IC15-3 30-day notice

IC15-3 30-day notice.pdf

FERC-587, Land Description (Public Land States/Non-Public Land States (Rectangular or Non Rectangular Survey System Lands in Public Land States))

IC15-3 30-day notice

OMB: 1902-0145

Document [pdf]
Download: pdf | pdf
35642

Federal Register / Vol. 80, No. 119 / Monday, June 22, 2015 / Notices

Dated: June 16, 2015.
Kimberly D. Bose,
Secretary.

other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 11, 2015.
Kimberly D. Bose,
Secretary.

[FR Doc. 2015–15232 Filed 6–19–15; 8:45 am]
BILLING CODE 6717–0–P

[FR Doc. 2015–15234 Filed 6–19–15; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission

DEPARTMENT OF ENERGY

Combined Notice of Filings

Federal Energy Regulatory
Commission

Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:

[Docket No. IC15–3–000]

tkelley on DSK3SPTVN1PROD with NOTICES

Filings Instituting Proceedings
Docket Numbers: PR15–37–000.
Applicants: Bay Gas Storage
Company, Ltd.
Description: Submits tariff filing per
284.123(b)(2) + (g): Petition for
Approval of Rates_6.8.15 to be effective
6/8/2015 Filing Type: 1310.
Filed Date: 6/8/15.
Accession Number: 20150608–5133.
Comments Due: 5 p.m. ET 6/29/15.
284.123(g) Protests Due: 5 p.m. ET
8/7/15.
Docket Numbers: RP15–1055–000.
Applicants: Dominion Transmission,
Inc.
Description: § 4(d) rate filing per
154.204: DTI—Dekaflow Transition to
be effective 7/11/2015.
Filed Date: 6/10/15.
Accession Number: 20150610–5236.
Comments Due: 5 p.m. ET 6/22/15.
Docket Numbers: RP15–1056–000.
Applicants: Dominion Cove Point
LNG, LP.
Description: § 4(d) rate filing per
154.204: DCP—Dekaflow Transition to
be effective 7/11/2015.
Filed Date: 6/10/15.
Accession Number: 20150610–5244.
Comments Due: 5 p.m. ET 6/22/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For

VerDate Sep<11>2014

17:45 Jun 19, 2015

Jkt 235001

Commission Information Collection
Activities, (FERC–567 and FERC–587),
Comment Request
Federal Energy Regulatory
Commission, Energy.
ACTION: Comment request.
AGENCY:

In compliance with the
requirements of the Paperwork
Reduction Act of 1995, 44 U.S.C.
3507(a)(1)(D), the Federal Energy
Regulatory Commission (Commission or
FERC) is submitting these information
collections [FERC–567 (Gas Pipeline
Certificates: Annual Reports of System
Flow Diagrams and System Capacity)
and FERC–587 (Land Description
(Public Land States/Non-Public Land
States [Rectangular or Non-Rectangular
Survey System Lands in Public Land
States])] to the Office of Management
and Budget (OMB) for review of the
information collection requirements.
Any interested person may file
comments directly with OMB and
should address a copy of those
comments to the Commission as
explained below. The Commission
previously issued a Notice in the
Federal Register (80 FR 19308, 4/10/
2015) requesting public comments. The
Commission received no comments on
neither the FERC–567 nor FERC–587
and is making this notation in its
submittal to OMB.
DATES: Comments on the collection of
information are due by July 22, 2015.
ADDRESSES: Comments filed with OMB,
identified by the OMB Control No.
1902–0005 (FERC–567) and 1902–0145
(FERC–587) should be sent via email to
the Office of Information and Regulatory
Affairs: [email protected].
Attention: Federal Energy Regulatory
Commission Desk Officer. The Desk
Officer may also be reached via
telephone at 202–395–4718.
A copy of the comments should also
be sent to the Commission, in Docket
No. IC15–3–000, by either of the
following methods:
SUMMARY:

PO 00000

Frm 00019

Fmt 4703

Sfmt 4703

• eFiling at Commission’s Web site:
http://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: http://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
[email protected], or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at [email protected], by
telephone at (202) 502–8663, and by fax
at (202) 273–0873.
SUPPLEMENTARY INFORMATION:
Type of Request: Three-year extension
of the information collection
requirements for all collections
described below with no changes to the
current reporting requirements. Please
note that each collection is distinct from
the next.
Comments: Comments are invited on:
(1) Whether the collections of
information are necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s
estimates of the burden and cost of the
collections of information, including the
validity of the methodology and
assumptions used; (3) ways to enhance
the quality, utility and clarity of the
information collections; and (4) ways to
minimize the burden of the collections
of information on those who are to
respond, including the use of automated
collection techniques or other forms of
information technology.
FERC–567, [Gas Pipeline Certificates:
Annual Reports of System Flow
Diagrams and System Capacity]
OMB Control No.: 1902–0005.
Abstract: The Commission uses the
information from the FERC–567 to
obtain accurate data on pipeline
facilities and the peak capacity of these
facilities. Additionally, the Commission
validates the need for new facilities
proposed by pipelines in certificate
applications. By modeling an
applicant’s pipeline system,
Commission staff utilizes the FERC–567

E:\FR\FM\22JNN1.SGM

22JNN1

35643

Federal Register / Vol. 80, No. 119 / Monday, June 22, 2015 / Notices
data to determine configuration and
location of installed pipeline facilities;
verify and determine the receipt and
delivery points between shippers,
producers and pipeline companies;
determine the location of receipt and
delivery points and emergency
interconnections on a pipeline system;
determine the location of pipeline
segments, laterals and compressor
stations on a pipeline system; verify
pipeline segment lengths and pipeline
diameters; justify the maximum
allowable operating pressures and
suction and discharge pressures at

compressor stations; verify the installed
horsepower and volumes compressed at
each compressor station; determine the
existing shippers and producers
currently using each pipeline company;
verify peak capacity on the system; and
develop and evaluate alternatives to the
proposed facilities as a means to
mitigate environmental impact of new
pipeline construction.
18 Code of Federal Regulations (CFR)
260.8(a) requires each major natural gas
pipeline with a system delivery capacity
exceeding 100,000 Mcf 1 per day to
submit by June 1 of each year, diagrams
reflecting operating conditions on the

pipeline’s main transmission system
during the previous 12 months ended
December 31. These physical/
engineering data are not included as
part of any other data collection
requirement.
Type of Respondent: Applicants
proposing hydropower projects on (or
changes to existing projects located
within) lands owned by the United
States.
Estimate of Annual Burden: The
Commission estimates the annual public
reporting burden for the information
collection as:

FERC–567—GAS PIPELINE CERTIFICATES: ANNUAL REPORTS OF SYSTEM FLOW DIAGRAMS AND SYSTEM CAPACITY
Number of
respondents

Annual
number of
responses per
respondent

Total number
of responses

Average
burden hours
and cost
per response 2

Total annual
burden hours
and total
annual cost

Cost per
respondent
($)

(1)

(2)

(1)*(2)=(3)

(4)

(3)*(4)=(5)

(5)÷(1)

FERC–567 Applicants ..............................

93

FERC–587, [Land Description (Public
Land States/Non-Public Land States
[Rectangular or Non-Rectangular
Survey System Lands in Public Land
States])]
OMB Control No.: 1902–0145.
Abstract: The Commission requires
the FERC–587 information collection to
satisfy the requirements of section 24 of
the Federal Power Act (FPA). The
Federal Power Act grants the
Commission authority to issue licenses
for the development and improvement
of navigation and for the development,
transmission, and utilization of power
across, along, from or in any of the
steams or other bodies of water over
which Congress has jurisdiction.3 The

1

93

Electric Consumers Protection Act
(ECPA) amends the FPA to allow the
Commission the responsibility of
issuing licenses for nonfederal
hydroelectric plants.4 section 24 of the
FPA requires that applicants proposing
hydropower projects on (or changes to
existing projects located within) lands
owned by the United States to provide
a description of the applicable U.S.
land. Additionally, the FPA requires the
notification of the Commission and
Secretary of the Interior of the
hydropower proposal. FERC–587
consolidates the information required
and identifies hydropower project
boundary maps associated with the
applicable U.S. land.

3
$216

279
$20,088

$216

The information consolidated by the
Form No. 587 verifies the accuracy of
the information provided for the FERC–
587 to the Bureau of Land Management
(BLM) and the Department of the
Interior (DOI). Moreover, this
information ensures that U.S. lands can
be reserved as hydropower sites and
withdrawn from other uses.
Type of Respondent: Applicants
proposing hydropower projects on (or
changes to existing projects located
within) lands owned by the United
States.
Estimate of Annual Burden: The
Commission estimates the annual public
reporting burden for the information
collection as:

FERC–587—LAND DESCRIPTION (PUBLIC LAND STATES/NON-PUBLIC LAND STATES [RECTANGULAR OR NONRECTANGULAR SURVEY SYSTEM LANDS IN PUBLIC LAND STATES])
Number of
respondents

Annual
number of
responses per
respondent

Total number
of responses

Average
burden hours
and cost per
response 2

Total annual
burden hours
and total
annual cost

Cost per
respondent
($)

(1)

(2)

(1)*(2)=(3)

(4)

(3)*(4)=(5)

(5)÷(1)

tkelley on DSK3SPTVN1PROD with NOTICES

Hydropower Project Applicants ................

137

1 ‘‘Mcf’’ is an abbreviation denoting a thousand
cubic feet of natural gas.
2 The estimates for cost per response are derived
using the following formula: Average Burden Hours

VerDate Sep<11>2014

17:45 Jun 19, 2015

Jkt 235001

1

137

per Response * $72 per Hour = Average Cost per
Response. The hourly cost figure comes from the
FERC average salary. Subject matter experts found
that industry employment costs closely resemble

PO 00000

Frm 00020

Fmt 4703

Sfmt 4703

1
$72

137
$9,864

FERC’s regarding the FERC–567 information
collection.
3 16 U.S.C. Section 797d (2010)
4 Public Law 99–495, 100 Stat. 1243 (1996)

E:\FR\FM\22JNN1.SGM

22JNN1

$72

35644

Federal Register / Vol. 80, No. 119 / Monday, June 22, 2015 / Notices

Dated: June 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–15233 Filed 6–19–15; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission

tkelley on DSK3SPTVN1PROD with NOTICES

Combined Notice Of Filings #2
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG15–96–000.
Applicants: 87RL 8me LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of 87RL 8me LLC.
Filed Date: 6/16/15.
Accession Number: 20150616–5089.
Comments Due: 5 p.m. ET 7/7/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–520–001.
Applicants: Deseret Generation &
Transmission Co-operative, Inc.
Description: Compliance filing per 35:
Compliance Filing to May 18 Order to
be effective 2/2/2015.
Filed Date: 6/16/15
Accession Number: 20150616–5154.
Comments Due: 5 p.m. ET 7/7/15.
Docket Numbers: ER15–528–001.
Applicants: Golden Spread Electric
Cooperative, Inc.
Description: Compliance filing per 35:
OATT Order No. 676–H Second
Compliance Filing to be effective 5/15/
2015.
Filed Date: 6/16/15.
Accession Number: 20150616–5269.
Comments Due: 5 p.m. ET 7/7/15.
Docket Numbers: ER15–1541–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing per 35:
2015–06–16_SA 764 Compliance ATCWisconsin Electric Bill of Sales to be
effective N/A.
Filed Date: 6/16/15.
Accession Number: 20150616–5145.
Comments Due: 5 p.m. ET 7/7/15.
Docket Numbers: ER15–1920–000.
Applicants: MATL LLP.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Attachment L
Creditworthiness Filing to be effective
6/16/2015.
Filed Date: 6/16/15.
Accession Number: 20150616–5001.
Comments Due: 5 p.m. ET 7/7/15.
Docket Numbers: ER15–1921–000.
Applicants: Southern California
Edison Company.

VerDate Sep<11>2014

17:45 Jun 19, 2015

Jkt 235001

Description: Tariff Withdrawal per
35.15: Notices of Cancellation LGIA and
Distribution Service Agmt Daggett Ridge
to be effective 8/31/2013.
Filed Date: 6/16/15.
Accession Number: 20150616–5007.
Comments Due: 5 p.m. ET 7/7/15.
Docket Numbers: ER15–1924–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Bylaws Revision for
Board of Directors Expansion to be
effective 8/15/2015.
Filed Date: 6/16/15.
Accession Number: 20150616–5155.
Comments Due: 5 p.m. ET 7/7/15.
Docket Numbers: ER15–1925–000.
Applicants: Breckinridge Wind
Project, LLC.
Description: Baseline eTariff Filing
per 35.1: Breckinridge Wind Project,
LLC Market-Based Rate Application to
be effective 8/1/2015.
Filed Date: 6/16/15.
Accession Number: 20150616–5195.
Comments Due: 5 p.m. ET 7/7/15.
Docket Numbers: ER15–1926–000.
Applicants: Innoventive Power LLC.
Description: Request of Innoventive
Power LLC for Limited Tariff Waiver on
an Expedited Basis.
Filed Date: 6/16/15.
Accession Number: 20150616–5213.
Comments Due: 5 p.m. ET 6/26/15.
Docket Numbers: ER15–1927–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Withdrawal per
35.15: Notice of Cancellation of
Interconnection Service Agreement to
be effective 7/8/2015.
Filed Date: 6/16/15.
Accession Number: 20150616–5215.
Comments Due: 5 p.m. ET 7/7/15.
Docket Numbers: ER15–1928–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 2015–06–16_SA 1564
NSP–NSP 2nd Rev. GIA (G237/J320) to
be effective 6/17/2015.
Filed Date: 6/16/15.
Accession Number: 20150616–5234.
Comments Due: 5 p.m. ET 7/7/15.
Docket Numbers: ER15–1929–000.
Applicants: Louisville Gas and
Electric Company.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Revised Att M LGIP to
be effective 8/17/2015.
Filed Date: 6/16/15.
Accession Number: 20150616–5235.
Comments Due: 5 p.m. ET 7/7/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.

PO 00000

Frm 00021

Fmt 4703

Sfmt 4703

Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–15231 Filed 6–19–15; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–2489–005;
ER12–726–004; ER12–2639–003; ER11–
3620–007; ER11–2882–008; ER10–2432–
007; ER10–2435–007; ER10–2440–007;
ER10–2442–007; ER10–2444–007; ER10–
2446–007; ER10–2449–007; ER12–1431–
005; ER12–1434–005; ER12–1432–005;
ER12–1435–005; ER13–2102–003; ER12–
2510–004; ER12–2511–004; ER12–2512–
004; ER12–2513–004; ER13–2308–002;
ER14–1439–002; ER14–1656–004; ER15–
1019–001; ER10–2628–002 ; ER11–3959–
004.
Applicants: Hatchet Ridge Wind, LLC,
Spring Valley Wind LLC, Ocotillo
Express LLC, Lyonsdale Biomass, LLC,
ReEnergy Sterling CT Limited
Partnership, Bayonne Plant Holding,
L.L.C., Camden Plant Holding, L.L.C.,
Dartmouth Power Associates Limited
Partnership, Elmwood Park Power, LLC,
Newark Bay Cogeneration Partnership,
L.P, Pedricktown Cogeneration
Company LP, York Generation Company
LLC, ReEnergy Ashland LLC, ReEnergy
Fort Fairfield LLC, ReEnergy Livermore
Falls LLC, ReEnergy Stratton LLC,
ReEnergy Black River LLC, Brandon
Shores LLC, C.P. Crane LLC, H.A.
Wagner LLC, Raven Power Marketing
LLC, Sapphire Power Marketing LLC,
TrailStone Power, LLC, CSOLAR IV
West, LLC, Fowler Ridge IV Wind Farm

E:\FR\FM\22JNN1.SGM

22JNN1


File Typeapplication/pdf
File Modified2015-06-22
File Created2015-06-22

© 2024 OMB.report | Privacy Policy