Download:
pdf |
pdfStakeholder Comment Form
Potomac Heritage National Scenic Trail (PHNST) Alignments:
Grist Mill Park, USAG Fort Belvoir, Pohick Bay Regional Park
Paperwork Reduction Act Statement: Your participation in this information collection is voluntary. NCPC will use your responses to inform early planning
work on potential Potomac Heritage National Scenic Trail alignments in and around Fort Belvoir. Federal agencies may not conduct or sponsor an information
collection and a person is not required to respond to this information request unless it displays a current valid OMB control number and an expiration date. The
control number for this collection is XXXX and its expiration date is XXXXX. The estimated average time to complete this survey is 30 minutes.
The deadline for
comments is
July 14, 2016
Please send comments to either of the following addresses:
Email: [email protected]
Mail: NCPC, Attn: Potomac Heritage Trail, 401 9th Street NW Suite 500N Washington DC, 20004
General Questions about trail use:
1.
What modes of transportation are important for the trail to accommodate? (e.g. walking, biking, horseback riding, canoeing)
____________________________________________________________________________________________________________
2.
When would you use the PHNST? Please specify the hours, days, and/or times of year.
____________________________________________________________________________________________________________
3.
How frequently would you use the PHNST? (e.g. daily, weekly, weekend only, seasonally)___________________________________
4.
For what purpose(s) would you use the PHNST? (e.g. commute, recreation) ______________________________________________
5.
At what points would you typically access and depart the PHNST?______________________________________________________
6.
What are the environmental features that are important to see along the trail? (e.g. Pohick Bay, Accotink Bay)
____________________________________________________________________________________________________________
7.
What are the cultural features that are important to see along the trail? (e.g. Quaker heritage, Cedar Grove Plantation Cemetery)
____________________________________________________________________________________________________________
8.
Are there any seasonal events that could make use of the trail ? (e.g. Christmas Bird Count, kayaking tours, Veteran’s Day hike,
Military Child Month hike, National Trails Day hike)
____________________________________________________________________________________________________________
9.
Do you have any other additional information that we should consider when planning a trail alignment?
____________________________________________________________________________________________________________
Questions about current concept proposals (Refer to map and assume that 1A and 1B will be constructed):
10.
What is your preferred alignment or combination of alignments for a PHNST route between Grist Mill Park and Pohick Bay Regional
Park and why?________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
11.
Please rank the following potential trail alignments by importance of being completed.
(1 = most critical to build, 6 = least critical to build) (refer to the map)
______ Alt 1c (Woodlawn Loop Spur)
______ Alt 1d (Off Road Trail along US Route 1)
______ Alt 2- assume controlled access only (Fort Belvoir interior trail)
______ Alt 1e (Pohick Regional Park off-road trail)
______ Alt 3 (Wetland bridge / Boardwalk)
12.
Are there other alignments, or changes to the potential alignments proposed in the map that we should consider? (Please describe,
or show your proposal on the attached trail alignment map.)
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
Questions on the trail alignment through Fort Belvoir (Alignment 2, “Potential PHNST - controlled access trail”)
13.
The Army is concerned with allowing unlimited access to this route because of security concerns, and potential hazards to human
health. Do you have suggestions for how to mitigate these concerns?
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
14.
If this alignment can only be opened a few times a year, do you have suggestions for when those times should be? What events or
themes should these seasonal openings coincide with?
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
15.
Would it be acceptable if the trail was available by appointment only?__________________________________________________
16.
Would it be acceptable if the trail could only be travelled if accompanied by an individual approved by the Army?_______________
17.
Would you rather have a controlled access trail (Alt 2) or a continuously open off-road trail (Alt 1D and 1C)?____________________
Name: ____________________________________________________________________________________
Organization: ______________________________________________________________________________
Email:____________________________________________________________________________________
Commenters may voluntarily provide their name and/or organization represented, and/or email.
Comments provided in this form may be used in public reports, and may be attributed to the person or organization provided
above. Personal information, including email addresses, will be added to a list of stakeholders who may be contacted for future
efforts related to the Potomac Heritage National Scenic Trail, including but not limited to the National Environmental Policy Act
(NEPA) process.
OMB Control Number
Potomac Heritage National Scenic Trail Alignments
File Type | application/pdf |
File Modified | 2016-06-07 |
File Created | 2016-06-07 |