NESHAP for Metal Coil Surface Coating Plants (40 CFR part 63, subpart SSSS) (Renewal)

ICR 201503-2060-005

OMB: 2060-0487

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2015-03-17
IC Document Collections
IC ID
Document
Title
Status
24718
Modified
ICR Details
2060-0487 201503-2060-005
Historical Active 201201-2060-007
EPA/OAR 1957.07
NESHAP for Metal Coil Surface Coating Plants (40 CFR part 63, subpart SSSS) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 11/10/2015
Retrieve Notice of Action (NOA) 03/27/2015
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
11/30/2018 36 Months From Approved 11/30/2015
167 0 167
25,145 0 19,901
91,200 0 3,648

This ICR affects respondents from new and existing coil coating line facilities that are major sources of hazardous air pollutant (HAP). Coil coating line is the process in which special equipment is used to apply an organic coating to the surface of metal coils. All NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. Respondents are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. The provisions of this Subpart do not apply to coil coating lines that are part of research or laboratory equipment, or coil coating lines in which 85 percent of the metal coil coated; unless the coating line is controlled by a common control device. The required semiannual reports are used to determine periods of excess emissions, identify problems at the facility, verify operation/maintenance procedures and for compliance determinations. This information is being collected to assure compliance with 40 CFR Part 63, Subpart SSSS.

US Code: 42 USC 7401 et seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  79 FR 30117 05/27/2014
80 FR 16373 03/27/2015
No

1
IC Title Form No. Form Name
NESHAP for Metal Coil Surface Coating Plants (Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 167 167 0 0 0 0
Annual Time Burden (Hours) 25,145 19,901 0 0 5,244 0
Annual Cost Burden (Dollars) 91,200 3,648 0 0 87,552 0
No
No
There is an increase of 5,244 hours in the total estimated respondent burden compared with the ICR currently approved by OMB. This increase is due to an adjustment of burden estimates based on industry comment received from consultation during the renewal of this ICR.

$22,276
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
03/27/2015


© 2024 OMB.report | Privacy Policy