EIA-757A Natural Gas Processing Plant Survey-Baseline Report

Natural Gas Data Collection Program Package

eia757a

Natural Gas Data Collection Program Package

OMB: 1905-0175

Document [pdf]
Download: pdf | pdf
OMB No. 1905-XXXX
Expiration Date: 12/31/20XX
Version No.: 20XX.01
Burden: 0.5 hours
NATURAL GAS PROCESSING PLANT SURVEY
FORM EIA-757
Schedule A: Baseline Report
This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil
penalties and other sanctions as provided by law. For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning the confidentiality of information in the instructions. Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction.

PART 1. PLANT IDENTIFICATION DATA
DATE:

-

PART 2. SUBMISSION INFORMATION
Form may be submitted using one of the following
methods:

- 2 0

EIA ID NUMBER:

Email:

[email protected]

If this is a resubmission, enter an "X" in the box:

Fax:

(202) 586-2849

If any Plant Identification Data has changed since the last report,

Secure File Transfer:
https://signon.eia.doe.gov/upload/notice757.jsp

enter an "X" in the box:
Plant Name:

Questions?

Call: (877) 800-5261

Plant Address 1:
Plant Address 2:
City:
County:

State:
Zip:

-

Plant Owner Companies (Top Three):
1
2
3
Operator Company:
PART 3. CONTACTS
Section A: Contact information during an emergency (such as a hurricane):
Processing Plant Operations Contact:

Secondary Contact:

Contact Name:

Contact Name:

Title:

Title:

Company:

Company:

Primary Phone No.:
Secondary Phone No.:
Fax Number.:
Email address:

Ext:
Ext:

Primary Phone No.:
Secondary Phone No.:

Ext:
Ext:

Fax Number.:
Email address:

Section B: Contact person regarding the submission of this form:
Contact Name:
Phone No.:

Ext:

Email Address:
Comments: (To separate one comment from another, press ALT+ENTER)

Page 1

OMB No. 1905-XXXX
Expiration Date: 12/31/20XX
Version No.: 20XX.01
NATURAL GAS PROCESSING PLANT SURVEY
FORM EIA-757
Schedule A: Baseline Report
DATE:

-

- 2 0

Burden: 0.5 hours

Resubmission

EIA ID NUMBER:
PART 4. BASELINE PIPELINE CONNECTION DATA
Please list all primary pipelines connected to the plant. (Please check all that apply.)
Name:
Capacity (list amount and check units):
Pipeline Type:

Entering

Wet Gas

Gas

Liquids

Exiting

Wet Gas

Gas

Liquids

If exiting, is the pipeline able to accept raw, unprocessed gas?

Yes

MMcf/Day

Bbls/Day

MMcf/Day

Bbls/Day

MMcf/Day

Bbls/Day

MMcf/Day

Bbls/Day

MMcf/Day

Bbls/Day

No

Name:
Capacity (list amount and check units):
Pipeline Type:

Entering

Wet Gas

Gas

Liquids

Exiting

Wet Gas

Gas

Liquids

If exiting, is the pipeline able to accept raw, unprocessed gas?

Yes

No

Name:
Capacity (list amount and check units):
Pipeline Type:

Entering

Wet Gas

Gas

Liquids

Exiting

Wet Gas

Gas

Liquids

If exiting, is the pipeline able to accept raw, unprocessed gas?

Yes

No

Name:
Capacity (list amount and check units):
Pipeline Type:

Entering

Wet Gas

Gas

Liquids

Exiting

Wet Gas

Gas

Liquids

If exiting, is the pipeline able to accept raw, unprocessed gas?

Yes

No

Name:
Capacity (list amount and check units):
Pipeline Type:

Entering

Wet Gas

Gas

Liquids

Exiting

Wet Gas

Gas

Liquids

If exiting, is the pipeline able to accept raw, unprocessed gas?

Yes

No

Page 2

NATURAL GAS PROCESSING PLANT SURVEY

OMB No. 1905-XXXX
Expiration Date: 12/31/20XX
Version No.: 20XX.01
Burden: 0.5 hours

FORM EIA-757
Schedule A: Baseline Report
DATE:

-

- 2 0

Resubmission

EIA ID NUMBER:
PART 5. BASELINE PLANT OPERATIONAL STATUS
What is the plant’s annual average total plant capacity?
(Please enter the inlet capacity level at which the plant is able to operate.)
MMcf/Day
What is the annual average natural gas flow at the plant inlet?
MMcf/Day
What is the average annual Btu content of natural gas at the plant inlet?
Btu/Mcf
Which functions is the plant able to perform? (Please check all that apply.)
Dehydration
Contamination Removal (i.e.: CO2, N2, H2S, Hg, …)
NGL Extraction
Fractionation
Other (please describe):
Which functions does the plant actually perform? (Please check all that apply.)
Dehydration
Contamination Removal (i.e.: CO2, N2, H2S, Hg, …)
NGL Extraction
Fractionation
Other (please describe):
What is the storage capacity at the plant?
Dry Natural Gas

MMcf

Natural Gas Liquids

Bbls

Page 3


File Typeapplication/pdf
File Titleeia757a-Jan2011.xls
AuthorJHR
File Modified2011-03-15
File Created2011-02-11

© 2024 OMB.report | Privacy Policy