Information Collection Request

30 CFR Part 780 - Surface Mining Permit Applications - Minimum Requirements for Reclamation and Operation Plans

ICR 201411-1029-004 · OMB 1029-0133 · Historical Inactive

Forms and Documents
DocumentTypeStatusAvailability
780SS.SPR Prop.6-16-15.docx Supporting Statement A Uploaded 2015-06-26 Available
SMCRA.pdf Supplementary Document Uploaded 2015-06-12 Available
30 CFR Part 780e.doc Supplementary Document Uploaded 2015-06-12 Available
IC Document Collections
IC IDCollectionTypeStatusForm
216987 780.12(h) - Stream restoration plan (SRAs) New
216986 780.12(h) - Stream restoration plan (Industry) New
213860 780.38 - What information must I provide concerning support facilities? (SRAs) New
213859 780.38 - What information must I provide concerning support facilities? (Industry) New
213858 780.37 - What information must I provide concerning access and haul roads? (SRAs) New
213857 780.37 - What information must I provide concerning access and haul roads? (Industry) New
213856 780.35 - What information must I provide concerning the minimization and disposal of excess spoil? (SRAs) New
213855 780.35 - What information must I provide concerning the minimization and disposal of excess spoil? (Industry) New
213853 780.33 - What information must I provide concerning the relocation or use of public roads? (SRAs) New
213852 780.33 - What information must I provide concerning the relocation or use of public roads? (Industry) New
213851 780.31 - What information must I provide concerning the protection of publicly owned parks and historic places? (SRAs) New
213850 780.31 - What information must I provide concerning the protection of publicly owned parks and historic places? (Industry) New
213849 780.29 - What information must I include in the surface-water runoff control plan? (SRAs) New
213848 780.29 - What information must I include in the surface-water runoff control plan? (Industry) New
213847 780.28 - What additional requirements apply to activities in, through, or adjacent to streams? (SRAs) New
213846 780.28 - What additional requirements apply to activities in, through, or adjacent to streams? (Industry) New
213845 780.27 - What special requirements apply to surface mining near underground mining? (SRAs) New
213844 780.27 - What special requirements apply to surface mining near underground mining? (Industry) New
213843 780.25 - What information must I provide for siltation structures, impoundments, and refuse piles? (SRAs) New
213842 780.25 - What information must I provide for siltation structures, impoundments, and refuse piles? (Industry) New
213841 780.24 - What requirements apply to the postmining land use? (SRAs) New
213840 780.24 - What requirements apply to the postmining land use? (Industry) New
213839 780.23 - What information must I include in plans for the monitoring of groundwater, surface water, and the biological condition of streams during and after mining? (SRAs) New
213808 780.23 - What information must I include in plans for the monitoring of groundwater, surface water, and the biological condition of streams during and after mining? (Industry) New
213807 780.22 - What information must I include in the hydrologic reclamation plan and what information must I provide on alternative water sources? (SRAs) New
213806 780.22 - What information must I include in the hydrologic reclamation plan and what information must I provide on alternative water sources? (Industry) New
213805 780.21 - What requirements apply to preparation and review of the cumulative hydrologic impact assessment (CHIA)? (SRAs) New
213804 780.21 - What requirements apply to preparation and review of the cumulative hydrologic impact assessment (CHIA)? (Industry) New
213803 780.20 - How must I prepare the determination of the probable hydrologic consequences of my proposed operation (PHC determination)? (SRAs) New
213802 780.20 - How must I prepare the determination of the probable hydrologic consequences of my proposed operation (PHC determination)? (Industry) New
213798 780.19 - What baseline information on hydrology, geology, and aquatic biology must I provide? (SRAs) New
213795 780.19 - What baseline information on hydrology, geology, and aquatic biology must I provide? (industry) New
213794 780.16 - What must I include in the fish and wildlife protection and enhancement plan? (SRAs) New
213793 780.16 - What must I include in the fish and wildlife protection and enhancement plan? (Industry) New
213792 780.15 - What plans for the use of explosives must I include in my application? (SRAs) New
213790 780.15 - What plans for the use of explosives must I include in my application? (Industry) New
213789 780.14 - What requirements apply to the use of existing structures? (SRAs) New
213788 780.14 - What requirements apply to the use of existing structures? (Industry) New
213787 780.13 - What additional maps and plans must I include in the reclamation plan? (SRAs) New
213786 780.13 - What additional maps and plans must I include in the reclamation plan? (Industry) New
213784 780.12 - What must the reclamation plan include? (SRAs) New
213783 780.12 - What must the reclamation plan include? (Industry) New
213782 780.11 - What must I include in the general description of my proposed operations? (SRA) New
213779 780.11 - What must I include in the general description of my proposed operations? (Industry) New
ICR Details
1029-0133 201411-1029-004
Historical Inactive
DOI/OSMRE Part 780 - Proposed SPR
30 CFR Part 780 - Surface Mining Permit Applications - Minimum Requirements for Reclamation and Operation Plans
New collection (Request for a new OMB Control Number)   No
Regular
Comment filed on proposed rule 09/08/2015
Retrieve Notice of Action (NOA) 07/29/2015
In accordance with 5 CFR 1320, OMB is withholding approval at this time. Prior to publication of the final rule, the agency must submit to OMB a summary of all comments related to the information collection contained in the proposed rule and the agency response. The agency should clearly indicate any changes made to the information collection as a result of these comments.
  Inventory as of this Action Requested Previously Approved
36 Months From Approved
0 0 0
0 0 0
0 0 0

Permit application requirements in Sections 507, 508, 510, 515 and 522 of PL 95-87 require the applicant to submit the operations and reclamation plans for coal mining activities.

PL: Pub.L. 95 - 87 507, 508, 510, 515, 522 Name of Law: Surface Mining Control and Reclamation Act
  
None

1029-AC63 Proposed rulemaking 80 FR 44436 07/27/2015

No

44
IC Title Form No. Form Name
780.23 - What information must I include in plans for the monitoring of groundwater, surface water, and the biological condition of streams during and after mining? (SRAs)
780.24 - What requirements apply to the postmining land use? (Industry)
780.25 - What information must I provide for siltation structures, impoundments, and refuse piles? (Industry)
780.27 - What special requirements apply to surface mining near underground mining? (SRAs)
780.31 - What information must I provide concerning the protection of publicly owned parks and historic places? (Industry)
780.31 - What information must I provide concerning the protection of publicly owned parks and historic places? (SRAs)
780.33 - What information must I provide concerning the relocation or use of public roads? (Industry)
780.38 - What information must I provide concerning support facilities? (SRAs)
780.11 - What must I include in the general description of my proposed operations? (SRA)
780.12 - What must the reclamation plan include? (Industry)
780.12 - What must the reclamation plan include? (SRAs)
780.15 - What plans for the use of explosives must I include in my application? (Industry)
780.11 - What must I include in the general description of my proposed operations? (Industry)
780.13 - What additional maps and plans must I include in the reclamation plan? (Industry)
780.13 - What additional maps and plans must I include in the reclamation plan? (SRAs)
780.14 - What requirements apply to the use of existing structures? (SRAs)
780.15 - What plans for the use of explosives must I include in my application? (SRAs)
780.19 - What baseline information on hydrology, geology, and aquatic biology must I provide? (industry)
780.25 - What information must I provide for siltation structures, impoundments, and refuse piles? (SRAs)
780.27 - What special requirements apply to surface mining near underground mining? (Industry)
780.28 - What additional requirements apply to activities in, through, or adjacent to streams? (Industry)
780.28 - What additional requirements apply to activities in, through, or adjacent to streams? (SRAs)
780.24 - What requirements apply to the postmining land use? (SRAs)
780.29 - What information must I include in the surface-water runoff control plan? (Industry)
780.29 - What information must I include in the surface-water runoff control plan? (SRAs)
780.33 - What information must I provide concerning the relocation or use of public roads? (SRAs)
780.37 - What information must I provide concerning access and haul roads? (SRAs)
780.14 - What requirements apply to the use of existing structures? (Industry)
780.16 - What must I include in the fish and wildlife protection and enhancement plan? (Industry)
780.16 - What must I include in the fish and wildlife protection and enhancement plan? (SRAs)
780.19 - What baseline information on hydrology, geology, and aquatic biology must I provide? (SRAs)
780.22 - What information must I include in the hydrologic reclamation plan and what information must I provide on alternative water sources? (SRAs)
780.20 - How must I prepare the determination of the probable hydrologic consequences of my proposed operation (PHC determination)? (Industry)
780.20 - How must I prepare the determination of the probable hydrologic consequences of my proposed operation (PHC determination)? (SRAs)
780.21 - What requirements apply to preparation and review of the cumulative hydrologic impact assessment (CHIA)? (SRAs)
780.22 - What information must I include in the hydrologic reclamation plan and what information must I provide on alternative water sources? (Industry)
780.21 - What requirements apply to preparation and review of the cumulative hydrologic impact assessment (CHIA)? (Industry)
780.23 - What information must I include in plans for the monitoring of groundwater, surface water, and the biological condition of streams during and after mining? (Industry)
780.12(h) - Stream restoration plan (Industry)
780.12(h) - Stream restoration plan (SRAs)
780.35 - What information must I provide concerning the minimization and disposal of excess spoil? (Industry)
780.35 - What information must I provide concerning the minimization and disposal of excess spoil? (SRAs)
780.37 - What information must I provide concerning access and haul roads? (Industry)
780.38 - What information must I provide concerning support facilities? (Industry)

Yes
Changing Regulations
No
OSMRE is proposing a Stream Protection Rule which will increase burden by 13,456 hours and $2,853,500 in non-wage costs as programmatic changes.

$111,020
No
No
No
No
No
Uncollected
John Trelease 202 208-2783 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 