, the Memorandum Decision stated that vacatur of the 2008 stream buffer zone rule resulted in reinstatement of the regulations in effect before the vacated rule took effect. Therefore, we are removing the provisions of the vacated 2008 rule and reinstating the corresponding information collection burdens in effect before the effective date of the 2008 rule (January 12, 2009).

$20,868
No
No
No
No
No
Uncollected
John Trelease 202 208-2783 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
10/07/2014