The affected entities are subject to
the General Provisions of the NSPS at 40 CFR part 60, subpart A and
any changes, or additions to the Provisions specified at 40 CFR
part 60, subpart WW. Owners or operators of the affected facilities
must make an initial notification, performance tests, periodic
reports, and maintain records of the occurrence and duration of any
startup, shutdown, or malfunction in the operation of an affected
facility, or any period during which the monitoring system is
inoperative. Reports are also required semiannually.
There is an adjustment increase
in the respondent burden from the most recently approved ICR. The
increase in respondent labor hour is caused by a change in
assumption; in this ICR, we assume all existing sources will take
some time each year to re-familiarize themselves with the rule
requirements. The small increase in the total O&M cost is due
to rounding; the total estimated costs have been rounded to three
significant digits in this ICR.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.