The collection is pre-approved, contingent upon no substantive changes being made to this collection after adoption of the final rule. Otherwise this collection should be re-submitted to OMB for review.
Inventory as of this Action
Requested
Previously Approved
11/30/2018
09/30/2017
09/30/2017
16
0
16
5,372
0
5,372
578
0
578
PROPOSED RULE: 10 CFR PARTS 20 AND 61, LOW-LEVEL RADIATION WASTE DISPOSAL
The NRC is proposing to amend its regulations to require LLRW disposal facilities to conduct site-specific technical analyses to demonstrate compliance with the performance objectives of 10 CFR part 61. The intent of the rule is to ensure performance objectives are met at disposal sites for safe disposal of LLRW that was not analyzed in the original 10 CFR part 61 regulatory basis (i.e., large quantities of depleted uranium).
The site-specific technical analyses would include compliance period analyses with both a performance assessment and an intruder assessment, analyses for the protective assurance period that include both a performance assessment and an intruder assessment, performance period analyses to evaluate how the disposal system could mitigate the risk from long-lived LLRW, new analyses that demonstrate the disposal site includes defense-in-depth protections, and an LLRW acceptance plan identifying the WAC for the disposal facility. In addition, licensees must review their LLRW acceptance plan annually and update the safety case and analyses as part of the application for closure.
The NRC Forms 540 and 541 would be updated to allow licensees to indicate the use of LLRW acceptance criteria.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.