Columbia River System Operation EIS Navigation Survey

Instrument(s) for Navigation Improvement Survey(s)

0710-0018_CRSO_Survey

Columbia River System Operation EIS Navigation Survey

OMB: 0710-0018

Document [docx]
Download: docx | pdf

Confidential


2018 Columbia/Snake River

Navigational Survey

Shape1


























Sponsored by:


United States Army Corps of Engineers



The information obtained from this survey is part of the court mandated Columbia River System Operations EIS. Your voluntary response to this survey will aid the USACE in fulfilling this mandate and evaluating different operating needs. Collected information can be used by local, state and federal transportation agencies to evaluate and support public provision of transportation infrastructure improvements. Depending upon the number of facilities served, the survey response time could take up to 30 minutes.


The public reporting burden for this collection of information, 0710-0018, is estimated to average 30 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or burden reduction suggestions to the Department of Defense, Washington Headquarters Services, at [email protected]. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.



Shipment Information

Shape2 «NAME»

Choice: Consider your last shipment from this location: «ADDRESS1»

(Please complete one questionnaire for each «CITY», «STATE» «ZIP»

facility you manage)


Q1. What is the primary commodity you ship from this facility? _____________ commodity


Q1b. What other commodities do you ship from this location? ______________________


Q2. At this location, do you have loading capabilities for…


Yes No

▼ ▼

  1. Trucks 1 2

  2. Rail Cars 1 2

c. Barges 1 2

Q2b. If YES to Rail loading capability, what is your rail car loading capacity?


______ # of cars


Q2c. If NO to Rail loading capability, how close is the nearest rail loading facility to this location?


_______ miles


Q2d. If NO to Barge loading capability, how close is the nearest barge loading facility to this location?


_______ miles




Your last Freight Shipment


Q3. What commodity was shipped in your last shipment? _____________ commodity


Q4. Where was this commodity shipped to: _____________________________ city ___________ state


Q4b. What type of destination is this?

1 River terminal 2 Another Elevator 3 Railroad terminal 4 Processing Plant

5 Other (please specify): _______________________________________(eg: export terminal, farm, feedlot,etc.)

Q5. How large was this shipment (payload weight)?

_____________________________ payload weight, in


1 Tons 2 Cwt. 3 Gallons 4 Bushels 5 Other (specify): _________________


Q6. What type of transportation was used for this shipment, approximately what distance did each travel (in miles), and what was the approximate transportation rate?


Mode Distance Transportation Per Unit type for commodity

(check if used) traveled rate Tons Cwt Gallons Bushels Shipment Other (Specify)

▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼

Truck __________ miles __________ rate 1 2 3 4 5 6 _________

Rail __________ miles __________ rate 1 2 3 4 5 6 _________

Barge __________ miles __________ rate 1 2 3 4 5 6 _________


What were the total transport costs? ___________ 1 2 3 4 5 6 _________

What was the total shipment distance in miles? ___________


Q7. Did that shipment arrive on-time? 1 Yes 2 No


Q7a.What do you estimate was the shipment time (include scheduling

time, wait for equipment and transit time)


_________ days + _________ hours.


Q8. What price did you receive for your commodity at the destination terminal?


__________ dollars per


1 Tons 2 Cwt. 3 Gallons 4 Bushels 5 Shipment 6 Other (specify): _________________



Shipping Alternatives



We want to know what options you could take if the mode and destination you used for your last shipment had not been available and would never be available. For example, if the rail system were shut down, shippers who used rail could use truck instead of rail, or could use barge with truck access to a barge loading facility, or could have sent the shipment to a different destination. We need to know what these alternatives are for you. Nearly everyone has some kind of shipping alternatives. Please provide us with information on these alternatives for you.


Q9. If the mode options and destination you used for your last shipment had not been available and would never be available, then you would …


1 Continue your operations but in a different, perhaps more costly way

2 Do something else: ________________________





First (best) Shipping Alternative


Q10. Where would this commodity be shipped to? ____________________ city _______ state


Q11. What type of destination is this?

1 River terminal 2 Another Elevator 3 Railroad terminal 4 Processing Plant

5 Other (please specify): ________________________

Q12. What transportation would be used for this shipment, approximately what distance would each travel (in miles) and what would be the transportation rate?


Mode Distance Transportation Per Unit type for commodity

(check if used) traveled rate Tons Cwt Gallons Bushels Shipment Other (Specify)

▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼

Truck __________ miles __________ rate 1 2 3 4 5 6 _________

Rail __________ miles __________ rate 1 2 3 4 5 6 _________

Barge __________ miles __________ rate 1 2 3 4 5 6 _________


What would be the total transport costs? ________ 1 2 3 4 5 6 _________

What would be the approximate total shipment distance in miles? ___________


Q13. What do you estimate would be the shipment time (include scheduling time, wait for equipment and transit time)


_________ days + _________ hours.


Q14. How reliable is the service? That is, for shipments like this one, what percent of the time would you expect them to arrive on time?


__________ percent on-time arrivals


Q15. How large would your shipment be (payload weight)?


_____________________________ payload weight, in


1 Tons 2 Cwt. 3 Gallons 4 Bushels 5 Other (specify): ____________________



Q16. What price would you receive for your commodity at the destination terminal?


__________ dollars per


1 Tons 2 Cwt. 3 Gallons 4 Bushels 5 Shipment 6 Other (specify): ____________________


Other Shipping Alternatives


Please complete the table below for your other shipping alternatives. If you have no other alternatives, skip to Q23



Second Best Alternative

Third Best Alternative


Q17. Where would it be shipped to?



______________ city _______ state



______________ city _______ state



Q18. What type of destination is this?

1 River terminal 2 Another Elevator

3 Rail terminal 4 Processing Plant

5 Other (specify): _______________

1 River terminal 2 Another Elevator

3 Rail terminal 4 Processing Plant

5 Other (specify): _______________


Q19. What type of transportation modes would be used for this shipment?

Mode Distance Transportation

(Check if used) traveled rate

▼ ▼ ▼

Truck _____miles ____rate

Rail _____miles ____rate

Barge _____miles ____rate


1 Tons 2 Cwt. 3 Gallons

4 Bushels 5 Shipment 6 Other

(specify):

Mode Distance Transportation

(Check if used) traveled rate

▼ ▼ ▼

Truck _____miles ____rate

Rail _____miles ____rate

Barge _____miles ____rate


1 Tons 2 Cwt. 3 Gallons

4 Bushels 5 Shipment 6 Other

(specify):


Q20. What do you estimate would be the shipment time?



_____ days + _____ hours


_____ days + _____ hours


Q21. How large would the shipment be?


__________ payload weight


1 Tons 2 Cwt. 3 Gallons

4 Bushels 5 Other

(specify):


__________ payload weight


1 Tons 2 Cwt. 3 Gallons

4 Bushels 5 Other

(specify):


Q22. What estimated price would you receive for your commodity at the destination terminal


__________ dollars


1 Tons 2 Cwt. 3 Gallons

4 Bushels 5 Shipment 6 Other

(specify):


__________ dollars


1 Tons 2 Cwt. 3 Gallons

4 Bushels 5 Shipment 6 Other

(specify):


Transportation Rates


In each of the next three questions relating to rate and service changes, please regard the changes as permanent changes.


Q23. For your last shipment, if the transportation rate increased «Percent_change1»%, would you continue with the original mode and destination or switch to your best alternative choice?


1 Continue to use Original mode

2 Switch to Best Alternative Choice Skip to Q24


Q23b. If you would continue to use your Original mode, what percentage increase in the transportation rate would be necessary to cause you to switch to the Alternative transportation mode?


______ % increase


Transit Time


Q24. For your last shipment, if the transit time (including scheduling and wait for equipment) for the original option increased «Percent_change2»%, would you continue with the original mode and destination or switch to the alternative at this location?


1 Continue to use Original mode

2 Switch to Best Alternative Choice Skip to Q25


Q24b. If you would continue to use your Original mode, what percentage increase in the transit time would be necessary to cause you to switch to the Alternative transportation mode?


______ % increase


Volume


Q25. If the average transportation rate you pay increased by «Percent_change4»%, would your annual volume shipped decrease (assume the rate increase applies to BOTH you and to your competitors)?


1 Yes

2 No Skip to Q26


Q25b. If yes, by how much would the volume decrease (assuming the rate increase applies to both you and to your competitors)?

__________ volume decrease



Shipper Characteristics


Q26. How long has this facility been at its current location?


_____ years


Q27. How large is your facility?


__________________ Total Amount of Annual Units Shipped


please check the type of unit for this facility

1 Tons 2 Cwt. 3 Gallons 4 Bushels 5 Other (specify): __________________



__________________ Total Amount of Storage Capacity


1 Tons 2 Cwt. 3 Gallons 4 Bushels 5 Other (specify): __________________





Q28. What proportion of the primary commodity shipped from this location is shipped

within each time period on a typical year?



__________%Sept.- Nov. __________%Dec.- Feb. __________%Mar.-May ___________%Jun.-Aug.


Q29. Does your firm (or parent firm) own export or import facilities?


1 Yes

2 No



Q30. How many facilities such as this one does your firm own and/or operate?


_______________ number of terminals or elevators.



Q31. How many employees (including yourself) work at this facility? _______ people



Q32. Finally, if we have any questions and wish to follow up, may we contact you?


1 Yes

2 No Skip to Q33



Q32b. Name: __________________________ Telephone: __________________________


Email: __________________________



Q33. Would you like a summary of the survey results?


1 Yes

2 No Skip to Q34


Q33b. Yes, please email the website for the report. Email: __________________________

Yes, please send a hard copy to:

Name: __________________________

Address: _________________________


City, State Zip: _____________________




Q34. Thank you for your help with this study. We would welcome any additional comments you would like to provide about shipping.


Shape3




















Please return your completed questionnaire to:


TBD

«ID» - 1

File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File Title2006 Survey of Agricultural Shipping Needs in the Midwest
Authorkent
File Modified0000-00-00
File Created2021-01-21

© 2024 OMB.report | Privacy Policy