Overview

# Respondents
# Responses
Respondent Burden
Agency Burden
Capital & O&M


Sheet 1: # Respondents

Number of Respondents

Respondents That Submit Reports Respondents That Do Not Submit Any Reports

(A) (B) (C) (D) (E)
Year Number of New Respondents Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are Also New Respondents Number of Respondents





(E=A+B+C-D)
1 32 532 0 0 564
2 32 564 0 0 596
3 32 596 0 0 628
Average 32 564 0 0 596
1 New respondents include sources with constructed, reconstructed, and modified affected facilities.

Sheet 2: # Responses

Total Annual Responses

(A)
Information Collection Activity
(B)
Number of Respondents
(C)
Number of Responses
(D)
Number of Existing Respondents That Keep Records But Do Not Submit Reports
(E)
Total Annual Responses
E=(BxC)+D

ERG Notes:
Notifications





Gas well completion 300 33 0 9,900

Gas well recompletion 300 4 0 1,200

New gas processing plant 29 1 0 29

New sweetening unit 3 1 0 3

Annual reports





Gas well completion/recompletion 300 1 0 300

Centrifugal compressor 65 1 0 65

Reciprocating compressor 2,095 1 0 2,095

Sweetening unit 15 1 0 15

Production pneumatic controller 300 1 0 300

Gas processing pneumatic controller 75 1 0 75

Storage vessel 380 1 0 380

Semiannual reports





Gas processing plant 145 2 0 290




Total 14,652
-prev renewal: 3,230 responses, 21 hrs/response.



hrs/response: 6.4


Sheet 3: Respondent Burden

Table 1: Annual Respondent Burden and Cost – NSPS for Oil and Natural Gas Production and Natural Gas Transmission and Distribution (40 CFR Part 60, Subpart OOOO) (Renewal)








Source Type No.




Labor Rates: $103.97 $129.93 $51.79

Existing 564
Burden item A B C D E F G H
Exploration/production 300
Person-hours
per occurrence
Annual occurrences
per respondent
Person-hours
per respondent
per year (AxB)
Respondents
per year a
Technical hours per
year (CxD)
Management hours per year (Ex0.05) Clerical hours
per year
(Ex0.10)
Annual cost
($) b

Transmission/storage 136
1. Applications N/A







Processing plants 116
2. Survey and Studies N/A







Sweetening units 12
3. Acquisition, installation, and utilization of technology and systems N/A







New 32
4. Report requirements N/A







Processing plants 29
a. Familiarization with the rule requirements c 1 1 1 596 596 29.8 59.6 68,924.72
Sweetening units 3
b. Required activities










i. Notification of gas well completion d 0.5 33 17 300 4,950 247.5 495 572,445.23
ERG Notes:
ii. Notification of gas well recompletion d 0.5 4 2 300 600 30 60 69,387.3


iii. Notification of new gas processing plant e 1 1 1 29 29 1.45 2.9 3,353.72


iv. Notification of new sweetening unit f 1 1 1 3 3 0.15 0.3 346.94


c. Create information See 4B









d. Gather existing information See 4E









e. Annual reports










i. Gas well completion/recompletion d 16 1 16 300 4,800 240 480 555,098.4


ii. Sweetening unit f 1 1 1 15 15 0.75 1.5 1,734.68


iii. Centrifugal compressor g 8 1 8 65 520 26 52 60,135.66


iv. Reciprocating compressor h 8 1 8 2,095 16,760 838 1,676 1,938,218.58


v. Production pneumatic controller i 8 1 8 300 2,400 120 240 277,549.2


vi. Gas processing pneumatic controller j 8 1 8 75 600 30 60 69,387.3


vii. Storage vessel k 8 1 8 380 3,040 152 304 351,562.32


f. Semiannual reports










i. Gas processing plant l 40 2 80 145 11,600 580 1,160 1,341,487.8


Reporting Subtotal



52,799 5,309,632


5. Recordkeeping requirements










a. Read instructions See 4A









b. Plan activities See 4B









c. Implement activities










i. Filing and maintaining records l 5 12 60 436 26,160 1,308 2,616 3,025,286.28


ii. Filing and maintaining records m 5 12 60 160 9,600 480 960 1,110,196.8


d. Record data N/A









e. Time to transmit or disclose information










i. Records required by standards See 5C









f. Time to train personnel See 5C









g. Time for audits N/A









Recordkeeping Subtotal



41,124 4,135,483


TOTAL ANNUAL BURDEN AND COST (ROUNDED)



93,900 9,450,000


TOTAL ANNUAL CAPITAL AND O&M COST (SEE SECTION 6(b)(iii))






1,750,000


GRAND TOTAL (LABOR, CAPITAL, AND O&M)






11,200,000
Prev renewal: 68,906 hrs and $2,306,573 (3-yr avg). Net increase due to industry growth. Also note that labor rates have nearly doubled since prev ICR, hence the significant burden increase.
N/A - Not Applicable










Note: Totals have been rounded to three significant digits. Figures may not add exactly due to rounding.






















Assumptions:










a EPA estimates an average of 564 existing sources and 32 new sources will be subject to the standard over the next three years. Existing sources comprise 300 exploration and production businesses, 136 transmission and storage operations, 116 processing plants and 12 sweetening units. New sources comprise 29 processing plants and 3 sweetening units.


b This ICR uses the following labor rates: $103.97 (technical), $129.93 (managerial), and $51.79 (clerical). These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2014, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” They have been increased by 110 percent to account for the benefit packages available to those employed by private industry.


c This burden represents the time existing respondents spend re-familiarizing themselves with rule requirements, or that new respondents spend learning rule requirements.


d Assumes 9,759 completions and 1,206 recompletions each year performed by 300 operators.


e EPA estimates an average of 116 existing and 29 new processing plants.


f EPA estimates an average of 12 existing and 3 new sweetening units.


g EPA estimates an average of 52 existing and 13 new centrifugal compressors equipped with wet seals at processing plants.


h EPA estimates an average of 1,676 existing and 419 new reciprocating compressors. For existing sources, EPA estimates there are 840 compressors at gathering & boosting stations and 836 compressors are at processing plants. For new sources, EPA estimates there will be 210 compressors at gathering & boosting stations and 209 compressors at processing plants.


i EPA estimates 13,632 pneumatic controllers across the 300 exploration & production sites.


j EPA estimates an average of 60 existing and 15 new pneumatic controllers at affected processing plants.


k EPA estimates an average of 304 existing and 76 new respondents in the production, processing, transmission, or storage segment will submit annual reports. EPA anticipates each report will cover approximately four storage vessels, based on research the Agency conducted during initial rule development.


l Activity applies to exploration & production businesses and transmission & storage operations, for which EPA estimates an average of 300 and 136 sources, respectively.


m Activity applies to gas processing plants and sweetening units. EPA estimates an average of 116 existing and 29 new processing plants and 12 existing and 3 new units.



Sheet 4: Agency Burden

Table 2: Average Annual EPA Burden and Cost – NSPS for Oil and Natural Gas Production and Natural Gas Transmission and Distribution (40 CFR Part 60, Subpart OOOO) (Renewal)
























Labor Rates: $46.67 $62.90 $25.25


Burden item A B C D E F G H

EPA
person-hours
per occurrence
Annual occurrences
per respondent
EPA
person-hours
per respondent
per year (AxB)
Respondents
per year a
Technical hours
per year
(CxD)
Management
hours per year
(Ex0.05)
Clerical hours
per year
(Ex0.10)
Annual cost
($) b

ERG Notes:
Review initial notifications









i. Notification of gas well completion 0.5 33 17 300 4,950 247.5 495 259,083

ii. Notification of gas well recompletion 0.5 4 2 300 600 30 60 31,404

iii. Notification of new gas processing plant 0.5 1 1 29 14.5 0.73 1.45 759.24

iv. Notification of new sweetening unit 0.5 1 1 3 1.5 0.08 0.15 78.82

Review annual reports









i. Gas well completion/recompletion 1 1 1 300 300 15 30 15,702

ii. Sweetening unit 1 1 1 15 15 0.75 1.5 785.1

iii. Centrifugal compressor 1 1 1 65 65 3.25 6.5 3,402.1

iv. Reciprocating compressor 1 1 1 2,095 2,095 104.75 209.5 109,652.3

v. Production pneumatic controller 1 1 1 300 300 15 30 15,702

vi. Gas processing pneumatic controller 1 1 1 75 75 3.75 7.5 3,925.5

vii. Storage vessel 1 1 1 380 380 19 38 19,889.2

Review semiannual reports









i. Gas processing plant 1 2 2 145 290 14.5 29 15,178.6

TOTAL ANNUAL BURDEN AND COST (ROUNDED) 10,400 476,000
Prev renewal: 9,207 hrs and $420,919 (3-yr avg). Net increase due to industry growth.
Note: Totals have been rounded to three significant digits. Figures may not add exactly due to rounding.




















Assumptions:









a EPA estimates an average of 564 existing sources and 32 new sources will be subject to the standard over the next three years. Existing sources comprise 300 exploration and production businesses, 136 transmission and storage operations, 116 processing plants and 12 sweetening units. New sources comprise 29 processing plants and 3 sweetening units.

b This ICR uses the following labor rates: $46.67 (technical), $62.90 (managerial), and $25.25 (clerical). These rates are from the Office of Personnel Management (OPM), 2014 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.


Sheet 5: Capital & O&M

Capital/Startup vs. Operation and Maintenance (O&M) Costs
(A) (B) (C) (D) (E) (F) (G)
Requirement Capital/Startup Cost for One Respondent Number of New Respondents Total Capital/Startup Cost, (B X C) Annual O&M Costs for One Respondent 1 Number of Respondents with O&M Total O&M, (E X F) ERG Notes
SO2 CEMS (control outlet) $73,000 3 $219,000 $17,100 15 $256,500
Continuous control device monitoring for centrifugal compressors 2 N/A 13 $0 $804 65 $52,260
Continuous control device monitoring for storage vessels 2 N/A 304 $0 $804 1,520 $1,222,080
Total

$219,000

$1,530,840 Prev renewal: Cap/Startup = $219,000; O&M = $612,336; O&M increase due to industry growth.
CEM - Continuous Emission Monitoring System






N/A - Not Applicable














Assumptions:






1 Annual O&M costs for centrifugal compressors and storage vessels were calculated assuming 2 hours per month at $33.51 per hour.






2 Capital/Startup costs for continuous control device monitoring were included in storage vessel and centrifugal compressor control device costs.






File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy