Reporter Information |
|||
Your Name |
|||
First name* |
|
Last name* |
|
|
|||
Contact Information |
|||
|
I am willing to be contacted for a brief follow-up confidential interview. |
||
Phone Number* |
|
||
Best Time To Call* |
to |
||
Timezone* |
|
||
Best Date To Call* |
to |
||
Message? |
BTS can leave me a voice mail message. |
||
Comment |
|
||
|
|||
I Work In |
|||
Operation* |
|
||
Job Position* |
[1] SEE BELOW |
||
|
|||
Work Experience In Oil And Gas |
|||
Year(s)* |
y(s) |
Month(s)* |
m(s) |
General Event Information |
|||
How did you find out about the Near-miss event you are reporting? |
|||
Source* |
|
||
|
|||
When did the Near-Miss event happen? |
|||
|
I am willing to be contacted for a brief follow-up confidential interview. |
||
Date of Event* |
|
||
Time of Event* |
|
||
Timezone* |
|
||
|
|||
Location of Event |
|||
Water Depth |
ft |
Mile to Shore |
m(s) |
|
|||
Briefly describe the incident in chronological order. Include what happened, work conditions and any other relevant information. |
|||
Description* |
|
||
|
|||
Has this kind of near-miss happened before? |
|||
Happened Before?* |
Yes No Don't Know |
||
Please describe |
|
||
|
|||
During which operation, did the near-miss event happen? |
|||
Operation* |
|
Rig Operations |
|
What is the Rig Type? |
|
Rig Type |
|
|
|
What is the Rig Components/Location on Rig? |
|
Components/Location |
|
|
|
Did the Near-Miss involve Lifting or Hoisting? |
|
Note: If yes, please fill out the lifting and hoisting form on next page. |
|
Lifting and Hoisting?* |
Yes No Don't Know |
Production Operations |
|
What is the Platform/Facility Type? |
|
Platform/Facility Type |
|
|
|
|
|
Is the facility Manned or Unmanned? |
|
Manned? |
Yes No Don't Know |
|
|
What is the Location on Platform/Facility? |
|
Location |
|
|
|
Did the Near-Miss involve Lifting or Hoisting? |
|
Note: If yes, please fill out the lifting and hoisting form on next page. |
|
Lifting and Hoisting?* |
Yes No Don't Know |
Pipeline Operations |
|||
Pipeline Identifying Information |
|||
Operator Name |
|
Pipeline Diameter |
|
|
|||
what material was in pipeline? |
|||
Material in Pipeline |
|
||
|
|||
Was the pipeline in H2s service? |
|||
H2S Service |
Yes No Don't Know |
||
|
|||
Pipeline Activity Equipment |
|||
Environment |
On sea floor On riser Splash Zone Surface Tie-in Subsurface Tie-in Other |
||
|
|||
Did the Near-Miss involve diving or ROV? |
|||
Diving involved? |
Yes No Don't Know |
||
ROV Involved? |
Yes No Don't Know |
||
|
|||
Did the Near-Miss involve Lifting or Hoisting? |
|||
Note: If yes, please fill out the lifting and hoisting form on next page. |
|||
Lifting and Hoisting?* |
Yes No Don't Know |
Transportation Operations |
|
Did the Near-Miss involve a rig? |
|
Rig Involved? |
Yes No Don't Know |
|
|
Did the near miss involve a platform? |
|
Platform Involved? |
Yes No Don't Know |
|
|
At the time of the near-miss, was the motor vessel/helicopter in radio contact with the facility? |
|
In Radio Contact? |
Yes No Don't Know |
|
|
Transportation Mode |
|
Transportation Mode |
|
|
|
Event Location |
|
Event Location |
|
|
|
Work Activity |
|
Work Activity |
|
|
|
Did the Near-Miss involve Lifting or Hoisting? |
|
Note: If yes, please fill out the lifting and hoisting form on next page. |
|
Lifting and Hoisting?* |
Yes No Don't Know |
Lifting And Hoisting Operations |
|
Lifting/Hoisting Activity |
|
Lifting From and To |
|
Material in Pipeline |
|
Device Location |
|
Communication Method Used |
|
|
|
Crane Information |
|
Crane Installation |
|
Crane Type |
|
|
|
Crane Inspection/Maintenance |
|
Equipment Type |
|
Combination of Devices |
|
Pre-Use Inspection? |
Yes No Don't Know |
Last Inspection Date |
|
|
|
Load Information |
|
Load Type |
|
Safety Harness Used? |
Yes No Don't Know |
Life Line Used? |
Yes No Don't Know |
Other Operations |
|
Please describe the Near-Miss Event as detail as possible. |
|
Description* |
|
[1]:
Job Positions (depending on response to “I work in:”)
“I work in”: Rig Operations
Barge Engineer/Ballast Control Operator
Catering Personnel, Camp Staff
Cement Equipment Operator
Crane Operator, Forklift Operator
Deck Supervisor, Deck Coordinator
Derrickman
Coil Service Equipment Operator
Driller (Crew Chief, Coil Service Operator
Driller (Asst Driller)
Floorman
Floorhand (Crew Worker, Coil Service Helper)
Electrician, Electronic Technician
Foam Air Equipment Operator
Heavy Equipment Operators (crane, forklift, excavation)
Maintenance Supervisor
Marine Crew
Mechanic
Mechanic, Repair Technician
HSE (Health Safety and Environment Personnel)
Motorman
Motorman / AD (Coil Service Fluid Pump Operator)
Nitrogen Equipment Operator
Radio Operator
Reverse Unit Operator
Roustabout (Leashand)
Special Service Operator
Stimulation Equipment Operator
Superintendent
Tool Dresser
Tool Pusher (Rig Supervisor, Coil Service Supervisor
Wireline Equipment Operator
Other
“I work in”: Product Operations
Production Operator
Mechanic
Electrician
I&E (Instrumentation)
Welder
Crane Operator
Other
“I work in”: Pipeline Operations
Pipeline Operator
Scada/Leak detection technician
Production Operator
Mechanic
Electrician
I&E (Instrumentation)
Welder
Crane Operator
Other
“I work in”: Lifting and Hoisting Operations
Rig Supervisor
Production Operator
Crane Owner/Representative
Qualified Inspector
Crane Operator
Engineer
Rigger
Signal Person
Vessel Captain or Crew Member
Other
“I work in”: Support Services Operations
Cook
Galley hand
Housekeeping
Other
“I work in”: Helicopter / Motor Vessel Operations
Helicopter pilot-Co-Pilot
Helicopter passenger
Motor Vessel captain
Motor Vessel crew
Motor Vessel passenger
Other
Form No: BTS-0030
File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
Author | USDOT_User |
File Modified | 0000-00-00 |
File Created | 2021-01-24 |