This workbook is designed to collect data regarding energy consumption at the AMPs in your PHA that received Capital Fund Recovery Grants under the grant program listed below. | ||||
Please complete all pages in the workbook. | ||||
The information portrayed in this sheet is split in three sections; please verify and complete the information where required. Note that the fields required to be completed are shaded in gray. The three sections are: | ||||
1. This is the General information page, requiring information regarding all AMPs at the PHA that received grants. | ||||
2. The "ECMs Details" pages provide information regarding the ECMs implemented as each AMP, based on data from the RAMPS system. | ||||
3. The "AMP - Utility" pages require entry of utility usage information for each energy source, at each AMP | ||||
1. General Public Housing Agency (PHA) Information | ||||
1. General Information | ||||
Public Housing Agency (PHA) code: | ||||
Grant Number | ||||
Grant Program | ||||
2. General PHA-AMPs information - please verify the information below and indicate the requested retrofit start and end dates, and the number of units retrofitted for each AMP | ||||
2.a. AMPs General Information | Retrofit Dates (MM/DD/YY) | Did this AMP also undergo retrofit financed through a Capital Fund Formula Grant? | ||
Development/Asset Management Project (AMP) Number | Start | End | ||
AMP | Buildings | Utility used for heating in building | Utility used for cooling in building | Year of Last Retrofit |
Are there any unusual features of these buildings or the retrofit you would like to note? | ||||
This worksheet describes the retrofit conducted in this AMP as a result of the grant under study. This information is from the RAMPS system, and is provided for your reference. | |
PHA Identifier | |
AMP Identifier | |
Energy Conservation Measures Implemented | Units Affected |
Doors and Windows | |
EE Replacement Windows | |
EE Replacement Exterior Doors | |
EE Storm Doors | |
EE Storm Windows | |
EE Window Film | |
Insulation and Air Sealing | |
Attic or Roof Insulation | |
Air Sealing | |
Heating and Cooling | |
Install Flue/Vent Dampers | |
Install Constant Air Regulating Dampers | |
Convert to Electronic Ignition | |
Replace Inefficient Heating Plant | |
Insulate Hot Water or Steam Pipes | |
Seal and Insulate Ducts | |
Replace Inefficient Central Air Conditioners | |
Replace HVAC Pump Motors | |
HVAC/Temperature Controls | |
Install Boiler Controls/Outdoor Air Reset | |
Install Radiator Controls (Units) | |
Install Programmable Thermostats (Units) | |
Domestic Hot Water | |
Insulate Hot Water Tanks | |
Convert Laundry to Cold Rinse | |
Replace Inefficient Hot Water Heater | |
Install Summertime DHW Heaters | |
Lighting | |
Replace Incandescent Lighting with CFLs (Units) Install LED Exit Signs | |
Replace Outdoor and Common Area Lighting Fixtures Install Outdoor and Common Area Lighting Controls | |
Appliances | |
Replace inefficient Refrigerators | |
Replace Inefficient Clothes Washers | |
Replace Inefficient Window AC Units | |
Replace Inefficient Dishwashers | |
Water Conservation | |
Install Water-saving Toilets | |
Low-flow Showerheads and Faucet Aerators | |
Grey Water Recycling | |
Renewable Energy | |
Install Photovoltaic Panels | |
Install Cogeneration/Micro Combined Heat and Power Systems | |
Green measures | |
Install Green Roofs | |
Use Low or No-VOC Paints | |
Use of Green Building Products | |
Install Spot Ventilation | |
Install advanced utility metering | |
* Data to be pulled from RAMPS |
PHA - AMP Utility Consumption: ELECTRICITY | ||||||||||
This sheet requests specific information regarding monthly utility consumption for one full year before and one full year after the implementation of the retrofit. Please provide the requested information in the shaded cells |
||||||||||
PHA Identifier | ||||||||||
AMP Identifier | ||||||||||
ELECTRICITY | ||||||||||
Please use the drop-down menu to indicate whether tenants pays for this utility for their units. | ||||||||||
Do tenants pay their electricity bill directly to the utility for any units in the AMP? | ||||||||||
How many electricity meters are there for which the PHA has usage data in this AMP? | ||||||||||
Do these meters cover the electricity usage in all common areas of the AMP? | ||||||||||
For each utility meter, please inidcate ID, location, whether the meter was utilized prior to the retrofit, and whether it was utilized after the retrofit. In addition, using the drop-down menu, please indicate if the meter measures consumption in common areas only, in units only, or in both common areas and units. | ||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Meter Location (Building address) | ||||||||||
Meter ID | ||||||||||
Used Pre-retrofit: Yes/No | ||||||||||
Used Post-retrofit: Yes/No | ||||||||||
Meter measures utility consumption in the following areas: | ||||||||||
Number of units covered by meter | ||||||||||
Number of units in building | ||||||||||
For each utility meter, please indicate the exact start and end dates of the pre and post retrofit utility consumption data provided | ||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Pre-retrofit Start Date Consumption data (MM/DD/YYYY) |
||||||||||
Pre-retrofit End Date Consumption data (MM/DD/YYYY) |
||||||||||
Post-retrofit Start Date Consumption data (MM/DD/YYYY) |
||||||||||
Post-retrofit End Date Consumption data (MM/DD/YYYY) |
||||||||||
For each utility meter, please use the drop-down menu to indicate the first month of pre-retrofit consumption data (this month should be exactly one year prior to the start of the retrofit implementation). The remaining 11 months will be automatically populated. In addition, for each month pre-retrofit, please indicate the exact consumption as indicated in your utility bill. |
||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Monthly Consumption Pre-retrofit |
DATE | Consumption | DATE | Consumption | DATE | Consumption | DATE | Consumption | DATE | Consumption |
Month | KWH | Month | KWH | Month | KWH | Month | KWH | Month | KWH | |
Month 1 | June | September | January | February | November | |||||
Month 2 | July | October | February | March | December | |||||
Month 3 | August | November | March | April | January | |||||
Month 4 | September | December | April | May | February | |||||
Month 5 | October | January | May | June | March | |||||
Month 6 | November | February | June | July | April | |||||
Month 7 | December | March | July | August | May | |||||
Month 8 | January | April | August | September | June | |||||
Month 9 | February | May | September | October | July | |||||
Month 10 | March | June | October | November | August | |||||
Month 11 | April | July | November | December | September | |||||
Month 12 | May | August | December | January | October | |||||
For each utility meter, please use the drop-down menu to indicate the first month of post-retrofit consumption data. The remaining 11 months will be automatically populated. In addition, for each month post-retrofit, please indicate the exact consumption as indicated in your utility bill. |
||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Monthly Consumption Post-retrofit |
DATE | Consumption | DATE | Consumption | DATE | Consumption | DATE | Consumption | DATE | Consumption |
Month | KWH | Month | KWH | Month | KWH | Month | KWH | Month | KWH | |
Month 1 | July | September | July | June | November | |||||
Month 2 | August | October | August | July | December | |||||
Month 3 | September | November | September | August | January | |||||
Month 4 | October | December | October | September | February | |||||
Month 5 | November | January | November | October | March | |||||
Month 6 | December | February | December | November | April | |||||
Month 7 | January | March | January | December | May | |||||
Month 8 | February | April | February | January | June | |||||
Month 9 | March | May | March | February | July | |||||
Month 10 | April | June | April | March | August | |||||
Month 11 | May | July | May | April | September | |||||
Month 12 | June | August | June | May | October |
PHA - AMP Utility Consumption: NATURAL GAS | ||||||||||
This sheet requests specific information regarding monthly utility consumption for one full year before and one full year after the implementation of the retrofit. Please provide the requested information in the shaded cells |
||||||||||
PHA Identifier | ||||||||||
AMP Identifier | ||||||||||
NATURAL GAS | ||||||||||
Please use the drop-down menu to indicate whether tenants pays for this utility for their units. | ||||||||||
Do tenants pay their natural gas bill directly to the utility for any units in the AMP? | ||||||||||
How many natural gas meters are there for which the PHA has usage data in this AMP? | ||||||||||
Do these meters cover the natural gas usage in all common areas of the AMP? | ||||||||||
For each utility meter, please inidcate ID, location, whether the meter was utilized prior to the retrofit, and whether it was utilized after the retrofit. In addition, using the drop-down menu, please indicate if the meter measures consumption in common areas only, in units only, or in both common areas and units. | ||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Meter Location (Building address) | ||||||||||
Meter ID | ||||||||||
Used Pre-retrofit: Yes/No | ||||||||||
Used Post-retrofit: Yes/No | ||||||||||
Meter measures utility consumption in the following areas: | ||||||||||
Number of units covered by meter | ||||||||||
Number of units in building | ||||||||||
For each utility meter, please indicate the exact start and end dates of the pre and post retrofit utility consumption data provided | ||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Pre-retrofit Start Date Consumption data (MM/DD/YYYY) |
||||||||||
Pre-retrofit End Date Consumption data (MM/DD/YYYY) |
||||||||||
Post-retrofit Start Date Consumption data (MM/DD/YYYY) |
||||||||||
Post-retrofit End Date Consumption data (MM/DD/YYYY) |
||||||||||
For each utility meter, please use the drop-down menu to indicate the units in which utility consumption is measured | ||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Consumption measuring units: | ||||||||||
For each utility meter, please use the drop-down menu to indicate the first month of pre-retrofit consumption data (this month should be exactly one year prior to the start of the retrofit implementation). The remaining 11 months will be automatically populated. In addition, for each month pre-retrofit, please indicate the exact consumption as indicated in your utility bill. |
||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Monthly Consumption Pre-retrofit |
DATE | Consumption | DATE | Consumption | DATE | Consumption | DATE | Consumption | DATE | Consumption |
Month | 0 | Month | 0 | Month | 0 | Month | 0 | Month | 0 | |
Month 1 | June | September | January | February | November | |||||
Month 2 | July | October | February | March | December | |||||
Month 3 | August | November | March | April | January | |||||
Month 4 | September | December | April | May | February | |||||
Month 5 | October | January | May | June | March | |||||
Month 6 | November | February | June | July | April | |||||
Month 7 | December | March | July | August | May | |||||
Month 8 | January | April | August | September | June | |||||
Month 9 | February | May | September | October | July | |||||
Month 10 | March | June | October | November | August | |||||
Month 11 | April | July | November | December | September | |||||
Month 12 | May | August | December | January | October | |||||
For each utility meter, please use the drop-down menu to indicate the first month of post-retrofit consumption data. The remaining 11 months will be automatically populated. In addition, for each month post-retrofit, please indicate the exact consumption as indicated in your utility bill. |
||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Monthly Consumption Post-retrofit |
DATE | Consumption | DATE | Consumption | DATE | Consumption | DATE | Consumption | DATE | Consumption |
Month | 0 | Month | 0 | Month | 0 | Month | 0 | Month | 0 | |
Month 1 | July | September | July | June | November | |||||
Month 2 | August | October | August | July | December | |||||
Month 3 | September | November | September | August | January | |||||
Month 4 | October | December | October | September | February | |||||
Month 5 | November | January | November | October | March | |||||
Month 6 | December | February | December | November | April | |||||
Month 7 | January | March | January | December | May | |||||
Month 8 | February | April | February | January | June | |||||
Month 9 | March | May | March | February | July | |||||
Month 10 | April | June | April | March | August | |||||
Month 11 | May | July | May | April | September | |||||
Month 12 | June | August | June | May | October |
This worksheet describes the retrofit conducted in this AMP as a result of the grant under study. This information is from the RAMPS system, and is provided for your reference. | |
PHA Identifier | |
AMP Identifier | |
Energy Conservation Measures Implemented | Units Affected |
Doors and Windows | |
EE Replacement Windows | |
EE Replacement Exterior Doors | |
EE Storm Doors | |
EE Storm Windows | |
EE Window Film | |
Insulation and Air Sealing | |
Attic or Roof Insulation | |
Air Sealing | |
Heating and Cooling | |
Install Flue/Vent Dampers | |
Install Constant Air Regulating Dampers | |
Convert to Electronic Ignition | |
Replace Inefficient Heating Plant | |
Insulate Hot Water or Steam Pipes | |
Seal and Insulate Ducts | |
Replace Inefficient Central Air Conditioners | |
Replace HVAC Pump Motors | |
HVAC/Temperature Controls | |
Install Boiler Controls/Outdoor Air Reset | |
Install Radiator Controls (Units) | |
Install Programmable Thermostats (Units) | |
Domestic Hot Water | |
Insulate Hot Water Tanks | |
Convert Laundry to Cold Rinse | |
Replace Inefficient Hot Water Heater | |
Install Summertime DHW Heaters | |
Lighting | |
Replace Incandescent Lighting with CFLs (Units) Install LED Exit Signs | |
Replace Outdoor and Common Area Lighting Fixtures Install Outdoor and Common Area Lighting Controls | |
Appliances | |
Replace inefficient Refrigerators | |
Replace Inefficient Clothes Washers | |
Replace Inefficient Window AC Units | |
Replace Inefficient Dishwashers | |
Water Conservation | |
Install Water-saving Toilets | |
Low-flow Showerheads and Faucet Aerators | |
Grey Water Recycling | |
Renewable Energy | |
Install Photovoltaic Panels | |
Install Cogeneration/Micro Combined Heat and Power Systems | |
Green measures | |
Install Green Roofs | |
Use Low or No-VOC Paints | |
Use of Green Building Products | |
Install Spot Ventilation | |
Install advanced utility metering | |
* Data to be pulled from RAMPS |
PHA - AMP Utility Consumption: ELECTRICITY | ||||||||||
This sheet requests specific information regarding monthly utility consumption for one full year before and one full year after the implementation of the retrofit. Please provide the requested information in the shaded cells |
||||||||||
PHA Identifier | ||||||||||
AMP Identifier | ||||||||||
ELECTRICITY | ||||||||||
Please use the drop-down menu to indicate whether tenants pays for this utility for their units. | ||||||||||
Do tenants pay their electricity bill directly to the utility for any units in the AMP? | ||||||||||
How many electricity meters are there for which the PHA has usage data in this AMP? | ||||||||||
Do these meters cover the electricity usage in all common areas of the AMP? | ||||||||||
For each utility meter, please inidcate ID, location, whether the meter was utilized prior to the retrofit, and whether it was utilized after the retrofit. In addition, using the drop-down menu, please indicate if the meter measures consumption in common areas only, in units only, or in both common areas and units. | ||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Meter Location (Building address) | ||||||||||
Meter ID | ||||||||||
Used Pre-retrofit: Yes/No | ||||||||||
Used Post-retrofit: Yes/No | ||||||||||
Meter measures utility consumption in the following areas: | ||||||||||
Number of units covered by meter | ||||||||||
Number of units in building | ||||||||||
For each utility meter, please indicate the exact start and end dates of the pre and post retrofit utility consumption data provided | ||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Pre-retrofit Start Date Consumption data (MM/DD/YYYY) |
||||||||||
Pre-retrofit End Date Consumption data (MM/DD/YYYY) |
||||||||||
Post-retrofit Start Date Consumption data (MM/DD/YYYY) |
||||||||||
Post-retrofit End Date Consumption data (MM/DD/YYYY) |
||||||||||
For each utility meter, please use the drop-down menu to indicate the first month of pre-retrofit consumption data (this month should be exactly one year prior to the start of the retrofit implementation). The remaining 11 months will be automatically populated. In addition, for each month pre-retrofit, please indicate the exact consumption as indicated in your utility bill. |
||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Monthly Consumption Pre-retrofit |
DATE | Consumption | DATE | Consumption | DATE | Consumption | DATE | Consumption | DATE | Consumption |
Month | KWH | Month | KWH | Month | KWH | Month | KWH | Month | KWH | |
Month 1 | June | August | May | February | November | |||||
Month 2 | July | September | June | March | December | |||||
Month 3 | August | October | July | April | January | |||||
Month 4 | September | November | August | May | February | |||||
Month 5 | October | December | September | June | March | |||||
Month 6 | November | January | October | July | April | |||||
Month 7 | December | February | November | August | May | |||||
Month 8 | January | March | December | September | June | |||||
Month 9 | February | April | January | October | July | |||||
Month 10 | March | May | February | November | August | |||||
Month 11 | April | June | March | December | September | |||||
Month 12 | May | July | April | January | October | |||||
For each utility meter, please use the drop-down menu to indicate the first month of post-retrofit consumption data. The remaining 11 months will be automatically populated. In addition, for each month post-retrofit, please indicate the exact consumption as indicated in your utility bill. |
||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Monthly Consumption Post-retrofit |
DATE | Consumption | DATE | Consumption | DATE | Consumption | DATE | Consumption | DATE | Consumption |
Month | KWH | Month | KWH | Month | KWH | Month | KWH | Month | KWH | |
Month 1 | July | September | July | June | November | |||||
Month 2 | August | October | August | July | December | |||||
Month 3 | September | November | September | August | January | |||||
Month 4 | October | December | October | September | February | |||||
Month 5 | November | January | November | October | March | |||||
Month 6 | December | February | December | November | April | |||||
Month 7 | January | March | January | December | May | |||||
Month 8 | February | April | February | January | June | |||||
Month 9 | March | May | March | February | July | |||||
Month 10 | April | June | April | March | August | |||||
Month 11 | May | July | May | April | September | |||||
Month 12 | June | August | June | May | October |
PHA - AMP Utility Consumption: NATURAL GAS | ||||||||||
This sheet requests specific information regarding monthly utility consumption for one full year before and one full year after the implementation of the retrofit. Please provide the requested information in the shaded cells |
||||||||||
PHA Identifier | ||||||||||
AMP Identifier | ||||||||||
NATURAL GAS | ||||||||||
Please use the drop-down menu to indicate whether tenants pays for this utility for their units. | ||||||||||
Do tenants pay their natural gas bill directly to the utility for any units in the AMP? | ||||||||||
How many natural gas meters are there for which the PHA has usage data in this AMP? | ||||||||||
Do these meters cover the natural gas usage in all common areas of the AMP? | ||||||||||
For each utility meter, please inidcate ID, location, whether the meter was utilized prior to the retrofit, and whether it was utilized after the retrofit. In addition, using the drop-down menu, please indicate if the meter measures consumption in common areas only, in units only, or in both common areas and units. | ||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Meter Location (Building address) | ||||||||||
Meter ID | ||||||||||
Used Pre-retrofit: Yes/No | ||||||||||
Used Post-retrofit: Yes/No | ||||||||||
Meter measures utility consumption in the following areas: | ||||||||||
Number of units covered by meter | ||||||||||
Number of units in building | ||||||||||
For each utility meter, please indicate the exact start and end dates of the pre and post retrofit utility consumption data provided | ||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Pre-retrofit Start Date Consumption data (MM/DD/YYYY) |
||||||||||
Pre-retrofit End Date Consumption data (MM/DD/YYYY) |
||||||||||
Post-retrofit Start Date Consumption data (MM/DD/YYYY) |
||||||||||
Post-retrofit End Date Consumption data (MM/DD/YYYY) |
||||||||||
For each utility meter, please use the drop-down menu to indicate the units in which utility consumption is measured | ||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Consumption measuring units: | ||||||||||
For each utility meter, please use the drop-down menu to indicate the first month of pre-retrofit consumption data (this month should be exactly one year prior to the start of the retrofit implementation). The remaining 11 months will be automatically populated. In addition, for each month pre-retrofit, please indicate the exact consumption as indicated in your utility bill. |
||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Monthly Consumption Pre-retrofit |
DATE | Consumption | DATE | Consumption | DATE | Consumption | DATE | Consumption | DATE | Consumption |
Month | 0 | Month | 0 | Month | 0 | Month | 0 | Month | 0 | |
Month 1 | January | November | April | February | November | |||||
Month 2 | February | December | May | March | December | |||||
Month 3 | March | January | June | April | January | |||||
Month 4 | April | February | July | May | February | |||||
Month 5 | May | March | August | June | March | |||||
Month 6 | June | April | September | July | April | |||||
Month 7 | July | May | October | August | May | |||||
Month 8 | August | June | November | September | June | |||||
Month 9 | September | July | December | October | July | |||||
Month 10 | October | August | January | November | August | |||||
Month 11 | November | September | February | December | September | |||||
Month 12 | December | October | March | January | October | |||||
For each utility meter, please use the drop-down menu to indicate the first month of post-retrofit consumption data. The remaining 11 months will be automatically populated. In addition, for each month post-retrofit, please indicate the exact consumption as indicated in your utility bill. |
||||||||||
Meter 1 | Meter 2 | Meter 3 | Meter 4 | Meter 5 | ||||||
Monthly Consumption Post-retrofit |
DATE | Consumption | DATE | Consumption | DATE | Consumption | DATE | Consumption | DATE | Consumption |
Month | 0 | Month | 0 | Month | 0 | Month | 0 | Month | 0 | |
Month 1 | July | September | July | June | November | |||||
Month 2 | August | October | August | July | December | |||||
Month 3 | September | November | September | August | January | |||||
Month 4 | October | December | October | September | February | |||||
Month 5 | November | January | November | October | March | |||||
Month 6 | December | February | December | November | April | |||||
Month 7 | January | March | January | December | May | |||||
Month 8 | February | April | February | January | June | |||||
Month 9 | March | May | March | February | July | |||||
Month 10 | April | June | April | March | August | |||||
Month 11 | May | July | May | April | September | |||||
Month 12 | June | August | June | May | October |
File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
File Modified | 0000-00-00 |
File Created | 0000-00-00 |