Information Collection Request

30 CFR Part 780 - Surface Mining Permit Applications - Minimum Requirements for Reclamation and Operation Plan

ICR 201409-1029-003 · OMB 1029-0036 · Historical Active

Forms and Documents
DocumentTypeStatusAvailability
Justification for 2008 SBZ Vacatur Rule.docx Justification for No Material/Nonsubstantive Change Uploaded 2014-09-29 Repair queued
780.30.2012.pdf Supplementary Document Uploaded 2012-02-15 Repair queued
780ss.MM.2012.doc Supporting Statement A Uploaded 2012-01-30 Available
780.60.2011.pdf Supplementary Document Uploaded 2012-01-30 Available
30 CFR Part 780e.doc Supplementary Document Uploaded 2012-01-25 Available
Section 522.doc Supplementary Document Uploaded 2008-09-04 Available
Section 515.doc Supplementary Document Uploaded 2008-09-04 Available
Section 510.doc Supplementary Document Uploaded 2008-09-04 Available
Section 508.doc Supplementary Document Uploaded 2008-09-04 Available
Section 507.doc Supplementary Document Uploaded 2008-09-04 Available
IC Document Collections
IC IDCollectionTypeStatusForm
188351 780.28 - Activities in or adjacent to perennial or intermittent streams. (SRAs) Removed
188350 780.28 - Activities in or adjacent to perennial or intermittent streams. (Industry) Removed
186423 780.38 - Support facilities. (SRAs) Unchanged
186421 780.38 - Support facilities. (Industry) Unchanged
186420 780.37 - Road systems. (SRAs) Unchanged
186419 780.37 - Road systems. (Industry) Unchanged
186417 780.35 - Disposal of excess spoil. (SRAs) Unchanged
186415 780.35 - Disposal of excess spoil. (Industry) Unchanged
186414 780.33 - Relocation or use of public roads. (SRAs) Unchanged
186413 780.33 - Relocation or use of public roads. (Industry) Unchanged
186411 780.31 - Protection of publicly owned parks and historic places. (SRAs) Unchanged
186410 780.31 - Protection of publicly owned parks and historic places. (Industry) Unchanged
186409 780.29 - Diversions. (SRAs) Unchanged
186408 780.29 - Diversions. (Industry) Unchanged
186407 780.27 - Reclamation plan: Surface mining near underground mining. (SRAs) Unchanged
186406 780.27 - Reclamation plan: Surface mining near underground mining. (Industry) Unchanged
186405 780.25 - Reclamation plan: Siltation structures, impoundments, and refuse piles. (SRAs) Unchanged
186404 780.25 - Reclamation plan: Siltation structures, impoundments, and refuse piles. (Industry) Unchanged
186403 780.23 - Reclamation plan: Land use information. (SRAs) Unchanged
186402 780.23 - Reclamation plan: Land use information (Industry) Unchanged
186401 780.22 - Geologic information. (SRAs) Unchanged
186400 780.22 - Geologic information. (Industry) Unchanged
186399 780.21 - Hydrologic information. (SRAs) Unchanged
186398 780.21 - Hydrologic information. (Industry) Unchanged
186397 780.18 - Reclamation plan: General requirements. (SRAs) Unchanged
186396 780.18 - Reclamation plan: General requirements. (Industry) Unchanged
186395 780.16 - Fish and wildlife information. (SRAs) Unchanged
186394 780.16 - Fish and wildlife information. (Industry) Unchanged
186391 780.14 - Operation plan: Maps and plans. (SRAs) Unchanged
186390 780.14 - Operation plan: Maps and plans. (Industry) Unchanged
186388 780.13 - Operation plan: Blasting. (SRAs) Unchanged
186387 780.13 - Operation plan: Blasting. (Industry) Unchanged
186386 780.12 - Operation plan: Existing structures. (SRAs) Unchanged
186385 780.12 - Operation plan: Existing structures. (Industry) Unchanged
186384 780.11 - Operation plan: General requirements. (SRA) Unchanged
11283 780.11 - Operation plan: General requirements. (Industry) Unchanged
ICR Details
1029-0036 201409-1029-003
Historical Active 201201-1029-004
DOI/OSMRE Part 780 - change
30 CFR Part 780 - Surface Mining Permit Applications - Minimum Requirements for Reclamation and Operation Plan
No material or nonsubstantive change to a currently approved collection   No
Regular
Approved without change 10/14/2014
Retrieve Notice of Action (NOA) 10/07/2014
  Inventory as of this Action Requested Previously Approved
04/30/2015 04/30/2015 04/30/2015
7,116 0 7,596
94,076 0 98,876
1,767,623 0 1,791,823

Permit application requirements in Sections 507, 508, 510, 515 and 522 of PL 95-87 require the applicant to submit the operations and reclamation plans for coal mining activities.

PL: Pub.L. 95 - 87 507, 508, 510, 515, 522 Name of Law: Surface Mining Control and Reclamation Act
  
None

Not associated with rulemaking

  76 FR 66964 10/28/2011
77 FR 8896 02/15/2012
No

34
IC Title Form No. Form Name
780.16 - Fish and wildlife information. (Industry)
780.23 - Reclamation plan: Land use information (Industry)
780.16 - Fish and wildlife information. (SRAs)
780.18 - Reclamation plan: General requirements. (SRAs)
780.13 - Operation plan: Blasting. (Industry)
780.23 - Reclamation plan: Land use information. (SRAs)
780.12 - Operation plan: Existing structures. (Industry)
780.14 - Operation plan: Maps and plans. (SRAs)
780.18 - Reclamation plan: General requirements. (Industry)
780.33 - Relocation or use of public roads. (SRAs)
780.37 - Road systems. (Industry)
780.38 - Support facilities. (SRAs)
780.11 - Operation plan: General requirements. (Industry)
780.22 - Geologic information. (SRAs)
780.13 - Operation plan: Blasting. (SRAs)
780.21 - Hydrologic information. (Industry)
780.29 - Diversions. (SRAs)
780.11 - Operation plan: General requirements. (SRA)
780.12 - Operation plan: Existing structures. (SRAs)
780.14 - Operation plan: Maps and plans. (Industry)
780.27 - Reclamation plan: Surface mining near underground mining. (Industry)
780.31 - Protection of publicly owned parks and historic places. (Industry)
780.31 - Protection of publicly owned parks and historic places. (SRAs)
780.21 - Hydrologic information. (SRAs)
780.28 - Activities in or adjacent to perennial or intermittent streams. (Industry)
780.28 - Activities in or adjacent to perennial or intermittent streams. (SRAs)
780.35 - Disposal of excess spoil. (SRAs)
780.38 - Support facilities. (Industry)
780.33 - Relocation or use of public roads. (Industry)
780.37 - Road systems. (SRAs)
780.27 - Reclamation plan: Surface mining near underground mining. (SRAs)
780.29 - Diversions. (Industry)
780.25 - Reclamation plan: Siltation structures, impoundments, and refuse piles. (Industry)
780.25 - Reclamation plan: Siltation structures, impoundments, and refuse piles. (SRAs)
780.35 - Disposal of excess spoil. (Industry)
780.22 - Geologic information. (Industry)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 7,116 7,596 0 -480 0 0
Annual Time Burden (Hours) 94,076 98,876 0 -4,800 0 0
Annual Cost Burden (Dollars) 1,767,623 1,791,823 0 -24,200 0 0
No
Yes
Changing Regulations
OSMRE is submitting this change notice due to the U.S. District Court for the District of Columbia's ruling on February 20, 2014, which vacated the stream buffer zone rule that we published December 12, 2008 (73 FR 75814). The court remanded the matter to us for further proceedings consistent with the decision. In relevant part, the Memorandum Decision stated that vacatur of the 2008 stream buffer zone rule resulted in reinstatement of the regulations in effect before the vacated rule took effect. Therefore, we are removing the provisions of the vacated 2008 rule and reinstating the corresponding information collection burdens in effect before the effective date of the 2008 rule (January 12, 2009).

$68,252
No
No
No
No
No
Uncollected
John Trelease 202 208-2783 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
10/07/2014