SUPPORTING STATEMENT
ENVIRONMENTAL PROTECTION AGENCY
NESHAP for Asbestos (40 CFR Part 61, Subpart M) (Renewal)
1. Identification of the Information Collection
1(a) Title of the Information Collection
NESHAP for Asbestos (40 CFR Part 61, Subpart M) (Renewal), EPA ICR Number 0111.14, OMB Control Number 2060-0101.
1(b) Short Characterization/Abstract
The National Emission Standards for Hazardous Air Pollutants (NESHAP) for the regulations published at 40 CFR Part 61, Subpart M were proposed on January 10, 1989, promulgated on November 20, 1990 (55 FR 48414), and amended on July 20, 2004 (69 FR 43324). These regulations apply to demolition and renovation of facilities; the disposal of asbestos waste; asbestos milling, manufacturing and fabricating; the use of asbestos on roadways; asbestos waste converting facilities; and the use of asbestos insulation and sprayed-on materials. This information is being collected to assure compliance with 40 CFR Part 61, Subpart M.
In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP.
Any owner/operator subject to the provisions of this part shall maintain a file of these measurements, and retain the file for at least two years following the date of such measurements, maintenance reports, and records. All reports are sent to the delegated state or local authority. In the event that there is no such delegated authority, the reports are sent directly to the United States Environmental Protection Agency (EPA) regional office.
Over the next three years, an average of 9,575 existing respondents per year will be subject to the standard, 38 additional respondents per year will become subject, and 10 respondents will no longer be subject to the standard due to facility closure.
The Office of Management and Budget (OMB) approved the currently active ICR without any “Terms of Clearance.”
The term “Affected Public” applies to owners or operators of demolition and renovation of facilities, asbestos waste disposal, asbestos milling, manufacturing and fabricating, use of asbestos on roadways, asbestos waste converting facilities, and the use of asbestos insulation and sprayed-on materials. The burden to the Affected Public may be found in Table 1: Annual Respondent Burden and Cost – NESHAP for Asbestos (40 CFR Part 61, Subpart M) (Renewal). The burden to the “Federal Government” burden is attributed entirely to work performed by federal employees or government contractors, and may be found in Table 2: Average Annual EPA Burden and Cost – NESHAP for Asbestos (40 CFR Part 61, Subpart M) (Renewal).
2. Need for and Use of the Collection
2(a) Need/Authority for the Collection
The EPA is charged under Section 112 of the Clean Air Act, as amended, to establish standards of performance for each category or subcategory of major sources and area sources of hazardous air pollutants. These standards are applicable to new or existing sources of hazardous air pollutants and shall require the maximum degree of emission reduction. In addition, section 114(a) states that the Administrator may require any owner/operator subject to any requirement of this Act to:
(A) Establish and maintain such records; (B) make such reports; (C) install, use, and maintain such monitoring equipment, and use such audit procedures, or methods; (D) sample such emissions (in accordance with such procedures or methods, at such locations, at such intervals, during such periods, and in such manner as the Administrator shall prescribe); (E) keep records on control equipment parameters, production variables or other indirect data when direct monitoring of emissions is impractical; (F) submit compliance certifications in accordance with Section 114(a)(3); and (G) provide such other information as the Administrator may reasonably require.
In the Administrator's judgment, asbestos emissions from demolition and renovation of asbestos-containing structures, the disposal of asbestos waste, asbestos waste converting operations, asbestos milling, manufacturing, and fabricating, the use of asbestos on roadways, and the use of asbestos insulation and spray materials cause or contribute to air pollution that may reasonably be anticipated to endanger public health or welfare. Therefore, the NESHAP were promulgated for this source category at 40 CFR Part 61, Subpart M.
2(b) Practical Utility/Users of the Data
The recordkeeping and reporting requirements in the standard ensure compliance with the applicable regulations which were promulgated in accordance with the Clean Air Act. The collected information is also used for targeting inspections and as evidence in legal proceedings.
Performance tests are required in order to determine an affected facility’s initial capability to comply with the emission standard. Continuous emission monitors are used to ensure compliance with the standard at all times. During the performance test, a record of the operating parameters under which compliance was achieved may be recorded and used to determine compliance in place of a continuous emission monitor.
The notifications required in the standard are used to inform the Agency or delegated authority when a source becomes subject to the requirements of the regulations. The reviewing authority may then inspect the source to check if the pollution control devices are properly installed and operated and that the standard is being met. The performance test may also be observed.
The required periodic reporting on waste management and semiannual compliance certifications are used to determine periods of excess emissions, identify problems at the facility, verify operation/maintenance procedures, and for compliance determinations.
3. Nonduplication, Consultations, and Other Collection Criteria
The requested recordkeeping and reporting are required under 40 CFR Part 61, Subpart M.
3(a) Nonduplication
If the subject standards have not been delegated, the information is sent directly to the appropriate EPA regional office. Otherwise, the information is sent directly to the delegated state or local agency. If a state or local agency has adopted its own similar standards to implement the Federal standards, a copy of the report submitted to the state or local agency can be sent to the Administrator in lieu of the report required by the Federal standards. Therefore, no duplication exists.
3(b) Public Notice Required Prior to ICR Submission to OMB
An announcement of a public comment period for the renewal of this ICR was published in the Federal Register (79 FR 30117) on May 27, 2014. No comments were received on the burden published in the Federal Register.
3(c) Consultations
The Agency has consulted industry experts and internal data sources to project the number of affected facilities and industry growth over the next three years. The primary source of information as reported by industry, in compliance with the recordkeeping and reporting provisions in the standard, is the Enforcement and Compliance History Online (ECHO), which is operated and maintained by EPA's Office of Compliance. ECHO is EPA’s database for the collection, maintenance, and retrieval of all compliance data.
Industry trade associations and other interested parties were provided with an opportunity to comment on the burden associated with the standard when it was being developed and further amended, and the standard has been previously reviewed to determine the minimum information needed for compliance purposes. For the current renewal, EPA contacted both the Waste Business Journal at (619) 793-5190 and the Asphalt Roofing Manufacturers Association (ARMA) at (202) 207-1121.
3(d) Effects of Less Frequent Collection
Less frequent information collection would decrease the margin of assurance that facilities are continuing to meet the standards. Requirements for information gathering and recordkeeping are useful techniques to ensure that good operation and maintenance practices are applied and emission limitations are met. If the information required by these standards was collected less frequently, the proper operation and maintenance of control equipment and the possibility of detecting violations would be less likely.
3(e) General Guidelines
These reporting or recordkeeping requirements do not violate any of the regulations promulgated by OMB under 5 CFR Part 1320, Section 1320.5.
3(f) Confidentiality
Any information submitted to the Agency for which a claim of confidentiality is made will be safeguarded according to the Agency policies set forth in Title 40, Chapter 1, Part 2, Subpart B - Confidentiality of Business Information (see 40 CFR 2; 41 FR 36902, September 1, 1976; amended by 43 FR 40000, September 8, 1978; 43 FR 42251, September 20, 1978; 44 FR 17674, March 23, 1979).
3(g) Sensitive Questions
The reporting or recordkeeping requirements in the standard do not include sensitive questions.
4. The Respondents and the Information Requested
4(a) Respondents/SIC Codes
The respondents to the recordkeeping and reporting requirements are owners or operators of demolition and renovation, asbestos waste disposal, asbestos milling, manufacturing, and fabricating, asbestos on roadways, asbestos waste converting, and asbestos spray operations. The United States Standard Industrial Classification (SIC) codes and corresponding North American Industry Classification System (NAICS) codes for the respondents affected by the standard are listed in the following table.
Standard (40 CFR Part 61, Subpart M) |
SIC Codes |
NAICS Codes |
Motor Vehicle Brake System Manufacturing |
3292 |
33634 |
All Other Miscellaneous Nonmetallic Mineral Product Manufacturing |
2661 |
327999 |
Resilient Floor Covering Manufacturing |
3996 |
326192 |
Alkalies and Chlorine Manufacturing |
2812 |
325181 |
Site Preparation Contractors |
1795 |
238910 |
Land Subdivision |
6552 |
237210 |
New Single-Family Housing Construction (except Operative Builders) |
1521, 8741 |
236115 |
Commercial and Institutional Building Construction |
1522, 1531, 1541, 1542, 1799, 8741 |
236220 |
New Multifamily Housing Construction (except Operative Builders) |
1522, 8741 |
236116 |
Industrial Building Construction |
1531, 1541, 1629, 8741 |
236210 |
Highway, Street, and Bridge Construction |
1611, 1622, 1721, 8741 |
237310 |
Other Heavy and Civil Engineering Construction |
1622, 1629, 1799, 8741 |
237990 |
Water and Sewer Line and Related Structures Construction |
1623, 1629, 1781, 8741 |
237110 |
Remediation Services |
1799, 4959 |
56291 |
Drywall and Insulation Contractors |
1742, 1743 |
238310 |
Poured Concrete Foundation and Structure Contractors |
1771 |
238110 |
Roofing Contractors |
1761 |
238160 |
Siding Contractors |
1761 |
238170 |
Flooring Contractors |
1752 |
238330 |
Tile and Terrazzo Contractors |
1743 |
238340 |
Solid Waste Landfill |
4953 |
562212 |
4(b) Information Requested
(i) Data Items
In this ICR, all the data that is recorded or reported is required by the NESHAP for Asbestos (40 CFR Part 61, Subpart M).
A source must make the following notifications:
Notifications |
|
Notification and application for construction or modification (applicable to asbestos converting sites) |
61.07, 61.155(a) |
Notification of intent to demolish or renovate, including renotifications due to change (applicable to demolition/renovation sites) |
61.145(b) |
Notification of commencement of operations using spray-on materials containing more than 1 percent asbestos (applicable to spray operation sites) |
61.146(b) |
Notification of excavation of asbestos materials (applicable to waste disposal sites) |
61.151(d), 61.154(j) |
A source must make the following reports:
Reports |
|
Control device maintenance plan (applicable to asbestos milling, manufacturing, and fabricating sites) |
61.142(b)(2), 61.144(b)(4), 61.147(b)(4) |
Semiannual visible emissions report (applicable to asbestos milling, manufacturing, and fabricating sites) |
61.142(b)(6), 61.144(b)(8), 61.147(b)(8) |
Waste generator report (applicable to waste disposal sites) |
61.154(e)(2) |
Excepted waste shipment report (applicable to spray operation; demolition/renovation; and asbestos milling, manufacturing, and fabricating sites) |
61.149(e)(3) 61.150(d)(4) |
New source reporting, including information on process emission control equipment (applicable to asbestos milling, manufacturing, and fabricating and waste disposal sites) |
61.153(a), 61.10 |
Improperly contained waste report, including waste shipment record (applicable to waste disposal sites) |
61.154(e)(1)(iv) |
Waste disposal discrepancy report, including waste shipment record (applicable to waste disposal sites) |
61.154(e)(3) |
Report of product composite sample analyses conducted during initial 90 days of operation (applicable to asbestos converting sites) |
61.155(g)(1) |
Quarterly reports of operations and monthly product composite samples (applicable to asbestos converting sites) |
61.155(g)(2) |
Upon facility closure, provide asbestos waste disposal locations and quantities (applicable to waste disposal sites) |
61.154(h) |
A source must keep the following records:
Recordkeeping |
|
Daily visible emissions monitoring and air cleaning device inspections, including two-year records retention (applicable to asbestos milling, manufacturing, and fabricating sites) |
61.142(b)(3 and 5), 61.144(b)(5 and 7), 61.147(b)(5 and 7) |
Cold weather temperature monitoring records, including two-year records retention (applicable to asbestos milling and demolition/renovation sites) |
61.145(c)(7)(iii), 61.149(c)(1)(iii) |
Waste shipment records, including excepted waste shipment reports and two-year records retention (applicable to asbestos converting; spray operation; demolition/renovation; milling, manufacturing, and fabricating; and waste disposal sites) |
61.149(e)(1 and 4), 61.150(d)(1 and 5), 61.154(e)(1 and 4) |
Records of weekly inspection of air cleaning devices (applicable to asbestos milling, manufacturing, and fabricating sites) |
61.142(b)(5), 61.144(b)(7), 61.147(b)(7) |
Records of startup performance testing and initial 90 days of operations, including two-year retention (applicable to asbestos converting sites) |
61.155(f) |
Waste management data of the asbestos-containing materials disposed at landfills such as its location, volume, etc., on a map (applicable to waste disposal sites) |
61.154(f) |
Record of deed once inactive (applicable to waste disposal sites) |
61.151(e) |
Electronic Reporting
Some of the respondents are using monitoring equipment that automatically records parameter data. Although personnel at the affected facility must still evaluate the data, internal automation has significantly reduced the burden associated with monitoring and recordkeeping at a plant site.
Also, regulatory agencies in cooperation with the respondents continue to create reporting systems to transmit data electronically. However, electronic reporting systems are still not widely used. At this time, it is estimated that approximately 10 percent of the respondents use electronic reporting.
(ii) Respondent Activities
Respondent Activities |
Read instructions. |
Perform initial performance test (transmission electron microscopy). |
Write the notifications and reports listed above. |
Enter information required to be recorded above. |
Submit the required reports developing, acquiring, installing, and utilizing technology and systems for the purpose of collecting, validating, and verifying information. |
Develop, acquire, install, and utilize technology and systems for the purpose of processing and maintaining information. |
Develop, acquire, install, and utilize technology and systems for the purpose of disclosing and providing information. |
Adjust the existing ways to comply with any previously applicable instructions and requirements. |
Train personnel to be able to respond to a collection of information. |
Transmit, or otherwise disclose the information. |
Currently sources are using monitoring and reporting equipment that provide parameter data in an automated way (e.g., continuous parameter monitoring system). Although personnel at the source still need to evaluate the data, this type of monitoring equipment has significantly reduced the burden associated with monitoring and recordkeeping.
5. The Information Collected: Agency Activities, Collection Methodology, and Information Management
5(a) Agency Activities
EPA conducts the following activities in connection with the acquisition, analysis, storage, and distribution of the required information.
Agency Activities |
Observe initial performance tests and repeat performance tests, if necessary. |
Review notifications and reports, including performance test reports and excess emissions reports, required to be submitted by industry. |
Audit facility records. |
Input, analyze, and maintain data in Integrated Compliance Information System (ICIS) and ECHO. |
5(b) Collection Methodology and Management
Following notification of startup, the reviewing authority could inspect the source to determine whether the pollution control devices are properly installed and operated. Performance test results included in the composite product sample analysis reports submitted by asbestos converting sites are used by the Agency to discern a source’s capability to comply with the emission standard. Data and records maintained by the respondents are tabulated and published for use in compliance and enforcement programs.
Information contained in the reports is reported by state and local governments in the ICIS Air database, which is operated and maintained by EPA's Office of Compliance. ICIS is EPA’s database for the collection, maintenance, and retrieval of compliance data for industrial and government-owned facilities. EPA uses ICIS for tracking air pollution compliance and enforcement by local and state regulatory agencies, EPA regional offices, and EPA headquarters. EPA and its delegated Authorities can edit, store, retrieve, and analyze the data.
The records required by this regulation must be retained by the owner/operator for two years.
5(c) Small Entity Flexibility
The majority of the respondents are large entities (i.e., large businesses). However, the impact on small entities (i.e., small businesses) was taken into consideration during the development of the regulation. Due to technical considerations involving the process operations and the types of control equipment employed, the recordkeeping and reporting requirements are the same for both small and large entities. The Agency considers these to be the minimum requirements needed to ensure compliance and, therefore, cannot reduce them further for small entities. To the extent that larger businesses can use economies of scale to reduce their burden, the overall burden will be reduced.
5(d) Collection Schedule
The specific frequency for each information collection activity within this request is shown in below Table 1: Annual Respondent Burden and Cost – NESHAP for Asbestos (40 CFR Part 61, Subpart M) (Renewal).
6. Estimating the Burden and Cost of the Collection
Table 1 documents the computation of individual burdens for the recordkeeping and reporting requirements applicable to the industry for the subpart included in this ICR. The individual burdens are expressed under standardized headings believed to be consistent with the concept of burden under the Paperwork Reduction Act. Where appropriate, specific tasks and major assumptions have been identified. Responses to this information collection are mandatory.
The Agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB Control Number.
6(a) Estimating Respondent Burden
The average annual burden to industry over the next three years from these recordkeeping and reporting requirements is estimated to be 292,050 (Total Labor Hours from Table 1). These hours are based on Agency studies and background documents from the development of the regulation, Agency knowledge and experience with the NESHAP program, the previously approved ICR, and any comments received.
6(b) Estimating Respondent Costs
(i) Estimating Labor Costs
This ICR uses the following labor rates:
Managerial $129.93 ($61.87 + 110%)
Technical $103.97 ($49.51 + 110%)
Clerical $51.79 ($24.66 + 110%)
These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2014, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.
(ii) Estimating Capital/Startup and Operation and Maintenance Costs
The only costs to the regulated industry resulting from information collection activities required by the subject standard are labor costs. There are no capital/startup or operation and maintenance (O&M) costs.
(iii) Capital/Startup vs. Operation and Maintenance (O&M) Costs
The only type of industry costs associated with the information collection activity in the regulations is labor costs. There are no capital/startup or O&M costs.
6(c) Estimating Agency Burden and Cost
The only costs to the Agency are those costs associated with analysis of the reported information. EPA's overall compliance and enforcement program includes activities such as the examination of records maintained by the respondents, periodic inspection of sources of emissions, and the publication and distribution of collected information.
The average annual Agency cost during the three years of the ICR is estimated to be $2,093,300.
This cost is based on the average hourly labor rate as follows:
Managerial $62.90 (GS-13, Step 5, $39.31 + 60%)
Technical $46.67 (GS-12, Step 1, $29.17 + 60%)
Clerical $25.25 (GS-6, Step 3, $15.78 + 60%)
These rates are from the Office of Personnel Management (OPM), 2014 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees. Details upon which this estimate is based appear below in Table 2: Average Annual EPA Burden and Cost – NESHAP for Asbestos (40 CFR Part 61, Subpart M) (Renewal).
6(d) Estimating the Respondent Universe and Total Burden and Costs
Based on our research for this ICR, on average over the next three years, approximately 9,575 existing respondents will be subject to the standard. It is estimated that an additional 38 additional respondents per year will become subject, and 10 respondents will no longer be subject to the standard due to facility closure. The overall average number of respondents, as shown in the table below, is 9,603 per year.
The number of respondents is calculated using the following table that addresses the three years covered by this ICR.
Number of Respondents |
|||||
|
Respondents That Submit Reports |
Respondents That Do Not Submit Any Reports |
|
||
Year |
(A) Number of New Respondents 1 |
(B) Number of Existing Respondents |
(C) Number of Existing Respondents that keep records but do not submit reports |
(D) Number of Existing Respondents No Longer Subject to the Rule Due to Closure 2 |
(E) Number of Respondents (E=A+B+C-D) |
1 |
38 |
9,547 |
0 |
10 |
9,575 |
2 |
38 |
9,575 |
0 |
10 |
9,603 |
3 |
38 |
9,603 |
0 |
10 |
9,631 |
Average |
38 |
9,575 |
0 |
10 |
9,603 |
1 New respondents include sources with constructed, reconstructed, and modified affected facilities.
2 On average, ten asbestos-containing waste disposal sites are expected to close over the next three years and will no longer be subject to the rule.
Column D is subtracted to avoid double-counting respondents. As shown above, the average Number of Respondents over the three year period of this ICR is 9,603.
The total number of annual responses per year is calculated using the following table:
Total Annual Responses |
||||
(A)
Information Collection Activity |
(B)
Number of Respondents |
(C)
Number of Responses |
(D) Number of Existing Respondents That Keep Records But Do Not Submit Reports |
(E) Total Annual Responses E=(BxC)+D |
Asbestos converting operations |
||||
Notification and application for construction |
0 |
1 |
0 |
0 |
Report on sample analyses performed during initial 90 days of operation |
0 |
1 |
0 |
0 |
Quarterly operations and monthly sample analysis report |
2 |
4 |
0 |
8 |
Spraying operations |
||||
Notification of commencement of operations using materials containing >1% asbestos |
0 |
1 |
0 |
0 |
Excepted waste shipment report |
0 |
1 |
0 |
0 |
Demolition/renovation |
||||
Notification of intent to demolish or renovate |
8,613 |
9 |
0 |
77,517 |
Re-notification due to change |
8,613 |
2 |
0 |
17,226 |
Excepted waste shipment report |
8,613 |
3 |
0 |
25,839 |
Milling, manufacturing, and fabricating |
||||
Control device maintenance plan |
40 |
1 |
0 |
40 |
Semiannual visible emissions report |
400 |
2 |
0 |
800 |
Excepted waste shipment report |
400 |
1 |
0 |
400 |
New source report |
0 |
1 |
0 |
0 |
Asbestos-containing waste disposal sites |
||||
New source report |
10 |
1 |
0 |
10 |
Waste generator reports |
560 |
1 |
0 |
560 |
Waste disposal discrepancy report |
560 |
1 |
0 |
560 |
Improperly contained waste report |
560 |
2 |
0 |
1,120 |
Notification of excavation of asbestos materials |
0 |
1 |
0 |
0 |
Facility closure report |
10 |
1 |
0 |
10 |
|
|
|
Total |
124,090 |
The number of Total Annual Responses is 124,090.
The total annual labor costs are $29,370,000. Details regarding these estimates may be found below in Table 1: Annual Respondent Burden and Cost – NESHAP for Asbestos (40 CFR Part 61, Subpart M) (Renewal).
6(e) Bottom Line Burden Hours and Cost Tables
The detailed bottom line burden hours and cost calculations for the respondents and the Agency are shown in Tables 1 and 2 below, respectively, and summarized below.
(i) Respondent Tally
The total annual labor hours are 292,050. Details regarding these estimates may be found in Table 1: Annual Respondent Burden and Cost – NESHAP for Asbestos (40 CFR Part 61, Subpart M) (Renewal).
Furthermore, the annual public reporting and recordkeeping burden for this collection of information is estimated to average 2 hours per response.
There are no annual capital/startup and O&M costs to the regulated entity.
(ii) The Agency Tally
The average annual Agency burden and cost over the next three years is estimated to be 45,993 labor hours at a cost of $2,093,300. See Table 2: Average Annual EPA Burden and Cost – NESHAP for Asbestos (40 CFR Part 61, Subpart M) (Renewal).
6(f) Reasons for Change in Burden
There is an increase in the total estimated burden as currently identified in the OMB Inventory of Approved Burdens. The change is due to an increase in the asbestos demolition and renovation operations each year; it is not due to any program changes. We have updated respondent and Agency burdens to reflect EPA’s current estimates of sources subject to the rule. We have also updated respondent and Agency labor rates, which were referenced from the Bureau of Labor Statistics and OPM, respectively.
During the preparation of this ICR, EPA identified several discrepancies related to rule reporting/recordkeeping requirements and associated burdens. We have updated the respondent and Agency burden tables accordingly in order to reconcile the discrepancies. For example, the previous ICR did not correctly reflect the number of demolition/renovation contractors that will participate in refresher training. The revisions did not result in a substantial burden change, as the average reporting and recordkeeping burden hours per response in this ICR is equal to that of the previous ICR.
6(g) Burden Statement
The annual public reporting and recordkeeping burden for this collection of information is estimated to average 2 hours per response. Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information.
An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a valid OMB Control Number. The OMB Control Numbers for EPA regulations are listed at 40 CFR Part 9 and 48 CFR Chapter 15.
To comment on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including the use of automated collection techniques, EPA has established a public docket for this ICR under Docket ID Number EPA-HQ-OECA-2014-0025. An electronic version of the public docket is available at http://www.regulations.gov which may be used to obtain a copy of the draft collection of information, submit or view public comments, access the index listing of the contents of the docket, and to access those documents in the public docket that are available electronically. When in the system, select “search,” then key in the docket ID number identified in this document. The documents are also available for public viewing at the Enforcement and Compliance Docket and Information Center in the EPA Docket Center (EPA/DC), EPA West, Room 3334, 1301 Constitution Ave., NW, Washington, DC. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Reading Room is (202) 566-1744, and the telephone number for the docket center is (202) 566-1927. Also, you can send comments to the Office of Information and Regulatory Affairs, Office of Management and Budget, 725 17th Street, NW, Washington, DC 20503, Attention: Desk Officer for EPA. Please include the EPA Docket ID Number EPA-HQ-OECA-2014-0025 and OMB Control Number 2060-0101 in any correspondence.
Part B of the Supporting Statement
This part is not applicable because no statistical methods were used in collecting this information.
Table 1: Annual Respondent Burden and Cost – NESHAP for Asbestos (40 CFR Part 61, Subpart M) (Renewal)
N/A – Not Applicable
Assumptions:
a EPA estimates an average of 9,575 existing sources will be subject to the rule over the next 3 years. On average during this period, 38 new sources per year will become subject, while 10 existing sources per year will close and will cease to be subject to the rule. The net total is 9,603 sources per year (9,575 + 38 - 10 = 9,603). The following is a detailed breakdown of the four source categories:
2 existing asbestos converting sources. No new sources are expected.
8,613 existing asbestos demolition/renovation sources. EPA assumes an increase of 28 new sources per year.
400 existing asbestos milling, manufacturing, and fabricating sources. No new sources are expected.
1,119 municipal/Subtitle D landfills nation-wide, of which 50%, or 560 sources, will receive asbestos-containing wastes subject to the rule. No net growth will occur because an estimated 10 sites will close annually, while an estimated 10 sites will become subject to the rule by commencing acceptance of asbestos-containing wastes.
b This ICR uses the following labor rates: $103.97 (technical), $129.93 (managerial), and $51.79 (clerical). These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2014, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” They have been increased by 110 percent to account for the benefit packages available to those employed by private industry.
c EPA does not expect any spray operation sources will become subject to the rule over the next three years.
d Report notifying EPA that waste shipment records signed by owners/operators of disposal sites were not received by waste generators within 45 days of the date of waste acceptance by initial transporters.
e The rule requires sources to submit a control device maintenance plan for any air cleaning devices that cannot be inspected on a weekly basis. EPA assumes 10% of sources will submit such maintenance plans.
f Sources are required to submit reports if discrepancies between designated waste shipment and actual received quantities are not resolved with waste generators.
g Active waste disposal sites are required to report the presence of improperly enclosed or uncovered waste, or any asbestos-containing waste material not sealed in leak-tight containers, and submit the waste shipment record.
h EPA assumes respondents will submit reports for improperly contained waste twice per year.
i EPA assumes asbestos-containing waste will not be excavated at any disposal site.
j EPA assumes approximately 4 million cubic yards of waste shipments will be recorded annually for all demolition/renovation contractors, and that each load will be about 20 cubic yards. This would result in approximately 200,000 loads annually (4 million cubic yards/20 cubic yards per load). Averaged out over all 8,613 contractors, we estimate approximately 23 loads per contractor per year (200,000 loads/8,613 contractors = 23.2 loads per contractor, or 24 after rounding up to the nearest whole integer).
k Based on Agency experience with the rule, operations generally cease from late fall into winter. We thus assume the burden for this activity will be negligible.
l EPA assumes sources will have an average of 2.5 control devices requiring monitoring, and that will operate for 255 days over 51 weeks, annually.
m EPA assumes all existing contractors (8,613) and new contractors entering the market for the first time (28) will spend resources annually on training due to employee turnover and new hires.
n EPA anticipates there will be no direct costs to respondents to train inspectors for Method 9 certification for daily visible emissions monitoring.
o EPA anticipates there will be no burden for waste disposal-related training.
Table 2: Average Annual EPA Burden and Cost – NESHAP for Asbestos (40 CFR Part 61, Subpart M) (Renewal)
Burden item |
A |
B |
C |
D |
E |
F |
G |
H |
EPA |
Annual occurrences |
EPA (AxB) |
Respondents |
Technical hours |
Management per
year |
Clerical hours |
Annual cost |
|
1. Asbestos converting operations |
|
|
|
|
|
|
|
|
A. Notification and application for construction |
80 |
1 |
80 |
0 |
0 |
0 |
0 |
0 |
B. Report on sample analyses performed during initial 90 days of operation |
1 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
C. Quarterly operations and monthly sample analysis report |
0.5 |
4 |
2 |
2 |
4 |
0.2 |
0.4 |
209.36 |
2. Spraying operations c |
|
|
|
|
|
|
|
|
A. Notification of commencement of operations using materials containing >1% asbestos |
N/A |
|
|
|
|
|
|
|
B. Excepted waste shipment report |
N/A |
|
|
|
|
|
|
|
3. Demolition/renovation |
|
|
|
|
|
|
|
|
A. Notification of intent to demolish or renovate |
0.25 |
9 |
2.25 |
8,613 |
19,379.25 |
968.96 |
1,937.93 |
1,014,309.95 |
B. Renotification due to change |
0.25 |
2 |
0.5 |
8,613 |
4,306.5 |
215.33 |
430.65 |
225,402.21 |
C. Excepted waste shipment report |
0.5 |
3 |
1.5 |
8,613 |
12,919.5 |
645.98 |
1,291.95 |
676,206.63 |
4. Milling, manufacturing, and fabricating |
|
|
|
|
|
|
|
|
A. Control device maintenance plan |
0.25 |
1 |
0.25 |
40 |
10 |
0.5 |
1 |
523.4 |
B. Semiannual visible emissions report |
0.1 |
2 |
0.2 |
400 |
80 |
4 |
8 |
4,187.2 |
C. Excepted waste shipment report |
0.5 |
1 |
0.5 |
400 |
200 |
10 |
20 |
10,468 |
D. New source report |
0.5 |
1 |
0.5 |
0 |
0 |
0 |
0 |
0 |
5. Asbestos-containing waste disposal sites |
|
|
|
|
|
|
|
|
A. New source report |
0.5 |
1 |
0.5 |
10 |
5 |
0.25 |
0.5 |
261.7 |
B. Waste generator reports |
4 |
1 |
4 |
560 |
2,240 |
112 |
224 |
117,241.6 |
C. Waste disposal discrepancy report |
0.5 |
1 |
0.5 |
560 |
280 |
14 |
28 |
14,655.2 |
D. Improperly contained waste report |
0.5 |
2 |
1 |
560 |
560 |
28 |
56 |
29,310.4 |
E. Notification of excavation of asbestos materials |
2 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
F. Facility closure report |
1 |
1 |
1 |
10 |
10 |
0.5 |
1 |
523.4 |
TOTAL ANNUAL BURDEN AND COST (ROUNDED) |
45,993 |
2,093,299 |
N/A – Not Applicable
Assumptions:
a EPA estimates an average of 9,575 existing sources will be subject to the rule over the next 3 years. On average during this period, 38 new sources per year will become subject, while 10 existing sources per year will close and will cease to be subject to the rule. The net total is 9,603 sources per year (9,575 + 38 - 10 = 9,603). The following is a detailed breakdown of the four source categories:
2 existing asbestos converting sources. No new sources are expected.
8,613 existing asbestos demolition/renovation sources. EPA assumes an increase of 28 new sources per year.
400 existing asbestos milling, manufacturing, and fabricating sources. No new sources are expected.
1,119 municipal/Subtitle D landfills nation-wide, of which 50%, or 560 sources, will receive asbestos-containing wastes subject to the rule. No net growth will occur because an estimated 10 sites will close annually, while an estimated 10 sites will become subject to the rule by commencing acceptance of asbestos-containing wastes.
b This ICR uses the following labor rates: $46.67 (technical), $62.90 (managerial), and $25.25 (clerical). These rates are from the Office of Personnel Management (OPM), 2014 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.
c EPA does not expect any spray operation sources will become subject to the rule over the next three years.
File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
File Title | ICR Package Instructions |
Author | rmarshal |
File Modified | 0000-00-00 |
File Created | 2021-01-24 |