NESHAP for Nine Metal Fabrication and Area Finishing Source (40 CFR Part 63, Subpart XXXXXX) (Renewal)

ICR 201506-2060-001

OMB: 2060-0622

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2015-06-17
IC Document Collections
ICR Details
2060-0622 201506-2060-001
Historical Active 201204-2060-013
EPA/OAR 2298.04
NESHAP for Nine Metal Fabrication and Area Finishing Source (40 CFR Part 63, Subpart XXXXXX) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 03/01/2016
Retrieve Notice of Action (NOA) 06/30/2015
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
03/31/2019 36 Months From Approved 02/29/2016
6,090 0 1,933
35,700 0 20,562
0 0 0

EPA is issuing national emission standards for control of hazardous air pollutants for nine metal fabrication and finishing area source categories: (1) Electrical and Electronic Equipment Finishing Operations; (2) Fabricated Metal Products; (3) Fabricated Plate Work (Boiler Shops); (4) Fabricated Structural Metal Manufacturing; (5) Heating Equipment, except Electric; (6) Industrial Machinery and Equipment Finishing Operations; (7) Iron and Steel Forging; (8) Primary Metal Products Manufacturing; and (9) Valves and Pipe Fittings. This final rule establishes emission standards in the form of management practices and equipment standards for new and existing operations of dry abrasive blasting, machining, dry grinding and dry polishing with machines, spray painting and other spray coating, and welding operations. These standards reflect EPA's determination regarding the generally achievable control technology and/or management practices for the nine area source categories.

US Code: 42 USC Sec. 7414 Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  79 FR 30117 05/27/2014
80 FR 37247 06/30/2015
No

1
IC Title Form No. Form Name
NESHAP - Area Source Standards - Nine Metal Fabrication and Finishing Source Categories

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 6,090 1,933 0 0 4,157 0
Annual Time Burden (Hours) 35,700 20,562 0 0 15,138 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
There is an adjustment increase in the estimated burden as currently identified in the OMB Inventory of Approved Burdens. The previous ICR incorrectly carried over burdens and costs from initial activities and divided the total number of respondents by three. This ICR is corrected to reflect the annual, on-going burden and costs for existing facilities. In addition, the use of more updated labor rates results in an increase in total labor costs. The overall result is an increase in burden hours and costs.

$640,000
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
06/30/2015


© 2024 OMB.report | Privacy Policy