Chromium ICR Tables 1-33

Chromium Tables 1-33 Updated_103015.pdf

Hexavalent Chromium Standards for General Industry, Shipyard Employment, and Construction

Chromium ICR Tables 1-33

OMB: 1218-0252

Document [pdf]
Download: pdf | pdf
Table 1

Initial Exposure Monitoring (§ 1910.1026(d)(2)(i) and (ii); Contract Cost for an IH Technician to Perform Initial Exposure Monitoring
This table calculates the contract cost for the employer to have an outside  industrial hygiene technician perform initial exposure 
monitoring by collecting personal breathing‐zone air samples to characterize full‐shift exposure for each job classification in each 
work area during each shift.  To determine the number of new employers that may need to conduct initial monitoring OSHA 
multiplied the number of existing plants by 5%.
Cost = (INITCONTTIME  * CONTCOST * #INIT * %INITADD * (%LEARN + %CONT) * (#PLANTS* 5%))
Variable
* INITCONTTIME =  Time, in hours, for an outside contractor (industrial hygiene technician) 
                                                  to conduct the initial monitoring.
* CONTCOST =  Cost per hour for an outside industrial hygiene contractor =$112.44
* # INIT =  Number of initial exposure measurements initial plus confirmation.
* % INITADD =  Percent of plants that have not satisified initial monitoring requirement
* % LEARN =  Percent of plants that will develop in‐house monitoring capability
* % CONT =  Percent of plants that will continue to use an outside contractor for monitoring
* # PLANTS =  Number of plants represented by the model output * 5% (new employers)

 Item 13 COSTS

 # PLANTS

 # PLANTS

 % CONT

 % LEARN

 % INITADD

 # INIT

  CONTCOST 

 INITCONTTIME

24.93%

Sector 1. Electroplating
Large

20 * $    112.44 *

2

* 25% * ( 0% + 100% ) *

883

44

=

$49,659

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 100% ) *

1,662
426

83
21

=
=

$56,075
$14,356

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0 + 100% ) *
* 25% * ( 0% + 100% ) *

801
580

40
29

=
=

$27,012
$19,569

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0 + 100% ) *
* 25% * ( 0% + 100% ) *

1,092
426

55
21

=
=

$36,836
$14,356

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0 + 100% ) *
* 25% * ( 0% + 100% ) *

801
503

40
25

=
=

$27,012
$16,954

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0 + 100% ) *
* 25% * ( 0% + 100% ) *

946
883

47
44

=
=

$31,913
$29,795

1,662

83

=

$56,075

)*

3,535

177

=

$107,329

* ( 0% + 100% ) *
* ( 0% + 90% ) *

3,962
2,593

198
130

=
=

$133,627
$78,729

* ( 0% + 100% ) *
* ( 0% + 90% ) *

2,905
786

145
39

=
=

$98,004
$23,848

* ( 0% + 100% ) *
* ( 0% + 90% ) *

880
314

44
16

=
=

$29,691
$9,533

* ( 0% + 100% ) *
* ( 0% + 90% ) *

352
78

18
4

=
=

$11,863
$2,376

* ( 0% + 100% ) *

88

4

=

$2,966

Hard Chrome

Job Shop Chrome Plater

Captive Shop Chrome Plater

Job Shop Plater

Captive Shop Plater

Operator
Small
12 * $    112.44 * 2 * 25%
Sector 2. Welding                                                                       GENERAL INDUSTRY
Large
12 * $    112.44 * 2 * 25%
SMAW
Small
12 * $    112.44 * 2 * 25%
Large
12 * $    112.44 * 2 * 25%
GMAW
Small
12 * $    112.44 * 2 * 25%
Large
12 * $    112.44 * 2 * 25%
TIG
Small
12 * $    112.44 * 2 * 25%
Large
12 * $    112.44 * 2 * 25%
SAW
Small
12 * $    112.44 * 2 * 25%
Large
12 * $    112.44 * 2 * 25%
Plasma Cutting
Small
12 * $    112.44 * 2 * 25%

Page 1

*(

0

+ 100% ) *

* ( 0% +

90%

90%

 Item 13 COSTS

 # PLANTS

 # PLANTS

 % CONT

 % LEARN

 % INITADD

 # INIT

  CONTCOST 

 INITCONTTIME

Table 1

Large

12 * $    112.44 *

2

* 25% * ( 0% +

)*

78

4

=

$2,376

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 90% ) *

88
472

4
24

=
=

$2,966
$14,314

Small

12 * $    112.44 *

529

26

=

$17,828

Large

2 * 25% * ( 0% + 100% ) *
MARITIME
12 * $    112.44 * 2 * 75% * ( 0% + 50% ) *

17

1

=

$880

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

10
24

0
1

=
=

$880
$1,222

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

14
6

1
0

=
=

$1,232
$293

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

3
116

0
6

=
=

$264
$5,867

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

66
4

3
0

=
=

$5,984
$196

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

2
2

0
0

=
=

$176
$98

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

1
4

0
0

=
=

$88
$196

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

2
2

0
0

=
=

$176
$98

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

1
0

0
0

=
=

$88
$0

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

0
0

0
0

=
=

$0
$0

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

0
15

0
1

=
=

$0
$782

Small

90%

)*

9

0

=

$792

Large

12 * $    112.44 * 2 * 75% * ( 0% +
CONSTRUCTION
12 * $    112.44 * 2 * 25% * ( 0% +

95%

)*

201

10

=

$6,440

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

1,609
3

80
0

=
=

$54,266
$93

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

21
41

1
2

=
=

$717
$1,300

Small
State

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

322
20

16
1

=
=

$10,853
$650

Local
State

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

161
4

8
0

=
=

$5,443
$124

Local

12 * $    112.44 *

2

* 25% * ( 0% + 100% ) *

32

2

=

$1,076

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting

Thermal Spray Tungsten Cutting

SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

Page 2

State

GOVERNMENT
12 * $    112.44 * 2 * 25% * ( 0% +

Local
State

12 * $    112.44 *
12 * $    112.44 *

Local
State

95%

 Item 13 COSTS

 # PLANTS

 # PLANTS

 % CONT

 % LEARN

 % INITADD

 # INIT

  CONTCOST 

 INITCONTTIME

Table 1

)*

19

1

=

$619

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

590
0

30
0

=
=

$19,914
$0

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

8
4

0
0

=
=

$261
$124

Local
State

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

118
2

6
0

=
=

$3,976
$62

Local
State

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

59
1

3
0

=
=

$1,988
$31

12

1

=

$391

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
Local
12 * $    112.44 * 2 * 25%
Sector 2. Mild Steel Welding                                                   GENERAL INDUSTRY
Large
12 * $    112.44 * 2 * 25%
SMAW
Small
12 * $    112.44 * 2 * 25%
Large
12 * $    112.44 * 2 * 25%
GMAW
Small
12 * $    112.44 * 2 * 25%
Large
12 * $    112.44 * 2 * 25%
TIG
Small
12 * $    112.44 * 2 * 25%
Large
12 * $    112.44 * 2 * 25%
SAW
Small
12 * $    112.44 * 2 * 25%
Large
12 * $    112.44 * 2 * 25%
Plasma Cutting
Small
12 * $    112.44 * 2 * 25%
Large
12 * $    112.44 * 2 * 25%
Plasma Welding
Small
12 * $    112.44 * 2 * 25%
Large
12 * $    112.44 * 2 * 25%
Resistance Welding
Small
12 * $    112.44 * 2 * 25%
MARITIME
Large
12 * $    112.44 * 2 * 75%
SMAW
Small
12 * $    112.44 * 2 * 75%
Large
12 * $    112.44 * 2 * 75%
GMAW
Small
12 * $    112.44 * 2 * 75%
Large
12 * $    112.44 * 2 * 75%
TIG
Small
12 * $    112.44 * 2 * 75%
Large
12 * $    112.44 * 2 * 75%
FCAW
Small
12 * $    112.44 * 2 * 75%
Large
12 * $    112.44 * 2 * 75%
Plasma Cutting
Small
12 * $    112.44 * 2 * 75%

Page 3

* ( 0% + 100% ) *
* ( 0% +

90%

)*

4,740

237

=

$143,907

* ( 0% + 100% ) *
* ( 0% + 90% ) *

4,826
3,476

241
174

=
=

$162,797
$105,539

* ( 0% + 100% ) *
* ( 0% + 90% ) *

3,539
1,053

177
53

=
=

$119,385
$31,973

* ( 0% + 100% ) *
* ( 0% + 90% ) *

1,073
421

54
21

=
=

$36,177
$12,789

* ( 0% + 100% ) *
* ( 0% + 90% ) *

429
105

21
5

=
=

$14,471
$3,197

* ( 0% + 100% ) *
* ( 0% + 90% ) *

107
105

5
5

=
=

$3,618
$3,197

* ( 0% + 100% ) *
* ( 0% + 90% ) *

107
632

5
32

=
=

$3,618
$19,184

* ( 0% + 100% ) *

644

32

=

$21,706

* ( 0% +

50%

)*

37

2

=

$1,858

* ( 0% +
* ( 0% +

90%
50%

)*
)*

21
53

1
3

=
=

$1,936
$2,689

* ( 0% +
* ( 0% +

90%
50%

)*
)*

30
13

1
1

=
=

$2,728
$636

* ( 0% +
* ( 0% +

90%
50%

)*
)*

7
249

0
12

=
=

$616
$12,613

* ( 0% +
* ( 0% +

90%
50%

)*
)*

141
8

7
0

=
=

$12,848
$391

* ( 0% +

90%

)*

5

0

=

$440

 Item 13 COSTS

 # PLANTS

 # PLANTS

 % CONT

 % LEARN

 % INITADD

 # INIT

  CONTCOST 

 INITCONTTIME

Table 1

Large

12 * $    112.44 *

2

* 75% * ( 0% +

50%

)*

3

0

=

$147

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

2
8

0
0

=
=

$176
$391

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

5
3

0
0

=
=

$440
$147

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

2
1

0
0

=
=

$176
$49

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

0
1

0
0

=
=

$0
$49

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

0
33

0
2

=
=

$0
$1,662

Small

90%

)*

18

1

=

$1,672

Large

12 * $    112.44 * 2 * 75% * ( 0% +
CONSTRUCTION
12 * $    112.44 * 2 * 25% * ( 0% +

95%

)*

301

15

=

$9,660

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

2,277
4

114
0

=
=

$76,819
$124

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

30
60

1
3

=
=

$1,010
$1,920

Small
State

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

455
30

23
1

=
=

$15,351
$960

Local
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

228
6

11
0

=
=

$7,692
$186

Small

12 * $    112.44 *

2

* 25% * ( 0% + 100% ) *

45

2

=

$1,532

Large

12 * $    112.44 *

2

* 25% * ( 0% +

25%

)*

49

2

=

$412

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% +
* 25% * ( 0% +

75%
25%

)*
)*

62
326

3
16

=
=

$1,558
$2,750

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% +
* 25% * ( 0% +

75%
25%

)*
)*

1,436
100

72
5

=
=

$36,319
$840

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% +
* 25% * ( 0% +

75%
10%

)*
)*

18
276

1
14

=
=

$458
$929

Small
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% +
* 25% * ( 0% +

90%
25%

)*
)*

476
671

24
34

=
=

$14,461
$5,657

Small
State

12 * $    112.44 *
12 * $    112.44 *

2
2

* 25% * ( 0% +
* 25% * ( 0% +

50%
25%

)*
)*

3,566
12

178
1

=
=

$60,151
$99

Local

12 * $    112.44 *

2

* 25% * ( 0% +

25%

)*

647

32

=

$5,453

Plasma Welding

Oxy‐fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting

Thermal Spray Tungsten Cutting

SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
SECTOR 3.  PAINTING
General Industry (Aerospace)

General Industry (Autobody)

General Industry (Coil Coating)

Maritime

Construction

Government

Page 4

 Item 13 COSTS

 # PLANTS

 # PLANTS

 % CONT

 % LEARN

 % INITADD

 # INIT

  CONTCOST 

 INITCONTTIME

Table 1

SECTOR 4.  Producers of Chromates
Large

12 * $    112.44 *

2

* 100% * ( 0% + 100% ) *

2

0

=

$258

* $    112.44 *

2

*

)*

0

0

=

$0

* $    112.44 *

2

* 25% * ( 0% + 100% ) *

2

0

=

$101

* $    112.44 *

2

* 25% * ( 0% + 100% ) *

1

0

=

$30

* $    112.44 *

2

* 25% * ( 0% + 100% ) *

2

0

=

$80

* $    112.44 *

2

*

* ( 0% +

0%

)*

0

0

=

$0

* $    112.44 *

2

* 25% * ( 0% +

20%

)*

5

0

=

$75

* $    112.44 *

2

*

* ( 0% +

0%

)*

0

0

=

$0

* $    112.44 *

2

* 25% * ( 0% +

75%

)*

80

4

=

$2,035

* $    112.44 *

2

* 25% * ( 0% +

75%

)*

126

6

=

$3,198

* $    112.44 *

2

* 100% * ( 0% +

90%

)*

2

0

=

$303

* $    112.44 *

2

* 100% * ( 0% +

90%

)*

8

0

=

$1,011

* $    112.44 *

2

* 25% * (

0

+ 100% ) *

81

4

=

$2,748

* $    112.44 *

2

* 25% * (

0

+ 100% ) *

40

2

=

$1,344

* $    112.44 *

2

* 75% * ( 0% +

80%

)*

6

0

=

$457

* $    112.44 *

2

* 75% * ( 0% +

75%

)*

4

0

=

$286

* $    112.44 *

2

* 100% * ( 0% + 100% ) *

1

0

=

$286

* $    112.44 *

2

*

* ( 0% +

0%

)*

0

0

=

$0

* $    112.44 *

2

* 75% * ( 0% +

90%

)*

34

2

=

$5,137

* $    112.44 *
* $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
90%

)*
)*

11
102

1
5

=
=

$989
$15,411

* $    112.44 *

2

* 75% * ( 0% +

90%

)*

32

2

=

$2,908

* $    112.44 *

2

* 75% * ( 0% +

90%

)*

33

2

=

$3,024

* $    112.44 *

2

* 75% * ( 0% +

90%

)*

31

2

=

$2,850

* $    112.44 *

2

* 25% * ( 0% +

90%

)*

163

8

=

$11,526

* $    112.44 *

2

* 25% * ( 0% +

90%

)*

118

6

=

$3,593

* $    112.44 *

2

* 25% * ( 0% + 100% ) *

3

0

=

$91

* $    112.44 *

2

* 25% * ( 0% + 100% ) *

1

0

=

$30

ALL
Small
12
SECTOR 5. Chromate Pigment Procedures
Large
20
ALL
Small
12
SECTOR 6. CCA Producers
Large
12
ALL
Small
12
SECTOR 7.  Chromium Catalyst Producers
Large
28
ALL
Small
12
SECTOR 8.  Paint and Coating Producers
Large
12
ALL
Small
12
SECTOR 9.  Printing Ink Producers
Large
12
ALL
Small
12
SECTOR 10.  Plastic Colorant Producers and Users
Large
12
ALL
Small
12
SECTOR 11.  Plating Mixture Producers
Large
12
ALL
Small
12
SECTOR 13.  Chromium Metal Producers
Large
28
ALL
Small
12
SECTOR 14.  Iron and Steel Mills
Large
20
Alloy Stainless Steel
Small
12
Large
20
Carbon Steel
Small
12
14.B Forging Industry
Large
12
Reshaping
Small
12
SECTOR 15.  Iron and Steel Foundries
Large
28
ALL
Small
12
SECTOR 17.  Chromium Dye Producers
Large
12
ALL
Small
12

Page 5

0%

0%

0%

0%

* ( 0% +

0%

SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
Catalyst Users
Small
Large
Chromium Catalyst Service 
Companies
Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27.  Solid Waste Incerneration
Large
General Industry
Small
State
Government
Local

* ( 0% +

0%

 Item 13 COSTS

 # PLANTS

 # PLANTS

 % CONT

12 * $    112.44 *

2

*

)*

0

0

=

$0

12 * $    112.44 *

2

* 100% * ( 0% + 100% ) *

5

0

=

$646

12 * $    112.44 *

2

* 75% * ( 0% + 100% ) *

216

11

=

$21,823

12 * $    112.44 *

2

* 75% * ( 0% + 100% ) *

1,627

81

=

$164,662

12 * $    112.44 *

2

* 75% * ( 0% +

90%

)*

343

17

=

$31,284

12 * $    112.44 *

2

* 75% * ( 0% +

90%

)*

697

35

=

$63,488

12 * $    112.44 *

2

* 75% * ( 0% +

90%

)*

6

0

=

$573

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
90%

)*
)*

20
90

1
5

=
=

$1,814
$8,210

12 * $    112.44 *

2

* 75% * ( 0% +

90%

)*

5

0

=

$477

12 * $    112.44 *

2

* 75% * ( 0% +

90%

)*

81

4

=

$7,410

12 * $    112.44 *

2

* 75% * ( 0% +

90%

)*

325

16

=

$29,640

12 * $    112.44 *

2

* 75% * ( 0% +

90%

)*

179

9

=

$16,291

12 * $    112.44 *
12 * $    112.44 *

2
2

* 0% * ( 0% +
* 75% * ( 0% +

90%
90%

)*
)*

0
23

0
1

=
=

$0
$2,099

12 * $    112.44 *

2

* 75% * ( 0% +

90%

)*

4

0

=

$400

12 * $    112.44 *

2

* 75% * ( 0% +

90%

)*

5

0

=

$491

12 * $    112.44 *

2

* 75% * ( 0% +

90%

)*

0

0

=

$0

12 * $    112.44 *

2

* 75% * ( 0% + 100% ) *

148

7

=

$14,975

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% + 100% ) *
* 75% * ( 0% + 100% ) *

79
36

4
2

=
=

$8,008
$3,648

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% + 100% ) *
* 75% * ( 0% + 100% ) *

32
1,162

2
58

=
=

$3,214
$117,566

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% + 100% ) *
* 75% * ( 0% + 100% ) *

4,650
12

233
1

=
=

$470,581
$1,182

12 * $    112.44 *

2

* 75% * ( 0% + 100% ) *

42

2

=

$4,274

20 * $    112.44 *

2

* 75% * ( 0% +

90%

)*

40

2

=

$6,045

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
25%

)*
)*

48
0

2
0

=
=

$4,353
$0

12 * $    112.44 *

2

* 75% * ( 0% +

90%

)*

24

1

=

$2,176

Page 6

0%

 % LEARN

 % INITADD

 # INIT

  CONTCOST 

 INITCONTTIME

Table 1

SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large
Industrial Rehabilitation 

Hazardous Waste‐site Work

28 * $    112.44 *

2

* 75% * ( 0% + 100% ) *

12 * $    112.44 *

2

*

0%

* ( 0% +

12 * $    112.44 *

2

*

0%

Small
State

12 * $    112.44 *
12 * $    112.44 *

Local
Large

 Item 13 COSTS

 # PLANTS

 # PLANTS

 % CONT

 % LEARN

 % INITADD

 # INIT

  CONTCOST 

 INITCONTTIME

Table 1

19

1

=

$4,487

)*

0

0

=

$0

* ( 0% + 100%

*

51

3

=

$0

2
2

* 0% * ( 0% + 100%
* 100% * ( 0% + 100%

*
*

233
15

12
1

=
=

$0
$1,993

12 * $    112.44 *
12 * $    112.44 *

2
2

* 100% * ( 0% + 100%
* 75% * ( 0% + 90%

*
*

88
40

4
2

=
=

$11,824
$3,662

Small
State

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
90%

*
*

170
1

8
0

=
=

$15,481
$75

Local
Large

12 * $    112.44 *
12 * $    112.44 *

2
2

* 75% * ( 0% +
* 0% * ( 0% +

90%
90%

*
*

239
44

12
2

=
=

$21,731
$0

Small

12 * $    112.44 *

2

*

90%
Total

*

175
75,684

0%

Refractory Brick Restoration

Page 7

0%

* ( 0% +

9
=
3,784

$0
$3,112,617

Table 2

Initial Exposure Monitoring (§ 1910.1026(d)(2)(i) and (ii); Contract Cost for a Laboratory to Conduct Analysis of Initial
Exposure Monitoring Air Samples
This table calculates the contract cost for the employer to have a laboratory conduct analysis of air samples 
collected during initial exposure monitoring.  To determine the number of new employers that may need to 
conduct initial monitoring OSHA multiplied the number of existing plants by 5%.

Item 13 COSTS

 # PLANTS 

  # PLANTS 

 % INITADD

 # INIT

 # SAMPS

 SHIFTS

 JOBCAT

 SAMPCOST

Cost = (SAMPCOST  * JOBCAT * SHIFTS * #SAMPS * #INIT * %INITADD)* #PLANTS
Variables
* SAMPCOST =  Variable cost per sample = $77
* JOBCAT =  Number of job categories (covering each work area).
* SHIFTS = Number of work shifts
* #SAMPS =  Number of samples per exposure measurement
*#INIT =  Number of initial exposure measurements required to be satisfied equals 2
%INITADD =  Percent of plants that have not satisified initial monitoring requirement 
* #PLANTS = Number of plants represented by the model output * 5%

Sector 1. Electroplating
Large ( $77 * 7 * 2 * 3 *

2

* 25% ) *

883

44

=

$71,354

Small ( $77 * 7 * 1 * 3 *
Large ( $77 * 1 * 2 * 3 *

2
2

* 25% ) *
* 25% ) *

1,662
426

83
21

=
=

$67,144
$4,911

Small
Large

( $77 * 1 * 1 * 3 *
( $77 * 1 * 2 * 3 *

2
2

* 25% ) *
* 25% ) *

801
580

40
29

=
=

$4,621
$6,695

Small
Large

( $77 * 1 * 1 * 3 *
( $77 * 1 * 2 * 3 *

2
2

* 25% ) *
* 25% ) *

1,092
426

55
21

=
=

$6,301
$4,911

Small
Large

( $77 * 1 * 1 * 3 *
( $77 * 1 * 2 * 3 *

2
2

* 25% ) *
* 25% ) *

801
503

40
25

=
=

$4,621
$5,800

Small
Large

( $77 * 1 * 1 * 3 *
( $77 * 1 * 2 * 3 *

2
2

* 25% ) *
* 25% ) *

946
883

47
44

=
=

$5,459
$10,193

Small

( $77 * 1 * 1 * 3 *

83

=

$9,592

Large

2 * 25% ) *
1,662
GENERAL INDUSTRY
( $77 * 1 * 3 * 2 * 2 * 25% ) *
3,535

177

=

$40,799

Small
Large

( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *

2
2

* 25% ) *
* 25% ) *

3,962
2,593

198
130

=
=

$22,858
$29,927

Small
Large

( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *

2
2

* 25% ) *
* 25% ) *

2,905
786

145
39

=
=

$16,764
$9,065

Small
Large

( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *

2
2

* 25% ) *
* 25% ) *

880
314

44
16

=
=

$5,079
$3,624

Small

( $77 * 1 * 1 * 3 *

2

* 25% ) *

352

18

=

$2,029

Hard Chrome

Job Shop Chrome Plater

Captive Shop Chrome Plater

Job Shop Plater

Captive Shop Plater

Operator
Sector 2. Welding
SMAW

GMAW

TIG

SAW

Page 8

S

1 El

l i

Item 13 COSTS

 # PLANTS 

  # PLANTS 

 % INITADD

 # INIT

 # SAMPS

 SHIFTS

 JOBCAT

 SAMPCOST

Table 2

Large

( $77 * 1 * 3 * 2 *

2

* 25% ) *

78

4

=

$903

Small
Large

( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *

2
2

* 25% ) *
* 25% ) *

88
78

4
4

=
=

$507
$903

Small
Large

( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *

2
2

* 25% ) *
* 25% ) *

88
472

4
24

=
=

$507
$5,441

Small

2

* 25% ) *

529

26

=

$3,050

Large

( $77 * 1 * 1 * 3 *
MARITIME
( $77 * 1 * 3 * 1 *

2

* 75% ) *

17

1

=

$301

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

10
24

0
1

=
=

$112
$418

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

14
6

1
0

=
=

$156
$100

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

3
116

0
6

=
=

$33
$2,007

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

66
4

3
0

=
=

$758
$67

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

2
2

0
0

=
=

$22
$33

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

1
4

0
0

=
=

$11
$67

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

2
2

0
0

=
=

$22
$33

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

1
0

0
0

=
=

$11
$0

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

0
0

0
0

=
=

$0
$0

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

0
15

0
1

=
=

$0
$268

Small

* 75% ) *

9

0

=

$100

Large

( $77 * 1 * 2 * 1 * 2
CONSTRUCTION
( $77 * 1 * 3 * 1 * 2

* 25% ) *

201

10

=

$1,160

Small
Large

( $77 * 1 * 1 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 25% ) *
* 25% ) *

1,609
3

80
0

=
=

$3,094
$17

Small

( $77 * 1 * 1 * 1 *

2

* 25% ) *

21

1

=

$41

Plasma Cutting

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting

Thermal Spray Tungsten Cutting

SAW

SMAW

Plasma Cutting

Page 9

S

1 El

l i
GMAW

Item 13 COSTS

 # PLANTS 

  # PLANTS 

 % INITADD

 # INIT

 # SAMPS

 SHIFTS

 JOBCAT

 SAMPCOST

Table 2

Large

( $77 * 1 * 3 * 1 *

2

* 25% ) *

41

2

=

$234

Small
State

( $77 * 1 * 1 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 25% ) *
* 25% ) *

322
20

16
1

=
=

$619
$117

Local
State

( $77 * 1 * 1 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 25% ) *
* 25% ) *

161
4

8
0

=
=

$310
$22

Local

* 25% ) *

32

2

=

$61

State

( $77 * 1 * 1 * 1 * 2
GOVERNMENT
( $77 * 1 * 1 * 1 * 2

* 25% ) *

19

1

=

$37

Local
State

( $77 * 1 * 1 * 1 *
( $77 * 1 * 1 * 1 *

2
2

* 25% ) *
* 25% ) *

590
0

30
0

=
=

$1,135
$0

Local
State

( $77 * 1 * 1 * 1 *
( $77 * 1 * 1 * 1 *

2
2

* 25% ) *
* 25% ) *

8
4

0
0

=
=

$15
$7

Local
State

( $77 * 1 * 1 * 1 *
( $77 * 1 * 1 * 1 *

2
2

* 25% ) *
* 25% ) *

118
2

6
0

=
=

$227
$4

Local
State

( $77 * 1 * 1 * 1 *
( $77 * 1 * 1 * 1 *

2
2

* 25% ) *
* 25% ) *

59
1

3
0

=
=

$113
$2

Local

( $77 * 1 * 1 * 1 *

2

1

=

$22

Large

( $77 * 1 * 3 * 2 *

2

* 25% ) *
12
GENERAL INDUSTRY
* 25% ) *
4,740

237

=

$54,703

Small
Large

( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *

2
2

* 25% ) *
* 25% ) *

4,826
3,476

241
174

=
=

$27,848
$40,119

Small
Large

( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *

2
2

* 25% ) *
* 25% ) *

3,539
1,053

177
53

=
=

$20,422
$12,154

Small
Large

( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *

2
2

* 25% ) *
* 25% ) *

1,073
421

54
21

=
=

$6,188
$4,862

Small
Large

( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *

2
2

* 25% ) *
* 25% ) *

429
105

21
5

=
=

$2,475
$1,215

Small
Large

( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *

2
2

* 25% ) *
* 25% ) *

107
105

5
5

=
=

$619
$1,215

Small
Large

( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *

2
2

* 25% ) *
* 25% ) *

107
632

5
32

=
=

$619
$7,292

Small

( $77 * 1 * 1 * 3 *

2

* 25% ) *

644

32

=

$3,713

Brazing

Metallizing

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
Sector 2. Mild Steel Welding
SMAW

GMAW

TIG

SAW

Plasma Cutting

Plasma Welding

Resistance Welding

Page 10

S

1 El

l i

Item 13 COSTS

 # PLANTS 

  # PLANTS 

 % INITADD

 # INIT

 # SAMPS

 SHIFTS

 JOBCAT

 SAMPCOST

Table 2

Large

MARITIME
( $77 * 1 * 3 * 1 *

2

* 75% ) *

37

2

=

$636

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

21
53

1
3

=
=

$245
$920

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

30
13

1
1

=
=

$346
$217

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

7
249

0
12

=
=

$78
$4,315

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

141
8

7
0

=
=

$1,628
$134

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

5
3

0
0

=
=

$56
$50

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

2
8

0
0

=
=

$22
$134

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

5
3

0
0

=
=

$56
$50

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

2
1

0
0

=
=

$22
$17

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

0
1

0
0

=
=

$0
$17

Small
Large

( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

0
33

0
2

=
=

$0
$569

Small

* 75% ) *

18

1

=

$212

Large

( $77 * 1 * 2 * 1 * 2
CONSTRUCTION
( $77 * 1 * 3 * 1 * 2

* 25% ) *

301

15

=

$1,739

Small
Large

( $77 * 1 * 1 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 25% ) *
* 25% ) *

2,277
4

114
0

=
=

$4,380
$22

Small
Large

( $77 * 1 * 1 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 25% ) *
* 25% ) *

30
60

1
3

=
=

$58
$346

Small
State

( $77 * 1 * 1 * 1 *
( $77 * 1 * 3 * 1 *

2
2

* 25% ) *
* 25% ) *

455
30

23
1

=
=

$875
$173

Local

( $77 * 1 * 1 * 1 *

2

* 25% ) *

228

11

=

$439

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting

Thermal Spray Tungsten Cutting

SAW

SMAW

Plasma Cutting

GMAW

Brazing

Page 11

S

1 El

l i

State

( $77 * 1 * 3 * 1 *

Item 13 COSTS

 # PLANTS 

  # PLANTS 

 % INITADD

 # INIT

 # SAMPS

 SHIFTS

 JOBCAT

 SAMPCOST

Table 2

2

* 25% ) *

6

0

=

$33

* 1 * 1 * 1 *

2

* 25% ) *

45

2

=

$87

* 2 * 3 * 3 *

2

* 25% ) *

49

2

=

$1,693

* 2 * 1 * 3 *
* 2 * 1 * 1 *

2
2

* 25% ) *
* 25% ) *

62
326

3
16

=
=

$711
$1,254

* 2 * 1 * 1 *
* 2 * 2 * 3 *

2
2

* 25% ) *
* 25% ) *

1,436
100

72
5

=
=

$5,522
$2,300

* 2 * 1 * 3 *
* 3 * 3 * 1 *

2
2

* 25% ) *
* 25% ) *

18
276

1
14

=
=

$209
$4,769

* 3 * 1 * 1 *
* 3 * 3 * 1 *

2
2

* 25% ) *
* 25% ) *

476
671

24
34

=
=

$2,749
$11,613

* 3 * 1 * 1 *
* 2 * 3 * 1 *

2
2

* 25% ) *
* 25% ) *

3,566
12

178
1

=
=

$20,579
$135

* 2 * 1 * 1 *

2

* 25% ) *

647

32

=

$2,487

* 4 * 3 * 3 *

2

* 100% ) *

2

0

=

$530

* 0 * 1 * 3 *

2

*

)*

0

0

=

$0

* 9 * 2 * 3 *

2

* 25% ) *

2

0

=

$187

* 1 * 1 * 3 *

2

* 25% ) *

1

0

=

$5

* 4 * 3 * 3 *

2

* 25% ) *

2

0

=

$164

* 0 * 3 * 0 *

2

*

)*

0

0

=

$0

* 14 * 3 * 3 *

2

* 25% ) *

5

0

=

$1,160

* 0 * 1 * 3 *

2

*

)*

0

0

=

$0

* 4 * 2 * 3 *

2

* 25% ) *

80

4

=

$3,713

* 4 * 2 * 3 *

2

* 25% ) *

126

6

=

$5,834

* 5 * 1 * 9 *

2

* 100% ) *

2

0

=

$865

* 3 * 1 * 5 *

2

* 100% ) *

8

0

=

$961

* 4 * 3 * 3 *

2

* 25% ) *

81

4

=

$5,642

* 1 * 1 * 3 *

2

* 25% ) *

40

2

=

$230

Metallizing
Local ( $77
SECTOR 3.  PAINTING ‐ General Industry
Large ( $77
AEROSPACE
Small ( $77
Large ( $77
General Industry (Autobody)
Small ( $77
Large ( $77
General Industry (Coil Coating)
Small ( $77
Large ( $77
Maritime
Small ( $77
Large ( $77
Construction
Small ( $77
State ( $77
Government
Local ( $77
SECTOR 4.  Producers of Chromates
Large ( $77
ALL
Small ( $77
SECTOR 5. Chromate Pigment Procedures
Large ( $77
ALL
Small ( $77
SECTOR 6. CCA Producers
Large ( $77
ALL
Small ( $77
SECTOR 7.  Chromium Catalyst Producers
Large ( $77
ALL
Small ( $77
SECTOR 8.  Paint and Coating Producers
Large ( $77
ALL
Small ( $77
SECTOR 9.  Printing Ink Producers
Large ( $77
ALL
Small ( $77
SECTOR 10.  Plastic Colorant Producers and Users
Large ( $77
ALL
Small ( $77
SECTOR 11.  Plating Mixture Producers

Page 12

0%

0%

0%

Item 13 COSTS

 # PLANTS 

* 75% ) *

6

0

=

$293

Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
Alloy and Stainless Steel
Small
Large
Carbon Steel
Small
14.B Forging Industry
Large
Reshaping
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22.  Printing
Large
ALL
Small

( $77 * 3 * 1 * 3 *

2

* 75% ) *

4

0

=

$195

( $77 * 16 * 3 * 3 *

2

* 100% ) *

1

0

=

$1,006

( $77 * 0 * 1 * 1 *

2

*

)*

0

0

=

$0

( $77 * 8 * 3 * 3 *

2

* 75% ) *

34

2

=

$14,060

( $77 * 4 * 1 * 3 *
( $77 * 8 * 3 * 3 *

2
2

* 75% ) *
* 75% ) *

11
102

1
5

=
=

$752
$42,179

( $77 * 4 * 1 * 1 *

2

* 75% ) *

32

2

=

$737

( $77 * 5 * 1 * 3 *

2

* 75% ) *

33

2

=

$2,874

( $77 * 2 * 1 * 3 *

2

* 75% ) *

31

2

=

$1,083

( $77 * 9 * 3 * 5 *

2

* 25% ) *

163

8

=

$42,249

( $77 * 5 * 1 * 5 *

2

* 25% ) *

118

6

=

$5,690

( $77 * 7 * 1 * 21 *

2

* 25% ) *

3

0

=

$763

( $77 * 5 * 1 * 7 *

2

* 25% ) *

1

0

=

$61

( $77 * 0 * 1 * 3 *

2

*

)*

0

0

=

$0

( $77 * 2 * 1 * 3 *

2

* 100% ) *

5

0

=

$221

( $77 * 1 * 1 * 3 *

2

* 75% ) *

216

11

=

$3,733

( $77 * 1 * 1 * 3 *

2

* 75% ) *

1,627

81

=

$28,167

( $77 * 3 * 3 * 3 *

2

* 75% ) *

343

17

=

$53,514

( $77 * 2 * 1 * 2 *

2

* 75% ) *

697

35

=

$16,089

( $77 * 3 * 3 * 12 *

2

* 75% ) *

6

0

=

$3,919

( $77 * 2 * 1 * 4 *
( $77 * 5 * 1 * 1 *

2
2

* 75% ) *
* 75% ) *

20
90

1
5

=
=

$919
$2,601

( $77 * 1 * 1 * 1 *

2

* 75% ) *

5

0

=

$30

( $77 * 3 * 3 * 2 *

2

* 75% ) *

81

4

=

$8,450

( $77 * 2 * 1 * 2 *

2

* 75% ) *

325

16

=

$7,511

Page 13

 # INIT
2

l i
 ALL 

 # SAMPS

( $77 * 3 * 1 * 3 *

1 El

 SHIFTS

Large

S

 JOBCAT

  # PLANTS 

 % INITADD

 SAMPCOST

Table 2

0%

0%

 # PLANTS 

Hazardous Waste‐site Work

Item 13 COSTS

  # PLANTS 

9

=

$18,578

$77 * 0 * 1 * 3 *
$77 * 0 * 3 * 3 *

2
2

* 0% ) *
* 75% ) *

0
23

0
1

=
=

$0
$0

$77 * 0 * 1 * 3 *

2

* 75% ) *

4

0

=

$0

$77 * 9 * 1 * 15 *

2

* 75% ) *

5

0

=

$4,202

$77 * 0 * 1 * 0 *

2

* 75% ) *

0

0

=

$0

$77 * 1 * 1 * 2 *

2

* 75% ) *

148

7

=

$1,708

$77 * 1 * 1 * 2 *
$77 * 1 * 1 * 1 *

2
2

* 75% ) *
* 75% ) *

79
36

4
2

=
=

$913
$208

$77 * 1 * 1 * 1 *
$77 * 1 * 1 * 1 *

2
2

* 75% ) *
* 75% ) *

32
1,162

2
58

=
=

$183
$6,704

$77 * 1 * 1 * 1 *
$77 * 1 * 1 * 1 *

2
2

* 75% ) *
* 75% ) *

4,650
12

233
1

=
=

$26,832
$67

$77 * 1 * 1 * 1 *

2

* 75% ) *

42

2

=

$244

$77 * 6 * 3 * 15 *

2

* 75% ) *

40

2

=

$62,048

$77 * 6 * 1 * 3 *
$77 * 0 * 3 * 15 *

2
2

* 75% ) *
* 75% ) *

48
0

2
0

=
=

$4,964
$0

$77 * 6 * 1 * 3 *

2

* 75% ) *

24

1

=

$2,482

$77 * 12 * 3 * 3 *

2

* 75% ) *

19

1

=

$11,843

$77 * 0 * 3 * 3 *

2

*

0%

)*

0

0

=

$0

$77 * 1 * 1 * 1 *

2

*

0%

)*

51

3

=

$0

Small
State

( $77 * 1 * 1 * 1 *
( $77 * 1 * 1 * 1 *

2
2

* 0% ) *
* 100% ) *

233
15

12
1

=
=

$0
$114

Local
Large

( $77 * 1 * 1 * 1 *
( $77 * 1 * 1 * 1 *

2
2

* 100% ) *
* 75% ) *

88
40

4
2

=
=

$674
$232

Small
State

( $77 * 1 * 1 * 1 *
( $77 * 1 * 1 * 1 *

2
2

* 75% ) *
* 75% ) *

170
1

8
0

=
=

$981
$5

Local

( $77 * 1 * 1 * 1 *

2

* 75% ) *

239

11

=

$1,269

Page 14

 # INIT

179

 # SAMPS

* 75% ) *

 SHIFTS

2

 JOBCAT

$77 * 2 * 3 * 3 *

S
1 El
l i
SECTOR 24.  Chromium Catalyst Users
Large (
Catalyst Users
Small (
Large (
Chromium Catalyst Service 
Companies
Small (
SECTOR 25.  Refractory Brick Producers
Large (
ALL
Small (
SECTOR 26.  Woodworking
Large (
General Industry
Small (
Large (
Maritime
Small (
Large (
Construction
Small (
State (
Government
Local (
SECTOR 27.  Solid Waste Incerneration
Large (
General Industry
Small (
State (
Government
Local (
SECTOR 30.  Superalloy Producers and Users
Large (
ALL
Small (
SECTOR 31.  Construction 
Large (
Industrial Rehabilitation 

 % INITADD

 SAMPCOST

Table 2

l i

( $77 * 1 * 1 * 1 *

2

*

Small

( $77 * 1 * 1 * 1 *

2

*

0%

)*

Item 13 COSTS

 % INITADD

 # INIT

 # SAMPS

 SHIFTS

Large

 # PLANTS 

1 El

  # PLANTS 

S

 JOBCAT

 SAMPCOST

Table 2

44

2

=

$0

9
3,783

=
=

$0
$1,010,800

Refractory Brick Restoration

Page 15

0% ) * 175
Total
75,684

Table 3

Semi‐Annual Exposure Monitoring (Paragraph (d)(2)(iii)); Employee Time and Cost to Conduct Semi‐Annual Exposure Monitoring       
This table calculates the burden hours and cost of employee time to conduct semi‐annual exposure monitoring.  When initial monitoring 
results equal or exceed the AL and are at or below the PEL, employers must continue to monitor employees at least every 6 months to 
ensure that exposures remain at or below the PEL. 
COST = BURDEN HOURS * NON SUPEWAGE
HOURS =  (ADMINTIME * NONSUPWAGE * JOBAL * SHIFTS * #SAMPS * 2 * %NOTSEMI * %ABOVEAL * (%INHOUSE + %LEARN) * #PLANTS)
Variables
* ADMINTIME =             In‐house administrative time (e.g., for pump calibration and report writing) per sample, in hours.
* NONSUPEWAGE =     Non‐suppervisory wage rate. $/hr.
* JOBAL =                       Number of job categories exposed at or above the AL
* SHIFTS =                      Number of work shifts.
* #SAMPS =                    Number of samples per exposure measurement
* 2 =                                  # times per year (semi‐annually)
* %NOTSEMI =               Percent of plants not performing semi‐annual monitoring requirements.
* %ABOVEAL =             Percent of plants that have an employee in at least one job category at or above the AL.
* %INHOUSE =              Percent of plants already with in‐house monitoring capabilities.
* %LEARN =                   Percent of plants that will develop in‐house monitoring capability.
* #PLANTS =                  Number of plants represented by the model input.

RESPONSES

*(

0% +

0% ) *

883

) =

$0

0

0

%NOTSEMI

#PLANTS

49.00%

%ABOVEAL

TOTAL HOURS

SEMI‐ANNUALLY

Item 12 COST

$     21.43 *

SHIFTS
#SAMPS

1 * 2 * 3 * 2 * 100% *

JOBAL

NONSUPEWAGE (2003)

%LEARN

0.50 * $     26.61

%INHOUSE

Sector 1. Electroplating
Large (
Hard Chrome
Small (
Large (
Job Shop 
Chrome Plater
Small (
Large (
Captive Shop 
Chrome Plater
Small (
Large (
Job Shop Plater
Small (
Large (
Captive Shop 
Plater
Small (
Large (
Operator
Small (
Sector 2. Welding
Large (
SMAW
Small (
Large (
GMAW
Small (
Large (
TIG
Small (
Large (
SAW
Small (
Large (
Plasma Cutting
Small (
Large (
Plasma 
Welding
Small (

NONSUPEWAGE

ADMINTIME

24.17%

0.50 * $     26.61
0.50 * $     26.61

21.43
21.43

*
*

1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *

49.00%
11.00%

*(
*(

0% +
0% +

0% ) *
0% ) *

1,662
426

) =
) =

$0
$0

0
0

0

0.50 * $     26.61
0.50 * $     26.61

21.43
21.43

*
*

1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *

11.00%
14.00%

*(
*(

0% +
0% +

0) *
0% ) *

801
580

) =
) =

$0
$0

0
0

0
0

0.50 *
*
0.50
0.50 *
0.50 *

$     26.61
$     26.61

21.43
21.43

*
*

1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *

14.00%
10.00%

*(
*(

0% +
0% +

0) *
0% ) *

1,092
426

) =
) =

$0
$0

0
0

0
0

$     26.61
$     26.61

21.43
21.43

*
*

1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *

10.00%
13.00%

*(
*(

0% +
0% +

0) *
0% ) *

801
503

) =
) =

$0
$0

0
0

0
0

0.50 * $     26.61
0.50 * $     26.61

21.43
21.43

*
*

1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *

13.00%
16.00%

*(
*(

0% +
0% +

0) *
0% ) *

946
883

) =
) =

$0
$0

0
0

0
0

0.50 * $     26.61

21.43

*

0% +

0) *

1,662

) =

$0

0

0

0.50 * $     26.20

21.10

*

1 * 1 * 3 * 2 * 100% * 16.00% * (
General Industry
1 * 3 * 2 * 2 * 100% *
0.92%
*(

10% +

0% ) *

3,535

) =

$511

20

39

1.00 * $     26.20
0.50 * $     26.20

21.10
21.10

*
*

1 * 1 * 3 * 2 * 100% *
1 * 3 * 2 * 2 * 100% *

0.92%
0.73%

*(
*(

0% +
10% +

0% ) *
0% ) *

3,962
2,593

) =
) =

$0
$298

0
11

0
23

1.00 * $     26.20
0.50 * $     26.20

21.10
21.10

*
*

1 * 1 * 3 * 2 * 100% *
1 * 3 * 2 * 2 * 100% *

0.73%
0.00%

*(
*(

0% +
10% +

0% ) *
0% ) *

2,905
786

) =
) =

$0
$0

0
0

0
0

1.00 * $     26.20
0.50 * $     26.20

21.10
21.10

*
*

1 * 1 * 3 * 2 * 100% *
0 * 3 * 2 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
10% +

0% ) *
0% ) *

880
314

) =
) =

$0
$0

0
0

0
0

1.00 * $     26.20
0.50 * $     26.20

21.10
21.10

*
*

0 * 1 * 3 * 2 * 100% *
1 * 3 * 2 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
10% +

0% ) *
0% ) *

352
78

) =
) =

$0
$0

0
0

0
0

1.00 * $     26.20
0.50 * $     26.20

21.10
21.10

*
*

1 * 1 * 3 * 2 * 100% *
1 * 3 * 2 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
10% +

0% ) *
0% ) *

88
78

) =
) =

$0
$0

0
0

0
0

1.00 * $     26.20

21.10

*

1 * 1 * 3 * 2 * 100% *

0.00%

*(

0% +

0% ) *

88

) =

$0

0

0

Page 16

TOTAL HOURS

RESPONSES

0.00%

*(

10% +

0% ) *

472

) =

$0

0

0

Small ( 1.00 * $     26.20

21.10

*

0.00%

*(

0% +

0% ) *

529

) =

$0

0

0

Large ( 0.50 * $     26.20

21.10

*

1 * 1 * 3 * 2 * 100% *
MARITIME
1 * 3 * 1 * 2 * 100% *

0.00%

*(

50% +

0% ) *

17

) =

$0

0

0

Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20

21.10
21.10

*
*

1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

10
24

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20

21.10
21.10

*
*

1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

14
6

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20

21.10
21.10

*
*

1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

3
116

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20

21.10
21.10

*
*

1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

66
4

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20

21.10
21.10

*
*

1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

2
2

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20

21.10
21.10

*
*

1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

1
4

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20

21.10
21.10

*
*

1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

2
2

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20

21.10
21.10

*
*

1 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

1
0

) =
) =

$0
$0

0
0

0
0

1.00 * $     26.20
0.50 * $     26.20

21.10
21.10

*
*

0 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

0
0

) =
) =

$0
$0

0
0

0
0

1.00 * $     26.20
0.50 * $     26.20

21.10
21.10

*
*

0 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

0
15

) =
) =

$0
$0

0
0

0
0

1.00 * $     26.20

21.10

*

0.00%

*(

10% +

0% ) *

9

) =

$0

0

0

Large ( 0.50 * $     26.20

21.10

*

0 * 2 * 1 * 2 * 100% *
CONSTRUCTION
1 * 3 * 1 * 2 * 100% *

0.00%

*(

5% +

0% ) *

201

) =

$0

0

0

Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20

21.10
21.10

*
*

1 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

1,609
3

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20

21.10
21.10

*
*

1 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

21
41

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $     26.20
State ( 0.50 * $     26.20

21.10
21.10

*
*

1 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

322
20

) =
) =

$0
$0

0
0

0
0

Local ( 1.00 * $     26.20
State ( 0.50 * $     26.20

21.10
21.10

*
*

1 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

161
4

) =
) =

$0
$0

0
0

0
0

Local ( 1.00 * $     26.20

21.10

*

0.00%

*(

0% +

0% ) *

32

) =

$0

0

0

State ( 0.50 * $     26.20

21.10

*

1 * 1 * 1 * 2 * 100% *
GOVERNMENT
1 * 1 * 1 * 2 * 100% *

0.00%

*(

5% +

0% ) *

19

) =

$0

0

0

Local ( 1.00 * $     26.20

21.10

*

1 * 1 * 1 * 2 * 100% *

0.00%

*(

0% +

0% ) *

590

) =

$0

0

0

%LEARN

%INHOUSE

%NOTSEMI

#PLANTS

1 * 3 * 2 * 2 * 100% *

%ABOVEAL

*

SHIFTS
#SAMPS

21.10

JOBAL

Item 12 COST

SEMI‐ANNUALLY

NONSUPEWAGE (2003)

Large ( 0.50 * $     26.20

ADMINTIME
Resistance 
Welding

NONSUPEWAGE

Table 3

SMAW

GMAW

TIG

FCAW

Plasma Cutting
Plasma 
Welding
Oxy‐fuel 
Cutting
Air Carbon Arc 
Cutting
Electric Torch 
Cutting

Small (
Thermal Spray  Large (
Tungsten 
Small (
Cutting
Large (
SAW
Small (

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

SMAW

Page 17

Item 12 COST

TOTAL HOURS

RESPONSES

0.00%

*(

5% +

0% ) *

0

) =

$0

0

0

Local ( 1.00 * $     26.20
State ( 0.50 * $     26.20

21.10
21.10

*
*

1 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

8
4

) =
) =

$0
$0

0
0

0
0

Local ( 1.00 * $     26.20
State ( 0.50 * $     26.20

21.10
21.10

*
*

1 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

118
2

) =
) =

$0
$0

0
0

0
0

Local ( 1.00 * $     26.20
State ( 0.50 * $     26.20

21.10
21.10

*
*

1 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

59
1

) =
) =

$0
$0

0
0

0
0

0.00%

*(

0% +

0% ) *

12

) =

$0

0

0

0.00%

*(

10% +

0% ) *

4,740

) =

$0

0

0

0.00%
0.00%

*(
*(

0% +
10% +

0% ) *
0% ) *

4,826
3,476

) =
) =

$0
$0

0
0

0
0

0.00%
0.00%

*(
*(

0% +
10% +

0% ) *
0% ) *

3,539
1,053

) =
) =

$0
$0

0
0

0
0

0.00%
0.00%

*(
*(

0% +
10% +

0% ) *
0% ) *

1,073
421

) =
) =

$0
$0

0
0

0
0

0.00%
0.00%

*(
*(

0% +
10% +

0% ) *
0% ) *

429
105

) =
) =

$0
$0

0
0

0
0

0.00%
0.00%

*(
*(

0% +
10% +

0% ) *
0% ) *

107
105

) =
) =

$0
$0

0
0

0
0

0.00%
0.00%

*(
*(

0% +
10% +

0% ) *
0% ) *

107
632

) =
) =

$0
$0

0
0

0
0

0.00%

*(

0% +

0% ) *

644

) =

$0

0

0

0.00%

*(

50% +

0% ) *

37

) =

$0

0

0

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

21
53

) =
) =

$0
$0

0
0

0
0

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

30
13

) =
) =

$0
$0

0
0

0
0

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

7
249

) =
) =

$0
$0

0
0

0
0

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

141
8

) =
) =

$0
$0

0
0

0
0

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

5
3

) =
) =

$0
$0

0
0

0
0

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

2
8

) =
) =

$0
$0

0
0

0
0

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

5
3

) =
) =

$0
$0

0
0

0
0

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

2
1

) =
) =

$0
$0

0
0

0
0

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

0
1

) =
) =

$0
$0

0
0

0
0

%NOTSEMI

#PLANTS

%LEARN

1 * 1 * 1 * 2 * 100% *

%ABOVEAL

*

SHIFTS
#SAMPS

21.10

JOBAL

State ( 0.50 * $     26.20

ADMINTIME

%INHOUSE

SEMI‐ANNUALLY

NONSUPEWAGE (2003)

NONSUPEWAGE

Table 3

Plasma Cutting

GMAW

Brazing

Metallizing
21.10 * 1 * 1 * 1 * 2 * 100% *
Local ( 1.00 * $     26.20
Sector 2. Mild Steel Welding                                                                        GENERAL INDUSTRY     
Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 2 * 2 * 100% *
SMAW
Small ( 1.00 * $     26.20
21.10 * 0 * 1 * 3 * 2 * 100% *
Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 2 * 2 * 100% *
GMAW
21.10 * 0 * 1 * 3 * 2 * 100% *
Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 2 * 2 * 100% *
TIG
21.10 * 0 * 1 * 3 * 2 * 100% *
Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 2 * 2 * 100% *
SAW
21.10 * 0 * 1 * 3 * 2 * 100% *
Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 2 * 2 * 100% *
Plasma Cutting
21.10 * 0 * 1 * 3 * 2 * 100% *
Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 2 * 2 * 100% *
Plasma 
Welding
21.10 * 0 * 1 * 3 * 2 * 100% *
Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 2 * 2 * 100% *
Resistance 
Welding
21.10 * 0 * 1 * 3 * 2 * 100% *
Small ( 1.00 * $     26.20
MARITIME
Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
SMAW
Small ( 1.00 * $     26.20
21.10 * 0 * 2 * 1 * 2 * 100% *
Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
GMAW
21.10 * 0 * 2 * 1 * 2 * 100% *
Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
TIG
21.10 * 0 * 2 * 1 * 2 * 100% *
Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
FCAW
21.10 * 0 * 2 * 1 * 2 * 100% *
Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
Plasma Cutting
21.10 * 0 * 2 * 1 * 2 * 100% *
Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
Plasma 
Welding
21.10 * 0 * 2 * 1 * 2 * 100% *
Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
Oxy‐fuel 
Cutting
21.10 * 0 * 2 * 1 * 2 * 100% *
Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
Air Carbon Arc 
Cutting
21.10 * 0 * 2 * 1 * 2 * 100% *
Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
Electric Torch 
Cutting
21.10 * 0 * 2 * 1 * 2 * 100% *
Small ( 1.00 * $     26.20
Thermal Spray  Large ( 0.50 * $     26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
Tungsten 

Page 18

TOTAL HOURS

RESPONSES

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

0
33

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $     26.20

21.10

*

0.00%

*(

10% +

0% ) *

18

) =

$0

0

0

Large ( 0.50 * $     26.20

21.10

*

0 * 2 * 1 * 2 * 100% *
CONSTRUCTION
0 * 3 * 1 * 2 * 100% *

0.00%

*(

5% +

0% ) *

301

) =

$0

0

0

Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20

21.10
21.10

*
*

0 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

2,277
4

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20

21.10
21.10

*
*

0 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

30
60

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20

21.10
21.10

*
*

0 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

455
30

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20

21.10
21.10

*
*

0 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

228
6

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $     26.20
SECTOR 3.  PAINTING
Large ( 0.50 * $     33.07
AEROSPACE
Small ( 1.00 * $     33.07
General 
Large ( 0.50 * $     33.07
Industry 
(Autobody) Small ( 1.00 * $     33.07
General 
Large ( 0.50 * $     33.07
Industry (Coil 
Small ( 1.00 * $     33.07
Coating)
Large ( 0.50 * $     33.07
Maritime
Small ( 1.00 * $     33.07
Large ( 0.50 * $     33.07
Construction
Small ( 1.00 * $     33.07
State ( 0.50 * $     33.07
Government
Local ( 1.00 * $     33.07
SECTOR 4.  Producers of Chromates
Large ( 0.50 * $     38.68
ALL
Small ( 1.00 * $     38.68
SECTOR 5. Chromate Pigment Procedures
Large ( 0.50 * $     37.70
ALL
Small ( 1.00 * $     37.70
SECTOR 6. CCA Producers
Large ( 0.50 * $     31.94
ALL
Small ( 1.00 * $     31.94

21.10

*

0 * 1 * 1 * 2 * 100% *

0.00%

*(

0% +

0% ) *

45

) =

$0

0

0

26.63

*

1 * 3 * 3 * 2 * 100% *

28.00%

*(

75% +

0% ) *

49

) =

$3,057

92

185

26.63
26.63

*
*

1 * 1 * 3 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *

9.00%
5.00%

*(
*(

25% +
75% +

0% ) *
0% ) *

62
326

) =
) =

$275
$404

26.63
26.63

*
*

1 * 1 * 1 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *

5.00%
8.00%

*(
*(

25% +
75% +

0% ) *
0% ) *

1,436
100

) =
) =

$1,187
$1,186

36
36

36
72

26.63
26.63

*
*

1 * 1 * 3 * 2 * 100% *
2 * 3 * 1 * 2 * 100% *

8.00%
36.00%

*(
*(

25% +
90% +

0% ) *
0% ) *

18
276

) =
) =

$72
$17,710

2
536

2
1071

26.63
26.63

*
*

0 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

36.00%
22.00%

*(
*(

10% +
75% +

0% ) *
0% ) *

476
671

) =
) =

$0
$10,980

0
332

0
664

26.63
26.63

*
*

1 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

22.00%
12.00%

*(
*(

50% +
75% +

0% ) *
0% ) *

3,566
12

) =
) =

$25,945
$104

785
3

785
6

26.63

*

1 * 1 * 1 * 2 * 100% *

12.00%

*(

75% +

0% ) *

647

) =

$3,849

116

116

31.15

*

3 * 3 * 3 * 2 * 100% *

45.00%

*(

0% +

0% ) *

2

) =

$0

0

0

31.15

*

0 * 1 * 3 * 2 * 100% *

0.00%

*(

0% +

0% ) *

0

) =

$0

0

0

30.36

*

5 * 2 * 3 * 2 * 100% *

71.00%

*(

0% +

0% ) *

2

) =

$0

0

0

30.36

*

1 * 1 * 3 * 2 * 100% *

50.00%

*(

0% +

0% ) *

1

) =

$0

0

0

25.72

*

1 * 3 * 3 * 2 * 100% *

33.00%

*(

0% +

0% ) *

2

) =

$0

0

0

25.72

*

0 * 3 * 0 * 2 * 100% *

0.00%

*(

0% +

0% ) *

0

) =

$0

0

0

%LEARN

%INHOUSE

%NOTSEMI

#PLANTS

0 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

%ABOVEAL

*
*

SHIFTS
#SAMPS

21.10
21.10

Cutting

JOBAL

Small ( 1.00 * $     26.20
Large ( 0.50 * $     26.20

ADMINTIME

Item 12 COST

SEMI‐ANNUALLY

NONSUPEWAGE (2003)

NONSUPEWAGE

Table 3

SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

Page 19

8
8
12 24.455626

SECTOR 7.  Chromium Catalyst Producers
Large ( 0.50 * $     38.68
31.15
ALL
31.15
Small ( 1.00 * $     38.68
SECTOR 8.  Paint and Coating Producers
Large ( 0.50 * $     28.81
23.20
ALL
23.20
Small ( 1.00 * $     28.81
SECTOR 9.  Printing Ink Producers
Large ( 0.50 * $     28.86
23.24
ALL
23.24
Small ( 0.50 * $     28.86
SECTOR 10.  Plastic Colorant Producers and Users
Large ( 0.50 * $     31.99
25.76
Small ( 1.00 * $     31.99
ALL
SECTOR 11.  Plating Mixture Producers
Large ( 0.50 * $     28.71
ALL
Small ( 1.00 * $     28.71
SECTOR 13.  Chromium Metal Producers
Large ( 0.5 * $     38.80
ALL
1 * $     38.80
Small (
SECTOR 14.  Iron and Steel Mills
Large ( 0.50 * $     38.80
Alloy and 
Stainless Steel
Small ( 1.00 * $     38.80
Large ( 0.50 * $     38.80
Carbon Steel
Small ( 1.00 * $     38.80
SECTOR 14B.  Forging Industry
Large ( 0.50 * $     38.80
Reshaping
Small ( 1.00 * $     38.80
SECTOR 15.  Iron and Steel Foundries
Large ( 0.50 * $     28.31
ALL
Small ( 1.00 * $     28.31
SECTOR 17.  Chromium Dye Producers
Large ( 0.50 * $     37.70
ALL
Small ( 1.00 * $     37.70
SECTOR 18.  Chromium Sulfate Producers
Large ( 0.5 * $     41.50
ALL
Small ( 0.5 * $     41.50
SECTOR 19.  Chemical Distributors
Large ( 0.50 * $     29.92
ALL
Small ( 0.50 * $     29.92
SECTOR 20.  Textile Dyeing
Large ( 0.50 * $     19.97

RESPONSES

TOTAL HOURS

Item 12 COST

#PLANTS

%LEARN

%INHOUSE

%ABOVEAL

%NOTSEMI

SEMI‐ANNUALLY

SHIFTS
#SAMPS

JOBAL

NONSUPEWAGE (2003)

NONSUPEWAGE

ADMINTIME

Table 3

*

6 * 3 * 3 * 2 * 100% *

100.00%

*(

80% +

0% ) *

5

) =

$8,000

*

0 * 1 * 3 * 2 * 100% *

0.00%

*(

0% +

0% ) *

0

) =

$0

0

0

*

1 * 2 * 3 * 2 * 100% *

13.00%

*(

25% +

0% ) *

80

) =

$452

16

31

*

1 * 2 * 3 * 2 * 100% *

13.00%

*(

25% +

0% ) *

126

) =

$1,420

49

49

*

3 * 1 * 9 * 2 * 100% *

69.00%

*(

10% +

0% ) *

2

) =

$134

5

9

*

2 * 1 * 5 * 2 * 100% *

69.00%

*(

10% +

0% ) *

8

) =

$166

6

11

*

2 * 3 * 3 * 2 * 100% *

51.00%

*(

0

+

0

)*

81

)=

$0

0

0

25.76

*

2 * 1 * 3 * 2 * 100% *

51.00%

*(

0

+

0

)*

40

)=

$0

23.12

*

1 * 1 * 3 * 2 * 100% *

100.00%

*(

20% +

0% ) *

6

) =

$97

3

7

23.12

*

1 * 1 * 3 * 2 * 100% *

100.00%

*(

25% +

0% ) *

4

) =

$162

6

5.643502

31.25

*

2 * 3 * 3 * 2 * 100% *

100.00%

*(

0% +

0% ) *

1

) =

$0

0

0

31.25

*

0 * 1* 1* 2*

0% *

0.00%

*(

0% +

0% ) *

0

) =

$0

0

0

31.25

*

3 * 3 * 3 * 2 * 100% *

38.00%

*(

10% +

0% ) *

34

) =

$1,347

35

69

31.25
31.25

*
*

1 * 1 * 3 * 2 * 100% *
0 * 3 * 3 * 2 * 100% *

38.00%
0.00%

*(
*(

10% +
10% +

0% ) *
0% ) *

11
102

) =
) =

$96
$0

2
0

2
0

31.25

*

0 * 1 * 1 * 2 * 100% *

0.00%

*(

10% +

0% ) *

32

) =

$0

0

0

31.25

*

4 * 1 * 3 * 2 * 100% *

63.00%

*(

10% +

0% ) *

33

) =

$974

25

79

31.25

*

2 * 1 * 3 * 2 * 100% *

63.00%

*(

10% +

0% ) *

31

) =

$918

24

24

22.80

*

6 * 3 * 5 * 2 * 100% *

100.00%

*(

10% +

0% ) *

163

) =

$41,459

1,464 2928.8717

22.80

*

5 * 1 * 5 * 2 * 100% *

100.00%

*(

10% +

0% ) *

118

) =

$16,751

592 591.69126

30.36

*

6 * 1 * # * 2 * 100% *

38.00%

*(

0% +

0% ) *

3

) =

$0

0

0

30.36

*

6 * 1 * 7 * 2 * 100% *

38.00%

*(

0% +

0% ) *

1

) =

$0

0

0

33.42

*

0 * 1 * 3 * 2 * 100% *

0.00%

*(

0% +

0% ) *

0

) =

$0

0

0

33.42

*

1 * 1 * 3 * 2 * 100% *

27.00%

*(

0% +

0% ) *

5

) =

$0

0

0

24.10

*

0 * 1 * 3 * 2 * 100% *

0.00%

*(

0% +

0% ) *

216

) =

$0

0

0

24.10

*

0 * 1 * 3 * 2 * 100% *

0.00%

*(

0% +

0% ) *

1,627

) =

$0

0

0

16.08

*

0 * 3 * 3 * 2 * 100% *

0.00%

*(

10% +

0% ) *

343

) =

$0

0

0

16.08

*

0.00%

*(

10% +

0% ) *

697

) =

$0

0

0

207 413.65003

0

0

ALL
Small

(

0.50

* $     19.97

0

* 1 * 2 * 2 * 100% *

Page 20

TOTAL HOURS

RESPONSES

*(

10% +

0% ) *

6

) =

$163

6

11

23.25
23.25

*
*

0
* 1 * 4 * 2 * 100% *
3 * 1 * 1 * 2 * 100% *

0.00%
20.00%

*(
*(

10% +
10% +

0% ) *
0% ) *

20
90

) =
) =

$0
$156

0
5

0
12

23.25

*

* 1 * 1 * 2 * 100% *

0.00%

*(

10% +

0% ) *

5

) =

$0

0

0

16.79

*

0 * 3 * 2 * 2 * 100% *

0.00%

*(

10% +

0% ) *

81

) =

$0

0

0

16.79

*

* 1 * 2 * 2 * 100% *

0.00%

*(

10% +

0% ) *

325

) =

$0

0

0

26.18

*

2 * 3 * 3 * 2 * 100% *

9.00%

*(

10% +

0% ) *

179

) =

$942

29

58

1.0 * $     32.51
0.5 * $     32.51

26.18
26.18

*
*

0
* 1 * 3 * 2 * 100% *
0 * 3 * 3 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
10% +

0% ) *
0% ) *

0
23

) =
) =

$0
$0

0
0

0
0

( 1.0 * $     32.51
SECTOR 25.  Refractory Brick Producers
Large ( 0.5 * $     25.64

26.18

*

* 1 * 3 * 2 * 100% *

0.00%

*(

10% +

0% ) *

4

) =

$0

0

0

20.65

*

0 * 1 * # * 2 * 100% *

0.00%

*(

10% +

0% ) *

5

) =

$0

0

0

20.65

*

* 1 * 0 * 2 * 100% *

0.00%

*(

10% +

0% ) *

0

) =

$0

0

0

25.86

*

0 * 1 * 2 * 2 * 100% *

0.00%

*(

0% +

0% ) *

148

) =

$0

0

0

25.86
25.86

*
*

* 1 * 2 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
0% +

0% ) *
0% ) *

79
36

) =
) =

$0
$0

0
0

0
0

25.86
25.86

*
*

0 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *

0.00%
22.00%

*(
*(

0% +
0% +

0% ) *
0% ) *

32
1,162

) =
) =

$0
$0

0
0

0
0

25.86
25.86

*
*

1 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *

22.00%
22.00%

*(
*(

0% +
0% +

0% ) *
0% ) *

4,650
12

) =
) =

$0
$0

0
0

0
0

25.86

*

1 * 1 * 1 * 2 * 100% *

22.00%

*(

0% +

0% ) *

42

) =

$0

0

0

21.93

*

0 * 3 * # * 2 * 100% *

0.00%

*(

10% +

0% ) *

40

) =

$0

0

0

21.93
21.93

*
*

0
* 1 * 3 * 2 * 100% *
0 * 3 * # * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
10% +

0% ) *
0% ) *

48
0

) =
) =

$0
$0

0
0

0
0

21.93

*

0 * 1 * 3 * 2 * 100% *

0.00%

*(

10% +

0% ) *

24

) =

$0

0

0

0

%LEARN

%INHOUSE

%NOTSEMI

#PLANTS

25.00%

%ABOVEAL

1 * 3 * # * 2 * 100% *

SHIFTS
#SAMPS

*

SECTOR 21.  Colored Glass Producers
Large ( 0.50 * $     28.87
General 
Industry
Small 1.00
(
* $     28.87
Large ( 0.50 * $     28.87
Fiber, Flat, 
Container Glass
Small 1.00
(
* $     28.87
SECTOR 22.  Printing
Large ( 0.5 * $     20.85

JOBAL

23.25

ADMINTIME

Item 12 COST

SEMI‐ANNUALLY

NONSUPEWAGE (2003)

NONSUPEWAGE

Table 3

ALL
Small
( 0.5 * $     20.85
SECTOR 24.  Chromium Catalyst Users
Large ( 0.5 * $     32.51

0

Catalyst Users
Small

(
Large (

Chromium 
Catalyst Service 
Companies Small

0

ALL
Small

( 0.5 * $     25.64
SECTOR 26.  Woodworking
Large ( 0.50 * $     32.11
General 
Industry
Small
(
1 * $     32.11
Large ( 0.50 * $     32.11
Maritime
1 * $     32.11
Small (
Large ( 0.50 * $     32.11
Construction
1 * $     32.11
Small (
State ( 0.50 * $     32.11
Government
1 * $     32.11
Local (
SECTOR 27.  Solid Waste Incerneration
Large ( 0.50 * $     27.23
General 
Industry
Small
(
1 * $     27.23
State ( 0.50 * $     27.23
Government
1 * $     27.23
Local (

0

0

Page 21

Item 12 COST

TOTAL HOURS

RESPONSES

0% ) *

19

) =

$0

0

0

* 3 * 3 * 2 * 100% *

0.00%

*(

0% +

0% ) *

0

) =

$0

0

0

*

0 * 1 * 1 * 2 * 100% *

0.00%

*(

0% +

0% ) *

51

) =

$0

0

0

22.49

*

25.88

%NOTSEMI

0 * 3 * 3 * 2 * 100% *

#PLANTS

0% +

*

%ABOVEAL

%LEARN

SEMI‐ANNUALLY

*(

22.49

SHIFTS
#SAMPS

0.00%

JOBAL

%INHOUSE

SECTOR 30.  Superalloy Producers and Users
Large ( 0.5 * $     27.93

NONSUPEWAGE (2003)

NONSUPEWAGE

ADMINTIME

Table 3

ALL
Small
(
1 * $     27.93
SECTOR 31.  Construction Cement Workers
Large ( 0.5 * $     32.13

0

Industrial  Small (
Rehabilitation  State (

1.0 * $     32.13
0.5 * $     32.13

25.88
25.88

*
*

0 * 1 * 1 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
0% +

0% ) *
0% ) *

233
15

) =
) =

$0
$0

0
0

0
0

Local (
Large (

1.0 * $     32.13
0.5 * $     32.13

25.88
25.88

*
*

0 * 1 * 1 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
10% +

0% ) *
0% ) *

88
40

) =
) =

$0
$0

0
0

0
0

Small (
State (

1.0 * $     32.13
0.5 * $     32.13

25.88
25.88

*
*

0 * 1 * 1 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
10% +

0% ) *
0% ) *

170
1

) =
) =

$0
$0

0
0

0
0

Local (
Large (

1.0 * $     32.13
0.5 * $     32.13

25.88
25.88

*
*

0 * 1 * 1 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *

0.00%
60.00%

*(
*(

10% +
10% +

0% ) *
0% ) *

239
44

) =
) =

$0
$0

0
0

0
0

Small (

1.0 * $     32.13

25.88

*

0 * 1 * 1 * 2 * 100% *

60.00%

*(

10% +

0% ) *
Total

175
) =
75,684

$0
$138,815

Hazardous 
Waste‐site 
Work
Refractory 
Brick 
Restoration

Page 22

0
0
4,463        7,336

Table 4

Semi‐Annual Exposure Monitoring (Paragraph (d)(2)(iii)); Contract Cost for an IH Technician to Perform Semi‐Annual 
Exposure Monitoring 
This table calculates the contract cost for the employer to have an outside industrial hygiene technician perform semi‐
annual exposure monitoring.  
Cost = (SEMICONTTIME  * CONTCOST * SEMI‐ANNUALLY * %NOTSEMI * %ABOVE AL *%CONT) * #PLANTS)         
Variables:
* SEMICONTTIME =  Time, in hours, for an outside contractor (industrial hygiene technician) 
    to conduct semi‐annual monitoring
* CONTCOST =  Cost per hour for an outside industrial hygiene contractor
* 2 =  2 times per year semi‐annually
* %NOTSEMI =  Percent of plants not performing semi‐annual monitoring requirements
* %ABOVEAL =  Percent of plants that have an employee in at least one job category at or above the AL
* %CONT =  Percent of plants that will continue to use an outside contractor for monitoring
* #PLANTS =  Number of plants represented by the model input

 Item 13 COST

 # PLANTS

 % CONT

 % ABOVEAL

 % NOTSEMI

SEMI ‐ ANNUALLY

  CONTCOST 

  CONTCOST (2003

 SEMICONTTIME

24.93%

Sector 1. Electroplating
Large

( 12 * $90.00

$      112.44 * 2 * 100% * 49.00% * 100% ) *

883

=

$1,167,970

Small
Large

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% * 49.00% * 100% ) *
$      112.44 * 2 * 100% * 11.00% * 100% ) *

1,662
426

=
=

$2,198,127
$126,329

* 100% * 11.00% * 100% ) *
* 100% * 14.00% * 100% ) *

801
580

=
=

$237,705
$219,176

* 100% * 14.00% * 100% ) *
* 100% * 10.00% * 100% ) *

1,092
426

=
=

$412,567
$114,845

* 100% * 10.00% * 100% ) *
* 100% * 13.00% * 100% ) *

801
503

=
=

$216,096
$176,319

* 100% * 13.00% * 100% ) *
* 100% * 16.00% * 100% ) *

946
883

=
=

$331,895
$381,378

* 100% * 16.00% * 100% ) *

1,662

=

$717,756

* 100% *

0.92%

*

)*

3,535

=

$78,994

* 100% *
* 100% *

0.92%
0.73%

* 100% ) *
* 90% ) *

3,962
2,593

=
=

$98,350
$45,978

* 100% *
* 100% *

0.73%
0.00%

* 100% ) *
* 90% ) *

2,905
786

=
=

$57,234
$0

* 100% *

0.00%

* 100% ) *

880

=

$0

Hard Chrome
Job Shop Chrome 
Plater

( 12 * $90.00 $      112.44 * 2
Small
( 12 * $90.00 $      112.44 * 2
Large
Captive Shop Chrome 
Plater
( 12 * $90.00 $      112.44 * 2
Small
( 12 * $90.00 $      112.44 * 2
Large
Job Shop Plater
( 12 * $90.00 $      112.44 * 2
Small
( 12 * $90.00 $      112.44 * 2
Large
Captive Shop Plater
( 12 * $90.00 $      112.44 * 2
Small
( 12 * $90.00 $      112.44 * 2
Large
Operator
( 12 * $90.00 $      112.44 * 2
Small
Sector 2. Welding                                                         GENERAL INDUSTRY
Large
( 12 * $90.00 $      112.44 * 2
SMAW
( 12 * $90.00 $      112.44 * 2
Small
Large
( 12 * $90.00 $      112.44 * 2
GMAW
( 12 * $90.00 $      112.44 * 2
Small
Large
( 12 * $90.00 $      112.44 * 2
TIG
( 12 * $90.00 $      112.44 * 2
Small

Page 23

90%

90%

 Item 13 COST

 # PLANTS

 % CONT

 % ABOVEAL

 % NOTSEMI

SEMI ‐ ANNUALLY

  CONTCOST 

  CONTCOST (2003

 SEMICONTTIME

Table 4

Large

( 0 * $90.00

$      112.44 * 2 * 100% *

0.00%

*

)*

314

=

$0

Small
Large

( 0 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 90% ) *

352
78

=
=

$0
$0

Small
Large

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 90% ) *

88
78

=
=

$0
$0

Small
Large

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 90% ) *

88
472

=
=

$0
$0

Small

( 12 * $90.00

0.00%

* 100% ) *

529

=

$0

0.00%

*

50%

)*

17

=

$0

SAW

Plasma Cutting

Plasma Welding

Resistance Welding

Large

( 12 * $90.00

$      112.44 * 2 * 100% *
MARITIME
$      112.44 * 2 * 100% *

Small
Large

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

10
24

=
=

$0
$0

Small
Large

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

14
6

=
=

$0
$0

Small
Large

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

3
116

=
=

$0
$0

Small
Large

( 0 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

66
4

=
=

$0
$0

Small
Large

( 0 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

2
2

=
=

$0
$0

Small
Large

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

1
4

=
=

$0
$0

Small
Large

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

2
2

=
=

$0
$0

Small
Large

( 12 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

1
0

=
=

$0
$0

Small
Large

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

0
0

=
=

$0
$0

Small

( 0 * $90.00

$      112.44 * 2 * 100% *

0.00%

*

90%

)*

0

=

$0

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting
Thermal Spray 
Tungsten Cutting

Page 24

 Item 13 COST

 # PLANTS

 % CONT

 % ABOVEAL

 % NOTSEMI

SEMI ‐ ANNUALLY

  CONTCOST 

  CONTCOST (2003

 SEMICONTTIME

Table 4

Large

( 0 * $90.00

$      112.44 * 2 * 100% *

0.00%

*

50%

)*

15

=

$0

Small

( 0 * $90.00

0.00%

*

90%

)*

9

=

$0

Large

( 12 * $90.00

$      112.44 * 2 * 100% *
CONSTRUCTION
$      112.44 * 2 * 100% *

0.00%

*

95%

)*

201

=

$0

Small
Large

( 12 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

1,609
3

=
=

$0
$0

Small
Large

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

21
41

=
=

$0
$0

Small
Large

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

322
20

=
=

$0
$0

Small
Large

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

161
4

=
=

$0
$0

Small

( 12 * $90.00

0.00%

* 100% ) *

32

=

$0

State

( 12 * $90.00

$      112.44 * 2 * 100% *
GOVERNMENT
$      112.44 * 2 * 100% *

0.00%

*

)*

19

=

$0

Local
State

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

590
0

=
=

$0
$0

Local
State

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

8
4

=
=

$0
$0

Local
State

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

118
2

=
=

$0
$0

Local
State

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

59
1

=
=

$0
$0

* 100% *

0.00%

* 100% ) *

12

=

$0

* 100% *

0.00%

*

)*

4,740

=

$0

* 100% *
* 100% *

0.00%
0.00%

* 100% ) *
* 90% ) *

4,826
3,476

=
=

$0
$0

* 100% *
* 100% *

0.00%
0.00%

* 100% ) *
* 90% ) *

3,539
1,053

=
=

$0
$0

* 100% *
* 100% *

0.00%
0.00%

* 100% ) *
* 90% ) *

1,073
421

=
=

$0
$0

* 100% *
* 100% *

0.00%
0.00%

* 100% ) *
* 90% ) *

429
105

=
=

$0
$0

* 100% *

0.00%

* 100% ) *

107

=

$0

SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

95%

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
( 12 * $90.00 $      112.44 * 2
Local
Sector 2. Mild Steel Welding                                       GENERAL INDUSTRY
Large
( 12 * $90.00 $      112.44 * 2
SMAW
( 0 * $90.00 $      112.44 * 2
Small
Large
( 0 * $90.00 $      112.44 * 2
GMAW
( 0 * $90.00 $      112.44 * 2
Small
Large
( 0 * $90.00 $      112.44 * 2
TIG
( 0 * $90.00 $      112.44 * 2
Small
Large
( 0 * $90.00 $      112.44 * 2
SAW
( 0 * $90.00 $      112.44 * 2
Small
Large
( 0 * $90.00 $      112.44 * 2
Plasma Cutting
( 0 * $90.00 $      112.44 * 2
Small

Page 25

90%

90%

 Item 13 COST

 # PLANTS

 % CONT

 % ABOVEAL

 % NOTSEMI

SEMI ‐ ANNUALLY

  CONTCOST 

  CONTCOST (2003

 SEMICONTTIME

Table 4

Large

( 0 * $90.00

$      112.44 * 2 * 100% *

0.00%

*

)*

105

=

$0

Small
Large

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 90% ) *

107
632

=
=

$0
$0

Small

( 0 * $90.00

0.00%

* 100% ) *

644

=

$0

0.00%

*

50%

)*

37

=

$0

Plasma Welding

Resistance Welding

Large

( 0 * $90.00

$      112.44 * 2 * 100% *
MARITIME
$      112.44 * 2 * 100% *

Small
Large

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

21
53

=
=

$0
$0

Small
Large

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

30
13

=
=

$0
$0

Small
Large

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

7
249

=
=

$0
$0

Small
Large

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

141
8

=
=

$0
$0

Small
Large

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

5
3

=
=

$0
$0

Small
Large

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

2
8

=
=

$0
$0

Small
Large

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

5
3

=
=

$0
$0

Small
Large

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

2
1

=
=

$0
$0

Small
Large

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

0
1

=
=

$0
$0

Small

( 0 * $90.00

$      112.44 * 2 * 100% *

0.00%

*

90%

)*

0

=

$0

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting
Thermal Spray 
Tungsten Cutting

Page 26

 Item 13 COST

 # PLANTS

 % CONT

 % ABOVEAL

 % NOTSEMI

SEMI ‐ ANNUALLY

  CONTCOST 

  CONTCOST (2003

 SEMICONTTIME

Table 4

Large

( 0 * $90.00

$      112.44 * 2 * 100% *

0.00%

*

50%

)*

33

=

$0

Small

( 0 * $90.00

0.00%

*

90%

)*

18

=

$0

Large

( 0 * $90.00

$      112.44 * 2 * 100% *
CONSTRUCTION
$      112.44 * 2 * 100% *

0.00%

*

95%

)*

301

=

$0

Small
Large

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

2,277
4

=
=

$0
$0

Small
Large

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

30
60

=
=

$0
$0

Small
Large

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

455
30

=
=

$0
$0

Small
State

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

228
6

=
=

$0
$0

Local

( 0 * $90.00

$      112.44 * 2 * 100% *

0.00%

* 100% ) *

45

=

$0

Large

( 12 * $90.00

$      112.44 * 2 * 100% * 28.00% *

25%

*

49

=

$9,239

Small
Large

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

9.00%
5.00%

*
*

75%
25%

)*
*

62
326

=
=

$11,219
$10,999

Small
Large

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

5.00%
8.00%

*
*

75%
25%

)*
*

1,436
100

=
=

$145,277
$5,377

Small
Large

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% * 8.00% *
$      112.44 * 2 * 100% * 36.00% *

75%
10%

)*
*

18
276

=
=

$2,933
$26,764

Small
Large

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% * 36.00% *
$      112.44 * 2 * 100% * 22.00% *

90%
25%

)*
*

476
671

=
=

$416,474
$99,567

Small
State

( 12 * $90.00
( 12 * $90.00

$      112.44 * 2 * 100% * 22.00% *
$      112.44 * 2 * 100% * 12.00% *

50%
25%

)*
*

3,566
12

=
=

$1,058,658
$946

( 12 * $90.00
Local
SECTOR 4.  Producers of Chromates
Large
( 12 * $90.00
ALL
( 0 * $90.00
Small

$      112.44 * 2 * 100% * 12.00% *

25%

)*

647

=

$52,349

$      112.44 * 2 * 100% * 45.00% * 100% ) *

2

=

$2,325

$      112.44 * 2 * 100% *

0

=

$0

SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
SECTOR 3.  PAINTING
AEROSPACE
General Industry 
(Autobody)
General Industry (Coil 
Coating)
Maritime

Construction

Government

Page 27

0.00%

*

0%

)*

SECTOR 5. Chromate Pigment Procedures
Large
( 12 * $90.00
ALL
( 12 * $90.00
Small
SECTOR 6. CCA Producers
Large
( 12 * $90.00
ALL
( 0 * $90.00
Small
SECTOR 7.  Chromium Catalyst Producers
Large
( 20 * $90.00
ALL
( 0 * $90.00
Small
SECTOR 8.  Paint and Coating Producers
Large
( 12 * $90.00
ALL
( 12 * $90.00
Small
SECTOR 9.  Printing Ink Producers
Large
( 12 * $90.00
ALL
( 12 * $90.00
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
( 12 * $90.00
ALL
( 12 * $90.00
Small
SECTOR 11.  Plating Mixture Producers
Large
( 12 * $90.00
ALL
( 12 * $90.00
Small
SECTOR 13.  Chromium Metal Producers
Large
( 12 * $90.00
ALL
( 0 * $90.00
Small
SECTOR 14.  Iron and Steel Mills
Large
( 12 * $90.00
Alloy and Stainless 
Steel
( 12 * $90.00
Small
Large
( 0 * $90.00
Carbon Steel
( 0 * $90.00
Small
SECTOR 14B.  Forging Industry
Large
( 12 * $90.00
Reshaping
( 12 * $90.00
Small

 Item 13 COST

 # PLANTS

 % CONT

 % ABOVEAL

 % NOTSEMI

SEMI ‐ ANNUALLY

  CONTCOST 

  CONTCOST (2003

 SEMICONTTIME

Table 4

$      112.44 * 2 * 100% * 71.00% * 100% ) *

2

=

$3,448

$      112.44 * 2 * 100% * 50.00% * 100% ) *

1

=

$1,214

$      112.44 * 2 * 100% * 33.00% * 100% ) *

2

=

$2,105

$      112.44 * 2 * 100% *

0.00%

*

0%

)*

0

=

$0

$      112.44 * 2 * 100% *

100%

*

20%

)*

5

=

$4,306

$      112.44 * 2 * 100% *

0.00%

*

0%

)*

0

=

$0

$      112.44 * 2 * 100% * 13.00% *

75%

)*

80

=

$21,162

$      112.44 * 2 * 100% * 13.00% *

75%

)*

126

=

$33,255

$      112.44 * 2 * 100% * 69.00% *

90%

)*

2

=

$4,186

$      112.44 * 2 * 100% * 69.00% *

90%

)*

8

=

$13,953

$      112.44 * 2 * 100% * 51.00% * 100% ) *

81

=

$112,133

$      112.44 * 2 * 100% * 51.00% * 100% ) *

40

=

$54,848

$      112.44 * 2 * 100% *

100%

*

80%

)*

6

=

$12,183

$      112.44 * 2 * 100% *

100%

*

75%

)*

4

=

$7,614

$      112.44 * 2 * 100% *

100%

* 100% ) *

1

=

$2,451

$      112.44 * 2 *

0.00%

*

0%

)*

0

=

$0

$      112.44 * 2 * 100% * 38.00% *

90%

)*

34

=

$31,233

$      112.44 * 2 * 100% * 38.00% *
$      112.44 * 2 * 100% * 0.00% *

90%
90%

)*
)*

11
102

=
=

$10,018
$0

$      112.44 * 2 * 100% *

*

90%

)*

32

=

$0

$      112.44 * 2 * 100% * 63.00% *

90%

)*

33

=

$50,803

$      112.44 * 2 * 100% * 63.00% *

90%

)*

31

=

$47,873

Page 28

0%

*

0.00%

SECTOR 15.  Iron and Steel Foundries
Large
( 20 *
ALL
( 12 *
Small
SECTOR 17.  Chromium Dye Producers
Large
( 12 *
ALL
( 12 *
Small
SECTOR 18.  Chromium Sulfate Producers
Large
( 0 *
ALL
( 12 *
Small
SECTOR 19.  Chemical Distributors
Large
( 0 *
ALL
( 0 *
Small
SECTOR 20.  Textile Dyeing
Large
( 0 *
ALL
( 0 *
Small
SECTOR 21.  Colored Glass Producers
Large
( 12 *
General Industry
( 0 *
Small
Large ( 12 *
Fiber, Flat, Container 
Glass
Small ( 12 *
SECTOR 22.  Printing
Large
( 0 *
ALL
( 0 *
Small
SECTOR 24.  Chromium Catalyst Users
Large
( 12 *
Catalyst Users
( 0 *
Small
Large
( 12 *
Chromium Catalyst 
Service Companies
( 12 *
Small
SECTOR 25.  Refractory Brick Producers
Large
( 0 *
ALL
( 0 *
Small

 Item 13 COST

 # PLANTS

 % CONT

 % ABOVEAL

 % NOTSEMI

SEMI ‐ ANNUALLY

  CONTCOST 

  CONTCOST (2003

 SEMICONTTIME

Table 4

$90.00

$      112.44 * 2 * 100% *

100%

*

90%

)*

163

=

$658,630

$90.00

$      112.44 * 2 * 100% *

100%

*

90%

)*

118

=

$287,402

$90.00

$      112.44 * 2 * 100% * 38.00% * 100% ) *

3

=

$2,768

$90.00

$      112.44 * 2 * 100% * 38.00% * 100% ) *

1

=

$923

$90.00

$      112.44 * 2 * 100% *

)*

0

=

$0

$90.00

$      112.44 * 2 * 100% * 27.00% * 100% ) *

5

=

$3,488

$90.00

$      112.44 * 2 * 100% *

0.00%

* 100% ) *

216

=

$0

$90.00

$      112.44 * 2 * 100% *

0.00%

* 100% ) *

1,627

=

$0

$90.00

$      112.44 * 2 * 100% *

0.00%

*

90%

)*

343

=

$0

$90.00

$      112.44 * 2 * 100% *

0.00%

*

90%

)*

697

=

$0

$90.00

$      112.44 * 2 * 100% * 25.00% *

90%

)*

6

=

$3,819

$90.00
$90.00

$      112.44 * 2 * 100% * 0.00% *
$      112.44 * 2 * 100% * 20.00% *

90%
90%

)*
)*

20
90

=
=

$0
$43,786

$90.00

$      112.44 * 2 * 100% *

0.00%

*

90%

)*

5

=

$0

$90.00

$      112.44 * 2 * 100% *

0.00%

*

90%

)*

81

=

$0

$90.00

$      112.44 * 2 * 100% *

0.00%

*

90%

)*

325

=

$0

$90.00

$      112.44 * 2 * 100% *

9.00%

*

90%

)*

179

=

$39,098

$90.00
$90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
90%

)*
)*

0
23

=
=

$0
$0

$90.00

$      112.44 * 2 * 100% *

0.00%

*

90%

)*

4

=

$0

$90.00

$      112.44 * 2 * 100% *

0.00%

*

90%

)*

5

=

$0

$90.00

$      112.44 * 2 * 100% *

0.00%

*

90%

)*

0

=

$0

Page 29

0.00%

*

0%

SECTOR 26.  Woodworking
Large
( 0 * $90.00
General Industry
( 0 * $90.00
Small
Large
( 0 * $90.00
Maritime
( 0 * $90.00
Small
Large
( 12 * $90.00
Construction
( 12 * $90.00
Small
State
( 12 * $90.00
Government
( 12 * $90.00
Local
SECTOR 27.  Solid Waste Incerneration
Large
( 0 * $90.00
General Industry
( 0 * $90.00
Small
State
( 0 * $90.00
Government
( 0 * $90.00
Local
SECTOR 30.  Superalloy Producers and Users
Large
( 0 * $90.00
ALL
( 0 * $90.00
Small
SECTOR 31.  Construction
Large
( 0 * $90.00
Small
State

 Item 13 COST

 # PLANTS

 % CONT

 % ABOVEAL

 % NOTSEMI

SEMI ‐ ANNUALLY

  CONTCOST 

  CONTCOST (2003

 SEMICONTTIME

Table 4

$      112.44 * 2 * 100% *

0.00%

* 100% ) *

148

=

$0

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 100% ) *

79
36

=
=

$0
$0

$      112.44 * 2 * 100% * 0.00% * 100% ) *
$      112.44 * 2 * 100% * 22.00% * 100% ) *

32
1,162

=
=

$0
$689,722

$      112.44 * 2 * 100% * 22.00% * 100% ) *
$      112.44 * 2 * 100% * 22.00% * 100% ) *

4,650
12

=
=

$2,760,742
$6,936

$      112.44 * 2 * 100% * 22.00% * 100% ) *

42

=

$25,077

$      112.44 * 2 * 100% *

0.00%

*

90%

)*

40

=

$0

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
25%

)*
)*

48
0

=
=

$0
$0

$      112.44 * 2 * 100% *

0.00%

*

90%

)*

24

=

$0

$      112.44 * 2 * 100% *

0.00%

* 100% ) *

19

=

$0

$      112.44 * 2 * 100% *

0.00%

*

)*

0

=

$0

$      112.44 * 2 * 100% *

0.00%

* 100% ) *

51

=

$0

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 100% ) *

233
15

=
=

$0
$0

Local
Large

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 90% ) *

88
40

=
=

$0
$0

Hazardous Waste‐site  Small
Work
State

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% *
$      112.44 * 2 * 100% *

0.00%
0.00%

*
*

90%
90%

)*
)*

170
1

=
=

$0
$0

Local
Large

( 0 * $90.00
( 0 * $90.00

$      112.44 * 2 * 100% * 0.00% *
$      112.44 * 2 * 100% * 60.00% *

90%
90%

)*
)*

239
44

=
=

$0
$0

Small

( 0 * $90.00

$      112.44 * 2 * 100% * 60.00% *

90%
Total

)*

175
75,684

=
=

$0
$13,358,026

Industrial 
Rehabilitation 

Refractory Brick 
Restoration

Page 30

0%

Table 5

Semi‐Annual Exposure Monitoring (Paragraph (d)(2)(iii)); Contract Cost for a Laboratory to Conduct Analysis 
of Semi‐Annual Exposure Monitoring Air Samples 
This table calculates the contract cost for the employer to have a laboratory conduct analysis of air samples 
collected during semi‐annual exposure monitoring.   

Item 13 COST

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Cost = (SAMPCOST  * JOBAL * SHIFTS * #SAMPS * 2 * %NOTSEMI * %ABOVE AL) * #PLANTS
Variables:
* SAMPCOST = Variable cost per sample = $77
* JOBAL =  Number of job categories exposed at or above the AL.
* SHIFTS =  Number of work shifts.
* #SAMPS =  Number of samples per exposure measurement.
* 2 =  2 times per year (semi‐annual).
* %NOTSEMI =  Percent of plants not performing semi‐annual monitoring requirements.
* %ABOVEAL =  Percent of plants that have an employee in at least one job category at or above the AL.
* #PLANTS =  Number of plants represented by the model input.

Sector 1. Electroplating
Large (

$77 * 1 * 2 * 3 * 2 * 100% *

49%

) *

883

=

$399,583

Small (
Large (

$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 2 * 3 * 2 * 100% *

49%
11%

) *

1,662
426

=

$376,009
$43,219

Small (
Large (

$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 2 * 3 * 2 * 100% *

11%
14%

) *

801
580

=

Small (
Large (

$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 2 * 3 * 2 * 100% *

14%
10%

) *

1,092
426

=

Small (
Large (

$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 2 * 3 * 2 * 100% *

10%
13%

) *

801
503

=

Small (
Large (

$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 2 * 3 * 2 * 100% *

13%
16%

) *

946
883

=

) *

=

$56,774
$130,476

Small (

$77 * 1 * 1 * 3 * 2 * 100% *

16%

) *

1,662

=

$122,778

Sector 2. Welding
SMAW

Large (

$77 * 1 * 3 * 2 * 2 * 100% *

0.92%

) *

3,535

=

$30,028

Small (
Large (

$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 3 * 2 * 2 * 100% *

0.92%
0.73%

) *

3,962
2,593

=

GMAW

$16,824
$17,478

$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 3 * 2 * 2 * 100% *

0.73%
0%

) *
) *

2,905
786

=

TIG

Small (
Large (

=

$9,790
$0

Small (

$77 * 1 * 1 * 3 * 2 * 100 *

0%

) *

880

=

$0

Hard Chrome
) *

=

Job Shop Chrome Plater
Captive Shop Chrome 
Plater

) *

) *

=

=

$40,662
$74,984
$70,573
$39,290

Job Shop Plater
) *

=

$36,965
$60,322

Captive Shop Plater
Operator

General Industry

Page 31

) *

=

Item 13 COST

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Table 5

Large (

$77 * 0 * 3 * 2 * 2 * 100% *

0%

) *

314

=

$0

Small (
Large (

$77 * 0 * 1 * 3 * 2 * 100% *
$77 * 1 * 3 * 2 * 2 * 100% *

0%
0%

) *

352
78

=

$0
$0

Small (
Large (

$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 3 * 2 * 2 * 100% *

0%
0%

) *

88
78

=

Small (
Large (

$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 3 * 2 * 2 * 100% *

0%
0%

) *

88
472

=

) *

=

$0
$0

$77 * 1 * 1 * 3 * 2 * 100% *
Maritime
Large ( $77 * 1 * 3 * 1 * 2 * 100% *

0%

) *

529

=

$0

0%

) *

17

=

$0

Small (
Large (

$77 * 1 * 2 * 1 * 2 * 100% *
$77 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

10
24

=

$0
$0

Small (
Large (

$77 * 1 * 2 * 1 * 2 * 100% *
$77 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

14
6

=

Small ( $77 * 1 * 2 * 1 * 2 * 100% *
Large ( $77 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

3
116

=

Small ( $77 * 1 * 2 * 1 * 2 * 100% *
Large ( $77 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

66
4

=

Small ( $77 * 1 * 2 * 1 * 2 * 100% *
Large ( $77 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

2
2

=

Small ( $77 * 1 * 2 * 1 * 2 * 100% *
Large ( $77 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

1
4

=

Small ( $77 * 1 * 2 * 1 * 2 * 100% *
Large ( $77 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

2
2

=

Small ( $77 * 1 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

1
0

=

Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

0
0

=

Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

0
15

=

) *

=

$0
$0

Small ( $77 * 0 * 2 * 1 * 2 * 100% *

0%

) *

9

=

$0

SAW
) *

=

Plasma Cutting
) *

=

$0
$0

Plasma Welding

Resistance Welding
Small (

SMAW
) *

=

GMAW
) *

=

$0
$0

TIG
) *

=

$0
$0

FCAW
) *

=

$0
$0

Plasma Cutting
) *

=

$0
$0

Plasma Welding
) *

=

$0
$0

Oxy‐fuel Cutting
) *

=

$0
$0

Air Carbon Arc Cutting
) *

=

$0
$0

Electric Torch Cutting
Thermal Spray Tungsten 
Cutting

) *

=

$0
$0

SAW

Page 32

Item 13 COST

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Table 5

CONSTRUCTION
Large ( $77 * 1 * 3 * 1 * 2 * 100% *

0%

) *

201

=

$0

Small ( $77 * 1 * 1 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

1,609
3

=

$0
$0

Small ( $77 * 1 * 1 * 1 * 2 * 100% *
Large ( $77 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

21
41

=

Small ( $77 * 1 * 1 * 1 * 2 * 100% *
State ( $77 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

322
20

=

Local ( $77 * 1 * 1 * 1 * 2 * 100% *
State ( $77 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

161
4

=

) *

=

$0
$0

Local ( $77 * 1 * 1 * 1 * 2 * 100% *
GOVERNMENT
State ( $77 * 1 * 1 * 1 * 2 * 100% *

0%

) *

32

=

$0

0%

) *

19

=

$0

Local ( $77 * 1 * 1 * 1 * 2 * 100% *
State ( $77 * 1 * 1 * 1 * 2 * 100% *

0%
0%

) *

590
0

=

$0
$0

Local ( $77 * 1 * 1 * 1 * 2 * 100% *
State ( $77 * 1 * 1 * 1 * 2 * 100% *

0%
0%

) *

8
4

=

Local ( $77 * 1 * 1 * 1 * 2 * 100% *
State ( $77 * 1 * 1 * 1 * 2 * 100% *

0%
0%

) *

118
2

=

Local ( $77 * 1 * 1 * 1 * 2 * 100% *
State ( $77 * 1 * 1 * 1 * 2 * 100% *

0%
0%

) *

59
1

=

) *

=

$0
$0

* 100% *

0%

) *

12

=

$0

* 100% *

0%

) *

4,740

=

$0

* 100% *

0%
0%

) *

4,826
3,476

=

$0
$0

0%
0%

) *

3,539
1,053

=

) *
) *

1,073
421

=

* 100% *

0%
0%

=

$0
$0

* 100% *

0%

) *

429

=

$0

SMAW
) *

=

Plasma Cutting
) *

=

$0
$0

GMAW
) *

=

$0
$0

Brazing

Metallizing

SMAW
) *

=

Plasma Cutting
) *

=

$0
$0

GMAW
) *

=

$0
$0

Brazing

Metallizing
Local ( $77 * 1 * 1 * 1 * 2
Sector 2. Mild Steel Welding                                   GENERAL INDUSTRY
Large ( $77 * 0 * 3 * 2 * 2
SMAW
Small ( $77 * 0 * 1 * 3 * 2
Large ( $77 * 0 * 3 * 2 * 2
GMAW
Small ( $77 * 0 * 1 * 3 * 2
Large ( $77 * 0 * 3 * 2 * 2
TIG
Small ( $77 * 0 * 1 * 3 * 2
Large ( $77 * 0 * 3 * 2 * 2
SAW
Small ( $77 * 0 * 1 * 3 * 2

Page 33

* 100% *
* 100% *
* 100% *
* 100 *

) *

) *

=

=

$0
$0

Item 13 COST

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Table 5

Large (

$77 * 0 * 3 * 2 * 2 * 100% *

0%

) *

105

=

$0

Small (
Large (

$77 * 0 * 1 * 3 * 2 * 100% *
$77 * 0 * 3 * 2 * 2 * 100% *

0%
0%

) *

107
105

=

$0
$0

Small (
Large (

$77 * 0 * 1 * 3 * 2 * 100% *
$77 * 0 * 3 * 2 * 2 * 100% *

0%
0%

) *

107
632

=

) *

=

$0
$0

$77 * 0 * 1 * 3 * 2 * 100% *
Maritime
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%

) *

644

=

$0

0%

) *

37

=

$0

Small (
Large (

$77 * 0 * 2 * 1 * 2 * 100% *
$77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

21
53

=

$0
$0

Small (
Large (

$77 * 0 * 2 * 1 * 2 * 100% *
$77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

30
13

=

Small (
Large (

$77 * 0 * 2 * 1 * 2 * 100% *
$77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

7
249

=

Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

141
8

=

Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

5
3

=

Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

2
8

=

Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

5
3

=

Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

2
1

=

Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

0
1

=

Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

0
33

=

) *

=

$0
$0

Small ( $77 * 0 * 2 * 1 * 2 * 100% *

0%

) *

18

=

$0

Plasma Cutting
) *

=

Plasma Welding

Resistance Welding
Small (

SMAW
) *

=

GMAW
) *

=

$0
$0

TIG
) *

=

$0
$0

FCAW
) *

=

$0
$0

Plasma Cutting
) *

=

$0
$0

Plasma Welding
) *

=

$0
$0

Oxy‐fuel Cutting
) *

=

$0
$0

Air Carbon Arc Cutting
) *

=

$0
$0

Electric Torch Cutting
Thermal Spray Tungsten 
Cutting

) *

=

$0
$0

SAW

Page 34

Item 13 COST

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Table 5

CONSTRUCTION
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%

) *

301

=

$0

Small ( $77 * 0 * 1 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

2,277
4

=

$0
$0

Small ( $77 * 0 * 1 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

30
60

=

Small ( $77 * 0 * 1 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

455
30

=

Small ( $77 * 0 * 1 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

228
6

=

) *

=

$0
$0

Small ( $77 * 0 * 1 * 1 * 2 * 100% *

0%

) *

45

=

$0

Large (

$77 * 1 * 3 * 3 * 2 * 100% *

28%

) *

49

=

$18,965

Small (
Large (

$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 1 * 1 * 2 * 100% *

9%
5%

) *

62
326

=

$2,559
$2,509

Small ( $77 * 1 * 1 * 1 * 2 * 100% *
Large ( $77 * 1 * 2 * 3 * 2 * 100% *

5%
8%

) *

1,436
100

=

Small ( $77 * 1 * 1 * 3 * 2 * 100% *
Large ( $77 * 2 * 3 * 1 * 2 * 100% *

8%
36%

) *

18
276

=

Small ( $77 * 0 * 1 * 1 * 2 * 100% *
Large ( $77 * 1 * 3 * 1 * 2 * 100% *

36%
22%

) *

476
671

=

Small ( $77 * 1 * 1 * 1 * 2 * 100% *
State ( $77 * 1 * 3 * 1 * 2 * 100% *

22%
12%

) *

3,566
12

=

) *

=

$120,728
$647

* 1 * 1 * 1 * 2 * 100% *

12%

) *

647

=

$11,940

* 3 * 3 * 3 * 2 * 100% *

45%

) *

2

=

$3,580

* 0 * 1 * 3 * 2 * 100% *

0%

) *

0

=

$0

* 5 * 2 * 3 * 2 * 100% *

71%

) *

2

=

$5,898

* 1 * 1 * 3 * 2 * 100% *

50%

) *

1

=

$208

SMAW
) *

=

Plasma Cutting
) *

=

$0
$0

GMAW
) *

=

$0
$0

Brazing

Metallizing
SECTOR 3.  PAINTING
AEROSPACE
General Industry 
(Autobody)
General Industry (Coil 
Coating)

) *

) *

) *

=

=

=

$11,045
$7,359
$669
$91,566

Maritime
) *

=

$0
$68,128

Construction

Government
Local ( $77
SECTOR 4.  Producers of Chromates
Large ( $77
ALL
Small ( $77
SECTOR 5. Chromate Pigment Procedures
Large ( $77
ALL
Small ( $77

Page 35

Item 13 COST

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Table 5

SECTOR 6. CCA Producers
Large (

$77 * 1 * 3 * 3 * 2 * 100% *

33%

) *

2

=

$1,080

*

3 * 0 * 2 * 100% *

0%

) *

0

=

$0

*

3 * 3 * 2 * 100% *

100%

) *

5

=

$39,780

*

1 * 3 * 2 * 100% *

0%

) *

0

=

$0

*

2 * 3 * 2 * 100% *

13%

) *

80

=

$9,653

*

2 * 3 * 2 * 100% *

13%

) *

126

=

$15,169

*

1 * 9 * 2 * 100% *

69%

) *

2

=

$7,161

*

1 * 5 * 2 * 100% *

69%

) *

8

=

$8,840

*

3 * 3 * 2 * 100% *

51%

) *

81

=

$115,088

*

1 * 3 * 2 * 100% *

51%

) *

40

=

$18,764

*

1 * 3 * 2 * 100% *

100%

) *

6

=

$2,605

*

1 * 3 * 2 * 100% *

100%

) *

4

=

$1,737

*

3 * 3 * 2 * 100% *

100%

) *

1

=

$2,515

*

1 * 1 * 2 *

*

0%

) *

0

=

$0

*

3 * 3 * 2 * 100% *

38%

) *

34

=

$53,426

*

1 * 3 * 2 * 100% *
3 * 3 * 2 * 100% *

38%
0%

) *
) *

11
102

=

*

=

$1,904
$0

*

1 * 1 * 2 * 100% *

0%

) *

32

=

$0

*

1 * 3 * 2 * 100% *

63%

) *

33

=

$38,624

*

1 * 3 * 2 * 100% *

63%

) *

31

=

$18,198

*

3 * 5 * 2 * 100% *

100%

) *

163

=

$2,253,289

*

1 * 5 * 2 * 100% *

100%

) *

118

=

$455,210

ALL
$77 * 0
SECTOR 7.  Chromium Catalyst Producers
Large ( $77 * 6
ALL
Small ( $77 * 0
SECTOR 8.  Paint and Coating Producers
Large ( $77 * 1
ALL
Small ( $77 * 1
SECTOR 9.  Printing Ink Producers
Large ( $77 * 3
ALL
Small ( $77 * 2
SECTOR 10.  Plastic Colorant Producers and Users
Large ( $77 * 2
ALL
Small ( $77 * 2
SECTOR 11.  Plating Mixture Producers
Large ( $77 * 1
ALL
Small ( $77 * 1
SECTOR 13.  Chromium Metal Producers
Large ( $77 * 2
ALL
Small ( $77 * 0
SECTOR 14.  Iron and Steel Mills
Large ( $77 * 3
Alloy Stainless Steel
Small ( $77 * 1
Large ( $77 * 0
Carbon Steel
Small ( $77 * 0
14B. Forging Industry
Large ( $77 * 4
Forging Industry
Small ( $77 * 2
SECTOR 15.  Iron and Steel Foundries
Large ( $77 * 6
ALL
Small ( $77 * 5
Small (

Page 36

0%

Item 13 COST

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Table 5

SECTOR 17.  Chromium Dye Producers
Large (

$77 * 6 * 1 * 21 * 2 * 100% *

38%

) *

3

=

$19,886

* 6 * 1 * 7 * 2 * 100% *

38%

) *

1

=

$2,210

* 0 * 1 * 3 * 2 * 100% *

0%

) *

0

=

$0

* 1 * 1 * 3 * 2 * 100% *

27%

) *

5

=

$597

* 0 * 1 * 3 * 2 * 100% *

0%

) *

216

=

$0

* 0 * 1 * 3 * 2 * 100% *

0%

) *

1,627

=

$0

* 0 * 3 * 3 * 2 * 100% *

0%

) *

343

=

$0

* 0 * 1 * 2 * 2 * 100% *

0%

) *

697

=

$0

* 1 * 3 * 12 * 2 * 100% *

25%

) *

6

=

$8,709

* 0 * 1 * 4 * 2 * 100% *
* 3 * 1 * 1 * 2 * 100% *

0%
20%

) *

20
90

=

) *

=

$0
$8,322

* 0 * 1 * 1 * 2 * 100% *

0%

) *

5

=

$0

* 0 * 3 * 2 * 2 * 100% *

0%

) *

81

=

$0

* 0 * 1 * 2 * 2 * 100% *

0%

) *

325

=

$0

* 2 * 3 * 3 * 2 * 100% *

9%

) *

179

=

$44,587

* 0 * 1 * 3 * 2 * 100% *
* 0 * 3 * 3 * 2 * 100% *

0%
0%

) *

=

) *

0
23

=

$0
$0

* 0 * 1 * 3 * 2 * 100% *

0%

) *

4

=

$0

* 0 * 1 * 15 * 2 * 100% *

0%

) *

5

=

$0

* 0 * 1 * 0 * 2 * 100% *

0%

) *

0

=

$0

* 0 * 1 * 2 * 2 * 100% *

0%

) *

148

=

$0

* 0 * 1 * 2 * 2 * 100% *
* 0 * 1 * 1 * 2 * 100% *

0%
0%

) *

79
36

=

) *

=

$0
$0

* 0 * 1 * 1 * 2 * 100% *

0%

) *

32

=

$0

ALL
$77
SECTOR 18.  Chromium Sulfate Producers
Large ( $77
ALL
Small ( $77
SECTOR 19.  Chemical Distributors
Large ( $77
ALL
Small ( $77
SECTOR 20.  Textile Dyeing
Large ( $77
ALL
Small ( $77
SECTOR 21.  Colored Glass Producers
Large ( $77
General Industry
Small ( $77
Large ( $77
Fiber, Flat, and Container 
Glass
Small ( $77
SECTOR 22.  Printing
Large ( $77
ALL
Small ( $77
SECTOR 24.  Chromium Catalyst Users
Large ( $77
Catalyst User
Small ( $77
Large ( $77
Chromium Catalyst Service 
Companies
Small ( $77
SECTOR 25.  Refractory Brick Producers
Large ( $77
ALL
Small ( $77
SECTOR 26.  Woodworking
Large ( $77
General Industry
Small ( $77
Large ( $77
Maritime
Small ( $77
Small (

Page 37

Item 13 COST

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Table 5

Large (

$77 * 1 * 1 * 1 * 2 * 100% *

22%

) *

1,162

=

$39,328

Small (
State (

$77 * 1 * 1 * 1 * 2 * 100% *
$77 * 1 * 1 * 1 * 2 * 100% *

22%
22%

) *

4,650
12

=

) *

=

$157,416
$395

1 * 1 * 1 * 2 * 100% *
2
0 * 3 * 15 * 2 * 100% *

22%

) *

42

=

$1,430

0%

) *

40

=

$0

0 * 1 * 3 * 2 * 100% *
0 * 3 * 15 * 2 * 100% *

0%
0%

) *

48
0

=

) *

=

$0
$0

0 * 1 * 3 * 2 * 100% *
2
0 * 3 * 3 * 2 * 100% *

0%

) *

24

=

$0

0%

) *

19

=

$0

0 * 3 * 3 * 2 * 100% *

0%

) *

0

=

$0

0 * 1 * 1 * 2 * 100% *

0%

) *

51

=

$0

Small ( $77 * 0 * 1 * 1 * 2 * 100% *
State ( $77 * 0 * 1 * 1 * 2 * 100% *

0%
0%

) *

233
15

=

$0
$0

Local ( $77 * 0 * 1 * 1 * 2 * 100% *
Large ( $77 * 0 * 1 * 1 * 2 * 100% *

0%
0%

) *

88
40

=

Small ( $77 * 0 * 1 * 1 * 2 * 100% *
State ( $77 * 0 * 1 * 1 * 2 * 100% *

0%
0%

) *

170
1

=

Local ( $77 * 0 * 1 * 1 * 2 * 100% *
Large ( $77 * 0 * 1 * 1 * 2 * 100% *

0%
60%

) *

239
44

=

Small ( $77 * 0 * 1 * 1 * 2 * 100% *

60%
TOTAL

) *

Construction

Government
Local ( $77 *
SECTOR 27.  Solid Waste Incerneration
Large ( $77 *
General Industry
Small ( $77 *
State ( $77 *
Government
Local ( $77 *
SECTOR 30.  Superalloy Producers and Users
Large ( $77 *
ALL
Small ( $77 *
SECTOR 31.  Construction
Large ( $77 *

Industrial Rehabilitation 

Hazardous Waste‐site 
Work

Refractory Brick 
Restoration

Page 38

) *

) *

) *

) *

=

=

=

=

175
=
75,684

$0
$0
$0
$0
$0
$0
$0
$5,197,478

Table 6

Quarterly Exposure Monitoring (Paragraph (d)(2)(iv)); Employee Time and Cost to Conduct Quarterly Exposure Monitoring       
When initial monitoring results exceed the PEL, periodic monitoring every three months allows the employer to maintain an accurate 
profile of employee exposures.  If the employer installs or upgrades controls, quarterly monitoring will demonstrate whether the controls 
are working properly.  
HOURS = (ADMINTIME * JOBPEL * SHIFTS * #SAMPS * 4* %NOTQUART * %ABOVEPEL * (%INHOUSE + %LEARN)) * 
#PLANTS
COST = (NONSUPEWAGE * BURDEN HOURS)
Variable
*ADMINTIME =
* NONSUPEWAGE = 
* JOBPEL = 
* SHIFTS = 
* #SAMPS = 
*4 = 
* %NOTQUART = 
* %ABOVEPEL = 
* %INHOUSE = 
* %LEARN = 
* #PLANTS = 

In‐house administrative time
Non‐supervisory wage rate, $/hr
Number of job categories exposed above the PEL
Number of work shifts.
Number of samples per exposure measurement.
Four times per year (Quarterly).
Percent of plants not performing quarterly monitoring requirements.
Percent of plants that have an employee in at least one job category above the PEL.
Percent of plantsalready with in‐house monitoring capabilities.
Percent of plants that will develop in house monitoring capability.
Number of plants represented by the model output.

RESPONSES

=

0

0

* ( 0% + 0% )) *
* ( 0% + 0% )) *

1,662
426

=
=

$0
$0

=
=

0
0

0
0

0%
0%

* ( 0% + 0% )) *
* ( 0% + 0% )) *

801
580

=
=

$0
$0

=
=

0
0

0
0

Small ( 0.50 * $        26.61 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $        26.61 * 0 * 2 * 3 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 0% + 0% )) *

1,092
426

=
=

$0
$0

=
=

0
0

0
0

Small ( 0.50 * $        26.61 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $        26.61 * 0 * 2 * 3 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 0% + 0% )) *

801
503

=
=

$0
$0

=
=

0
0

0
0

Small ( 0.50 * $        26.61 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $        26.61 * 0 * 2 * 3 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 0% + 0% )) *

946
883

=
=

$0
$0

=
=

0
0

0
0
0

Small ( 0.50 * $        26.61 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $        26.61 * 0 * 2 * 3 * 4 * 100% *

0%
0%

Small ( 0.50 * $        26.61 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $        26.61 * 0 * 2 * 3 * 4 * 100% *

 # SAMPS

0

 SHIFTS

* ( 0% +

 JOBPEL

0%

 ADMINTIME

*

 # PLANTS

$0

 % LEARN

=

  % INHOUSE 

883

 % ABOVEPEL

TOTAL HOURS

 Item 12 COSTS

 % NOTQUART

 NONSUPEWAGE

24.17%

Sector 1. Electroplating
Large ( 0.50 * $        26.61 * 0 * 2 * 3 * 4 *

)) *

Hard Chrome
Job Shop Chrome 
Plater
Captive Shop 
Chrome Plater
Job Shop Plater

Captive Shop Plater

Operator
Small
Sector 2. Welding                  
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small

( 0.50 * $        26.61 * 1 * 1 * 3 * 4 * 100% *

0% * ( 0% + 0% )) *
GENERAL INDUSTRY
( 0.50 * $        26.20 * 1 * 3 * 2 * 4 * 100% * 4.85% * ( 10% + 0% )) *

1,662

=

$0

=

0

3,535

=

$141,238

=

5,391

412

( 1.00 * $        26.20 * 1 * 1 * 3 * 4 * 100% * 4.84% * ( 0% + 0% )) *
( 0.50 * $        26.20 * 1 * 3 * 2 * 4 * 100% * 0.37% * ( 10 + 0% )) *

3,962
2,593

=
=

$0
$790,373

=
=

0
30,167

0
2,180

( 1.00 * $        26.20 * 1 * 1 * 3 * 4 * 100% * 0.38% * ( 0% + 0% )) *
( 0.50 * $        26.20 * 1 * 3 * 2 * 4 * 100% * 0% * ( 10% + 0% )) *

2,905
786

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        26.20 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $        26.20 * 0 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

880
314

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        26.20 * 0 * 1 * 3 * 4 * 100% *
( 0.50 * $        26.20 * 1 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

352
78

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        26.20 * 1 * 1 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

88

=

$0

=

0

0

Page 39

RESPONSES

0

0

Small ( 1.00 * $        26.20 * 1 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $        26.20 * 1 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

88
472

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 1 * 1 * 3 * 4 * 100% * 0%
MARITIME
Large ( 0.50 * $        26.20 * 1 * 3 * 1 * 4 * 100% * 0%

* ( 0% + 0% )) *

529

=

$0

=

0

0

* ( 50% + 0% )) *

17

=

$0

=

0

0

 # PLANTS

=

 % LEARN

$0

  % INHOUSE 

=

 % ABOVEPEL

78

 # SAMPS

* ( 10% + 0% )) *

 SHIFTS

0%

 JOBPEL

Large ( 0.50 * $        26.20 * 1 * 3 * 2 * 4 * 100% *

 ADMINTIME

TOTAL HOURS

 Item 12 COSTS

 % NOTQUART

 NONSUPEWAGE

Table 6

Plasma Welding

Resistance Welding

SMAW
Small ( 1.00 * $        26.20 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

10
24

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

14
6

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

3
116

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

66
4

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

2
2

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

1
4

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

2
2

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

1
0

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

0
0

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

0
15

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 1 * 2 * 1 * 4 * 100% * 0%
CONSTRUCTION
Large ( 0.50 * $        26.20 * 1 * 3 * 1 * 4 * 100% * 0%

* ( 10% + 0% )) *

9

=

$0

=

0

0

* ( 5% + 0% )) *

201

=

$0

=

0

0

Small ( 1.00 * $        26.20 * 1 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

1,609
3

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 1 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

21
41

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 1 * 1 * 1 * 4 * 100% *
State ( 0.50 * $        26.20 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

322
20

=
=

$0
$0

=
=

0
0

0
0

Local
State

( 1.00 * $        26.20 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $        26.20 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

161
4

=
=

$0
$0

=
=

0
0

0
0

Local

( 1.00 * $        26.20 * 1 * 1 * 1 * 4 * 100% *

0%

* ( 0% + 0% )) *

32

=

$0

=

0

0

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting
Air Carbon Arc 
Cutting
Electric Torch 
Cutting
Thermal Spray 
Tungsten Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

Page 40

RESPONSES

0

0

Local
State

( 1.00 * $        26.20 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $        26.20 * 1 * 1 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

590
0

=
=

$0
$0

=
=

0
0

0
0

Local
State

( 1.00 * $        26.20 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $        26.20 * 1 * 1 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

8
4

=
=

$0
$0

=
=

0
0

0
0

Local
State

( 1.00 * $        26.20 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $        26.20 * 1 * 1 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

118
2

=
=

$0
$0

=
=

0
0

0
0

Local
State

( 1.00 * $        26.20 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $        26.20 * 1 * 1 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

59
1

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        26.20 * 1 * 1 * 1 * 4 * 100% *

12

=

$0

=

0

0

( 0.50 * $        26.20 * 1 * 3 * 2 * 4 * 100% *

0% * ( 0% + 0% )) *
General Industry
0% * ( 10% + 0% )) *

4,740

=

$0

=

0

0

( 1.00 * $        26.20 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $        26.20 * 1 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

4,826
3,476

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        26.20 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $        26.20 * 1 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

3,539
1,053

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        26.20 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $        26.20 * 0 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

1,073
421

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        26.20 * 0 * 1 * 3 * 4 * 100% *
( 0.50 * $        26.20 * 1 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

429
105

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        26.20 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $        26.20 * 1 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

107
105

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        26.20 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $        26.20 * 1 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

107
632

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        26.20 * 1 * 1 * 3 * 4 * 100% * 0%
MARITIME
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% * 0%

* ( 0% + 0% )) *

644

=

$0

=

0

0

* ( 50% + 0% )) *

37

=

$0

=

0

0

Small ( 1.00 * $        26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

21
53

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

30
13

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

7
249

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

141
8

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

5
3

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 0 * 2 * 1 * 4 * 100% *

0%

* ( 10% + 0% )) *

2

=

$0

=

0

0

 # PLANTS

=

 % LEARN

$0

  % INHOUSE 

=

 % ABOVEPEL

19

 # SAMPS

* ( 5% + 0% )) *

 SHIFTS

GOVERNMENT
( 0.50 * $        26.20 * 1 * 1 * 1 * 4 * 100% * 0%

 JOBPEL

State

 ADMINTIME

TOTAL HOURS

 Item 12 COSTS

 % NOTQUART

 NONSUPEWAGE

Table 6

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
Local
Sector 2. Mild Steel Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
Small
Large
Resistance Welding
Small

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Page 41

RESPONSES

$0

=

0

0

Small ( 1.00 * $        26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

5
3

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

2
1

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

0
1

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

0
33

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 0 * 2 * 1 * 4 * 100% * 0%
CONSTRUCTION
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% * 0%

* ( 10% + 0% )) *

18

=

$0

=

0

0

* ( 5% + 0% )) *

301

=

$0

=

0

0

Small ( 1.00 * $        26.20 * 0 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

2,277
4

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 0 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

30
60

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        26.20 * 0 * 1 * 1 * 4 * 100% *
State ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

455
30

=
=

$0
$0

=
=

0
0

0
0

Local
State

( 1.00 * $        26.20 * 0 * 1 * 1 * 4 * 100% *
( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

228
6

=
=

$0
$0

=
=

0
0

0
0

Local

( 1.00 * $        26.20 * 0 * 1 * 1 * 4 * 100% *

0%

* ( 0% + 0% )) *

45

=

$0

=

0

0

Large ( 0.50 * $        33.07 * 1 * 3 * 3 * 4 * 100% *

28%

* ( 75% + 0% )) *

49

=

$202,146

=

6,113

390

Small ( 1.00 * $        33.07 * 1 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $        33.07 * 0 * 1 * 1 * 4 * 100% *

9%
5%

* ( 25% + 0% )) *
* 75% + 0%
*

62
326

=
=

$18,182
$0

=
=

550
0

17
49

Small ( 1.00 * $        33.07 * 2 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $        33.07 * 0 * 2 * 3 * 4 * 100% *

5%
8%

*
*

25% + 0%
75% + 0%

*
*

1,436
100

=
=

$156,967
$0

=
=

4,747
0

144
150

Small ( 1.00 * $        33.07 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $        33.07 * 1 * 3 * 1 * 4 * 100% *

8%
36%

*
*

25% + 0%
90% + 0%

*
*

18
276

=
=

$0
$585,590

=
=

0
17,710

0
1,071

Small ( 1.00 * $        33.07 * 1 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $        33.07 * 1 * 3 * 1 * 4 * 100% *

36%
22%

*
*

10% + 0%
75% + 0%

*
*

476
671

=
=

$74,998
$726,160

=
=

2,268
21,961

69
2,056

Small ( 1.00 * $        33.07 * 1 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $        33.07 * 1 * 3 * 1 * 4 * 100% *

22%
12%

*
*

50% + 0%
75% + 0%

*
*

3,566
12

=
=

$1,715,767
$6,898

=
=

51,889
209

1,569
13

* 1 * 1 * 1 * 4 * 100% *

12%

*

75% + 0%

*

647

=

$254,524

=

7,697

233

* 0 * 3 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

2

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

0

=

$0

=

0

0

* 1 * 2 * 3 * 4 * 100% *

77%

* ( 0% + 0% )) *

2

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

1

=

$0

=

0

0

 % LEARN

  % INHOUSE 

 # PLANTS
=

 % ABOVEPEL

8

 # SAMPS

* ( 50% + 0% )) *

 SHIFTS

0%

 JOBPEL

Large ( 0.50 * $        26.20 * 0 * 3 * 1 * 4 * 100% *

 ADMINTIME

TOTAL HOURS

 Item 12 COSTS

 % NOTQUART

 NONSUPEWAGE

Table 6

Oxy‐fuel Cutting
Air Carbon Arc 
Cutting
Electric Torch 
Cutting
Thermal Spray 
Tungsten Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
SECTOR 3.  PAINTING
AEROSPACE

AUTOBODY

COIL COATING

MARITIME

CONSTRUCTION

GOVERNMENT
Small ( 1.00 * $        33.07
SECTOR 4.  Producers of Chromates
Large ( 0.50 * $        38.68
ALL
Small ( 1.00 * $        38.68
SECTOR 5. Chromate Pigment Procedures
Large ( 0.50 * $        37.70
ALL
Small ( 1.00 * $        37.70

Page 42

$0

=

0

0

* 0 * 3 * 0 * 4 * 100% *

0%

* ( 0% + 0% )) *

0

=

$0

=

0

0

* 0 * 3 * 3 * 4 * 100% *

0%

* ( 80% + 0% )) *

5

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

0

=

$0

=

0

0

* 0 * 2 * 3 * 4 * 100% *

0%

* ( 25% + 75% )) *

80

=

$0

=

0

0

* 0 * 2 * 3 * 4 * 100% *

0%

* ( 25% + 75% )) *

126

=

$0

=

0

0

* 0 * 1 * 9 * 4 * 100% *

0%

* ( 10% + 0% )) *

2

=

$0

=

0

0

* 0 * 1 * 5 * 4 * 100% *

0%

* ( 10% + 0% )) *

8

=

$0

=

0

0

* 3 * 3 * 3 * 4 * 100% *

36%

* ( 0% + 0% )) *

81

=

$0

=

0

0

* 5 * 1 * 3 * 4 * 100% *

36%

* ( 0% + 0% )) *

40

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 20% + 0% )) *

6

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 25% + 0% )) *

4

=

$0

=

0

0

* 0 * 3 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

1

=

$0

=

0

0

* 0 * 1 * 1 *4*

*

0%

* ( 0% + 0% )) *

0

=

$0

=

0

0

* 0 * 3 * 3 * 4 * 100% *

0%

* ( 10% + 0% )) *

34

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *
* 0 * 3 * 3 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 10% + 0% )) *

11
102

=
=

$0
$0

=
=

0
0

0
0

* 0 * 1 * 1 * 4 * 100% *

0%

* ( 10% + 0% )) *

32

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

63%

* ( 10% + 0% )) *

33

=

$0

=

0

25

* 0 * 1 * 3 * 4 * 100% *

63%

* ( 10% + 0% )) *

31

=

$0

=

0

0

* 0 * 3 * 5 * 4 * 100% *

0%

* ( 10% + 0% )) *

163

=

$0

=

0

0

* 0 * 1 * 5 * 4 * 100% *

0%

* ( 10% + 0% )) *

118

=

$0

=

0

0

* 7 * 1 * 21 * 4 * 100% *

62%

* ( 0% + 0% )) *

3

=

$0

=

0

0

* 5 * 1 * 7 * 4 * 100% *

62%

* ( 0% + 0% )) *

1

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

0

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

5

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

216

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

1,627

=

$0

=

0

0

0%

Page 43

 # PLANTS
=

 % LEARN

2

  % INHOUSE 

* ( 0% + 0% )) *

 % ABOVEPEL

RESPONSES

 Item 12 COSTS

 % NOTQUART

0%

 # SAMPS

* 0 * 3 * 3 * 4 * 100% *

 SHIFTS

TOTAL HOURS

SECTOR 6. CCA Producers
Large ( 0.50 * $        31.94
ALL
Small ( 1.00 * $        31.94
SECTOR 7.  Chromium Catalyst Producers
Large ( 0.50 * $        38.68
ALL
Small ( 1.00 * $        38.68
SECTOR 8.  Paint and Coating Producers
Large ( 0.50 * $        28.81
ALL
Small ( 1.00 * $        28.81
SECTOR 9.  Printing Ink Producers
Large ( 0.50 * $        28.86
ALL
Small ( 0.50 * $        28.86
SECTOR 10.  Plastic Colorant Producers and Users
Large ( 0.50 * $        31.99
ALL
Small ( 1.00 * $        31.99
SECTOR 11.  Plating Mixture Producers
Large ( 0.50 * $        28.71
ALL
Small ( 1.00 * $        28.71
SECTOR 13.  Chromium Metal Producers
Large ( 0.50 * $        38.80
ALL
Small ( 1.00 * $        38.80
SECTOR 14.  Iron and Steel Mills
Large ( 0.50 * $        38.80
Alloy and Stainless 
Steel
Small ( 1.00 * $        38.80
Large ( 0.50 * $        38.80
Carbon Steel
Small ( 1.00 * $        38.80
SECTOR 14B.  Forging Industry
Large ( 0.50 * $        38.80
Reshaping
Small ( 1.00 * $        38.80
SECTOR 15.  Iron and Steel Foundries
Large ( 0.50 * $        28.31
ALL
Small ( 1 * $        28.31
SECTOR 17.  Chromium Dye Producers
Large ( 0.50 * $        37.70
ALL
Small ( 1 * $        37.70
SECTOR 18.  Chromium Sulfate Producers
Large ( 0.50 * $        41.50
ALL
Small ( 0.50 * $        41.50
SECTOR 19.  Chemical Distributors
Large ( 0.50 * $        29.92
ALL
Small ( 0.50 * $        29.92

 JOBPEL

 NONSUPEWAGE

 ADMINTIME

Table 6

TOTAL HOURS

RESPONSES

 Item 12 COSTS

0

* 0 * 1 * 2 * 4 * 100% *

0%

* ( 10% + 0% )) *

697

=

$0

=

0

0

* 0 * 3 * 12 * 4 * 100% *

0%

* ( 10% + 0% )) *

6

=

$0

=

0

0

* 0 * 1 * 4 * 4 * 100% *
* 1 * 1 * 1 * 4 * 100% *

0%
20%

* ( 10% + 0% )) *
* ( 10% + 0% )) *

20
90

=
=

$0
$3,005

=
=

0
104

0
7

* 1 * 1 * 1 * 4 * 100% *

0%

* ( 10% + 0% )) *

5

=

$0

=

0

0

* 0 * 3 * 2 * 4 * 100% *

0%

* ( 10% + 0% )) *

81

=

$0

=

0

0

* 0 * 1 * 2 * 4 * 100% *

0%

* ( 10% + 0% )) *

325

=

$0

=

0

0

* 0 * 3 * 3 * 4 * 100% *

0%

* ( 10% + 0% )) *

179

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *
* 0 * 3 * 3 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 10% + 0% )) *

0
23

=
=

$0
$0

=
=

0
0

0
0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 10% + 0% )) *

4

=

$0

=

0

0

* 0 * 1 * 15 * 4 * 100% *

0%

* ( 10% + 0% )) *

5

=

$0

=

0

0

* 0 * 1 * 0 * 4 * 100% *

0%

* ( 10% + 0% )) *

0

=

$0

=

0

0

* 0 * 1 * 2 * 4 * 100% *

0%

* ( 0% + 0% )) *

148

=

$0

=

0

0

* 0 * 1 * 2 * 4 * 100% *
* 0 * 1 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 0% + 0% )) *

79
36

=
=

$0
$0

=
=

0
0

0
0

* 0 * 1 * 1 * 4 * 100% *
* 0 * 1 * 1 * 4 * 100% *

0%
22%

* ( 0% + 0% )) *
* ( 0% + 0% )) *

32
1,162

=
=

$0
$0

=
=

0
0

0
0

* 0 * 1 * 1 * 4 * 100% *
* 0 * 1 * 1 * 4 * 100% *

22%
22%

* ( 0% + 0% )) *
* ( 0% + 0% )) *

4,650
12

=
=

$0
$0

=
=

0
0

0
0

* 0 * 1 * 1 * 4 * 100% *

22%

* ( 0% + 0% )) *

42

=

$0

=

0

0

* 0 * 3 * 15 * 4 * 100% *

0%

* ( 10% * 0% )) *

40

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *
* 0 * 3 * 15 * 4 * 100% *

0%
0%

* ( 10% * 0% )) *
* ( 10% * 0% )) *

48
0

=
=

$0
$0

=
=

0
0

0
0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 10% * 0% )) *

24

=

$0

=

0

0

* 0 * 3 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

19

=

$0

=

0

0

* 0 * 3 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

0

=

$0

=

0

0

* 0 * 1 * 1 * 4 * 100% *

0%

* ( 0% + 0% )) *

51

=

$0

=

0

0

Small ( 1.00 * $        32.13 * 0 * 1 * 1 * 4 * 100% *
State ( 0.50 * $        32.13 * 0 * 1 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 0% + 0% )) *

233
15

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        32.13 * 0 * 1 * 1 * 4 * 100% *

0%

* ( 0% + 0% )) *

88

=

$0

=

0

0

Local

Page 44

 # PLANTS

0

 % LEARN

=

  % INHOUSE 

$0

 % ABOVEPEL

=

 # SAMPS

343

 SHIFTS

* ( 10% + 0% )) *

 JOBPEL

0%

 ADMINTIME

* 0 * 3 * 3 * 4 * 100% *

SECTOR 20.  Textile Dyeing
Large ( 0.50 * $        19.97
ALL
Small ( 0.50 * $        19.97
SECTOR 21.  Colored Glass Producers
Large ( 0.50 * $        28.87
ALL
Small ( 1.00 * $        28.87
Large ( 0.50 * $        28.87
Fiber, Flat, Container 
Glass
Small ( 1.00 * $        28.87
SECTOR 22.  Printing
Large ( 0.50 * $        20.85
ALL
Small ( 0.50 * $        20.85
SECTOR 24.  Chromium Catalyst Users
Large ( 0.50 * $        32.51
Catalyst Users
Small ( 1.00 * $        32.51
Large ( 0.50 * $        32.51
Chromium Catalyst 
Service Companies
Small ( 1.00 * $        32.51
SECTOR 25.  Refractory Brick Producers
Large ( 0.50 * $        25.64
ALL
Small ( 0.50 * $        25.64
SECTOR 26.  Woodworking
Large ( 0.50 * $        32.11
General Industry
Small ( 1.00 * $        32.11
Large ( 0.50 * $        32.11
Maritime
Small ( 1.00 * $        32.11
Large ( 0.50 * $        32.11
Construction
Small ( 1.00 * $        32.11
STATE ( 0.50 * $        32.11
Government
LOCAL ( 1.00 * $        32.11
SECTOR 27.  Solid Waste Inceneration
Large ( 0.50 $        27.23
GENERAL INDUSTRY
Small ( 1.00 $        27.23
STATE ( 0.50 $        27.23
GOVERNMENT
LOCAL ( 1.00 $        27.23
SECTOR 30.  Superalloy Producers and Users
Large ( 0.50 * $        27.93
ALL
Small ( 1.00 * $        27.93
SECTOR 31.  Construction
Large ( 0.50 * $        32.13
Industrial 
Rehabilitation 

 % NOTQUART

 NONSUPEWAGE

Table 6

RESPONSES

0

0

Hazardous Waste‐ Small ( 1.00 * $        32.13 * 0 * 1 * 1 * 4 * 100% *
site Work
State ( 0.50 * $        32.13 * 0 * 1 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 10% + 0% )) *

170
1

=
=

$0
$0

=
=

0
0

0
0

Local ( 1.00 * $        32.13 * 0 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $        32.13 * 0 * 1 * 1 * 4 * 100% *

0%
60%

* ( 10% + 0% )) *
* ( 10% + 0% )) *

239
44

=
=

$0
$0

=
=

0
0

0
11

Small ( 1.00 * $        32.13 * 0 * 1 * 1 * 4 * 100% *

60%

* ( 10% + 0% )) *
175
=
Total
  75,684

$0
$4,675,850

=

0
148,807

Refractory Brick 
Restoration

Page 45

 # PLANTS

=

 % LEARN

$0

  % INHOUSE 

=

 % ABOVEPEL

40

 # SAMPS

* ( 10% + 0% )) *

 SHIFTS

0%

 JOBPEL

Large ( 0.50 * $        32.13 * 0 * 1 * 1 * 4 * 100% *

 ADMINTIME

TOTAL HOURS

 Item 12 COSTS

 % NOTQUART

 NONSUPEWAGE

Table 6

0
8,394

Table 7

Quarterly Exposure Monitoring (Paragraph (d)(2)(iv)); Contract Cost for an IH Technician to Perform Quarterly 
Exposure Monitoring 
This table calculates the contract cost for the employer to have an outside  industrial hygiene 
technician perform quarterly exposure monitoring.  
COST =

(QUARTCONTTIME*CONTCOST*4*%NOTQUART*%ABOVEPEL*%CONT)
* #PLANTS

Variable
* QUARTCONTTIME = 

Time, in hours, for an outside contractor (industrial hygiene technician) to conduct 
quarterly‐annual monitoring
Cost per hour for an outside industrial hygiene contractor
4 times per year (quarterly)
Percent of plants not performing quarterly monitoring requirements
Percent of plants that have an employee in at least one job category above the PEL
Percent of plants that will continue to use an outside contractor for monitoring
Number of plants represented by the model output

* CONTCOST = 
* 4 =
* %NOTQUART = 
*%ABOVEPEL=
%CONT=
#PLANTS=

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

QUARTERLY

  CONTCOST 

QUARTCONTTIME

24.93%

Sector 1. Electroplating
(

0

* $  112.44 * 4 * 100% * ( 0.00% * 100% ) *

883

=

$0

(
(

0
0

* $  112.44 * 4 * 100% * ( 0.00% * 100% ) * 1,662 =
* $  112.44 * 4 * 100% * ( 0.00% * 100% ) * 426 =

$0
$0

(
(

12
0

* $  112.44 * 4 * 100% * ( 0.00% * 100% ) *
* $  112.44 * 4 * 100% * ( 0.00% * 100% ) *

=
=

$0
$0

(
(

0
0

* $  112.44 * 4 * 100% * ( 0.00% * 100% ) * 1,092 =
* $  112.44 * 4 * 100% * ( 0.00% * 100% ) * 426 =

$0

(
(

12
0

* $  112.44 * 4 * 100% * ( 0.00% * 100% ) *
* $  112.44 * 4 * 100% * ( 0.00% * 100% ) *

801
503

=

$0

=

$0

(
(

0
0

* $  112.44 * 4 * 100% * ( 0.00% * 100% ) *
* $  112.44 * 4 * 100% * ( 0.00% * 100% ) *

946
883

=

$0

=

$0

(

12

* $  112.44 * 4 * 100% * ( 0.00% * 100% ) * 1,662 =

$0

(

12

* $  112.44 * 4 * 100% * (

4.85% *

(
(

12
12

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

4.84% * 100% ) * 3,962 =
0.37% * 90% ) * 2,593 =

$1,034,810

(

12

* $  112.44 * 4 * 100% * (

0.38% * 100% ) * 2,905 =

$59,587

Hard Chrome

Job Shop Chrome Plater

801
580

Captive Shop Chrome
$0

Job Shop Plater

Captive Shop Plater

Operator
Sector 2. Welding
90%

) * 3,535 =

$832,871

SMAW
$46,608

GMAW

Page 46

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

QUARTERLY

  CONTCOST 

QUARTCONTTIME

Table 7

(

12

* $  112.44 * 4 * 100% * (

0.00% *

) *

786

=

$0

(
(

12
0

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 90% ) *

880
314

=

$0

=

$0

(

0
12

* $  112.44 * 4 * 100% * (

0.00% * 100% ) *

* $  112.44 * 4 * 100% * (

0.00% *

352
78

=
=

$0
$0

* $  112.44 * 4 * 100% * (

0.00% * 100% ) *

(

12
12

* $  112.44 * 4 * 100% * (

0.00% *

) *

88
78

=
=

$0
$0

(
(

12
12

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 90% ) *

88
472

=
=

$0
$0

(

12

* $  112.44 * 4 * 100% * (
MARITIME

0.00% * 100% ) *

529

=

$0

(

12

* $  112.44 * 4 * 100% * (

0.00% *

50%

) *

17

=

$0

(
(

12
12

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

10
24

=
=

$0
$0

(
(

12
12

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

14
6

=

$0

=

$0

(
(

12
12

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

3
116

=
=

$0
$0

(
(

12
12

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

66
4

=
=

$0
$0

(

12
12

* $  112.44 * 4 * 100% * (

0.00% *

90%

) *

* $  112.44 * 4 * 100% * (

0.00% *

50%

) *

2
2

=
=

$0
$0

12
12

* $  112.44 * 4 * 100% * (

0.00% *

90%

) *

* $  112.44 * 4 * 100% * (

0.00% *

50%

) *

1
4

=
=

$0
$0

12
12

* $  112.44 * 4 * 100% * (

0.00% *

90%

) *

* $  112.44 * 4 * 100% * (

0.00% *

50%

) *

2
2

=
=

$0
$0

* $  112.44 * 4 * 100% * (

0.00% *

90%

) *

(

12
0

* $  112.44 * 4 * 100% * (

0.00% *

50%

) *

1
0

=
=

$0
$0

(

0

* $  112.44 * 4 * 100% * (

0.00% *

90%

) *

0

=

$0

90%

TIG

SAW
(

90%

) *

Plasma Cutting
(

90%

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting
(

Plasma Welding
(
(

Oxy‐fuel Cutting
(
(

Air Carbon Arc Cutting
(

Electric Torch Cutting

Page 47

Thermal Spray Tungsten 
Cutting

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

QUARTERLY

  CONTCOST 

QUARTCONTTIME

Table 7

(

0

* $  112.44 * 4 * 100% * (

0.00% *

50%

) *

0

=

$0

(
(

0
0

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

0
15

=
=

$0
$0

(

0

* $  112.44 * 4 * 100% * (

0.00% *

90%

) *

9

=

$0

(

12

* $  112.44 * 4 * 100% * (

0.00% *

95%

) *

201

=

$0

(
(

12
0

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% * 100% ) * 1,609 =
0.00% * 95% ) *
3
=

$0

(
(

12
0

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 95% ) *

21
41

=
=

$0
$0

(
(

12
12

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 95% ) *

322
20

=

$0

=

$0

(
(

12
12

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 95% ) *

161
4

=
=

$0
$0

(

12

* $  112.44 * 4 * 100% * (

0.00% * 100% ) *

32

=

$0

SAW
CONSTRUCTION
SMAW
$0

Plasma Cutting

GMAW

Brazing

Metallizing
GOVERNMENT
(

12

* $  112.44 * 4 * 100% * (

0.00% *

) *

19

=

$0

(
(

12
12

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 95% ) *

590
0

=

$0

=

$0

(
(

12
12

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 95% ) *

8
4

=
=

$0
$0

(

12
12

* $  112.44 * 4 * 100% * (

0.00% * 100% ) *

* $  112.44 * 4 * 100% * (

0.00% *

118
2

=
=

$0
$0

* $  112.44 * 4 * 100% * (

0.00% * 100% ) *

(

12
12

* $  112.44 * 4 * 100% * (

0.00% *

) *

59
1

=
=

$0
$0

(

12

* $  112.44 * 4 * 100% * (

0.00% * 100% ) *

12

=

$0

(

12

* $  112.44 * 4 * 100% * (

0.00% *

) * 4,740 =

$0

(

12
12

* $  112.44 * 4 * 100% * (

(

* $  112.44 * 4 * 100% * (

0.00% * 100% ) * 4,826 =
0.00% * 90% ) * 3,476 =

$0
$0

(

12

* $  112.44 * 4 * 100% * (

0.00% * 100% ) * 3,539 =

$0

95%

SMAW

Plasma Cutting

GMAW
(

95%

) *

Brazing
(

95%

Metallizing
Sector 2. Mild Steel Welding
90%

SMAW

GMAW

Page 48

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

QUARTERLY

  CONTCOST 

QUARTCONTTIME

Table 7

(

12

* $  112.44 * 4 * 100% * (

0.00% *

) * 1,053 =

$0

(
(

12
0

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% * 100% ) * 1,073 =
0.00% * 90% ) * 421 =

$0

(

0
0

* $  112.44 * 4 * 100% * (

0.00% * 100% ) *

* $  112.44 * 4 * 100% * (

0.00% *

* $  112.44 * 4 * 100% * (

0.00% * 100% ) *

(

0
0

* $  112.44 * 4 * 100% * (

0.00% *

(
(

0
0

(

90%

TIG
$0

SAW

429
105

=
=

$0
$0

) *

107
105

=
=

$0
$0

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 90% ) *

107
632

=
=

$0
$0

0

* $  112.44 * 4 * 100% * (
MARITIME

0.00% * 100% ) *

644

=

$0

(

12

* $  112.44 * 4 * 100% * (

0.00% *

50%

) *

37

=

$0

(
(

12
12

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

21
53

=
=

$0
$0

(
(

12
0

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

30
13

=

$0

=

$0

(
(

0
0

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

7
249

=
=

$0
$0

(
(

* $  112.44 * 4 * 100% * (
0
0.00 * $  112.44 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

141
8

=
=

$0
$0

(

0.00 * $  112.44 * 4 * 100% * (
0.00 * $  112.44 * 4 * 100% * (

0.00% *

90%

) *

0.00% *

50%

) *

5
3

=
=

$0
$0

0.00 * $  112.44 * 4 * 100% * (
0.00 * $  112.44 * 4 * 100% * (

0.00% *

90%

) *

0.00% *

50%

) *

2
8

=
=

$0
$0

0.00 * $  112.44 * 4 * 100% * (
0.00 * $  112.44 * 4 * 100% * (

0.00% *

90%

) *

0.00% *

50%

) *

5
3

=
=

$0
$0

0.00% *

90%

) *

(

0.00 * $  112.44 * 4 * 100% * (
0.00 * $  112.44 * 4 * 100% * (

0.00% *

50%

) *

2
1

=
=

$0
$0

(

0.00 * $  112.44 * 4 * 100% * (

0.00% *

90%

) *

0

=

$0

(

90%

) *

Plasma Cutting
(

90%

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting
(

Plasma Welding
(
(

Oxy‐fuel Cutting
(
(

Air Carbon Arc Cutting
(

Electric Torch Cutting

Page 49

Thermal Spray Tungsten 
Cutting

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

QUARTERLY

  CONTCOST 

QUARTCONTTIME

Table 7

(

0.00 * $  112.44 * 4 * 100% * (

0.00% *

50%

) *

1

=

$0

(
(

0.00 * $  112.44 * 4 * 100% * (
0.00 * $  112.44 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

0
33

=

$0

=

$0

(

0.00 * $  112.44 * 4 * 100% * (
CONSTRUCTION
0.00 * $  112.44 * 4 * 100% * (

0.00% *

90%

) *

18

=

$0

0.00% *

95%

) *

301

=

$0

( 12.00 * $  112.44 * 4 * 100% * (
( 0.00 * $  112.44 * 4 * 100% * (

0.00% * 100% ) * 2,277 =
0.00% * 95% ) *
4
=

$0

(

SAW

(

SMAW
$0

Plasma Cutting
0.00 * $  112.44 * 4 * 100% * (
0.00 * $  112.44 * 4 * 100% * (

0.00% * 100% ) *

(

) *

30
60

=
=

$0
$0

(
(

0.00 * $  112.44 * 4 * 100% * (
0.00 * $  112.44 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 95% ) *

455
30

=

$0

=

$0

(
(

0.00 * $  112.44 * 4 * 100% * (
0.00 * $  112.44 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 95% ) *

228
6

=
=

$0
$0

( 12.00 * $  112.44 * 4 * 100% * (

0.00% * 100% ) *

45

=

$0

0.00% *

95%

GMAW

Brazing

Metallizing
SECTOR 3.  PAINTING
( 12.00 * $  112.44 * 4 * 100% * (

28.00% *

25%

) *

49

=

$18,478

( 12.00 * $  112.44 * 4 * 100% * (
( 12.00 * $  112.44 * 4 * 100% * (

9.00% *
5.00% *

75%
25%

) *
) *

62
326

=
=

$22,438
$21,998

( 12.00 * $  112.44 * 4 * 100% * (
( 12.00 * $  112.44 * 4 * 100% * (

5.00% *
36.00% *

75%
10%

) * 1,436 =
) * 100 =

$290,555
$19,358

( 12.00 * $  112.44 * 4 * 100% * (
( 12.00 * $  112.44 * 4 * 100% * (

36.00% *
8.00% *

90%
25%

) *
) *

18
276

=
=

$31,677
$29,738

( 12.00 * $  112.44 * 4 * 100% * (
( 12.00 * $  112.44 * 4 * 100% * (

8.00% *

75%

) *

=

$154,250

22.00% *

25%

) *

476
671

=

$199,135

( 12.00 * $  112.44 * 4 * 100% * (
( 12.00 * $  112.44 * 4 * 100% * (

22.00% *
12.00% *

50%
25%

) * 3,566 =
) *
12 =

( 12.00 * $  112.44 * 4 * 100% * (
SECTOR 4.  Producers of Chromates
( 0.00 * $  112.44 * 4 * 100% * (
ALL
( 0.00 * $  112.44 * 4 * 100% * (
SECTOR 5. Chromate Pigment Procedures

12.00% *

25%

) *

AEROSPACE

AUTOBODY

MARITIME

COIL COATING

CONSTRUCTION
$2,117,317
$1,892

GOVERNMENT

Page 50

647

=

$104,697

0.00% * 100% ) *

2

=

$0

0.00% *

0

=

$0

0%

) *

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

QUARTERLY

  CONTCOST 

QUARTCONTTIME

Table 7

( 12.00 * $  112.44 * 4 * 100% * (

77.00% * 100% ) *

2

=

$7,478

( 12.00 * $  112.44 * 4 * 100% * (

0.00% * 100% ) *

1

=

$0

( 12.00 * $  112.44 * 4 * 100% * (

0.00% * 100% ) *

2

=

$0

* 4 * 100% * (

0.00% *

0%

) *

0

=

$0

* 4 * 100% * (

0.00% *

20%

) *

5

=

$0

* 4 * 100% * (

0.00% *

0%

) *

0

=

$0

* 4 * 100% * (

0.00% *

75%

) *

80

=

$0

* 4 * 100% * (

0.00% *

75%

) *

126

=

$0

* 4 * 100% * (

0.00% *

90%

) *

2

=

$0

* 4 * 100% * (

0.00% *

90%

) *

8

=

$0

* 4 * 100% * (

36.00% * 100% ) *

81

=

$158,306

* 4 * 100% * (

36.00% * 100% ) *

40

=

$77,432

ALL
SECTOR 6. CCA Producers
ALL
( 12.00 * $  112.44
SECTOR 7.  Chromium Catalyst Producers
( 12.00 * $  112.44
ALL
( 12.00 * $  112.44
SECTOR 8.  Paint and Coating Producers
( 12.00 * $  112.44
ALL
( 12.00 * $  112.44
SECTOR 9.  Printing Ink Producers
( 0.00 * $  112.44
ALL
( 0.00 * $  112.44
SECTOR 10.  Plastic Colorant Producers and Users
( 12.00 * $  112.44
ALL
( 12.00 * $  112.44
SECTOR 11.  Plating Mixture Producers
( 12.00 * $  112.44
ALL
( 12.00 * $  112.44
SECTOR 13.  Chromium Metal Producers
( 12.00 * $  112.44
ALL
( 12.00 * $  112.44
SECTOR 14.  Iron and Steel Mills
( 0.00 * $  112.44
ALLOY AND STAINLESS 
STEEL
( 0.00 * $  112.44
( 0.00 * $  112.44
CARBON STEEL
( 0.00 * $  112.44
SECTOR 14B.  FORGING INDUSTRY
( 0.00 * $  112.44
RESHAPING
( 0.00 * $  112.44

* 4 * 100% * (

0.00% *

80%

) *

6

=

$0

* 4 * 100% * (

0.00% *

75%

) *

4

=

$0

* 4 * 100% * (

0.00% * 100% ) *

1

=

$0

* 4 *

0% * (

0.00% *

0%

) *

0

=

$0

* 4 * 100% * (

0.00% *

90%

) *

34

=

$0

* 4 * 100% * (
* 4 * 100% * (

0.00% *
0.00% *

90%
90%

) *
) *

11
102

=

$0

=

$0

* 4 * 100% * (

0.00% *

90%

) *

32

=

$0

* 4 * 100% * (

63.00% *

90%

) *

33

=

$0

* 4 * 100% * (

63.00% *

90%

) *

31

=

$0

Page 51

SECTOR 15.  Iron and Steel Foundries
( 0.00 * $  112.44
ALL
( 0.00 * $  112.44
SECTOR 17.  Chromium Dye Producers
( 12.00 * $  112.44
ALL
( 12.00 * $  112.44
SECTOR 18.  Chromium Sulfate Producers
( 12.00 * $  112.44
ALL
( 12.00 * $  112.44
SECTOR 19.  Chemical Distributors
( 12.00 * $  112.44
ALL
( 12.00 * $  112.44
SECTOR 20.  Textile Dyeing
( 0.00 * $  112.44
ALL
( 0.00 * $  112.44
SECTOR 21.  Colored Glass Producers
( 0.00
General Industry
( 0.00
( 12.00
Fiber, Flat and Container 
Glass
( 12.00
SECTOR 22.  Printing
( 0.00
ALL
( 0.00
SECTOR 24.  Chromium Catalyst Users
( 12.00
CATALYST USER
( 12.00
( 12.00

CATALYST SERVICE 
COMPANIES

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

QUARTERLY

  CONTCOST 

QUARTCONTTIME

Table 7

* 4 * 100% * (

0.00% *

90%

) *

163

=

$0

* 4 * 100% * (

0.00% *

90%

) *

118

=

$0

* 4 * 100% * (

62.00% * 100% ) *

3

=

$9,032

* 4 * 100% * (

62.00% * 100% ) *

1

=

$3,011

* 4 * 100% * (

0.00% *

) *

0

=

$0

* 4 * 100% * (

0.00% * 100% ) *

5

=

$0

* 4 * 100% * (

0.00% * 100% ) *

216

=

$0

* 4 * 100% * (

0.00% * 100% ) * 1,627 =

$0

* 4 * 100% * (

0.00% *

90%

) *

343

=

$0

* 4 * 100% * (

0.00% *

90%

) *

697

=

$0

* $  112.44 * 4 * 100% * (

0.00% *

90%

) *

6

=

$0

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% *
20.00% *

90%
90%

) *
) *

20
90

=

$0

=

$87,572

* $  112.44 * 4 * 100% * (

0.00% *

90%

) *

5

=

$0

* $  112.44 * 4 * 100% * (

0.00% *

90%

) *

81

=

$0

* $  112.44 * 4 * 100% * (

0.00% *

90%

) *

325

=

$0

* $  112.44 * 4 * 100% * (

0.00% *

90%

) *

179

=

$0

* $  112.44 * 4 * 100% * (
* $  112.44 * 4 * 100% * (

0.00% *
0.00% *

90%
90%

) *
) *

0
23

=

$0

=

$0

$  112.44 * 4 * 100% * (

0.00% *

90%

) *

4

=

$0

$  112.44 * 4 * 100% * (

0.00% *

90%

) *

5

=

$0

$  112.44 * 4 * 100% * (

0.00% *

90%

) *

0

=

$0

$  112.44 * 4 * 100% * (

0.00% * 100% ) *

148

=

$0

$  112.44 * 4 * 100% * (

0.00% * 100% ) *

79

=

$0

( 12.00 *
SECTOR 25.  Refractory Brick Producers
( 0.00 *
ALL
( 0.00 *
SECTOR 26.  Woodworking
( 0.00 *
ALL
( 0.00 *

Page 52

0%

(

0.00 * $  112.44 * 4 * 100% * (

(
(
(
(

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

QUARTERLY

  CONTCOST 

QUARTCONTTIME

Table 7

0.00% * 100% ) *

36

=

$0

0.00 * $  112.44 * 4 * 100% * (
0.00 * $  112.44 * 4 * 100% * (

32 =
0.00% * 100% ) *
22.00% * 100% ) * 1,162 =

$0

0.00 * $  112.44 * 4 * 100% * (
0.00 * $  112.44 * 4 * 100% * (

22.00% * 100% ) * 4,650 =
22.00% * 100% ) *
12 =

$0

MARITIME
$0

CONSTRUCTION
$0

GOVERNMENT
( 0.00 * $  112.44
SECTOR 27.  Solid Waste Incerneration
( 0.00 * $  112.44
GENERAL INDUSTRY
( 0.00 * $  112.44
( 0.00 * $  112.44
GOVERNMENT
( 0.00 * $  112.44
SECTOR 30.  Superalloy Producers and Users
( 0.00 * $  112.44
ALL
( 0.00 * $  112.44
SECTOR 31.  Construction
( 0.00 * $  112.44

Industrial Rehabilitation 

* 4 * 100% * (

22.00% * 100% ) *

=

$0

* 4 * 100% * (

0.00% *

90%

) *

40

=

$0

* 4 * 100% * (
* 4 * 100% * (

0.00% *
0.00% *

90%
25%

) *
) *

48
0

=
=

$0
$0

* 4 * 100% * (

0.00% *

90%

) *

24

=

$0

* 4 * 100% * (

0.00% * 100% ) *

19

=

$0

* 4 * 100% * (

0.00% *

) *

0

=

$0

* 4 * 100% * (

0.00% * 100% ) *

51

=

$0

(
(

0.00 * $  112.44 * 4 * 100% * (
0.00 * $  112.44 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 100% ) *

233
15

=
=

$0
$0

(
(

0.00 * $  112.44 * 4 * 100% * (
0.00 * $  112.44 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 90% ) *

88
40

=
=

$0
$0

0.00% *
0.00% *

90%
90%

) *
) *

170
1

=

$0

=

$0

239
44

=
=

$0
$0

175

=

$0
$5,328,238

Hazardous Waste‐site  ( 0.00 * $  112.44 * 4 * 100% * (
Work
( 0.00 * $  112.44 * 4 * 100% * (

Refractory Brick 
Restoration

42

0%

(
(

0.00 * $  112.44 * 4 * 100% * (
0.00 * $  112.44 * 4 * 100% * (

0.00% *
60.00% *

90%
90%

) *
) *

(

0.00 * $  112.44 * 4 * 100% * (

60.00% *

90%

) *

Total

75,684

Page 53

Table 8

Quarterly Exposure Monitoring (Paragraph (d)(2)(iv)); Contract Cost for a Laboratory to Conduct Analysis 
of Quarterly Exposure Monitoring 
This table calculates the contract cost for the employer to have a laboratory conduct analysis of air samples collected 
during quarterly exposure monitoring.   
(SAMPCOST  * JOBPEL * SHIFTS * #SAMPS * 4 * %NOTQUART * %ABOVEPEL) * #PLANTS

 QUARTERLY

 %NOTQUART

 %ABOVEPEL

(

$77 * 0

* 2 *

3

* 4

* 100% *

0.00%

)*

883

=

$0

Small

(
(

$77 * 0
$77 * 0

* 1 *
* 2 *

3
3

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

1,662
426

=
=

$0
$0

(
(

$77 * 0
$77 * 0

* 1 *
* 2 *

3
3

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

801
580

=
=

$0
$0

(
(

$77 * 0
$77 * 0

* 1 *
* 2 *

3
3

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

1,092
426

=
=

$0
$0

(
(

$77 * 0
$77 * 0

* 1 *
* 2 *

3
3

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

801
503

=
=

$0
$0

Small
Large

(
(

$77 * 0
$77 * 0

* 1 *
* 2 *

3
3

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

946
883

=
=

$0
$0

Small

3

* 4

* 100% *

0.00%

)*

1,662

=

$0

Large

( $77 * 1 * 1 *
GENERAL INDUSTRY
( $77 * 1 * 3 *

2

* 4

* 100% *

4.85%

)*

3,535

=

$316,600

Small
Large

(
(

$77 * 1
$77 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

4.84%
0.37%

)*
)*

3,962
2,593

=
=

$177,013
$17,717

Small
Large

(
(

$77 * 1
$77 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.38%
0.00%

)*
)*

2,905
786

=
=

$10,193
$0

Small
Large

(
(

$77 * 1
$77 * 0

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

880
314

=
=

$0
$0

Small
Large

(
(

$77 * 0
$77 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

352
78

=
=

$0
$0

Small

(

$77 * 1

* 1 *

3

* 4

* 100% *

0.00%

)*

88

=

$0

 #PLANTS

 Item 13 COST

 #SAMPS

Large

 JOBPEL

 SHIFTS

Variable cost per sample 
Number of job categories exposed above the PEL
Number of work shifts
Number of samples per exposure measurement
four times per year (quarterly)
Percent of plants not performing quarterly monitoring requirements
Percent of plants that have an employee in at least one job category above the PEL
Number of plants represented by the model output

 SAMPCOST

Cost = 
Variables
* SAMPCOST = 
* JOBPEL = 
* SHIFTS = 
* #SAMPS = 
*4 = 
* %NOTQUART =
* %ABOVEPEL = 
* #PLANTS =

Sector 1. Electroplating
Hard Chrome

Job Shop Chrome Plater

Large
Small

Captive Shop Chrome Plater

Large
Small

Job Shop Plater

Large
Small

Captive Shop Plater

Large

Operator
Sector 2. Welding
SMAW

GMAW

TIG

SAW

Plasma Cutting

Page 54

 QUARTERLY

 %NOTQUART

 %ABOVEPEL

$77 * 1

* 3 *

2

* 4

* 100% *

0.00%

)*

78

=

$0

Small
Large

(
(

$77 * 1
$77 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

88
472

=
=

$0
$0

Small

(

$77 * 1

* 4

* 100% *

0.00%

)*

529

=

$0

Large (

$77 * 1

* 1 * 3
MARITIME
* 3 * 1

* 4

* 100% *

0.00%

)*

17

=

$0

Small (
Large (

$77 * 1
$77 * 1

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

10
24

=
=

$0
$0

Small (
Large (

$77 * 1
$77 * 1

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

14
6

=
=

$0
$0

Small (
Large (

$77 * 1
$77 * 1

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

3
116

=
=

$0
$0

Small
Large

(
(

$77 * 1
$77 * 1

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

66
4

=
=

$0
$0

Small
Large

(
(

$77 * 1
$77 * 1

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

2
2

=
=

$0
$0

Small
Large

(
(

$77 * 1
$77 * 1

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

1
4

=
=

$0
$0

Small
Large

(
(

$77 * 1
$77 * 1

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

2
2

=
=

$0
$0

Small
Large

(
(

$77 * 1
$77 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

1
0

=
=

$0
$0

Small
Large

(
(

$77 * 0
$77 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

0
0

=
=

$0
$0

Small
Large

(
(

$77 * 0
$77 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

0
15

=
=

$0
$0

Small

(

$77 * 0

* 100% *

0.00%

)*

9

=

$0

Large

(

* 2 * 1 * 4
CONSTRUCTION
$77 * 1 * 3 * 1 * 4

* 100% *

0.00%

)*

201

=

$0

Small
Large

(
(

$77 * 1
$77 * 0

* 1 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

1,609
3

=
=

$0
$0

Small
Large

(
(

$77 * 1
$77 * 0

* 1 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

21
41

=
=

$0
$0

Small

(

$77 * 1

* 1 *

1

* 4

* 100% *

0.00%

)*

322

=

$0

 #PLANTS

 Item 13 COST

 #SAMPS

(

 JOBPEL

Large

 SAMPCOST

 SHIFTS

Table 8

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting

Thermal Spray Tungsten Cutting

SAW

SMAW

Plasma Cutting

GMAW

Page 55

 QUARTERLY

 %NOTQUART

 %ABOVEPEL

$77 * 1

* 3 *

1

* 4

* 100% *

0.00%

)*

20

=

$0

Local
State

(
(

$77 * 1
$77 * 1

* 1 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

161
4

=
=

$0
$0

Local

(

$77 * 1

* 100% *

0.00%

)*

32

=

$0

Large

(

* 1 * 1 * 4
GOVERNMENT
$77 * 1 * 1 * 1 * 4

* 100% *

0.00%

)*

19

=

$0

Small
Large

(
(

$77 * 1
$77 * 1

* 1 *
* 1 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

590
0

=
=

$0
$0

Small
Large

(
(

$77 * 1
$77 * 1

* 1 *
* 1 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

8
4

=
=

$0
$0

Small
State

(
(

$77 * 1
$77 * 1

* 1 *
* 1 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

118
2

=
=

$0
$0

Local
State

(
(

$77 * 1
$77 * 1

* 1 *
* 1 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

59
1

=
=

$0
$0

Local

(

$77 * 1

* 1 *

1

* 4

* 100% *

0.00%

)*

12

=

$0

Large

(

$77 * 1

* 3 *

2

* 4

* 100% *

0.00%

)*

4,740

=

$0

Small
Large

(
(

$77 * 1
$77 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

4,826
3,476

=
=

$0
$0

Small
Large

(
(

$77 * 1
$77 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

3,539
1,053

=
=

$0
$0

Small
Large

(
(

$77 * 1
$77 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

1,073
421

=
=

$0
$0

Small
Large

(
(

$77 * 1
$77 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

429
105

=
=

$0
$0

Small
Large

(
(

$77 * 1
$77 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

107
105

=
=

$0
$0

Small
Large

(
(

$77 * 1
$77 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

107
632

=
=

$0
$0

Small

(

$77 * 1

* 4

* 100% *

0.00%

)*

644

=

$0

Large (

$77 * 0

* 1 * 3
MARITIME
* 3 * 1

* 4

* 100% *

0.00%

)*

37

=

$0

Small (
Large (

$77 * 0
$77 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

21
53

=
=

$0
$0

Small (

$77 * 0

* 2 *

1

* 4

* 100% *

0.00%

)*

30

=

$0

 #PLANTS

 Item 13 COST

 #SAMPS

(

 JOBPEL

State

 SAMPCOST

 SHIFTS

Table 8

Brazing

Metallizing

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
Sector 2. Mild Steel Welding
SMAW

GMAW

TIG

SAW

Plasma Cutting

Plasma Welding

Resistance Welding

SMAW

GMAW

Page 56

 QUARTERLY

 %NOTQUART

 %ABOVEPEL

* 3 *

1

* 4

* 100% *

0.00%

)*

13

=

$0

Small (
Large (

$77 * 0
$77 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

7
249

=
=

$0
$0

Small
Large

(
(

$77 * 0
$77 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

141
8

=
=

$0
$0

Small
Large

(
(

$77 * 0
$77 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

5
3

=
=

$0
$0

Small
Large

(
(

$77 * 0
$77 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

2
8

=
=

$0
$0

Small
Large

(
(

$77 * 0
$77 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

5
3

=
=

$0
$0

Small
Large

(
(

$77 * 0
$77 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

2
1

=
=

$0
$0

Small
Large

(
(

$77 * 0
$77 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

0
1

=
=

$0
$0

Small
Large

(
(

$77 * 0
$77 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

0
33

=
=

$0
$0

Small

(

$77 * 0

* 100% *

0.00%

)*

18

=

$0

Large

(

* 2 * 1 * 4
CONSTRUCTION
$77 * 0 * 3 * 1 * 4

* 100% *

0.00%

)*

301

=

$0

Small
Large

(
(

$77 * 0
$77 * 0

* 1 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

2,277
4

=
=

$0
$0

Small
Large

(
(

$77 * 0
$77 * 0

* 1 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

30
60

=
=

$0
$0

Small
Large

(
(

$77 * 0
$77 * 0

* 1 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

455
30

=
=

$0
$0

Small
Large

(
(

$77 * 0
$77 * 0

* 1 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

228
6

=
=

$0
$0

Small

(

$77 * 0

* 1 *

1

* 4

* 100% *

0.00%

)*

45

=

$0

Large

(

$77 * 1

* 3 *

3

* 4

* 100% * 28.00% ) *

49

=

$37,930

Small
Large

(
(

$77 * 1
$77 * 0

* 1 *
* 1 *

3
1

* 4
* 4

* 100% *
* 100% *

9.00%
5.00%

)*
)*

62
326

=
=

$5,118
$0

Small

(

$77 * 2

* 1 *

1

* 4

* 100% *

5.00%

)*

1,436

=

$44,180

 #PLANTS

 Item 13 COST

 #SAMPS

$77 * 0

 JOBPEL

Large (

 SAMPCOST

 SHIFTS

Table 8

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting

Thermal Spray Tungsten Cutting

SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
SECTOR 3.  PAINTING
AEROSPACE

AUTOBODY

Page 57

 QUARTERLY

 %NOTQUART

 %ABOVEPEL

$77 * 0

* 2 *

3

* 4

* 100% *

8.00%

)*

100

=

$0

Small
Large

(
(

$77 * 0
$77 * 1

* 1 *
* 3 *

3
1

* 4
* 4

* 100% * 8.00% ) *
* 100% * 36.00% ) *

18
276

=
=

$0
$91,566

Small
Large

(
(

$77 * 1
$77 * 1

* 1 *
* 3 *

1
1

* 4
* 4

* 100% * 36.00% ) *
* 100% * 22.00% ) *

476
671

=
=

$52,771
$136,255

Small
Large

(
(

$77 * 1
$77 * 1

* 1 *
* 3 *

1
1

* 4
* 4

* 100% * 22.00% ) *
* 100% * 12.00% ) *

3,566
12

=
=

$241,457
$1,294

Small

(

$77 * 1

* 1 *

1

* 4

* 100% * 12.00% ) *

647

=

$23,879

Large

(

$77 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

2

=

$0

Small (
SECTOR 5. Chromate Pigment Procedures
Large (
ALL
Small (
SECTOR 6. CCA Producers
Large (
ALL
Small (
SECTOR 7.  Chromium Catalyst Producers
Large (
ALL
Small (
SECTOR 8.  Paint and Coating Producers
Large (
ALL
Small (
SECTOR 9.  Printing Ink Producers
Large (
ALL
Small (
SECTOR 10.  Plastic Colorant Producers and Users
Large (
ALL
Small (
SECTOR 11.  Plating Mixture Producers
Large (
ALL
Small (
SECTOR 13.  Chromium Metal Producers
Large (
ALL
Small (
SECTOR 14.  Iron and Steel Mills
Large (
ALLOY AND STAINLESS STEEL
Small (

$77 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

0

=

$0

$77 * 1

* 2 *

3

* 4

* 100% * 77.00% ) *

2

=

$2,558

$77 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

1

=

$0

$77 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

2

=

$0

$77 * 0

* 3 *

0

* 4

* 100% *

0.00%

)*

0

=

$0

$77 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

5

=

$0

$77 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

0

=

$0

$77 * 0

* 2 *

3

* 4

* 100% *

0.00%

)*

80

=

$0

$77 * 0

* 2 *

3

* 4

* 100% *

0.00%

)*

126

=

$0

$77 * 0

* 1 *

9

* 4

* 100% *

0.00%

)*

2

=

$0

$77 * 0

* 1 *

5

* 4

* 100% *

0.00%

)*

8

=

$0

$77 * 3

* 3 *

3

* 4

* 100% * 36.00% ) *

81

=

$243,716

$77 * 5

* 1 *

3

* 4

* 100% * 36.00% ) *

40

=

$66,227

$77 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

6

=

$0

$77 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

4

=

$0

$77 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

1

=

$0

$77 * 0

* 1 *

1

* 4

*

*

0.00%

)*

0

=

$0

$77 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

34

=

$0

$77 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

11

=

$0

 #PLANTS

 Item 13 COST

 #SAMPS

(

 JOBPEL

Large

 SAMPCOST

 SHIFTS

Table 8

COIL COATING

MARITIME

CONSTRUCTION

GOVERNMENT
SECTOR 4.  Producers of Chromates
ALL

Page 58

0%

 QUARTERLY

 %NOTQUART

 %ABOVEPEL

$77 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

102

=

$0

Small

(

$77 * 0

* 1 *

1

* 4

* 100% *

0.00%

)*

32

=

$0

Large

(

$77 * 0

* 1 *

3

* 4

* 100% * 63.00% ) *

33

=

$0

Small

(

$77 * 0

* 1 *

3

* 4

* 100% * 63.00% ) *

31

=

$0

Large

(

$77 * 0

* 3 *

5

* 4

* 100% *

0.00%

)*

163

=

$0

Small

(

$77 * 0

* 1 *

5

* 4

* 100% *

0.00%

)*

118

=

$0

Large

(

$77 * 7

* 1 * 21 * 4

* 100% * 62.00% ) *

3

=

$75,707

Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
Chromium Users
Small
Large
Chromium Catalyst Service Companies
Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small

(

$77 * 5

* 1 *

7

* 4

* 100% * 62.00% ) *

1

=

$6,009

(

$77 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

0

=

$0

(

$77 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

5

=

$0

(

$77 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

216

=

$0

(

$77 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

1,627

=

$0

(

$77 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

343

=

$0

(

$77 * 0

* 1 *

2

* 4

* 100% *

0.00%

)*

697

=

$0

(

$77 * 0

* 3 * 12 * 4

* 100% *

0.00%

)*

6

=

$0

(
(

$77 * 0
$77 * 1

* 1 *
* 1 *

4
1

* 4
* 4

* 100% * 0.00% ) *
* 100% * 20.00% ) *

20
90

=
=

$0
$5,548

(

$77 * 1

* 1 *

1

* 4

* 100% *

0.00%

)*

5

=

$0

(

$77 * 0

* 3 *

2

* 4

* 100% *

0.00%

)*

81

=

$0

(

$77 * 0

* 1 *

2

* 4

* 100% *

0.00%

)*

325

=

$0

(

$77 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

179

=

$0

(
(

$77 * 0
$77 * 0

* 1 *
* 3 *

3
3

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

0
23

=
=

$0
$0

(

$77 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

4

=

$0

(

$77 * 0

* 1 * 15 * 4

* 100% *

0.00%

)*

5

=

$0

(

$77 * 0

* 1 *

* 100% *

0.00%

)*

0

=

$0

 #PLANTS

 Item 13 COST

 #SAMPS

(

 JOBPEL

Large

 SAMPCOST

 SHIFTS

Table 8

CARBON STEEL
14b. FORGING INDUSTRY
Reshaping
SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL

Page 59

0

* 4

 QUARTERLY

 %NOTQUART

 %ABOVEPEL

$77 * 0

* 1 *

2

* 4

* 100% *

0.00%

)*

148

=

$0

Small
Large

(
(

$77 * 0
$77 * 0

* 1 *
* 1 *

2
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

79
36

=
=

$0
$0

Small
Large

(
(

$77 * 0
$77 * 0

* 1 *
* 1 *

1
1

* 4
* 4

* 100% *
* 22% *

0.00%
0.00%

)*
)*

32
1,162

=
=

$0
$0

Small
State

(
(

$77 * 0
$77 * 0

* 1 *
* 1 *

1
1

* 4
* 4

*
*

22% *
22% *

0.00%
0.00%

)*
)*

4,650
12

=
=

$0
$0

Local

(

$77 * 0

* 1 *

1

* 4

*

22% *

0.00%

)*

42

=

$0

Large

(

$77 * 0

* 3 * 15 * 4

* 100% *

0.00%

)*

40

=

$0

Small
Large

(
(

$77 * 0
$77 * 0

* 1 * 3 * 4
* 3 * 15 * 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

48
0

=
=

$0
$0

Small
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

(

$77 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

24

=

$0

(

$77 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

19

=

$0

(

$77 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

0

=

$0

(

$77 * 0

* 1 *

1

* 4

* 100% *

0.00%

)*

51

=

$0

Small
State

(
(

$77 * 0
$77 * 0

* 1 *
* 1 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

233
15

=
=

$0
$0

Local
Large

(
(

$77 * 0
$77 * 0

* 1 *
* 1 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

88
40

=
=

$0
$0

Small
State

(
(

$77 * 0
$77 * 0

* 1 *
* 1 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

170
1

=
=

$0
$0

Local
Large

(
(

$77 * 0
$77 * 0

* 1 *
* 1 *

1
1

* 4
* 4

* 100% * 0.00% ) *
* 100% * 60.00% ) *

239
44

=
=

$0
$0

Small

(

$77 * 0

* 1 *

1

* 4

* 100% * 60.00% ) *

 #PLANTS

 Item 13 COST

 #SAMPS

(

 JOBPEL

Large

 SAMPCOST

 SHIFTS

Table 8

SECTOR 26.  Woodworking
General Industry

Maritime

Construction

Government
SECTOR 27.  Solid Waste Incerneration
GENERAL INDUSTRY

GOVERNMENT

Industrial Rehabilitation 

Hazardous Waste‐site Work

Refractory Brick Restoration
Total

Page 60

175
=
$0
75,684
$1,555,739

Table 9

Employer Time and Cost to Notify Employees of Quarterly Monitoring Results
HOURS =  ((NOTETIME * JOBPEL * SHIFTS * # SAMPS * 4) * %NOTQUART * %ABOVEPEL) * #PLANTS
COST = (SUPWAGE) * BURDEN HOURS
ASSUMPTIONS:
* SUPWAGE = Supervisory wage rate, $/hr.
* NOTETIME = Time, in hours, to notify an employee of the exposure monitoring results
* JOBPEL = Number of job categories exposed above the PEL
* SHIFTS = Number of work shifts
* #SAMPS = Number of samples per exposure measurement
* 4 = 4 times per year (quarterly)
* %NOTQUART = Percent of plants not performing quarterly monitoring requirements
* %ABOVEPEL = Percent of plants that have an employee in at least one job category above the PEL
* #PLANTS = Number of plants represented by the model input

Item 12 Cost

Responses

$0

0

0.25 * 0 *
0.25 * 0 *

1*
2*

3 * 4 * 100% *
3 * 4 * 100% *

0.00%
0.00%

*
*

1,662
426

0 $  36.22
0 $  36.22

$0
$0

0
0

0.25 * 0 *
0.25 * 0 *

1*
2*

3 * 4 * 100% *
3 * 4 * 100% *

0.00%
0.00%

*
*

801
580

0 $  36.22
0 $  36.22

$0
$0

0
0

0.25 * 0 *
0.25 * 0 *

1*
2*

3 * 4 * 100% *
3 * 4 * 100% *

0.00%
0.00%

*
*

1,092
426

0 $  36.22
0 $  36.22

$0
$0

0
0

0.25 * 0 *
0.25 * 0 *

1*
2*

3 * 4 * 100% *
3 * 4 * 100% *

0.00%
0.00%

*
*

801
503

0 $  36.22
0 $  36.22

$0
$0

0
0

0.25 * 0 *
0.25 * 0 *

1*
2*

3 * 4 * 100% *
3 * 4 * 100% *

0.00%
0.00%

*
*

946
883

0 $  36.22
0 $  36.22

$0
$0

0
0

0.25 * 0 *

1*

3 * 4 * 100% *

0.00%

*

1,662

0 $  36.22

$0

0

0.25 * 1 *

3*

2 * 4 * 100% *

4.85% *

3,535

1,029 $  35.65

$36,680

4115

0.25 * 1 *
0.25 * 1 *

1*
3*

3 * 4 * 100% *
2 * 4 * 100% *

4.84% *
0.37% *

3,962
2,593

575 $  35.65
58 $  35.65

$20,508
$2,053

2301
230

0.25 * 1 *
0.25 * 1 *

1*
3*

3 * 4 * 100% *
2 * 4 * 100% *

0.38% *
0.00% *

2,905
786

33 $  35.65
0 $  35.65

$1,181
$0

132
0

0.25 * 1 *
0.25 * 0 *

1*
3*

3 * 4 * 100% *
2 * 4 * 100% *

0.00% *
0.00% *

880
314

0 $  35.65
0 $  35.65

$0
$0

0
0

0.25 * 0 *
0.25 * 1 *

1*
3*

3 * 4 * 100% *
2 * 4 * 100% *

0.00% *
0.00% *

352
78

0 $  35.65
0 $  35.65

$0
$0

0
0

0.25 * 1 *
0.25 * 1 *

1*
3*

3 * 4 * 100% *
2 * 4 * 100% *

0.00% *
0.00% *

88
78

0 $  35.65
0 $  35.65

$0
$0

0
0

Page 61

#PLANTS

SUPWAGE
0 $  36.22

Hours

883

%ABOVEPEL
*

4

0.00%

#SAMPS

3 * 4 * 100% *

SHIFTS
2*

JOBPEL

0.25 * 0 *

NOTETIME
Sector 1. Electroplating
Large
Hard Chrome
Small
Large
Job Shop Chrome 
Plater
Small
Large
Captive Shop 
Chrome Plater
Small
Large
Job Shop Plater
Small
Large
Captive Shop Plater
Small
Large
Operator
Small
Sector 2. Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding

%NOTQUART

20.69%

Item 12 Cost

Responses

0 $  35.65
0 $  35.65

$0
$0

0
0

Small

0.25 * 1 *

1*

0.00% *

529

0 $  35.65

$0

0

Large

0.25 * 1 *

1*

3 * 4 * 100% *
MARITIME
1 * 4 * 100% *

0.00% *

17

0 $  35.65

$0

0

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

10
24

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

14
6

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

3
116

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

66
4

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

2
2

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

1
4

0 $  35.65
0 $   35.65

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

2
2

0 $  35.65
0 $   35.65

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 0 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

1
0

0 $  35.65
0 $   35.65

$0
$0

0
0

Small
Large

0.25 * 0 *
0.25 * 0 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

0
0

0 $  35.65
0 $   35.65

$0
$0

0
0

Small
Large

0.25 * 0 *
0.25 * 0 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

0
15

0 $  35.65
0 $   35.65

$0
$0

0
0

Small

0.00% *

9

0 $  35.65

$0

0

Large

0.25 * 0 * 1 * 1 * 4 * 100% *
CONSTRUCTION
0.25 * 1 * 3 * 1 * 4 * 100% *

0.00% *

201

0 $  35.65

$0

0

Small
Large

0.25 * 1 *
0.25 * 0 *

1*
3*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

1,609
3

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 0 *

1*
3*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

21
41

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
State

0.25 * 1 *
0.25 * 1 *

1*
3*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

322
20

0 $  35.65
0 $  35.65

$0
$0

0
0

Local
State

0.25 * 1 *
0.25 * 1 *

1*
3*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

161
4

0 $  35.65
0 $  35.65

$0
$0

0
0

SUPWAGE

88
472

Hours

#PLANTS

0.00% *
0.00% *

4

3 * 4 * 100% *
2 * 4 * 100% *

#SAMPS

1*
3*

SHIFTS

0.25 * 1 *
0.25 * 1 *

JOBPEL

Small
Large

NOTETIME

%ABOVEPEL

%NOTQUART

Table 9

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting
Air Carbon Arc 
Cutting
Electric Torch 
Cutting
Thermal Spray 
Tungsten Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

Page 62

Item 12 Cost

Responses

0.00% *

19

0 $  35.65

$0

0

0.25 * 1 *
0.25 * 0 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

590
0

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

8
4

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
State

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

118
2

0 $  35.65
0 $  35.65

$0
$0

0
0

Local
State

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

59
1

0 $  35.65
0 $   35.65

$0
$0

0
0

Local
2A. Mild Steel Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
Small
Large
Resistance Welding
Small

0.25 * 1 *

1*

1 * 4 * 100% *

0.00% *

12

0 $  35.65

$0

0

0.25 * 0 *

1*

1 * 4 * 100% *

0.00% *

4,740

0 $  35.65

$0

0

0.25 * 1 * 1 * 1 * 4 * 100% *
0.25 * 1 * 1 * 1 * 4 * 100% *

0.00% *
0.00% *

4,826
3,476

0 $  35.65
0 $  35.65

$0

0
0

SHIFTS
1*

Large

0.25 * 1 *

Small
Large

SUPWAGE

0

0.25 * 1 *

Hours

#PLANTS

$0

Local

4

0 $  35.65

#SAMPS

32

JOBPEL

0.00% *

1*

1 * 4 * 100% *
GOVERNMENT
1 * 4 * 100% *

NOTETIME

%ABOVEPEL

%NOTQUART

Table 9

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

0.25 * 1
0.25 * 1

* 1
* 1

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

3,539
1,053

0 $  35.65
0 $  35.65

$0
$0

0
0

0.25 * 1
0.25 * 1

* 1
* 1

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

1,073
421

0 $  35.65
0 $  35.65

$0
$0

0
0

0.25 * 1
0.25 * 0

* 1
* 1

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

429
105

0 $  35.65
0 $  35.65

$0
$0

0
0

0.25 * 1
0.25 * 1

* 1
* 1

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

107
105

0 $  35.65
0 $  35.65

$0
$0

0
0

0.25 * 1
0.25 * 1

* 1
* 1

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

107
632

0 $  35.65
0 $  35.65

$0
$0

0
0

0.25 * 1

* 1

* 1

0.00% *

644

0 $  35.65

$0

0

Large

0.25 * 0 *

* 4 * 100% *
MARITIME
1 * 4 * 100% *

0.00% *

37

0 $  35.65

$0

0

Small
Large

0.25 * 0 * 2 * 1 * 4 * 100% *
0.25 * 0 * 3 * 1 * 4 * 100% *

0.00% *
0.00% *

21
53

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

30
13

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

7
249

0 $  35.65
0 $  35.65

$0
$0

0
0

Small

0.25 * 0

* 2

* 1

* 4 * 100% *

0.00% *

141

0 $  35.65

$0

0

3*

SMAW

GMAW

TIG

FCAW

Page 63

Item 12 Cost

Responses

0.00% *

8

0 $  35.65

$0

0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

5
3

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

2
8

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

5
3

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

2
1

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

0
1

0 $  35.65
0 $   35.65

$0
$0

0
0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

0
33

0 $  35.65
0 $   35.65

$0
$0

0
0

Small

0.25 * 0

* 2

* 1

0.00% *

18

0 $  35.65

$0

0

Large

0.25 * 0

* 3

* 1

* 4 * 100% *
CONSTRUCTION
* 4 * 100% *

0.00% *

301

0 $  35.65

$0

0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

2,277
4

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

30
60

0 $  35.65
0 $  35.65

$0
$0

0
0

Small
State

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

455
30

0 $  35.65
0 $  35.65

$0
$0

0
0

Local
State

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

228
6

0 $  35.65
0 $  35.65

$0
$0

0
0

Local

0.25 * 0

* 2

* 1

* 4 * 100% *

0.00% *

45

0 $  35.65

$0

0

Large

0.25 * 1 *

3*

3 * 4 * 100% *

28.00% *

49

123 $  44.87

$5,531

493

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
3*

3 * 4 * 100% *
3 * 4 * 100% *

9.00% *
5.00% *

62
326

17 $  44.87
147 $  44.87

$746
$6,585

67
587

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
3*

3 * 4 * 100% *
3 * 4 * 100% *

5.00% *
8.00% *

1,436
100

215 $  44.87
72 $  44.87

$9,663
$3,219

861
287

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
3*

3 * 4 * 100% *
3 * 4 * 100% *

8.00% *
36.00% *

18
276

4 $  44.87
893 $  44.87

$195
$40,056

17
3571

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
3*

3 * 4 * 100% *
3 * 4 * 100% *

36.00% *
22.00% *

476
671

514 $  44.87
1,328 $  44.87

$23,085
$59,606

2058
5313

Small

0.25 * 1 *

1*

3 * 4 * 100% *

22.00% *

3,566

2,354 $  44.87

$105,628

9416

SHIFTS

SUPWAGE

* 4 * 100% *

Hours

#PLANTS

* 1

4

* 3

#SAMPS

0.25 * 0

JOBPEL

Large

NOTETIME

%ABOVEPEL

%NOTQUART

Table 9

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting
Air Carbon Arc 
Cutting
Electric Torch 
Cutting
Thermal Spray 
Tungsten Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
Sector 3. Painting
AEROSPACE

AUTOBODY

COIL COATING

MARITIME

CONSTRUCTION

Page 64

%NOTQUART

50

*

3 * 4 * 100% *

12.00% *

647

233 $  44.87

$10,446

931

*

3 * 4 * 100% *

0.00% *

2

0 $  52.66

$0

0

*

3 * 4 * 100% *

0.00% *

0

0 $  52.66

$0

0

*

3 * 4 * 100% *

77.00% *

2

8 $  51.32

$427

33

*

3 * 4 * 100% *

0.00% *

1

0 $  51.32

$0

0

*

3 * 4 * 100% *

0.00% *

2

0 $  43.46

$0

0

*

0 * 4 * 100% *

0.00% *

0

0 $  43.46

$0

0

*

3 * 4 * 100% *

0.00% *

5

0 $  52.66

$0

0

*

3 * 4 * 100% *

0.00% *

0

0 $  52.66

$0

0

*

3 * 4 * 100% *

0.00% *

80

0 $  39.21

$0

0

*

3 * 4 * 100% *

0.00% *

126

0 $  39.21

$0

0

*

9 * 4 * 100% *

0.00% *

2

0 $  39.29

$0

0

*

5 * 4 * 100% *

0.00% *

8

0 $  39.29

$0

0

*

3 * 4 * 100% *

36.00% *

81

792 $  43.52

$34,468

3168

*

3 * 4 * 100% *

36.00% *

40

215 $  43.52

$9,366

861

*

3 * 4 * 100% *

0.00% *

6

0 $  39.06

$0

0

*

3 * 4 * 100% *

0.00% *

4

0 $  39.06

$0

0

*

3 * 4 * 100% *

0.00% *

1

0 $  52.83

$0

0

*

1* 4*

0% *

0.00% *

0

0 $  52.83

$0

0

*

3 * 4 * 100% *

0.00% *

34

0 $  52.83

$0

0

*
*

3 * 4 * 100% *
3 * 4 * 100% *

0.00% *
38.00% *

11
102

0 $  52.83
1,042 $  52.83

$0
$55,029

0
4167

*

3 * 4 * 100% *

38.00% *

32

36 $  52.83

$1,923

146

*

3 * 4 * 100% *

38.00% *

33

341 $  52.83

$17,997

1363

*

3 * 4 * 100% *

38.00% *

31

36 $  52.83

$1,884

143

SHIFTS

SUPWAGE

$566

Hours

13 $  44.87

#PLANTS
12

%ABOVEPEL
12.00% *

3*

4

3 * 4 * 100% *

#SAMPS

Responses

0.25 * 1 *

Item 12 Cost

Large

JOBPEL

NOTETIME

Table 9

GOVERNMENT
0.25 * 1 * 1
Small
Sector 4. Producers of Chromates
Large
0.25 * 0 * 3
ALL
0.25 * 0 * 1
Small
Sector 5. Chromate Pigment Procedures
Large
0.25 * 1 * 2
ALL
0.25 * 0 * 1
Small
Sector 6. CCA Producers
Large
0.25 * 0 * 3
ALL
0.25 * 0 * 3
Small
Sector 7. Chromium Catalyst Producers
Large
0.25 * 0 * 3
ALL
0.25 * 0 * 1
Small
Sector 8. Paint and Coating Producers
Large
0.25 * 0 * 2
ALL
0.25 * 0 * 2
Small
Sector 9. Printing Ink Producers
Large
0.25 * 0 * 1
ALL
0.25 * 0 * 1
Small
Sector 10. Plastic Colorant Producers and Users
Large
0.25 * 3 * 3
ALL
0.25 * 5 * 1
Small
Sector 11. Plating Mixture Producers
Large
0.25 * 0 * 1
ALL
0.25 * 0 * 1
Small
Sector 13. Chromium Metal Producers
Large
0.25 * 0 * 3
ALL
0.25 * 0 * 1
Small
Sector 14. Iron and Steel Mills
Large
0.25 * 0 * 3
ALLOY AND 
STAINLESS STEEL
0.25 * 0 * 1
Small
Large
0.25 * 3 * 3
CARBON STEEL
0.25 * 1 * 1
Small
14B. Forging Industry
Large
0.25 * 3 * 3
FORGING 
INDUSTRY
0.25 * 1 * 1
Small

Page 65

Item 12 Cost

Responses

163

0 $  38.53

$0

0

*

1*

5 * 4 * 100% *

0.00% *

118

0 $  38.53

$0

0

*

1 * 21 * 4 * 100% *

62.00% *

3

246 $  51.32

$12,625

984

*

1*

7 * 4 * 100% *

62.00% *

1

20 $  51.32

$1,002

78

*

1*

3 * 4 * 100% *

0.00% *

0

0 $  56.48

$0

0

*

1*

3 * 4 * 100% *

0.00% *

5

0 $  56.48

$0

0

*

1*

3 * 4 * 100% *

0.00% *

216

0 $  40.75

$0

0

*

1*

3 * 4 * 100% *

0.00% *

1,627

0 $  40.75

$0

0

*

3*

3 * 4 * 100% *

0.00% *

343

0 $  27.18

$0

0

0*

1*

2 * 4 * 100% *

0.00% *

697

0 $  27.18

$0

0

0*

3 * 12 * 4 * 25% *

0.00% *

6

0 $  39.30

$0

0

0*
1*

1*
3*

4 * 4 * 0% *
1 * 4 * 25% *

0.00% *
0.00% *

20
90

0 $  39.30
0 $  39.30

$0
$0

0
0

0*

1*

1* 4*

0% *

0.00% *

5

0 $  39.30

$0

0

0*

3*

2 * 4 * 100% *

0.00% *

81

0 $  28.36

$0

0

0*

1*

2 * 4 * 100% *

0.00% *

325

0 $  28.36

$0

0

0*

3*

3 * 4 * 100% *

13.00% *

179

0 $  44.23

$0

0

0*
2*

1*
3*

3 * 4 * 100% *
3 * 4 * 100% *

0.00% *
13.00% *

0
23

0 $  44.23
54 $  44.23

$0
$2,385

0
216

0*

1*

3 * 4 * 100% *

0.00% *

4

0 $  44.23

$0

0

0*

1 * 15 * 4 * 100% *

0.00% *

5

0 $  34.92

$0

0

0*

1*

0 * 4 * 100% *

0.00% *

0

0 $  34.92

$0

0

0*

1*

2 * 4 * 100% *

0.00% *

148

0 $  31.42

$0

0

0*
0*

1*
1*

2 * 4 * 100% *
2 * 4 * 100% *

0.00% *
0.00% *

79
36

0 $  31.42
0 $  31.42

$0
$0

0
0

0*
1*

1*
1*

2 * 4 * 100% *
2 * 4 * 100% *

0.00% *
0.00% *

32
1,162

0 $  31.42
0 $  31.42

$0
$0

0
0

1*

1*

2 * 4 * 100% *

0.00% *

4,650

0 $  31.42

$0

0

Page 66

SHIFTS

SUPWAGE

#PLANTS

0.00% *

Hours

%ABOVEPEL

0.25 *
Small
Sector 21. Colored Glass Producers
Large
0.25 *
ALL
0.25 *
Small
Large
0.25 *
Fiber, Flat, and 
Container Glass
0.25 *
Small
Sector 22. Printing
Large
0.25 *
ALL
0.25 *
Small
Sector 24. Chromium Catalyst Users
Large
0.25 *
Catalyst Users
0.25 *
Small
Large
0.25 *
Catalyst Companies
0.25 *
Small
Sector 25. Refractory Brick Producers
Large
0.25 *
ALL
0.25 *
Small
Sector 26. Woodworking
Large
0.25 *
General Industry
0.25 *
Small
Large
0.25 *
Maritime
0.25 *
Small
Large
0.25 *
Construction
0.25 *
Small

%NOTQUART

5 * 4 * 100% *

4

3*

Sector 15. Iron and Steel Foundries
Large
0.25 * 0
ALL
0.25 * 0
Small
Sector 17. Chromium Dye Producers 
Large
0.25 * 7
ALL
0.25 * 5
Small
Sector 18. Chromium Sulfate Producers
Large
0.25 * 0
ALL
0.25 * 0
Small
Sector 19. Chemical Distributers
Large
0.25 * 0
ALL
0.25 * 0
Small
Sector 20. Textile Dyeing
Large
0.25 * 0
ALL

#SAMPS

*

JOBPEL

NOTETIME

Table 9

Item 12 Cost

Responses

$0

0

0.25 * 1 *
Small
Sector 27. Solid Waste Incerneration
Large
0.25 * 0 *
General Industry
0.25 * 0 *
Small

1*

2 * 4 * 100% *

0.00% *

42

0 $  31.42

$0

0

3 * 15 * 4 * 100% *

0.00% *

40

0 $  37.07

$0

0

SUPWAGE
0 $  31.42

Hours

#PLANTS
12

4

0.00% *

#SAMPS

2 * 4 * 100% *

SHIFTS
1*

Large

JOBPEL

0.25 * 1 *

NOTETIME

%ABOVEPEL

%NOTQUART

Table 9

Government

1*

3 * 4 * 100% *

0.00% *

$0

0

0.25 *

0*

3*

15 * 4 * 100% *

0.00% *

48
0

0 $  37.07

State

0 $   37.07

$0

0

Local

0.25 *

0*

1*

3 * 4 * 100% *

0.00% *

24

0 $   37.07

$0

0

3*

3 * 4 * 100% *

0.00% *

19

0 $  38.01

$0

0

3*

3 * 4 * 100% *

0.00% *

0

0 $  38.01

$0

0

1*

3 * 4 * 100% *

0.00% *

51

0 $  43.74

$0

0

Government

Sector 30. Superalloy Producers and Users
Large
0.25 * 0 *
ALL
0.25 * 0 *
Small
Sector 31. Construction
Large
0.25 * 0 *
Small
State

0.25 * 0 *
0.25 * 0 *

1*
1*

2 * 4 * 100% *
2 * 4 * 100% *

0.00% *
0.00% *

233
15

0 $  43.74
0 $  43.74

$0
$0

0
0

Local
Large

0.25 * 0 *
0.25 * 0 *

1*
1*

3 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

88
40

0 $  43.74
0 $  43.74

$0
$0

0
0

Hazardous Waste‐ Small
site Work
State

0.25 * 0 *
0.25 * 0 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

170
1

0 $  43.74
0 $  43.74

$0
$0

0
0

Local
Large

0.25 * 0 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
60.00% *

239
44

0 $  43.74
27 $  43.74

$0
$1,163

0
106

Small

0.25 * 1 *

1*

1 * 4 * 100% *

60.00% *
Total

175
105 $  43.74
75,684 10,529

$4,600
$468,618

421
42,114

Industrial 
Rehabilitation 

Refractory Brick 
Restoration

Page 67

Table 9a (Remand)

Employer Time and Cost to Notify Employees of Initial Monitoring Results 
Hours = (NOTETIME * JOBCAT * SHIFTS * #SAMPS * #INIT * %INITADD * #PLANTS)
Cost = BURDEN HOURS * NONSUPWAGE 
           * NOTETIME =  Time, in hours, to notifiy an employee of the exposure monitoring results by posting .25 hours (15 minutes).
NONSUPWAGE =  Non‐supervisory wage rate, $/hr.
* JOBCAT =  Number of job categories (covering each work area)
* SHIFTS =  Number of work shifts
* #SAMPS = Number of samples per exposure measurement
* #INIT =  Equals two, reflecting that initial monitoring will have to be conducted twice — with readings below the action level 
    in order for the requirement of semi‐annual monitoring to be waived.  
* %INITADD =  Percent of plants that have not satisified initial monitoring requirement
* #PLANTS * 5% = Number of plants represented by the model output * 5%

% INITADD

 # PLANTS

#PLANTS * 5%

Item 12 COSTS

HOURS

RESPONSES

* 25% *

883

44

=

$6,170

232

927

( 0.25 * $        26.61 $        21.43
( 0.25 * $        26.61 $        21.43

7 * 1 * 3 *
1 * 2 * 3 *

2
2

* 25% *
* 25% *

1,662
426

83
21

=
=

$5,806
$425

218
16

873
64

( 0.25 * $        26.61 $        21.43
( 0.25 * $        26.61 $        21.43

1 * 1 * 3 *
1 * 2 * 3 *

2
2

* 25% *
* 25% *

801
580

40
29

=
=

$400
$579

15
22

60
87

( 0.25 * $        26.61 $        21.43
( 0.25 * $        26.61 $        21.43

1 * 1 * 3 *
1 * 2 * 3 *

2
2

* 25% *
* 25% *

1,092
426

55
21

=
=

$545
$425

20
16

82
64

Job Shop Plater

Large
Small

( 0.25 * $        26.61 $        21.43
( 0.25 * $        26.61 $        21.43

1 * 1 * 3 *
1 * 2 * 3 *

2
2

* 25% *
* 25% *

801
503

40
25

=
=

$400
$502

15
19

60
75

2
2

* 25% *
* 25% *

946
883

47
44

=
=

$472
$881

18
33

71
132

2

* 25% *

1,662

83

=

$829

31

125

# SAMPS

2

SHIFTS

7 * 2 * 3 *

JOBCAT

# INIT

Job Shop 
Large
Chrome Plater
Small
Large
Captive Shop 
Chrome Plater
Small

 NONSUPEWAGE (2003)

( 0.25 * $        26.61 $        21.43

NOTETIME
Sector 1. Electroplating
Large
Hard Chrome
Small

 NONSUPEWAGE

24.17%

Captive Shop  Large
Plater
Small ( 0.25 * $        26.61 $        21.43 1 * 1 * 3 *
Large ( 0.25 * $        26.61 $        21.43 1 * 2 * 3 *
Operator
Small ( 0.25 * $        26.61 $        21.43 1 * 1 * 3 *
Sector 2. Welding                                                                      GENERAL INDUSTRY
Large

( 0.25 * $        26.20 $        21.10

1 * 3 * 2 *

2

* 25% *

3,535

177

=

$3,473

133

530

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 3 *
1 * 3 * 2 *

2
2

* 25% *
* 25% *

3,962
2,593

198
130

=
=

$1,946
$2,548

74
97

297
389

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 3 *
1 * 3 * 2 *

2
2

* 25% *
* 25% *

2,905
786

145
39

=
=

$1,427
$772

54
29

218
118

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 3 *
1 * 3 * 2 *

2
2

* 25% *
* 25% *

880
314

44
16

=
=

$432
$309

17
12

66
47

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 3 *
1 * 3 * 2 *

2
2

* 25% *
* 25% *

352
78

18
4

=
=

$173
$77

7
3

26
12

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 3 *
1 * 3 * 2 *

2
2

* 25% *
* 25% *

88
78

4
4

=
=

$43
$77

2
3

7
12

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 3 *
1 * 3 * 2 *

2
2

* 25% *
* 25% *

88
472

4
24

=
=

$43
$463

2
18

7
71

Small

( 0.25 * $        26.20 $        21.10

529

26

=

$260

10

40

Large

( 0.25 * $        26.20 $        21.10

1 * 1 * 3 * 2 * 25% *
MARITIME
1 * 3 * 1 * 2 * 75% *

17

1

=

$26

1

4

SMAW

GMAW

TIG

SAW

Plasma Cutting

Plasma Welding
Resistance 
Welding

SMAW

Page 68

% INITADD

 # PLANTS

#PLANTS * 5%

Item 12 COSTS

HOURS

RESPONSES

2
2

* 75% *
* 75% *

10
24

0
1

=
=

$9
$36

0
1

1
5

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 2 * 1 *
1 * 3 * 1 *

2
2

* 75% *
* 75% *

14
6

1
0

=
=

$13
$9

1
0

2
1

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 2 * 1 *
1 * 3 * 1 *

2
2

* 75% *
* 75% *

3
116

0
6

=
=

$3
$171

0
7

0
26

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 2 * 1 *
1 * 3 * 1 *

2
2

* 75% *
* 75% *

66
4

3
0

=
=

$65
$6

2
0

10
1

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 2 * 1 *
1 * 3 * 1 *

2
2

* 75% *
* 75% *

2
2

0
0

=
=

$2
$3

0
0

0
0

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 2 * 1 *
1 * 3 * 1 *

2
2

* 75% *
* 75% *

1
4

0
0

=
=

$1
$6

0
0

0
1

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 2 * 1 *
1 * 3 * 1 *

2
2

* 75% *
* 75% *

2
2

0
0

=
=

$2
$3

0
0

0
0

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 2 * 1 *
1 * 3 * 1 *

2
2

* 75% *
* 75% *

1
0

0
0

=
=

$1
$0

0
0

0
0

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 2 * 1 *
1 * 3 * 1 *

2
2

* 75% *
* 75% *

0
0

0
0

=
=

$0
$0

0
0

0
0

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 2 * 1 *
1 * 3 * 1 *

2
2

* 75% *
* 75% *

0
15

0
1

=
=

$0
$23

0
1

0
3

Small

( 0.25 * $        26.20 $        21.10

9

0

=

$9

0

1

Large

( 0.25 * $        26.20 $        21.10

1 * 2 * 1 * 2 * 75% *
CONSTRUCTION
1 * 3 * 1 * 2 * 25% *

201

10

=

$99

4

15

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 1 *
1 * 3 * 1 *

2
2

* 25% *
* 25% *

1,609
3

80
0

=
=

$263
$1

10
0

40
0

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 1 *
1 * 3 * 1 *

2
2

* 25% *
* 25% *

21
41

1
2

=
=

$3
$20

0
1

1
3

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 1 *
1 * 3 * 1 *

2
2

* 25% *
* 25% *

322
20

16
1

=
=

$53
$10

2
0

8
2

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 1 *
1 * 3 * 1 *

2
2

* 25% *
* 25% *

161
4

8
0

=
=

$26
$2

1
0

4
0

Small

( 0.25 * $        26.20 $        21.10

32

2

=

$5

0

1

State

( 0.25 * $        26.20 $        21.10

1 * 1 * 1 * 2 * 25% *
GOVERNMENT
1 * 1 * 1 * 2 * 25% *

19

1

=

$3

0

0

Local

( 0.25 * $        26.20 $        21.10

1 * 1 * 1 *

590

30

=

$97

4

15

# SAMPS

1 * 2 * 1 *
1 * 3 * 1 *

SHIFTS

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

JOBCAT

Small
Large

NOTETIME

# INIT

 NONSUPEWAGE (2003)

 NONSUPEWAGE

Table 9a (Remand)

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting
Air Carbon Arc 
Cutting
Electric Torch 
Cutting
Thermal Spray 
Tungsten Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

SMAW
2

Page 69

* 25% *

% INITADD

 # PLANTS

#PLANTS * 5%

Item 12 COSTS

HOURS

RESPONSES

2

* 25% *

0

0

=

$0

0

0

Local
State

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 1 *
1 * 1 * 1 *

2
2

* 25% *
* 25% *

8
4

0
0

=
=

$1
$1

0
0

0
0

Local
State

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 1 *
1 * 1 * 1 *

2
2

* 25% *
* 25% *

118
2

6
0

=
=

$19
$0

1
0

3
0

Local
State

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 1 *
1 * 1 * 1 *

2
2

* 25% *
* 25% *

59
1

3
0

=
=

$10
$0

0
0

1
0

* 25% *

12

1

=

$2

0

0

* 25% *

4,740

237

=

$4,657

178

711

* 25% *
* 25% *

4,826
3,476

241
174

=
=

$2,371
$3,416

90
130

362
521

* 25% *
* 25% *

3,539
1,053

177
53

=
=

$1,739
$1,035

66
39

265
158

* 25% *
* 25% *

1,073
421

54
21

=
=

$527
$414

20
16

80
63

* 25% *
* 25% *

429
105

21
5

=
=

$211
$103

8
4

32
16

* 25% *
* 25% *

107
105

5
5

=
=

$53
$103

2
4

8
16

* 25% *
* 25% *

107
632

5
32

=
=

$53
$621

2
24

8
95

* 25% *

644

32

=

$316

12

48

* 75% *

37

2

=

$54

2

8

* 75% *
* 75% *

21
53

1
3

=
=

$21
$78

1
3

3
12

* 75% *
* 75% *

30
13

1
1

=
=

$29
$19

1
1

4
3

* 75% *
* 75% *

7
249

0
12

=
=

$7
$367

0
14

1
56

* 75% *
* 75% *

141
8

7
0

=
=

$139
$11

5
0

21
2

* 75% *
* 75% *

5
3

0
0

=
=

$5
$4

0
0

1
1

* 75% *
* 75% *

2
8

0
0

=
=

$2
$11

0
0

0
2

* 75% *
* 75% *

5
3

0
0

=
=

$5
$4

0
0

1
1

* 75% *
* 75% *

2
1

0
0

=
=

$2
$1

0
0

0
0

# SAMPS

1 * 1 * 1 *

SHIFTS

( 0.25 * $        26.20 $        21.10

JOBCAT

State

NOTETIME

# INIT

 NONSUPEWAGE (2003)

 NONSUPEWAGE

Table 9a (Remand)

Plasma Cutting

GMAW

Brazing

Metallizing
Local ( 0.25 * $        26.20 $        21.10 1 * 1 * 1 * 2
Sector 2. Mild Steel Welding                                                   GENERAL INDUSTRY
Large ( 0.25 * $        26.20 $        21.10 1 * 3 * 2 * 2
SMAW
Small ( 0.25 * $        26.20 $        21.10 1 * 1 * 3 * 2
Large ( 0.25 * $        26.20 $        21.10 1 * 3 * 2 * 2
GMAW
Small ( 0.25 * $        26.20 $        21.10 1 * 1 * 3 * 2
Large ( 0.25 * $        26.20 $        21.10 1 * 3 * 2 * 2
TIG
Small ( 0.25 * $        26.20 $        21.10 1 * 1 * 3 * 2
Large ( 0.25 * $        26.20 $        21.10 1 * 3 * 2 * 2
SAW
Small ( 0.25 * $        26.20 $        21.10 1 * 1 * 3 * 2
Large ( 0.25 * $        26.20 $        21.10 1 * 3 * 2 * 2
Plasma Cutting
Small ( 0.25 * $        26.20 $        21.10 1 * 1 * 3 * 2
Large ( 0.25 * $        26.20 $        21.10 1 * 3 * 2 * 2
Plasma Welding
Small ( 0.25 * $        26.20 $        21.10 1 * 1 * 3 * 2
Large ( 0.25 * $        26.20 $        21.10 1 * 3 * 2 * 2
Resistance 
Welding
Small ( 0.25 * $        26.20 $        21.10 1 * 1 * 3 * 2
MARITIME
Large ( 0.25 * $        26.20 $        21.10 1 * 3 * 1 * 2
SMAW
Small ( 0.25 * $        26.20 $        21.10 1 * 2 * 1 * 2
Large ( 0.25 * $        26.20 $        21.10 1 * 3 * 1 * 2
GMAW
Small ( 0.25 * $        26.20 $        21.10 1 * 2 * 1 * 2
Large ( 0.25 * $        26.20 $        21.10 1 * 3 * 1 * 2
TIG
Small ( 0.25 * $        26.20 $        21.10 1 * 2 * 1 * 2
Large ( 0.25 * $        26.20 $        21.10 1 * 3 * 1 * 2
FCAW
Small ( 0.25 * $        26.20 $        21.10 1 * 2 * 1 * 2
Large ( 0.25 * $        26.20 $        21.10 1 * 3 * 1 * 2
Plasma Cutting
Small ( 0.25 * $        26.20 $        21.10 1 * 2 * 1 * 2
Large ( 0.25 * $        26.20 $        21.10 1 * 3 * 1 * 2
Plasma Welding
Small ( 0.25 * $        26.20 $        21.10 1 * 2 * 1 * 2
Large ( 0.25 * $        26.20 $        21.10 1 * 3 * 1 * 2
Oxy‐fuel Cutting
Small ( 0.25 * $        26.20 $        21.10 1 * 2 * 1 * 2
Large ( 0.25 * $        26.20 $        21.10 1 * 3 * 1 * 2
Air Carbon Arc 
Cutting
Small ( 0.25 * $        26.20 $        21.10 1 * 2 * 1 * 2
Large ( 0.25 * $        26.20 $        21.10 1 * 3 * 1 * 2
Electric Torch

Page 70

 # PLANTS

#PLANTS * 5%

Item 12 COSTS

HOURS

RESPONSES

1 * 2 * 1 *
1 * 3 * 1 *

2
2

* 75% *
* 75% *

0
1

0
0

=
=

$0
$1

0
0

0
0

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 2 * 1 *
1 * 3 * 1 *

2
2

* 75% *
* 75% *

0
33

0
2

=
=

$0
$48

0
2

0
7

Small

( 0.25 * $        26.20 $        21.10

18

1

=

$18

1

3

Large

( 0.25 * $        26.20 $        21.10

1 * 2 * 1 * 2 * 75% *
CONSTRUCTION
1 * 3 * 1 * 2 * 25% *

301

15

=

$148

6

23

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 1 *
1 * 3 * 1 *

2
2

* 25% *
* 25% *

2,277
4

114
0

=
=

$373
$2

14
0

57
0

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 1 *
1 * 3 * 1 *

2
2

* 25% *
* 25% *

30
60

1
3

=
=

$5
$29

0
1

1
4

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 1 *
1 * 3 * 1 *

2
2

* 25% *
* 25% *

455
30

23
1

=
=

$75
$15

3
1

11
2

Small
Large

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

1 * 1 * 1 *
1 * 3 * 1 *

2
2

* 25% *
* 25% *

228
6

11
0

=
=

$37
$3

1
0

6
0

$        21.10

1 * 1 * 1 *

2

* 25% *

45

2

=

$7

0

1

$        26.63

2 * 3 * 3 *

2

* 25% *

49

2

=

$182

6

22

$        26.63
$        26.63

1 * 1 * 3 *
2 * 2 * 3 *

2
2

* 25% *
* 25% *

62
326

3
16

=
=

$38
$809

1
24

5
98

$        26.63
$        26.63

2 * 1 * 3 *
2 * 2 * 3 *

2
2

* 25% *
* 25% *

1,436
100

72
5

=
=

$1,780
$247

54
7

215
30

$        26.63
$        26.63

2 * 1 * 3 *
3 * 3 * 1 *

2
2

* 25% *
* 25% *

18
276

1
14

=
=

$22
$512

1
15

3
62

$        26.63
$        26.63

3 * 1 * 1 *
3 * 3 * 1 *

2
2

* 25% *
* 25% *

476
671

24
34

=
=

$295
$1,248

9
38

36
151

$        26.63
$        26.63

3 * 1 * 1 *
2 * 3 * 1 *

2
2

* 25% *
* 25% *

3,566
12

178
1

=
=

$2,211
$14

67
0

267
2

$        26.63

2 * 1 * 1 *

2

* 25% *

647

32

=

$267

8

32

$        31.15

4 * 3 * 3 *

2

* 100% *

2

0

=

$67

2

7

$        31.15

0 * 1 * 3 *

2

*

*

0

0

=

$0

0

0

$        30.36

9 * 2 * 3 *

2

* 25% *

2

0

=

$23

1

2

$        30.36

1 * 1 * 3 *

2

* 25% *

1

0

=

$1

0

0

$        25.72

4 * 3 * 3 *

2

* 25% *

2

0

=

$17

1

2

$        25.72

0 * 3 * 0 *

2

*

*

0

0

=

$0

0

0

$        31.15 14 * 3 * 3 *

2

* 25% *

5

0

=

$146

4

15

$        31.15

2

*

0

0

=

$0

0

0

# SAMPS

( 0.25 * $        26.20 $        21.10
( 0.25 * $        26.20 $        21.10

SHIFTS

Small
Large

JOBCAT

% INITADD

 NONSUPEWAGE (2003)

# INIT

Thermal Spray 
Tungsten Cutting

NOTETIME

Electric Torch 
Cutting

 NONSUPEWAGE

Table 9a (Remand)

SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
Small ( 0.25 * $        26.20
SECTOR 3.  PAINTING
Large ( 0.25 * $        33.07
General Industry 
(Aerospace)
Small ( 0.25 * $        33.07
Large ( 0.25 * $        33.07
General Industry 
(Autobody)
Small ( 0.25 * $        33.07
Large ( 0.25 * $        33.07
General Industry 
(Coil Coating)
Small ( 0.25 * $        33.07
Large ( 0.25 * $        33.07
Maritime
Small ( 0.25 * $        33.07
Large ( 0.25 * $        33.07
Construction
Small ( 0.25 * $        33.07
State ( 0.25 * $        33.07
Government
Local ( 0.25 * $        33.07
SECTOR 4.  Producers of Chromates
Large ( 0.25 * $        38.68
ALL
Small ( 0.25 * $        38.68
SECTOR 5. Chromate Pigment Procedures
Large ( 0.25 * $        37.70
ALL
Small ( 0.25 * $        37.70
SECTOR 6. CCA Producers
Large ( 0.25 * $        31.94
ALL
Small ( 0.25 * $        31.94
SECTOR 7.  Chromium Catalyst Producers
Large ( 0.25 * $        38.68
ALL
Small ( 0.25 * $        38.68
SECTOR 8.  Paint and Coating Producers

0 * 1 * 3 *

Page 71

0%

0%

0%

*

 # PLANTS

#PLANTS * 5%

Item 12 COSTS

HOURS

RESPONSES

* 25% *

80

4

=

$348

12

48

$        23.20

4 * 2 * 3 *

2

* 25% *

126

6

=

$546

19

76

$        23.24

5 * 1 * 9 *

2

* 100% *

2

0

=

$81

3

11

$        23.24

3 * 1 * 5 *

2

* 100% *

8

0

=

$90

3

12

$        25.76

4 * 3 * 3 *

2

* 25% *

81

4

=

$586

18

73

$        25.76

1 * 1 * 3 *

2

* 25% *

40

2

=

$24

1

3

$        23.12

3 * 1 * 3 *

2

* 75% *

6

0

=

$27

1

4

$        23.12

3 * 1 * 3 *

2

* 75% *

4

0

=

$18

1

3

$        31.25 16 * 3 * 3 *

2

* 100% *

1

0

=

$127

3

13

$        31.25

0 * 1 * 1 *

2

*

*

0

0

=

$0

0

0

$        31.25

8 * 3 * 3 *

2

* 75% *

34

2

=

$1,773

46

183

$        31.25
$        31.25

4 * 1 * 3 *
8 * 3 * 3 *

2
2

* 75% *
* 75% *

11
102

1
5

=
=

$95
$5,318

2
137

10
548

$        31.25

4 * 1 * 3 *

2

* 75% *

32

2

=

$279

7

29

$        31.25

5 * 1 * 3 *

2

* 75% *

33

2

=

$362

9

37

$        31.25

2 * 1 * 1 *

2

* 75% *

31

2

=

$46

1

5

$        22.80

9 * 3 * 5 *

2

* 25% *

163

8

=

$3,887

137

549

$        22.80

5 * 1 * 5 *

2

* 25% *

118

6

=

$523

18

74

$        30.36

7 * 1 * 21 *

2

* 25% *

3

0

=

$93

2

10

$        30.36

5 * 1 * 7 *

2

* 25% *

1

0

=

$7

0

1

$        33.42

0 * 1 * 3 *

2

*

*

0

0

=

$0

0

0

$        33.42

2 * 1 * 3 *

2

* 100% *

5

0

=

$30

1

3

$        24.10

1 * 1 * 3 *

2

* 75% *

216

11

=

$363

12

49

$        24.10

1 * 1 * 3 *

2

* 75% *

1,627

81

=

$2,739

92

366

# SAMPS

2

SHIFTS

4 * 2 * 3 *

( 0.25 * $        28.81 $        23.20

JOBCAT

% INITADD

 NONSUPEWAGE (2003)

# INIT

Large

 NONSUPEWAGE

NOTETIME

Table 9a (Remand)

ALL
Small ( 0.25 * $        28.81
SECTOR 9.  Printing Ink Producers
Large ( 0.25 * $        28.86
ALL
Small ( 0.25 * $        28.86
SECTOR 10.  Plastic Colorant Producers and Users
Large ( 0.25 * $        31.99
ALL
Small ( 0.25 * $        31.99
SECTOR 11.  Plating Mixture Producers
Large ( 0.25 * $        28.71
ALL
Small ( 0.25 * $        28.71
SECTOR 13.  Chromium Metal Producers
Large ( 0.25 * $        38.80
ALL
Small ( 0.25 * $        38.80
SECTOR 14.  Iron and Steel Mills
Large ( 0.25 * $        38.80
Alloy Stainless 
Steel
Small ( 0.25 * $        38.80
Large ( 0.25 * $        38.80
Carbon Steel
Small ( 0.25 * $        38.80
14.B Forging 
Large ( 0.25 * $        38.80
Forging Industry
Small ( 0.25 * $        38.80
SECTOR 15.  Iron and Steel Foundries
Large ( 0.25 * $        28.31
ALL
Small ( 0.25 * $        28.31
SECTOR 17.  Chromium Dye Producers
Large ( 0.25 * $        37.70
ALL
Small ( 0.25 * $        37.70
SECTOR 18.  Chromium Sulfate Producers
Large ( 0.25 * $        41.50
ALL
Small ( 0.25 * $        41.50
SECTOR 19.  Chemical Distributors
Large ( 0.25 * $        29.92
ALL
Small ( 0.25 * $        29.92

Page 72

0%

0%

% INITADD

 # PLANTS

#PLANTS * 5%

Item 12 COSTS

HOURS

RESPONSES

2

* 75% *

343

17

=

$3,472

174

696

$        16.08

2 * 1 * 2 *

2

* 75% *

697

35

=

$1,044

52

209

$        23.25

3 * 3 * 12 *

2

* 75% *

6

0

=

$368

13

51

$        23.25
$        23.25

2 * 1 * 4 *
3 * 3 * 12 *

2
2

* 75% *
* 75% *

20
90

1
5

=
=

$86
$5,270

3
183

12
730

$        23.25

2 * 1 * 4 *

2

* 75% *

5

0

=

$23

1

3

$        16.79

3 * 3 * 2 *

2

* 75% *

81

4

=

$572

27

110

$        16.79

2 * 1 * 2 *

2

* 75% *

325

16

=

$509

24

98

$        26.18

2 * 3 * 3 *

2

* 75% *

179

9

=

$1,962

60

241

$        26.18
$        26.18

0 * 1 * 3 *
2 * 3 * 3 *

2
2

* 0% *
* 75% *

0
23

0
1

=
=

$0
$253

0
8

0
31

$        26.18

0 * 1 * 3 *

2

*

*

4

0

=

$0

0

0

$        20.65

9 * 1 * 15 *

2

* 75% *

5

0

=

$350

14

55

$        20.65

0 * 1 * 0 *

2

* 75% *

0

0

=

$0

0

0

$        18.59

1 * 1 * 1 *

2

* 75% *

148

7

=

$64

3

11

$        18.59
$        18.59

1 * 1 * 1 *
1 * 1 * 1 *

2
2

* 75% *
* 75% *

79
36

4
2

=
=

$34
$16

1
1

6
3

$        18.59
$        25.86

1 * 1 * 1 *
1 * 1 * 1 *

2
2

* 75% *
* 75% *

32
1,162

2
58

=
=

$14
$699

1
22

2
87

$        18.59
$        25.86

1 * 1 * 1 *
1 * 1 * 1 *

2
2

* 75% *
* 75% *

4,650
12

233
1

=
=

$2,013
$7

87
0

349
1

$        18.59

1 * 1 * 1 *

2

* 75% *

42

2

=

$18

1

3

$        21.93

6 * 3 * 15 *

2

* 75% *

40

2

=

$5,490

202

807

$        21.93
$        21.93

6 * 1 * 3 *
0 * 3 * 15 *

2
2

* 75% *
* 75% *

48
0

2
0

=
=

$439
$0

16
0

65
0

$        21.93

6 * 1 * 3 *

2

* 75% *

24

1

=

$220

8

32

$        22.49 12 * 3 * 3 *

2

* 75% *

19

1

=

$1,075

38

154

$        22.49

2

*

0

0

=

$0

0

0

# SAMPS

3 * 3 * 3 *

SHIFTS

$        16.08

JOBCAT

# INIT

SECTOR 20.  Textile Dyeing
Large ( 0.25 * $        19.97
ALL
Small ( 0.25 * $        19.97
SECTOR 21.  Colored Glass Producers
Large ( 0.25 * $        28.87
General Industry
Small ( 0.25 * $        28.87
Large ( 0.25 * $        28.87
Fiber, Flat and 
Container Glass
Small ( 0.25 * $        28.87
SECTOR 22.  Printing
Large ( 0.25 * $        20.85
ALL
Small ( 0.25 * $        20.85
SECTOR 24.  Chromium Catalyst Users
Large ( 0.25 * $        32.51
Catalyst Users
Small ( 0.25 * $        32.51
Chromium  Large ( 0.25 * $        32.51
Catalyst Service 
Small ( 0.25 * $        32.51
Companies
SECTOR 25.  Refractory Brick Producers
Large ( 0.25 * $        25.64
ALL
Small ( 0.25 * $        25.64
SECTOR 26.  Woodworking
Large ( 0.25 * $        23.08
General Industry 
Small ( 0.25 * $        23.08
Large ( 0.25 * $        23.08
Maritime
Small ( 0.25 * $        23.08
Large ( 0.25 * $        32.11
Construction
Small ( 0.25 * $        23.08
State ( 0.25 * $        32.11
Government
Local ( 0.25 * $        23.08
SECTOR 27.  Solid Waste Incerneration
Large ( 0.25 * $        27.23
General Industry 
Small ( 0.25 * $        27.23
State ( 0.25 * $        27.23
Government
Local ( 0.25 * $        27.23
SECTOR 30.  Superalloy Producers and Users
Large ( 0.25 * $        27.93
ALL
Small ( 0.25 * $        27.93

 NONSUPEWAGE (2003)

 NONSUPEWAGE

NOTETIME

Table 9a (Remand)

0 * 3 * 3 *

Page 73

0%

0%

*

% INITADD

 # PLANTS

#PLANTS * 5%

Item 12 COSTS

HOURS

RESPONSES

2

* 75% *

51

3

=

$368

11

46

# SAMPS

4 * 1 * 3 *

SHIFTS

# INIT

SECTOR 31.  Construction ‐ Cement Workers
Large ( 0.25 * $        32.13 $        25.88

JOBCAT

 NONSUPEWAGE (2003)

 NONSUPEWAGE

NOTETIME

Table 9a (Remand)

Industrial 
Small
rehabilitation  State

( 0.25 * $        32.13 $        25.88
( 0.25 * $        32.13 $        25.88

4 * 1 * 2 *
1 * 1 * 1 *

2
2

* 75% *
* 100% *

233
15

12
1

=
=

$1,125
$12

35
0

140
1

Local
Large

( 0.25 * $        32.13 $        25.88
( 0.25 * $        32.13 $        25.88

1 * 1 * 1 *
1 * 1 * 1 *

2
2

* 100% *
* 75% *

88
40

4
2

=
=

$70
$24

2
1

9
3

Hazardous  Small
Waste‐site Work State

( 0.25 * $        32.13 $        25.88
( 0.25 * $        32.13 $        25.88

1 * 1 * 1 *
1 * 1 * 1 *

2
2

* 75% *
* 75% *

170
1

8
0

=
=

$102
$0

3
0

13
0

Local
Large

( 0.25 * $        32.13 $        25.88
( 0.25 * $        32.13 $        25.88

1 * 1 * 1 *
1 * 1 * 1 *

2
2

* 75% *
* 0% *

239
44

12
2

=
=

$144
$0

4
0

18
0

Small
Large

( 0.25 * $        32.13 $        25.88
( 0.25 * $        32.13 $        25.88

1 * 1 * 1 *
4 * 1 * 3 *

2
2

* 0% *
* 75% *

175
9,592

9
480

=
=

$0
$69,351

0
2158

0
8633

Small
State

( 0.25 * $        32.13 $        25.88
( 0.25 * $        32.13 $        25.88

4 * 1 * 2 *
4 * 1 * 3 *

2
2

* 75% * 76,673
* 75% *
23

3,834
1

=
=

$369,581
$167

11501
5

46004
21

$        25.88

4 * 1 * 2 *

2

* 75% *

616

31

=

$2,968

92

369

$        22.21

7 * 1 * 11 *

2

* 75% *

1,330

66

=

$52,937

1920

7678

$        22.21

5 * 1 * 6 *

2

* 75% *

2,187

109

=

$33,928

1230

4921

$        22.21

7 * 1 * 11 *

2

* 75% *

1,994

100

=

$79,405

2879

11517

$        22.21

5 * 1 * 6 *

2

* 75% *

4,653
172,752

233 =
   8,638

$72,187
$779,227

2618
      25,971

10470
103,882

Refractory Brick 
Restoration

Cement Workers

Local ( 0.25 * $        32.13
SECTOR 32.  Pre‐Cast Concrete Products
Large ( 0.25 * $        27.58
ALL
Small ( 0.25 * $        27.58
SECTOR 32A.  Ready Mix Concrete
Large ( 0.25 * $        27.58
ALL
Small ( 0.25 * $        27.58
Total

Page 74

Table 9b

Employer Time and Cost to Notify Employees of Semi‐Annual Monitoring Results
COST = BURDEN HOURS * NON SUPEWAGE
HOURS =  (NOTETIME * NONSUPWAGE * JOBAL * SHIFTS * #SAMPS * 2 * %NOTSEMI * %ABOVEAL * #PLANTS)
Variables 
         * NOTETIME = Time, in hours, to notifiy an employee of the exposure monitoring results by posting .25 hours (15 mintues).

TOTAL HOURS

RESPONSES
5194

( 0.25 * $     26.61 * 1 * 1 *
( 0.25 * $     26.61 * 1 * 2 *

3 * 2 * 100% * 49.00% * 1,662 ) =
3 * 2 * 100% * 11.00% * 426 ) =

$32,513
$3,737

1,222
140

4887
562

( 0.25 * $     26.61 * 1 * 1 *
( 0.25 * $     26.61 * 1 * 2 *

3 * 2 * 100% * 11.00% *
3 * 2 * 100% * 14.00% *

)=
)=

$3,516
$6,484

132
244

529
975

( 0.25 * $     26.61 * 1 * 1 *
( 0.25 * $     26.61 * 1 * 2 *

3 * 2 * 100% * 14.00% * 1,092 ) =
3 * 2 * 100% * 10.00% * 426 ) =

$6,102
$3,397

229
128

917
511

( 0.25 * $     26.61 * 1 * 1 *
( 0.25 * $     26.61 * 1 * 2 *

3 * 2 * 100% * 10.00% *
3 * 2 * 100% * 13.00% *

801
503

)=
)=

$3,196
$5,216

120
196

480
784

( 0.25 * $     26.61 * 1 * 1 *
( 0.25 * $     26.61 * 1 * 2 *

3 * 2 * 100% * 13.00% *
3 * 2 * 100% * 16.00% *

946
883

)=
)=

$4,909
$11,282

184
424

738
1696

( 0.25 * $     26.61 * 1 * 1 *

$10,616

399

1596

( 0.25 * $     26.20 * 1 * 3 *

3 * 2 * 100% * 16.00% * 1,662 ) =
General Industry
2 * 2 * 100% * 0.92% * 3,535 ) =

$2,556

98

390

( 0.25 * $     26.20 * 1 * 1 *
( 0.25 * $     26.20 * 1 * 3 *

3 * 2 * 100% *
2 * 2 * 100% *

0.92%
0.73%

* 3,962 ) =
* 2,593 ) =

$1,432
$1,488

55
57

219
227

( 0.25 * $     26.20 * 1 * 1 *
( 0.25 * $     26.20 * 1 * 3 *

3 * 2 * 100% *
2 * 2 * 100% *

0.73%
0.00%

* 2,905 ) =
* 786 ) =

$834
$0

32
0

127
0

( 0.25 * $     26.20 * 1 * 1 *
( 0.25 * $     26.20 * 0 * 3 *

3 * 2 * 100% *
2 * 2 * 100% *

0.00%
0.00%

*
*

880
314

)=
)=

$0
$0

0
0

0
0

( 0.25 * $     26.20 * 0 * 1 *
( 0.25 * $     26.20 * 1 * 3 *

3 * 2 * 100% *
2 * 2 * 100% *

0.00%
0.00%

*
*

352
78

)=
)=

$0
$0

0
0

0
0

( 0.25 * $     26.20 * 1 * 1 *

3 * 2 * 100% *

0.00%

*

88

)=

$0

0

0

Page 75

#PLANTS

%ABOVEAL

1,298

%NOTSEMI

ITEM 12 COST

SEMI‐ANNUALLY

$34,551

#SAMPS

)=

SHIFTS

3 * 2 * 100% * 49.00% *

JOBAL

( 0.25 * $     26.61 * 1 * 2 *

NOTETIME
Sector 1. Electroplating
Large
Hard Chrome
Small
Large
Job Shop 
Chrome Plater
Small
Large
Captive Shop 
Chrome Plater
Small
Large
Job Shop Plater
Small
Large
Captive Shop 
Plater
Small
Large
Operator
Small
Sector 2. Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small

 NONSUPEWAGE

* NONSUPEWAGE = Non‐supervisory wage rate. $/hr.
                * JOBAL = Number of job categories exposed at or above the AL
                * SHIFTS =  Number of work shifts.
               * #SAMPS =  Number of samples per exposure measurement
                            * 2 = # times per year (semi‐annually)
       * %NOTSEMI = Percent of plants not performing semi‐annual monitoring requirements.
      * %ABOVEAL = Percent of plants that have an employee in at least one job category above the AL.
           * #PLANTS =  Number of plants represented by the model input.
24.17%

883

801
580

TOTAL HOURS

RESPONSES

)=

$0

0

0

Small ( 0.25 * $     26.20 * 1 * 1 *
Large ( 0.25 * $     26.20 * 1 * 3 *

3 * 2 * 100% *
2 * 2 * 100% *

0.00%
0.00%

*
*

88
472

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 1 * 1 *

0.00%

*

529

)=

$0

0

0

Large ( 0.25 * $     26.20 * 1 * 3 *

3 * 2 * 100% *
MARITIME
1 * 2 * 100% *

0.00%

*

17

)=

$0

0

0

Small ( 0.25 * $     26.20 * 1 * 2 *
Large ( 0.25 * $     26.20 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

10
24

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 1 * 2 *
Large ( 0.25 * $     26.20 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

14
6

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 1 * 2 *
Large ( 0.25 * $     26.20 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

3
116

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 1 * 2 *
Large ( 0.25 * $     26.20 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

66
4

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 1 * 2 *
Large ( 0.25 * $     26.20 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

2
2

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 1 * 2 *
Large ( 0.25 * $     26.20 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

1
4

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 1 * 2 *
Large ( 0.25 * $     26.20 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

2
2

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 1 * 2 *
Large ( 0.25 * $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

1
0

)=
)=

$0
$0

0
0

0
0

* $     26.20 * 0 * 2 *
* $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

0
0

)=
)=

$0
$0

0
0

0
0

* $     26.20 * 0 * 2 *
* $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

0
15

)=
)=

$0
$0

0
0

0
0

* $     26.20 * 0 * 2 *

*

9

)=

$0

0

0

Large ( 0.25 * $     26.20 * 1 * 3 *

1 * 2 * 100% * 0.00%
CONSTRUCTION
1 * 2 * 100% * 0.00%

*

201

)=

$0

0

0

Small ( 0.25 * $     26.20 * 1 * 1 *
Large ( 0.25 * $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

* 1,609 ) =
*
3
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 1 * 1 *

1 * 2 * 100% *

0.00%

*

$0

0

0

#PLANTS

%ABOVEAL

78

%NOTSEMI

ITEM 12 COST

Resistance 
Welding

SEMI‐ANNUALLY

*

#SAMPS

0.00%

SHIFTS

2 * 2 * 100% *

JOBAL

Large ( 0.25 * $     26.20 * 1 * 3 *

NOTETIME
Plasma 
Welding

 NONSUPEWAGE

Table 9b

SMAW

GMAW

TIG

FCAW

Plasma Cutting
Plasma 
Welding
Oxy‐fuel 
Cutting
Air Carbon Arc 
Cutting
Electric Torch 
Cutting

Small ( 0.25
Thermal Spray  Large ( 0.25
Tungsten 
Small ( 0.25
Cutting
Large ( 0.25
SAW
Small ( 0.25

SMAW

Plasma Cutting

Page 76

21

)=

TOTAL HOURS

RESPONSES

41

)=

$0

0

0

Small ( 0.25 * $     26.20 * 1 * 1 *
State ( 0.25 * $     26.20 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

322
20

)=
)=

$0
$0

0
0

0
0

Local
State

( 0.25 * $     26.20 * 1 * 1 *
( 0.25 * $     26.20 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

161
4

)=
)=

$0
$0

0
0

0
0

Local

( 0.25 * $     26.20 * 1 * 1 *

*

32

)=

$0

0

0

State

( 0.25 * $     26.20 * 1 * 1 *

1 * 2 * 100% * 0.00%
GOVERNMENT
1 * 2 * 100% * 0.00%

*

19

)=

$0

0

0

Local
State

( 0.25 * $     26.20 * 1 * 1 *
( 0.25 * $     26.20 * 1 * 1 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

590
0

)=
)=

$0
$0

0
0

0
0

Local
State

( 0.25 * $     26.20 * 1 * 1 *
( 0.25 * $     26.20 * 1 * 1 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

8
4

)=
)=

$0
$0

0
0

0
0

Local
State

( 0.25 * $     26.20 * 1 * 1 *
( 0.25 * $     26.20 * 1 * 1 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

118
2

)=
)=

$0
$0

0
0

0
0

Local
State

( 0.25 * $     26.20 * 1 * 1 *
( 0.25 * $     26.20 * 1 * 1 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

59
1

)=
)=

$0
$0

0
0

0
0

*

0.00%

*

12

)=

$0

0

0

*

0.00%

* 4,740 ) =

$0

0

0

*
*

0.00%
0.00%

* 4,826 ) =
* 3,476 ) =

$0
$0

0
0

0
0

*
*

0.00%
0.00%

* 3,539 ) =
* 1,053 ) =

$0
$0

0
0

0
0

*
*

0.00%
0.00%

* 1,073 ) =
* 421 ) =

$0
$0

0
0

0
0

*
*

0.00%
0.00%

*
*

429
105

)=
)=

$0
$0

0
0

0
0

*
*

0.00%
0.00%

*
*

107
105

)=
)=

$0
$0

0
0

0
0

*
*

0.00%
0.00%

*
*

107
632

)=
)=

$0
$0

0
0

0
0

*

0.00%

*

644

)=

$0

0

0

#PLANTS

%NOTSEMI

%ABOVEAL
*

#SAMPS

0.00%

SHIFTS

1 * 2 * 100% *

JOBAL

Large ( 0.25 * $     26.20 * 1 * 3 *

NOTETIME

ITEM 12 COST

SEMI‐ANNUALLY

 NONSUPEWAGE

Table 9b

GMAW

Brazing

Metallizing

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
Local ( 0.25 * $     26.20 * 1 * 1 * 1 * 2 * 100%
Sector 2. Mild Steel Welding                                        GENERAL INDUSTRY
Large ( 0.25 * $     26.20 * 0 * 3 * 2 * 2 * 100%
SMAW
Small ( 0.25 * $     26.20 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $     26.20 * 0 * 3 * 2 * 2 * 100%
GMAW
Small ( 0.25 * $     26.20 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $     26.20 * 0 * 3 * 2 * 2 * 100%
TIG
Small ( 0.25 * $     26.20 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $     26.20 * 0 * 3 * 2 * 2 * 100%
SAW
Small ( 0.25 * $     26.20 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $     26.20 * 0 * 3 * 2 * 2 * 100%
Plasma Cutting
Small ( 0.25 * $     26.20 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $     26.20 * 0 * 3 * 2 * 2 * 100%
Plasma 
Welding
Small ( 0.25 * $     26.20 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $     26.20 * 0 * 3 * 2 * 2 * 100%
Resistance 
Welding
Small ( 0.25 * $     26.20 * 0 * 1 * 3 * 2 * 100%

Page 77

TOTAL HOURS

RESPONSES

)=

$0

0

0

Small ( 0.25 * $     26.20 * 0 * 2 *
Large ( 0.25 * $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

21
53

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 0 * 2 *
Large ( 0.25 * $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

30
13

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 0 * 2 *
Large ( 0.25 * $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

7
249

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 0 * 2 *
Large ( 0.25 * $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

141
8

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 0 * 2 *
Large ( 0.25 * $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

5
3

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 0 * 2 *
Large ( 0.25 * $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

2
8

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 0 * 2 *
Large ( 0.25 * $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

5
3

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 0 * 2 *
Large ( 0.25 * $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

2
1

)=
)=

$0
$0

0
0

0
0

* $     26.20 * 0 * 2 *
* $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

0
1

)=
)=

$0
$0

0
0

0
0

* $     26.20 * 0 * 2 *
* $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

0
33

)=
)=

$0
$0

0
0

0
0

* $     26.20 * 0 * 2 *

1 * 2 * 100% *

0.00%

*

18

)=

$0

0

0

301

#PLANTS

%ABOVEAL

37

%NOTSEMI

*

#SAMPS

0.00%

SHIFTS

MARITIME
1 * 2 * 100% *

JOBAL

Large ( 0.25 * $     26.20 * 0 * 3 *

NOTETIME

ITEM 12 COST

SEMI‐ANNUALLY

 NONSUPEWAGE

Table 9b

SMAW

GMAW

TIG

FCAW

Plasma Cutting
Plasma 
Welding
Oxy‐fuel 
Cutting
Air Carbon Arc 
Cutting
Electric Torch 
Cutting

Small ( 0.25
Thermal Spray  Large ( 0.25
Tungsten 
Cutting
Small ( 0.25
Large ( 0.25
SAW
Small ( 0.25

CONSTRUCTION
Large ( 0.25 * $     26.20 * 0 * 3 *

1 * 2 * 100% *

0.00%

*

)=

$0

0

0

Small ( 0.25 * $     26.20 * 0 * 1 *
Large ( 0.25 * $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

* 2,277 ) =
*
4
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 0 * 1 *
Large ( 0.25 * $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

30
60

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 0 * 1 *
Large ( 0.25 * $     26.20 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

455
30

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     26.20 * 0 * 1 *

1 * 2 * 100% *

0.00%

*

228

)=

$0

0

0

SMAW

Plasma Cutting

GMAW

Brazing

Page 78

TOTAL HOURS

RESPONSES

)=

$0

0

0

* 1*

1 * 2 * 100% *

0.00%

*

45

)=

$0

0

0

* 3*

3 * 2 * 100% * 28.00% *

49

)=

$2,038

62

247

* 1*
* 1*

3 * 2 * 100% *
1 * 2 * 100% *

9.00%
5.00%

*
*

62
326

)=
)=

$275
$270

8
8

33
33

* 1*
* 2*

1 * 2 * 100% *
3 * 2 * 100% *

5.00%
8.00%

* 1,436 ) =
* 100 ) =

$1,187
$791

36
24

144
96

* 1*
* 3*

3 * 2 * 100% * 8.00% *
1 * 2 * 100% * 36.00% *

18
276

)=
)=

$72
$9,839

2
298

9
1190

* 1*
* 3*

1 * 2 * 100% * 36.00% *
1 * 2 * 100% * 22.00% *

476
671

)=
)=

$0
$7,320

0
221

0
886

* 1*
* 3*

1 * 2 * 100% * 22.00% * 3,566 ) =
1 * 2 * 100% * 12.00% * 12 ) =

$12,972
$70

392
2

1569
8

* 1*

1 * 2 * 100% * 12.00% *

647

)=

$1,283

39

155

* 3*

3 * 2 * 100% * 45.00% *

2

)=

$450

12

47

* 1*

3 * 2 * 100% *

*

0

)=

$0

0

0

* 2*

3 * 2 * 100% * 71.00% *

2

)=

$722

19

77

* 1*

3 * 2 * 100% * 50.00% *

1

)=

$25

1

3

* 3*

3 * 2 * 100% * 33.00% *

2

)=

$112

4

14

* 3*

0 * 2 * 100% *

*

0

)=

$0

0

0

* 3*

3 * 2 * 100% * 100.00% *

5

)=

$5,000

129

517

* 1*

3 * 2 * 100% *

*

0

)=

$0

0

0

* 2*

3 * 2 * 100% * 13.00% *

80

)=

$904

31

125

* 2*

3 * 2 * 100% * 13.00% *

126

)=

$1,420

49

197

* 1*

9 * 2 * 100% * 69.00% *

2

)=

$671

23

93

* 1*

5 * 2 * 100% * 69.00% *

8

)=

$829

29

115

* 3 * 3 * 2 * 100% * 51.00% *

81

)=

$11,962

374

1496

Small ( 0.25 * $     31.99 * 2 * 1 * 3 * 2 * 100% * 51.00% *
ALL
SECTOR 11.  Plating Mixture Producers

40

)=

$1,950

61

244

#PLANTS

%ABOVEAL

6

%NOTSEMI

*

#SAMPS

0.00%

SHIFTS

1 * 2 * 100% *

JOBAL

Large ( 0.25 * $     26.20 * 0 * 3 *

NOTETIME

ITEM 12 COST

SEMI‐ANNUALLY

 NONSUPEWAGE

Table 9b

Metallizing
Small ( 0.25 * $     26.20 * 0
SECTOR 3.  PAINTING
Large ( 0.25 * $     33.07 * 1
AEROSPACE
Small ( 0.25 * $     33.07 * 1
General 
Large ( 0.25 * $     33.07 * 1
Industry 
(Autobody) Small ( 0.25 * $     33.07 * 1
General 
Large ( 0.25 * $     33.07 * 1
Industry (Coil 
Small ( 0.25 * $     33.07 * 1
Coating)
Large ( 0.25 * $     33.07 * 2
Maritime
Small ( 0.25 * $     33.07 * 0
Large ( 0.25 * $     33.07 * 1
Construction
Small ( 0.25 * $     33.07 * 1
State ( 0.25 * $     33.07 * 1
Government
Local ( 0.25 * $     33.07 * 1
SECTOR 4.  Producers of Chromates
Large ( 0.25 * $     38.68 * 3
ALL
Small ( 0.25 * $     38.68 * 0
SECTOR 5. Chromate Pigment Procedures
Large ( 0.25 * $     37.70 * 5
ALL
Small ( 0.25 * $     37.70 * 1
SECTOR 6. CCA Producers
Large ( 0.25 * $     31.94 * 1
ALL
Small ( 0.25 * $     31.94 * 0
SECTOR 7.  Chromium Catalyst Producers
Large ( 0.25 * $     38.68 * 6
ALL
Small ( 0.25 * $     38.68 * 0
SECTOR 8.  Paint and Coating Producers
Large ( 0.25 * $     28.81 * 1
ALL
Small ( 0.25 * $     28.81 * 1
SECTOR 9.  Printing Ink Producers
Large ( 0.25 * $     28.86 * 3
ALL
Small ( 0.25 * $     28.86 * 2
SECTOR 10.  Plastic Colorant Producers and Users
Large ( 0.25 * $     31.99 * 2

Page 79

0.00%

0.00%

0.00%

TOTAL HOURS

RESPONSES

8

34

* 1 * 1*

3 * 2 * 100% * 100.00% *

4

)=

$162

6

23

* 2 * 3*

3 * 2 * 100% * 100.00% *

1

)=

$317

8

33

* 0 * 1*

1* 2*

*

0

)=

$0

0

0

* 3 * 3*

3 * 2 * 100% * 38.00% *

34

)=

$6,737

174

694

* 1 * 1*
* 0 * 3*

3 * 2 * 100% * 38.00% *
3 * 2 * 100% * 0.00% *

11
102

)=
)=

$240
$0

6
0

25
0

* 0 * 1*

1 * 2 * 100% *

*

32

)=

$0

0

0

* 4 * 1*

3 * 2 * 100% * 63.00% *

33

)=

$4,870

126

502

* 2 * 1*

3 * 2 * 100% * 63.00% *

31

)=

$2,295

59

237

* 6 * 3*

5 * 2 * 100% * 100.00% *

163

)=

$207,294

7,322

29289

* 5 * 1*

5 * 2 * 100% * 100.00% *

118

)=

$41,878

1,479

5917

* 6 * 1 * 21 * 2 * 100% * 38.00% *

3

)=

$2,436

65

258

* 6 * 1*

7 * 2 * 100% * 38.00% *

1

)=

$271

7

29

* 0 * 1*

3 * 2 * 100% *

*

0

)=

$0

0

0

* 1 * 1*

3 * 2 * 100% * 27.00% *

5

)=

$80

2

8

* 0 * 1*

3 * 2 * 100% *

0.00%

*

216

)=

$0

0

0

* 0 * 1*

3 * 2 * 100% *

0.00%

* 1,627 ) =

$0

0

0

* 0 * 3*

3 * 2 * 100% *

0.00%

*

343

)=

$0

0

0

* 0 * 1*

2 * 2 * 100% *

0.00%

*

697

)=

$0

0

0

* 1 * 3 * 12 * 2 * 100% * 25.00% *

6

)=

$817

28

113

* 0 * 1*

20

)=

$0

0

0

#PLANTS

%ABOVEAL

$243

%NOTSEMI

)=

#SAMPS

6

SHIFTS

3 * 2 * 100% * 100.00% *

JOBAL

Large ( 0.25 * $     28.71 * 1 * 1 *

NOTETIME

ITEM 12 COST

SEMI‐ANNUALLY

 NONSUPEWAGE

Table 9b

ALL
Small ( 0.25 * $     28.71
SECTOR 13.  Chromium Metal Producers
Large ( 0.25 * $     38.80
ALL
Small ( 0.25 * $     38.80
SECTOR 14.  Iron and Steel Mills
Large ( 0.25 * $     38.80
Alloy and 
Stainless Steel
Small ( 0.25 * $     38.80
Large ( 0.25 * $     38.80
Carbon Steel
Small ( 0.25 * $     38.80
SECTOR 14B.  Forging Industry
Large ( 0.25 * $     38.80
Reshaping
Small ( 0.25 * $     38.80
SECTOR 15.  Iron and Steel Foundries
Large ( 0.25 * $     28.31
ALL
Small ( 0.25 * $     28.31
SECTOR 17.  Chromium Dye Producers
Large ( 0.25 * $     37.70
ALL
Small ( 0.25 * $     37.70
SECTOR 18.  Chromium Sulfate Producers
Large ( 0.25 * $     41.50
ALL
Small ( 0.25 * $     41.50
SECTOR 19.  Chemical Distributors
Large ( 0.25 * $     29.92
ALL
Small ( 0.25 * $     29.92
SECTOR 20.  Textile Dyeing
Large ( 0.25 * $     19.97
ALL
Small ( 0.25 * $     19.97
SECTOR 21.  Colored Glass Producers
Large ( 0.25 * $     28.87
General 
Industry
Small ( 0.25 * $     28.87

0% *

4 * 2 * 100% *

Page 80

0.00%

0.00%

0.00%

0.00%

*

RESPONSES

27

108

* 0 * 1*

1 * 2 * 100% *

0.00%

*

5

)=

$0

0

0

* 0 * 3*

2 * 2 * 100% *

0.00%

*

81

)=

$0

0

0

* 0 * 1*

2 * 2 * 100% *

0.00%

*

325

)=

$0

0

0

* 2 * 3*

3 * 2 * 100% *

9.00%

*

1

)=

$26

1

3

* 0 * 1*
* 0 * 3*

3 * 2 * 100% *
3 * 2 * 100% *

0.00%
0.00%

*
*

0
23

)=
)=

$0
$0

0
0

0
0

* 0 * 1*

3 * 2 * 100% *

0.00%

*

4

)=

$0

0

0

* 0 * 1 * 15 * 2 * 100% *

0.00%

*

5

)=

$0

0

0

* 0 * 1*

0 * 2 * 100% *

0.00%

*

0

)=

$0

0

0

* 0 * 1*

2 * 2 * 100% *

0.00%

*

148

)=

$0

0

0

* 0 * 1*
* 0 * 1*

2 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

79
36

)=
)=

$0
$0

0
0

0
0

* 0 * 1*
* 1 * 1*

1 * 2 * 100% * 0.00% * 32 ) =
1 * 2 * 100% * 22.00% * 1,162 ) =

$0
$4,104

0
128

0
511

* 1 * 1*
* 1 * 1*

1 * 2 * 100% * 22.00% * 4,650 ) =
1 * 2 * 100% * 22.00% * 12 ) =

$16,425
$41

512
1

2046
5

* 1 * 1*

1 * 2 * 100% * 22.00% *

#PLANTS

%ABOVEAL

$781

%NOTSEMI

TOTAL HOURS

Small ( 0.25 * $     28.87
SECTOR 22.  Printing
Large ( 0.25 * $     20.85
ALL
Small ( 0.25 * $     20.85
SECTOR 24.  Chromium Catalyst Users
Large ( 0.25 * $     32.51
Catalyst Users
Small ( 0.25 * $     32.51
Chromium  Large ( 0.25 * $     32.51
Catalyst Service 
Small ( 0.25 * $     32.51
Companies
SECTOR 25.  Refractory Brick Producers
Large ( 0.25 * $     25.64
ALL
Small ( 0.25 * $     25.64
SECTOR 26.  Woodworking
Large ( 0.25 * $     32.11
General 
Industry
Small ( 0.25 * $     32.11
Large ( 0.25 * $     32.11
Maritime
Small ( 0.25 * $     32.11
Large ( 0.25 * $     32.11
Construction
Small ( 0.25 * $     32.11
State ( 0.25 * $     32.11
Government
Local ( 0.25 * $     32.11
SECTOR 27.  Solid Waste Incerneration
Large ( 0.25 * $     27.23
General 
Industry
Small ( 0.25 * $     27.23
State ( 0.25 * $     27.23
Government
Local ( 0.25 * $     27.23

SEMI‐ANNUALLY

)=

Large ( 0.25 * $     28.87 * 3 * 1 *

#SAMPS

90

SHIFTS

1 * 2 * 100% * 20.00% *

JOBAL

ITEM 12 COST

Fiber, Flat, 
Container Glass

 NONSUPEWAGE

NOTETIME

Table 9b

42

)=

$149

5

19

* 0 * 3 * 15 * 2 * 100% *

0.00%

*

40

)=

$0

0

0

* 0 * 1 * 3 * 2 * 100% *
* 0 * 3 * 15 * 2 * 100% *

0.00%
0.00%

*
*

48
0

)=
)=

$0
$0

0
0

0
0

* 0 * 1*

0.00%

*

24

)=

$0

0

0

3 * 2 * 100% *

Page 81

TOTAL HOURS

RESPONSES

$0

0

0

3 * 2 * 100% *

0.00%

*

0

)=

$0

0

0

1 * 2 * 100% *

0.00%

*

51

)=

$0

0

0

Industrial  Small ( 0.25 * $     32.13 * 0 * 1 *
Rehabilitation  State ( 0.25 * $     32.13 * 0 * 1 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

233
15

)=
)=

$0
$0

0
0

0
0

Local ( 0.25 * $     32.13 * 0 * 1 *
Large ( 0.25 * $     32.13 * 0 * 1 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

88
40

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     32.13 * 0 * 1 *
State ( 0.25 * $     32.13 * 0 * 1 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

170
1

)=
)=

$0
$0

0
0

0
0

Local ( 0.25 * $     32.13 * 0 * 1 *
Large ( 0.25 * $     32.13 * 0 * 1 *

1 * 2 * 100% * 0.00% *
1 * 2 * 100% * 60.00% *

239
44

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     32.13 * 0 * 1 *

1 * 2 * 100% * 60.00% *

$0
0
$446,607     15,447

0
61,788

Hazardous 
Waste‐site 
Work
Refractory 
Brick 
Restoration

Page 82

#PLANTS

%ABOVEAL

)=

%NOTSEMI

19

SECTOR 30.  Superalloy Producers and Users
Large ( 0.25 * $     27.93 * 0 * 3 *
ALL
Small ( 0.25 * $     27.93 * 0 * 3 *
SECTOR 31.  Construction Cement Workers
Large ( 0.25 * $     32.13 * 0 * 1 *

#SAMPS

*

SHIFTS

0.00%

JOBAL

3 * 2 * 100% *

NOTETIME

ITEM 12 COST

SEMI‐ANNUALLY

 NONSUPEWAGE

Table 9b

175 ) =
75,506

Table 10

Respiratory‐Protection Program:  Qualitative Fit Testing for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2)); 
Employee and Industrial Hygiene Technician Time and Cost to Conduct Qualitative Fit Testing 
This table calculates the burden hours and cost of employee and industrial hygienist time to conduct fit‐testing. The time, in hours, for an employee
to be qualitative fit‐tested is multiplied by the number of employees that require fit ‐testing and by the nonsupervisory wage rate.
COST = BURDEN HOURS * NONSUPEWAGE 
*ASSUMPTIONS:

Item 12 COST

RESPONSES

0.25 ) *

5,341 *

71%

*

1

) =

1,896 * $       26.61 =

$50,450

3,792

Small ( 0.25 +

0.25 ) *

1,164 *

97%

*

1

) =

565 * $       26.61 =

$15,027

1,129

Large ( 0.25 +

0.25 ) *

2,854 *

81%

*

1

) =

1,156 * $       26.20 =

$30,286

2,312

Small ( 0.25 +
Large ( 0.25 +

0.25 ) *
0.25 ) *

2,087 *
2,330 *

98%
55%

*
*

1
1

) =
) =

1,023 * $       26.20 =
641 * $       26.20 =

$26,793
$16,784

2,045
1,281

Small ( 0.25 +
Large ( 0.25 +

0.25 ) *
0.25 ) *

55 *
3,225 *

95%
88%

*
*

1
1

) =
) =

26 * $       26.20 =
1,419 * $       26.20

$685
$37,180

52
2,838

Small ( 0.25 +
State ( 0.25 +

0.25 ) *
0.25 ) *

2,494 *
14 *

99%
88%

*
*

1
1

) =
) =

1,234 * $       26.20 *
6 * $       26.20 *

$32,342
$167

2,469
13

( 0.25 +

0.25 ) *

73 *

99%

*

1

) =

36 * $       26.20 *

$952

73

( 0.25 +

0.25 ) *

691 *

81%

*

1

) =

280 * $       26.20 =

$7,331

560

( 0.25 +
( 0.25 +

0.25 ) *
0.25 ) *

2,087 *
16 *

98%
55%

*
*

1
1

) =
) =

1,023 * $       26.20 =
5 * $       26.20 =

$26,793
$118

2,045
9

( 0.25 +
( 0.25 +

0.25 ) *
0.25 ) *

0*
658 *

95%
88%

*

1
1

) =
)

0 * $       26.20 =
290 $       26.20

$0
$7,585

0
579

( 0.25 +
( 0.25 +

0.25 ) *
0.25 ) *

529 *
14 *

99%
88%

*
*

1
1

) =
) =

262
6

$       26.20 =
$       26.20 =

$6,867
$167

524
13

( 0.25 +

0.25 ) *

73 *

99%

*

1

) =

36

$       26.20 =

$952

73

( 0.25 +

0.25 ) *

45 *

81%

*

49

) =

897 * $       33.07 =

$29,664

1,794

( 0.25 +

0.25 ) *

0*

98%

*

62

) =

4 * $       33.07 =

$127

8

#PLANTS

1‐%FITBASE

Large ( 0.25 +

QLFITTIME

QLFITEMP

 NONSUPEWAG

24.17%

QLFITTECH

BURDEN HOURS

* QLFITTIME = Time, in hours, for an employee to be qualitative fit‐tested
* QLFITTECH = Time, in hours, for a technician to conduct one qualitative fit test
* QLFITEMP ‐ Number of employees requiring annual qualitative fit‐testing
* 1‐%FITBASE  (%FITBASE is the percent of plants conducting annual respirator fit‐testing in the baseline)
* NONSUPEWAGE = Non‐Supervisory wage rate
* #PLANTS = Number of plants represented by the model input

Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
Local
Sector 2A. Mild Steel Welding
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small
Large
CONSTRUCTION
Small
State
GOVERNMENT
Local
SECTOR 3.  Painting
Large
GENERAL INDUSTRY 
(AEROSPACE)
Small

Page 83

Item 12 COST

RESPONSES

 NONSUPEWAG

1*

81%

*

) =

120 * $       33.07 =

$3,955

239

Small ( 0.25 +
Large ( 0.25 +

0.25 ) *
0.25 ) *

0*
2*

98%
81%

* 1,436 ) =
* 100 ) =

147 * $       33.07 =
73 * $       33.07 =

$4,846
$2,417

293
146

Small ( 0.25 +
Large ( 0.25 +

0.25 ) *
0.25 ) *

1 * 98% *
3 * 55.00% *

Small ( 0.25 +
Large ( 0.25 +

0.25 ) *
0.25 ) *

1*
413 *

95%
0%

Small ( 0.25 +
State ( 0.25 +

0.25 ) *
0.25 ) *

520 *
31 *

*

#PLANTS

QLFITEMP

1‐%FITBASE

0.25 ) *

QLFITTECH

Large ( 0.25 +

QLFITTIME
GENERAL INDUSTRY 
(AUTO BODY REPAIR)

BURDEN HOURS

Table 10

326

COIL COATING
18
276

) =
) =

8 * $       33.07 =
206 * $       33.07 =

$266
$6,816

16
412

*
*

476
1

) =
) =

214 * $       33.07 =
0 * $       33.07 =

$7,063
$0

427
0

0%
0%

*
*

1
1

) =
) =

0 * $       33.07 =
0 * $       33.07 =

$0
$0

0
0

133 *

0%

*

1

) =

0 * $       33.07 =

$0

0

*

7*

37%

*

2

) =

2 * $       38.68 =

$92

5

*

0*

93%

*

0

) =

0 * $       38.68 =

$0

0

*              8 *

37%

*

2

) =

3 * $       37.70 =

$102

5

*              1 *

93%

*

1

) =

0 * $       37.70 =

$14

1

*

2*

37%

*

2

) =

1 * $       31.94 =

$33

2

*

0*

93%

*

0

) =

0 * $       31.94 =

$0

0

*

11 *

37%

*

5

) =

10 * $       38.68 =

$394

20

*

0*

93%

*

0

) =

0 * $       38.68 =

$0

0

*

1*

37%

*

80

) =

14 * $       28.81 =

$410

28

*

0*

93%

*

126

) =

0 * $       28.81 =

$0

0

*            10 *

37%

*

2

) =

5 * $       28.86 =

$133

9

*              2 *

93%

*

8

) =

10 * $       28.86 =

$279

19

*

342 *

54%

*

1

) =

92 * $       31.99 =

$2,952

185

*

35 *

95%

*

1

) =

16 * $       31.99 =

$525

33

*

3*

37%

*

6

) =

3 * $       28.71 =

$85

6

*

1*

93%

*

4

) =

2 * $       28.71 =

$47

3

MARITIME

CONSTRUCTION

Local ( 0.25 + 0.25 )
SECTOR 4.  Producers of Chromates
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 5. Chromate Pigment Procedures
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 6. CCA Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 7.  Chromium Catalyst Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 8.  Paint and Coating Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 9.  Printing Ink Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 10.  Plastic Colorant Producers and Users
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 11.  Plating Mixture Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )

Page 84

RESPONSES

56%

*

1

) =

2 * $       38.80 =

$72

4

0.25 ) *

0*

95%

*

0

) =

0 * $       38.80 =

$0

0

0.25 ) *

27 *

56%

*

34

) =

254 * $       38.80 =

$9,861

508

0.25 ) *
0.25 ) *

1*
1*

95%
56%

*
*

11
102

) =
) =

7 * $       38.80 =
18 * $       38.80 =

$256
$704

13
36

0.25 ) *

1*

95%

*

32

) =

19 * $       38.80 =

$751

39

Large ( 0.25 +

0.25 ) *

3*

56%

*

33

) =

24 * $       38.80 =

$921

47

Small ( 0.25 +
SECTOR 15.  Iron and Steel Foundries
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 17.  Chromium Dye Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 18.  Chromium Sulfate Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 19.  Chemical Distributors
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 20.  Textile Dyeing
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 21.  Colored Glass Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
Large ( 0.25 +
FIBER, FLAT, AND 
CONTAINER GLASS
Small ( 0.25 +
SECTOR 22.  Printing
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 24.  Chromium Catalyst Users
Large ( 0.25 +
Chromium Catalyst 
Users
Small ( 0.25 +

0.25 ) *

1*

95%

*

31

) =

9 * $       38.80 =

$368

19

0.25 ) *            17 *

56%

*

163

) =

786 * $       28.31 =

$22,259

1,573

0.25 ) *              4 *

95%

*

118

) =

231 * $       28.31 =

$6,539

462

0.25 ) *            29 *

37%

*

3

) =

14 * $       37.70 =

$542

29

0.25 ) *              7 *

93%

*

1

) =

3 * $       37.70 =

$109

6

0.25 ) *

0*

37%

*

0

) =

0 * $       41.50 =

$0

0

0.25 ) *

0*

93%

*

5

) =

0 * $       41.50 =

$0

0

0.25 ) *

0*

92%

*

216

) =

0 * $       29.92 =

$0

0

0.25 ) *

0*

99%

* 1,627 ) =

0 * $       29.92 =

$0

0

0.25 ) *

0*

89%

*

343

) =

0 * $       19.97 =

$0

0

0.25 ) *

0*

99%

*

697

) =

0 * $       19.97 =

$0

0

0.25 ) *

1*

76%

*

6

) =

3 * $       28.87 =

$72

5

0.25 ) *
0.25 ) *

0*
9*

97%
76%

*
*

20
90

) =
) =

0 * $       28.87 =
323 * $       28.87 =

$0
$9,329

0
646

0.25 ) *

2*

97%

*

5

) =

5 * $       28.87 =

$154

11

0.25 ) *

0*

98%

*

81

) =

0 * $       20.85 =

$0

0

0.25 ) *

0 * 99.70% *

325

) =

0 * $       20.85 =

$0

0

0.25 ) *

1*

67%

*

1

) =

0 * $       32.51 =

$12

1

0.25 ) *

0*

97%

*

0

) =

0 * $       32.51 =

$0

0

#PLANTS

QLFITEMP

1‐%FITBASE
7*

SECTOR 13.  Chromium Metal Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 14.  Iron and Steel Mills
Large ( 0.25 +
ALL
Small ( 0.25 +
Large ( 0.25 +
CARBON STEEL
Small ( 0.25 +

QLFITTECH
0.25 ) *

QLFITTIME

Item 12 COST

 NONSUPEWAG

BURDEN HOURS

Table 10

14b. FORGING INDUSTRY

RESHAPING INDUSTRY

Page 85

RESPONSES

0*

0%

*

1

) =

0 * $       32.51 =

$0

0

Small ( 0.25 +
SECTOR 25.  Refractory Brick Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 26.  Woodworking
GENERAL INDUSTRY Large ( 0.25 +

0.25 ) *

0*

0%

*

1

) =

0 * $       32.51 =

$0

0

0.25 ) *

0*

76%

*

5

) =

0 * $       25.64 =

$0

0

0.25 ) *

0*

97%

*

0

) =

0 * $       25.64 =

$0

0

0.25 ) *

0*

94%

*

1

) =

0 * $       32.11 =

$0

0

Small ( 0.25 +
Large ( 0.25 +

0.25 ) *
0.25 ) *

0*
0*

99%
55%

*

1
36

) =
) =

0 * $       32.11 =
0 * $       32.11 =

$0
$0

0

MARITIME

CONSTRUCTION

Small ( 0.25 +
Large ( 0.25 +

0.25 ) *
0.25 ) *

0*
0*

95%
88%

32
1

) =
) =

0 * $       32.11 =
0 * $       32.11 =

$0
$0

0

Small ( 0.25 +
State ( 0.25 +

0.25 ) *
0.25 ) *

0*
0*

99%
88%

*
*

1
1

) =
) =

0 * $       32.11 =
0 * $       32.11 =

$0
$0

0
0

) *

0*

88%

*

1

) =

0 * $       32.11 =

$0

0

) *

5*

59%

*

40

) =

60 * $       27.23 =

$1,622

119

) *
) *

1*
0*

96%
59%

*
*

48
0

) =
) =

17 * $       27.23 =
0 * $       27.23 =

$452
$0

33

) *

0*

96%

*

24

) =

0 * $       27.23 =

$0

0

) *

0*

56%

*

19

) =

0 * $       27.93 =

$0

0

) *

0*

95%

*

0

) =

0 * $       27.93 =

$0

0

) *

0*

88%

*

51

) =

0 * $       32.13 =

$0

0

INDUSTRIAL 
Small ( 0.25 +
REHABILITATION AND 
State ( 0.25 +
MAINTENANCE

0.25 ) *
0.25 ) *

0*
0*

99%
88%

*
*

233
15

) =
) =

0 * $       32.13 =
0 * $       32.13 =

$0
$0

0
0

Local ( 0.25 +
Large ( 0.25 +

0.25 ) *
0.25 ) *

0*
0*

88%
88%

*
*

88
1

) =
) =

0 * $       32.13 =
0 * $       32.13 =

$0
$0

0
0

HAZARDOUS WASTE‐ Small ( 0.25 +
SITE WORK
State ( 0.25 +

0.25 ) *
0.25 ) *

0*
0*

99%
88%

*
*

1
1

) =
) =

0 * $       32.13 =
0 * $       32.13 =

$0
$0

0
0

Local ( 0.25 +
Large ( 0.25 +

0.25 ) *
0.25 ) *

0*
0*

88%
88%

*
*

1
44

) =
) =

0 * $       32.13 =
0 * $       32.13 =

$0
$0

0
0

Small ( 0.25 +

0.25 ) *

0*

99%
Total

*

175 ) =
7,772

0 * $       32.13 =
13,506

$0
$374,725

0
27,011

#PLANTS

QLFITEMP

1‐%FITBASE

0.25 ) *

Catalyst Service 
Companies

QLFITTECH

Large ( 0.25 +

QLFITTIME

Item 12 COST

 NONSUPEWAG

BURDEN HOURS

Table 10

 GOVERNMENT
Local ( 0.25 + 0.25
SECTOR 27.  Solid Waste Incineration
Large ( 0.25 + 0.25
ALL
Small ( 0.25 + 0.25
State ( 0.25 + 0.25
 GOVERNMENT
Local ( 0.25 + 0.25
SECTOR 30.  Superalloy Producers and Users
Large ( 0.25 + 0.25
ALL
Small ( 0.25 + 0.25
SECTOR 31.  Construction
Large ( 0.25 + 0.25

REFRACTORY BRICK 
RESTORATION 

Page 86

Table 11
Respiratory‐Protection Program: Cost of Materials for Qualitative Fit Testing 
This table calculates the contract cost  of the materials used for qualitative fit‐testing by multiplying the number of 
employees  who require qualitative fit‐testing by the cost of materials per fit‐test.
COST = ((QLFITMTRLS * QLFITEMP) * 1‐%FITBASE * #PLANTS)

#PLANTS

 Item 13 Cost 

71%

*

1

= $                 340

Small ( $    0.09 * 1,164 ) *

97%

*

1

= $                 101

Large ( $    0.09 * 2,854 ) *

81%

*

1

= $                 208

Small ( $    0.09 * 2,087 ) *
Large ( $    0.09 * 2,330 ) *

98%
55%

*
*

1
1

= $                 184
= $                 115

55 ) *
Small ( $    0.09 *
Large ( $    0.09 * 3,225 ) *

95%
88%

*
*

1
1

= $                     5
= $                 255

Small ( $    0.09 * 2,494 ) *
14 ) *
State ( $    0.09

99%
88%

*
*

1
1

= $                 222
= $                     1

Local ( $    0.09

73

) *

99%

*

1

= $                     7

Large ( $    0.09 *

691

) *

81%

*

1

= $                   50

Small ( $    0.09 * 2,087 ) *
16 ) *
Large ( $    0.09 *

98%
55%

*
*

1
1

= $                 184
= $                     1

Small ( $    0.09 *
Large ( $    0.09 *

0
658

) *
) *

95%
88%

*
*

1
1

=
0
= $                   52

Small ( $    0.09 *
State ( $    0.09 *

529
15

) *
*

99%
88%

*
*

1
1

= $                   47
= $                     1

Local ( $    0.09 *

74

*

99%

*

1

= $                     7

Large ( $    0.09 *

45

) *

81%

*

49

= $                 161

Small ( $    0.09 *
Large ( $    0.09 *

0
1

) *
) *

98%
81%

*
*

62
326

= $                     1
= $                   21

Small ( $    0.09 *

0

) *

98%

*

1,436

= $                   26

QLFITEMP

1‐%FITBASE

Large ( $    0.09 * 5,341 ) *

 QLFITMTRLS 

Variables

* QLFITMTRLS = Cost of materials per qualitative fit‐testing
* QLFITEMP ‐ Number of employees requiring annual qualitative fit‐testing
* 1‐%FITBASE  (%FITBASE is the percent of plants conducting annual respirator fit‐testing in the baseline)
* #PLANTS = Number of plants represented by the model input

Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
Sector 2A. Mild Steel Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
SECTOR 3.  PAINTING
GENERAL INDUSTRY (AEROSPACE)

GENERAL INDUSTRY (AUTO BODY REPAIR)

Page 87

 Item 13 Cost 

2

) *

*

100

= $                   13

Small ( $    0.09 *
Large ( $    0.09 *

1
1

) *
98%
*
) * 55.00% *

18
276

= $                     1
= $                   13

Small ( $    0.09 *
Large ( $    0.09 *

0
413

) *
) *

95%
0.00%

*
*

476
1

= $                   13
=
0

Small ( $    0.09 *
State ( $    0.09 *

520
31

) *
) *

0.00%
0.00%

*
*

1
1

=
=

0
0

Local ( $     0.09 *

133

) *

0.00%

*

1

=

0

Large ( $    0.09 *

7

) *

37%

*

2

= $                0.43

Small ( $    0.09 *

0

) *

93%

*

0

=

Large ( $    0.09 *

8

) *

37%

*

2

= $                     0

Small ( $    0.09 *

1

) *

93%

*

1

= $                     0

Large ( $    0.09 *

4

) *

37%

*

2

= $                0.31

Small ( $    0.09 *

0

) *

93%

*

0

=

Large ( $    0.09 *

11

) *

37%

*

5

= $                     2

Small ( $    0.09 *

0

) *

93%

*

0

=

Large ( $    0.09 *

1

) *

37%

*

80

= $                     3

Small ( $    0.09 *

0

) *

93%

*

126

=

Large ( $    0.09 *

10

) *

37%

*

2

= $                     1

( $    0.09 *

2

) *

93%

*

8

= $                     2

( $    0.09 *

342

) *

54%

*

1

= $                   17

( $    0.09 *

35

) *

95%

*

1

= $                     3

( $    0.09 *

3

) *

37%

*

6

= $                0.53

( $    0.09 *

1

) *

93%

*

4

= $                0.30

QLFITEMP

1‐%FITBASE

Large ( $    0.09 *

 QLFITMTRLS 

#PLANTS

Variables

Table 11

81%

COIL COATING

MARITIME

CONSTRUCTION

SECTOR 4.  Producers of Chromates
ALL
0

SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
0

SECTOR 7.  Chromium Catalyst Producers
ALL
0

SECTOR 8.  Paint and Coating Producers
ALL
0

SECTOR 9.  Printing Ink Producers
ALL
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small

Page 88

#PLANTS

 Item 13 Cost 

7

) *

56%

*

1

= $                0.33

Small ( $    0.09 *

0

) *

95%

*

0

=

Large ( $    0.09 *

27

) *

56%

*

34

= $                   46

Small ( $    0.09 *
Large ( $    0.09 *

1
1

) *
) *

95%
56%

*
*

11
102

= $                     1
= $                     3

Small ( $    0.09 *

1

) *

95%

*

32

= $                     3

Large ( $    0.09 *

3

) *

56%

*

33

= $                     4

Small ( $    0.09 *

1

) *

95%

*

31

= $                     2

Large ( $    0.09 *

17

) *

56%

*

163

= $                 141

Small ( $    0.09 *

4

) *

95%

*

118

= $                   41

Large ( $    0.09 *

29

) *

37%

*

3

= $                     3

Small ( $    0.09 *

7

) *

93%

*

1

= $                0.52

Large ( $    0.09 *

0

) *

37%

*

0

=

Small ( $    0.09 *

1

) *

93%

*

5

= $                0.38

Large ( $    0.09 *

0

) *

92%

*

216

=

0

Small ( $    0.09 *

0

) *

99%

*

1,627

=

0

Large ( $    0.09 *

0

) *

89%

*

343

=

0

Small ( $    0.09 *

0

) *

99%

*

697

=

0

Large ( $    0.09 *

1

) *

76%

*

6

= $                0.45

Small ( $    0.09 *
Large ( $    0.09 *

0
9

) *
) *

97%
76%

*
*

20
90

=
0
= $             58.01

Small ( $    0.09 *

2

) *

97%

*

5

= $                     1

Large ( $    0.09 *

0

) *

98%

*

81

=

0

Small ( $    0.09 *

0

) * 99.70% *

325

=

0

QLFITEMP

1‐%FITBASE

Large ( $    0.09 *

 QLFITMTRLS 

Variables

Table 11

SECTOR 13.  Chromium Metal Producers
ALL
0

SECTOR 14.  Iron and Steel Mills
ALLOY AND STAINLESS STEEL

Carbon Steel
14b. FORGING INDUSTRY

RESHAPING INDUSTRY
SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL
SECTOR 18.  Chromium Sulfate Producers
0

ALL
SECTOR 19.  Chemical Distributors
ALL
SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
ALL

Fiber, Flat and Container Glass
SECTOR 22.  Printing
ALL

Page 89

#PLANTS

 Item 13 Cost 

1

) *

67%

*

1

= $                0.07

Small ( $    0.09 *
Large ( $    0.09 *

0
1

) *
) *

97%
67%

*
*

0
1

=
0
= $                0.07

Small ( $    0.09 *

1

) *

97%

*

1

=

0.095541157

Large ( $    0.09 *

0

) *

76%

*

5

=

0

Small ( $    0.09 *

0

) *

97%

*

0

=

0

Large ( $    0.09 *

0

) *

94%

*

1

=

0

Small ( $    0.09 *
Large ( $    0.09 *

0
0

) *
) *

99%
55%

*
*

1
36

=
=

0
0

Small ( $    0.09 *
Large ( $    0.09 *

0
0

) *
) *

95%
88%

*
*

32
1

=
=

0
0

Small ( $    0.09 *
State ( $    0.09 *

0
0

) *
) *

99%
88%

*
*

1
1

=
=

0
0

Local ( $    0.09 *

0

) *

88%

*

1

=

0

Large ( $    0.09 *

5

) *

59%

*

40

= $                   11

Small ( $    0.09 *
State ( $    0.09 *

1
0

) *
) *

96%
59%

*
*

48
0

= $                     3
=
0

Local ( $     0.09 *

0

) *

96%

*

24

=

0

Large ( $     0.09 +

0

) *

56%

*

19

=

0

Small ( $     0.09 +

0

) *

95%

*

0

=

0

Large ( $    0.09 *

0

) *

88%

*

51

=

0

Small ( $    0.09 *
State ( $    0.09 *

0
0

) *
) *

99%
88%

*
*

233
15

=
=

0
0

Local ( $    0.09 *
Large ( $    0.09 *

0
0

) *
) *

88%
88%

*
*

88
1

=
=

0
0

Small ( $    0.09 *
State ( $    0.09 *

0
0

) *
) *

99%
88%

*
*

1
1

=
=

0
0

Local ( $    0.09 *

0

) *

88%

*

1

=

0

QLFITEMP

1‐%FITBASE

Large ( $    0.09 *

 QLFITMTRLS 

Variables

Table 11

SECTOR 24.  Chromium Catalyst Users
CHROMIUM CATALYST USERS

CHROMIUM CATALYST COMPANIES
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
SECTOR 27.  Solid Waste Incineration
ALL

 GOVERNMENT
SECTOR 30.  Superalloy Producers and Users
ALL
SECTOR 31.  Construction

INDUSTRIAL REHABILITATION AND 
MAINTENANCE

HAZARDOUS WASTE‐SITE WORK

Page 90

 Item 13 Cost 

#PLANTS

1‐%FITBASE

QLFITEMP

 QLFITMTRLS 

Variables

Table 11

Large ( $    0.09 *

0

) *

88%

*

44

=

0

Small ( $    0.09 *

0

) *

99%
Total

*

175
=
7,772

0
$             2,376

REFRACTORY BRICK RESTORATION

Page 91

Table 12

Respirator Protection Program: Quantitative Fit Testing for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2)); 
Employee Time and Cost to Conduct Quantitative Fit Testing 
This table calculates the burden hour and cost of employee time to be fit‐tested. The time, in hours, for an employee to be quantitative fit‐tested is 
multiplied by the number of employees that require fit ‐testing and by the nonsupervisory wage rate.
BURDEN HOURS = (QNFITTIME + QNFITTEMP) * 1‐%FITBASE * #PLANTS
COST = BURDEN HOURS * NONSUPWAGE 
* QNFITTIME = Time, in hours, for an employee to be quantitative fit‐tested
* QNFITTEMP = Number of employees requiring annual quantitative fit‐testing
* 1‐%FITBASE  (%FITBASE is the percent of plants conducting annual respirator fit‐testing in the baseline)
* #PLANTS = Number of plants represented by the model input
* NONSUPEWAGE = Non‐Supervisory wage rate

Item 12 COST

Responses

 NONSUPEWAGE

QNFITEMP

Large

(

0.5 *

0

) *

71%

*

1

) =

0 * $  26.61 =

$0

0

Small

(

0.5 *

0

) *

97%

*

1

) =

0 * $  26.61 =

$0

0

Large

(

0.5 *

0

) *

81%

*

1

) =

0 * $  26.20 =

$0

0

Small
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

98%
55%

*
*

1
1

) =
) =

0 * $  26.20 =
0 * $  26.20 =

$0
$0

0
0

Small
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

95%
88%

*

1
1

) =
) =

0 * $  26.20 =
0 * $  26.20 =

$0
$0

0
0

Small
State 

(
(

0.5 *
0.5 *

0
0

) *
) *

99%
88%

1
1

) =
) =

0 * $  26.20 =
0 * $  26.20 =

$0
$0

0
0

Local

(

0.5 *

0

) *

99%

1

) =

0 * $  26.20 =

$0

0

Large

(

0.5 *

0

) *

81%

*

1

) =

0 * $  26.20 =

$0

0

Small
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

98%
55%

*

1
1

) =
) =

0 * $  26.20 =
0 * $  26.20 =

$0
$0

0
0

Small
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

95%
82%

1
1

) =
) =

0 * $  26.20 =
0 * $  26.20 =

$0
$0

0
0

Small

(

0.5 *

0

) *

99%

1

) =

0 * $  26.20 =

$0

0

Large

(

0.5 *

0

) *

81%

*

49

) =

0 * $  33.07 =

$0

0

Small
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

98%
81%

*
*

62
326

) =
) =

0 * $  33.07 =
0 * $  33.07 =

$0
$0

0
0

Small
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

98%
81%

*
*

1,436
100

) =
) =

0 * $  33.07 =
0 * $  33.07 =

$0
$0

0
0

Small
Large

(
(

0.5 *
0.5 *

0
0

) * 98% *
) * 55.00%

18
276

) =
) =

0 * $  33.07 =
0 * $  33.07 =

$0
$0

0
0

#PLANTS

1‐%FITBASE

QNFITTIME

BURDEN HOURS  

24.17%

Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION
SECTOR 3.  PAINTING
GENERAL INDUSTRY AEROSPACE
GENERAL INDUSTRY AUTOBODY 
REPAIR
COIL COATING

MARITIME

Page 92

QNFITEMP

1‐%FITBASE

#PLANTS

Item 12 COST

Responses

 NONSUPEWAGE

QNFITTIME

BURDEN HOURS  

Table 12

Small
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

95%
0%

476
1

) =
) =

0 * $  33.07 =
0 * $  33.07 =

$0
$0

0
0

Small
State 

(
(

0.5 *
0.5 *

0
0

) *
) *

0%
0%

1
1

) =
) =

0 * $  33.07 =
0 * $  33.07 =

$0
$0

0
0

Local

(

0.5 *

0

) *

0%

1

) =

0 * $  33.07 =

$0

0

Large

(

0.5 *

0

) *

37%

*

2

) =

0 * $  38.68 =

$0

0

(
Small
SECTOR 5. Chromate Pigment Procedures
Large
(
ALL
(
Small
SECTOR 6. CCA Producers
Large
(
ALL
(
Small
SECTOR 7.  Chromium Catalyst Producers
Large
(
ALL
(
Small
SECTOR 8.  Paint and Coating Producers
Large
(
ALL
(
Small
SECTOR 9.  Printing Ink Producers
Large
(
ALL
(
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
(
ALL
(
Small
SECTOR 11.  Plating Mixture Producers
Large
(
ALL
(
Small
SECTOR 13.  Chromium Metal Producers
Large
(
ALL
(
Small
SECTOR 14.  Iron and Steel Mills
Large
(
ALLOY AND STAINLESS STEEL
(
Small
Large
(
CARBON STEEL
(
Small
14b. FORGING INDUSTRY
Large
(
RESHAPING INDUSTRY

0.5 *

0

) *

93%

*

0

) =

0 * $  38.68 =

$0

0

0.5 *

0

) *

37%

*

2

) =

0 * $  37.70 =

$0

0

0.5 *

0

) *

93%

*

1

) =

0 * $  37.70 =

$0

0

0.5 *

0

) *

37%

*

2

) =

0 * $  31.94 =

$0

0

0.5 *

0

) *

93%

*

0

) =

0 * $  31.94 =

$0

0

0.5 *

0

) *

37%

*

5

) =

0 * $  38.68 =

$0

0

0.5 *

0

) *

93%

*

0

) =

0 * $  38.68 =

$0

0

0.5 *

0

) *

37%

*

80

) =

0 * $  28.81 =

$0

0

0.5 *

0

) *

93%

*

126

) =

0 * $  28.81 =

$0

0

0.5 *

0

) *

37%

*

2

) =

0 * $  28.86 =

$0

0

0.5 *
*
0.5 *

0

) *

93%

*

8

) =

0 * $  28.86 =

$0

0

0

) *

54%

*

1

) =

0 * $  31.99 =

$0

0

0.5 *

0

) *

95%

*

1

) =

0 * $  31.99 =

$0

0

0.5 *

0

) *

37%

*

6

) =

0 * $  28.71 =

$0

0

0.5 *

0

) *

93%

*

4

) =

0 * $  28.71 =

$0

0

0.5 *

0

) *

56%

*

1

) =

0 * $  38.80 =

$0

0

0.5 *

0

) *

95%

*

0

) =

0 * $  38.80 =

$0

0

0.5 *

0

) *

56%

*

34

) =

0 * $  38.80 =

$0

0

0.5 *
0.5 *

0
0

) *
) *

95%
56%

*
*

11
102

) =
) =

0 * $  38.80 =
0 * $  38.80 =

$0
$0

0
0

0.5 *

0

) *

95%

*

32

) =

0 * $  38.80 =

$0

0

0.5 *

0

) *

56%

*

33

) =

0 * $  38.80 =

$0

0

CONSTRUCTION

GOVERNMENT
SECTOR 4.  Producers of Chromates
ALL

Page 93

Item 12 COST

Responses

 NONSUPEWAGE

QNFITEMP

Small

(

0.5 *

0

) *

95%

*

31

) =

0 * $  38.80 =

$0

0

Large

(

0.5 *

0

) *

56%

*

163

) =

0 * $  28.31 =

$0

0

Small

(

0.5 *

0

) *

95%

*

118

) =

0 * $  28.31 =

$0

0

Large

(

0.5 *

0

) *

37%

*

3

) =

0 * $  37.70 =

$0

0

Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
ALL
Small
Large
Carbon, Flat, and Container Glass
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
Chromium Catalyst Users
Small
Large
Chromium Catalyst Companies
Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small
Large
CONSTRUCTION
Small

(

0.5 *

0

) *

93%

*

1

) =

0 * $  37.70 =

$0

0

(

0.5 *

0

) *

37%

*

0

) =

0 * $  41.50 =

$0

0

(

0.5 *

0

) *

93%

*

5

) =

0 * $  41.50 =

$0

0

(

0.5 *

0

) *

92%

*

216

) =

0 * $  29.92 =

$0

0

(

0.5 *

0

) *

99%

*

1,627

) =

0 * $  29.92 =

$0

0

(

0.5 *

0

) *

89%

*

343

) =

0 * $  19.97 =

$0

0

(

0.5 *

0

) *

99%

*

697

) =

0 * $  19.97 =

$0

0

(

0.5 *

0

) *

76%

*

6

) =

0 * $  28.87 =

$0

0

(
(

0.5 *
0.5 *

0
0

) *
) *

97%
76%

*
*

20
90

) =
) =

0 * $  28.87 =
0 * $  28.87 =

$0
$0

0
0

(

0.5 *

0

) *

97%

*

5

) =

0 * $  28.87 =

$0

0

(

0.5 *

0

) *

98%

*

81

) =

0 * $  20.85 =

$0

0

(

0.5 *

0

) * 99.70% *

325

) =

0 * $  20.85 =

$0

0

(

0.5 *

0

) *

67%

*

1

) =

0 * $  32.51 =

$0

0

(
(

0.5 *
0.5 *

0
119

) *
) *

97%
67%

*
*

0
1

) =
) =

0 * $  32.51 =
40 * $  32.51 =

$0
$1,291

0
79

(

0.5 *

11

) *

97%

*

1

) =

5 * $  32.51 =

$173

11

(

0.5 *

0

) *

76%

*

5

) =

0 * $  25.64 =

$0

0

(

0.5 *

0

) *

97%

*

0

) =

0 * $  25.64 =

$0

0

(

0.5 *

0

) *

94%

*

1

) =

0 * $  32.11 =

$0

0

(
(

0.5 *
0.5 *

0
0

) *
) *

99%
55%

*
*

1
36

) =
) =

0 * $  32.11 =
0 * $  32.11 =

$0
$0

0
0

(
(

0.5 *
0.5 *

0
0

) *
) *

95%
88%

*
*

32
1

) =
) =

0 * $  32.11 =
0 * $  32.11 =

$0
$0

0
0

(

0.5 *

0

) *

99%

*

1

) =

0 * $  32.11 =

$0

0

#PLANTS

1‐%FITBASE

QNFITTIME

BURDEN HOURS  

Table 12

SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL

Page 94

Item 12 COST

Responses

 NONSUPEWAGE

QNFITEMP

State 

(

0.5 *

0

) *

88%

*

1

) =

0 * $  32.11 =

$0

0

Local

(

0.5 *

0

) *

88%

*

1

) =

0 * $  32.11 =

$0

0

Large

(

0.5 *

0

) *

59%

*

40

) =

0 * $  27.23 =

$0

0

Small
State 

(
(

0.5 *
0.5 *

0
0

) *
) *

96%
59%

*
*

48
0

) =
) =

0 * $  27.23 =
0 * $  27.23 =

$0
$0

0
0

Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

(

0.5 *

0

) *

96%

*

24

) =

0 * $  27.23 =

$0

0

(

0.5 *

0

) *

56%

*

19

) =

0 * $  27.93 =

$0

0

(

0.5 *

0

) *

95%

*

0

) =

0 * $  27.93 =

$0

0

(

0.5 *

0

) *

88%

*

51

) =

0 * $  32.13 =

$0

0

Small
State

(
(

0.5 *
0.5 *

0
0

) *
) *

99%
88%

*
*

233
15

) =
) =

0 * $  32.13 =
0 * $  32.13 =

$0
$0

0
0

Local
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

88%
88%

*
*

88
1

) =
) =

0 * $  32.13 =
0 * $  32.13 =

$0
$0

0
0

Small
State

(
(

0.5 *
0.5 *

0
0

) *
) *

99%
88%

*
*

1
1

) =
) =

0 * $  32.13 =
0 * $  32.13 =

$0
$0

0
0

Local
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

88%
88%

*
*

1
44

) =
) =

0 * $  32.13 =
0 * $  32.13 =

$0
$0

0
0

Small

(

0.5 *

0

) *

99%
Total

*

175
) =
7,770

0 * $  32.13 =
45

$0
$1,464

0
90

#PLANTS

1‐%FITBASE

QNFITTIME

BURDEN HOURS  

Table 12

GOVERNMENT
SECTOR 27.  Solid Waste Incineration
ALL

GOVERNMENT

INDUSTRIAL REHABILITATION AND 
MAINTENANCE

HAZARDOUS WASTE‐SITE WORK

REFRACTORY BRICK RESTORATION 

Page 95

Table 13

Respiratory Protection Program: Contract Cost for an Industrial Hygienist to Conduct  Quantitative Fit Testing for Respirators
This table calculates the contract cost  for the industrial hygiene technician to conduct quantitative fit‐testing.
COST = ((QNFITCOST * QNFITEMP) * 1‐%FITBASE * #PLANTS)

Item 13 COST

#PLANTS

1‐%FITBASE

QNFITEMP

QNFITCOST

Variables

* QNFITCOST = $38.00 hourly cost for a industrial hygiene technician * # of hours
* QNFITTEMP = # Employees requiring annual quantitative fit‐test
* 1‐%FITBASE = Percent of plants not conducting fit‐testing (%FITBASE is the percent of plants conducting annual respirator fit‐testing in 
the baseline)
* #PLANTS = Number of plants represented by the model input

Sector 1. Electroplating
Large

(

$0

*

0

*

71%

*

1

) = $                   ‐

Small

(

$0

*

0

*

97%

*

1

) = $                   ‐

Large

(

$77

*

0

*

81%

*

1

) = $                   ‐

Small
Large

(
(

$77
$0

*
*

0
0

*
*

98%
55%

*
*

1
1

) = $                   ‐
) = $                   ‐

Small
Large

(
(

$0
$0

*
*

0
0

*
*

95%
88%

*
*

1
1

) = $                   ‐
) = $                   ‐

Small
State

(
(

$0
$0

*
*

0
0

*
*

99%
88%

*
*

1
1

) = $                   ‐
) = $                   ‐

Local

(

$0

*

0

*

99%

*

1

) = $                   ‐

Large

(

$77

*

0

*

81%

*

1

) = $                   ‐

MARITIME

Small
Large

(
(

$77
$0

*
*

0
0

*
*

98%
81%

*
*

1
1

) = $                   ‐
) = $                   ‐

CONSTRUCTION

Small
Large

(
(

$0
$0

*
*

0
0

*
*

98%
81%

*
*

1
1

) = $                   ‐
) = $                   ‐

Small

(

$0

*

0

*

98%

*

1

) = $                   ‐

Large

(

$0

*

0

*

81%

*

49

) = $                   ‐

Small
Large

(
(

$0
$0

*
*

0
0

*
*

98%
81%

*
*

62
326

) = $                   ‐
) = $                   ‐

Small
Large

(
(

$0
$0

*
*

0
0

*
*

98%
81%

*
*

1,436
100

) = $                   ‐
) = $                   ‐

Small
Large

(
(

$0
$0

*
*

0
0

* 98% *
* 55.00% *

18
276

) = $                   ‐
) = $                   ‐

Small
Large

(
(

$0
$0

*
*

0
0

*
*

476
1

) = $                   ‐
) = $                   ‐

ALL
Sector 2. Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY

SECTOR 3.  PAINTING
GENERAL INDUSTRY AEROSPACE

GENERAL INDUSTRY AUTOBODY

COIL COATING

MARITIME

Page 96

95%
0%

*
*

Item 13 COST

#PLANTS

1‐%FITBASE

QNFITEMP

QNFITCOST

Variables

Table 13

CONSTRUCTION
Small

(

$0

Page 97

*

0

*

0%

*

1

) = $                   ‐

Item 13 COST

#PLANTS

1‐%FITBASE

QNFITEMP

QNFITCOST

Variables

Table 13

State

(

$0

*

0

*

0%

*

1

) = $                   ‐

Local

(

$0

*

0

*

0%

*

1

) = $                   ‐

Large

(

$0

*

0

*

37%

*

2

) = $                   ‐

Small

(

$0

*

0

*

93%

*

0

) = $                   ‐

Large

(

$0

*

0

*

37%

*

2

) = $                   ‐

Small

(

$0

*

0

*

93%

*

1

) = $                   ‐

Large

(

$0

*

0

*

37%

*

2

) = $                   ‐

Small

(

$0

*

0

*

93%

*

0

) = $                   ‐

Large

(

$0

*

0

*

37%

*

5

) = $                   ‐

Small

(

$0

*

0

*

93%

*

0

) = $                   ‐

Large

(

$0

*

0

*

37%

*

80

) = $                   ‐

Small

(

$0

*

0

*

93%

*

126

) = $                   ‐

Large

(

$0

*

0

*

37%

*

2

) = $                   ‐

Small

(

$0

*

0

*

93%

*

8

) = $                   ‐

Large

(

$0

*

0

*

54%

*

1

) = $                   ‐

Small

(

$0

*

0

*

95%

*

1

) = $                   ‐

Large

(

$0

*

0

*

37%

*

6

) = $                   ‐

Small

(

$0

*

0

*

93%

*

4

) = $                   ‐

Large

(

$0

*

0

*

56%

*

1

) = $                   ‐

Small

(

$0

*

0

*

95%

*

0

) = $                   ‐

Large

(

$0

*

0

*

56%

*

34

) = $                   ‐

Small
Large

(
(

$0
$0

*
*

0
0

*
*

95%
56%

*
*

11
102

) = $                   ‐
) = $                   ‐

Small

(

$0

*

0

*

95%

*

32

) = $                   ‐

Large

(

$0

*

0

*

56%

*

33

) = $                   ‐

Small

(

$0

*

0

*

95%

*

31

) = $                   ‐

Large

(

$0

*

0

*

56%

*

163

) = $                   ‐

GOVERNMENT
SECTOR 4.  Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
ALL
SECTOR 9.  Printing Ink Producers
ALL
SECTOR 10.  Plastic Colorant Producers and Users
ALL
SECTOR 11.  Plating Mixture Producers
ALL
SECTOR 13.  Chromium Metal Producers
ALL
SECTOR 14.  Iron and Steel Mills
ALL

CARBON STEEL
14b. RESHAPING INDUSTRY 
RESHAPING
SECTOR 15.  Iron and Steel Foundries

Page 98

Item 13 COST

#PLANTS

1‐%FITBASE

QNFITEMP

QNFITCOST

Variables

Table 13

ALL
Small

(

$0

Page 99

*

0

*

95%

*

118

) = $                   ‐

Item 13 COST

#PLANTS

1‐%FITBASE

QNFITEMP

QNFITCOST

Variables

Table 13

SECTOR 17.  Chromium Dye Producers
Large

(

$0

*

0

*

37%

*

3

) = $                   ‐

Small

(

$0

*

0

*

93%

*

1

) = $                   ‐

Large

(

$0

*

0

*

37%

*

0

) = $                   ‐

Small

(

$0

*

0

*

93%

*

5

) = $                   ‐

Large

(

$0

*

0

*

92%

*

216

) = $                   ‐

Small

(

$0

*

0

*

99%

*

1,627

) = $                   ‐

Large

(

$0

*

0

*

89%

*

343

) = $                   ‐

Small

(

$0

*

0

*

99%

*

697

) = $                   ‐

Large

(

$0

*

0

*

76%

*

6

) = $                   ‐

Small
Large

(
(

$0
$0

*
*

0
0

*
*

97%
76%

*
*

20
90

) = $                   ‐
) = $                   ‐

Small

(

$0

*

0

*

97%

*

5

) = $                   ‐

Large

(

$0

*

0

*

98%

*

81

) = $                   ‐

Small

(

$0

*

0

* 99.70% *

325

) = $                   ‐

Large

(

$0

*

0

*

67%

*

1

) = $                   ‐

Small
Large

(
(

$0
$138

*
*

0
33

*
*

97%
100%

*
*

0
1

) = $                   ‐
) = $               4,559

Small

(

$13

*

33

*

100%

*

1

) = $                  422

Large

(

$0

*

0

*

76%

*

5

) = $                   ‐

Small

(

$0

*

0

*

97%

*

0

) = $                   ‐

Large

(

$0

*

0

*

94%

*

1

) = $                   ‐

Small
Large

(
(

$0
$0

*
*

0
0

*
*

99%
55%

*
*

1
36

) = $                   ‐
) = $                   ‐

Small
Large

(
(

$0
$0

*
*

0
0

*
*

95%
88%

*
*

32
1

) = $                   ‐
) = $                   ‐

Small
State

(
(

$0
$0

*
*

0
0

*

99%
88%

*

1
1

) = $                   ‐
) = $                   ‐

Local

(

$0

*

0

1

) = $                   ‐

$0

*

0

40

) = $                   ‐

ALL
SECTOR 18.  Chromium Sulfate Producers
ALL
SECTOR 19.  Chemical Distributors
ALL
SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
ALL

Carbon, Flat, and Container Glass
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
Chromium Catalyst Users

Chromium Catalyst Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

88%

SECTOR 27.  Solid Waste Incineration
Large

Page 100

*

59%

*

ALL
Small

(
(

$0

Page 101

*

0

*

96%

*

48

Item 13 COST

#PLANTS

1‐%FITBASE

QNFITEMP

QNFITCOST

Variables

Table 13

) = $                   ‐

#PLANTS

Item 13 COST

1‐%FITBASE

State

(

$0

*

0

59%

0

) = $                   ‐

Local

(

$0

*

0

96%

24

) = $                   ‐

Large

(

$0

*

0

*

56%

*

19

) = $                   ‐

Small

(

$0

*

0

*

95%

*

0

) = $                   ‐

Large

(

$0

*

0

*

88%

*

51

) = $                   ‐

Small
State

(
(

$0
$0

*
*

0
0

*
*

99%
88%

*
*

233
15

) = $                   ‐
) = $                   ‐

Local
Large

(
(

$0
$0

*
*

0
0

*
*

88%
88%

*
*

88
1

) = $                   ‐
) = $                   ‐

Small
State

(
(

$0
$0

*
*

0
0

*
*

99%
88%

*
*

1
1

) = $                   ‐
) = $                   ‐

Local
Large

(
(

$0
$0

*
*

0
0

*
*

88%
88%

*
*

1
44

) = $                   ‐
) = $                   ‐

Small

(

$0

*

0

*

99%
Total

*

175
) = $                   ‐
7,770
$              4,981

QNFITCOST

QNFITEMP

Variables

Table 13

GOVERNMENT
SECTOR 30.  Superalloy Producers and Users
ALL
SECTOR 31.  Construction

INDUSTRIAL REHABILITATION AND 
MAINTENANCE

HAZARDOUS WASTE‐SITE WORK

REFRACTORY BRICK RESTORATION AND 
MAINTENANCE

Page 102

Table 14

Respiratory‐Protection Program:  Medical  Questionnaire for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2));
Employee Time and Cost to Complete the Medical Questionnaire for Respirator Use 
This table calculates the burden hours and cost of employee time to complete a medical questionnaire.  The hours and cost is determined by the 
number of employees who are at or above the action level and at or below the PEL by the time it takes to fill our the medical questionnaire and by non‐
supervisory wage rate.
Hours = (EMPAL * MEDHISTTIME * 1‐%FITBASE * #PLANTS)
Cost = Hours x NONSUPEWAGE
Variables:
* EMPAL = Number of employees who wear respirators who are at or above the AL and at or below the PEL
 in the model plant
* MEDHISTTIME = Employee time to complete medical history questionnaire
* 1‐%FITBASE = Percent of plants not conducting annual respirator fit‐test
* #PLANTS = Number of plants represented by the model output
* NONSUPEWAGE = Non‐Supervisory wage rate

RESPONSES

71%

*

1

)

=

223.11 * $     26.61 = $     5,937

1,312

Small (

3,478 * 0.17 *

97%

*

1

)

=

573.47 * $     26.61 = $   15,260

3,373

Large (

0 * 0.17 *

81%

*

1

)

=

Small (
Large (

0 * 0.17 *
2,330 * 0.17 *

98%
55%

*
*

1
1

)
)

Small (
Large (

55 * 0.17 *
3,225 * 0.17 *

95%
88%

*
*

1
1

Small (
State (

2,494 * 0.17 *
14 * 0.17 *

99%
88%

*
*

Local (

73 * 0.17 *

99%

Large (

0 * 0.17 *

Small (
Large (

Hours

#PLANTS

1‐%FITBASE

1,848 * 0.17 *

MEDHISTTIME

Large (

EMPAL

 Item 12 COST 

 NONSUPEWAGE

Variables

24.17%

Sector 1. Electroplating
ALL
Sector 2. Welding
0.00 * $     26.20 =

0

0

=
=

0.00 * $     26.20 =
0
217.81 * $     26.20 = $     5,707

0
1,281

)
)

=
=

8.89 * $     26.20 = $         233
482.50 * $     26.20 = $   12,641

52
2,838

1
1

)
)

=
=

419.71 * $     26.20 = $   10,996
2.17 * $     26.20 = $           57

2,469
13

*

1

)

=

12.36 * $     26.20 = $         324

73

55%

*

1

)

=

0.00 * $     26.20 =

0

0

0 * 0.17 *
16 * 0.17 *

95%
88%

*
*

1
1

)
)

=
=

0.00 * $     26.20 =
0
2.46 * $     26.20 = $           64

0
14

Small (
Large (

0 * 0.17 *
658 * 0.17 *

99%
88%

*
*

1
1

)
)

=
=

0.00 * $     26.20 =
0
98.44 * $     26.20 = $     2,579

0
579

Small (

529 * 0.17 *

99%

*

1

)

=

89.11 * $     26.20 = $     2,335

524

Large (

32 * 0.17 *

81%

*

49

)

=

213.51 * $     33.07 = $     7,060

1,256

Small (
Large (

0 * 0.17 *
1 * 0.17 *

98%
81%

*
*

62
326

)
)

=
=

0.00 * $     33.07 =
0
40.67 * $     33.07 = $     1,345

0
239

Small (
Large (

0 * 0.17 *
2 * 0.17 *

98%
81%

* 1,436 )
* 100 )

=
=

0.00 * $     33.07 =
0
24.85 * $     33.07 = $         822

0
146

Small (

1 * 0.17 *

98%

*

=

2.73 * $     33.07 = $           90

16

GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION
SECTOR 3.  PAINTING
GENERAL INDUSTRY AEROSPACE
GENERAL INDUSTRY AUTOBODY 
REPAIR
COIL COATING

Page 103

18

)

RESPONSES

1 * 0.17 * 55.00% *

 NONSUPEWAGE

276

)

=

22.11 * $     33.07 = $         731

130

Hours

#PLANTS

1‐%FITBASE

 Item 12 COST 

Large (

MEDHISTTIME

EMPAL

Variables

Table 14

MARITIME
Small (
Large (

1 * 0.17 *
413 * 0.17 *

95%
0%

*
*

476
1

)
)

=
=

76.93 * $     33.07 =
0.00 * $     33.07 =

2543.756
0

453
0

Small (
State (

520 * 0.17 *
31 * 0.17 *

0%
0%

*
*

1
1

)
)

=
=

0.00 * $     33.07 =
0.00 * $     33.07 =

0
0

0
0

Local (

133 * 0.17 *

0%

*

1

)

=

0.00 * $     33.07 =

0

0

Large (

7 * 0.17 *

37%

*

2

)

=

0.81 * $     38.68 = $           31

5

0 * 0.17 *

93%

*

0

)

=

0.00 * $     38.68 =

0

0

5 * 0.17 *

37%

*

2

)

=

0.00 * $     37.70 =

0

4

1 * 0.17 *

93%

*

1

)

=

0.00 * $     37.70 =

0

1

2 * 0.17 *

37%

*

2

)

=

0.00 * $     31.94 =

0

1

0 * 0.17 *

93%

*

0

)

=

0.00 * $     31.94 =

0

0

11 * 0.17 *

37%

*

5

)

=

3.46 * $     38.68 = $         134

20

0 * 0.17 *

93%

*

0

)

=

0.00 * $     38.68 =

0

0

1 * 0.17 *

37%

*

80

)

=

4.84 * $     28.81 = $         140

28

0 * 0.17 *

93%

*

126

)

=

0.00 * $     28.81 =

0

0

10 * 0.17 *

37%

*

2

)

=

1.57 * $     28.86 = $           45

9

2 * 0.17 *

93%

*

8

)

=

3.29 * $     28.86 = $           95

19

342 * 0.17 *

54%

*

1

)

=

31.38 * $     31.99 = $     1,004

185

35 * 0.17 *

95%

*

1

)

=

5.58 * $     31.99 = $         178

33

3 * 0.17 *

37%

*

6

)

=

1.00 * $     28.71 = $           29

6

1 * 0.17 *

93%

*

4

)

=

0.56 * $     28.71 = $           16

3

7 * 0.17 *

56%

*

1

)

=

0.63 * $     38.80 = $           24

4

0 * 0.17 *

95%

*

0

)

=

0.00 * $     38.80 =

0

0

27 * 0.17 *

56%

*

34

)

=

86.40 * $     38.80 = $     3,353

508

1 * 0.17 *
1 * 0.17 *

95%
56%

*
*

11
102

)
)

=
=

2.24 * $     38.80 = $           87
6.17 * $     38.80 = $         239

13
36

1 * 0.17 *

95%

*

32

)

=

6.58 * $     38.80 = $         256

39

3 * 0.17 *

56%

*

33

)

=

8.07 * $     38.80 = $         313

47

1 * 0.17 *

95%

*

31

)

=

3.23 * $     38.80 = $         125

19

CONSTRUCTION

GOVERNMENT
SECTOR 4.  Producers of Chromates
ALL
Small (
SECTOR 5. Chromate Pigment Procedures
Large (
ALL
Small (
SECTOR 6. CCA Producers
Large (
ALL
Small (
SECTOR 7.  Chromium Catalyst Producers
Large (
ALL
Small (
SECTOR 8.  Paint and Coating Producers
Large (
ALL
Small (
SECTOR 9.  Printing Ink Producers
Large (
ALL
Small (
SECTOR 10.  Plastic Colorant Producers and Users
Large (
ALL
Small (
SECTOR 11.  Plating Mixture Producers
Large (
ALL
Small (
SECTOR 13.  Chromium Metal Producers
Large (
ALL
Small (
SECTOR 14.  Iron and Steel Mills
Large (
ALL
Small (
Large (
CARBON STEEL
Small (
14b. RESHAPING
Large (
RESHAPING
Small (

Page 104

RESPONSES

56%

*

163

)

=

267.33 * $     28.31 = $     7,568

1,573

Small (

4 * 0.17 *

95%

*

118

)

=

78.53 * $     28.31 = $     2,223

462

Large (

29 * 0.17 *

37%

*

3

)

=

4.89 * $     37.70 = $         184

29

(

6 * 0.17 *

93%

*

1

)

=

0.90 * $     37.70 = $           34

5

(

0 * 0.17 *

37%

*

0

)

=

0.00 * $     41.50 =

0

0

(

1 * 0.17 *

93%

*

5

)

=

0.72 * $     41.50 = $           30

4

(

0 * 0.17 *

92%

*

216

)

=

0.00 * $     29.92 =

0

0

(

0 * 0.17 *

99%

* 1,627 )

=

0.00 * $     29.92 =

0

0

(

0 * 0.17 *

89%

*

343

)

=

0.00 * $     19.97 =

0

0

(

0 * 0.17 *

99%

*

697

)

=

0.00 * $     19.97 =

0

0

(

1 * 0.17 *

76%

*

6

)

=

0.85 * $     28.87 = $           25

5

(
(

0 * 0.17 *
7 * 0.17 *

97%
76%

*
*

20
90

)
)

=
=

0.00 * $     28.87 =
0
85.46 * $     28.87 = $     2,467

0
503

(

1 * 0.17 *

97%

*

5

)

=

0.91 * $     28.87 = $           26

5

(

0 * 0.17 *

98%

*

81

)

=

0.00 * $     20.85 =

0

0

(

0 * 0.17 * 99.70% *

325

)

=

0.00 * $     20.85 =

0

0

(

1 * 0.17 *

67%

*

1

)

=

0.12 * $     32.51 = $             4

1

(
(

0 * 0.17 *
119 * 0.17 *

97%
0%

*
*

0
1

)
)

=
=

0.00 * $     32.51 =
0.00 * $     32.51 =

0
0

0
0

(

0 * 0.17 *

0%

*

1

)

=

0.00 * $     32.51 =

0

0

(

0 * 0.17 *

76%

*

5

)

=

0.00 * $     25.64 =

0

0

(

0 * 0.17 *

97%

*

0

)

=

0.00 * $     25.64 =

0

0

(

0 * 0.17 *

94%

*

1

)

=

0.00 * $     32.11 =

0

0

(
(

0 * 0.17 *
0 * 0.17 *

99%
55%

*
*

1
36

)
)

=
=

0.00 * $     32.11 =
* $     32.11 =

0
0

0
0

(
(

0 * 0.17 *
0 * 0.17 *

95%
88%

*
*

32
1

)
)

=
=

0.00 * $     32.11 =
0.00 * $     32.11 =

0
0

0
0

(
(

0 * 0.17 *
0 * 0.17 *

99%
88%

*
*

1
1

)
)

=
=

0.00 * $     32.11 =
0.00 * $     32.11 =

0
0

0
0

(

0 * 0.17 *

88%

*

1

)

=

0.00 * $     32.11 =

0

0

Hours

#PLANTS

1‐%FITBASE

17 * 0.17 *

MEDHISTTIME

Large (

EMPAL

 Item 12 COST 

 NONSUPEWAGE

Variables

Table 14

SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
ALL
Small
Large
FIBER, FLAT, CONTAINER GLASS
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
ALL
Small
Large
Chromium Catalyst Companies
Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small
Large
CONSTRUCTION
Small
State
GOVERNMENT
Local

Page 105

RESPONSES

59%

*

40

)

=

0.00 * $     27.23 =

0

0

Small (
State (

0 * 0.17 *
0 * 0.17 *

96%
59%

*
*

48
0

)
)

=
=

0.00 * $     27.23 =
0.00 * $     27.23

0
0

0
0

(

0 * 0.17 *

96%

*

24

)

=

0.00 * $     27.23

0

0

(

0 * 0.17 *

56%

*

19

)

=

0.00 * $     27.93 =

0

0

(

0 * 0.17 *

95%

*

0

)

=

0.00 * $     27.93 =

0

0

(

0 * 0.17 *

88%

*

51

)

=

0.00 * $     32.13 =

0

0

INDUSTRIAL REHABILITATION AND  Small (
MAINTENANCE
State (

0 * 0.17 *
0 * 0.17 *

99%
88%

*
*

233
15

)
)

=
=

0.00 * $     32.13 =
0.00 * $     32.13 =

0
0

0
0

Local (
Large (

0 * 0.17 *
0 * 0.17 *

88%
88%

*
*

88
1

)
)

=
=

0.00 * $     32.13 =
0.00 * $     32.13 =

0
0

0
0

Small (
State (

0 * 0.17 *
0 * 0.17 *

99%
88%

*
*

1
1

)
)

=
=

0.00 * $     32.13 =
0.00 * $     32.13 =

0
0

0
0

Local (
Large (

0 * 0.17 *
0 * 0.17 *

88%
88%

*
*

1
44

)
)

=
=

0.00 * $     32.13 =
0.00 * $     32.13 =

0
0

0
0

Small (

0 * 0.17 *

99%

*

175 )
7,770

=

0.00 * $     32.13 =
0
3,116
$   87,355

0
18,337

Hours

#PLANTS

1‐%FITBASE

0 * 0.17 *

MEDHISTTIME

Large (

EMPAL

 Item 12 COST 

 NONSUPEWAGE

Variables

Table 14

SECTOR 27.  Solid Waste Incineration
ALL

GOVERNMENT
Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

HAZARDOUS WASTE‐SITE WORK

REFRACTORY BRICK RESTORATION 
Total

Page 106

Table 15

Respiratory Protection Program: Medical Questionnaire for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2));
Contract Cost for a PLHCP to Review the Medical Questionnaire for Respirator Use 
This table calculates the contract cost of the medical questionnaire and review by the licensed physician.
COST = (EMPAL * MEDHISTCOST * 1‐%FITBASE * #PLANTS)

Item 13 COST

(

1,848 * $      45.56 *

71%

*

1

) = $           59,790.08

Small

(

3,478 * $      45.56 *

97%

*

1

) = $         153,682.05

Large

(

0 * $      45.56 *

81%

*

1

) = $                       ‐

MARITIME

Small
Large

(
(

0 * $      45.56 *
2,330 * $      45.56 *

98%
55%

*
*

1
1

) = $                       ‐
) = $           58,371.26

CONSTRUCTION

Small
Large

(
(

55 * $      45.56 *
3,225 * $      45.56 *

95%
88%

*
*

1
1

) = $             2,383.62
) = $         129,302.87

Small
State

(
(

2,494 * $      45.56 *
14 * $      45.56 *

99%
88%

*
*

1
1

) = $         112,476.64
) = $                 581.05

Local

(

73 * $      45.56 *

99%

*

1

) = $             3,311.98

Large

(

0 * $      45.56 *

81%

*

1

) = $                       ‐

MARITIME

Small
Large

(
(

0 * $      45.56 *
16 * $      45.56 *

98%
55%

*
*

1
1

) = $                       ‐
) = $                 411.58

CONSTRUCTION

Small
Large

(
(

0 * $      45.56 *
658 * $      45.56 *

95%
88%

*
*

1
1

) = $                       ‐
) = $           26,379.64

Small

(

529 * $      45.56 *

99%

*

1

) = $           23,881.13

Large

(

32 * $      45.56 *

81%

*

49

) = $           57,218.62

Small
Large

(
(

0 * $      45.56 *
1 * $      45.56 *

98%
81%

*
*

62
326

) = $                       ‐
) = $           10,898.79

Small
Large

(
(

0 * $      45.56 *
2 * $      45.56 *

98%
81%

*
*

1,436
100

) = $                       ‐
) = $             6,660.37

Small
Large

(
(

1 * $      45.56 * 98% *
1 * $      45.56 * 55.00% *

18
276

) = $                 732.57
) = $             6,903.28

Small

(

1

476

) = $           20,616.00

Sector 1. Electroplating
ALL

Sector 2. Welding
GENERAL INDUSTRY

1‐%FITBASE

Large

EMPAL

#PLANTS

 MEDHISTCOST 

Variables

* EMPAL = Number of employees who wear respirators who are at or above the AL and at or below the PEL 
 in the model plant
* MEDHISTCOST = Cost of medical history questionnaire to be reviewed by a PLHCP.
* 1‐%FITBASE = Percent of plants not conducting annual respirator fit‐test
* #PLANTS = Number of plants represented by the model output
                                                                                                                                       

GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY

SECTOR 3.  PAINTING
GENERAL INDUSTRY (AEROSPACE)

GENERAL INDUSTRY (AUTOBODY REPAIR)

GENERAL INDUSTRY (COIL COATING)
MARITIME

$      45.56 *

Page 107

95%

*

Item 13 COST

#PLANTS

1‐%FITBASE

 MEDHISTCOST 

EMPAL

Variables

Table 15

Large

(

413 * $      45.56 *

0%

*

1

) = $                       ‐

Small
State

(
(

520 * $      45.56 *
31 * $      45.56 *

0%
0%

*
*

1
1

) = $                       ‐
) = $                       ‐

Local

(

133 * $      45.56 *

0%

*

1

) = $                       ‐

Large

(

7 * $      45.56 *

37%

*

2

) = $                 216.37

Small

(

0 * $      45.56 *

93%

*

0

) = $                       ‐

Large

(

5 * $      45.56 *

37%

*

2

) = $                 163.76

Small

(

1 * $      45.56 *

93%

*

1

) = $                   34.30

Large

(

2 * $      45.56 *

37%

*

2

) = $                   62.78

Small

(

0 * $      45.56 *

93%

*

0

Large

(

11 * $      45.56 *

37%

*

5

) = $                       ‐
$                       ‐
) = $                 927.28

Small

(

0 * $      45.56 *

93%

*

0

) = $                       ‐

Large

(

1 * $      45.56 *

37%

*

80

) = $             1,298.20

Small

(

0 * $      45.56 *

93%

*

126

) = $                       ‐

Large

(

10 * $      45.56 *

37%

*

2

) = $                 420.72

Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL

(

2 * $      45.56 *

93%

*

8

) = $                 881.24

(

342 * $      45.56 *

54%

*

1

) = $             8,409.99

Small

(

35 * $      45.56 *

95%

*

1

) = $             1,494.87

Large

(

3 * $      45.56 *

37%

*

6

) = $                 268.43

Small

(

1 * $      45.56 *

93%

*

4

) = $                 149.93

Large

(

7 * $      45.56 *

56%

*

1

) = $                 168.33

Small

(

0 * $      45.56 *

95%

*

0

) = $                       ‐

Large

(

27 * $      45.56 *

56%

*

34

) = $           23,154.89

Small
Large

(
(

1 * $      45.56 *
1 * $      45.56 *

95%
56%

*
*

11
102

) = $                 599.97
) = $             1,653.92

Small

(

1 * $      45.56 *

95%

*

32

) = $             1,764.63

Large

(

3 * $      45.56 *

56%

*

33

) = $             2,163.62

Small

(

1 * $      45.56 *

95%

*

31

) = $                 864.67

CONSTRUCTION

GOVERNMENT
SECTOR 4.  Producers of Chromates
ALL

SECTOR 5. Chromate Pigment Procedures
ALL

SECTOR 6. CCA Producers
ALL

SECTOR 7.  Chromium Catalyst Producers
ALL

SECTOR 8.  Paint and Coating Producers
ALL

SECTOR 9.  Printing Ink Producers
ALL

SECTOR 11.  Plating Mixture Producers
ALL

SECTOR 13.  Chromium Metal Producers
ALL

SECTOR 14.  Iron and Steel Mills
Alloy and Stainless Steel

Carbon Steel

14b. RESHAPING INDUSTRY
Reshaping Industry

Page 108

Item 13 COST

(

17 * $      45.56 *

56%

*

163

) = $           71,640.46

Small

(

4 * $      45.56 *

95%

*

118

) = $           21,044.66

Large

(

29 * $      45.56 *

37%

*

3

) = $             1,310.08

Small

(

6 * $      45.56 *

93%

*

1

) = $                 240.11

Large

(

0 * $      45.56 *

37%

*

0

) = $                       ‐

Small

(

1 * $      45.56 *

93%

*

5

) = $                 194.23

Large

(

0 * $      45.56 *

92%

*

216

) = $                       ‐

Small

(

0 * $      45.56 *

99%

*

1,627

) = $                       ‐

Large

(

0 * $      45.56 *

89%

*

343

) = $                       ‐

Small

(

0 * $      45.56 *

99%

*

697

) = $                       ‐

Large

(

1 * $      45.56 *

76%

*

6

) = $                 228.25

Small
Large

(
(

0 * $      45.56 *
7 * $      45.56 *

97%
76%

*
*

20
90

) = $                       ‐
) = $           22,900.92

Small

(

1 * $      45.56 *

97%

*

5

) = $                 242.76

Large

(

0 * $      45.56 *

98%

*

81

) = $                       ‐

Small

(

0 * $      45.56 * 99.70% *

325

) = $                       ‐

Large

(

1 * $      45.56 *

67%

*

1

) = $                   33.50

Small
Large

(
(

0 * $      45.56 *
119 $      45.56 *

97%
0%

*
*

0
1

) = $                       ‐
) = $                       ‐

Small

(

0

$      45.56 *

0%

*

1

) = $                       ‐

Large

(

0 * $      45.56 *

76%

*

5

) = $                       ‐

Small

(

0 * $      45.56 *

97%

*

0

) = $                       ‐

Large

(

0 * $      45.56 *

94%

*

1

) = $                       ‐

Small
Large

(
(

0 * $      45.56 *
0 * $      45.56 *

99%
55%

*
*

1
36

) = $                       ‐
) = $                       ‐

Small
Large

(
(

0 * $      45.56 *
0 * $      45.56 *

95%
88%

*
*

32
1

) = $                       ‐
) = $                       ‐

Small

(

0 * $      45.56 *

99%

*

1

) = $                       ‐

1‐%FITBASE

Large

EMPAL

#PLANTS

 MEDHISTCOST 

Variables

Table 15

SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL
SECTOR 18.  Chromium Sulfate Producers
ALL
SECTOR 19.  Chemical Distributors
ALL
SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
ALL

FIBER, FLAT AND CONTAINER GLASS
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
ALL

Chromium Catalyst Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

Page 109

Item 13 COST

#PLANTS

1‐%FITBASE

 MEDHISTCOST 

EMPAL

Variables

Table 15

State

(

0 * $      45.56 *

88%

*

1

) = $                       ‐

Local

(

0 * $      45.56 *

88%

*

1

) = $                       ‐

Large

(

0

59%

40

$                       ‐

Small
State

(
(

0 * $      45.56 *
0 $      45.56

96%
59%

48
0

) = $                       ‐
$                       ‐

Local

(

0

96%

24

$                       ‐

Large

(

0 * $      45.56 *

56%

*

19

) = $                       ‐

Small

(

0 * $      45.56 *

95%

*

0

) = $                       ‐

Large

(

0 * $      45.56 *

88%

*

51

) = $                       ‐

Small
State

(
(

0 * $      45.56 *
0 * $      45.56 *

99%
88%

*
*

233
15

) = $                       ‐
) = $                       ‐

Local
Large

(
(

0 * $      45.56 *
0 * $      45.56 *

88%
88%

*
*

88
1

) = $                       ‐
) = $                       ‐

Small
State

(
(

0 * $      45.56 *
0 * $      45.56 *

99%
88%

*
*

1
1

) = $                       ‐
) = $                       ‐

Local
Large

(
(

0 * $      45.56 *
0 * $      45.56 *

88%
88%

*
*

1
44

) = $                       ‐
) = $                       ‐

Small

(

0 * $      45.56 *

99%
Total

*

175
) = $                       ‐
7,770
$              836,134

Government
SECTOR 27.  Solid Waste Incineration
$      45.56

ALL
*

Government
$      45.56

SECTOR 30.  Superalloy Producers and Users
ALL
SECTOR 31.  Construction

INDUSTRIAL REHABILITATION AND 
MAINTENANCE

HAZARDOUS WASTE‐SITE WORK

REFRACTORY BRICK RESTORATION 

Page 110

Table 16

Respiratory Protection Program:  Follow‐up Medical Examination for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2));
Employee Time and Cost to Complete the Medical Examination for Respirator Use
This table calculates the burden hour and cost estimate for employees that "fail" the medical history 
questionnaire.  It is estimated that 23% (EMPMEDXAM) will not pass the medial questionnaire
BURDEN HOURS = (EMPAL * RESPEXAMTIME * %EMPMEDEXAM * 1‐%FITBASE * PLANTS)
COST = BURDEN HOURS * NONSUPEWAGE
* EMPAL = Number of employees who wear respirators who are at or above the AL and at or below the PEL  
in the model plant
* RESPEXAMTIME = Employee time, in hours, for medical exam for respirator use
* %EMPMEDEXAM = Percent of employees that will require a medical exam for respirator use
* 1‐%FITBASE = Percent of plants not conducting annual respirator fit‐test
* #PLANTS = Number of plants represented by the model output
* NONSUPEWAGE = Non‐Supervisory wage rate
* %EMPMEDEXAM = Percent of employees who "fail" an initial medical exam

Item 12 COST

Responses

1,848 *

3*

23% *

71%

*

1

=

905.56 * $     26.61 $    24,096.36

302

Small

(

3,478 *

3*

23% *

97%

*

1

=

2327.62 * $     21.43 $    49,880.85

776

Large

(

0*

3*

23% *

81%

*

1

=

0.00 * $     21.10 $                ‐

Small
Large

(
(

0*
2,330 *

3*
3*

23% *
23% *

98%
55%

*
*

1
1

=

0.00 * $     21.10 $                ‐
884.07 * $     21.10 $    18,653.92

0
295

Small
Large

(
(

55 *
3,225 *

3*
3*

23% *
23% *

95%
88%

*
*

1
1

=
=

36.10 * $     21.10 $          761.74
1958.38 * $     21.10 $    41,321.79

12
653

Small
State

(
(

2,494 *
14 *

3*
3*

23% *
23% *

99%
88%

*
*

1
1

=
=

1703.53 * $     21.10 $    35,944.57
8.80 * $     21.10 $          185.69

568
3

Local

(

73 *

3*

23% *

99%

*

1

=

50.16 * $     21.10 $      1,058.42

17

Large

(

0*

3*

23% *

81%

*

1

=

0.00 * $     21.10 $                ‐

0

Small
Large

(
(

0*
16 *

3*
3*

23% *
23% *

98%
55%

*
*

1
1

=

0.00 * $     21.10 $                ‐
6.23 * $     21.10 $          131.53

0
2

Small
Large

(
(

0*
658 *

3*
3*

23% *
23% *

95%
88%

*
*

1
1

=
=

0.00 * $     21.10 $                ‐
399.54 * $     21.10 $      8,430.24

0
133

Small

(

529 *

3*

23% *

99%

*

1

=

361.70 * $     21.10 $      7,631.78

121

Large

(

32 *

3*

23% *

81%

*

49

=

866.61 *

26.63 $    23,077.94

289

Small
Large

(
(

0*
1*

3*
3*

23% *
23% *

98%
81%

*
*

62
326

=
=

0.00 *
165.07 *

26.63 $                ‐
26.63 $      4,395.80

0
55

Small
Large

(
(

0*
2*

3*
3*

23% *
23% *

98%
81%

* 1,436 =
* 100 =

0.00 *
100.88 *

26.63 $                ‐
26.63 $      2,686.32

0
34

Small

(

1*

3*

23% *

98%

*

11.10 *

26.63 $          295.47

4

HOURS

EMPAL

 NONSUPEWAGE

(

#PLANTS

1‐%FITBASE

Large

RESPEXAMTIME

%EMPMEDEXAM

24.17%

Sector 1. Electroplating
ALL
Sector 2. Welding
0

GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION
SECTOR 3.  PAINTING
GENERAL INDUSTRY (AEROSPACE)
GENERAL INDUSTRY (AUTOBODY 
REPAIR)
GENERAL INDUSTRY (COIL 
COATING)

Page 111

18

=

Responses

(

1*

3*

23% * 55.00% *

276

=

89.74 *

26.63 $      2,389.70

30

Small
Large

(
(

1*
413 *

3*
3*

23% *
23% *

95%
0%

*
*

476
1

=
=

312.24 *
0.00 *

26.63 $      8,315.04
26.63 $                ‐

104
0

Small
State

(
(

520 *
31

3*
3

23% *
23%

0%
0%

*

1
1

=

0.00 *
0.00

26.63 $                ‐
26.63 $                ‐

0
0

Local

(

133

3

23%

0%

0.00

26.63 $                ‐

0

Large

(

7*

3*

23% *

37%

*

2

=

3.28 *

31.15 $          102.08

1

(
Small
SECTOR 5. Chromate Pigment Procedures
Large
(
ALL
(
Small
SECTOR 6. CCA Producers
Large
(
ALL
(
Small
SECTOR 7.  Chromium Catalyst Producers
Large
(
ALL
(
Small
SECTOR 8.  Paint and Coating Producers
Large
(
ALL
(
Small
SECTOR 9.  Printing Ink Producers
Large
(
ALL
(
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
(
ALL
(
Small
SECTOR 11.  Plating Mixture Producers
Large
(
ALL
(
Small
SECTOR 13.  Chromium Metal Producers
Large
(
ALL
(
Small
SECTOR 14.  Iron and Steel Mills
Large
(
Alloy and Stainless Steel
(
Small
Large
(
Carbon Steel
(
Small

0*

3*

23% *

93%

*

0

=

0.00 *

31.15 $                ‐

0

5*

3*

23% *

37%

*

2

=

2.48 *

30.36 $            75.30

1

1*

3*

23% *

93%

*

1

=

0.52 *

30.36 $            15.77

0

2*

3*

23% *

37%

*

2

=

0.95 *

25.72 $            24.46

0

0*

3*

23% *

93%

*

0

=

0.00 *

25.72 $                ‐

0

11 *

3*

23% *

37%

*

5

=

14.04 *

31.15 $          437.48

5

0*

3*

23% *

93%

*

0

=

0.00 *

31.15 $                ‐

0

1*

3*

23% *

37%

*

80

=

19.66 *

23.20 $          456.16

7

0*

3*

23% *

93%

*

126

=

0.00 *

23.20 $                ‐

0

10 *

3*

23% *

37%

*

2

=

6.37 *

23.24 $          148.09

2

2*

3*

23% *

93%

*

8

=

13.35 *

23.24 $          310.18

4

342 *

3*

23% *

54%

*

1

=

127.37 *

25.76 $      3,281.18

42

35 *

3*

23% *

95%

*

1

=

22.64 *

25.76 $          583.23

8

3*

3*

23% *

37%

*

6

=

4.07 *

23.12 $            94.00

1

1*

3*

23% *

93%

*

4

=

23.12 $            52.50

1

7*

3*

23% *

56%

*

1

=

2.27 *
0.00
2.55 *

31.25 $            79.67

1

0*

3*

23% *

95%

*

0

=

0.00 *

31.25 $                ‐

0

27 *

3*

23% *

56%

*

34

=

350.70 *

31.25 $    10,959.26

117

1*
1*

3*
3*

23% *
23% *

95%
56%

*
*

11
102

=
=

9.09 *
25.05 *

31.25 $          283.97
31.25 $          782.80

3
8

1*

3*

23% *

95%

*

32

=

26.73 *

31.25 $          835.20

9

HOURS

#PLANTS

1‐%FITBASE

Large

EMPAL

Item 12 COST

 NONSUPEWAGE

%EMPMEDEXAM

RESPEXAMTIME

Table 16

MARITIME

CONSTRUCTION

GOVERNMENT
1

SECTOR 4.  Producers of Chromates
ALL

Page 112

Item 12 COST

Responses

3*

3*

23% *

56%

*

33

=

32.77 *

31.25 $      1,024.05

11

Small

(

1*

3*

23% *

95%

*

31

=

13.10 *

31.25 $          409.25

4

Large

(

17 *

3*

23% *

56%

*

163

=

1085.04 *

22.8 $    24,738.98

362

Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
ALL
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
ALL
Small
Large
Chromium Catalyst Companies
Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small

(

4*

3*

23% *

95%

*

118

=

318.74 *

22.8 $      7,267.17

106

(

29 *

3*

23% *

37%

*

3

=

19.84 *

30.36 $          602.40

7

(

6*

3*

23% *

93%

*

1

=

3.64 *

30.36 $          110.41

1

(

0*

3*

23% *

37%

*

0

=

0.00 *

33.42 $                ‐

0

(

1*

3*

23% *

93%

*

5

=

2.94 *

33.42 $            98.31

1

(

0*

3*

23% *

92%

*

216

=

0.00 *

24.1 $                ‐

0

(

0*

3*

23% *

99%

* 1,627 =

0.00 *

24.1 $                ‐

0

(

0*

3*

23% *

89%

*

343

=

0.00 *

16.08 $                ‐

0

(

0*

3*

23% *

99%

*

697

=

0.00 *

16.08 $                ‐

0

(

1*

3*

23% *

76%

*

6

=

3.46 *

23.25 $            80.37

1

(
(

0*
7*

3*
3*

23% *
23% *

97%
76%

*
*

20
90

=
=

0.00 *
346.85 *

23.25 $                ‐
23.25 $      8,064.26

0
116

(

1*

3*

23% *

97%

*

5

=

3.68 *

23.25 $            85.49

1

(

0*

3*

23% *

98%

*

81

=

0.00 *

16.79 $                ‐

0

(

0*

3*

23% * 99.70% *

325

=

0.00 *

16.79 $                ‐

0

(

1*

3*

23% *

67%

*

1

=

0.51 *

26.18 $            13.28

0

(
(

0*
119 *

3*
3*

23% *
23% *

0%
0%

*
*

0
1

=
=

0.00 *
0.00 *

26.18 $                ‐
26.18 $                ‐

0
0

(

0*

3*

23% *

97%

*

1

=

0.00 *

26.18 $                ‐

0

(

0*

3*

23% *

76%

*

5

=

0.00 *

20.65 $                ‐

0

(

0*

3*

23% *

97%

*

0

=

0.00 *

20.65 $                ‐

0

(

0*

3*

23% *

94%

*

1

=

0.00 *

18.59 $                ‐

0

(
(

0*
0*

3*
3*

23% *
23% *

99%
55%

*
*

1
36

=
=

0.00 *
0.00 *

18.59 $                ‐
18.59 $                ‐

0
0

(

0*

3*

23% *

95%

*

32

=

0.00 *

18.59 $                ‐

0

HOURS

EMPAL

 NONSUPEWAGE

(

#PLANTS

1‐%FITBASE

Large

RESPEXAMTIME

%EMPMEDEXAM

Table 16

SECTOR 14B.  Forging Industry
RESHAPING INDUSTRY
SECTOR 15.  Iron and Steel Foundries
ALL

Page 113

23% *

88%

*

1

=

0.00 *

18.59 $                ‐

0

Small
State

(
(

0*
0*

3*
3*

23% *
23% *

99%
88%

*
*

1
1

=
=

0.00 *
0.00 *

18.59 $                ‐
18.59 $                ‐

0
0

Local

(

0*

3*

23% *

88%

*

1

=

0.00 *

18.59 $                ‐

0

Large

(

0*

3*

23% *

59%

*

40

=

0.00 *

21.93 $                ‐

0

Small
State

(
(

0*
0*

3*
3*

23% *
23% *

96%
59%

*
*

48
0

=
=

0.00 *
0.00 *

21.93 $                ‐
21.93 $                ‐

0
0

Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

(

0*

3*

23% *

96%

*

24

=

0.00 *

21.93 $                ‐

0

(

0*

3*

23% *

56%

*

19

=

0.00 *

22.49 $                ‐

0

(

0*

3*

23% *

95%

*

0

=

0.00 *

22.49 $                ‐

0

(

0*

3*

23% *

88%

*

51

=

0.00

25.88 $                ‐

0

INDUSTRIAL REHABILITATION AND  Small
MAINTENANCE
State

(
(

0*
0*

3*
3*

23% *
23% *

99%
88%

*
*

233
15

=
=

0.00
0.00

25.88 $                ‐
25.88 $                ‐

0
0

Local
Large

(
(

0*
0*

3*
3*

23% *
23% *

88%
88%

*
*

88
1

=
=

0.00
0.00 *

25.88 $                ‐
25.88 $                ‐

0
0

Small
State

(
(

0*
0*

3*
3*

23% *
23% *

99%
88%

*
*

1
1

=
=

0.00 *
0.00 *

25.88 $                ‐
25.88 $                ‐

0
0

Local
Large

(
(

0*
0*

3*
3*

23% *
23% *

88%
88%

*
*

1
44

=
=

0.00 *
0.00 *

25.88 $                ‐
25.88 $                ‐

0
0

Small

(

0*

3*

23% *

99%
Total

*

175 =
7,770

0.00 *
12,649

HOURS

EMPAL

Responses

3*

Item 12 COST

0*

 NONSUPEWAGE

(

#PLANTS

1‐%FITBASE

Large

RESPEXAMTIME

%EMPMEDEXAM

Table 16

CONSTRUCTION

GOVERNMENT
SECTOR 27.  Solid Waste Incineration
ALL

GOVERNMENT

HAZARDOUS WASTE‐SITE WORK

REFRACTORY BRICK RESTORATION 

Page 114

25.88 $                ‐
$       290,272

0
4,216

Table 17

Respiratory Protection Program:  Follow‐up Medical Examination for Respirator Use;
Contract Cost for a PLHCP to Conduct the Medical Examination for Respirator Use
Employers must use a PLHCP to conduct the follow‐up medical examination.  The follow‐up medical 
examination allows PLHCPs to obtain additional information that may be useful in arriving at a final medical 
recommendation regarding respirator use.

1‐%FITBASE

#PLANTS

Item 13 Cost

1,848 * $     136.66 *

23% *

71%

*

1

$        41,251.29

Small

3,478 * $     136.66 *

23% *

97%

*

1

$      106,030.66

Large

0 * $     136.66 *

23% *

81%

*

1

$                     ‐

Small
Large

0 * $     136.66 *
2,330 * $     136.66 *

23% *
23% *

98%
55%

*
*

1
1

$                     ‐
$        40,272.39

Small
Large

55 * $     136.66 *
3,225 * $     136.66 *

23% *
23% *

95%
88%

*
*

1
1

$           1,644.55
$        89,210.61

Small
State

2,494 * $     136.66 *
14 * $     136.66 *

23% *
23% *

99%
88%

*
*

1
1

$        77,601.60
$              400.89

Local

73 * $     136.66 *

23% *

99%

*

1

$           2,285.05

Large

0 * $     136.66 *

23% *

81%

*

1

$                     ‐

Small
Large

0 * $     136.66 *
16 * $     136.66 *

23% *
23% *

98%
55%

*
*

1
1

$                     ‐
$              283.96

Small
Large

0 * $     136.66 *
658 * $     136.66 *

23% *
23% *

95%
88%

*
*

1
1

$                     ‐
$        18,200.25

Small

529 * $     136.66 *

23% *

99%

*

1

$        16,476.43

Large

     46 * $     136.66 *

23% *

81%

*

49

$        57,273.68

Small

0 * $     136.66 *

23% *

98%

*

62

$                     ‐

RESPEXAMCOST

Large

EMPAL

%EMPMEDEXAM

COST = (EMPAL * RESPEXAMCOST * %EMPMEDEXAM * 1‐%FITBASE * #PLANTS)
* EMPAL = Number of employees who wear respirators for more than 5 hours/week and who are at or above the AL  
 and at or below the PEL in the model plant
* RESPEXAMCOST = Cost for medical exam for respirator use
* %EMPMEDEXAM = Percent of employees that will require a medical exam for respirator use
* 1‐%FITBASE = Percent of plants not conducting annual respirator fit‐test
* #PLANTS = Number of plants represented by the model output

Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION
SECTOR 3.  PAINTING
GENERAL INDUSTRY AEROSPACE

Page 115

1‐%FITBASE

#PLANTS

Item 13 Cost

1 * $     136.66 *

23% *

81%

*

326

$           7,519.46

Small
Large

0 * $     136.66 *
2 * $     136.66 *

23% *
23% *

98%
81%

*
*

1,436
100

$                     ‐
$           4,595.22

Small
Large

1 * $     136.66 *
1 * $     136.66 *

23% * 98% *
23% * 55.00% *

18
276

$              505.42
$           4,087.81

Small
Large

1 * $     136.66 *
413 * $     136.66 *

23% *
23% *

95%
0%

*
*

476
1

$        14,223.71
$                     ‐

Small
State

520 * $     136.66 *
31 * $     136.66 *

23% *
23% *

0%
0%

*
*

1
1

$                     ‐
$                     ‐

Local

133 * $     136.66 *

23% *

0%

*

1

Large

7 * $     136.66 *

23% *

37%

*

2

$                     ‐
$                     ‐
$              149.28

0 * $     136.66 *

23% *

93%

*

0

$                     ‐

5 * $     136.66 *

23% *

37%

*

2

$              112.98

1 * $     136.66 *

23% *

93%

*

1

2 * $     136.66 *

23% *

37%

*

2

$                23.67
$                     ‐
$                43.32

0 * $     136.66 *

23% *

93%

*

0

$                     ‐

11 * $     136.66 *

23% *

37%

*

5

$              639.77

0 * $     136.66 *

23% *

93%

*

0

$                     ‐

1 * $     136.66 *

23% *

37%

*

80

$              895.67

0 * $     136.66 *

23% *

93%

*

126

$                     ‐

10 * $     136.66 *

23% *

37%

*

2

$              290.27

2 * $     136.66 *

23% *

93%

*

8

$              608.00

342 * $     136.66 *

23% *

54%

*

1

$           5,802.35

35 * $     136.66 *

23% *

95%

*

1

$           1,031.36

RESPEXAMCOST

Large

EMPAL

%EMPMEDEXAM

Table 17

GENERAL INDUSTRY AUTOBODY

COIL COATINGS

MARITIME

CONSTRUCTION

GOVERNMENT
SECTOR 4.  Producers of Chromates
ALL
Small
SECTOR 5. Chromate Pigment Procedures
Large
ALL
Small
SECTOR 6. CCA Producers
Large
ALL
Small
SECTOR 7.  Chromium Catalyst Producers
Large
ALL
Small
SECTOR 8.  Paint and Coating Producers
Large
ALL
Small
SECTOR 9.  Printing Ink Producers
Large
ALL
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small

Page 116

1‐%FITBASE

#PLANTS

Item 13 Cost

3 * $     136.66 *

23% *

37%

*

6

$              185.20

Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
Alloy and Stainless Steel
Small
Large
Carbon Steel
Small
SECTOR 14B.  Forging Industry
Large
Reshaping Industry
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
ALL
Small
Large
Fiber, Flat and Container
small

1 * $     136.66 *

23% *

93%

*

4

7 * $     136.66 *

23% *

56%

*

1

$              103.44
$                     ‐
$              116.14

0 * $     136.66 *

23% *

95%

*

0

$                     ‐

27 * $     136.66 *

23% *

56%

*

34

$        15,975.37

1 * $     136.66 *
1 * $     136.66 *

23% *
23% *

95%
56%

*
*

11
102

$              413.94
$           1,141.10

1 * $     136.66 *

23% *

95%

*

32

$           1,217.48

3 * $     136.66 *

23% *

56%

*

33

$           1,492.76

1 * $     136.66 *

23% *

95%

*

31

$              596.56

17 * $     136.66 *

23% *

56%

*

163

$        49,427.28

4 * $     136.66 *

23% *

95%

*

118

$        14,519.45

29 * $     136.66 *

23% *

37%

*

3

$              903.87

6 * $     136.66 *

23% *

93%

*

1

$              165.66

0 * $     136.66 *

23% *

37%

*

0

$                     ‐

1 * $     136.66 *

23% *

93%

*

5

$              134.00

0 * $     136.66 *

23% *

92%

*

216

$                     ‐

0 * $     136.66 *

23% *

99%

*

1627

$                     ‐

0 * $     136.66 *

23% *

89%

*

343

$                     ‐

0 * $     136.66 *

23% *

99%

*

697

$                     ‐

1 * $     136.66 *

23% *

76%

*

6

$              157.48

0 * $     136.66 *
7 * $     136.66 *

23% *
23% *

97%
76%

*
*

20
90

$                     ‐
$        15,800.15

1 * $     136.66 *

23% *

97%

*

5

$              167.49

RESPEXAMCOST

Large

EMPAL

%EMPMEDEXAM

Table 17

SECTOR 11.  Plating Mixture Producers
ALL

Page 117

23% *

98%

*

81

Small

0 * $     136.66 *

23% * 99.70% *

325

Large

1 * $     136.66 *

23% *

67%

*

1

$                     ‐
$                     ‐
$                23.11

Small
Large

0 * $     136.66 *
119 * $     136.66 *

23% *
23% *

0%
0%

*
*

0
1

$                     ‐
$                     ‐

Small

0 * $     136.66 *

23% *

0%

*

1

$                     ‐

Large

0 * $     136.66 *

23% *

76%

*

5

$                     ‐

Small

0 * $     136.66 *

23% *

97%

*

0

$                     ‐

Large

0 * $     136.66 *

23% *

94%

*

1

$                     ‐

Small
Large

0 * $     136.66 *
0 * $     136.66 *

23% *
23% *

99%
55%

*
*

1
36

$                     ‐
$                     ‐

Small
Large

0 * $     136.66 *
0 * $     136.66 *

23% *
23% *

95%
88%

*
*

32
1

$                     ‐
$                     ‐

Small
State

0 * $     136.66 *
0 * $     136.66 *

23% *
23% *

99%
88%

*
*

1
1

$                     ‐
$                     ‐

Local

0 * $     136.66 *

23% *

88%

*

1

Large

0 * $     136.66 *

23% *

59%

*

40

$                     ‐
$                     ‐
$                     ‐

Small
State

0 * $     136.66 *
0 * $     136.66 *

23% *
23% *

96%
59%

*
*

48
0

$                     ‐
$                     ‐

Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

0 * $     136.66 *

23% *

96%

*

24

$                     ‐

0 * $     136.66 *

23% *

56%

*

19

$                     ‐

0 * $     136.66 *

23% *

95%

*

0

$                     ‐

0 * $     136.66 *

23% *

88%

*

51

$                     ‐

Small
State

0 * $     136.66 *
0 * $     136.66 *

23% *
23% *

99%
88%

*
*

233
15

$                     ‐
$                     ‐

Local

0 * $     136.66 *

23% *

88%

*

88

$                     ‐

#PLANTS

Item 13 Cost

1‐%FITBASE

0 * $     136.66 *

RESPEXAMCOST

Large

EMPAL

%EMPMEDEXAM

Table 17

SECTOR 22.  Printing

$                     ‐
$                     ‐

ALL
SECTOR 24.  Chromium Catalyst Users
Chromium Catalyst Users

Chromium Catalyst Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

Government
SECTOR 27.  Solid Waste Incineration
ALL

Government

INDUSTRIAL REHABILITATION AND 
MAINTENANCE

Page 118

23% *

88%

*

1

$                     ‐

HAZARDOUS WASTE‐SITE WORK

Small
State

0 * $     136.66 *
0 * $     136.66 *

23% *
23% *

99%
88%

*
*

1
1

$                     ‐
$                     ‐

Local
Large

0 * $     136.66 *
0 * $      136.66 *

23% *
23% *

88%
88%

*
*

1
44

$                     ‐
$                     ‐

Small

0 * $     136.66 *
16,517

23% *

99%

*

175
$                     ‐
7,770 $            594,000

#PLANTS

Item 13 Cost

1‐%FITBASE

0 * $     136.66 *

RESPEXAMCOST

Large

EMPAL

%EMPMEDEXAM

Table 17

REFRACTORY BRICK RESTORATION 
Total

Page 119

Table 18

Protective Work Clothing and Equipment, Removal and Storage (§§1910.1026(h)(2)(iv), 
1915.1026(g)(2)(iv), and 1926.1126(g)(2)(iv)); Contract Cost to Obtain Cr(VI) Hazard‐Warning Labels for 
Bags or Containers Used to Store Cr(VI)‐Contaminated Protective Clothing or Equipment
This table calculates the contract cost for purchasing appropriate labels for glove disposal containers.  OSHA estimates 
that 5% of the containers will need new or replacement labels.  The number of replacement gloves used throughout the 
year is divided by 1,602.  The factor of 1,602 is the estimated number of gloves that can fit into a thirty‐gallon garbage 
bag.
Cost = GLOVERPL/1,602 * 5%*$0.32 *#PLANTS

Item 13 Cost

#PLANTS

COST

5% of containers need labels

NOGLOVESCONT

GLOVEREPL

Variables

GLOVEREPL = The number of glove replacements per year
NOGLOVESCONT = The number of gloves that can fit into a thirty‐gallon container.
5% of containers need new or replacement labels.
COST = The cost of a label
#PLANTS = Number of model plants
COST = The cost of a label

Sector 1. Electroplating
Large

54,888,821 / 1,602 1713.13 $0.41

1=

$703

Small

11,970,179 / 1,602

Large

ALL
373.60

$0.41

1=

$153

0 / 1,602

0.00

$0.41

7,857 =

$0

Small
Large

0 / 1,602
0 / 1,602

0.00
0.00

$0.41
$0.41

8,804 =
189 =

$0
$0

Small
Large

0 / 1,602
0 / 1,602

0.00
0.00

$0.41
$0.41

107 =
268 =

$0
$0

Small
State

0 / 1,602
0 / 1,602

0.00
0.00

$0.41
$0.41

2,145 =
25 =

$0
$0

Local

0 / 1,602

0.00

$0.41

787 =

$0

Large

0 / 1,602

0.00

$0.41

10,535 =

$0

Small
Large

0 / 1,602
0 / 1,602

0.00
0.00

$0.41
$0.41

10,724 =
409 =

$0
$0

Small

0 / 1,602

0.00

$0.41

232 =

$0

Sector 2. Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
Sector 2A. Mild Steel Welding
GENERAL INDUSTRY

MARITIME

Page 120

COST

#PLANTS

Item 13 Cost

0 / 1,602

0.00

$0.41

402 =

$0

Small

0 / 1,602

0.00

$0.41

3,037 =

$0

Large

125,000 / 1,602

3.90

$0.41

49 =

$78

Small

1,000 / 1,602

0.03

$0.41

62 =

$1

GLOVEREPL

CONSTRUCTION
SECTOR 3.  Painting
GENERAL INDUSTRY

NOGLOVESCONT

Large

Variables

5% of containers need labels

Table 18

AEROSPACE

Page 121

#PLANTS

1.90

$0.41

326 =

$255

Small
Large

5,000 / 1,602
14,000 / 1,602

0.16
0.44

$0.41
$0.41

1,436 =
100 =

$92
$18

Small
Large

3,000 / 1,602
5,000 / 1,602

0.09
0.16

$0.41
$0.41

18 =
276 =

$1
$18

Small
Large

2,000 / 1,602
14,000 / 1,602

0.06
0.44

$0.41
$0.41

476 =
671 =

$12
$120

Small
State

3,000 / 1,602
5,000 / 1,602

0.09
0.16

$0.41
$0.41

3,566 =
12 =

$137
$1

Local

59,000 / 1,602

1.84

$0.41

647 =

$489

Large

75,000 / 1,602

2.34

$0.41

2=

$2

Small

0 / 1,602

0.00

$0.41

0=

$0

Large

24,000 / 1,602

0.75

$0.41

2=

$1

Small

3,000 / 1,602

0.09

$0.41

1=

$0

Large

8,760 / 1,602

0.27

$0.41

2=

$0

Small

0 / 1,602

0.00

$0.41

0=

$0

Large

57,000 / 1,602

1.78

$0.41

5=

$3

Small

0 / 1,602

0.00

$0.41

0=

$0

Large

12,000 / 1,602

0.37

$0.41

80 =

$12

Small

6,000 / 1,602

0.19

$0.41

126 =

$10

Large

24,000 / 1,602

0.75

$0.41

2=

$1

Small
SECTOR 10.  Plastic Colorant Producers and Users
Large

480 / 1,602

0.01

$0.41

8=

$0

583 / 1,602

0.02

$0.41

81 =

$1

GLOVEREPL

Item 13 Cost

COST

61,000 / 1,602

NOGLOVESCONT

Large

Variables

5% of containers need labels

Table 18

AUTO BODY

COIL COATING

MARITIME

CONSTRUCTION

GOVERNMENT
SECTOR 4.  Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
ALL
SECTOR 9.  Printing Ink Producers
ALL

Page 122

COST

#PLANTS

Item 13 Cost

120 / 1,602

0.00

$0.41

40 =

$0

Large

14,400 / 1,602

0.45

$0.41

6=

$1

Small

2,880 / 1,602

0.09

$0.41

4=

$0

Large

0 / 1,602

0.00

$0.41

1=

$0

Small

0 / 1,602

0.00

$0.41

0=

$0

Large

0 / 1,602

0.00

$0.41

34 =

$0

Small

0 / 1,602

0.00

$0.41

11 =

$0

GLOVEREPL

NOGLOVESCONT

Small

Variables

5% of containers need labels

Table 18

ALL
SECTOR 11.  Plating Mixture Producers
ALL
SECTOR 13.  Chromium Metal Producers
ALL
SECTOR 14.  Iron and Steel Mills
GENERAL INDUSTRY

Page 123

$0.41

0=

$0

Small
SECTOR 14b. Alloy Stainless Steel Forging Industry
Large
RESHAPING INDUSTRY
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
ALL
Small
Large
FIBER, FLAT, AND CONTAINER GLASS
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
Chromium Catalyst Users

0 / 1,602

0.00

$0.41

0=

$0

0 / 1,602

0.00

$0.41

33 =

$0

0 / 1,602

0.00

$0.41

31 =

$0

0 / 1,602

0.00

$0.41

163 =

$0

0 / 1,602

0.00

$0.41

118 =

$0

3,840 / 1,602

0.12

$0.41

3=

$0

840 / 1,602

0.03

$0.41

1=

$0

0 / 1,602

0.00

$0.41

0=

$0

2,000 / 1,602

0.06

$0.41

5=

$0

0 / 1,602

0.00

$0.41

216 =

$0

0 / 1,602

0.00

$0.41

1,627 =

$0

7,580 / 1,602

0.24

$0.41

343 =

$33

240 / 1,602

0.01

$0.41

697 =

$2

1,000 / 1,602

0.03

$0.41

6=

$0

0 / 1,602
0 / 1,602

0.00
0.00

$0.41
$0.41

20 =
0=

$0
$0

0 / 1,602

0.00

$0.41

0=

$0

5,460 / 1,602

0.17

$0.41

81 =

$6

360 / 1,602

0.01

$0.41

325 =

$2

2,000 / 1,602

0.06

$0.41

179 =

$5

GLOVEREPL

Item 13 Cost

0.00

#PLANTS

COST

0 / 1,602

NOGLOVESCONT

Large

Variables

5% of containers need labels

Table 18

CARBON STEEL

Page 124

COST

#PLANTS

Item 13 Cost

0 / 1,602
30,000 / 1,602

0.00
0.94

$0.41
$0.41

0=
23 =

$0
$9

Small

15,000 / 1,602

0.47

$0.41

4=

$1

Large

11,000 / 1,602

0.34

$0.41

5=

$1

Small

0 / 1,602

0.00

$0.41

0=

$0

Large

0 / 1,602

0.00

$0.41

148 =

$0

MARITIME

Small
Large

0 / 1,602
0 / 1,602

0.00
0.00

$0.41
$0.41

79 =
36 =

$0
$0

CONSTRUCTION

Small
Large

0 / 1,602
2,000 / 1,602

0.00
0.06

$0.41
$0.41

32 =
1,162 =

$0
$30

Small
State

1,000 / 1,602
1,000 / 1,602

0.03
0.03

$0.41
$0.41

4,650 =
12 =

$60
$0

Local

1,000 / 1,602

0.03

$0.41

42 =

$1

Large

20,000 / 1,602

0.62

$0.41

40 =

$10

Small
State

3,000 / 1,602
20,000 / 1,602

0.09
0.62

$0.41
$0.41

48 =
0=

$2
$0

Local

3,000 / 1,602

0.09

$0.41

24 =

$1

Large

0 / 1,602

0.00

$0.41

19 =

$0

Small

0 / 1,602

0.00

$0.41

0=

$0

Large

0 / 1,602

0.00

$0.41

0=

$0

Small
State

0 / 1,602
0 / 1,602

0.00
0.00

$0.41
$0.41

0=
0=

$0
$0

Local
Large

0 / 1,602
14,000 / 1,602

0.00
0.44

$0.41
$0.41

0=
40 =

$0
$7

GLOVEREPL

NOGLOVESCONT

Small
Large

Variables

5% of containers need labels

Table 18

Catalyst Service Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
GENERAL INDUSTRY

 GOVERNMENT
SECTOR 27.  Solid Waste Incineration
ALL

 GOVERNMENT
SECTOR 30.  Superalloy Producers and Users
ALL
SECTOR 31.  Construction

INDUSTRIAL REHABILITATION AND 
MAINTENANCE

Page 125

COST

#PLANTS

Item 13 Cost

3,000 / 1,602
2,000 / 1,602

0.09
0.06

$0.41
$0.41

170
1

$7
$0

Local
Large

3,000 / 1,602
14,000 / 1,602

0.09
0.44

$0.41
$0.41

239 =
44 =

$9
$8

Small

1,000 / 1,602

0.03

$0.41
Total

175 =
64,410

$2
$2,302

GLOVEREPL
HAZARDOUS WASTE‐SITE WORK

REFRACTORY BRICK RESTORATION

Page 126

NOGLOVESCONT

Small
State

Variables

5% of containers need labels

Table 18

Table 18a

Protective Work Clothing and Equipment, Removal and Storage (§§1910.1026(h)(2)(iv), 1915.1026(g)(2)(iv), 
and 1926.1126(g)(2)(iv)); Clerical Time and Cost to Affix Cr(VI) Hazard‐Warning Labels for Bags or Containers 
Used to Store Cr(VI)‐Contaminated Protective Clothing or Equipment

OSHA assumes that it will take 1 minute of clerical employee time to obtain and affix Cr(VI) hazard‐warning labels to glove 
disposal containers.  OSHA assumes the number of labels will be the same as the number of containers needing labels, as 
calculated in Table 18.  
5% of containers need new or replacement labels = see Table 18
* HCLWAGE =    Highest clerical wage rate (overestimation)
* AFFIX = 1 minute for a clerical worker to obtain and affix label
#PLANTS = Number of model plants
COST = The cost to obtain and affix the label

Responses

Item 12 Cost

HCLWage

Burden Hours

 AFFIX

#PLANTS

Variables

5% of containers need labels

22%

Sector 1. Electroplating
1713.13 *

1 *

0.02

=

34.26

*

$34.72 =

$1,189.71 1713.13

373.60 *

1 *

0.02

=

7.47

*

$34.72 =

$259.45

373.60

ALL
Sector 2. Welding
0.00

*

7,857 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

0.00
0.00

*
*

8,804 *
189 *

0.02
0.02

=
=

0.00
0.00

*
*

$34.72 =
$34.72 =

$0.00
$0.00

0.00
0.00

0.00
0.00

*
*

107 *
268 *

0.02
0.02

=
=

0.00
0.00

*
*

$34.72 =
$34.72 =

$0.00
$0.00

0.00
0.00

0.00
0.00

*
*

2,145 *
25 *

0.02
0.02

=
=

0.00
0.00

*
*

$34.72 =
$34.72 =

$0.00
$0.00

0.00
0.00

0.00

*

787 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

0.00

*

10,535 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

0.00
0.00

*
*

10,724 *
409 *

0.02
0.02

=
=

0.00
0.00

*
*

$34.72 =
$34.72 =

$0.00
$0.00

0.00
0.00

0.00
0.00

*
*

232 *
402 *

0.02
0.02

=
=

0.00
0.00

*
*

$34.72 =
$34.72 =

$0.00
$0.00

0.00
0.00

0.00

*

3,037 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

3.90

*

49 *

0.02

=

3.82

*

$34.72 =

$132.52

190.82

0.03
1.90

*
*

62 *
326 *

0.02
0.02

=
=

0.04
12.42

*
*

$34.72 =
$34.72 =

$1.34
$431.13

1.92
620.80

GENERAL INDUSTRY

MARITIME

CONSTRUCTION
GOVERNMENT
Sector 2A. Mild Steel Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION
SECTOR 3.  Painting
GENERAL INDUSTRY
AEROSPACE

Page 127

Item 12 Cost

Responses

0.16
0.44

*
*

1,436 *
100 *

0.02
0.02

=
=

4.48
0.87

*
*

$34.72 =
$34.72 =

$155.59
$30.23

224.04
43.54

0.09
0.16

*
*

18 *
276 *

0.02
0.02

=
=

0.03
0.86

*
*

$34.72 =
$34.72 =

$1.18
$29.86

1.70
42.99

0.06
0.44

*
*

476 *
671 *

0.02
0.02

=
=

0.59
5.86

*
*

$34.72 =
$34.72 =

$20.65
$203.57

29.73
293.13

0.09

*

3,566 *

0.02

=

6.68

*

$34.72 =

$231.91

333.94

HCLWage

 AFFIX

Burden Hours

#PLANTS

Variables

5% of containers need labels

Table 18a

AUTO BODY

COIL COATING

MARITIME

CONSTRUCTION

Page 128

Item 12 Cost

Responses

HCLWage

Burden Hours

 AFFIX

#PLANTS

Variables

5% of containers need labels

Table 18a

$1.27

1.82

0.16

*

12 *

0.02

=

0.04

*

$34.72 =

1.84

*

647 *

0.02

=

23.81

*

$34.72 =

2.34

*

2 *

0.02

=

0.09

*

$34.72 =

$3.11

4.48

0.00

*

0 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

0.75

*

2 *

0.02

=

0.03

*

$34.72 =

$0.94

1.35

0.09

*

1 *

0.02

=

0.00

*

$34.72 =

$0.06

0.08

0.27

*

2 *

0.02

=

0.01

*

$34.72 =

$0.45

0.65

0.00

*

0 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

1.78

*

5 *

0.02

=

0.17

*

$34.72 =

$5.91

8.52

0.00

*

0 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

0.37

*

80 *

0.02

=

0.60

*

$34.72 =

$20.92

30.12

0.19

*

126 *

0.02

=

0.47

*

$34.72 =

$16.44

23.67

0.75

*

2 *

0.02

=

0.04

*

$34.72 =

$1.30

1.87

0.01
SECTOR 10.  Plastic Colorant Producers and Users
0.02
ALL
0.00
SECTOR 11.  Plating Mixture Producers
0.45
ALL
0.09
SECTOR 13.  Chromium Metal Producers
0.00
ALL
0.00
SECTOR 14.  Iron and Steel Mills
0.00
GENERAL INDUSTRY
0.00
0.00
CARBON STEEL
0.00
SECTOR 14b. Alloy Stainless Steel Forging Industry
0.00

*

8 *

0.02

=

0.00

*

$34.72 =

$0.09

0.12

*

81 *

0.02

=

0.03

*

$34.72 =

$1.03

1.48

*

40 *

0.02

=

0.00

*

$34.72 =

$0.10

0.15

*

6 *

0.02

=

0.05

*

$34.72 =

$1.76

2.54

*

4 *

0.02

=

0.01

*

$34.72 =

$0.23

0.34

*

1 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

*

0 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

*

34 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

*
*

11 *
0 *

0.02
0.02

=
=

0.00
0.00

*
*

$34.72 =
$34.72 =

$0.00
$0.00

0.00
0.00

*

0 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

*

33 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

GOVERNMENT
$826.93 1190.75

SECTOR 4.  Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
ALL
SECTOR 9.  Printing Ink Producers
ALL

Page 129

Responses

31 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

0.00

*

163 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

0.00

*

118 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

0.12

*

3 *

0.02

=

0.01

*

$34.72 =

$0.22

0.32

0.03

*

1 *

0.02

=

0.00

*

$34.72 =

$0.02

0.02

HCLWage

Item 12 Cost

Burden Hours

*

 AFFIX

0.00

#PLANTS

Variables

5% of containers need labels

Table 18a

RESHAPING INDUSTRY
SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL

Page 130

Responses

0 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

0.06

*

5 *

0.02

=

0.01

*

$34.72 =

$0.21

0.30

0.00

*

216 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

0.00

*

1,627 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

0.24

*

343 *

0.02

=

1.63

*

$34.72 =

$56.44

81.26

0.01

*

697 *

0.02

=

0.10

*

$34.72 =

$3.63

5.22

0.03

*

6 *

0.02

=

0.00

*

$34.72 =

$0.14

0.20

0.00
0.00

*
*

20 *
0 *

0.02
0.02

=
=

0.00
0.00

*
*

$34.72 =
$34.72 =

$0.00
$0.00

0.00
0.00

0.00

*

0 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

0.17

*

81 *

0.02

=

0.28

*

$34.72 =

$9.63

13.87

0.01

*

325 *

0.02

=

0.07

*

$34.72 =

$2.54

3.66

0.06

*

179 *

0.02

=

0.22

*

$34.72 =

$7.75

11.17

0.00
0.94

*
*

0 *
23 *

0.02
0.02

=
=

0.00
0.43

*
*

$34.72 =
$34.72 =

$0.00
$14.98

0.00
21.58

0.47

*

4 *

0.02

=

0.04

*

$34.72 =

$1.43

2.06

0.34

*

5 *

0.02

=

0.04

*

$34.72 =

$1.29

1.85

0.00

*

0 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

0.00

*

148 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

MARITIME

0.00
0.00

*
*

79 *
36 *

0.02
0.02

=
=

0.00
0.00

*
*

$34.72 =
$34.72 =

$0.00
$0.00

0.00
0.00

CONSTRUCTION

0.00
0.06

*
*

32 *
1,162 *

0.02
0.02

=
=

0.00
1.45

*
*

$34.72 =
$34.72 =

$0.00
$50.36

0.00
72.52

0.03
0.03

*
*

4,650 *
12 *

0.02
0.02

=
=

2.90
0.01

*
*

$34.72 =
$34.72 =

$100.79
$0.25

145.14
0.36

0.03

*

42 *

0.02

=

0.03

*

$34.72 =

$0.92

1.32

HCLWage

*

 AFFIX

0.00

#PLANTS

Item 12 Cost

Burden Hours

Variables

5% of containers need labels

Table 18a

SECTOR 18.  Chromium Sulfate Producers
ALL
SECTOR 19.  Chemical Distributors
ALL
SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
ALL

FIBER, FLAT, AND CONTAINER GLASS
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
Chromium Catalyst Users

Catalyst Service Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
GENERAL INDUSTRY

 GOVERNMENT
SECTOR 27.  Solid Waste Incineration

Page 131

Responses

40 *

0.02

=

0.50

*

$34.72 =

$17.27

24.86

0.09
0.62

*
*

48 *
0 *

0.02
0.02

=
=

0.09
0.00

*
*

$34.72 =
$34.72 =

$3.11
$0.00

4.48
0.00

0.09

*

24 *

0.02

=

0.04

*

$34.72 =

$1.55

2.24

0.00

*

19 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

0.00

*

0 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

HCLWage

Item 12 Cost

Burden Hours

*

 AFFIX

0.62

#PLANTS

Variables

5% of containers need labels

Table 18a

ALL

 GOVERNMENT
SECTOR 30.  Superalloy Producers and Users
ALL

Page 132

Responses

0 *

0.02

=

0.00

*

$34.72 =

$0.00

0.00

0.00
0.00

*
*

0 *
0 *

0.02
0.02

=
=

0.00
0.00

*
*

$34.72 =
$34.72 =

$0.00
$0.00

0.00
0.00

0.00
0.44

*
*

0 *
40 *

0.02
0.02

=
=

0.00
0.35

*
*

$34.72 =
$34.72 =

$0.00
$12.20

0.00
17.57

0.09
0.06

*
*

170 *
1 *

0.02
0.02

0.32
0.00

*
*

$34.72
$34.72

$11.05
$0.04

15.92
0.05

0.09
0.44

*
*

239 *
44 *

0.02
0.02

=
=

0.45
0.39

*
*

$34.72 =
$34.72 =

$15.52
$13.45

22.34
19.36

0.03

*

175 *
64,410

0.02

=

0.11
*
112.21

$34.72 =

HCLWage

Item 12 Cost

Burden Hours

*

 AFFIX

0.00

#PLANTS

Variables

5% of containers need labels

Table 18a

SECTOR 31.  Construction

INDUSTRIAL REHABILITATION AND 
MAINTENANCE

HAZARDOUS WASTE‐SITE WORK

REFRACTORY BRICK RESTORATION

Total

Page 133

$3.80
5.47
$3,896.25 5610.44

Table 19

Protective Work Clothing and Equipment, Cleaning and Replacement (§§ 1910.1026(h)(3)(iii), 1915.1026(g)(3)(iii), and 
1926.1126(g)(3)(iii)) 
Employer Time and Cost to Inform Laundry Contractor About Cr(VI)‐Contaminated Protective Clothing or Equipment 
The laundering company will be informed of the presence of hexavalent chromium in the laundry at the commencement of the laundering agreement.  
Laundering facilities typically collect dirty uniforms for cleaning.  It is estimated that the laundering facility will assume the cost burden for labeling the 
contaminated laundry and include the cost in their laundering fee.   For purposes of calculating burden hours, OSHA assumes that it will take a maximum 
of five minutes to notify the laundry, and that 25% of the plants will need to annually notify or reinform the laundry.
Hours = #PLANTS * NOTTIME
Cost = Hours * SUPEWAGE
#PLANTS = Number of plants represented by the model plant * 25% need to notify or reinform.
NOTIME = Time to notify the laundry.
SUPEWAGE = Supervisory Wage Rate

Item 12 Cost

RESPONSES

0.25 *

0.08

=

0.02 * $       36.22 =

$                  0.72

1

Small

1

0.25 *

0.08

=

0.02 * $       36.22 =

$                  0.72

1

Large

7,857 1964.3369 *

0.08

=

157.15 * $       35.65 =

$          5,602.74

7,857

Small
Large

8,804 2201.0622 *
189 47.345061 *

0.08
0.08

=
=

176.08 * $       35.65 =
3.79 * $       35.65 =

$          6,277.94
$             135.04

8,804
189

Small
Large

107 26.812764 *
268 66.911132 *

0.08
0.08

=
=

2.15 * $       35.65 =
5.35 * $       35.65 =

$                76.48
$             190.85

107
268

Small
State

2,145 536.25528 *
25 6.2804672 *

0.08
0.08

=
=

42.90 * $       35.65 =
0.50 * $       35.65 =

$          1,529.52
$                17.91

2,145
25

Local

787 196.86849 *

0.08

=

15.75 * $       35.65 =

$             561.51

787

Large

10,535 2633.6898 *

0.08

=

210.70 * $       35.65 =

$          7,511.89

10,535

Small
Large

10,724 2681.0348 *
409 102.17837 *

0.08
0.08

=
=

214.48 * $       35.65 =
8.17 * $       35.65 =

$          7,646.93
$             291.44

10,724
409

Small
Large

232 57.973544 *
402 100.48748 *

0.08
0.08

=
=

4.64 * $       35.65 =
8.04 * $       35.65 =

$             165.35
$             286.61

232
402

Small

3,037 759.21187 *

0.08

=

60.74 * $       35.65 =

$          2,165.45

3,037

Large

49 12.227813 *

0.08

=

0.98 * $       44.87 =

$                43.90

49

Small
Large

62 15.397987 *
326 81.518752 *

0.08
0.08

=
=

1.23 * $       44.87 =
6.52 * $       44.87 =

$                55.28
$             292.65

62
326

Small
Large

1,436 358.90895 *
100 24.908508 *

0.08
0.08

=
=

28.71 * $       44.87 =
1.99 * $       44.87 =

$          1,288.45
$                89.42

1,436
100

Small
Large

18 4.5288196 *
276 68.876701 *

0.08
0.08

=
=

0.36 * $       44.87 =
5.51 * $       44.87 =

$                16.26
$             247.26

18
276

Small

476 119.08588 *

0.08

=

9.53 * $       44.87 =

$             427.51

476

SUPWAGE

1

BURDEN HOURS  

NOTIME

Large

#PLANTS

# of PLANTS *25%

20.69%

Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION
GOVERNMENT
Sector 2A. Mild Steel Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION
SECTOR 3.  Painting
GENERAL INDUSTRY
AEROSPACE

AUTO BODY

COIL COATING

MARITIME

Page 134

Table 19

Large

671 167.71502 *

0.08

=

13.42 * $       44.87 =

$             602.08

671

Small
State

3,566 891.62133 *
12 2.9208754 *

0.08
0.08

=
=

71.33 * $       44.87 =
0.23 * $       44.87 =

$          3,200.84
$                10.49

3,566
12

Local

647 161.65922 *

0.08

=

12.93 * $       44.87 =

$             580.34

647

Large

2 0.4787616 *

0.08

=

0.04 * $       52.66 =

$                  2.02

2

Small

0

0*

0.08

=

0.00 * $       52.66 =

$                    ‐

0

Large

2 0.4498851 *

0.08

=

0.04 * $       51.32 =

$                  1.85

2

Small

1 0.2249425 *

0.08

=

0.02 * $       51.32 =

$                  0.92

1

Large

2 0.5909091 *

0.08

=

0.05 * $       43.46 =

$                  2.05

2

Small

0

0*

0.08

=

0.00 * $       43.46 =

$                    ‐

0

Large

5

1.196904 *

0.08

=

0.10 * $       52.66 =

$                  5.04

5

Small

0

0*

0.08

=

0.00 * $       52.66 =

$                    ‐

0

Large

80 20.107988 *

0.08

=

1.61 * $       39.21 =

$                63.08

80

Small

126 31.598266 *

0.08

=

2.53 * $       39.21 =

$                99.13

126

Large

2 0.6244898 *

0.08

=

0.05 * $       39.29 =

$                  1.96

2

Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
GENERAL INDUSTRY
Small
Large
CARBON STEEL
Small
SECTOR 14b. Alloy Stainless Steel Forging Industry
Large
RESHAPING INDUSTRY
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL

8 2.0816327 *

0.08

=

0.17 * $       39.29 =

$                  6.54

8

CONSTRUCTION

GOVERNMENT
SECTOR 4.  Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
ALL
SECTOR 9.  Printing Ink Producers
ALL

81

20.36956 *

0.08

=

1.63 * $       43.52 =

$                70.92

81

40

9.963372 *

0.08

=

0.80 * $       43.52 =

$                34.69

40

6 1.4108755 *

0.08

=

0.11 * $       39.06 =

$                  4.41

6

4 0.9405837 *

0.08

=

0.08 * $       39.06 =

$                  2.94

4

1 0.2270408 *

0.08

=

0.02 * $       52.83 =

$                  0.96

1

0

0*

0.08

=

0.00 * $       52.83 =

$                    ‐

0

34 8.4605844 *

0.08

=

0.68 * $       52.83 =

$                35.76

34

11 2.7137723 *
0
0*

0.08
0.08

=
=

0.22 * $       52.83 =
0.00 * $       52.83 =

$                11.47
$                    ‐

11
0

0*

0.08

=

0.00 * $       52.83 =

$                    ‐

33 8.3009507 *

0.08

=

0.66 * $       52.83 =

$                35.08

33

31 7.8220497 *

0.08

=

0.63 * $       52.83 =

$                33.06

31

163 40.678774 *

0.08

=

3.25 * $       38.53 =

$             125.37

163

118 29.584563 *

0.08

=

2.37 * $       38.53 =

$                91.18

118

3 0.6748276 *

0.08

=

0.05 * $       51.32 =

$                  2.77

3

1 0.2249425 *

0.08

=

0.02 * $       51.32 =

$                  0.92

1

0

0.08

=

0.00 * $       56.48 =

$                    ‐

0

0

0*

Page 135

0

Table 19

1.196904 *

0.08

=

0.10 * $       56.48 =

$                  5.41

5

Large

216 53.913101 *

0.08

=

4.31 * $       40.75 =

$             175.74

216

Small

1,627 406.79885 *

0.08

=

32.54 * $       40.75 =

$          1,326.04

1,627

Large

343 85.874812 *

0.08

=

6.87 * $       27.18 =

$             186.73

343

Small

697 174.27535 *

0.08

=

13.94 * $       27.18 =

$             378.95

697

Large

6 1.5722892 *

0.08

=

0.13 * $       39.30 =

$                  4.94

6

Small
Large

20 4.9789157 *
0
0*

0.08
0.08

=
=

0.40 * $       39.30 =
0.00 * $       39.30 =

$                15.65
$                    ‐

20
0

0*

0.08

=

0.00 * $       39.30 =

$                    ‐

Large

81 20.340732 *

0.08

=

1.63 * $       28.36 =

$                46.15

81

Small

325 81.362927 *

0.08

=

6.51 * $       28.36 =

$             184.62

325

Large

179 44.718064 *

0.08

=

3.58 * $       44.23 =

$             158.25

179

Small
Large

0
0*
23 5.7612229 *

0.08
0.08

=
=

0.00 * $       44.23 =
0.46 * $       44.23 =

$                    ‐
$                20.39

0
23

Small

4 1.0973758 *

0.08

=

0.09 * $       44.23 =

$                  3.88

4

Large

5 1.3486088 *

0.08

=

0.11 * $       34.92 =

$                  3.77

5

Small

0

0*

0.08

=

0.00 * $       34.92 =

$                    ‐

0

Large

148 36.996376 *

0.08

=

2.96 * $       43.69 =

$             129.31

148

MARITIME

Small
Large

79 19.784159 *
36 9.0119048 *

0.08
0.08

=
=

1.58 * $       43.69 =
0.72 * $       43.69 =

$                69.15
$                31.50

79
36

CONSTRUCTION

Small
Large

32 7.939059 *
1,162 290.44838 *

0.08
0.08

=
=

0.64 * $       43.69 =
23.24 * $       43.69 =

$                27.75
$          1,015.20

32
1,162

Small
State

4,650 1162.5738 *
12 2.9208754 *

0.08
0.08

=
=

93.01 * $       43.69 =
0.23 * $       43.69 =

$          4,063.53
$                10.21

4,650
12

Local

42 10.560088 *

0.08

=

0.84 * $       43.69 =

$                36.91

42

Large

40 9.9568966 *

0.08

=

0.80 * $       37.07 =

$                29.52

40

Small
State

48 11.948276 *
0
0*

0.08
0.08

=
=

0.96 * $       37.07 =
0.00 * $       37.07 =

$                35.43
$                    ‐

48
0

Local

24 5.9741379 *

0.08

=

0.48 * $       37.07 =

$                17.71

24

Large

19 4.7510774 *

0.08

=

0.38 * $       38.01 =

$                14.45

19

Small

5

SECTOR 19.  Chemical Distributors
ALL
SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
ALL

FIBER, FLAT, AND CONTAINER GLASS
Small

0

0

SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
Chromium Catalyst Users

Catalyst Service Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
GENERAL INDUSTRY

 GOVERNMENT
SECTOR 27.  Solid Waste Incineration
ALL

 GOVERNMENT
SECTOR 30.  Superalloy Producers and Users
ALL
Small

0

0*

0.08

=

0.00 * $       38.01 =

$                    ‐

0

Large

0

0*

0.08

=

0.00 * $       43.76 =

$                    ‐

0

Small
State

0
0

0*
0*

0.08
0.08

=
=

0.00 * $       43.76 =
0.00 * $       43.76 =

$                    ‐
$                    ‐

0
0

0
0*
40 10.053501 *

0.08
0.08

=
=

0.00 * $       43.76 =
0.80 * $       43.76 =

$                    ‐
$                35.20

SECTOR 31.  Construction

INDUSTRIAL REHABILITATION AND 
MAINTENANCE

Local
Large

Page 136

0
40

Table 19

HAZARDOUS WASTE‐SITE WORK

Small
State

170 42.495748 *
1 0.2051735 *

0.08
0.08

=
=

3.40 * $       43.76 =
0.02 * $       43.76

$             148.78
$                  0.72

170
1

Local
Large

239 59.652416
44 11.079369 *

0.08
0.08

=
=

4.77 $       43.76
0.89 * $       43.76 =

$209
$                38.79

239
44

Small

175 43.815492 *
16,102

0.08

=

3.51 * $       43.76 =
1,288

$             153.40
$48,524.65

175
64,410

REFRACTORY BRICK RESTORATION
Total

Page 137

Table 20

Initial Medical Examination (§§ 1910.1026(k)(1)(i)(A), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(1)(i)(A), (i)(3)(i), and (i)(3)(ii); and 1926.1126(i)(1)(i)(A), (i)(3)(i), and  
(i)(3)(ii))
Employee Time and Cost to Complete the Initial  Medical Examination
This table calculates the burden hours and costs of employee time to complete the initial medical examinations for those employees who are potentially 
exposed to airborne hexavalent chromium at or above the action level or who show "signs or symptoms" of exposure to hexavalent chromium before 
the implementation of engineering controls.   For purposes of estimating the ICR costs, the Agency assumes that: all initial monitoring is completed, 
existing employers will experience a 5% turnover of potentially exposed employees with initial medical examinations,  and new employers will have no 
employees requiring an initial medical examination.
Hours = POTEXEMP*MEDEXAMTIME * #PLANTS
Cost = POTEXEMP* MEDEXAMTIME *NONSUPWAGE * #PLANTS
* POTEXEMP * 5% = Total number of potentially exposed employees at or above the AL and workers with "signs and symptoms" before the 
implementation of engineering controls.
* MEDEXAMTIME = Employee time, in hours, for a medical examination.
*NONSUPEWAGE ‐ Non‐supervisory wage rate
* #PLANTS = Number of Plants 

RESPONSES

1,848 =

1,513 * $26.61

$40,269

10,089

Small

1 0.0455 * 3 *

3,478 =

475 * $26.61

$12,627

3,164

Large

2 0.0966 * 3 *

7,857 =

2,278 * $26.20

$59,672

15,184

Small
Large

0
0
* 3 *
18 0.9179 * 3 *

8,804 =
189 =

0 * $26.20
522 * $26.20

$0
$13,663

0
3,477

Small
Large

1 0.0483 * 3 *
49 2.4639 * 3 *

107 =
268 =

16 * $26.20
1,978 * $26.20

$407
$51,831

104
13,189

Small
Local

5 0.2416 * 3 *
2 0.0966 * 3 *

2,145 =
25 =

1,554 * $26.20
7 * $26.20

$40,725
$191

10,363
49

State

0

* 3 *

787 =

0 * $26.20

$0

0

Large

1 0.0483 * 3 *

10,535 =

1,527 * $26.20

$40,003

10,179

Small
Large

0
0

* 3 *
* 3 *

10,724 =
409 =

0 * $26.20
0 * $26.20

$0
$0

0
0

1 0.0483 * 3 *
18 0.9179 * 3 *

232 =
402 =

34 * $26.20
1,107 * $26.20

$881
$28,999

224
7,379

*

3,037 =

880 * $26.20

$23,063

5,869

*

49 =

339 * $33.07

$11,206

2,259

*
*

62 =
326 =

8 * $33.07
576 * $33.07

$277
$19,044

56
3,840

*
*

1,436 =
100 =

195 * $33.07
27 * $33.07

$6,450
$895

1,300
180

*
*

18 =
276 =

2 * $33.07
106 * $33.07

$81
$3,518

16
709

*

476 =

61 * $33.07

$2,028

409

Hours

5 0.2729 * 3 *

#PLANTS

Large

POTEXEMP

Item 12 Cost

 NONSUPEWAGE

MEDEXAMTIME

POTEXEMP * 5%

Variables

24.17%

Sector 1. Electroplating
ALL
Sector 2. Welding
General Industry

Maritime

Construction

GOVERNMENT
0

Sector 2. Mild Steel Welding
General Industry
0
0

Maritime
Small
Large
Construction
2 0.0966 * 3
Small
SECTOR 3.  PAINTING                                                                        GENERAL INDUSTRY
Large
46 2.3097 * 3
AEROSPACE
1
0.0453 * 3
Small
Large
12 0.5887 * 3
Autobody
1
0.0453 * 3
Small
Large
2
0.0906 * 3
Coil Coating
1
0.0453 * 3
Small
Large
3
0.1287 * 3
Maritime 
1
0.0429 * 3
Small

Page 138

RESPONSES

0.0953 * 3 *

671 =

192 * $33.07

$6,342

1,279

Small
Local

1
6

0.0318 * 3 *
0.3146 * 3 *

3,566 =
12 =

340 * $33.07
11 * $33.07

$11,238
$365

2,266
74

State

0

0.0225 * 3 *

647 =

44 * $33.07

$1,441

291

Large

7 0.3351 * 3 *

2=

2 * $38.68

$74

13

Small

0

* 3 *

0=

0 * $38.68

$0

0

Large

22 1.0797 * 3 *

2=

6 * $37.70

$220

39

Small

3 0.135 * 3 *

1=

0 * $37.70

$14

2

Large

2 0.1182 * 3 *

2=

1 * $31.94

$27

6

Small

0

* 3 *

0=

0 * $31.94

$0

0

25 1.2448 * 3 *

5=

18 * $38.68

$692

119

Hours

2

#PLANTS

Large

POTEXEMP

Item 12 Cost

 NONSUPEWAGE

MEDEXAMTIME

POTEXEMP * 5%

Variables

Table 20

Construction

Government
SECTOR 4.  Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL

0

SECTOR 6. CCA Producers
ALL
0

SECTOR 7.  Chromium Catalyst Producers
Large
ALL
Small

0

0

* 3 *

0=

0 * $38.68

$0

0

Large

5 0.2394 * 3 *

80 =

58 * $28.81

$1,664

385

Small

2 0.0958 * 3 *

126 =

36 * $28.81

$1,046

242

Large

0

0

* 3 *

2=

0 * $28.86

$0

0

Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
Alloy Stainless Steel
Small
Large
Carbon Steel
Small
14B. Alloy Stainless Steel Forging Industry
Large
Reshaping
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small

0

0

* 3 *

8=

0 * $28.86

$0

0

0

0

* 3 *

81 =

0 * $31.99

$0

0

0

0

* 3 *

40 =

0 * $31.99

$0

0

3 0.1411 * 3 *

6=

2 * $28.71

$69

16

2 0.0941 * 3 *

4=

1 * $28.71

$30

7

12 0.5903 * 3 *

1=

2 * $38.80

$62

11

* 3 *

0=

0 * $38.80

$0

0

36 1.8198 * 3 *

34 =

185 * $38.80

$7,169

1,232

1 0.0639 * 3 *
9 0.447 * 3 *

11 =
102 =

2 * $38.80
136 * $38.80

$81
$5,283

14
908

1 0.0639 * 3 *

32 =

6 * $38.80

$237

41

3 0.1277 * 3 *

33 =

13 * $38.80

$494

85

0

* 3 *

31 =

0 * $38.80

$0

0

25 1.2327 * 3 *

163 =

602 * $28.31

$17,035

4,012

5 0.2465 * 3 *

118 =

88 * $28.31

$2,478

583

SECTOR 8.  Paint and Coating Producers
ALL
SECTOR 9.  Printing Ink Producers
ALL

0

0

0

0

0

* 3 *

3=

0 * $37.70

$0

0

0

0

* 3 *

1=

0 * $37.70

$0

0

Page 139

Item 12 Cost

RESPONSES

 NONSUPEWAGE

0

* 3 *

0=

0 * $41.50

$0

0

Small

3 0.1436 * 3 *

5=

2 * $41.50

$86

14

Large

0

0

* 3 *

216 =

0 * $29.92

$0

0

Small

0

0

* 3 *

1,627 =

0 * $29.92

$0

0

Large

0

0

* 3 *

343 =

0 * $19.97

$0

0

Small

0

0

* 3 *

697 =

0 * $19.97

$0

0

Large

1 0.0524 * 3 *

6=

1 * $28.87

$29

7

Small
Large

0
0
* 3 *
12 0.5765 * 3 *

20 =
90 =

0 * $28.87
156 * $28.87

$0
$4,501

0
1,039

Small

2 0.1048 * 3 *

5=

2 * $28.87

$48

11

Large

0

0

* 3 *

81 =

0 * $20.85

$0

0

Small

0

0

* 3 *

325 =

0 * $20.85

$0

0

Large

1 0.0549 * 3 *

179 =

29 * $32.51

$957

196

Small
Large

0
0
* 3 *
11 0.5487 * 3 *

0=
23 =

0 * $32.51
38 * $32.51

$0
$1,233

0

Small

5 0.2743 * 3 *

4=

4 * $32.51

$117

24

Large

0

0

* 3 *

5=

0 * $25.64

$0

0

Small

0

0

* 3 *

0=

0 * $25.64

$0

0

Large

1 0.0396 * 3 *

148 =

18 * $32.11

$564

117

Small
Large

0
0

* 3 *
* 3 *

79 =
36 =

0 * $32.11
0 * $32.11

$0
$0

0
0

Small
Large

0
0
* 3 *
2 0.117 * 3 *

32 =
1,162 =

0 * $32.11
408 * $32.11

$0
$13,098

0
2,719

Small
State

1 0.039 * 3 *
0 0.0225 * 3 *

4,650 =
12 =

544 * $32.11
1 * $32.11

$17,476
$25

3,628
5

Local

0 0.0225 * 3 *

42 =

3 * $32.11

$91

19

Large

0

0

* 3 *

40 =

0 * $27.23

$0

0

Small
State

0
0

0
0

* 3 *
* 3 *

48 =
0=

0 * $27.23
0 * $27.23

$0
$0

0
0

Local

0

0

* 3 *

24 =

0 * $27.23

$0

0

Large

2 0.1056 * 3 *

19 =

6 * $27.93

$168

40

Small

0

0=

0 * $27.93

$0

0

Hours

0

#PLANTS

MEDEXAMTIME

Large

POTEXEMP

POTEXEMP * 5%

Variables

Table 20

SECTOR 18.  Chromium Sulfate Producers
ALL
SECTOR 19.  Chemical Distributors
ALL
SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
ALL

Fiber, Flat and Container Glass
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
Catalyst Users

Chromium Catalyst Service Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
General Industry
0
0

Maritime

Construction

Government
SECTOR 27.  Solid Waste Incineration
ALL

Government
SECTOR 30.  Superalloy Producers and Users
ALL
0

* 3 *

Page 140

Item 12 Cost

RESPONSES

 NONSUPEWAGE

0

0

* 3 *

51 =

0 * $32.13

$0

0

Small
State Gov't

0
0

0
0

* 3 *
* 3 *

233 =
15 =

0 * $32.13
0 * $32.13

$0
$0

0
0

Local Gov't
Large

0
0

0
0

* 3 *
* 3 *

88 =
40 =

0 * $32.13
0 * $32.13

$0
$0

0
0

Small
State Gov't

0
0

0
0

* 3 *
* 3 *

170 =
1=

0 * $32.13
0 * $32.13

$0
$0

0
0

0
0
* 3 *
11 0.5279 * 3 *

239 =
44 =

0 * $32.13
70 * $32.13

$0
$2,255

0
468

1 0.0528 * 3 *

175 =
70,349

28 * $32.13

$892
$453,431

185
108,133

Hours

#PLANTS

MEDEXAMTIME

Large

POTEXEMP

POTEXEMP * 5%

Variables

Table 20

SECTOR 31.  Construction

Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

Local Gov't
Large
Refractory Brick Restoration
Small
Total

Page 141

16,258

Table 21

Initial Medical Examination (§§ 1910.1026(k)(1)(i)(A), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(1)(i)(A), (i)(3)(i), and (i)(3)(ii); and 
1926.1126(i)(1)(i)(A), (i)(3)(i), and  (i)(3)(ii)) 
Contract Cost for a PLHCP to Conduct the Initial Medical Examination
This table calculates the cost for a contractor PLHCP to conduct initial medical examinations.

COST

#PLANTS

MEDEXAMCOST

POTEXEMP*5%

Variables

POTEXEMP

COST = POTEXEMP * MEDEXAMCOST * # PLANTS
* POTEXEMP = Total number of potentially exposed employees at or above the AL and workers with "signs and symptoms" 
                              before the implementation of engineering controls * 5%
*MEDEXAMCOST = Cost of medical exam
* #PLANTS = Number of Plants 

Sector 1. Electroplating
Large

5 0.2729 *

$160 *

1,848 =

$80,852

Small

1 0.0455 *

$160 *

3,478 =

$25,353

Large

2 0.0966 *

$160 *

7,857 =

$121,683

Small
Large

0 0.0000 *
18 0.9179 *

$160 *
$160 *

8,804 =
189 =

$0
$27,862

Small
Large

1 0.0483 *
49 2.4639 *

$160 *
$160 *

107 =
268 =

$830
$105,695

Small
State

5 0.2416 *
2 0.0966 *

$160 *
$160 *

2,145 =
25 =

$83,047
$389

Local

0 0.0000 *

$160 *

787 =

$0

Large

1 0.0483 *

$160 *

10,535 =

$81,573

Small
Large

0 0.0000 *
0 0.0000 *

$160 *
$160 *

10,724 =
409 =

$0
$0

Small
Large

1 0.0483 *
18 0.9179 *

$160 *
$160 *

232 =
402 =

$1,796
$59,136

*

$160 *

3,037 =

$47,030

*

$160 *

49 =

$18,107

*
*

$160 *
$160 *

62 =
326 =

$447
$4,807

*
*

$160 *
$160 *

1,436 =
100 =

$10,583
$1,446

*

$160 *

18 =

$131

All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
2 0.0966
Small
SECTOR 3.  PAINTING                                                  General Industry
Large
46 2.3097
AEROSPACE
1 0.0453
Small
Large
   2 0.0920
Auto Body
1 0.0460
Small
Large
2 0.0906
Coil Coating
1 0.0453
Small

Page 142

COST

#PLANTS

MEDEXAMCOST

POTEXEMP*5%

Variables

POTEXEMP

Table 21

Large

3 0.1287 *

$160 *

276 =

$5,685

Small
Large

1 0.0429 *
2 0.0953 *

$160 *
$160 *

476 =
671 =

$3,276
$10,246

Small
State

1 0.0318 *
6 0.3146 *

$160 *
$160 *

3,566 =
12 =

$18,157
$589

Local

0 0.0225 *

$160 *

647 =

$2,329

Large

7 0.3351 *

$160 *

2=

$103

Small

0 0.0000 *

$160 *

0=

$0

Large

22 1.0797 *

$160 *

2=

$311

Small

3 0.1350 *

$160 *

1=

$19

Large

2 0.1182 *

$160 *

2=

$45

Small

0 0.0000 *

$160 *

0=

$0

Large

25 1.2448 *

$160 *

5=

$955

Small

0 0.0000 *

$160 *

0=

$0

Large

5 0.2394 *

$160 *

80 =

$3,086

Small

2 0.0958 *

$160 *

126 =

$1,940

Large

0 0.0000 *

$160 *

2=

$0

Small

0 0.0000 *

$160 *

8=

$0

Large

0 0.0000 *

$160 *

81 =

$0

Small

0 0.0000 *

$160 *

40 =

$0

Large

3 0.1411 *

$160 *

6=

$128

Small

2 0.0941 *

$160 *

4=

$57

Large

12 0.5903 *

$160 *

1=

$86

Small

0 0.0000 *

$160 *

0=

$0

Large

36 1.8198 *

$160 *

34 =

$9,871

Small

1 0.0639 *

$160 *

11 =

$111

Maritime

Construction

Government
SECTOR 4.  Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
ALL
SECTOR 9.  Printing Ink Producers
ALL
SECTOR 10.  Plastic Colorant Producers and Users
ALL
SECTOR 11.  Plating Mixture Producers
ALL
SECTOR 13.  Chromium Metal Producers
ALL
SECTOR 14.  Iron and Steel Mills
General Industry

Page 143

COST

#PLANTS

MEDEXAMCOST

POTEXEMP*5%

Variables

POTEXEMP

Table 21

Large

9 0.4470 *

$160 *

102 =

$7,273

Small

1 0.0639 *

$160 *

32 =

$327

Large

3 0.1277 *

$160 *

33 =

$680

Small

0 0.0000 *

$160 *

31 =

$0

Large

25 1.2327 *

$160 *

163 =

$32,148

Small

5 0.2465 *

$160 *

118 =

$4,676

Large

0 0.0000 *

$160 *

3=

$0

Small

0 0.0000 *

$160 *

1=

$0

Large

0 0.0000 *

$160 *

0=

$0

Small

3 0.1436 *

$160 *

5=

$110

Large

0 0.0000 *

$160 *

216 =

$0

Small

0 0.0000 *

$160 *

1,627 =

$0

Large

0 0.0000 *

$160 *

343 =

$0

Small

0 0.0000 *

$160 *

697 =

$0

Large

1 0.0524 *

$160 *

6=

$53

Small
Large

0 0.0000 *
12 0.5765 *

$160 *
$160 *

20 =
90 =

$0
$8,329

Small

2 0.1048 *

$160 *

5=

$88

Large

0 0.0000 *

$160 *

81 =

$0

Small

0 0.0000 *

$160 *

325 =

$0

Large

1 0.0549 *

$160 *

179 =

$1,573

Small

0 0.0000 *

$160 *

0=

$0

Carbon Steel
SECTOR 14B. Forging Industry
Reshaping
SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL
SECTOR 18.  Chromium Sulfate Producers
ALL
SECTOR 19.  Chemical Distributors
ALL
SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
General Industry

Fiber, Flat and Container Glass
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
General Industry

Page 144

COST

#PLANTS

MEDEXAMCOST

POTEXEMP*5%

Variables

POTEXEMP

Table 21

Large

11 0.5487 *

$160 *

23 =

$2,027

Small

5 0.2743 *

$160 *

4=

$193

Large

0 0.0000 *

$160 *

5=

$0

Small

0 0.0000 *

$160 *

0=

$0

Large

1 0.0396 *

$160 *

148 =

$939

Small
Large

0 0.0000 *
0 0.0000 *

$160 *
$160 *

79 =
36 =

$0
$0

Small
Large

0 0.0000 *
2 0.1170 *

$160 *
$160 *

32 =
1,162 =

$0
$21,794

Small
State

1 0.0390 *
0 0.0225 *

$160 *
$160 *

4,650 =
12 =

$29,078
$42

Local

0 0.0225 *

$160 *

42 =

$152

Large

0 0.0000 *

$160 *

40 =

$0

Small
State

0 0.0000 *
1 0.0438 *

$160 *
$160 *

48 =
0=

$0
$0

Local

0 0.0000 *

$160 *

24 =

$0

Large

2 0.1056 *

$160 *

19 =

$322

Small

0 0.0000 *

$160 *

0=

$0

Large

0 0.0000 *

$160 *

51 =

$0

Small
State

0 0.0000 *
0 0.0000 *

$160 *
$160 *

233 =
15 =

$0
$0

Local
Large

0 0.0000 *
0 0.0000 *

$160 *
$160 *

88 =
40 =

$0
$0

Small
State

0 0.0000 *
0 0.0000 *

$160 *
$160 *

170 =
1=

$0
$0

Local
Large

0 0.0000 *
11 0.5279 *

$160 *
$160 *

239 =
44 =

$0
$3,750

Small

1 0.0528 *

$160 *

175 =
70,349

$1,483
$842,799

Chromium Service Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
General Industry

Maritime

Construction

Government
SECTOR 27.  Solid Waste Incineration
ALL

Government
SECTOR 30.  Superalloy Producers and Users
ALL
SECTOR 31.  Construction

Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration 
Total

Page 145

Table 22

Annual Medical Examination (§§ 1910.1026(k)(2)(ii), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(2)(ii), (i)(3)(i), and (i)(3)(ii); and 
1926.1126(i)(2)(ii), (i)(3)(i), and  (i)(3)(ii))
Employee Time and Cost to Complete the Annual Medical Examination 
This table calculates the burden hours and costs associated with employee time to complete the annual medical examination in the year after the initial medical 
examination is completed.  These hours and costs are for existing emplyoees who are potentially exposed at or above the action level or who show "signs and 
symptoms" of exposure.  The Agency assumes that a varying percentage of existing plants will have employees who will complete these exams; these percentages are 
specific to each sector and plant size (large or small).  Employees who work for employers who conduct annual examinations, %BASEMED, will incur a incremental 
medical exam time of 3 hours.  Employees who are not working for employers providing annual medical examinations (1‐%BASEMED) will incur three hours for a full 
limited medical exam. 
COST = (LIMEMPAL + MEDEXAMADDERM)*(LIMPARTIME * %BASEMED)+(LIMFULLTIME*(1‐%BASEMED))*PLANTS
Hours= Burden Hours x NONSUPEWAGE
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering controls.
* MEDEXAMADDERM = Number of employees above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" 
                                               after the implementation of engineering controls.
LIMPARTIME = Incremental employee time, in hours, for a partial limited exam
%BASEMED = Percentage of employers who are providing annual medical examinations
LIMITFULLTIME = Employee time, in hours, for a full limited medical exam
*1‐%BASEMED = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants

Responses

(

3+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

1,848 =

15,133

$26.61

$402,692

5,044

(

0+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

3,478 =

0

$26.61

$0

0

Large

(

0+

0.000000 ) * ( ( 3 *

5.00%

) +(

3.00 * (

1 ‐

5.00%

) ) *

7,857 =

0

$26.20

$0

0

Small
Large

(
(

0+
14 +

0.000000 ) * ( ( 3 *
2.898677 ) * ( ( 3 *

0.00%
5.00%

) +(
) +(

3.00 * (
3.00 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

8,804 =
189 =

0
9,332

$26.20
$26.20

$0
$244,499

0
3,111

Small
Large

(
(

1+
26 +

0.000000 ) * ( ( 3 *
2.898677 ) * ( ( 3 *

0.00%
5.00%

) +(
) +(

3.00 * (
3.00 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

107 =
268 =

311
23,274

$26.20
$26.20

$8,145
$609,780

104
7,758

Small
State

(
(

3+
0+

0.000000 ) * ( ( 3 *
0.000000 ) * ( ( 3 *

0.00%
5.00%

) +(
) +(

3.00 * (
3.00 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

2,145 =
25 =

18,653
0

$26.20
$26.20

$488,705
$0

6,218
0

Local

(

0+

0.000000 ) * ( ( 3 *

0.00%

) +(

3.00 * (

1 ‐

0.00%

) ) *

787 =

0

$26.20

$0

0

Large

(

0+

0.000000 ) * ( ( 3 *

5.00%

) +(

3.00 * (

1 ‐

5.00%

) ) * 10,535 =

0

$26.20

$0

0

Small
Large

(
(

0+
0+

0.000000 ) * ( ( 3 *
0.000000 ) * ( ( 3 *

0.00%
5.00%

) +(
) +(

3.00 * (
3.00 * (

1 ‐
1 ‐

0.00%
5.00%

) ) * 10,724 =
) ) *
409 =

0
0

$26.20
$26.20

$0
$0

0
0

Small
Large

(
(

0+
10 +

0.000000 ) * ( ( 3 *
0.000000 ) * ( ( 3 *

0.00%
5.00%

) +(
) +(

3.00 * (
3.00 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

232 =
402 =

0
11,651

$26.20
$26.20

$0
$305,257

0
3,884

Small

(

1+

0.000000 ) * ( ( 3 *

0.00%

) +(

3.00 * (

1 ‐

0.00%

) ) *

3,037 =

8,803

$26.20

$230,631

2,934

Large

(

45 +

0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (

1 ‐

80.00% ) ) *

49 =

6,645

$33.07

$219,734

2,215

Small
Large

(
(

0+
1+

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

50.00% ) ) *
80.00% ) ) *

62 =
326 =

0
886

$33.07
$33.07

$0
$29,298

0
295

Small
Large

(
(

0+
2+

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

50.00% ) ) *
80.00% ) ) *

1,436 =
100 =

0
541

$33.07
$33.07

$0
$17,904

0
180

Small
Large

(
(

1+
2+

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (
3.00 * (

1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *

18 =
276 =

49
0

$33.07
$33.07

$1,628
$0

16
473

Small
Large

(
(

1+
2+

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (
3.00 * (

1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *

476 =
671 =

1,227
3,836

$33.07
$33.07

$40,556
$126,831

409
1,279

Small
State

(
(

0+
0+

0.000000 ) * ( ( 3 * 100.00% ) + (
0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (
3.00 * (

1 ‐ 100.00% ) ) *
1 ‐ 100.00% ) ) *

3,566 =
12 =

0
0

$33.07
$33.07

$0
$0

0
0

Local

(

6+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

647 =

12,204

$33.07

$403,545

4,068

Large

(

7+

0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

2=

39

$38.68

$1,489

13

Small

(

0+

0.000000 ) * ( ( 3 *

3.00 * (

1 ‐

0.00%

0=

0

$38.68

$0

0

Hours

Large
Small

#PLANTS

Cost

 NONSUPEWAGE

1‐%BASEMED

LIMPFULLTIME

%BASEMED

LIMPARTIME

 MEDEXAMADDERM

LIMEMPAL

Variables

24.17%

Sector 1. Electroplating
All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
SECTOR 3.  PAINTING
AEROSPACE

Auto Body

Coil Coating

Maritime

Construction

Government
SECTOR 4.  Producers of Chromates
ALL
0.00%

) +(

Page 146

) ) *

8+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

2=

44

$37.70

$1,648

15

(

1+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

1=

2

$37.70

$92

1

(

2+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

2=

11

$31.94

$357

4

(

0+

0.000000 ) * ( ( 3 *

) +(

3.00 * (

1 ‐

) ) *

0=

0

$31.94

$0

0

(

11 +

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

5=

165

$38.68

$6,383

55

(

0+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

0=

0

$38.68

$0

0

(

1+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

80 =

231

$28.81

$6,656

77

(

0+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

126 =

0

$28.81

$0

0

(

0+

0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (

1 ‐

80.00% ) ) *

2=

0

$28.86

$0

0

(

0+

0.000000 ) * ( ( 3 * 10.00% ) + (

3.00 * (

1 ‐

10.00% ) ) *

8=

0

$28.86

$0

0

(

0+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

81 =

0

$31.99

$0

0

(

0+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

40 =

0

$31.99

$0

0

(        3 +

0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

6=

48

$28.71

$1,371

16

(        1 +

0.000000 ) * ( ( 3 * 30.00% ) + (

3.00 * (

1 ‐

30.00% ) ) *

4=

11

$28.71

$305

4

(

7+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

1=

20

$38.80

$768

7

(

0+

0.000000 ) * ( ( 3 *

) +(

3.00 * (

1 ‐

0.00%

) ) *

0=

0

$38.80

$0

0

(

27 +

0.005900 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

34 =

2,723

$38.80

$105,675

908

(
(

1+
1+

0.000281 ) * ( ( 3 * 30.00% ) + (
0.000140 ) * ( ( 3 * 50.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

30.00% ) ) *
50.00% ) ) *

11 =
102 =

42
195

$38.80
$38.80

$1,614
$7,548

14
65

(

1+

0.000281 ) * ( ( 3 * 30.00% ) + (

3.00 * (

1 ‐

30.00% ) ) *

32 =

122

$38.80

$4,747

41

0.00%

0.00%

0.00%

Hours

(

#PLANTS

Responses

 NONSUPEWAGE

1‐%BASEMED

LIMPFULLTIME

%BASEMED

LIMPARTIME

Cost

SECTOR 5. Chromate Pigment Procedures
Large
ALL
Small
SECTOR 6. CCA Producers
Large
ALL
Small
SECTOR 7.  Chromium Catalyst Producers
Large
ALL
Small
SECTOR 8.  Paint and Coating Producers
Large
ALL
Small
SECTOR 9.  Printing Ink Producers
Large
ALL
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small

 MEDEXAMADDERM

LIMEMPAL

Variables

Table 22

(

0+

0.000562 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

33 =

0

$38.80

$2

0

(

0+

0.000140 ) * ( ( 3 * 30.00% ) + (

3.00 * (

1 ‐

30.00% ) ) *

31 =

0

$38.80

$1

0

(

17 +

0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (

1 ‐

80.00% ) ) *

163 =

8,424

$28.31

$238,494

2,808

(

4+

0.000000 ) * ( ( 3 * 10.00% ) + (

3.00 * (

1 ‐

10.00% ) ) *

118 =

1,459

$28.31

$41,298

486

(

0+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

3=

0

$37.70

$0

0

(

0+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

1=

0

$37.70

$0

0

(

0+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

0=

0

$41.50

$0

0

(

1+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

5=

14

$41.50

$571

5

(

0+

0.000000 ) * ( ( 3 *

0.00%

) +(

3.00 * (

1 ‐

0.00%

) ) *

216 =

0

$29.92

$0

0

(

0+

0.000000 ) * ( ( 3 *

0.00%

) +(

3.00 * (

1 ‐

0.00%

) ) *

1,627 =

0

$29.92

$0

0

(

0+

0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (

1 ‐

80.00% ) ) *

343 =

0

$19.97

$0

0

(

0+

0.000000 ) * ( ( 3 * 10.00% ) + (

3.00 * (

1 ‐

10.00% ) ) *

697 =

0

$19.97

$0

0

(

1+

0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (

1 ‐

80.00% ) ) *

6=

20

$28.87

$571

7

(
(

0+
9+

0.000000 ) * ( ( 3 * 10.00% ) + (
0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

10.00% ) ) *
80.00% ) ) *

20 =
90 =

0
2,551

$28.87
$28.87

$0
$73,651

0
850

(

2+

0.000000 ) * ( ( 3 * 10.00% ) + (

3.00 * (

1 ‐

10.00% ) ) *

5=

33

$28.87

$952

11

Page 147

Cost

Responses

 NONSUPEWAGE

0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (

1 ‐

80.00% ) ) *

81 =

0

$20.85

$0

0

Small

(

0+

0.000000 ) * ( ( 3 * 10.00% ) + (

3.00 * (

1 ‐

10.00% ) ) *

325 =

0

$20.85

$0

0

Large

(

0+

0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (

1 ‐

80.00% ) ) *

179 =

0

$32.51

$0

0

Small
Large

(
(

0+
5+

0.000000 ) * ( ( 3 * 80.00% ) + (
0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

80.00% ) ) *
80.00% ) ) *

0=
23 =

0
379

$32.51
$32.51

$0
$12,331

0
126

Small

(

3+

0.000000 ) * ( ( 3 * 30.00% ) + (

3.00 * (

1 ‐

30.00% ) ) *

4=

43

$32.51

$1,409

14

Large

(

0+

0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (

1 ‐

80.00% ) ) *

5=

0

$25.64

$0

0

Small

(

0+

0.000000 ) * ( ( 3 * 10.00% ) + (

3.00 * (

1 ‐

10.00% ) ) *

0=

0

$25.64

$0

0

Large

(

0+

0.000000 ) * ( ( 3 * 25.00% ) + (

3.00 * (

1 ‐

25.00% ) ) *

148 =

0

$32.11

$0

0

Small
Large

(
(

0+
0+

0.000000 ) * ( ( 3 * 0.00% ) + (
0.000000 ) * ( ( 3 * 25.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

0.00% ) ) *
25.00% ) ) *

79 =
36 =

0
0

$32.11
$32.11

$0
$0

0
0

Small
Large

(
(

0+
1+

0.000000 ) * ( ( 3 * 0.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

0.00% ) ) *
50.00% ) ) *

32 =
1,162 =

0
2,719

$32.11
$32.11

$0
$87,322

0
906

Small
State

(
(

1+
0+

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

4,650 =
12 =

10,885
16

$32.11
$32.11

$349,523
$506

3,628
5

Local

(

0+

0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

42 =

57

$32.11

$1,828

19

Large

(

0+

0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

40 =

0

$27.23

$0

0

Small
State

(
(

0+
1+

0.000000 ) * ( ( 3 * 30.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

30.00% ) ) *
50.00% ) ) *

48 =
0=

0
0

$27.23
$27.23

$0
$0

0
0

Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

(

0+

0.000000 ) * ( ( 3 * 30.00% ) + (

3.00 * (

1 ‐

30.00% ) ) *

24 =

0

$27.23

$0

0

(

2+

0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

19 =

120

$27.93

$3,362

40

(

0+

0.000000 ) * ( ( 3 * 30.00% ) + (

3.00 * (

1 ‐

30.00% ) ) *

0=

0

$27.89

$0

0

(

0+

0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

51 =

0

$32.13

$0

0

Small
State

(
(

0+
0+

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

233 =
15 =

0
0

$32.13
$32.13

$0
$0

0
0

Local
Large

(
(

0+
0+

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

88 =
40 =

0
0

$32.13
$32.13

$0
$0

0
0

Small
State

(
(

0+
0+

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

170 =
1=

0
0

$32.13
$32.13

$0
$0

0
0

Local
Large

(
(

0+
1+

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

239 =
44 =

0
140

$32.13
$32.13

$0
$4,511

0
47

Small

(

1+

0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

175 =
70,349

555
143,615

$32.13

Hours

#PLANTS

0+

%BASEMED

(

LIMPARTIME

Large

LIMEMPAL

1‐%BASEMED

LIMPFULLTIME

 MEDEXAMADDERM

Variables

Table 22

SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
General Industry

Chromium Service Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26. Woodworking
General Industry

Maritime

Construction

Government
SECTOR 27. Solid Waste Incineration
ALL

Government

Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration 
Total

Page 148

$17,839
185
$4,102,028 48,345

Table 23

Annual Medical Examination (§§ 1910.1026(k)(2)(ii), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(2)(ii), (i)(3)(i), and (i)(3)(ii); and 
1926.1126(i)(2)(ii), (i)(3)(i), and  (i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Medical Examination 
This table calculates the cost for a contractor PLHCP to conduct the annual medical examination.  Employers who were providing annual examinations (%BASEMED) will incur a partial 
medical exam cost  per employee.  Employers who were NOT providing annual medical examinations (1‐%BASEMED) will incur the full cost of a medical exam  per employee.
COST = (LIMEMPAL + MEDEXAMADDERM)*((PARTFULLCOST*%BASEMED)+(LIMFULLCOST *(1‐%BASEMED))*PLANTS
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" 
                                    after the implementation of engineering controls.
PARTFULLCOST = The cost of a partial medical exam for employers who are providing annual medical examinations.
%BASEMED = Percentage of employers who are providing annual medical examinations

 COST 

#PLANTS

1‐%BASEMED

LIMFULLCOST

%BASEMED

LIMPPARTCOST

 MEDEXAMADDERM

LIMEMPAL

Variables

LIMITFULLCOST = The cost of a medical examination for employers who are not providing annual medical examinations
*1‐%BASEMED = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants

Sector 1. Electroplating
Large

(

3+

0.000000 ) * ( ( 136.67 *

100.00%

) +(

$160 * (

1 ‐ 100.00% ) ) *

1,848 =

$             689,445

Small

(

0+

0.000000 ) * ( ( 136.67 *

100.00%

) +(

$160 * (

1 ‐ 100.00% ) ) *

3,478 =

$                     ‐

Large

(

0+

0.000000 ) * ( ( 136.67 *

5.00%

) +(

$160 * (

1 ‐

5.00%

) ) *

7,857 =

$                     ‐

Small
Large

(
(

0+
14 +

0.000000 ) * ( ( 136.67 *
2.898677 ) * ( ( 136.67 *

0.00%
5.00%

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

8,804 =
189 =

$                     ‐
$             494,912

Small
Large

(
(

1+
26 +

0.000000 ) * ( ( 136.67 *
2.898677 ) * ( ( 136.67 *

0.00%
5.00%

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

107 =
268 =

$               16,609
$         1,234,308

Small
State

(
(

3+
0+

0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *

0.00%
5.00%

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

2,145 =
25 =

$            996,568
$                      ‐

Local

(

0+

0.000000 ) * ( ( 136.67 *

0.00%

) +(

$160 * (

1 ‐

0.00%

) ) *

787 =

$                     ‐

Large

(

0+

0.000000 ) * ( ( 136.67 *

5.00%

) +(

$160 * (

1 ‐

5.00%

) ) *

10,535 =

$                     ‐

Small
Large

(
(

0+
0+

0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *

0.00%
5.00%

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

10,724 =
409 =

$                     ‐
$                      ‐

Small
Large

(
(

0+
10 +

0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *

0.00%
5.00%

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

232 =
402 =

$                     ‐
$            617,897

) +(

$160 * (

1 ‐

0.00%

) ) *

3,037 =

$            470,302

) +(

$160 * (

1 ‐

80.00% ) ) *

49 =

$             313,202

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

50.00% ) ) *
80.00% ) ) *

62 =
326 =

$                     ‐
$               41,760

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

50.00% ) ) *
80.00% ) ) *

1,436 =
100 =

$                     ‐
$               25,520

) +(
) +(

$160 * (
$160 * (

1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *

18 =
276 =

$                 2,436
$               64,636

) +(
) +(

$160 * (
$137 * (

1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *

476 =
671 =

$               60,702
$            174,744

) +(
) +(

$137 * (
$137 * (

1 ‐ 100.00% ) ) *
1 ‐ 100.00% ) ) *

3,566 =
12 =

) +(

$137 * (

1 ‐ 100.00% ) ) *

647 =

$            555,994

) +(

$160 * (

1 ‐

50.00% ) ) *

2=

$                 1,906

) +(

$160 * (

1 ‐

0.00%

0=

$                     ‐

All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
(
1+
0.000000 ) * ( ( 136.67 *
0.00%
Small
SECTOR 3.  PAINTING                                                                                                                  General Industry
Large
( 45 +
0.000000 ) * ( ( 136.67 *
80.00%
AEROSPACE
(
0+
0.000000 ) * ( ( 136.67 *
50.00%
Small
Large
(
1+
0.000000 ) * ( ( 136.67 *
80.00%
Auto Body
(
0+
0.000000 ) * ( ( 136.67 *
50.00%
Small
Large
(
2+
0.000000 ) * ( ( 136.67 *
80.00%
Coil Coating
(
1+
0.000000 ) * ( ( 136.67 *
50.00%
Small
Large
(
2+
0.000000 ) * ( ( 136.67 * 100.00%
Maritime
(
1+
0.000000 ) * ( ( 136.67 *
50.00%
Small
(
2+
0.000000 ) * ( ( 136.67 * 100.00%
Large
Construction
(
0+
0.000000 ) * ( ( 136.67 * 100.00%
Small
(
0+
0.000000 ) * ( ( 136.67 * 100.00%
State
Government
(
6+
0.000000 ) * ( ( 136.67 * 100.00%
Local
SECTOR 4.  Producers of Chromates
Large
(
7+
0.000000 ) * ( ( 136.67 *
50.00%
ALL
(
0+
0.000000 ) * ( ( 136.67 *
0.00%
Small

Page 149

) ) *

$                     ‐
$                     ‐

 COST 

#PLANTS

1‐%BASEMED

LIMFULLCOST

%BASEMED

LIMPPARTCOST

 MEDEXAMADDERM

LIMEMPAL

Variables

Table 23

SECTOR 5. Chromate Pigment Procedures
Large

(

8+

0.000000 ) * ( ( 136.67 *

100.00%

) +(

$160 * (

1 ‐ 100.00% ) ) *

2=

$                 1,992

Small

(

1+

0.000000 ) * ( ( 136.67 *

100.00%

) +(

$160 * (

1 ‐ 100.00% ) ) *

1=

$                     111

Large

(

2+

0.000000 ) * ( ( 136.67 *

100.00%

) +(

$160 * (

1 ‐ 100.00% ) ) *

2=

$                     509

Small

(

0+

0.000000 ) * ( ( 136.67 *

0.00%

) +(

$160 * (

1 ‐

) ) *

0=

$                     ‐

Large

(

11 +

0.000000 ) * ( ( 136.67 *

100.00%

) +(

$160 * (

1 ‐ 100.00% ) ) *

5=

$                 7,519

Small

(

0+

0.000000 ) * ( ( 136.67 *

100.00%

) +(

$160 * (

1 ‐ 100.00% ) ) *

0=

$                     ‐

Large

(

1+

0.000000 ) * ( ( 136.67 *

100.00%

) +(

$160 * (

1 ‐ 100.00% ) ) *

80 =

Small

(

0+

0.000000 ) * ( ( 136.67 *

100.00%

) +(

$160 * (

1 ‐ 100.00% ) ) *

126 =

$                     ‐

Large

(

0+

0.000000 ) * ( ( 136.67 *

80.00%

) +(

$160 * (

1 ‐

80.00% ) ) *

2=

$                      ‐

(

0+

0.000000 ) * ( ( 136.67 *

10.00%

) +(

$160 * (

1 ‐

10.00% ) ) *

8=

$                     ‐

(

0+

0.000000 ) * ( ( 136.67 *

100.00%

) +(

$160 * (

1 ‐ 100.00% ) ) *

81 =

$                      ‐

(

0+

0.000000 ) * ( ( 136.67 *

100.00%

) +(

$160 * (

1 ‐ 100.00% ) ) *

40 =

$                     ‐

(

3+

0.000000 ) * ( ( 136.67 *

50.00%

) +(

$160 * (

1 ‐

50.00% ) ) *

6=

$                 2,364

(

1+

0.000000 ) * ( ( 136.67 *

30.00%

) +(

$160 * (

1 ‐

30.00% ) ) *

4=

$                     542

(

7+

0.000000 ) * ( ( 136.67 *

100.00%

) +(

$160 * (

1 ‐ 100.00% ) ) *

1=

$                     902

(

0+

0.000000 ) * ( ( 136.67 *

0.00%

) +(

$160 * (

1 ‐

0.00%

) ) *

0=

$                     ‐

(

27 +

0.005900 ) * ( ( 136.67 *

50.00%

) +(

$160 * (

1 ‐

50.00% ) ) *

34 =

$             134,786

(
(

1+
1+

0.000281 ) * ( ( 136.67 *
0.000140 ) * ( ( 136.67 *

30.00%
50.00%

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

30.00% ) ) *
50.00% ) ) *

11 =
102 =

$                 2,124
$                 9,628

(

1+

0.000281 ) * ( ( 136.67 *

30.00%

) +(

$160 * (

1 ‐

30.00% ) ) *

32 =

$                 6,248

(

0+

0.000562 ) * ( ( 136.67 *

50.00%

) +(

$160 * (

1 ‐

50.00% ) ) *

33 =

$                         3

(

0+

0.000140 ) * ( ( 136.67 *

30.00%

) +(

$160 * (

1 ‐

30.00% ) ) *

31 =

$                         1

(

17 +

0.000000 ) * ( ( 136.67 *

80.00%

) +(

$160 * (

1 ‐

80.00% ) ) *

163 =

$             397,046

(

4+

0.000000 ) * ( ( 136.67 *

10.00%

) +(

$160 * (

1 ‐

10.00% ) ) *

118 =

$               76,787

(

0+

0.000000 ) * ( ( 136.67 *

100.00%

) +(

$160 * (

1 ‐ 100.00% ) ) *

3=

$                      ‐

(

0+

0.000000 ) * ( ( 136.67 *

100.00%

) +(

$160 * (

1 ‐ 100.00% ) ) *

1=

$                     ‐

(

0+

0.000000 ) * ( ( 136.67 *

100.00%

) +(

$160 * (

1 ‐ 100.00% ) ) *

0=

$                      ‐

(

1+

0.000000 ) * ( ( 136.67 *

100.00%

) +(

$160 * (

1 ‐ 100.00% ) ) *

5=

$                     627

(

0+

0.000000 ) * ( ( 136.67 *

0.00%

) +(

$160 * (

1 ‐

0.00%

) ) *

216 =

$                      ‐

(

0+

0.000000 ) * ( ( 136.67 *

0.00%

) +(

$160 * (

1 ‐

0.00%

) ) *

1,627 =

$                     ‐

(

0+

0.000000 ) * ( ( 136.67 *

80.00%

) +(

$160 * (

1 ‐

80.00% ) ) *

343 =

$                      ‐

(

0+

0.000000 ) * ( ( 136.67 *

10.00%

) +(

$160 * (

1 ‐

10.00% ) ) *

697 =

$                     ‐

(

1+

0.000000 ) * ( ( 136.67 *

80.00%

) +(

$160 * (

1 ‐

80.00% ) ) *

6=

(

0+

0.000000 ) * ( ( 136.67 *

10.00%

) +(

$160 * (

1 ‐

10.00% ) ) *

20 =

ALL
SECTOR 6. CCA Producers
ALL
0.00%

SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
$               10,526

ALL
SECTOR 9.  Printing Ink Producers
ALL
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
General Industry
Small

Page 150

$                     932
$                     ‐

9+

0.000000 ) * ( ( 136.67 *

80.00%

) +(

$160 * (

1 ‐

80.00% ) ) *

90 =

$             120,241

Small

(

2+

0.000000 ) * ( ( 136.67 *

10.00%

) +(

$160 * (

1 ‐

10.00% ) ) *

5=

$                 1,735

Large

(

0+

0.000000 ) * ( ( 136.67 *

80.00%

) +(

$160 * (

1 ‐

80.00% ) ) *

81 =

$                      ‐

Small

(

0+

0.000000 ) * ( ( 136.67 *

10.00%

) +(

$160 * (

1 ‐

10.00% ) ) *

325 =

$                     ‐

Large

(

0+

0.000000 ) * ( ( 136.67 *

80.00%

) +(

$160 * (

1 ‐

80.00% ) ) *

179 =

$                      ‐

Small
Large

(
(

0+
5+

0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *

80.00%
80.00%

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

80.00% ) ) *
80.00% ) ) *

0=
23 =

$                     ‐
$               17,878

Small

(

3+

0.000000 ) * ( ( 136.67 *

30.00%

) +(

$160 * (

1 ‐

30.00% ) ) *

4=

$                 2,214

Large

(

0+

0.000000 ) * ( ( 136.67 *

80.00%

) +(

$160 * (

1 ‐

80.00% ) ) *

5=

$                      ‐

Small

(

0+

0.000000 ) * ( ( 136.67 *

10.00%

) +(

$160 * (

1 ‐

10.00% ) ) *

0=

$                     ‐

Large

(

0+

0.000000 ) * ( ( 136.67 *

25.00%

) +(

$160 * (

1 ‐

25.00% ) ) *

148 =

$                      ‐

Small
Large

(
(

0+
0+

0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *

0.00%
25.00%

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

0.00% ) ) *
25.00% ) ) *

79 =
36 =

$                     ‐
$                      ‐

Small
Large

(
(

0+
1+

0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *

0.00%
50.00%

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

0.00% ) ) *
50.00% ) ) *

32 =
1,162 =

$                     ‐
$             134,592

Small
State

(
(

1+
0+

0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *

50.00%
50.00%

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

4,650 =
12 =

$            538,728
$                     780

Local

(

0+

0.000000 ) * ( ( 136.67 *

50.00%

) +(

$160 * (

1 ‐

50.00% ) ) *

42 =

$                 2,818

Large

(

0+

0.000000 ) * ( ( 136.67 *

50.00%

) +(

$160 * (

1 ‐

50.00% ) ) *

40 =

$                      ‐

Small
State

(
(

0+
1+

0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *

30.00%
50.00%

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

30.00% ) ) *
50.00% ) ) *

48 =
0=

$                     ‐
$                      ‐

Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

(

0+

0.000000 ) * ( ( 136.67 *

30.00%

) +(

$160 * (

1 ‐

30.00% ) ) *

24 =

$                     ‐

(

2+

0.000000 ) * ( ( 136.67 *

50.00%

) +(

$160 * (

1 ‐

50.00% ) ) *

19 =

$                 5,958

(

0+

0.000000 ) * ( ( 136.67 *

30.00%

) +(

$160 * (

1 ‐

30.00% ) ) *

0=

$                     ‐

(

0+

0.000000 ) * ( ( 136.67 *

50.00%

) +(

$160 * (

1 ‐

50.00% ) ) *

51 =

$                      ‐

Small
State

(
(

0+
0+

0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *

50.00%
50.00%

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

233 =
15 =

$                     ‐
$                      ‐

Local
Large

(
(

0+
0+

0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *

50.00%
50.00%

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

88 =
40 =

$                     ‐
$                      ‐

Small
State

(
(

0+
0+

0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *

50.00%
50.00%

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

170 =
1=

$                     ‐
$                      ‐

Local
Large

(
(

0+
1+

0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *

50.00%
50.00%

) +(
) +(

$160 * (
$160 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

239 =
44 =

$                     ‐
$                 6,947

Small

(

1+

0.000000 ) * ( ( 136.67 *

50.00%

) +(

$160 * (

1 ‐

50.00% ) ) *
Total

175 =
70,349

$               27,474
$         7,272,952

%BASEMED

 COST 

#PLANTS

(

LIMFULLCOST

Large

LIMEMPAL

1‐%BASEMED

LIMPPARTCOST

 MEDEXAMADDERM

Variables

Table 23

Fiber, Flat and Container Glass
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
General Industry

Chromium Service Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
General Industry

Maritime

Construction

Government
SECTOR 27.  Solid Waste Incineration
ALL

Government

Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration 

Page 151

Table 24

Initial Medical Examination with Additional Tests (§§1910.1026(k)(1)(i)(B) and (k)(3)(i)‐(k)(3)(iii); 
1915.1026(i)(1)(i)(B) and (i)(3)(i)‐(i)(3)(iii); and  1926.1126(i)(1)(i)(B) and (i)(3)(i)‐(i)(3)(iii))
Employee Time and Cost for Complete Initial Medical Examination with Additional Tests
The burden hour and cost equation is for the employee time to receive additional tests after the employee is found to have abnormal initial 
medical exam results.  The Agency assumes that .5% of employees  potentially exposed employees at or above the AL and workers with "signs 
and symptoms" will be found to have abnormal exam results and will receive additional testing.  
BURDEN HOURS = POTEXEMP * 5% * %PREVABN * MEDEXAMADDAL * #PLANTS
COST = Burden Hours *  NONSUPWAGE
* POTEXEMP * 5% = Total number of  employees potentially exposed at or above the AL and workers with "signs and symptoms" before the 
implementation of engineering controls.
* %PREVABN = Percent of previously exposed employees who will be found to have abnormal exam results.
*MEDEXAMADDAL = Employee time for medical examination with additional testing
#PLANTS = Number of Plants 
NONSUPEWAGE = Nonsupervisory wage rate.

Cost

Responses

4

*

1,848 =

10 *

$26.61

$268

3

Small

0.0455 *

0.50% *

4

*

3,478 =

3*

$26.61

$84

1

Large

0.0966 *

0.50% *

4

*

7,857 =

15 *

$26.20

$398

4

Small
Large

0.0000 *
0.9179 *

0.50% *
0.50% *

4
4

*
*

8,804 =
189 =

0*
3*

$26.20
$26.20

$0
$91

0
1

Small
Large

0.0483 *
2.4639 *

0.50% *
0.50% *

4
4

*
*

107 =
268 =

0*
13 *

$26.20
$26.20

$3
$346

0
3

Small
State

0.2416 *
0.0966 *

0.50% *
0.50% *

4
4

*
*

2,145 =
25 =

10 *
0*

$26.20
$26.20

$272
$1

3
0

Local

0.0000 *

0.50% *

4

*

787 =

0*

$26.20

$0

0

Large

0.0483 *

0.50% *

4

*

10,535 =

10 *

$26.20

$267

3

Small
Large

0.0000 *
0.0000 *

0.50% *
0.50% *

4
4

*
*

10,724 =
409 =

0*
0*

$26.20
$26.20

$0
$0

0
0

Small
Large

0.0483 *
0.9179 *

0.50% *
0.50% *

4
4

*
*

232 =
402 =

0*
7

$26.20
$26.20

$6
$193

0
2

Small

0.0966 *

0.50% *

4

*

3,037 =

6

$26.20

$154

1

Large

2.3097 *

0.50% *

4

*

49 =

2*

$33.07

$75

1

Small

0.0453 *

0.50% *

4

*

62 =

0*

$33.07

$2

0

 NONSUPEWAGE

0.50% *

Hours

0.2729 *

#PLANTS

MEDEXAMADDAL

     
Large

POTEXEMP * 5%

Sector 1. Electroplating

24.17%

%PREVABN

Variables

0.0500

All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
SECTOR 3.  PAINTING
General Industry AEROSPACE

Page 152

 NONSUPEWAGE

Cost

Responses

0.50% *

4

*

326 =

1*

$33.07

$20

0

Small
Large

0.0460 *
0.0906 *

0.50% *
0.50% *

4
4

*
*

1,436 =
100 =

1*
0*

$33.07
$33.07

$44
$6

0
0

Small
Large

0.0453 *
0.1287 *

0.50% *
0.50% *

4
4

*
*

18 =
276 =

0*
1*

$33.07
$33.07

$1
$23

0
0

Small
Large

0.0429 *
0.0953 *

0.50% *
0.50% *

4
4

*
*

476 =
671 =

0*
1*

$33.07
$33.07

$14
$42

0
0

Small
State

0.0318 *
0.3146 *

0.50% *
0.50% *

4
4

*
*

3,566 =
12 =

2*
0*

$33.07
$33.07

$75
$2

1
0

Local

0.0225 *

0.50% *

4

*

647 =

0*

$33.07

$10

0

Large

0.3351 *

0.50% *

4

*

2=

0*

$38.68

$0

0

0.0000 *

0.50% *

4

*

0=

0*

$38.68

$0

0

1.0797 *

0.50% *

4

*

2=

0*

$37.70

$1

0

0.1350 *

0.50% *

4

*

1=

0*

$37.70

$0

0

0.1182 *

0.50% *

4

*

2=

0*

$31.94

$0

0

0.0000 *

0.50% *

4

*

0=

0*

$31.94

$0

0

1.2448 *

0.50% *

4

*

5=

0*

$38.68

$5

0

0.0000 *

0.50% *

4

*

0=

0*

$38.68

$0

0

0.2394 *

0.50% *

4

*

80 =

0*

$28.81

$11

0

0.0958 *

0.50% *

4

*

126 =

0*

$28.81

$7

0

0.0000 *

0.50% *

4

*

2=

0*

$28.86

$0

0

0.0000 *

0.50% *

4

*

8=

0*

$28.86

$0

0

0.0000 *

0.50% *

4

*

81 =

0*

$31.99

$0

0

0.0000 *

0.50% *

4

*

40 =

0*

$31.99

$0

0

0.1411 *

0.50% *

4

*

6=

0*

$28.71

$0

0

0.0941 *

0.50% *

4

*

4=

0*

$28.71

$0

0

0.5903 *

0.50% *

4

*

1=

0*

$38.80

$0

0

0.0000 *

0.50% *

4

*

0=

0*

$38.80

$0

0

Hours

0.0920 *

#PLANTS

MEDEXAMADDAL

Large

POTEXEMP * 5%

%PREVABN

Variables

Table 24

AUTOBODY REPAIR

COIL COATING

Maritime

Construction

Government
SECTOR 4.  Producers of Chromates
All
Small
SECTOR 5. Chromate Pigment Procedures
Large
All
Small
SECTOR 6. CCA Producers
Large
All
Small
SECTOR 7.  Chromium Catalyst Producers
Large
All
Small
SECTOR 8.  Paint and Coating Producers
Large
All
Small
SECTOR 9.  Printing Ink Producers
Large
All
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
All
Small
SECTOR 11.  Plating Mixture Producers
Large
All
Small
SECTOR 13.  Chromium Metal Producers
Large
All
Small

Page 153

 NONSUPEWAGE

Cost

Responses

0.50% *

4

*

34 =

1*

$38.80

$48

0
0

Small
Large

0.0639 *
0.4470 *

0.50% *
0.50% *

4
4

*
*

11 =
102 =

0*
1*

$38.80
$38.80

$1
$35

0
0

Small

0.0639 *

0.50% *

4

*

32 =

0*

$38.80

$2

0

Large

0.1277 *

0.50% *

4

*

33 =

0*

$38.80

$3

0

Small

0.0000 *

0.50% *

4

*

31 =

0*

$38.80

$0

0

Large

1.2327 *

0.50% *

4

*

163 =

4*

$28.31

$114

1

Small

0.2465 *

0.50% *

4

*

118 =

1*

$28.31

$17

0

Large

0.0000 *

0.50% *

4

*

3=

0*

$37.70

$0

0

Small
SECTOR 18.  Chromium Sulfate Producers
Large
All
Small
SECTOR 19.  Chemical Distributors
Large
All
Small
SECTOR 20.  Textile Dyeing
Large
All
Small
SECTOR 21.  Colored Glass Producers
Large
All
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22.  Printing
Large
All
Small
SECTOR 24.  Chromium Catalyst Users
Large
All
Small
Large
Catalyst Service Companies
Small

0.0000 *

0.50% *

4

*

1=

0*

$37.70

$0

0

0.0000 *

0.50% *

4

*

0=

0*

$41.50

$0

0

0.1436 *

0.50% *

4

*

5=

0*

$41.50

$1

0

0.0000 *

0.50% *

4

*

216 =

0*

$29.92

$0

0

0.0000 *

0.50% *

4

*

1,627 =

0*

$29.92

$0

0

0.0000 *

0.50% *

4

*

343 =

0*

$19.97

$0

0

0.0000 *

0.50% *

4

*

697 =

0*

$19.97

$0

0

0.0524 *

0.50% *

4

*

6=

0*

$28.87

$0

0

0.0000 *
0.5765 *

0.50% *
0.50% *

4
4

*
*

20 =
90 =

0*
1*

$28.87
$28.87

$0
$30

0
0

0.1048 *

0.50% *

4

*

5=

0*

$28.87

$0

0

0.0000 *

0.50% *

4

*

81 =

0*

$20.85

$0

0

0.0000 *

0.50% *

4

*

325 =

0*

$20.85

$0

0

0.0549 *

0.50% *

4

*

179 =

0*

$32.51

$6

0

0.0000 *
0.5487 *

0.50% *
0.50% *

4
4

*
*

0=
23 =

0*
0*

$32.51
$32.51

$0
$8

0
0

0.2743 *

0.50% *

4

*

4=

0*

$32.51

$1

0

Hours

1.8198 *

#PLANTS

MEDEXAMADDAL

Large

POTEXEMP * 5%

%PREVABN

Variables

Table 24

SECTOR 14.  Iron and Steel Mills
All

Carbon Steel
14B. 
Reshaping Industry
SECTOR 15.  Iron and Steel Foundries
All
SECTOR 17.  Chromium Dye Producers
All

Page 154

 NONSUPEWAGE

Cost

Responses

0.50% *

4

*

5=

0*

$25.64

$0

0

Small

0.0000 *

0.50% *

4

*

0=

0*

$25.64

$0

0

Large

0.0396 *

0.50% *

4

*

148 =

0*

$32.11

$4

0

Small
Large

0.0000 *
0.0000 *

0.50% *
0.50% *

4
4

*
*

79 =
36 =

0*
0*

$32.11
$32.11

$0
$0

0
0

Small

0.0000 *

0.50% *

4

*

32 =

0*

$32.11

$0

0

Large

0.1170 *

0.50% *

4

*

1,162 =

3*

$32.11

$87

1

Small
Local

0.0390 *
0.0225 *

0.50% *
0.50% *

4
4

*
*

4,650 =
12 =

4*
0*

$32.11
$32.11

$117
$0

1
0

State

0.0225 *

0.50% *

4

*

42 =

0*

$32.11

$1

0

Large

0.0000 *

0.50% *

4

*

40 =

0*

$32.11

$0

0

Small
Local

0.0000 *

0.50% *

4

*

48 =

0*

$32.11

$0

0

0.0438 *

0.50% *

4

*

0=

0*

$27.23

$0

0

State
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

0.0000 *

0.50% *

4

*

24 =

0*

$27.23

$0

0

0.1056 *

0.50% *

4

*

19 =

0*

$27.93

$0

0

0.0000 *

0.50% *

4

*

0=

0*

$27.93

$0

0

0.0000 *

0.50% *

4

*

51 =

0*

$32.13

$0

0

Small
State Gov't

0.0000 *
0.0000 *

0.50% *
0.50% *

4
4

*
*

233 =
15 =

0*
0*

$32.13
$32.13

$0
$0

0
0

Local Gov't
Large

0.0000 *
0.0000 *

0.50% *
0.50% *

4
4

*
*

88 =
40 =

0*
0*

$32.13
$32.13

$0
$0

0
0

Small
State Gov't

0.0000 *
0.0000 *

0.50% *
0.50% *

4
4

*
*

170 =
1=

0*
0*

$32.13
$32.13

$0
$0

0
0

Local Gov't
Large

0.0000 *
0.5279 *

0.50% *
0.50% *

4
4

*
*

239 =
44 =

0*
0*

$32.13
$32.13

$0
$15

0
0

Small

0.0528 *

0.50% *
Total

4

*

175 =
70,349

0*
105

$32.13

$6
$2,915

0
26

Hours

0.0000 *

#PLANTS

MEDEXAMADDAL

Large

POTEXEMP * 5%

%PREVABN

Variables

Table 24

SECTOR 25.  Refractory Brick Producers
All
SECTOR 26.  Woodworking
General Industry

Maritime

Construction

Government
SECTOR 27.  Solid Waste Incineration
ALL

Government

Industrial Rehabilitation & 
Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration & 
Maintenance

Page 155

Table 25

Initial Medical Examination with Additional Tests (§§1910.1026(k)(1)(i)(B) and (k)(3)(i)‐(k)(3)(iii); 
1915.1026(i)(1)(i)(B) and (i)(3)(i)‐(i)(3)(iii); and  1926.1126(i)(1)(i)(B) and (i)(3)(i)‐(i)(3)(iii))
Contract Cost for a PLHCP to Conduct the Initial Medical Examination with Additional Tests
This table calculates the cost for a contractor PLHCP to conduct additional medical testing for those employees who have abnormal annual 
medical examination results. 

0.2729

*

0.50% *

$273.33

*

1,848 = $689

Small

0.0455

*

0.50% *

$273.33

*

3,478 = $216

Large

0.0966

*

0.50% *

$273.33

*

7,857 = $1,038

Small
Large

0.0000
0.9179

*
*

0.50% *
0.50% *

$273.33
$273.33

*
*

8,804 = $0
189 = $238

Small
Large

0.0483
2.4639

*
*

0.50% *
0.50% *

$273.33
$273.33

*
*

107 = $7
268 = $901

Small
State

0.2416
0.0966

*

0.50% *
0.50% *

$273.33

*

2,145 = $708

*

$273.33

*

25 = $3

Local

0.0000

*

0.50% *

$273.33

*

787 = $0

Large

0.0483

*

0.50% *

$273.33

*

10,535 = $696

Small
Large

0.0000
0.0000

*
*

0.50% *
0.50% *

$273.33
$273.33

*
*

10,724 = $0
409 = $0

Small
Large

0.0483
0.9179

*
*

0.50% *
0.50% *

$273.33
$273.33

*
*

232 = $15
402 = $504

Small

0.0966

*

0.50% *

$273.33

*

3,037 = $401

Large

2.3097

*

0.50% *

$273.33

*

49 = $154

Small
Large

0.0453
0.0920

*

0.50% *
0.50% *

$273.33

*

62 = $4

$273.33

*

326 = $41

Small
Large

0.0460
0.0906

*

0.50% *
0.50% *

$273.33

*

1,436 = $90

*

$273.33

*

100 = $12

Small

0.0453

*

0.50% *

$273.33

*

18 = $1

Cost

MEDCOSTADD

Large

#PLANTS

%PREVABN

POTEXEMP * 5%

* POTEXEMP * 5% = Total number of new potentially exposed employees at or above the AL and workers with "signs and symptoms" before 
the implementation of engineering controls.
* %PREVABN = Percent of previously exposed employees who will be found to have abnormal exam results.
*MEDCOSTADD = Cost for medical examination with additional testing
#PLANTS = Number of Plants

Sector 1. Electroplating
All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
SECTOR 3.  PAINTING
General Industry AEROSPACE
*

General Industry AUTOBODY

COIL COATING

Page 156

0.1287

*

0.50% *

$273.33

*

276 = $48

Small
Large

0.0429
0.0953

*
*

0.50% *
0.50% *

$273.33
$273.33

*
*

476 = $28
671 = $87

Small

0.0318

*

0.50% *

$273.33

*

3,566 = $155

State 

0.3146

*

0.50% *

$273.33

*

12 = $5

Local

0.0225

*

0.50% *

$273.33

*

647 = $20

Large

0.3351

*

0.50% *

$273.33

*

2 = $1

Small

0.0000

*

0.50% *

$273.33

*

0 = $0

Large

1.0797

*

0.50% *

$273.33

*

2 = $3

Small

0.1350

*

0.50% *

$273.33

*

1 = $0

Large

0.1182

*

0.50% *

$273.33

*

2 = $0

Small

0.0000

*

0.50% *

$273.33

*

0 = $0

Large

1.2448

*

0.50% *

$273.33

*

5 = $8

Small

0.0000

*

0.50% *

$273.33

*

0 = $0

Large

0.2394

*

0.50% *

$273.33

*

80 = $26

Small

0.0958

*

0.50% *

$273.33

*

126 = $17

Large

0.0000

*

0.50% *

$273.33

*

2 = $0

Small

0.0000

*

0.50% *

$273.33

*

8 = $0

Large

0.0000

*

0.50% *

$273.33

*

81 = $0

Small

0.0000

*

0.50% *

$273.33

*

40 = $0

Large

0.1411

*

0.50% *

$273.33

*

6 = $1

Small

0.0941

*

0.50% *

$273.33

*

4 = $0

Large

0.5903

*

0.50% *

$273.33

*

1 = $1

Small

0.0000

*

0.50% *

$273.33

*

0 = $0

Large

1.8198

*

0.50% *

$273.33

*

34 = $84

Small

0.0639

*

0.50% *

$273.33

*

11 = $1

Cost

MEDCOSTADD

Large

#PLANTS

%PREVABN

POTEXEMP * 5%

Table 25

Maritime 

Construction

Governments
SECTOR 4.  Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
ALL
SECTOR 9.  Printing Ink Producers
ALL
SECTOR 10.  Plastic Colorant Producers and Users
ALL
SECTOR 11.  Plating Mixture Producers
ALL
SECTOR 13.  Chromium Metal Producers
ALL
SECTOR 14.  Iron and Steel Mills
ALL

Page 157

0.4470

*

0.50% *

$273.33

*

102 = $62

Small

0.0639

*

0.50% *

$273.33

*

32 = $3

Large

0.1277

*

0.50% *

$273.33

*

33 = $6

Small

0.0000

*

0.50% *

$273.33

*

31 = $0

Large

1.2327

*

0.50% *

$273.33

*

163 = $274

Small

0.2465

*

0.50% *

$273.33

*

118 = $40

Large

0.0000

*

0.50% *

$273.33

*

3 = $0

Small

0.0000

*

0.50% *

$273.33

*

1 = $0

Large

0.0000

*

0.50% *

$273.33

*

0 = $0

Small

0.1436

*

0.50% *

$273.33

*

5 = $1

Large

0.0000

*

0.50% *

$273.33

*

216 = $0

Small

0.0000

*

0.50% *

$273.33

*

1,627 = $0

Large

0.0000

*

0.50% *

$273.33

*

343 = $0

Small

0.0000

*

0.50% *

$273.33

*

697 = $0

Large

0.0524

*

0.50% *

$273.33

*

6 = $0

Small
Large

0.0000
0.5765

*
*

0.50% *
0.50% *

$273.33
$273.33

*
*

20 = $0
90 = $71

Small

0.1048

*

0.50% *

$273.33

*

5 = $1

Large

0.0000

*

0.50% *

$273.33

*

81 = $0

Small

0.0000

*

0.50% *

$273.33

*

325 = $0

Large

0.0549

*

0.50% *

$273.33

*

179 = $13

Small
Large

0.0000
0.5487

*
*

0.50% *
0.50% *

$273.33
$273.33

*
*

0 = $0
23 = $17

Small

0.2743

*

0.50% *

$273.33

*

4 = $2

Large

0.0000

*

0.50% *

$273.33

*

5 = $0

Small

0.0000

*

0.50% *

$273.33

*

0 = $0

Cost

MEDCOSTADD

Large

#PLANTS

%PREVABN

POTEXEMP * 5%

Table 25

Carbon Steel
SECTOR 14B. Forging Industry
ALL
SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL
SECTOR 18.  Chromium Sulfate Producers
ALL
SECTOR 19.  Chemical Distributors
ALL
SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
ALL

Fiber, Flat, Container Glass
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
ALL

Chromium Catalyst Companies
SECTOR 25.  Refractory Brick Producers
ALL

Page 158

0.0396

*

0.50% *

$273.33

*

148 = $8

Small
Large

0.0000
0.0000

*
*

0.50% *
0.50% *

$273.33
$273.33

*
*

79 = $0
36 = $0

Small
Large

0.0000
0.1170

*

0.50% *
0.50% *

$273.33

*

32 = $0

$273.33

*

1,162 = $186

Small
State

0.0390
0.0225

*

0.50% *
0.50% *

$273.33

*

4,650 = $248

*

$273.33

*

12 = $0

Local

0.0225

*

0.50% *

$273.33

*

42 = $1

Large

0.0000

*

0.50% *

$273.33

*

40 = $0

Small
State

0.0000
0.0438

*
*

0.50% *
0.50% *

$273.33
$273.33

*
*

48 = $0
0 = $0

Local

0.0000

*

0.50% *

$273.33

*

24 = $0

Large

0.1056

*

0.50% *

$273.33

*

19 = $3

Small

0.0000

*

0.50% *

$273.33

*

0 = $0

Large

0.0000

*

0.50% *

$273.33

*

51 = $0

Small
State Gov't

0.0000
0.0000

*

0.50% *
0.50% *

$273.33

*

233 = $0

*

$273.33

*

15 = $0

Local Gov't
Large

0.0000
0.0000

*
*

0.50% *
0.50% *

$273.33
$273.33

*
*

88 = $0
40 = $0

Small
State Gov't

0.0000
0.0000

*

0.50% *
0.50% *

$273.33

*

170 = $0

$273.33

*

1 = $0

Local Gov't
Large

0.0000
0.5279

*

0.50% *
0.50% *

$273.33

*

239 = $0

*

$273.33

*

Small

0.0528

*

0.50% *

$273.33

*

Cost

MEDCOSTADD

Large

#PLANTS

%PREVABN

POTEXEMP * 5%

Table 25

SECTOR 26.  Woodworking
General Industry

Maritime
*

Construction

Government
SECTOR 27.  Solid Waste Incineration
ALL

Government
SECTOR 30.  Superalloy Producers and Users
ALL
SECTOR 31.  Construction

Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

*

44 = $32

Refractory Brick Restoration & Maintenance

Total

Page 159

175 = $13

70,349

$7,186

Table 26

Annual Medical Examination with Additional Tests (1910.1026(k)(2)(ii) and (k)(3)(i)‐(k)(3)(iii) and (i)(3)(i)‐(i)(3)(iii); and 
1926.1126(i)(2)(ii) and (i)(3)(i)‐(i)(3)(iii))
Employee Time and Cost to Complete the Annual Medical Examination with Additional Tests
This table calculates the burden hours and costs for the time it takes an employee to receive additional tests after the employee is found to 
have abnormal annual medical exam test results. 
Hours = (LIMEMPAL + MEDEXAMADDERM) * %ALABN * ADDMEDTIME * #PLANTS
Cost =Hours *NONSUPWAGE 

RESPONSES

Cost

 NONSUPEWAGE

Hours

#PLANTS

ADDMEDTIME

%ALABN

 MEDEXAMADDERM

LIMEMPAL

Variables

* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the 
implementation of engineering controls.
*%ALABN = Percent of employees exposed at or above the action level 30 days per year  (and therefore requiring a limited or comprehensive 
medical exam who will be found to have abnormal results) 
*ADDMEDTIME = Three hours for an employee to receive additional testing after exam tests are abnormal.
*NONSUPEWAGE ‐ Non‐supervisory wage rate
* #PLANTS = Number of Plants
24.17%

Sector 1. Electroplating
Large

( 3 +

0.00000 ) *

0.50% * 3 *

1,848 =

76 * $26.61

$2,013

25

Small

( 0 +

0.00000 ) *

0.50% * 3 *

3,478 =

0 * $21.43

$0

0

Large

( 0 +

0.00000 ) *

0.50% * 3 *

7,857 =

0 * $26.20

$0

0

Small
Large

( 0 +
( 14 +

0.00000 ) *
2.89868 ) *

0.50% * 3 *
0.50% * 3 *

8,804 =
189 =

0 * $21.43
47 * $26.20

$0
$1,222

0
16

Small
Large

( 1 +
( 26 +

0.00000 ) *
2.89868 ) *

0.50% * 3 *
0.50% * 3 *

107 =
268 =

2 * $22.43
116 * $26.20

$35
$3,049

1
39

Small
Local

( 3 +
( 0 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

2,145 =
25 =

93 * $23.43
0 * $26.20

$2,185
$0

31
0

State

( 0 +

0.00000 ) *

0.50% * 3 *

787 =

0 * $24.43

$0

0

Large

( 0 +

0.00000 ) *

0.50% * 3 *

10,535 =

0 * $26.20

$0

0

Small
Large

( 0 +
( 0 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

10,724 =
409 =

0 * $24.43
0 * $26.20

$0
$0

0
0

Small
Large

( 0 +
( 10 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

232 =
402 =

0 * $25.43
58 * $26.20

$0
$1,526

0
19

*

3,037 =

44 * $26.43

$1,163

15

*

49 =

33 * $33.07

$1,099

11

*
*

62 =
326 =

0 * $26.43
4 * $33.07

$0
$146

0
1

*
*

1,436 =
100 =

0 * $27.43
3 * $33.07

$0
$90

0
1

*

18 =

0 * $28.43

$7

0

ALL
Sector 2. Welding
General Industry

Maritime

Construction

GOVERNMENT
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
Small ( 1 + 0.00000 ) * 0.50% * 3
SECTOR 3.  PAINTING                                                                             GENERAL INDUSTRY
Large ( 45 + 0.00000 ) * 0.50% * 3
AEROSPACE
Small ( 0 + 0.00000 ) * 0.50% * 3
Large ( 1 + 0.00000 ) * 0.50% * 3
Autobody
Small ( 0 + 0.00000 ) * 0.50% * 3
Large ( 2 + 0.00000 ) * 0.50% * 3
Coil Coating
Small ( 1 + 0.00000 ) * 0.50% * 3

Table 26

Large

( 2 +

0.00000 ) *

0.50% * 3 *

276 =

7 * $33.07

$235

2

Small
Large

( 1 +
( 2 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

476 =
671 =

6 * $29.43
19 * $33.07

$180
$634

2
6

Small
Local

( 0 +
( 0 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

3,566 =
12 =

0 * $30.43
0 * $33.07

$0
$0

0
0

State

( 6 +

0.00000 ) *

0.50% * 3 *

647 =

61 * $31.43

$1,918

20

Large

( 7 +

0.00000 ) *

0.50% * 3 *

2=

0 * $38.68

$7

0

Small
SECTOR 5. Chromate Pigment Procedures
ALL
Large

( 0 +

0.00000 ) *

0.50% * 3 *

0=

0 * $31.43

$0

0

( 8 +

0.00000 ) *

0.50% * 3 *

2=

0 * $37.70

$8

0

Small

( 1 +

0.00000 ) *

0.50% * 3 *

1=

0 * $31.43

$0

0

Large

( 2 +

0.00000 ) *

0.50% * 3 *

2=

0 * $31.94

$2

0

+

0.00000 ) *

0.50% * 3 *

0=

0 * $31.43

$0

0

+

0.00000 ) *

0.50% * 3 *

5=

1 * $38.68

$32

0

+

0.00000 ) *

0.50% * 3 *

0=

0 * $31.43

$0

0

+

0.00348 ) *

0.50% * 3 *

80 =

1 * $28.81

$33

0

+

0.00000 ) *

0.50% * 3 *

126 =

0 * $31.43

$0

0

+

0.00000 ) *

0.50% * 3 *

2=

0 * $28.86

$0

0

+

0.00000 ) *

0.50% * 3 *

8=

0 * $31.43

$0

0

+

0.00000 ) *

0.50% * 3 *

81 =

0 * $31.99

$0

0

+

0.00000 ) *

0.50% * 3 *

40 =

0 * $31.43

$0

0

+

0.00000 ) *

0.50% * 3 *

6=

0 * $28.71

$7

0

+

0.00000 ) *

0.50% * 3 *

4=

0 * $31.43

$2

0

+

0.00000 ) *

0.50% * 3 *

1=

0 * $38.80

$4

0

+

0.00000 ) *

0.50% * 3 *

0=

0 * $31.43

$0

0

+

0.00590 ) *

0.50% * 3 *

34 =

14 * $38.80

$528

5

+
+

0.00028 ) *
0.00014 ) *

0.50% * 3 *
0.50% * 3 *

11 =
102 =

0 * $31.43
1 * $38.80

$7
$38

0
0

+

0.00028 ) *

0.50% * 3 *

32 =

1 * $31.43

$19

0

+

0.00056 ) *

0.50% * 3 *

33 =

0 * $38.80

$0

0

+

0.00014 ) *

0.50% * 3 *

31 =

0 * $31.43

$0

0

+

0.00000 ) *

0.50% * 3 *

163 =

42 * $28.31

$1,192

14

+

0.00000 ) *

0.50% * 3 *

118 =

7 * $31.43

$229

2

+

0.00000 ) *

0.50% * 3 *

3=

0 * $37.70

$0

0

+

0.00000 ) *

0.50% * 3 *

1=

0 * $31.43

$0

0

Maritime 

Construction

Government
SECTOR 4.  Producers of Chromates
ALL

SECTOR 6. CCA Producers
ALL
Small ( 0
SECTOR 7.  Chromium Catalyst Producers
Large ( 11
ALL
Small ( 0
SECTOR 8.  Paint and Coating Producers
Large ( 1
ALL
Small ( 0
SECTOR 9.  Printing Ink Producers
Large ( 0
ALL
Small ( 0
SECTOR 10.  Plastic Colorant Producers and Users
Large ( 0
ALL
Small ( 0
SECTOR 11.  Plating Mixture Producers
Large ( 3
ALL
Small ( 1
SECTOR 13.  Chromium Metal Producers
Large ( 7
ALL
Small ( 0
SECTOR 14.  Iron and Steel Mills
Large ( 27
Alloy Stainless Steel
Small ( 1
Large ( 1
Carbon Steel
Small ( 1
14B. Alloy Stainless Steel Forging Industry
Large ( 0
Reshaping
Small ( 0
SECTOR 15.  Iron and Steel Foundries
Large ( 17
ALL
Small ( 4
SECTOR 17.  Chromium Dye Producers
Large ( 0
ALL
Small ( 0

Table 26

SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
ALL
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
Catalyst Users
Small
Large
Chromium Catalyst Service 
Companies
Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27.  Solid Waste Incineration
Large
ALL
Small
State
Government
Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large
Industrial Rehabilitation & 
Maintenance

( 0 +

0.00000 ) *

0.50% * 3 *

0=

0 * $41.50

$0

0

( 1 +

0.00000 ) *

0.50% * 3 *

5=

0 * $31.43

$2

0

( 0 +

0.00000 ) *

0.50% * 3 *

216 =

0 * $29.92

$0

0

( 0 +

0.00000 ) *

0.50% * 3 *

1,627 =

0 * $31.43

$0

0

( 0 +

0.00000 ) *

0.50% * 3 *

343 =

0 * $19.97

$0

0

( 0 +

0.00000 ) *

0.50% * 3 *

697 =

0 * $31.43

$0

0

( 1 +

0.00000 ) *

0.50% * 3 *

6=

0 * $28.87

$3

0

( 0 +
( 9 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

20 =
90 =

0 * $31.43
13 * $28.87

$0
$368

0
4

( 2 +

0.00000 ) *

0.50% * 3 *

5=

0 * $31.43

$5

0

( 0 +

0.00000 ) *

0.50% * 3 *

81 =

0 * $20.85

$0

0

( 0 +

0.00000 ) *

0.50% * 3 *

325 =

0 * $31.43

$0

0

( 0 +

0.00000 ) *

0.50% * 3 *

179 =

0 * $32.51

$0

0

( 0 +
( 5 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

0=
23 =

0 * $31.43
2 * $32.51

$0
$62

0
1

( 3 +

0.00000 ) *

0.50% * 3 *

4=

0 * $31.43

$7

0

( 0 +

0.00000 ) *

0.50% * 3 *

5=

0 * $25.64

$0

0

( 0 +

0.00000 ) *

0.50% * 3 *

0=

0 * $31.43

$0

0

( 0 +

0.00000 ) *

0.50% * 3 *

148 =

0 * $32.11

$0

0

( 0 +
( 0 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

79 =
36 =

0 * $31.43
0 * $32.11

$0
$0

0
0

( 0 +
( 1 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

32 =
1,162 =

0 * $31.43
14 * $32.11

$0
$437

0
5

( 1 +
( 0 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

4,650 =
12 =

54 * $31.43
0 * $32.11

$1,711
$3

18
0

( 0 +

0.00000 ) *

0.50% * 3 *

42 =

0 * $31.43

$9

0

( 0 +

0.00000 ) *

0.50% * 3 *

40 =

0 * $27.23

$0

0

( 0 +
( 0 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

48 =
0=

0 * $31.43
0 * $27.23

$0
$0

0
0

( 0 +

0.00000 ) *

0.50% * 3 *

24 =

0 * $32.43

$0

0

( 4 +

0.00000 ) *

0.50% * 3 *

19 =

1 * $27.93

$34

0

( 0 +

0.00000 ) *

0.50% * 3 *

0=

0 * $32.43

$0

0

( 0 +

0.00000 ) *

0.50% * 3 *

51 =

0 * $32.13

$0

0

Small ( 0 +
State Go( 0 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

233 =
15 =

0 * $32.43
0 * $32.13

$0
$0

0
0

Local Go( 0 +

0.00000 ) *

0.50% * 3 *

88 =

0 * $33.43

$0

0

Table 26

Large
Hazardous Waste Site Work

( 0 +

0.00000 ) *

0.50% * 3 *

40 =

0 * $32.13

$0

0

Small ( 0 +
State Go( 0 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

170 =
1=

0 * $34.43
0 * $32.13

$0
$0

0
0

Local Go( 0 +
Large ( 1 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

239 =
44 =

0 * $35.43
1 * $32.13

$0
$23

0
0

( 1 +

0.00000 ) *

0.50% * 3 *

175 =
70,349

3 * $36.43

$101
$20,375

1
242

Refractory Brick Restoration
Small
TOTALS 

726

Table 27

Annual Medical Examination with Additional Tests (§§ 1910.1026(k)(2)(ii) and (k)(3)(i)‐(k)(3)(iii); 
1915.1026(i)(2)(ii) and (i)(3)(i)‐(i)(3)(iii); and 1926.1126(i)(2)(ii) and (i)(3)(i)‐(i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Annual Medical Examination with Additional Tests  
This table calculates the cost for a contractor PLHCP to conduct additional medical testing for those employees who have abnormal annual medical examination 
results.  Abnormal results will require additional medical testing "as deemed appropriate by the physician."
COST = (LIMEMPAL + MEDEXAMADDERM) * %ALABN * MEDCOSTADD* #PLANTS

Cost

#PLANTS

MEDCOSTADD

%ALABN

MEDEXAMADDERM

Variables

LIMEMPAL

* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the implementation 
of engineering controls.
*%ALABN = Percent of employees exposed at or above the action level 30 days per year  (and therefore requiring a limited or comprehensive                                                            
medical exam who will be found to have abnormal results 
#PLANTS = Number of Plants

Sector 1. Electroplating
Large

(

3 + 0.000000 ) *

0.50% ) * $273.33 *

1,848 =

$6,894

Small

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

3,478 =

$0

Large

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

7,857 =

$0

Small
Large

(
(

0 + 0.000000 ) *
14 + 0.000000 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

8,804 =
189 =

$0
$3,501

Small
Large

(
(

1 + 0.000000 ) *
26 + 2.898677 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

107 =
268 =

$142
$10,603

Small
State

(
(

3 + 0.000000 ) *
0 + 0.000000 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

2,145 =
25 =

$8,498
$0

Local

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

787 =

$0

Large

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

10,535 =

$0

Small
Large

(
(

0 + 0.000000 ) *
0 + 0.000000 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

10,724 =
409 =

$0
$0

Small
Large

(
(

0 + 0.000000 ) *
10 + 0.000000 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

232 =
402 =

$0
$5,308

Small

(

1 + 0.000000 ) *

0.50% ) * $273.33 *

3,037 =

$4,010

Large

(

45 + 0.000000 ) *

0.50% ) * $273.33 *

49 =

$3,027

Small
Large

(
(

0 + 0.000000 ) *
1 + 0.000000 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

62 =
326 =

$0
$404

Small
Large

(
(

0 + 0.000000 ) *
2 + 0.000000 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

1,436 =
100 =

$0
$247

Small
Large

(
(

1 + 0.000000 ) *
2 + 0.000000 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

18 =
276 =

$22
$646

Small
Large

(
(

1 + 0.000000 ) *
2 + 0.000000 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

476 =
671 =

$559
$1,747

Small
State 

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

3,566 =

$0

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

12 =

$0

Local

(

6 + 0.000000 ) *

0.50% ) * $273.33 *

647 =

$5,560

All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
SECTOR 3.  PAINTING
General Industry AEROSPACE

General Industry AUTOBODY
COIL COATING

Maritime 

Construction

Governments

Page 164

Cost

#PLANTS

MEDCOSTADD

%ALABN

MEDEXAMADDERM

Variables

LIMEMPAL

Table 27

SECTOR 4.  Producers of Chromates
Large

(

7 + 0.000000 ) *

0.50% ) * $273.33 *

2=

$18

Small

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

0=

$0

Large

(

8 + 0.000000 ) *

0.50% ) * $273.33 *

2=

$20

Small

(

1 + 0.000000 ) *

0.50% ) * $273.33 *

1=

$1

Large

(

2 + 0.000000 ) *

0.50% ) * $273.33 *

2=

$5

Small

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

0=

$0

Large

(

11 + 0.000000 ) *

0.50% ) * $273.33 *

5=

$75

Small

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

0=

$0

Large

(

1 + 0.003476 ) *

0.50% ) * $273.33 *

80 =

$106

Small

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

126 =

$0

Large

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

2=

$0

Small

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

8=

$0

Large

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

81 =

$0

Small

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

40 =

$0

Large

(

3 + 0.000000 ) *

0.50% ) * $273.33 *

6=

$22

Small

(

1 + 0.000000 ) *

0.50% ) * $273.33 *

4=

$5

Large

(

7 + 0.000000 ) *

0.50% ) * $273.33 *

1=

$9

Small

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

0=

$0

Large

(

27 + 0.005900 ) *

0.50% ) * $273.33 *

34 =

$1,241

Small
Large

(
(

1 + 0.000281 ) *
1 + 0.000140 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

11 =
102 =

$19
$89

Small

(

1 + 0.000281 ) *

0.50% ) * $273.33 *

32 =

$56

Large

(

0 + 0.000562 ) *

0.50% ) * $273.33 *

33 =

$0

Small

(

0 + 0.000140 ) *

0.50% ) * $273.33 *

31 =

$0

Large

(

17 + 0.000000 ) *

0.50% ) * $273.33 *

163 =

$3,838

Small

(

4 + 0.000000 ) *

0.50% ) * $273.33 *

118 =

$665

Large

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

3=

$0

Small

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

1=

$0

Large

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

0=

$0

Small

(

1 + 0.000000 ) *

0.50% ) * $273.33 *

5=

$6

Large

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

216 =

$0

Small

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

1,627 =

$0

ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
ALL
SECTOR 9.  Printing Ink Producers
ALL
SECTOR 10.  Plastic Colorant Producers and Users
ALL
SECTOR 11.  Plating Mixture Producers
ALL
SECTOR 13.  Chromium Metal Producers
ALL
SECTOR 14.  Iron and Steel Mills
ALL

Carbon Steel
SECTOR 14B. Forging Industry
ALL
SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL
SECTOR 18.  Chromium Sulfate Producers
ALL
SECTOR 19.  Chemical Distributors
ALL

Page 165

Cost

Large

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

343 =

$0

Small

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

697 =

$0

Large

(

1 + 0.000000 ) *

0.50% ) * $273.33 *

6=

$9

Small
Large

(
(

0 + 0.000000 ) *
9 + 0.000000 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

20 =
90 =

$0
$1,162

Small

(

2 + 0.000000 ) *

0.50% ) * $273.33 *

5=

$15

Large

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

81 =

$0

Small

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

325 =

$0

Large

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

179 =

$0

Small
Large

(
(

0 + 0.000000 ) *
5 + 0.000000 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

0=
23 =

$0
$173

Small

(

3 + 0.000000 ) *

0.50% ) * $273.33 *

4=

$20

Large

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

5=

$0

Small

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

0=

$0

Large

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

148 =

$0

Small
Large

(
(

0 + 0.000000 ) *
0 + 0.000000 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

79 =
36 =

$0
$0

Small
Large

(
(

0 + 0.000000 ) *
1 + 0.000000 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

32 =
1,162 =

$0
$1,239

Small
State

(
(

1 + 0.000000 ) *
0 + 0.000000 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

4,650 =
12 =

$4,959
$7

Local

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

42 =

$26

Large

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

40 =

$0

Small
State

(
(

0 + 0.000000 ) *
1 + 0.724138 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

48 =
0=

$0
$0

Local

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

24 =

$0

Large

(

2 + 2.111590 ) *

0.50% ) * $273.33 *

19 =

$110

Small

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

0=

$0

Large

(

0 + 0.000000 ) *

0.50% ) * $273.33 *

51 =

$0

(
Small
State Gov't (

0 + 0.000000 ) *
0 + 0.000000 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

233 =
15 =

$0
$0

Local Gov't (
Large
(

0 + 0.000000 ) *
0 + 0.000000 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

88 =
40 =

$0
$0

)
Small
State Gov't (

0 + 0.000000 ) *
0 + 0.000000 ) *

0.50% ) * $273.33 *
0.50% ) * $273.33 *

170 =
1=

$0
$0

Local Gov't (

0 + 0.000000 ) *

0.50% ) * $273.33 *

239 =

$0

%ALABN

#PLANTS

MEDCOSTADD

MEDEXAMADDERM

Variables

LIMEMPAL

Table 27

SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
ALL

Fiber, Flat, Container Glass
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
ALL

Chromium Catalyst Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
General Industry

Maritime

Construction

Government
SECTOR 27.  Solid Waste Incineration
ALL

Government
SECTOR 30.  Superalloy Producers and Users
ALL
SECTOR 31.  Construction

Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

Page 166

Cost

#PLANTS

MEDCOSTADD

%ALABN

MEDEXAMADDERM

Variables

LIMEMPAL

Table 27

Large

(

1 + 0.000000 ) *

0.50% ) * $273.33 *

44 =

$64

Small

(

1 + 0.000000 ) *

0.50% ) * $273.33 *

175 =
70,349

$0
$65,123

Refractory Brick Restoration & Maintenance
Total

Page 167

Table 28

Medical Examination After Initial Assignment (§§1910.1026(k)(2)(i), (k)(3)(i), and (k)(3)(ii);1915.1026(i)(2)(i), (i)(3)(i), 
and (i)(3)(ii); and 1926.1126(i)(2)(i), (i)(3)(i), and (i)(3)(ii))
Employee Time and Cost to Complete the Medical Examination After Initial Assignment 
This table calculates the  burden hours and cost for those employees who are newly assigned to operations that involve exposure at or above the action level to receive medical 
examinations.  It is estimated that the employee will be provided a comprehensive medical examination. 
Hours = (LIMEMPAL + MEDEXAMADDERM)*TURNOVER*COMPFULLTIME * (1‐%BASEMED) * #PLANTS
Cost =Hours *NONSUPWAGE 
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or  > AL after implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the implementation of engineering controls.

RESPONSES

Cost

 NONSUPEWAGE

Hours

#PLANTS

1‐%BASEMED

COMPFULLTIME

24.17%

TURNOVER

 MEDEXAMADDERM

LIMEMPAL

Variables

*COMPFULLTIME = Four hours for an employee to receive a comprehensive medical examination
*NONSUPEWAGE ‐ Non‐supervisory wage rate
(1‐%BASEMED) = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants

Sector 1. Electroplating
Large

(

3

+

0.00000 ) * 23.30% *

4

* (

1

‐ 100.00% ) *

1,848 =

0 * $26.61

$0

Small

(

0

+

0.00000 ) * 23.30% *

4

* (

1

‐ 100.00%

*

3,478 =

0 * $26.61

$0

Large

(

0

+

0.00000 ) * 24.26% *

4

* (

1

‐

5.00%

*

7,857 =

0 * $26.20

$0

0

Small
Large

(
(

0
14

+
+

0.00000 ) * 24.26% *
2.89868 ) * 24.26% *

4
4

* (
* (

1
1

‐
‐

0.00%
5.00%

*
*

8,804 =
189 =

0 * $26.20
2,868 * $26.20

$0
$75,135

0
717

Small
Large

(
(

1
26

+
+

0.00000 ) * 24.26% *
2.89868 ) * 24.26% *

4
4

* (
* (

1
1

‐
‐

0.00%
5.00%

*
*

107 =
268 =

101 * $26.20
7,152 * $26.20

$2,635
$187,386

25
1,788

Small
Local

(
(

3
0

+
+

0.00000 ) * 24.26% *
0.00000 ) * 24.26% *

4
4

* (
* (

1
1

‐
‐

0.00%
5.00%

*
*

2,145 =
25 =

6,034 * $26.20
0 * $26.20

$158,084
$0

1,508
0

State

(

0

+

0.00000 ) * 24.26% *

4

* (

1

‐

0.00%

*

787 =

0 * $26.20

$0

0

Large

(

0

+

0.00000 ) * 24.26% *

4

* (

1

‐

5.00%

*

10,535 =

0 * $26.20

$0

0

Small
Large

(
(

0
0

+
+

0.00000 ) * 24.26% *
0.00000 ) * 24.26% *

4
4

* (
* (

1
1

‐
‐

0.00%
5.00%

*
*

10,724 =
409 =

0 * $26.20
0 * $26.20

$0
$0

0
0

Small
Large

(
(

0
10

+
+

0.00000 ) * 24.26% *
0.00000 ) * 24.26% *

4
4

* (
* (

1
1

‐
‐

0.00%
5.00%

*
*

232 =
402 =

0 * $26.20
3,580 * $26.20

$0
$93,806

0
942

Small

(

1

+

0.00000 ) * 24.26% *

4

* (

1

‐

0.00%

*

3,037 =

2,847 * $26.20

$74,603

712

Large

(

45

+

0.00000 ) * 24.26% *

4

* (

1

‐ 80.00%

*

49 =

430 * $33.07

$14,216

107

Small
Large

(
(

0
1

+
+

0.00000 ) * 24.26% *
0.00000 ) * 24.26% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 80.00%

*
*

62 =
326 =

0 * $33.07
57 * $33.07

$0
$1,895

0
14

Small
Large

(
(

0
2

+
+

0.00000 ) * 24.26% *
0.00000 ) * 24.26% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 80.00%

*
*

1,436 =
100 =

0 * $33.07
35 * $33.07

$0
$1,158

0
9

Small
Large

(
(

1
2

+
+

0.00000 ) * 24.26% *
0.00000 ) * 24.26% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 100.00%

*
*

18 =
276 =

8 * $33.07
0 * $33.07

$263
$0

2
0

Small
Large

(
(

1
2

+
+

0.00000 ) * 24.26% *
0.00000 ) * 24.26% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 100.00%

*
*

476 =
671 =

198 * $33.07
0 * $33.07

$6,559
$0

50
0

Small
Local

(
(

0
0

+
+

0.00000 ) * 24.26% *
0.00000 ) * 24.26% *

4
4

* (
* (

1
1

‐ 100.00%
‐ 100.00%

*
*

3,566 =
12 =

0 * $33.07
0 * $33.07

$0
$0

0
0

State

(

6

+

0.00000 ) * 24.26% *

4

* (

1

‐ 100.00%

*

647 =

0 * $33.07

$0

0

Large

(

7

+

0.00000 ) * 25.97% *

4

* (

1

‐ 50.00%

*

2=

7 * $38.68

$258

2

Small

(

0

+

0.00000 ) * 25.97% *

4

* (

1

‐

*

0=

0 * $38.68

$0

0

0

ALL
Sector 2. Welding
General Industry

Maritime

Construction

GOVERNMENT
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
SECTOR 3.  PAINTING
AEROSPACE

Autobody

Coil Coating

Maritime 

Construction

Government
SECTOR 4.  Producers of Chromates
ALL

Page 168

0.00%

RESPONSES

Cost

 NONSUPEWAGE

Hours

#PLANTS

1‐%BASEMED

COMPFULLTIME

TURNOVER

 MEDEXAMADDERM

LIMEMPAL

Variables

Table 28

SECTOR 5. Chromate Pigment Procedures
Large
ALL

(

8

+

0.00000 ) * 25.97% *

4

* (

1

‐ 100.00%

*

2=

0 * $37.70

$0

0

Small

(

1

+

0.00000 ) * 25.97% *

4

* (

1

‐ 100.00%

*

1=

0 * $37.70

$0

0

Large

(

2

+

0.00000 ) * 25.97% *

4

* (

1

‐ 100.00%

*

2=

0 * $31.94

$0

0

(

0

+

0.00000 ) * 25.97% *

4

* (

1

‐

*

0=

0 * $31.94

$0

0

(

11

+

0.00000 ) * 25.97% *

4

* (

1

‐ 100.00%

*

5=

0 * $38.68

$0

0

(

0

+

0.00000 ) * 25.97% *

4

* (

1

‐ 100.00%

*

0=

0 * $38.68

$0

0

(

1

+

0.00348 ) * 25.97% *

4

* (

1

‐ 100.00%

*

80 =

0 * $28.81

$0

0

(

0

+

0.00000 ) * 25.97% *

4

* (

1

‐ 100.00%

*

126 =

0 * $28.81

$0

0

(

0

+

0.00000 ) * 25.97% *

4

* (

1

‐ 80.00%

*

2=

0 * $28.86

$0

0

(

0

+

0.00000 ) * 25.97% *

4

* (

1

‐ 10.00%

*

8=

0 * $28.86

$0

0

(

0

+

0.00000 ) * 25.97% *

4

* (

1

‐ 100.00%

*

81 =

0 * $31.99

$0

0

(

0

+

0.00000 ) * 25.97% *

4

* (

1

‐ 100.00%

*

40 =

0 * $31.99

$0

0

(

3

+

0.00000 ) * 25.97% *

4

* (

1

‐ 50.00%

*

6=

8 * $28.71

$237

2

(

1

+

0.00000 ) * 25.97% *

4

* (

1

‐ 30.00%

*

4=

3 * $28.71

$74

1

(

7

+

0.00000 ) * 23.30% *

4

* (

1

‐ 100.00%

*

1=

0 * $38.80

$0

0

(

0

+

0.00000 ) * 23.30% *

4

* (

1

‐

0.00%

*

0=

0 * $38.80

$0

0

(

27

+

0.00590 ) * 23.30% *

4

* (

1

‐ 50.00%

*

34 =

423 * $38.80

$16,414

106

(
(

1
1

+
+

0.00028 ) * 23.30% *
0.00014 ) * 23.30% *

4
4

* (
* (

1
1

‐ 30.00%
‐ 50.00%

*
*

11 =
102 =

9 * $38.80
30 * $38.80

$351
$1,172

2
8

(

1

+

0.00028 ) * 23.30% *

4

* (

1

‐ 30.00%

*

32 =

27 * $38.80

$1,032

7

(

0

+

0.00056 ) * 23.30% *

4

* (

1

‐ 50.00%

*

33 =

0 * $38.80

$0

0

(

0

+

0.00014 ) * 23.30% *

4

* (

1

‐ 30.00%

*

31 =

0 * $38.80

$0

0

(

17

+

0.00000 ) * 23.30% *

4

* (

1

‐ 80.00%

*

163 =

523 * $28.31

$14,818

131

(

4

+

0.00000 ) * 23.30% *

4

* (

1

‐ 10.00%

*

118 =

408 * $28.31

$11,546

102

(

0

+

0.00000 ) * 25.97% *

4

* (

1

‐ 100.00%

*

3=

0 * $37.70

$0

0

(

0

+

0.00000 ) * 25.97% *

4

* (

1

‐ 100.00%

*

1=

0 * $37.70

$0

0

(

0

+

0.00000 ) * 25.97% *

4

* (

1

‐ 100.00%

*

0=

0 * $41.50

$0

0

(

1

+

0.00000 ) * 25.97% *

4

* (

1

‐ 100.00%

*

5=

0 * $41.50

$0

0

(

0

+

0.00000 ) * 23.73% *

4

* (

1

‐

0.00%

*

216 =

0 * $29.92

$0

0

(

0

+

0.00000 ) * 23.73% *

4

* (

1

‐

0.00%

*

1,627 =

0 * $29.92

$0

0

(

0

+

0.00000 ) * 25.97% *

4

* (

1

‐ 80.00%

*

343 =

0 * $19.97

$0

0

(

0

+

0.00000 ) * 25.97% *

4

* (

1

‐ 10.00%

*

697 =

0 * $19.97

$0

0

(

1

+

0.00000 ) * 25.97% *

4

* (

1

‐ 80.00%

*

6=

1 * $28.87

$40

0

(
(

0
9

+
+

0.00000 ) * 25.97% *
0.00000 ) * 25.97% *

4
4

* (
* (

1
1

‐ 10.00%
‐ 80.00%

*
*

20 =
90 =

0 * $28.87
177 * $28.87

$0
$5,101

0
44

(

2

+

0.00000 ) * 25.97% *

4

* (

1

‐ 10.00%

*

5=

10 * $28.87

$297

3

SECTOR 6. CCA Producers
ALL
Small
SECTOR 7.  Chromium Catalyst Producers
Large
ALL
Small
SECTOR 8.  Paint and Coating Producers
Large
ALL
Small
SECTOR 9.  Printing Ink Producers
Large
ALL
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
Alloy Stainless Steel
Small
Large
Carbon Steel
Small
14B. Alloy Stainless Steel Forging Industry
Large
Reshaping
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
ALL
Small
Large
Fiber, Flat and Container Glass
Small

Page 169

0.00%

RESPONSES

Cost

 NONSUPEWAGE

Hours

#PLANTS

1‐%BASEMED

COMPFULLTIME

TURNOVER

 MEDEXAMADDERM

LIMEMPAL

Variables

Table 28

SECTOR 22.  Printing
Large

(

0

+

0.00000 ) * 25.97% *

4

* (

1

‐ 80.00%

*

81 =

0 * $20.85

$0

0

Small

(

0

+

0.00000 ) * 25.97% *

4

* (

1

‐ 10.00%

*

325 =

0 * $20.85

$0

0

Large

(

0

+

0.00000 ) * 23.30% *

4

* (

1

‐ 80.00%

*

179 =

0 * $32.51

$0

0

Small
Large

(
(

0
5

+
+

0.00000 ) * 23.30% *
0.00000 ) * 23.30% *

4
4

* (
* (

1
1

‐ 80.00%
‐ 80.00%

*
*

0=
23 =

0 * $32.51
24 * $32.51

$0
$766

0
6

Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27.  Solid Waste Incineration
Large
ALL
Small
State
Government
Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

(

3

+

0.00000 ) * 23.30% *

4

* (

1

‐ 80.00%

*

4=

3 * $32.51

$88

1

(

0

+

0.00000 ) * 23.30% *

4

* (

1

‐ 80.00%

*

5=

0 * $25.64

$0

0

(

0

+

0.00000 ) * 23.30% *

4

* (

1

‐ 10.00%

*

0=

0 * $25.64

$0

0

(

0

+

0.00000 ) * 23.30% *

4

* (

1

‐ 25.00%

*

148 =

0 * $32.11

$0

0

(
(

0
0

+
+

0.00000 ) * 23.30% *
0.00000 ) * 23.30% *

4
4

* (
* (

1
1

‐ 0.00%
‐ 25.00%

*
*

79 =
36 =

0 * $32.11
0 * $32.11

$0
$0

0
0

(
(

0
1

+
+

0.00000 ) * 23.30% *
0.00000 ) * 23.30% *

4
4

* (
* (

1
1

‐ 0.00%
‐ 50.00%

*
*

32 =
1,162 =

0 * $32.11
422 * $32.11

$0
$13,563

0
106

(
(

1
0

+
+

0.00000 ) * 23.30% *
0.00000 ) * 23.30% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 50.00%

*
*

4,650 =
12 =

1,691 * $32.11
2 * $32.11

$54,290
$79

423
1

(

0

+

0.00000 ) * 23.30% *

4

* (

1

‐ 50.00%

*

42 =

9 * $32.11

$284

2

(

0

+

0.00000 ) * 41.79% *

4

* (

1

‐ 50.00%

*

40 =

0 * $27.23

$0

0

(
(

0
0

+
+

0.00000 ) * 41.79% *
0.00000 ) * 41.79% *

4
4

* (
* (

1
1

‐ 30.00%
‐ 50.00%

*
*

48 =
0=

0 * $27.23
0 * $27.23

$0
$0

0
0

(

0

+

0.00000 ) * 41.79% *

4

* (

1

‐ 30.00%

*

24 =

0 * $27.23

$0

0

(

4

+

0.00000 ) * 23.30% *

4

* (

1

‐ 50.00%

*

19 =

37 * $27.93

$1,044

9

(

0

+

0.00000 ) * 23.30% *

4

* (

1

‐ 30.00%

*

0=

0 * $27.93

$0

0

(

0

+

0.00000 ) * 60.38% *

4

* (

1

‐ 50.00%

*

51 =

0 * $32.13

$0

0

(
Small
State Gov't (

0
0

+
+

0.00000 ) * 60.38% *
0.00000 ) * 60.38% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 50.00%

*
*

233 =
15 =

0 * $32.13
0 * $32.13

$0
$0

0
0

Local Gov't (
Large
(

0
0

+
+

0.00000 ) * 60.38% *
0.00000 ) * 60.38% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 50.00%

*
*

88 =
40 =

0 * $32.13
0 * $32.13

$0
$0

0
0

(
Small
State Gov't (

0
0

+
+

0.00000 ) * 60.38% *
0.00000 ) * 60.38% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 50.00%

*
*

170 =
1=

0 * $32.13
0 * $32.13

$0
$0

0
0

Local Gov't (
Large
(

0
1

+
+

0.00000 ) * 60.38% *
0.00000 ) * 60.38% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 50.00%

*
*

239 =
44 =

0 * $32.13
57 * $32.13

$0
$1,816

0
14

(

1

+

0.00000 ) * 60.38% *

4

* (

1

‐ 50.00%

*

175 =
70,349

223 * $32.13
27,405

$7,181
$746,192

56
6,898

ALL
SECTOR 24.  Chromium Catalyst Users
Catalyst Users
Chromium Catalyst Service 
Companies

Industrial Rehabilitation & 
Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration
Small
TOTAL

Page 170

Table 29

Medical Examination After Initial Assignment (§§1910.1026(k)(2)(i), (k)(3)(i), and (k)(3)(ii);1915.1026(i)(2)(i), (i)(3)(i), and (i)(3)(ii); 
and 1926.1126(i)(2)(i), (i)(3)(i), and (i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Medical Examination After Initial Assignment 
This table calculates the cost for a contractor PLHCP to conduct medical examinations to employees newly assigned to operations that involve exposure at or above the action level.
Hours = (LIMEMPAL + MEDEXAMADDERM)*TURNOVER*COMPFULLCOST *(1‐%BASEMED)*#PLANTS
Cost =Hours *NONSUPWAGE 
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the implementation of engineering controls.

Cost

#PLANTS

1 ‐%BASEMED 

COMPFULLCOST

TURNOVER

TURNOVER (Old)

 MEDEXAMADDERM

LIMEMPAL

Variables

*COMPFULLCOST = Cost for an employer to administer a comprehensive medical examination
1‐%BASEMED = Percentage of establishments that do not have annual medical surveillance for their employees in the baseline. 
* #PLANTS = Number of Plants

Sector 1. Electroplating
Large

(

3

+

0.00000 ) * 26.16% 23.30% *

$513.87

* (

1

‐

100.00%

) *

1,848 =

$0

Small

(

0

+

0.00000 ) * 26.16% 23.30% *

$513.87

*

1

‐

100.00%

*

3,478 =

$0

Large

(

0

+

0.00000 ) * 27.24% 24.26% *

$513.87

*

1

‐

5.00%

*

7,857 =

$0

Small
Large

(
(

0
14

+
+

0.00000 ) * 27.24% 24.26% *
2.89868 ) * 27.24% 24.26% *

$513.87
$513.87

*
*

1
1

‐
‐

0.00%
5.00%

*
*

8,804 =
189 =

$0
$368,415

Small
Large

(
(

1
26

+
+

0.00000 ) * 27.24% 24.26% *
2.89868 ) * 27.24% 24.26% *

$513.87
$513.87

*
*

1
1

‐
‐

0.00%
5.00%

*
*

107 =
268 =

$12,919
$918,827

Small
Local

(
(

3
0

+
+

0.00000 ) * 27.24% 24.26% *
0.00000 ) * 27.24% 24.26% *

$513.87
$513.87

*
*

1
1

‐
‐

0.00%
5.00%

*
*

2,145 =
25 =

$775,145
$0

State

(

0

+

0.00000 ) * 27.24% 24.26% *

$513.87

*

1

‐

0.00%

*

787 =

$0

Large

(

0

+

0.00000 ) * 27.24% 24.26% *

$513.87

*

1

‐

5.00%

*

10,535 =

$0

Small
Large

(
(

0
0

+
+

0.00000 ) * 27.24% 24.26% *
0.00000 ) * 27.24% 24.26% *

$513.87
$513.87

*
*

1
1

‐
‐

0.00%
5.00%

*
*

10,724 =
409 =

$0
$0

Small
Large

(
(

0
10

+
+

0.00000 ) * 27.24% 24.26% *
0.00000 ) * 27.24% 24.26% *

$513.87
$513.87

*
*

1
1

‐
‐

0.00%
5.00%

*
*

232 =
402 =

$0
$459,966

Small

(

1

+

0.00000 ) * 27.24% 24.26% *

$513.87

*

1

‐

0.00%

*

3,037 =

$365,808

Large

(

45

+

0.00000 ) * 27.24% 24.26% *

$513.87

*

1

‐

80.00%

*

49 =

$55,230

Small
Large

(
(

0
1

+
+

0.00000 ) * 27.24% 24.26% *
0.00000 ) * 27.24% 24.26% *

$513.87
$513.87

*
*

1
1

‐
‐

50.00%
80.00%

*
*

62 =
326 =

$0
$7,364

Small
Large

(
(

0
2

+
+

0.00000 ) * 27.24% 24.26% *
0.00000 ) * 27.24% 24.26% *

$513.87
$513.87

*
*

1
1

‐
‐

50.00%
80.00%

*
*

1,436 =
100 =

$0
$4,500

Small
Large

(
(

1
2

+
+

0.00000 ) * 27.24% 24.26% *
0.00000 ) * 27.24% 24.26% *

$513.87
$513.87

*
*

1
1

‐
‐

50.00%
100.00%

*
*

18 =
276 =

$1,023
$0

Small
Large

(
(

1
2

+
+

0.00000 ) * 27.24% 24.26% *
0.00000 ) * 27.24% 24.26% *

$513.87
$513.87

*
*

1
1

‐
‐

50.00%
100.00%

*
*

476 =
671 =

$25,484
$0

Small
Local

(
(

0
0

+
+

0.00000 ) * 27.24% 24.26% *
0.00000 ) * 27.24% 24.26% *

$513.87
$513.87

*
*

1
1

‐
‐

100.00%
100.00%

*
*

3,566 =
12 =

$0
$0

State

(

6

+

0.00000 ) * 27.24% 24.26% *

$513.87

*

1

‐

100.00%

*

647 =

$0

ALL
Sector 2. Welding
General Industry

Maritime

Construction

GOVERNMENT
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
SECTOR 3.  PAINTING
AEROSPACE

Autobody

Coil Coating

Maritime 

Construction

Government

Page 171

Cost

#PLANTS

1 ‐%BASEMED 

COMPFULLCOST

TURNOVER

TURNOVER (Old)

 MEDEXAMADDERM

LIMEMPAL

Variables

Table 29

SECTOR 4.  Producers of Chromates
Large

(

7

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

50.00%

*

2=

$857

Small
SECTOR 5. Chromate Pigment Procedures
ALL
Large

(

0

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

0.00%

*

0=

$0

(

8

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

100.00%

*

2=

$0

Small

(

1

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

100.00%

*

1=

$0

Large

(

2

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

100.00%

*

2=

$0

(

0

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

0.00%

*

0=

$0

(

11

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

100.00%

*

5=

$0

(

0

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

100.00%

*

0=

$0

(

1

+

0.00348 ) * 29.16% 25.97% *

$513.87

*

1

‐

100.00%

*

80 =

$0

(

0

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

100.00%

*

126 =

$0

(

0

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

80.00%

*

2=

$0

(

0

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

10.00%

*

8=

$0

(

0

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

100.00%

*

81 =

$0

(

0

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

100.00%

*

40 =

$0

(

3

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

50.00%

*

6=

$1,063

(

1

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

30.00%

*

4=

$331

(

7

+

0.00000 ) * 26.16% 23.30% *

$513.87

*

1

‐

100.00%

*

1=

$0

(

0

+

0.00000 ) * 26.16% 23.30% *

$513.87

*

1

‐

0.00%

*

0=

$0

(

27

+

0.00590 ) * 26.16% 23.30% *

$513.87

*

1

‐

50.00%

*

34 =

$54,343

(
(

1
1

+
+

0.00028 ) * 26.16% 23.30% *
0.00014 ) * 26.16% 23.30% *

$513.87
$513.87

*
*

1
1

‐
‐

30.00%
50.00%

*
*

11 =
102 =

$1,162
$3,882

(

1

+

0.00028 ) * 26.16% 23.30% *

$513.87

*

1

‐

30.00%

*

32 =

$3,418

(

0

+

0.00056 ) * 26.16% 23.30% *

$513.87

*

1

‐

50.00%

*

33 =

$1

(

0

+

0.00014 ) * 26.16% 23.30% *

$513.87

*

1

‐

30.00%

*

31 =

$0

(

17

+

0.00000 ) * 26.16% 23.30% *

$513.87

*

1

‐

80.00%

*

163 =

$67,239

(

4

+

0.00000 ) * 26.16% 23.30% *

$513.87

*

1

‐

10.00%

*

118 =

$52,394

(

0

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

100.00%

*

3=

$0

(

0

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

100.00%

*

1=

$0

(

0

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

100.00%

*

0=

$0

(

1

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

100.00%

*

5=

$0

(

0

+

0.00000 ) * 26.64% 23.73% *

$513.87

*

1

‐

0.00%

*

216 =

$0

(

0

+

0.00000 ) * 26.64% 23.73% *

$513.87

*

1

‐

0.00%

*

1,627 =

$0

ALL

SECTOR 6. CCA Producers
ALL
Small
SECTOR 7.  Chromium Catalyst Producers
Large
ALL
Small
SECTOR 8.  Paint and Coating Producers
Large
ALL
Small
SECTOR 9.  Printing Ink Producers
Large
ALL
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
Alloy Stainless Steel
Small
Large
Carbon Steel
Small
14B. Alloy Stainless Steel Forging Industry
Large
Reshaping
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small

Page 172

Cost

#PLANTS

1 ‐%BASEMED 

COMPFULLCOST

TURNOVER

TURNOVER (Old)

 MEDEXAMADDERM

LIMEMPAL

Variables

Table 29

SECTOR 20.  Textile Dyeing
Large

(

0

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

80.00%

*

343 =

$0

Small

(

0

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

10.00%

*

697 =

$0

Large

(

1

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

80.00%

*

6=

$176

Small
Large

(
(

0
9

+
+

0.00000 ) * 29.16% 25.97% *
0.00000 ) * 29.16% 25.97% *

$513.87
$513.87

*
*

1
1

‐
‐

10.00%
80.00%

*
*

20 =
90 =

$0
$22,698

Small

(

2

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

10.00%

*

5=

$1,320

Large

(

0

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

80.00%

*

81 =

$0

Small

(

0

+

0.00000 ) * 29.16% 25.97% *

$513.87

*

1

‐

10.00%

*

325 =

$0

Large

(

0

+

0.00000 ) * 26.16% 23.30% *

$513.87

*

1

‐

80.00%

*

179 =

$0

Small
Large

(
(

0
5

+
+

0.00000 ) * 26.16% 23.30% *
0.00000 ) * 26.16% 23.30% *

$513.87
$513.87

*
*

1
1

‐
‐

80.00%
80.00%

*
*

0=
23 =

$0
$3,028

Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27.  Solid Waste Incineration
Large
ALL
Small
State
Government
Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

(

3

+

0.00000 ) * 26.16% 23.30% *

$513.87

*

1

‐

80.00%

*

4=

$346

(

0

+

0.00000 ) * 26.16% 23.30% *

$513.87

*

1

‐

80.00%

*

5=

$0

(

0

+

0.00000 ) * 26.16% 23.30% *

$513.87

*

1

‐

10.00%

*

0=

$0

(

0

+

0.00000 ) * 26.16% 23.30% *

$513.87

*

1

‐

25.00%

*

148 =

$0

(
(

0
0

+
+

0.00000 ) * 26.16% 23.30% *
0.00000 ) * 26.16% 23.30% *

$513.87
$513.87

*
*

1
1

‐
‐

0.00%
25.00%

*
*

79 =
36 =

$0
$0

(
(

0
1

+
+

0.00000 ) * 26.16% 23.30% *
0.00000 ) * 26.16% 23.30% *

$513.87
$513.87

*
*

1
1

‐
‐

0.00%
50.00%

*
*

32 =
1,162 =

$0
$54,264

(
(

1
0

+
+

0.00000 ) * 26.16% 23.30% *
0.00000 ) * 26.16% 23.30% *

$513.87
$513.87

*
*

1
1

‐
‐

50.00%
50.00%

*
*

4,650 =
12 =

$217,204
$314

(

0

+

0.00000 ) * 26.16% 23.30% *

$513.87

*

1

‐

50.00%

*

42 =

$1,136

(

0

+

0.00000 ) * 46.92% 41.79% *

$513.87

*

1

‐

50.00%

*

40 =

$0

(
(

0
0

+
+

0.00000 ) * 46.92% 41.79% *
0.00000 ) * 46.92% 41.79% *

$513.87
$513.87

*
*

1
1

‐
‐

30.00%
50.00%

*
*

48 =
0=

$0
$0

(

0

+

0.00000 ) * 46.92% 41.79% *

$513.87

*

1

‐

30.00%

*

24 =

$0

(

4

+

0.00000 ) * 26.16% 23.30% *

$513.87

*

1

‐

50.00%

*

19 =

$4,804

(

0

+

0.00000 ) * 26.16% 23.30% *

$513.87

*

1

‐

30.00%

*

0=

$0

ALL
SECTOR 21.  Colored Glass Producers
ALL

Fiber, Flat and Container Glass
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
Catalyst Users
Chromium Catalyst Service 
Companies

Industrial Rehabilitation & 
Maintenance

Hazardous Waste Site Work

(

0

+

0.00000 ) * 67.80% 60.38% *

$513.87

*

1

‐

50.00%

*

51 =

$0

Small
State Gov't

(
(

0
0

+
+

0.00000 ) * 67.80% 60.38% *
0.00000 ) * 67.80% 60.38% *

$513.87
$513.87

*
*

1
1

‐
‐

50.00%
50.00%

*
*

233 =
15 =

$0
$0

Local Gov't
Large

(
(

0
0

+
+

0.00000 ) * 67.80% 60.38% *
0.00000 ) * 67.80% 60.38% *

$513.87
$513.87

*
*

1
1

‐
‐

50.00%
50.00%

*
*

88 =
40 =

$0
$0

Small
State Gov't

(
(

0
0

+
+

0.00000 ) * 67.80% 60.38% *
0.00000 ) * 67.80% 60.38% *

$513.87
$513.87

*
*

1
1

‐
‐

50.00%
50.00%

*
*

170 =
1=

$0
$0

Local Gov't
Large

(
(

0
1

+
+

0.00000 ) * 67.80% 60.38% *
0.00000 ) * 67.80% 60.38% *

$513.87
$513.87

*
*

1
1

‐
‐

50.00%
50.00%

*
*

239 =
44 =

$0
$7,259

Small

(

1

+

0.00000 ) * 67.80% 60.38% *

$513.87

*

1

‐

50.00%
TOTAL

*

175 =
70,349

$28,709
$3,520,628

Refractory Brick Restoration

Page 173

Table 30

Medical Examination at the Termination of  Employment (§§ 1910.1026(k)(2)(vi) and (k)(3)(i)‐(k)(3)(iii); 1915.1026(i)(2)(vi) 
and (i)(3)(i)‐(i)(3)(iii); and 1926.1126(i)(2)(vi) and (i)(3)(i)‐(i)(3)(ii))
Employee Time and Cost to Complete the Medical Examination at the Termination of Employment
Employees receive a comprehensive medical examination at the termination of employment.  For employers who are providing annual medical testing (%BASEMED) the additional employee time will be 
3 hours (COMPARTTIME).  For employers who are not providing annual medical testing (1‐%BASEMED) the time for a full comprehensive examination is 4 hours (COMPFULLTIME).  The employee 
turnover rate is divided by two, because medical examinations must be provided at the termination of employment ". . . unless the last examination . . . was less then six months prior to the date of 
determination.  It is estimated that half of the employee turnover occurs at the beginning of the year and the other half occurs a the end of the year.  Therefore, based on this estimation at any time 
during the year, it has been greater then six months since their last medical examination for half of the employees that are leaving, and therefore, these employees require a medical examination. 
Burden hours = (LIMEMPAL + MEDEXAMADDERM)*(TURNOVER/2)* ((COMPARTTIME*%BASEMED)+(COMPFULLTIME*(1‐%BASEMED)))*#PLANTS
Cost = Burden hours x NONSUPEWAGE
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or  > AL after the implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" 
                                    after the implementation of engineering controls.
COMPARTTIME= The time an employee takes for a comprehensive exam  when employed by employers already providing annual medical testing in the baseline.  
%BASEMED = Percentage of employers who are providing annual medical examinations
COMPFULLTIME = The time an employee takes for  a comprehensive exam when employed by employers who were not providing any annual medical testing in the baseline.
*1‐%BASEMED = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants
NONSUPEWAGE = Non‐supervisory Wage Rate

Responses

$46,911.10

588

$0.00

0

0

$26.20

$0.00

0

8,804 =
189 =

0
1,434

$26.20
$26.20

$0.00
$37,575.28

0
377

) ) *
) ) *

107 =
268 =

50
8,902

$26.20
$26.20

$1,317.36
$233,235.36

13
2,342

0.00%
5.00%

) ) *
) ) *

2,145 =
25 =

7,509
0

$26.20
$26.20

$196,734.23
$0.00

1,877
0
0

Hours

$26.61
$26.61

#PLANTS

Cost

 NONSUPEWAGE

1‐%BASEMED

COMPFULLTIME

%BASEMED

COMPPARTTIME

Divide
2

TURNOVER

TURNOVER (Old)

 MEDEXAMADDERM

LIMEMPAL

Variables

24.17%

Sector 1. Electroplating
Large

(

3+

0.000000 ) * ( 26.16%

23.30% /

2 ) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

1,848 =

Small

(

0+

0.000000 ) * ( 26.16%

23.30% /

2 ) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

3,478 =

Large

(

0+

0.000000 ) * ( 27.24%

24.26% /

2 ) *( (

3 *

5.00%

) +(

4 *(

1 ‐

5.00%

) ) *

7,857 =

Small
Large

(
(

0+
14 +

0.000000 ) * ( 27.24%
2.898677 ) * ( 27.24%

24.26% /
24.26% /

2 ) *( (
2 ) *( (

3 *
3 *

0.00%
5.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

Small
Large

(
(

1+
26 +

0.000000 ) * ( 27.24%
2.898677 ) * ( 67.80%

24.26% /
60.38% /

2 ) *( (
2 ) *( (

3 *
3 *

0.00%
5.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

0.00%
5.00%

Small
State

(
(

3+
0+

0.000000 ) * ( 67.80%
0.000000 ) * ( 67.80%

60.38% /
60.38% /

2 ) *( (
2 ) *( (

3 *
3 *

0.00%
5.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

1,763

All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Local

(

0+

0.000000 ) * ( 67.80%

60.38% /

2 ) *( (

3 *

0.00%

) +(

4 *(

1 ‐

0.00%

) ) *

787 =

0

$26.20

$0.00

Large

(

0+

0.000000 ) * ( 27.74%

24.71% /

2 ) *( (

3 *

5.00%

) +(

4 *(

1 ‐

5.00%

) ) *

10,535 =

0

$26.20

$0.00

0

Small
Large

(
(

0+
0+

0.000000 ) * ( 27.74%
0.000000 ) * ( 27.74%

24.71% /
24.71% /

2 ) *( (
2 ) *( (

3 *
3 *

0.00%
5.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

10,724 =
409 =

0
0

$26.20
$26.20

$0.00
$0.00

0
0

Small
Large

(
(

0+
10 +

0.000000 ) * ( 27.74%
0.000000 ) * ( 67.80%

24.71% /
60.38% /

2 ) *( (
2 ) *( (

3 *
3 *

0.00%
5.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

232 =
402 =

0
4,456

$26.20
$26.20

$0.00
$116,752.26

0
1,173

) *( (

3 *

0.00%

) +(

4 *(

1 ‐

0.00%

) ) *

3,037 =

3,544

$26.20

$92,843.20

886

) *( (

3 *

80.00%

) +(

4 *(

1 ‐

80.00% ) ) *

49 =

232

$33.07

$7,682.29

274

) *( (
) *( (

3 *
3 *

50.00%
80.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

50.00% ) ) *
80.00% ) ) *

62 =
326 =

0
29

$33.07
$33.07

$0.00
$973.99

0
36

) *( (
) *( (

3 *
3 *

50.00%
80.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

50.00% ) ) *
80.00% ) ) *

1,436 =
100 =

0
18

$33.07
$33.07

$0.00
$607.55

0
22

) *( (
) *( (

3 * 50.00% ) + (
3 * 100.00% ) + (

4 *(
4 *(

1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *

18 =
276 =

4
1

$33.07
$33.07

$139.59
$21.03

2
58

) *( (
) *( (

3 * 50.00% ) + (
3 * 100.00% ) + (

4 *(
4 *(

1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *

476 =
671 =

101
2

$33.07
$33.07

$3,345.14
$57.08

51
386

) *( (
) *( (

3 * 100.00% ) + (
3 * 100.00% ) + (

4 *(
4 *(

1 ‐ 100.00% ) ) *
1 ‐ 100.00% ) ) *

3,566 =
12 =

0
0

$33.07
$33.07

$0.00
$0.00

0
0

) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

647 =

6

$33.07

$188.42

1,228

) *( (

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *

2=

5

$38.68

$179.43

2

) *( (

3 *

0.00%

) +(

4 *(

1 ‐

0.00%

) ) *

0=

0

$38.62

$0.00

0

) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

2=

3

$37.70

$118.92

2

) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

1=

0

$37.70

$13.21

0

) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

2=

1

$31.94

$19.60

0

) *( (

3 *

) +(

4 *(

1 ‐

) ) *

0=

0

$31.94

$0.00

0

) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

5=

4

$38.68

$173.13

7

) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

0=

0

$38.68

$0.00

0

) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

80 =

0

$28.81

$10.75

10

) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

126 =

0

$28.81

$0.00

0

) *( (

3 *

80.00%

) +(

4 *(

1 ‐

80.00% ) ) *

2=

0

$28.86

$0.00

0

) *( (

3 *

10.00%

) +(

4 *(

1 ‐

10.00% ) ) *

8=

0

$28.86

$0.00

0

Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
(
1+
0.000000 ) * ( 67.80% 60.38% / 2
Small
SECTOR 3.  PAINTING                                                                                                                           
General Industry
Large
(
45 +
0.000000 ) * ( 27.74% 24.71% / 2
AEROSPACE
(
0+
0.000000 ) * ( 27.74% 24.71% / 2
Small
Large
(
1+
0.000000 ) * ( 27.74% 24.71% / 2
Auto Body
) * ( 27.74% 24.71% / 2
(
0
+
0.000000
Small
Large
(
2+
0.000000 ) * ( 27.74% 24.71% / 2
Coil Coating
(
1+
0.000000 ) * ( 27.74% 24.71% / 2
Small
Large
(
2+
0.000000 ) * ( 27.74% 24.71% / 2
Maritime
(
1+
0.000000 ) * ( 27.74% 24.71% / 2
Small
(
2+
0.000000 ) * ( 67.80% 60.38% / 2
Large
Construction
) * ( 67.80% 60.38% / 2
(
0
+
0.000000
Small
(
0+
0.000000 ) * ( 67.80% 60.38% / 2
State
Government
(
6+
0.000000 ) * ( 67.80% 60.38% / 2
Local
SECTOR 4.  Producers of Chromates
Large
(
7+
0.000000 ) * ( 29.16% 25.97% / 2
ALL
) * ( 29.16% 25.97% / 2
(
0
+
0.000000
Small
SECTOR 5. Chromate Pigment Procedures
Large
(
8+
0.000000 ) * ( 29.16% 25.97% / 2
ALL
(
1+
0.000000 ) * ( 29.16% 25.97% / 2
Small
SECTOR 6. CCA Producers
Large
(
2+
0.000000 ) * ( 29.16% 25.97%
2
ALL
2
(
0+
0.000000 ) * ( 29.16% 25.97%
Small
SECTOR 7.  Chromium Catalyst Producers
Large
(
11 +
0.000000 ) * ( 29.16% 25.97% / 2
ALL
(
0+
0.000000 ) * ( 29.16% 25.97% / 2
Small
SECTOR 8.  Paint and Coating Producers
Large
(
1+
0.000000 ) * ( 29.16% 25.97% / 2
ALL
(
0+
0.000000 ) * ( 29.16% 25.97% / 2
Small
SECTOR 9.  Printing Ink Producers
Large
(
0+
0.000000 ) * ( 29.16% 25.97% / 2
ALL
(
0+
0.000000 ) * ( 29.16% 25.97% / 2
Small

Page 174

0.00%

0.00%

Table 30

SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
General Industry
Small
Large
Chromium Service Companies
Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27.  Solid Waste Incineration
Large
ALL
Small
State
Government
Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small

(

0+

0.000000 ) * ( 29.16%

25.97% /

2 ) *( (

3 * 100.00% ) + (

(

0+

0.000000 ) * ( 29.16%

25.97% /

2 ) *( (

3 * 100.00% ) + (

(

3+

0.000000 ) * ( 29.16%

25.97% /

2 ) *( (

3 *

50.00%

) +(

(

1+

0.000000 ) * ( 29.16%

25.97% /

2 ) *( (

3 *

30.00%

) +(

4 *(

4 *(

1 ‐ 100.00% ) ) *

81 =

0

$31.99

$0.00

0

4 *(

1 ‐ 100.00% ) ) *

40 =

0

4 *(

1 ‐

50.00% ) ) *

6=

5

$31.99

$0.00

0

$28.71

$134.51

1 ‐

30.00% ) ) *

4=

1

$28.71

2

$40.09

0

(

7+

0.000000 ) * ( 26.16%

23.30% /

2 ) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

1=

0

$38.80

$0.00

1

(

0+

0.000000 ) * ( 26.16%

23.30% /

2 ) *( (

3 *

0.00%

) +(

4 *(

1 ‐

0.00%

) ) *

0=

0

$38.80

$0.00

0

(

27 +

0.005900 ) * ( 26.16%

23.30% /

2 ) *( (

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *

34 =

216

$38.80

$8,388.87

106

(
(

1+
1+

0.000281 ) * ( 26.16%
0.000140 ) * ( 26.16%

23.30% /
23.30% /

2 ) *( (
2 ) *( (

3 *
3 *

30.00%
50.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

30.00% ) ) *
50.00% ) ) *

11 =
102 =

5
15

$38.80
$38.80

$180.69
$590.54

2
8

(

1+

0.000281 ) * ( 26.16%

23.30% /

2 ) *( (

3 *

30.00%

) +(

4 *(

1 ‐

30.00% ) ) *

32 =

13

$38.80

$521.36

5
0

(

0+

0.000562 ) * ( 26.16%

23.30% /

2 ) *( (

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *

33 =

0

$38.80

$0.17

(

0+

0.000140 ) * ( 26.16%

23.30% /

2 ) *( (

3 *

30.00%

) +(

4 *(

1 ‐

30.00% ) ) *

31 =

0

$38.80

$0.06

0

(

17 +

0.000000 ) * ( 26.16%

23.30% /

2 ) *( (

3 *

80.00%

) +(

4 *(

1 ‐

80.00% ) ) *

163 =

267

$28.31

$7,545.41

327

(

4+

0.000000 ) * ( 26.16%

23.30% /

2 ) *( (

3 *

10.00%

) +(

4 *(

1 ‐

10.00% ) ) *

118 =

204

$28.31

$5,777.17

57

(

0+

0.000000 ) * ( 29.16%

25.97% /

2 ) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

3=

0

$37.70

$0.00

0

(

0+

0.000000 ) * ( 29.16%

25.97% /

2 ) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

1=

0

$37.70

$0.00

0

(

0+

0.000000 ) * ( 29.16%

25.97% /

2 ) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

0=

0

$41.50

$0.00

0

(

1+

0.000000 ) * ( 29.16%

25.97% /

2 ) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

5=

0

$41.50

$15.48

1

(

0+

0.000000 ) * ( 26.64%

23.73% /

2 ) *( (

3 *

0.00%

) +(

4 *(

1 ‐

0.00%

) ) *

216 =

0

$29.92

$0.00

0

(

0+

0.000000 ) * ( 26.64%

23.73% /

2 ) *( (

3 *

0.00%

) +(

4 *(

1 ‐

0.00%

) ) *

1,627 =

0

$29.92

$0.00

0
0

(

0+

0.000000 ) * ( 29.16%

25.97% /

2 ) *( (

3 *

80.00%

) +(

4 *(

1 ‐

80.00% ) ) *

343 =

0

$19.97

$0.00

(

0+

0.000000 ) * ( 29.16%

25.97% /

2 ) *( (

3 *

10.00%

) +(

4 *(

1 ‐

10.00% ) ) *

697 =

0

$19.97

$0.00

0

(

1+

0.000000 ) * ( 29.16%

25.97% /

2 ) *( (

3 *

80.00%

) +(

4 *(

1 ‐

80.00% ) ) *

6=

1

$28.87

$29.20

1

(
(

0+
9+

0.000000 ) * ( 29.16%
0.000000 ) * ( 29.16%

25.97% /
25.97% /

2 ) *( (
2 ) *( (

3 *
3 *

10.00%
80.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

10.00% ) ) *
80.00% ) ) *

20 =
90 =

0
91

$28.87
$28.87

$0.00
$2,635.23

0
110

(

2+

0.000000 ) * ( 29.16%

25.97% /

2 ) *( (

3 *

10.00%

) +(

4 *(

1 ‐

10.00% ) ) *

5=

5

$28.87

$150.63

1

(

0+

0.000000 ) * ( 29.16%

25.97% /

2 ) *( (

3 *

80.00%

) +(

4 *(

1 ‐

80.00% ) ) *

81 =

0

$20.85

$0.00

0

(

0+

0.000000 ) * ( 29.16%

25.97% /

2 ) *( (

3 *

10.00%

) +(

4 *(

1 ‐

10.00% ) ) *

325 =

0

$20.85

$0.00

0

(

0+

0.000000 ) * ( 26.16%

23.30% /

2 ) *( (

3 *

80.00%

) +(

4 *(

1 ‐

80.00% ) ) *

179 =

0

$32.51

$0.00

0

(
(

0+
5+

0.000000 ) * ( 26.16%
0.000000 ) * ( 26.16%

23.30% /
23.30% /

2 ) *( (
2 ) *( (

3 *
3 *

80.00%
80.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

80.00% ) ) *
80.00% ) ) *

0=
23 =

0
13

$32.51
$32.51

$0.00
$432.93

0
15

(

3+

0.000000 ) * ( 26.16%

23.30% /

2 ) *( (

3 *

30.00%

) +(

4 *(

1 ‐

30.00% ) ) *

4=

5

$32.51

$164.45

2

(

0+

0.000000 ) * ( 26.16%

23.30% /

2 ) *( (

3 *

80.00%

) +(

4 *(

1 ‐

80.00% ) ) *

5=

0

$25.64

$0.00

0

(

0+

0.000000 ) * ( 26.16%

23.30% /

2 ) *( (

3 *

10.00%

) +(

4 *(

1 ‐

10.00% ) ) *

0=

0

$25.64

$0.00

0

(

0+

0.000000 ) * ( 26.16%

23.30% /

2 ) *( (

3 *

25.00%

) +(

4 *(

1 ‐

25.00% ) ) *

148 =

0

$32.11

$0.00

0

(
(

0+
0+

0.000000 ) * ( 26.16%
0.000000 ) * ( 26.16%

23.30% /
23.30% /

2 ) *( (
2 ) *( (

3 *
3 *

0.00%
25.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

0.00% ) ) *
25.00% ) ) *

79 =
36 =

0
0

$32.11
$32.11

$0.00
$0.00

0
0

(
(

0+
1+

0.000000 ) * ( 26.16%
0.000000 ) * ( 67.80%

23.30% /
60.38% /

2 ) *( (
2 ) *( (

3 *
3 *

0.00%
50.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

0.00% ) ) *
50.00% ) ) *

32 =
1,162 =

0
548

$32.11
$32.11

$0.00
$17,587.66

0
274

(
(

1+
0+

0.000000 ) * ( 67.80%
0.000000 ) * ( 67.80%

60.38% /
60.38% /

2 ) *( (
2 ) *( (

3 *
3 *

50.00%
50.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

4,650 =
12 =

2,191
3

$32.11
$32.11

$70,363.81
$108.33

1,095
2

(

0+

0.000000 ) * ( 67.80%

60.38% /

2 ) *( (

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *

42 =

12

$32.11

$374.57

6

(

0+

0.000000 ) * ( 46.92%

41.79% /

2 ) *( (

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *

40 =

0

$27.23

$0.00

0

(
(

0+
1+

0.000000 ) * ( 46.92%
0.000000 ) * ( 46.92%

41.79% /
41.79% /

2 ) *( (
2 ) *( (

3 *
3 *

30.00%
50.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

30.00% ) ) *
50.00% ) ) *

48 =
0=

0
0

$27.23
$27.23

$0.00
$6.18

0
0

(

0+

0.000000 ) * ( 46.92%

41.79% /

2 ) *( (

3 *

30.00%

) +(

4 *(

1 ‐

30.00% ) ) *

24 =

0

$27.23

$0.00

0

(

2+

0.000000 ) * ( 26.16%

23.30% /

2 ) *( (

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *

19 =

10

$27.93

$271.40

5

(

0+

0.000000 ) * ( 26.16%

23.30% /

2 ) *( (

3 *

30.00%

) +(

4 *(

1 ‐

30.00% ) ) *

0=

0

$27.93

$0.00

0

Page 175

Table 30

SECTOR 31.  Construction
Large
Industrial Rehabilitation & Maintenance

(

0+

0.000000 ) * ( 67.80%

60.38% /

2 ) *( (

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *

51 =

0

$32.13

$0.00

0

(
Small
State Gov't (

0+
0+

0.000000 ) * ( 67.80%
0.000000 ) * ( 67.80%

60.38% /
60.38% /

2 ) *( (
2 ) *( (

3 *
3 *

50.00%
50.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

233 =
15 =

0
0

$32.13
$32.13

$0.00
$0.00

0
0

(
(

0+
0+

0.000000 ) * ( 67.80%
0.000000 ) * ( 67.80%

60.38% /
60.38% /

2 ) *( (
2 ) *( (

3 *
3 *

50.00%
50.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

88 =
40 =

0
0

$32.13
$32.13

$0.00
$0.00

0
0

(
Small
State Gov't (

0+
0+

0.000000 ) * ( 67.80%
0.000000 ) * ( 67.80%

60.38% /
60.38% /

2 ) *( (
2 ) *( (

3 *
3 *

50.00%
50.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

170 =
1=

0
0

$32.13
$32.13

$0.00
$0.00

0
0

Local Gov't
Large

(
(

0+
1+

0.000000 ) * ( 67.80%
0.000000 ) * ( 67.80%

60.38% /
60.38% /

2 ) *( (
2 ) *( (

3 *
3 *

50.00%
50.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

239 =
44 =

0
29

$32.13
$32.13

$0.00
$923.30

0
14

Small

(

1+

0.000000 ) * ( 67.80%

60.38% /

2 ) *( (

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *
Total

175 =
70,349

112
31,813

$32.13

Local Gov't
Large
Hazardous Waste Site Work

Refractory Brick Restoration 

Page 176

$3,605.97
56
$858,746.95 11,422

Table 31

Medical Examination at the Termination of  Employment (§§ 1910.1026(k)(2)(vi) and (k)(3)(i)‐(k)(3)(iii); 1915.1026(i)(2)(vi) and
(i)(3)(i)‐(i)(3)(iii); and 1926.1126(i)(2)(vi) and (i)(3)(i)‐(i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Medical Examination at the Termination of Employment  
Employees receive a comprehensive medical examination at the termination of employment.  For employers who are providing annual medical testing (%BASEMED) the additional cost will be $227.00 (COMPARTCOST).  For 
employers who are not providing annual medical testing (1‐%BASEMED) the cost for a full comprehensive examination will be $454.00 (COMPFULLCOST).  The employee turnover rate is divided by two, because medical 
examinations must be provided at the termination of employment ". . . unless the last examination . . . was less then six months prior to the date of determination.  It is estimated that half of the employee turnover occurs at 
the begining of the year and the other half occurs a the end of the year.  Therefore, based on this estimation at any time during the year, it has been greater then six months since their last medical examination for half of 
the employees that are leaving, and therefore, these employees require a medical examination. 
COST = (LIMEMPAL + MEDEXAMADDDERM)*(TURNOVER/2)* ((COMPARTCOST*%BASEMED)+(COMPFULLCOST*(1‐%BASEMED)))*#PLANTS

26.16%

23.30%

/ 2) *( (

$256

* 100.00% ) + (

Small

(

0+

0.000000 ) * (

26.16%

23.30%

/ 2) *( (

$256

* 100.00% ) + (

Large

(

0+

0.000000 ) * (

27.24%

24.26%

/ 2) *( (

$256

*

5.00%

) +(

Small
Large

(
(

0+
14 +

0.000000 ) * (
2.898677 ) * (

27.24%
27.24%

24.26%
24.26%

/ 2) *( (
/ 2) *( (

$256
$256

*
*

0.00%
5.00%

) +(
) +(

Small
Large

(
(

1+
26 +

0.000000 ) * (
2.898677 ) * (

27.24%
67.80%

24.26%
60.38%

/ 2) *( (
/ 2) *( (

$256
$256

*
*

0.00%
5.00%

Small
State

(
(

3+
0+

0.000000 ) * (
0.000000 ) * (

67.80%
67.80%

60.38%
60.38%

/ 2) *( (
/ 2) *( (

$256
$256

*
*

1‐%BASEMED

 COST 

%BASEMED

0.000000 ) * (

#PLANTS

COMPPARTCOST

3+

COMPFULLCOST

TURNOVER

(

Divide
2

TURNOVER (Old)

Large

LIMEMPAL

 MEDEXAMADDERM

Variables

* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" 
                                    after the implementation of engineering controls
TURNOVER/2 = Represents the frequency of termination exams.
COMPARTCOST= The cost of a  comprehensive exam for those employers already providing annual medical testing in the baseline
%BASEMED = Percentage of employers who are providing annual medical examinations
COMPFULLCOST = The cost of a comprehensive exam for those employers who were not providing any annual medical testing in the baseline
*1‐%BASEMED = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants

Sector 1. Electroplating
$513 * (

1 ‐

100.00% ) ) *

1,848 =

$         150,700.97

$513 * (

1 ‐

100.00% ) ) *

$513 * (

1 ‐

5.00%

) ) *

7,857 =

3,478 =

$                       ‐
$                       ‐

$513 * (
$513 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

8,804 =
189 =

$                       ‐
$         183,883.80

) +(
) +(

$513 * (
$513 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

107 =
268 =

$             6,447.29
$     1,141,417.27

0.00%
5.00%

) +(
) +(

$513 * (
$513 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

2,145 =
25 =

$         962,833.83
$                       ‐

All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Local

(

0+

0.000000 ) * (

67.80%

60.38%

/ 2) *( (

$256

*

0.00%

) +(

$513 * (

1 ‐

0.00%

) ) *

787 =

$                       ‐

Large

(

0+

0.000000 ) * (

27.74%

24.71%

/ 2) *( (

$256

*

5.00%

) +(

$513 * (

1 ‐

5.00%

) ) *

10,535 =

$                       ‐

Small
Large

(
(

0+
0+

0.000000 ) * (
0.000000 ) * (

27.74%
27.74%

24.71%
24.71%

/ 2) *( (
/ 2) *( (

$256
$256

*
*

0.00%
5.00%

) +(
) +(

$513 * (
$513 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

10,724 =
409 =

$                       ‐
$                       ‐

Small
Large

(
(

0+
10 +

0.000000 ) * (
0.000000 ) * (

27.74%
67.80%

24.71%
60.38%

/ 2) *( (
/ 2) *( (

$256
$256

*
*

0.00%
5.00%

) +(
) +(

$513 * (
$513 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

232 =
402 =

$                       ‐
$         571,376.64

(
1 + 0.000000 ) * ( 67.80% 60.38%
Small
SECTOR 3.  PAINTING                                                                                                                          
 General Industry
Large
( 45 + 0.000000 ) * ( 27.74% 24.71%
AEROSPACE
(
0 + 0.000000 ) * ( 27.74% 24.71%
Small
Large
(
1 + 0.000000 ) * ( 27.74% 24.71%
Auto Body
(
0 + 0.000000 ) * ( 27.74% 24.71%
Small
Large
(
2 + 0.000000 ) * ( 27.74% 24.71%
Coil Coating
(
1 + 0.000000 ) * ( 27.74% 24.71%
Small
Large
(
2 + 0.000000 ) * ( 27.74% 24.71%
Maritime
(
1 + 0.000000 ) * ( 27.74% 24.71%
Small
(
2 + 0.000000 ) * ( 67.80% 60.38%
Large
Construction
(
0 + 0.000000 ) * ( 67.80% 60.38%
Small
(
0 + 0.000000 ) * ( 67.80% 60.38%
State
Government
(
6 + 0.000000 ) * ( 67.80% 60.38%
Local
SECTOR 4.  Producers of Chromates
Large
(
7 + 0.000000 ) * ( 29.16% 25.97%
ALL
(
0 + 0.000000 ) * ( 29.16% 25.97%
Small
SECTOR 5. Chromate Pigment Procedures
Large
(
8 + 0.000000 ) * ( 29.16% 25.97%
ALL
(
1 + 0.000000 ) * ( 29.16% 25.97%
Small

/ 2) *( (

$256

*

0.00%

) +(

$513 * (

1 ‐

0.00%

) ) *

3,037 =

$         454,382.39

/ 2) *( (

$256

*

80.00%

) +(

$513 * (

1 ‐

80.00%

) ) *

49 =

$            29,216.32

/ 2) *( (
/ 2) *( (

$256
$256

*
*

50.00%
80.00%

) +(
) +(

$513 * (
$513 * (

1 ‐
1 ‐

50.00%
80.00%

) ) *
) ) *

62 =
326 =

$                       ‐
$             3,765.43

/ 2) *( (
/ 2) *( (

$256
$256

*
*

50.00%
80.00%

) +(
) +(

$513 * (
$513 * (

1 ‐
1 ‐

50.00%
80.00%

) ) *
) ) *

1,436 =
100 =

$                       ‐
$             2,332.98

/ 2) *( (
/ 2) *( (

$256
$256

* 50.00% ) + (
* 100.00% ) + (

$513 * (
$513 * (

1 ‐
1 ‐

50.00% ) ) *
100.00% ) ) *

18 =
276 =

$                534.14
$                   54.38

/ 2) *( (
/ 2) *( (

$256
$256

* 50.00% ) + (
* 100.00% ) + (

$513 * (
$513 * (

1 ‐
1 ‐

50.00% ) ) *
100.00% ) ) *

476 =
671 =

$           12,964.92
$                147.56

/ 2) *( (
/ 2) *( (

$256
$256

* 100.00% ) + (
* 100.00% ) + (

$513 * (
$513 * (

1 ‐
1 ‐

100.00% ) ) *
100.00% ) ) *

3,566 =
12 =

/ 2) *( (

$256

* 100.00% ) + (

$513 * (

1 ‐

100.00% ) ) *

647 =

$                487.10

/ 2) *( (

$256

*

50.00%

) +(

$513 * (

1 ‐

50.00%

) ) *

2=

$                539.04

/ 2) *( (

$256

*

0.00%

) +(

$513 * (

1 ‐

0.00%

) ) *

0=

$                       ‐

/ 2) *( (

$256

* 100.00% ) + (

$513 * (

1 ‐

100.00% ) ) *

2=

$                269.66

/ 2) *( (

$256

* 100.00% ) + (

$513 * (

1 ‐

100.00% ) ) *

1=

$                   29.96

Sector 2. Mild Steel Welding
General Industry

Maritime

Construction

Page 177

$                       ‐
$                       ‐

* 100.00% ) + (

$513 * (

1 ‐

#PLANTS

1‐%BASEMED

 COST 

$256

COMPFULLCOST

25.97%

%BASEMED

29.16%

COMPPARTCOST

TURNOVER

0.000000 ) * (

Divide
2

TURNOVER (Old)

2+

LIMEMPAL

 MEDEXAMADDERM

Variables

Table 31

SECTOR 6. CCA Producers
Large

(

2) *( (

100.00% ) ) *

2=

$                   52.47

ALL
Small

(

0+

0.000000 ) * (

29.16%

25.97%

2) *( (

$256

*

) +(

$513 * (

1 ‐

) ) *

0=

$                       ‐

Large

(

11 +

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

* 100.00% ) + (

$513 * (

1 ‐

100.00% ) ) *

5=

$                382.63
$                       ‐

0.00%

0.00%

SECTOR 7.  Chromium Catalyst Producers
ALL
Small

(

0+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

* 100.00% ) + (

$513 * (

1 ‐

100.00% ) ) *

0=

Large

(

1+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

* 100.00% ) + (

$513 * (

1 ‐

100.00% ) ) *

80 =

Small

(

0+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

* 100.00% ) + (

$513 * (

1 ‐

100.00% ) ) *

126 =

$                       ‐

Large

(

0+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

*

80.00%

) +(

$513 * (

1 ‐

80.00%

) ) *

2=

$                       ‐

(

0+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

*

10.00%

) +(

$513 * (

1 ‐

10.00%

) ) *

8=

$                       ‐

SECTOR 8.  Paint and Coating Producers
$                   31.89

ALL
SECTOR 9.  Printing Ink Producers
ALL
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
General Industry
Small
Large
Chromium Service Companies
Small

(

0+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

* 100.00% ) + (

$513 * (

1 ‐

100.00% ) ) *

81 =

$                       ‐

(

0+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

* 100.00% ) + (

$513 * (

1 ‐

100.00% ) ) *

40 =

(

3+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

*

50.00%

) +(

$513 * (

1 ‐

50.00%

) ) *

6=

$                       ‐
29.16
$                577.27

(

1+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

*

30.00%

) +(

$513 * (

1 ‐

30.00%

) ) *

4=

$                174.38

100.00% ) ) *

1=

$                       ‐

0=

$                       ‐

(

7+

0.000000 ) * (

26.16%

23.30%

/ 2) *( (

$256

* 100.00% ) + (

$513 * (

1 ‐

(

0+

0.000000 ) * (

26.16%

23.30%

/ 2) *( (

$256

*

0.00%

) +(

$513 * (

1 ‐

0.00%

) ) *

(

27 +

0.005900 ) * (

26.16%

23.30%

/ 2) *( (

$256

*

50.00%

) +(

$513 * (

1 ‐

50.00%

) ) *

34 =

$           27,520.55

(
(

1+
1+

0.000281 ) * (
0.000140 ) * (

26.16%
26.16%

23.30%
23.30%

/ 2) *( (
/ 2) *( (

$256
$256

*
*

30.00%
50.00%

) +(
) +(

$513 * (
$513 * (

1 ‐
1 ‐

30.00%
50.00%

) ) *
) ) *

11 =
102 =

$                591.37
$             1,946.67

(

1+

0.000281 ) * (

26.16%

23.30%

/ 2) *( (

$256

*

30.00%

) +(

$513 * (

1 ‐

30.00%

) ) *

32 =

$             1,717.10

(

0+

0.000562 ) * (

26.16%

23.30%

/ 2) *( (

$256

*

50.00%

) +(

$513 * (

1 ‐

50.00%

) ) *

33 =

$                     0.57

(

0+

0.000140 ) * (

26.16%

23.30%

/ 2) *( (

$256

*

30.00%

) +(

$513 * (

1 ‐

30.00%

) ) *

31 =

$                     0.19

(

17 +

0.000000 ) * (

26.16%

23.30%

/ 2) *( (

$256

*

80.00%

) +(

$513 * (

1 ‐

80.00%

) ) *

163 =

$           33,968.26

(

4+

0.000000 ) * (

26.16%

23.30%

/ 2) *( (

$256

*

10.00%

) +(

$513 * (

1 ‐

10.00%

) ) *

118 =

$           26,159.66

(

0+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

* 100.00% ) + (

$513 * (

1 ‐

100.00% ) ) *

3=

$                       ‐

(

0+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

* 100.00% ) + (

$513 * (

1 ‐

100.00% ) ) *

1=

$                       ‐

(

0+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

* 100.00% ) + (

$513 * (

1 ‐

100.00% ) ) *

0=

$                       ‐

(

1+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

* 100.00% ) + (

$513 * (

1 ‐

100.00% ) ) *

5=

$                   31.89

(

0+

0.000000 ) * (

26.64%

23.73%

/ 2) *( (

$256

*

0.00%

) +(

$513 * (

1 ‐

0.00%

) ) *

216 =

$                       ‐

(

0+

0.000000 ) * (

26.64%

23.73%

/ 2) *( (

$256

*

0.00%

) +(

$513 * (

1 ‐

0.00%

) ) *

1,627 =

$                       ‐

(

0+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

*

80.00%

) +(

$513 * (

1 ‐

80.00%

) ) *

343 =

$                       ‐

(

0+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

*

10.00%

) +(

$513 * (

1 ‐

10.00%

) ) *

697 =

$                       ‐

(

1+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

*

80.00%

) +(

$513 * (

1 ‐

80.00%

) ) *

6=

$                115.73

(
(

0+
9+

0.000000 ) * (
0.000000 ) * (

29.16%
29.16%

25.97%
25.97%

/ 2) *( (
/ 2) *( (

$256
$256

*
*

10.00%
80.00%

) +(
) +(

$513 * (
$513 * (

1 ‐
1 ‐

10.00%
80.00%

) ) *
) ) *

20 =
90 =

$                       ‐
$           11,578.74

(

2+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

*

10.00%

) +(

$513 * (

1 ‐

10.00%

) ) *

5=

$                665.55

(

0+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

*

80.00%

) +(

$513 * (

1 ‐

80.00%

) ) *

81 =

$                       ‐

(

0+

0.000000 ) * (

29.16%

25.97%

/ 2) *( (

$256

*

10.00%

) +(

$513 * (

1 ‐

10.00%

) ) *

325 =

$                       ‐

(

0+

0.000000 ) * (

26.16%

23.30%

/ 2) *( (

$256

*

80.00%

) +(

$513 * (

1 ‐

80.00%

) ) *

179 =

$                       ‐

(
(

0+
5+

0.000000 ) * (
0.000000 ) * (

26.16%
26.16%

23.30%
23.30%

/ 2) *( (
/ 2) *( (

$256
$256

*
*

80.00%
80.00%

) +(
) +(

$513 * (
$513 * (

1 ‐
1 ‐

80.00%
80.00%

) ) *
) ) *

0=
23 =

$                       ‐
$             1,642.11

(

3+

0.000000 ) * (

26.16%

23.30%

/ 2) *( (

$256

*

30.00%

) +(

$513 * (

1 ‐

30.00%

) ) *

4=

$                633.90

Page 178

0.000000 ) * (

26.16%

23.30%

/ 2) *( (

$256

*

80.00%

) +(

$513 * (

1 ‐

80.00%

) ) *

Small

(

0+

0.000000 ) * (

26.16%

23.30%

/ 2) *( (

$256

*

10.00%

) +(

$513 * (

1 ‐

10.00%

Large

(

0+

0.000000 ) * (

26.16%

23.30%

/ 2) *( (

$256

*

25.00%

) +(

$513 * (

1 ‐

25.00%

Small
Large

(
(

0+
0+

0.000000 ) * (
0.000000 ) * (

26.16%
26.16%

23.30%
23.30%

/ 2) *( (
/ 2) *( (

$256
$256

*
*

0.00%
25.00%

) +(
) +(

$513 * (
$513 * (

1 ‐
1 ‐

Small
Large

(
(

0+
1+

0.000000 ) * (
0.000000 ) * (

26.16%
67.80%

23.30%
60.38%

/ 2) *( (
/ 2) *( (

$256
$256

*
*

0.00%
50.00%

) +(
) +(

$513 * (
$513 * (

Small
State

(
(

1+
0+

0.000000 ) * (
0.000000 ) * (

67.80%
67.80%

60.38%
60.38%

/ 2) *( (
/ 2) *( (

$256
$256

*
*

50.00%
50.00%

) +(
) +(

 COST 

#PLANTS

1‐%BASEMED

%BASEMED

COMPFULLCOST

0+

COMPPARTCOST

TURNOVER

(

Divide
2

TURNOVER (Old)

Large

LIMEMPAL

 MEDEXAMADDERM

Variables

Table 31

SECTOR 25.  Refractory Brick Producers
5=

$                       ‐

) ) *

0=

$                       ‐

) ) *

148 =

$                       ‐

0.00%
25.00%

) ) *
) ) *

79 =
36 =

$                       ‐
$                       ‐

1 ‐
1 ‐

0.00%
50.00%

) ) *
) ) *

32 =
1,162 =

$                       ‐
$           70,216.63

$513 * (
$513 * (

1 ‐
1 ‐

50.00%
50.00%

) ) *
) ) *

4,650 =
12 =

$         280,964.45
$                423.90

ALL
SECTOR 26.  Woodworking
General Industry

Maritime

Construction

Government
Local

(

0+

0.000000 ) * (

67.80%

60.38%

/ 2) *( (

$256

*

50.00%

) +(

$513 * (

1 ‐

50.00%

) ) *

42 =

$             1,487.06

Large

(

0+

0.000000 ) * (

46.92%

41.79%

/ 2) *( (

$256

*

50.00%

) +(

$513 * (

1 ‐

50.00%

) ) *

40 =

$                       ‐

Small
State

(
(

0+
1+

0.000000 ) * (
0.000000 ) * (

46.92%
46.92%

41.79%
41.79%

/ 2) *( (
/ 2) *( (

$256
$256

*
*

30.00%
50.00%

) +(
) +(

$513 * (
$513 * (

1 ‐
1 ‐

30.00%
50.00%

) ) *
) ) *

48 =
0=

$                       ‐
$                   19.40

Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

(

0+

0.000000 ) * (

46.92%

41.79%

/ 2) *( (

$256

*

30.00%

) +(

$513 * (

1 ‐

30.00%

) ) *

24 =

$                       ‐
$             1,230.38

SECTOR 27.  Solid Waste Incineration
ALL

Government

(

2+

0.000000 ) * (

26.16%

23.30%

/ 2) *( (

$256

*

50.00%

) +(

$513 * (

1 ‐

50.00%

) ) *

19 =

(

0+

0.000000 ) * (

26.16%

23.30%

/ 2) *( (

$256

*

30.00%

) +(

$513 * (

1 ‐

30.00%

) ) *

0=

$                       ‐

(

0+

0.000000 ) * (

67.80%

60.38%

/ 2) *( (

$256

*

50.00%

) +(

$513 * (

1 ‐

50.00%

) ) *

51 =

$                       ‐

(
Small
Industrial Rehabilitation & Maintenance
State Gov't (

0+
0+

0.000000 ) * (
0.000000 ) * (

67.80%
67.80%

60.38%
60.38%

/ 2) *( (
/ 2) *( (

$256
$256

*
*

50.00%
50.00%

) +(
) +(

$513 * (
$513 * (

1 ‐
1 ‐

50.00%
50.00%

) ) *
) ) *

233 =
15 =

$                       ‐
$                       ‐

Local Gov't (
Large
(

0+
0+

0.000000 ) * (
0.000000 ) * (

67.80%
67.80%

60.38%
60.38%

/ 2) *( (
/ 2) *( (

$256
$256

*
*

50.00%
50.00%

) +(
) +(

$513 * (
$513 * (

1 ‐
1 ‐

50.00%
50.00%

) ) *
) ) *

88 =
40 =

$                       ‐
$                       ‐

(
Small
State Gov't (

0+
0+

0.000000 ) * (
0.000000 ) * (

67.80%
67.80%

60.38%
60.38%

/ 2) *( (
/ 2) *( (

$256
$256

*
*

50.00%
50.00%

) +(
) +(

$513 * (
$513 * (

1 ‐
1 ‐

50.00%
50.00%

) ) *
) ) *

170 =
1=

$                       ‐
$                       ‐

Local Gov't (
Large
(

0+
1+

0.000000 ) * (
0.000000 ) * (

67.80%
67.80%

60.38%
60.38%

/ 2) *( (
/ 2) *( (

$256
$256

*
*

50.00%
50.00%

) +(
) +(

$513 * (
$513 * (

1 ‐
1 ‐

50.00%
50.00%

) ) *
) ) *

239 =
44 =

$                       ‐
$             3,663.67

(

1+

0.000000 ) * (

67.80%

60.38%

/ 2) *( (

$256

*

50.00%

) +(

$513 * (

1 ‐

50.00%
Total

) ) *

175 =
70,349

$           14,367.94
$           4,001,548

Hazardous Waste Site Work

Refractory Brick Restoration 
Small

Page 179

Table 32

Information Provided to the PLHCP (§§ 1910.1026(k)(4), 1915.1026(i)(4), and 1926.1126(i)(4)); Clerical Time and Cost to Provide Information to the  PLHCP 
This table estimates the burden hours and costs for employers to update required information in worker records and provide the information to the 
PLHCP.  OSHA assumes that it will take 5 minutes for a clerical worker to update the worker record and provide this information.  The Agency 
reduced the time for this requirement from 1 hour to 5 minutes because, after the first year of medical surveillance, employers will not need to 
establish files.
Hours = POTEXEMP * MEDRECORD * PLANTS
COST = BURDEN HOURS * CLWAGE

Responses

Cost

CLWAGE

Hours

#PLANTS

MEDRECORD

POTEXEMP

* POTEXEMP = Total number of potentially exposed employees at or above the AL and workers with "signs and symptoms" before the 
implementation of engineering controls.
* MEDRECORD = Clerical time per employee, in hours, to maintain detailed medical records and provide to the PLHCP (.08 hour)
* CLWAGE = Clerical wage. $/hr.
* #PLANTS = Number of plants represented by the model
22.44%

Sector 1. Electroplating
Large

5 * 0.08 *

1,848 =

807 *

$18.94 =

$15,287.70 10088.999

Small

1 * 0.08 *

3,478 =

253 *

$18.94 =

Large

2 * 0.08 *

7,857 =

1,215 *

$18.65 =

$4,793.71 3163.5697
0
$22,651.04 15183.943

Small
Large

0 * 0.08 *
18 * 0.08 *

8,804 =
189 =

0 *
278 *

$18.65 =
$18.65 =

$0.00
0
$5,186.45 3476.6972

Small
Large

1 * 0.08 *
49 * 0.08 *

107 =
268 =

8 *
1,055 *

$18.65 =
$18.65 =

$154.59 103.62873
$19,674.82 13188.856

Small
State 

5 * 0.08 *
2 * 0.08 *

2,145 =
25 =

829 *
4 *

$18.65 =
$18.65 =

$15,459.08 10362.873
$72.42 48.546792

Local 

0 * 0.08 *

787 =

0 *

$18.65 =

Large

1 * 0.08 *

10,535 =

814 *

$18.65 =

Small
Large

0 * 0.08 *
0 * 0.08 *

10,724 =
409 =

0 *
0 *

$18.65 =
$18.65 =

Small
Large

1 * 0.08 *
18 * 0.08 *

232 =
402 =

18 *
590 *

$18.65 =
$18.65 =

$334.25 224.06212
$11,007.98 7379.1124

=

469 *

$18.65 =

$8,754.58 5868.5603

=

181 *

$23.45 =

$4,238.05 2259.4044

=
=

4 *
307 *

$23.45 =
$18.65 =

$104.64 55.787762
$5,727.69 3839.5107

=
=

104 *
14 *

$18.65 =
$18.65 =

$1,939.83 1300.3471
$269.25 180.48982

=
=

1 *
57 *

$18.65 =
$23.45 =

$24.48 16.408165
$1,330.62 709.38316

=
=

33 *
102 *

$23.45 =
$23.45 =

$766.87 408.83453
$2,398.25 1278.5604

=
=

181 *
6 *

$23.45 =
$18.65 =

$4,249.92 2265.7317
$109.65 73.502268

=

23 *

$18.65 =

$433.47 290.57627

=

1 *

$27.52 =

All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Sector 2. Mild Steel Welding

$0.00

0
0
$15,184.72 10178.955

General Industry
$0.00
$0.00

0
0

Maritme

Construction
2 * 0.08 *
3,037
Small
SECTOR 3.  PAINTING                                                                              GENERAL INDUSTRY
Large
46 * 0.08 *
49
Aerospace
1 * 0.08 *
62
Small
Large
12 * 0.08 *
326
Auto Body
1 * 0.08 *
1,436
Small
Large
2 * 0.08 *
100
Coil Coating
1 * 0.08 *
18
Small
Large
3 * 0.08 *
276
Maritime 
1 * 0.08 *
476
Small
2 * 0.08 *
671
Large
Construction
1 * 0.08 *
3,566
Small
6 * 0.08 *
12
State 
Government
0 * 0.08 *
647
Local 
SECTOR 4.  Producers of Chromates
Large
7 * 0.08 *
2
All

Page 180

$28.26

12.83591

Cost

Responses

CLWAGE

Hours

#PLANTS

MEDRECORD

POTEXEMP

Table 32

$0.00

0

Small

0 * 0.08 *

0=

0 *

$27.52 =

Large

22 * 0.08 *

2=

3 *

$27.52 =

$85.57 38.860146

Small

3 * 0.08 *

1=

0 *

$27.52 =

$5.35 2.4287591

Large

2 * 0.08 *

2=

0 *

$22.71 =

$10.15 5.5867769

Small

0 * 0.08 *

0=

0 *

$22.71 =

Large

25 * 0.08 *

5=

10 *

$27.52 =

Small

0 * 0.08 *

0=

0 *

$27.52 =

$0.00

0

Large

5 * 0.08 *

80 =

31 *

$20.51 =

$631.78

385.0773

Small

2 * 0.08 *

126 =

19 *

$20.51 =

$397.12 242.04859

Large

0 * 0.08 *

2=

0 *

$20.53 =

$0.00

0

Small

0 * 0.08 *

8=

0 *

$20.53 =

$0.00

0

Large

0 * 0.08 *

81 =

0 *

$22.75 =

$0.00

0

Small

0 * 0.08 *

40 =

0 *

$22.75 =

$0.00

0

Large

3 * 0.08 *

6=

1 *

$20.42 =

$26.02 15.924557

Small

2 * 0.08 *

4=

1 *

$20.42 =

$11.56 7.0775811

Large

12 * 0.08 *

1

1 *

$27.61

$23.68 10.721887

Small

0 * 0.08 *

0

0 *

$27.61

Large

36 * 0.08 *

34 =

99 *

$27.61 =

$2,720.63 1231.7418

Small
Large

1 * 0.08 *
9 * 0.08 *

11 =
102 =

1 *
73 *

$27.61 =
$27.61 =

$30.62 13.862702
$2,004.68 907.59924

Small

1 * 0.08 *

32 =

3 *

$27.61 =

$90.06 40.772652

Large

3 * 0.08 *

33 =

7 *

$27.61 =

$187.32 84.807117

Small

0 * 0.08 *

31 =

0 *

$27.61 =

Large

25 * 0.08 *

163 =

321 *

$20.14 =

$6,463.70 4011.5459

Small

5 * 0.08 *

118 =

47 *

$20.14 =

$940.17 583.49758

Large

0 * 0.08 *

3=

0 *

$26.83 =

$0.00

0

Small

0 * 0.08 *

1=

0 *

$26.83 =

$0.00

Large

0 * 0.08 *

0=

0 *

$29.53 =

$0.00

0
0
0

Small

3 * 0.08 *

5=

1 *

$29.53 =

Large

0 * 0.08 *

216 =

0 *

$21.29 =

$0.00

0

Small

0 * 0.08 *

1,627 =

0 *

$21.29 =

$0.00

0

Large

0 * 0.08 *

343 =

0 *

$14.20 =

$0.00

0

SECTOR 5. Chromate Pigment Procedures
All
SECTOR 6. CCA Producers
All
$0.00

0

SECTOR 7.  Chromium Catalyst Producers
$262.45 119.19059

All
SECTOR 8.  Paint and Coating Producers
All
SECTOR 9.  Printing Ink Producers
All
SECTOR 10.  Plastic Colorant Producers and Users
All
SECTOR 11.  Plating Mixture Producers
All
SECTOR 13.  Chromium Metal Producers
All
$0.00

0

SECTOR 14.  Iron and Steel Mills
All

Carbon Steel
SECTOR 14B.  Forging Industry
All
$0.00

0

SECTOR 15.  Iron and Steel Foundries
All
SECTOR 17.  Chromium Dye Producers
All
SECTOR 18.  Chromium Sulfate Producers
All
$32.49 13.752761

SECTOR 19.  Chemical Distributors
All
SECTOR 20.  Textile Dyeing
All

Page 181

Responses

697 =

0 *

$14.20 =

$0.00

0

Large

1 * 0.08 *

6=

1 *

$14.83 =

$7.82 6.5922485

Small
Large

0 * 0.08 *
12 * 0.08 *

20 =
90 =

0 *
83 *

$14.83 =
$14.83 =

$0.00
0
$1,232.88 1039.3778

Small

2 * 0.08 *

5=

1 *

$14.83 =

$13.03 10.987081

Large

0 * 0.08 *

81 =

0 *

$14.83 =

$0.00

0

Small

0 * 0.08 *

325 =

0 *

$14.83 =

$0.00

0

Large

1 * 0.08 *

179 =

16 *

$23.13 =

$363.19 196.29008

Small
Large

0 * 0.08 *
11 * 0.08 *

0=
23 =

0 *
20 *

$22.88 =
$22.88 =

$0.00
0
$462.96 252.88906

Small

5 * 0.08 *

4=

2 *

$22.88 =

$44.09 24.084673

Large

0 * 0.08 *

5=

0 *

$18.26 =

$0.00

0

Small

0 * 0.08 *

0=

0 *

$18.26 =

$0.00

0

Large

1 * 0.08 *

148 =

9 *

$22.83 =

Small
Large

0 * 0.08 *
0 * 0.08 *

79 =
36 =

0 *
0 *

$22.83 =
$22.83 =

Small
Large

0 * 0.08 *
2 * 0.08 *

32 =
1,162 =

0 *
218 *

$22.83 =
$22.83 =

$0.00
0
$4,967.83 2719.4711

Small
State

1 * 0.08 *
0 * 0.08 *

4,650 =
12 =

290 *
0 *

$22.83 =
$22.83 =

$6,628.22 3628.3966
$9.59 5.250162

Local

0 * 0.08 *

42 =

2 *

$22.83 =

$34.67 18.981355

Large

0 * 0.08 *

40 =

0 *

$19.50 =

$0.00

0

Small
State

0 * 0.08 *
0 * 0.08 *

48 =
0=

0 *
0 *

$19.50 =
$22.83 =

$0.00
$0.00

0
0

Local

0 * 0.08 *

24 =

0 *

$22.83 =

$0.00

0

Large

2 * 0.08 *

19 =

3 *

$19.87 =

Small

0 * 0.08 *

0=

0 *

$19.87 =

$0.00

0

Large

0 * 0.08 *

51 =

0 *

$22.87 =

$0.00

0

Small
State Gov't

0 * 0.08 *
0 * 0.08 *

233 =
15 =

0 *
0 *

$22.87 =
$22.87 =

$0.00
$0.00

0
0

Local Gov't
Large

0 * 0.08 *
0 * 0.08 *

88 =
40 =

0 *
0 *

$22.87 =
$22.87 =

$0.00
$0.00

0
0

Small
State Gov't

0 * 0.08 *
0 * 0.08 *

170 =
1=

0 *
0 *

$22.87 =
$22.87 =

$0.00
$0.00

0
0

Local Gov't
Large

0 * 0.08 *
11 * 0.08 *

239 =
44 =

0 *
37 *

$22.87 =
$22.87 =

$0.00
0
$856.12 467.90168

1 * 0.08 *

175 =

15 *

$22.87 =

$338.57

CLWAGE

0 * 0.08 *

Hours

Small

#PLANTS

Cost

MEDRECORD

POTEXEMP

Table 32

SECTOR 21.  Colored Glass Producers
All

Fiber, Flat, and Container Glass
SECTOR 22.  Printing
All
SECTOR 24.  Chromium Catalyst Users
All

Chromium Catalyst Companies
SECTOR 25.  Refractory Brick Producers
All
SECTOR 26.  Woodworking
$213.93 117.11075

General Industry
$0.00
$0.00

0
0

Maritime

Construction

Government
SECTOR 27.  Solid Waste Incineration
All

Government
SECTOR 30.  Superalloy Producers and Users
$63.79 40.129309

All
SECTOR 31.  Construction

Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration 
Small

Page 182

185.0407

Hours

70,349
8,671

Page 183

Cost

Responses

CLWAGE

#PLANTS

Total
MEDRECORD

POTEXEMP

Table 32

169,342
108,386

Table 33

Clerical Time and Cost to Provide the PLHCP’s Written Medical Opinion to Employee
and to Establish and Maintain Record for Air Monitoring Data and Medical Surveillance
The Standard requires that employers maintain exposure and medical surveillance records.  As part of the medical record, 
employers must maintain a copy of the PLHCP's written opinion.  OSHA assumes that the 5 minutes for recordkeeping 
includes the time it takes for employers to provide a copy of the PLHCP's written opinion to the employee.  

HOURS = RECTIME * EMPEXP * #PLANTS 
COST = Hours x CLWAGE
RECTIME =  Time, 0.08 hour per record for exposed workers
EMPEXP =  Exposed employees to chromium or employees exposed dermally
#PLANTS = Number of Plants
CLWAGE = Clerical wage Rate

Responses

1,848 =

2,018

$18.94 $         38,219

25,222

Small

0.08 *

3 *

3,478 =

759

$18.94 $         14,381

9,491

Large

0.08 *

3 *

8,339 =

1,934

$18.65 $         36,061

24,174

Small

0.08 *

3 *

11,844 =

2,747

$18.65 $         51,216

34,332

Large

0.08 *

4 *

11,345

3,508

$18.65 $         65,413

43,849

Small

0.08 *

1 *

13,993

1,082

$18.65 $         20,169

13,520

Large

0.08 *

41 *      1,433 =

4,687

$23.45 $      109,887

58,583

Small
SECTOR 4.  Producers of Chromates
Large
ALL

0.08 *

1 *      6,205 =

664

$23.45 $         15,562

8,296

0.08 *

72 *

2=

11

$27.52 $              303

138

Small
SECTOR 5. Chromate Pigment Procedures
Large
ALL

0.08 *

0 *

0=

0

$27.52 $               ‐

0.08 *

22 *

2=

3

$27.52 $                 86

39

Small

0.08 *

3 *

1=

0

$27.52 $                   5

2

Large

0.08 *

7 *

2=

1

$22.71 $                 30

17

0.08 *

0 *

0=

0

$22.71

0.08 *

60 *

5=

23

EMPEXP

CLWAGE

14 *

HOURS

0.08 *

#PLANTS

Large

RECTIME

COST

22.44%

Sector 1. Electroplating
ALL
Sector 2. Welding
ALL
Sector 2B. Mild Steel Welding

SECTOR 3.  PAINTING
ALL

SECTOR 6. CCA Producers
ALL

Small
SECTOR 7.  Chromium Catalyst Producers
Large
ALL

Page 184

0

0

0

$27.52 $              636

289

COST

Responses

0

0

111

$20.51 $           2,274

1,386

126 =

77

$20.51 $           1,588

968

17 *

2=

3

$20.53 $                 68

42

0.08 *
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
0.08 *
ALL

17 *

8=

11

$20.53 $              228

139

5 *

81 =

35

$22.75 $              788

433

Small
SECTOR 11.  Plating Mixture Producers
Large
ALL

0.08 *

1 *

40 =

3

$22.75 $                 64

35

0.08 *

16 *

6=

7

$20.42 $              147

90

Small
SECTOR 13.  Chromium Metal Producers
Large
ALL

0.08 *

4 *

4=

1

$20.42 $                 23

14

0.08 *

43 *

1=

3

$27.61 $                 86

39

Small
SECTOR 14.  Iron and Steel Mills
Large
ALL

0.08 *

0 *

0=

0

$27.61 $               ‐

0.08 *

42 *

1,929 =

6,504

$27.61 $      179,562

81,295

Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL

0.08 *

3 *

22 =

4

$27.61 $              122

55

0.08 *

  105 *

163 =

1,369

$20.14 $         27,578

17,116

Small
SECTOR 17.  Chromium Dye Producers
Large
ALL

0.08 *

  105 *

118 =

996

$20.14 $         20,057

12,448

0.08 *

29

*

3=

6

$26.83 $              167

78

Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL

0.08 *

6

*

1=

0

$26.83 $                 12

6

0.08 *

0 *

0=

0

$29.53 $               ‐

0

Small
SECTOR 19.  Chemical Distributors
Large
ALL

0.08 *

2 *

5=

1

$29.53 $                 22

9

0.08 *

0 *

216 =

0

$21.29 $               ‐

Small

0.08 *

0 *

1,627 =

0

$21.29 $               ‐

Large

0.08 *

58 *

343 =

1,590

$14.20 $         22,583

19,876

Small

0.08 *

2 *

697 =

102

$14.20 $           1,455

1,281

HOURS

EMPEXP

#PLANTS

$27.52

RECTIME

CLWAGE

Table 33

Small
SECTOR 8.  Paint and Coating Producers
Large
ALL

0.08 *

0 *

0=

0

0.08 *

17 *

80 =

Small
SECTOR 9.  Printing Ink Producers
Large
ALL

0.08 *

8 *

0.08 *

SECTOR 20.  Textile Dyeing
ALL

Page 185

0

0

COST

Responses

5 *

96 =

35

$14.83 $              517

436

Small

0.08 *

1 *

25 =

2

$14.83 $                 27

23

Large

0.08 *

38 *

81 =

249

$14.83 $           3,691

3,111

Small
SECTOR 24.  Chromium Catalyst Users
Large
ALL

0.08 *

2 *

0=

0

0.08 *

33 *

179 =

471

$23.13 $         10,896

5,889

Small
Large

0.08 *
0.08 *

16 *
1 *

0=
23

0
2

$23.13 $               ‐
$23.13 $                 47

25

0.08 *

0 *

0

0

$23.13 $               ‐

0.08 *

11 *

5=

5

$18.26 $                 85

Small

0.08 *

0 *

0=

0

$18.26 $               ‐

Large

0.08 *

0 *

1,358 =

0

$22.83 $               ‐

0

Small
SECTOR 27.  Solid Waste Incarnation
Large
ALL

0.08 *

0 *

4,803 =

0

$22.83 $               ‐

0

0.08 *

0 *

40 =

0

$19.38 $               ‐

0

Small
SECTOR 30.  Superalloy Producers and Users
Large
ALL

0.08 *

1 *

72 =

5

$19.38 $                 97

63

0.08 *

41 *

19 =

63

$19.87 $           1,244

783

Small

0.08 *

0 *

0=

0

Large

0.08 *

25

51

103

$22.87 $           2,359

1,289

Small
State Gov't

0.08 *
0.08 *

1
1

233
15

20
1

$22.87 $              451
$22.87 $                 29

246
16

Local Gov't
Large

0.08
0.08 *

1
15

88
40

7
48

$22.87 $              169
$22.87 $           1,088

93
594

Small
State Gov't

0.08 *
0.08 *

3
2

170
1

43
0

$22.87 $              985
$22.87 $                   3

538
2

Local Gov't
Large

0.08 *
0.08 *

3
15

239
44

60
52

$22.87 $           1,383
$22.87 $           1,199

756
655

Small

0.08 *

1

175

15

$22.87 $              339

185

SECTOR 22.  Printing
ALL

Catalyst Service Companies

Small
SECTOR 25.  Refractory Brick Producers
Large
ALL

SECTOR 26.  Woodworking
ALL

CLWAGE

HOURS

0.08 *

EMPEXP

SECTOR 21.  Colored Glass Producers
Large
ALL

RECTIME

#PLANTS

Table 33

$14.83 $               ‐

0

0
58

$19.87 $               ‐

SECTOR 31.  Construction

Industrial Rehabilitation & 
Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration & 
Maintenance

Page 186

Page 187

Responses

29,442

COST

HOURS

TOTAL

CLWAGE

#PLANTS
71,728

EMPEXP

RECTIME

Table 33

$      633,401

368,023


File Typeapplication/pdf
File TitleChromium Tables 1-34 Updated_103015.xlsx
AuthorRShowalter
File Modified2015-11-13
File Created2015-11-13

© 2024 OMB.report | Privacy Policy