NESHAP for Ferroalloys Production: Ferromanganese and Silicomanganese (Renewal)

ICR 201503-2060-008

OMB: 2060-0391

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2015-04-17
ICR Details
2060-0391 201503-2060-008
Historical Active 201201-2060-004
EPA/OAR 1831.06
NESHAP for Ferroalloys Production: Ferromanganese and Silicomanganese (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 12/22/2015
Retrieve Notice of Action (NOA) 04/24/2015
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
12/31/2018 36 Months From Approved 12/31/2015
10 0 7
600 0 584
0 0 0

The NESHAP applies to ferroalloy production facilities that manufacture ferromanganese and silicomanganese that are major sources of hazardous air pollutants (HAPs) or are co-located at major sources of HAPs. In general, all NESHAP standards require initial notifications, performance tests, and periodic reports. Respondents that are not required to conduct an initial performance test are required to notify the EPA Administrator of the initial compliance status of the source. Sources are also required to monitor and maintain records of its operations including: (1) Process or control device parameters; (2) bag leak detention systems; (3) maintenance plan for air pollution control devices (e.g., capture system and venturi scrubbers); (4) certification that monitoring devices are accurate; and (5) the implementation and corrective actions taken related to the startup, shutdown and malfunction plan and the fugitive dust control plan. The types of periodic reports required by this regulation include: Opacity-related reports; performance test results reports; immediate and periodic startup, shutdown, and malfunction reports; quarterly emissions reports; capture hood inspection reports; fugitive dust operations reports; and annual compliance status reports. These notifications, reports, and records are essential in determining compliance, and are required of all sources subject to NESHAP standards. This information is collected to assure compliance with 40 CFR Part 63, Subpart XXX.

US Code: 42 USC 7401 Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  79 FR 30117 05/27/2014
80 FR 22991 04/24/2015
No

1
IC Title Form No. Form Name
NESHAP for Ferroalloys Production: Ferromanganese and Silicomanganese (40 CFR Part 63, Subpart XXX)(Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 10 7 0 0 3 0
Annual Time Burden (Hours) 600 584 0 0 16 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
There is a slight increase of 16 hours in the total estimated respondent burden compared with the ICR currently approved by OMB. This is due to the rounding of estimates.

$1,900
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
04/24/2015


© 2024 OMB.report | Privacy Policy