Information Collection Request

FERC-725X, (Order in RD14-11) Mandatory Reliability Standards: Voltage and Reactive (VAR) Standards

ICR 201409-1902-010 · OMB 1902-0278 · Historical Active

Forms and Documents
DocumentTypeStatusAvailability
RD14-11 FERC-725X and 725A Supporting Statement 4-22-2015.docx Supporting Statement A Uploaded 2015-04-22 Available
RD14-11 30-day Notice.pdf Supplementary Document Uploaded 2014-11-20 Available
RD14-11 NERC Petition Exhibits.docx Supplementary Document Uploaded 2014-09-23 Available
RD14-11 (725X) Reliability Standard VAR-002-3.pdf Supplementary Document Uploaded 2014-09-23 Available
RD14-11 (725X) Reliability Standard VAR-001-4.pdf Supplementary Document Uploaded 2014-09-23 Available
RD14-11 DLO - Issued 8-1-14.doc Supplementary Document Uploaded 2014-09-23 Available
RD14-11 (725X) NERC Petition.pdf Supplementary Document Uploaded 2014-09-23 Available
IC Document Collections
IC IDCollectionTypeStatusForm
213219 RD14-11 New Documentation Requirements New
ICR Details
1902-0278 201409-1902-010
Historical Active
FERC FERC-725X
FERC-725X, (Order in RD14-11) Mandatory Reliability Standards: Voltage and Reactive (VAR) Standards
New collection (Request for a new OMB Control Number)   No
Regular
Approved with change 04/22/2015
Retrieve Notice of Action (NOA) 12/05/2014
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
04/30/2018 36 Months From Approved
1,058 0 0
204,240 0 0
0 0 0

The Commission intends for the FERC-725X information collection to eventually contain all paperwork burden for Voltage and Reactive (VAR) Reliability Standards. It is a new collection, so it doesn't contain any existing paperwork burden currently. The Order in RD14-11 is the first activity (and first paperwork burden) added to the 725X. In an Order in RD14-11 the Commission approved new versions of two VAR Reliability Standards, which are being included in FERC-725X. The net change in burden is zero. In conjunction with the burden increase requested in this ICR, the Commission is asking (in a separate ICR) for the same amount to be subtracted from the FERC-725A (OMB Control Number 1902-0244), which includes the current standards being replaced.

US Code: 16 USC 824o Name of Law: Energy Policy Act of 2005
  
None

Not associated with rulemaking

  79 FR 46781 08/11/2014
79 FR 64758 10/31/2014
No

1
IC Title Form No. Form Name
RD14-11 New Documentation Requirements

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 1,058 0 0 1,058 0 0
Annual Time Burden (Hours) 204,240 0 0 204,240 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
Yes
Miscellaneous Actions
No
In RD14-11 the Commission approved new versions of two existing Reliability Standards. The Order in Docket No. RD14-11 does not result in a net burden change to industry. The burden increases in the new FERC-725X are offset by the burden reductions in FERC-725A (in a separate ICR), which includes the current requirements for VAR standards that are being replaced.

$5,092
No
No
No
No
No
Uncollected
David O'Conner 202 502-6695

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
12/05/2014