FERC-567, Gas Pipeline Certificates: Annual Reports of System Flow Diagrams

ICR 201507-1902-006

OMB: 1902-0005

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2015-07-29
Supporting Statement A
2015-07-29
Supplementary Document
2015-07-24
Supplementary Document
2015-07-24
Supplementary Document
2012-06-12
IC Document Collections
IC ID
Document
Title
Status
22914
Modified
ICR Details
1902-0005 201507-1902-006
Historical Active 201205-1902-002
FERC FERC-567
FERC-567, Gas Pipeline Certificates: Annual Reports of System Flow Diagrams
Extension without change of a currently approved collection   No
Regular
Approved without change 10/30/2015
Retrieve Notice of Action (NOA) 07/29/2015
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
10/31/2018 36 Months From Approved 10/31/2015
93 0 103
279 0 5,665
0 0 0

The Commission uses the information collected under the requirements of the FERC-567 to obtain accurate data on pipeline facilities. More specifically, the Commission utilizes the FERC-567 to validate the need for new facilities proposed by pipelines in certificate applications. By modeling a pipeline applicant's system, Commission staff utilizes the FERC-567 data to determine configuration/location of installed pipeline facilities, and verify and determine the receipt and delivery points between shippers, producers and pipeline companies. Additionally, the Commissions uses the FERC-567 to determine the location of receipt and delivery points and emergency interconnections on a pipeline system, determine the location of pipeline segments, laterals and compressor stations on a pipeline system, verify pipeline segment lengths and pipeline diameters, justify the maximum allowable operating pressures and suction and discharge pressures at compressor stations, verify the installed horsepower and volumes compressed at each compressor station, determine the existing shippers and producers currently using each pipeline company, and develop and evaluate alternatives to proposed facilities as a means to mitigate environmental impact of new pipeline construction.

US Code: 15 USC 717 Name of Law: Natural Gas Act
  
None

Not associated with rulemaking

  80 FR 19308 04/10/2015
80 FR 35642 06/22/2015
No

1
IC Title Form No. Form Name
FERC-567, Annual Reports of System Flow Diagrams

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 93 103 0 0 -10 0
Annual Time Burden (Hours) 279 5,665 0 0 -5,386 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
FERC staff updated the burden hours to reflect the increased use of technology which makes copying, printing and distributing the engineering diagrams easier and quicker. The increased usage of technology significantly reduced the burden hours associated with the collection. Additionally, the number of respondents decreased from 103 to 93 due to normal fluctuation in the activity concerning gas pipelines.

$79,938
No
No
No
No
No
Uncollected
Sheila Lampitoc 202 502-6193

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
07/29/2015


© 2024 OMB.report | Privacy Policy