Initial Exposure Monitoring (§ 1910.1026(d)(2)(i) and (ii); Contract Cost for an IH Technician to Perform Initial Exposure Monitoring
This table calculates the contract cost for the employer to have an outside industrial hygiene technician perform initial exposure
monitoring by collecting personal breathing‐zone air samples to characterize full‐shift exposure for each job classification in each
work area during each shift. To determine the number of new employers that may need to conduct initial monitoring OSHA
multiplied the number of existing plants by 5%.
Cost = (INITCONTTIME * CONTCOST * #INIT * %INITADD * (%LEARN + %CONT) * (#PLANTS* 5%))
Variable
* INITCONTTIME = Time, in hours, for an outside contractor (industrial hygiene technician)
to conduct the initial monitoring.
* CONTCOST = Cost per hour for an outside industrial hygiene contractor =$112.44
* # INIT = Number of initial exposure measurements initial plus confirmation.
* % INITADD = Percent of plants that have not satisified initial monitoring requirement
* % LEARN = Percent of plants that will develop in‐house monitoring capability
* % CONT = Percent of plants that will continue to use an outside contractor for monitoring
* # PLANTS = Number of plants represented by the model output * 5% (new employers)
Item 13 COSTS
# PLANTS
# PLANTS
% CONT
% LEARN
% INITADD
# INIT
CONTCOST
INITCONTTIME
24.93%
Sector 1. Electroplating
Large
20 * $ 112.44 *
2
* 25% * ( 0% + 100% ) *
883
44
=
$49,659
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 100% ) *
1,662
426
83
21
=
=
$56,075
$14,356
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0 + 100% ) *
* 25% * ( 0% + 100% ) *
801
580
40
29
=
=
$27,012
$19,569
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0 + 100% ) *
* 25% * ( 0% + 100% ) *
1,092
426
55
21
=
=
$36,836
$14,356
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0 + 100% ) *
* 25% * ( 0% + 100% ) *
801
503
40
25
=
=
$27,012
$16,954
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0 + 100% ) *
* 25% * ( 0% + 100% ) *
946
883
47
44
=
=
$31,913
$29,795
1,662
83
=
$56,075
)*
3,535
177
=
$107,329
* ( 0% + 100% ) *
* ( 0% + 90% ) *
3,962
2,593
198
130
=
=
$133,627
$78,729
* ( 0% + 100% ) *
* ( 0% + 90% ) *
2,905
786
145
39
=
=
$98,004
$23,848
* ( 0% + 100% ) *
* ( 0% + 90% ) *
880
314
44
16
=
=
$29,691
$9,533
* ( 0% + 100% ) *
* ( 0% + 90% ) *
352
78
18
4
=
=
$11,863
$2,376
* ( 0% + 100% ) *
88
4
=
$2,966
Hard Chrome
Job Shop Chrome Plater
Captive Shop Chrome Plater
Job Shop Plater
Captive Shop Plater
Operator
Small
12 * $ 112.44 * 2 * 25%
Sector 2. Welding GENERAL INDUSTRY
Large
12 * $ 112.44 * 2 * 25%
SMAW
Small
12 * $ 112.44 * 2 * 25%
Large
12 * $ 112.44 * 2 * 25%
GMAW
Small
12 * $ 112.44 * 2 * 25%
Large
12 * $ 112.44 * 2 * 25%
TIG
Small
12 * $ 112.44 * 2 * 25%
Large
12 * $ 112.44 * 2 * 25%
SAW
Small
12 * $ 112.44 * 2 * 25%
Large
12 * $ 112.44 * 2 * 25%
Plasma Cutting
Small
12 * $ 112.44 * 2 * 25%
Page 1
*(
0
+ 100% ) *
* ( 0% +
90%
90%
Item 13 COSTS
# PLANTS
# PLANTS
% CONT
% LEARN
% INITADD
# INIT
CONTCOST
INITCONTTIME
Table 1
Large
12 * $ 112.44 *
2
* 25% * ( 0% +
)*
78
4
=
$2,376
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 90% ) *
88
472
4
24
=
=
$2,966
$14,314
Small
12 * $ 112.44 *
529
26
=
$17,828
Large
2 * 25% * ( 0% + 100% ) *
MARITIME
12 * $ 112.44 * 2 * 75% * ( 0% + 50% ) *
17
1
=
$880
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
10
24
0
1
=
=
$880
$1,222
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
14
6
1
0
=
=
$1,232
$293
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
3
116
0
6
=
=
$264
$5,867
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
66
4
3
0
=
=
$5,984
$196
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
2
2
0
0
=
=
$176
$98
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
1
4
0
0
=
=
$88
$196
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
2
2
0
0
=
=
$176
$98
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
1
0
0
0
=
=
$88
$0
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
0
0
0
0
=
=
$0
$0
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
0
15
0
1
=
=
$0
$782
Small
90%
)*
9
0
=
$792
Large
12 * $ 112.44 * 2 * 75% * ( 0% +
CONSTRUCTION
12 * $ 112.44 * 2 * 25% * ( 0% +
95%
)*
201
10
=
$6,440
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
1,609
3
80
0
=
=
$54,266
$93
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
21
41
1
2
=
=
$717
$1,300
Small
State
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
322
20
16
1
=
=
$10,853
$650
Local
State
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
161
4
8
0
=
=
$5,443
$124
Local
12 * $ 112.44 *
2
* 25% * ( 0% + 100% ) *
32
2
=
$1,076
Plasma Welding
Resistance Welding
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Page 2
State
GOVERNMENT
12 * $ 112.44 * 2 * 25% * ( 0% +
Local
State
12 * $ 112.44 *
12 * $ 112.44 *
Local
State
95%
Item 13 COSTS
# PLANTS
# PLANTS
% CONT
% LEARN
% INITADD
# INIT
CONTCOST
INITCONTTIME
Table 1
)*
19
1
=
$619
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
590
0
30
0
=
=
$19,914
$0
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
8
4
0
0
=
=
$261
$124
Local
State
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
118
2
6
0
=
=
$3,976
$62
Local
State
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
59
1
3
0
=
=
$1,988
$31
12
1
=
$391
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Local
12 * $ 112.44 * 2 * 25%
Sector 2. Mild Steel Welding GENERAL INDUSTRY
Large
12 * $ 112.44 * 2 * 25%
SMAW
Small
12 * $ 112.44 * 2 * 25%
Large
12 * $ 112.44 * 2 * 25%
GMAW
Small
12 * $ 112.44 * 2 * 25%
Large
12 * $ 112.44 * 2 * 25%
TIG
Small
12 * $ 112.44 * 2 * 25%
Large
12 * $ 112.44 * 2 * 25%
SAW
Small
12 * $ 112.44 * 2 * 25%
Large
12 * $ 112.44 * 2 * 25%
Plasma Cutting
Small
12 * $ 112.44 * 2 * 25%
Large
12 * $ 112.44 * 2 * 25%
Plasma Welding
Small
12 * $ 112.44 * 2 * 25%
Large
12 * $ 112.44 * 2 * 25%
Resistance Welding
Small
12 * $ 112.44 * 2 * 25%
MARITIME
Large
12 * $ 112.44 * 2 * 75%
SMAW
Small
12 * $ 112.44 * 2 * 75%
Large
12 * $ 112.44 * 2 * 75%
GMAW
Small
12 * $ 112.44 * 2 * 75%
Large
12 * $ 112.44 * 2 * 75%
TIG
Small
12 * $ 112.44 * 2 * 75%
Large
12 * $ 112.44 * 2 * 75%
FCAW
Small
12 * $ 112.44 * 2 * 75%
Large
12 * $ 112.44 * 2 * 75%
Plasma Cutting
Small
12 * $ 112.44 * 2 * 75%
Page 3
* ( 0% + 100% ) *
* ( 0% +
90%
)*
4,740
237
=
$143,907
* ( 0% + 100% ) *
* ( 0% + 90% ) *
4,826
3,476
241
174
=
=
$162,797
$105,539
* ( 0% + 100% ) *
* ( 0% + 90% ) *
3,539
1,053
177
53
=
=
$119,385
$31,973
* ( 0% + 100% ) *
* ( 0% + 90% ) *
1,073
421
54
21
=
=
$36,177
$12,789
* ( 0% + 100% ) *
* ( 0% + 90% ) *
429
105
21
5
=
=
$14,471
$3,197
* ( 0% + 100% ) *
* ( 0% + 90% ) *
107
105
5
5
=
=
$3,618
$3,197
* ( 0% + 100% ) *
* ( 0% + 90% ) *
107
632
5
32
=
=
$3,618
$19,184
* ( 0% + 100% ) *
644
32
=
$21,706
* ( 0% +
50%
)*
37
2
=
$1,858
* ( 0% +
* ( 0% +
90%
50%
)*
)*
21
53
1
3
=
=
$1,936
$2,689
* ( 0% +
* ( 0% +
90%
50%
)*
)*
30
13
1
1
=
=
$2,728
$636
* ( 0% +
* ( 0% +
90%
50%
)*
)*
7
249
0
12
=
=
$616
$12,613
* ( 0% +
* ( 0% +
90%
50%
)*
)*
141
8
7
0
=
=
$12,848
$391
* ( 0% +
90%
)*
5
0
=
$440
Item 13 COSTS
# PLANTS
# PLANTS
% CONT
% LEARN
% INITADD
# INIT
CONTCOST
INITCONTTIME
Table 1
Large
12 * $ 112.44 *
2
* 75% * ( 0% +
50%
)*
3
0
=
$147
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
2
8
0
0
=
=
$176
$391
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
5
3
0
0
=
=
$440
$147
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
2
1
0
0
=
=
$176
$49
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
0
1
0
0
=
=
$0
$49
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
0
33
0
2
=
=
$0
$1,662
Small
90%
)*
18
1
=
$1,672
Large
12 * $ 112.44 * 2 * 75% * ( 0% +
CONSTRUCTION
12 * $ 112.44 * 2 * 25% * ( 0% +
95%
)*
301
15
=
$9,660
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
2,277
4
114
0
=
=
$76,819
$124
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
30
60
1
3
=
=
$1,010
$1,920
Small
State
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
455
30
23
1
=
=
$15,351
$960
Local
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
228
6
11
0
=
=
$7,692
$186
Small
12 * $ 112.44 *
2
* 25% * ( 0% + 100% ) *
45
2
=
$1,532
Large
12 * $ 112.44 *
2
* 25% * ( 0% +
25%
)*
49
2
=
$412
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% +
* 25% * ( 0% +
75%
25%
)*
)*
62
326
3
16
=
=
$1,558
$2,750
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% +
* 25% * ( 0% +
75%
25%
)*
)*
1,436
100
72
5
=
=
$36,319
$840
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% +
* 25% * ( 0% +
75%
10%
)*
)*
18
276
1
14
=
=
$458
$929
Small
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% +
* 25% * ( 0% +
90%
25%
)*
)*
476
671
24
34
=
=
$14,461
$5,657
Small
State
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 25% * ( 0% +
* 25% * ( 0% +
50%
25%
)*
)*
3,566
12
178
1
=
=
$60,151
$99
Local
12 * $ 112.44 *
2
* 25% * ( 0% +
25%
)*
647
32
=
$5,453
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
SECTOR 3. PAINTING
General Industry (Aerospace)
General Industry (Autobody)
General Industry (Coil Coating)
Maritime
Construction
Government
Page 4
Item 13 COSTS
# PLANTS
# PLANTS
% CONT
% LEARN
% INITADD
# INIT
CONTCOST
INITCONTTIME
Table 1
SECTOR 4. Producers of Chromates
Large
12 * $ 112.44 *
2
* 100% * ( 0% + 100% ) *
2
0
=
$258
* $ 112.44 *
2
*
)*
0
0
=
$0
* $ 112.44 *
2
* 25% * ( 0% + 100% ) *
2
0
=
$101
* $ 112.44 *
2
* 25% * ( 0% + 100% ) *
1
0
=
$30
* $ 112.44 *
2
* 25% * ( 0% + 100% ) *
2
0
=
$80
* $ 112.44 *
2
*
* ( 0% +
0%
)*
0
0
=
$0
* $ 112.44 *
2
* 25% * ( 0% +
20%
)*
5
0
=
$75
* $ 112.44 *
2
*
* ( 0% +
0%
)*
0
0
=
$0
* $ 112.44 *
2
* 25% * ( 0% +
75%
)*
80
4
=
$2,035
* $ 112.44 *
2
* 25% * ( 0% +
75%
)*
126
6
=
$3,198
* $ 112.44 *
2
* 100% * ( 0% +
90%
)*
2
0
=
$303
* $ 112.44 *
2
* 100% * ( 0% +
90%
)*
8
0
=
$1,011
* $ 112.44 *
2
* 25% * (
0
+ 100% ) *
81
4
=
$2,748
* $ 112.44 *
2
* 25% * (
0
+ 100% ) *
40
2
=
$1,344
* $ 112.44 *
2
* 75% * ( 0% +
80%
)*
6
0
=
$457
* $ 112.44 *
2
* 75% * ( 0% +
75%
)*
4
0
=
$286
* $ 112.44 *
2
* 100% * ( 0% + 100% ) *
1
0
=
$286
* $ 112.44 *
2
*
* ( 0% +
0%
)*
0
0
=
$0
* $ 112.44 *
2
* 75% * ( 0% +
90%
)*
34
2
=
$5,137
* $ 112.44 *
* $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
90%
)*
)*
11
102
1
5
=
=
$989
$15,411
* $ 112.44 *
2
* 75% * ( 0% +
90%
)*
32
2
=
$2,908
* $ 112.44 *
2
* 75% * ( 0% +
90%
)*
33
2
=
$3,024
* $ 112.44 *
2
* 75% * ( 0% +
90%
)*
31
2
=
$2,850
* $ 112.44 *
2
* 25% * ( 0% +
90%
)*
163
8
=
$11,526
* $ 112.44 *
2
* 25% * ( 0% +
90%
)*
118
6
=
$3,593
* $ 112.44 *
2
* 25% * ( 0% + 100% ) *
3
0
=
$91
* $ 112.44 *
2
* 25% * ( 0% + 100% ) *
1
0
=
$30
ALL
Small
12
SECTOR 5. Chromate Pigment Procedures
Large
20
ALL
Small
12
SECTOR 6. CCA Producers
Large
12
ALL
Small
12
SECTOR 7. Chromium Catalyst Producers
Large
28
ALL
Small
12
SECTOR 8. Paint and Coating Producers
Large
12
ALL
Small
12
SECTOR 9. Printing Ink Producers
Large
12
ALL
Small
12
SECTOR 10. Plastic Colorant Producers and Users
Large
12
ALL
Small
12
SECTOR 11. Plating Mixture Producers
Large
12
ALL
Small
12
SECTOR 13. Chromium Metal Producers
Large
28
ALL
Small
12
SECTOR 14. Iron and Steel Mills
Large
20
Alloy Stainless Steel
Small
12
Large
20
Carbon Steel
Small
12
14.B Forging Industry
Large
12
Reshaping
Small
12
SECTOR 15. Iron and Steel Foundries
Large
28
ALL
Small
12
SECTOR 17. Chromium Dye Producers
Large
12
ALL
Small
12
Page 5
0%
0%
0%
0%
* ( 0% +
0%
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
Catalyst Users
Small
Large
Chromium Catalyst Service
Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27. Solid Waste Incerneration
Large
General Industry
Small
State
Government
Local
* ( 0% +
0%
Item 13 COSTS
# PLANTS
# PLANTS
% CONT
12 * $ 112.44 *
2
*
)*
0
0
=
$0
12 * $ 112.44 *
2
* 100% * ( 0% + 100% ) *
5
0
=
$646
12 * $ 112.44 *
2
* 75% * ( 0% + 100% ) *
216
11
=
$21,823
12 * $ 112.44 *
2
* 75% * ( 0% + 100% ) *
1,627
81
=
$164,662
12 * $ 112.44 *
2
* 75% * ( 0% +
90%
)*
343
17
=
$31,284
12 * $ 112.44 *
2
* 75% * ( 0% +
90%
)*
697
35
=
$63,488
12 * $ 112.44 *
2
* 75% * ( 0% +
90%
)*
6
0
=
$573
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
90%
)*
)*
20
90
1
5
=
=
$1,814
$8,210
12 * $ 112.44 *
2
* 75% * ( 0% +
90%
)*
5
0
=
$477
12 * $ 112.44 *
2
* 75% * ( 0% +
90%
)*
81
4
=
$7,410
12 * $ 112.44 *
2
* 75% * ( 0% +
90%
)*
325
16
=
$29,640
12 * $ 112.44 *
2
* 75% * ( 0% +
90%
)*
179
9
=
$16,291
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 0% * ( 0% +
* 75% * ( 0% +
90%
90%
)*
)*
0
23
0
1
=
=
$0
$2,099
12 * $ 112.44 *
2
* 75% * ( 0% +
90%
)*
4
0
=
$400
12 * $ 112.44 *
2
* 75% * ( 0% +
90%
)*
5
0
=
$491
12 * $ 112.44 *
2
* 75% * ( 0% +
90%
)*
0
0
=
$0
12 * $ 112.44 *
2
* 75% * ( 0% + 100% ) *
148
7
=
$14,975
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% + 100% ) *
* 75% * ( 0% + 100% ) *
79
36
4
2
=
=
$8,008
$3,648
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% + 100% ) *
* 75% * ( 0% + 100% ) *
32
1,162
2
58
=
=
$3,214
$117,566
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% + 100% ) *
* 75% * ( 0% + 100% ) *
4,650
12
233
1
=
=
$470,581
$1,182
12 * $ 112.44 *
2
* 75% * ( 0% + 100% ) *
42
2
=
$4,274
20 * $ 112.44 *
2
* 75% * ( 0% +
90%
)*
40
2
=
$6,045
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
25%
)*
)*
48
0
2
0
=
=
$4,353
$0
12 * $ 112.44 *
2
* 75% * ( 0% +
90%
)*
24
1
=
$2,176
Page 6
0%
% LEARN
% INITADD
# INIT
CONTCOST
INITCONTTIME
Table 1
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
Industrial Rehabilitation
Hazardous Waste‐site Work
28 * $ 112.44 *
2
* 75% * ( 0% + 100% ) *
12 * $ 112.44 *
2
*
0%
* ( 0% +
12 * $ 112.44 *
2
*
0%
Small
State
12 * $ 112.44 *
12 * $ 112.44 *
Local
Large
Item 13 COSTS
# PLANTS
# PLANTS
% CONT
% LEARN
% INITADD
# INIT
CONTCOST
INITCONTTIME
Table 1
19
1
=
$4,487
)*
0
0
=
$0
* ( 0% + 100%
*
51
3
=
$0
2
2
* 0% * ( 0% + 100%
* 100% * ( 0% + 100%
*
*
233
15
12
1
=
=
$0
$1,993
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 100% * ( 0% + 100%
* 75% * ( 0% + 90%
*
*
88
40
4
2
=
=
$11,824
$3,662
Small
State
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
90%
*
*
170
1
8
0
=
=
$15,481
$75
Local
Large
12 * $ 112.44 *
12 * $ 112.44 *
2
2
* 75% * ( 0% +
* 0% * ( 0% +
90%
90%
*
*
239
44
12
2
=
=
$21,731
$0
Small
12 * $ 112.44 *
2
*
90%
Total
*
175
75,684
0%
Refractory Brick Restoration
Page 7
0%
* ( 0% +
9
=
3,784
$0
$3,112,617
Table 2
Initial Exposure Monitoring (§ 1910.1026(d)(2)(i) and (ii); Contract Cost for a Laboratory to Conduct Analysis of Initial
Exposure Monitoring Air Samples
This table calculates the contract cost for the employer to have a laboratory conduct analysis of air samples
collected during initial exposure monitoring. To determine the number of new employers that may need to
conduct initial monitoring OSHA multiplied the number of existing plants by 5%.
Item 13 COSTS
# PLANTS
# PLANTS
% INITADD
# INIT
# SAMPS
SHIFTS
JOBCAT
SAMPCOST
Cost = (SAMPCOST * JOBCAT * SHIFTS * #SAMPS * #INIT * %INITADD)* #PLANTS
Variables
* SAMPCOST = Variable cost per sample = $77
* JOBCAT = Number of job categories (covering each work area).
* SHIFTS = Number of work shifts
* #SAMPS = Number of samples per exposure measurement
*#INIT = Number of initial exposure measurements required to be satisfied equals 2
%INITADD = Percent of plants that have not satisified initial monitoring requirement
* #PLANTS = Number of plants represented by the model output * 5%
Sector 1. Electroplating
Large ( $77 * 7 * 2 * 3 *
2
* 25% ) *
883
44
=
$71,354
Small ( $77 * 7 * 1 * 3 *
Large ( $77 * 1 * 2 * 3 *
2
2
* 25% ) *
* 25% ) *
1,662
426
83
21
=
=
$67,144
$4,911
Small
Large
( $77 * 1 * 1 * 3 *
( $77 * 1 * 2 * 3 *
2
2
* 25% ) *
* 25% ) *
801
580
40
29
=
=
$4,621
$6,695
Small
Large
( $77 * 1 * 1 * 3 *
( $77 * 1 * 2 * 3 *
2
2
* 25% ) *
* 25% ) *
1,092
426
55
21
=
=
$6,301
$4,911
Small
Large
( $77 * 1 * 1 * 3 *
( $77 * 1 * 2 * 3 *
2
2
* 25% ) *
* 25% ) *
801
503
40
25
=
=
$4,621
$5,800
Small
Large
( $77 * 1 * 1 * 3 *
( $77 * 1 * 2 * 3 *
2
2
* 25% ) *
* 25% ) *
946
883
47
44
=
=
$5,459
$10,193
Small
( $77 * 1 * 1 * 3 *
83
=
$9,592
Large
2 * 25% ) *
1,662
GENERAL INDUSTRY
( $77 * 1 * 3 * 2 * 2 * 25% ) *
3,535
177
=
$40,799
Small
Large
( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *
2
2
* 25% ) *
* 25% ) *
3,962
2,593
198
130
=
=
$22,858
$29,927
Small
Large
( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *
2
2
* 25% ) *
* 25% ) *
2,905
786
145
39
=
=
$16,764
$9,065
Small
Large
( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *
2
2
* 25% ) *
* 25% ) *
880
314
44
16
=
=
$5,079
$3,624
Small
( $77 * 1 * 1 * 3 *
2
* 25% ) *
352
18
=
$2,029
Hard Chrome
Job Shop Chrome Plater
Captive Shop Chrome Plater
Job Shop Plater
Captive Shop Plater
Operator
Sector 2. Welding
SMAW
GMAW
TIG
SAW
Page 8
S
1 El
l i
Item 13 COSTS
# PLANTS
# PLANTS
% INITADD
# INIT
# SAMPS
SHIFTS
JOBCAT
SAMPCOST
Table 2
Large
( $77 * 1 * 3 * 2 *
2
* 25% ) *
78
4
=
$903
Small
Large
( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *
2
2
* 25% ) *
* 25% ) *
88
78
4
4
=
=
$507
$903
Small
Large
( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *
2
2
* 25% ) *
* 25% ) *
88
472
4
24
=
=
$507
$5,441
Small
2
* 25% ) *
529
26
=
$3,050
Large
( $77 * 1 * 1 * 3 *
MARITIME
( $77 * 1 * 3 * 1 *
2
* 75% ) *
17
1
=
$301
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
10
24
0
1
=
=
$112
$418
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
14
6
1
0
=
=
$156
$100
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
3
116
0
6
=
=
$33
$2,007
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
66
4
3
0
=
=
$758
$67
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
2
2
0
0
=
=
$22
$33
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
1
4
0
0
=
=
$11
$67
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
2
2
0
0
=
=
$22
$33
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
1
0
0
0
=
=
$11
$0
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
0
0
0
0
=
=
$0
$0
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
0
15
0
1
=
=
$0
$268
Small
* 75% ) *
9
0
=
$100
Large
( $77 * 1 * 2 * 1 * 2
CONSTRUCTION
( $77 * 1 * 3 * 1 * 2
* 25% ) *
201
10
=
$1,160
Small
Large
( $77 * 1 * 1 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 25% ) *
* 25% ) *
1,609
3
80
0
=
=
$3,094
$17
Small
( $77 * 1 * 1 * 1 *
2
* 25% ) *
21
1
=
$41
Plasma Cutting
Plasma Welding
Resistance Welding
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray Tungsten Cutting
SAW
SMAW
Plasma Cutting
Page 9
S
1 El
l i
GMAW
Item 13 COSTS
# PLANTS
# PLANTS
% INITADD
# INIT
# SAMPS
SHIFTS
JOBCAT
SAMPCOST
Table 2
Large
( $77 * 1 * 3 * 1 *
2
* 25% ) *
41
2
=
$234
Small
State
( $77 * 1 * 1 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 25% ) *
* 25% ) *
322
20
16
1
=
=
$619
$117
Local
State
( $77 * 1 * 1 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 25% ) *
* 25% ) *
161
4
8
0
=
=
$310
$22
Local
* 25% ) *
32
2
=
$61
State
( $77 * 1 * 1 * 1 * 2
GOVERNMENT
( $77 * 1 * 1 * 1 * 2
* 25% ) *
19
1
=
$37
Local
State
( $77 * 1 * 1 * 1 *
( $77 * 1 * 1 * 1 *
2
2
* 25% ) *
* 25% ) *
590
0
30
0
=
=
$1,135
$0
Local
State
( $77 * 1 * 1 * 1 *
( $77 * 1 * 1 * 1 *
2
2
* 25% ) *
* 25% ) *
8
4
0
0
=
=
$15
$7
Local
State
( $77 * 1 * 1 * 1 *
( $77 * 1 * 1 * 1 *
2
2
* 25% ) *
* 25% ) *
118
2
6
0
=
=
$227
$4
Local
State
( $77 * 1 * 1 * 1 *
( $77 * 1 * 1 * 1 *
2
2
* 25% ) *
* 25% ) *
59
1
3
0
=
=
$113
$2
Local
( $77 * 1 * 1 * 1 *
2
1
=
$22
Large
( $77 * 1 * 3 * 2 *
2
* 25% ) *
12
GENERAL INDUSTRY
* 25% ) *
4,740
237
=
$54,703
Small
Large
( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *
2
2
* 25% ) *
* 25% ) *
4,826
3,476
241
174
=
=
$27,848
$40,119
Small
Large
( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *
2
2
* 25% ) *
* 25% ) *
3,539
1,053
177
53
=
=
$20,422
$12,154
Small
Large
( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *
2
2
* 25% ) *
* 25% ) *
1,073
421
54
21
=
=
$6,188
$4,862
Small
Large
( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *
2
2
* 25% ) *
* 25% ) *
429
105
21
5
=
=
$2,475
$1,215
Small
Large
( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *
2
2
* 25% ) *
* 25% ) *
107
105
5
5
=
=
$619
$1,215
Small
Large
( $77 * 1 * 1 * 3 *
( $77 * 1 * 3 * 2 *
2
2
* 25% ) *
* 25% ) *
107
632
5
32
=
=
$619
$7,292
Small
( $77 * 1 * 1 * 3 *
2
* 25% ) *
644
32
=
$3,713
Brazing
Metallizing
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Sector 2. Mild Steel Welding
SMAW
GMAW
TIG
SAW
Plasma Cutting
Plasma Welding
Resistance Welding
Page 10
S
1 El
l i
Item 13 COSTS
# PLANTS
# PLANTS
% INITADD
# INIT
# SAMPS
SHIFTS
JOBCAT
SAMPCOST
Table 2
Large
MARITIME
( $77 * 1 * 3 * 1 *
2
* 75% ) *
37
2
=
$636
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
21
53
1
3
=
=
$245
$920
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
30
13
1
1
=
=
$346
$217
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
7
249
0
12
=
=
$78
$4,315
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
141
8
7
0
=
=
$1,628
$134
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
5
3
0
0
=
=
$56
$50
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
2
8
0
0
=
=
$22
$134
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
5
3
0
0
=
=
$56
$50
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
2
1
0
0
=
=
$22
$17
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
0
1
0
0
=
=
$0
$17
Small
Large
( $77 * 1 * 2 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
0
33
0
2
=
=
$0
$569
Small
* 75% ) *
18
1
=
$212
Large
( $77 * 1 * 2 * 1 * 2
CONSTRUCTION
( $77 * 1 * 3 * 1 * 2
* 25% ) *
301
15
=
$1,739
Small
Large
( $77 * 1 * 1 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 25% ) *
* 25% ) *
2,277
4
114
0
=
=
$4,380
$22
Small
Large
( $77 * 1 * 1 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 25% ) *
* 25% ) *
30
60
1
3
=
=
$58
$346
Small
State
( $77 * 1 * 1 * 1 *
( $77 * 1 * 3 * 1 *
2
2
* 25% ) *
* 25% ) *
455
30
23
1
=
=
$875
$173
Local
( $77 * 1 * 1 * 1 *
2
* 25% ) *
228
11
=
$439
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Page 11
S
1 El
l i
State
( $77 * 1 * 3 * 1 *
Item 13 COSTS
# PLANTS
# PLANTS
% INITADD
# INIT
# SAMPS
SHIFTS
JOBCAT
SAMPCOST
Table 2
2
* 25% ) *
6
0
=
$33
* 1 * 1 * 1 *
2
* 25% ) *
45
2
=
$87
* 2 * 3 * 3 *
2
* 25% ) *
49
2
=
$1,693
* 2 * 1 * 3 *
* 2 * 1 * 1 *
2
2
* 25% ) *
* 25% ) *
62
326
3
16
=
=
$711
$1,254
* 2 * 1 * 1 *
* 2 * 2 * 3 *
2
2
* 25% ) *
* 25% ) *
1,436
100
72
5
=
=
$5,522
$2,300
* 2 * 1 * 3 *
* 3 * 3 * 1 *
2
2
* 25% ) *
* 25% ) *
18
276
1
14
=
=
$209
$4,769
* 3 * 1 * 1 *
* 3 * 3 * 1 *
2
2
* 25% ) *
* 25% ) *
476
671
24
34
=
=
$2,749
$11,613
* 3 * 1 * 1 *
* 2 * 3 * 1 *
2
2
* 25% ) *
* 25% ) *
3,566
12
178
1
=
=
$20,579
$135
* 2 * 1 * 1 *
2
* 25% ) *
647
32
=
$2,487
* 4 * 3 * 3 *
2
* 100% ) *
2
0
=
$530
* 0 * 1 * 3 *
2
*
)*
0
0
=
$0
* 9 * 2 * 3 *
2
* 25% ) *
2
0
=
$187
* 1 * 1 * 3 *
2
* 25% ) *
1
0
=
$5
* 4 * 3 * 3 *
2
* 25% ) *
2
0
=
$164
* 0 * 3 * 0 *
2
*
)*
0
0
=
$0
* 14 * 3 * 3 *
2
* 25% ) *
5
0
=
$1,160
* 0 * 1 * 3 *
2
*
)*
0
0
=
$0
* 4 * 2 * 3 *
2
* 25% ) *
80
4
=
$3,713
* 4 * 2 * 3 *
2
* 25% ) *
126
6
=
$5,834
* 5 * 1 * 9 *
2
* 100% ) *
2
0
=
$865
* 3 * 1 * 5 *
2
* 100% ) *
8
0
=
$961
* 4 * 3 * 3 *
2
* 25% ) *
81
4
=
$5,642
* 1 * 1 * 3 *
2
* 25% ) *
40
2
=
$230
Metallizing
Local ( $77
SECTOR 3. PAINTING ‐ General Industry
Large ( $77
AEROSPACE
Small ( $77
Large ( $77
General Industry (Autobody)
Small ( $77
Large ( $77
General Industry (Coil Coating)
Small ( $77
Large ( $77
Maritime
Small ( $77
Large ( $77
Construction
Small ( $77
State ( $77
Government
Local ( $77
SECTOR 4. Producers of Chromates
Large ( $77
ALL
Small ( $77
SECTOR 5. Chromate Pigment Procedures
Large ( $77
ALL
Small ( $77
SECTOR 6. CCA Producers
Large ( $77
ALL
Small ( $77
SECTOR 7. Chromium Catalyst Producers
Large ( $77
ALL
Small ( $77
SECTOR 8. Paint and Coating Producers
Large ( $77
ALL
Small ( $77
SECTOR 9. Printing Ink Producers
Large ( $77
ALL
Small ( $77
SECTOR 10. Plastic Colorant Producers and Users
Large ( $77
ALL
Small ( $77
SECTOR 11. Plating Mixture Producers
Page 12
0%
0%
0%
Item 13 COSTS
# PLANTS
* 75% ) *
6
0
=
$293
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
Alloy and Stainless Steel
Small
Large
Carbon Steel
Small
14.B Forging Industry
Large
Reshaping
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. Printing
Large
ALL
Small
( $77 * 3 * 1 * 3 *
2
* 75% ) *
4
0
=
$195
( $77 * 16 * 3 * 3 *
2
* 100% ) *
1
0
=
$1,006
( $77 * 0 * 1 * 1 *
2
*
)*
0
0
=
$0
( $77 * 8 * 3 * 3 *
2
* 75% ) *
34
2
=
$14,060
( $77 * 4 * 1 * 3 *
( $77 * 8 * 3 * 3 *
2
2
* 75% ) *
* 75% ) *
11
102
1
5
=
=
$752
$42,179
( $77 * 4 * 1 * 1 *
2
* 75% ) *
32
2
=
$737
( $77 * 5 * 1 * 3 *
2
* 75% ) *
33
2
=
$2,874
( $77 * 2 * 1 * 3 *
2
* 75% ) *
31
2
=
$1,083
( $77 * 9 * 3 * 5 *
2
* 25% ) *
163
8
=
$42,249
( $77 * 5 * 1 * 5 *
2
* 25% ) *
118
6
=
$5,690
( $77 * 7 * 1 * 21 *
2
* 25% ) *
3
0
=
$763
( $77 * 5 * 1 * 7 *
2
* 25% ) *
1
0
=
$61
( $77 * 0 * 1 * 3 *
2
*
)*
0
0
=
$0
( $77 * 2 * 1 * 3 *
2
* 100% ) *
5
0
=
$221
( $77 * 1 * 1 * 3 *
2
* 75% ) *
216
11
=
$3,733
( $77 * 1 * 1 * 3 *
2
* 75% ) *
1,627
81
=
$28,167
( $77 * 3 * 3 * 3 *
2
* 75% ) *
343
17
=
$53,514
( $77 * 2 * 1 * 2 *
2
* 75% ) *
697
35
=
$16,089
( $77 * 3 * 3 * 12 *
2
* 75% ) *
6
0
=
$3,919
( $77 * 2 * 1 * 4 *
( $77 * 5 * 1 * 1 *
2
2
* 75% ) *
* 75% ) *
20
90
1
5
=
=
$919
$2,601
( $77 * 1 * 1 * 1 *
2
* 75% ) *
5
0
=
$30
( $77 * 3 * 3 * 2 *
2
* 75% ) *
81
4
=
$8,450
( $77 * 2 * 1 * 2 *
2
* 75% ) *
325
16
=
$7,511
Page 13
# INIT
2
l i
ALL
# SAMPS
( $77 * 3 * 1 * 3 *
1 El
SHIFTS
Large
S
JOBCAT
# PLANTS
% INITADD
SAMPCOST
Table 2
0%
0%
# PLANTS
Hazardous Waste‐site Work
Item 13 COSTS
# PLANTS
9
=
$18,578
$77 * 0 * 1 * 3 *
$77 * 0 * 3 * 3 *
2
2
* 0% ) *
* 75% ) *
0
23
0
1
=
=
$0
$0
$77 * 0 * 1 * 3 *
2
* 75% ) *
4
0
=
$0
$77 * 9 * 1 * 15 *
2
* 75% ) *
5
0
=
$4,202
$77 * 0 * 1 * 0 *
2
* 75% ) *
0
0
=
$0
$77 * 1 * 1 * 2 *
2
* 75% ) *
148
7
=
$1,708
$77 * 1 * 1 * 2 *
$77 * 1 * 1 * 1 *
2
2
* 75% ) *
* 75% ) *
79
36
4
2
=
=
$913
$208
$77 * 1 * 1 * 1 *
$77 * 1 * 1 * 1 *
2
2
* 75% ) *
* 75% ) *
32
1,162
2
58
=
=
$183
$6,704
$77 * 1 * 1 * 1 *
$77 * 1 * 1 * 1 *
2
2
* 75% ) *
* 75% ) *
4,650
12
233
1
=
=
$26,832
$67
$77 * 1 * 1 * 1 *
2
* 75% ) *
42
2
=
$244
$77 * 6 * 3 * 15 *
2
* 75% ) *
40
2
=
$62,048
$77 * 6 * 1 * 3 *
$77 * 0 * 3 * 15 *
2
2
* 75% ) *
* 75% ) *
48
0
2
0
=
=
$4,964
$0
$77 * 6 * 1 * 3 *
2
* 75% ) *
24
1
=
$2,482
$77 * 12 * 3 * 3 *
2
* 75% ) *
19
1
=
$11,843
$77 * 0 * 3 * 3 *
2
*
0%
)*
0
0
=
$0
$77 * 1 * 1 * 1 *
2
*
0%
)*
51
3
=
$0
Small
State
( $77 * 1 * 1 * 1 *
( $77 * 1 * 1 * 1 *
2
2
* 0% ) *
* 100% ) *
233
15
12
1
=
=
$0
$114
Local
Large
( $77 * 1 * 1 * 1 *
( $77 * 1 * 1 * 1 *
2
2
* 100% ) *
* 75% ) *
88
40
4
2
=
=
$674
$232
Small
State
( $77 * 1 * 1 * 1 *
( $77 * 1 * 1 * 1 *
2
2
* 75% ) *
* 75% ) *
170
1
8
0
=
=
$981
$5
Local
( $77 * 1 * 1 * 1 *
2
* 75% ) *
239
11
=
$1,269
Page 14
# INIT
179
# SAMPS
* 75% ) *
SHIFTS
2
JOBCAT
$77 * 2 * 3 * 3 *
S
1 El
l i
SECTOR 24. Chromium Catalyst Users
Large (
Catalyst Users
Small (
Large (
Chromium Catalyst Service
Companies
Small (
SECTOR 25. Refractory Brick Producers
Large (
ALL
Small (
SECTOR 26. Woodworking
Large (
General Industry
Small (
Large (
Maritime
Small (
Large (
Construction
Small (
State (
Government
Local (
SECTOR 27. Solid Waste Incerneration
Large (
General Industry
Small (
State (
Government
Local (
SECTOR 30. Superalloy Producers and Users
Large (
ALL
Small (
SECTOR 31. Construction
Large (
Industrial Rehabilitation
% INITADD
SAMPCOST
Table 2
l i
( $77 * 1 * 1 * 1 *
2
*
Small
( $77 * 1 * 1 * 1 *
2
*
0%
)*
Item 13 COSTS
% INITADD
# INIT
# SAMPS
SHIFTS
Large
# PLANTS
1 El
# PLANTS
S
JOBCAT
SAMPCOST
Table 2
44
2
=
$0
9
3,783
=
=
$0
$1,010,800
Refractory Brick Restoration
Page 15
0% ) * 175
Total
75,684
Table 3
Semi‐Annual Exposure Monitoring (Paragraph (d)(2)(iii)); Employee Time and Cost to Conduct Semi‐Annual Exposure Monitoring
This table calculates the burden hours and cost of employee time to conduct semi‐annual exposure monitoring. When initial monitoring
results equal or exceed the AL and are at or below the PEL, employers must continue to monitor employees at least every 6 months to
ensure that exposures remain at or below the PEL.
COST = BURDEN HOURS * NON SUPEWAGE
HOURS = (ADMINTIME * NONSUPWAGE * JOBAL * SHIFTS * #SAMPS * 2 * %NOTSEMI * %ABOVEAL * (%INHOUSE + %LEARN) * #PLANTS)
Variables
* ADMINTIME = In‐house administrative time (e.g., for pump calibration and report writing) per sample, in hours.
* NONSUPEWAGE = Non‐suppervisory wage rate. $/hr.
* JOBAL = Number of job categories exposed at or above the AL
* SHIFTS = Number of work shifts.
* #SAMPS = Number of samples per exposure measurement
* 2 = # times per year (semi‐annually)
* %NOTSEMI = Percent of plants not performing semi‐annual monitoring requirements.
* %ABOVEAL = Percent of plants that have an employee in at least one job category at or above the AL.
* %INHOUSE = Percent of plants already with in‐house monitoring capabilities.
* %LEARN = Percent of plants that will develop in‐house monitoring capability.
* #PLANTS = Number of plants represented by the model input.
RESPONSES
*(
0% +
0% ) *
883
) =
$0
0
0
%NOTSEMI
#PLANTS
49.00%
%ABOVEAL
TOTAL HOURS
SEMI‐ANNUALLY
Item 12 COST
$ 21.43 *
SHIFTS
#SAMPS
1 * 2 * 3 * 2 * 100% *
JOBAL
NONSUPEWAGE (2003)
%LEARN
0.50 * $ 26.61
%INHOUSE
Sector 1. Electroplating
Large (
Hard Chrome
Small (
Large (
Job Shop
Chrome Plater
Small (
Large (
Captive Shop
Chrome Plater
Small (
Large (
Job Shop Plater
Small (
Large (
Captive Shop
Plater
Small (
Large (
Operator
Small (
Sector 2. Welding
Large (
SMAW
Small (
Large (
GMAW
Small (
Large (
TIG
Small (
Large (
SAW
Small (
Large (
Plasma Cutting
Small (
Large (
Plasma
Welding
Small (
NONSUPEWAGE
ADMINTIME
24.17%
0.50 * $ 26.61
0.50 * $ 26.61
21.43
21.43
*
*
1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *
49.00%
11.00%
*(
*(
0% +
0% +
0% ) *
0% ) *
1,662
426
) =
) =
$0
$0
0
0
0
0.50 * $ 26.61
0.50 * $ 26.61
21.43
21.43
*
*
1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *
11.00%
14.00%
*(
*(
0% +
0% +
0) *
0% ) *
801
580
) =
) =
$0
$0
0
0
0
0
0.50 *
*
0.50
0.50 *
0.50 *
$ 26.61
$ 26.61
21.43
21.43
*
*
1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *
14.00%
10.00%
*(
*(
0% +
0% +
0) *
0% ) *
1,092
426
) =
) =
$0
$0
0
0
0
0
$ 26.61
$ 26.61
21.43
21.43
*
*
1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *
10.00%
13.00%
*(
*(
0% +
0% +
0) *
0% ) *
801
503
) =
) =
$0
$0
0
0
0
0
0.50 * $ 26.61
0.50 * $ 26.61
21.43
21.43
*
*
1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *
13.00%
16.00%
*(
*(
0% +
0% +
0) *
0% ) *
946
883
) =
) =
$0
$0
0
0
0
0
0.50 * $ 26.61
21.43
*
0% +
0) *
1,662
) =
$0
0
0
0.50 * $ 26.20
21.10
*
1 * 1 * 3 * 2 * 100% * 16.00% * (
General Industry
1 * 3 * 2 * 2 * 100% *
0.92%
*(
10% +
0% ) *
3,535
) =
$511
20
39
1.00 * $ 26.20
0.50 * $ 26.20
21.10
21.10
*
*
1 * 1 * 3 * 2 * 100% *
1 * 3 * 2 * 2 * 100% *
0.92%
0.73%
*(
*(
0% +
10% +
0% ) *
0% ) *
3,962
2,593
) =
) =
$0
$298
0
11
0
23
1.00 * $ 26.20
0.50 * $ 26.20
21.10
21.10
*
*
1 * 1 * 3 * 2 * 100% *
1 * 3 * 2 * 2 * 100% *
0.73%
0.00%
*(
*(
0% +
10% +
0% ) *
0% ) *
2,905
786
) =
) =
$0
$0
0
0
0
0
1.00 * $ 26.20
0.50 * $ 26.20
21.10
21.10
*
*
1 * 1 * 3 * 2 * 100% *
0 * 3 * 2 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
10% +
0% ) *
0% ) *
880
314
) =
) =
$0
$0
0
0
0
0
1.00 * $ 26.20
0.50 * $ 26.20
21.10
21.10
*
*
0 * 1 * 3 * 2 * 100% *
1 * 3 * 2 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
10% +
0% ) *
0% ) *
352
78
) =
) =
$0
$0
0
0
0
0
1.00 * $ 26.20
0.50 * $ 26.20
21.10
21.10
*
*
1 * 1 * 3 * 2 * 100% *
1 * 3 * 2 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
10% +
0% ) *
0% ) *
88
78
) =
) =
$0
$0
0
0
0
0
1.00 * $ 26.20
21.10
*
1 * 1 * 3 * 2 * 100% *
0.00%
*(
0% +
0% ) *
88
) =
$0
0
0
Page 16
TOTAL HOURS
RESPONSES
0.00%
*(
10% +
0% ) *
472
) =
$0
0
0
Small ( 1.00 * $ 26.20
21.10
*
0.00%
*(
0% +
0% ) *
529
) =
$0
0
0
Large ( 0.50 * $ 26.20
21.10
*
1 * 1 * 3 * 2 * 100% *
MARITIME
1 * 3 * 1 * 2 * 100% *
0.00%
*(
50% +
0% ) *
17
) =
$0
0
0
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10
21.10
*
*
1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
10
24
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10
21.10
*
*
1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
14
6
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10
21.10
*
*
1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
3
116
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10
21.10
*
*
1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
66
4
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10
21.10
*
*
1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
2
2
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10
21.10
*
*
1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
1
4
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10
21.10
*
*
1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
2
2
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10
21.10
*
*
1 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
1
0
) =
) =
$0
$0
0
0
0
0
1.00 * $ 26.20
0.50 * $ 26.20
21.10
21.10
*
*
0 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
0
0
) =
) =
$0
$0
0
0
0
0
1.00 * $ 26.20
0.50 * $ 26.20
21.10
21.10
*
*
0 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
0
15
) =
) =
$0
$0
0
0
0
0
1.00 * $ 26.20
21.10
*
0.00%
*(
10% +
0% ) *
9
) =
$0
0
0
Large ( 0.50 * $ 26.20
21.10
*
0 * 2 * 1 * 2 * 100% *
CONSTRUCTION
1 * 3 * 1 * 2 * 100% *
0.00%
*(
5% +
0% ) *
201
) =
$0
0
0
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10
21.10
*
*
1 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
1,609
3
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10
21.10
*
*
1 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
21
41
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 26.20
State ( 0.50 * $ 26.20
21.10
21.10
*
*
1 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
322
20
) =
) =
$0
$0
0
0
0
0
Local ( 1.00 * $ 26.20
State ( 0.50 * $ 26.20
21.10
21.10
*
*
1 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
161
4
) =
) =
$0
$0
0
0
0
0
Local ( 1.00 * $ 26.20
21.10
*
0.00%
*(
0% +
0% ) *
32
) =
$0
0
0
State ( 0.50 * $ 26.20
21.10
*
1 * 1 * 1 * 2 * 100% *
GOVERNMENT
1 * 1 * 1 * 2 * 100% *
0.00%
*(
5% +
0% ) *
19
) =
$0
0
0
Local ( 1.00 * $ 26.20
21.10
*
1 * 1 * 1 * 2 * 100% *
0.00%
*(
0% +
0% ) *
590
) =
$0
0
0
%LEARN
%INHOUSE
%NOTSEMI
#PLANTS
1 * 3 * 2 * 2 * 100% *
%ABOVEAL
*
SHIFTS
#SAMPS
21.10
JOBAL
Item 12 COST
SEMI‐ANNUALLY
NONSUPEWAGE (2003)
Large ( 0.50 * $ 26.20
ADMINTIME
Resistance
Welding
NONSUPEWAGE
Table 3
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma
Welding
Oxy‐fuel
Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Small (
Thermal Spray Large (
Tungsten
Small (
Cutting
Large (
SAW
Small (
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
SMAW
Page 17
Item 12 COST
TOTAL HOURS
RESPONSES
0.00%
*(
5% +
0% ) *
0
) =
$0
0
0
Local ( 1.00 * $ 26.20
State ( 0.50 * $ 26.20
21.10
21.10
*
*
1 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
8
4
) =
) =
$0
$0
0
0
0
0
Local ( 1.00 * $ 26.20
State ( 0.50 * $ 26.20
21.10
21.10
*
*
1 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
118
2
) =
) =
$0
$0
0
0
0
0
Local ( 1.00 * $ 26.20
State ( 0.50 * $ 26.20
21.10
21.10
*
*
1 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
59
1
) =
) =
$0
$0
0
0
0
0
0.00%
*(
0% +
0% ) *
12
) =
$0
0
0
0.00%
*(
10% +
0% ) *
4,740
) =
$0
0
0
0.00%
0.00%
*(
*(
0% +
10% +
0% ) *
0% ) *
4,826
3,476
) =
) =
$0
$0
0
0
0
0
0.00%
0.00%
*(
*(
0% +
10% +
0% ) *
0% ) *
3,539
1,053
) =
) =
$0
$0
0
0
0
0
0.00%
0.00%
*(
*(
0% +
10% +
0% ) *
0% ) *
1,073
421
) =
) =
$0
$0
0
0
0
0
0.00%
0.00%
*(
*(
0% +
10% +
0% ) *
0% ) *
429
105
) =
) =
$0
$0
0
0
0
0
0.00%
0.00%
*(
*(
0% +
10% +
0% ) *
0% ) *
107
105
) =
) =
$0
$0
0
0
0
0
0.00%
0.00%
*(
*(
0% +
10% +
0% ) *
0% ) *
107
632
) =
) =
$0
$0
0
0
0
0
0.00%
*(
0% +
0% ) *
644
) =
$0
0
0
0.00%
*(
50% +
0% ) *
37
) =
$0
0
0
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
21
53
) =
) =
$0
$0
0
0
0
0
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
30
13
) =
) =
$0
$0
0
0
0
0
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
7
249
) =
) =
$0
$0
0
0
0
0
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
141
8
) =
) =
$0
$0
0
0
0
0
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
5
3
) =
) =
$0
$0
0
0
0
0
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
2
8
) =
) =
$0
$0
0
0
0
0
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
5
3
) =
) =
$0
$0
0
0
0
0
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
2
1
) =
) =
$0
$0
0
0
0
0
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
0
1
) =
) =
$0
$0
0
0
0
0
%NOTSEMI
#PLANTS
%LEARN
1 * 1 * 1 * 2 * 100% *
%ABOVEAL
*
SHIFTS
#SAMPS
21.10
JOBAL
State ( 0.50 * $ 26.20
ADMINTIME
%INHOUSE
SEMI‐ANNUALLY
NONSUPEWAGE (2003)
NONSUPEWAGE
Table 3
Plasma Cutting
GMAW
Brazing
Metallizing
21.10 * 1 * 1 * 1 * 2 * 100% *
Local ( 1.00 * $ 26.20
Sector 2. Mild Steel Welding GENERAL INDUSTRY
Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 2 * 2 * 100% *
SMAW
Small ( 1.00 * $ 26.20
21.10 * 0 * 1 * 3 * 2 * 100% *
Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 2 * 2 * 100% *
GMAW
21.10 * 0 * 1 * 3 * 2 * 100% *
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 2 * 2 * 100% *
TIG
21.10 * 0 * 1 * 3 * 2 * 100% *
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 2 * 2 * 100% *
SAW
21.10 * 0 * 1 * 3 * 2 * 100% *
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 2 * 2 * 100% *
Plasma Cutting
21.10 * 0 * 1 * 3 * 2 * 100% *
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 2 * 2 * 100% *
Plasma
Welding
21.10 * 0 * 1 * 3 * 2 * 100% *
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 2 * 2 * 100% *
Resistance
Welding
21.10 * 0 * 1 * 3 * 2 * 100% *
Small ( 1.00 * $ 26.20
MARITIME
Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
SMAW
Small ( 1.00 * $ 26.20
21.10 * 0 * 2 * 1 * 2 * 100% *
Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
GMAW
21.10 * 0 * 2 * 1 * 2 * 100% *
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
TIG
21.10 * 0 * 2 * 1 * 2 * 100% *
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
FCAW
21.10 * 0 * 2 * 1 * 2 * 100% *
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
Plasma Cutting
21.10 * 0 * 2 * 1 * 2 * 100% *
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
Plasma
Welding
21.10 * 0 * 2 * 1 * 2 * 100% *
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
Oxy‐fuel
Cutting
21.10 * 0 * 2 * 1 * 2 * 100% *
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
Air Carbon Arc
Cutting
21.10 * 0 * 2 * 1 * 2 * 100% *
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
Electric Torch
Cutting
21.10 * 0 * 2 * 1 * 2 * 100% *
Small ( 1.00 * $ 26.20
Thermal Spray Large ( 0.50 * $ 26.20
21.10 * 0 * 3 * 1 * 2 * 100% *
Tungsten
Page 18
TOTAL HOURS
RESPONSES
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
0
33
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 26.20
21.10
*
0.00%
*(
10% +
0% ) *
18
) =
$0
0
0
Large ( 0.50 * $ 26.20
21.10
*
0 * 2 * 1 * 2 * 100% *
CONSTRUCTION
0 * 3 * 1 * 2 * 100% *
0.00%
*(
5% +
0% ) *
301
) =
$0
0
0
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10
21.10
*
*
0 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
2,277
4
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10
21.10
*
*
0 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
30
60
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10
21.10
*
*
0 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
455
30
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
21.10
21.10
*
*
0 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
228
6
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 26.20
SECTOR 3. PAINTING
Large ( 0.50 * $ 33.07
AEROSPACE
Small ( 1.00 * $ 33.07
General
Large ( 0.50 * $ 33.07
Industry
(Autobody) Small ( 1.00 * $ 33.07
General
Large ( 0.50 * $ 33.07
Industry (Coil
Small ( 1.00 * $ 33.07
Coating)
Large ( 0.50 * $ 33.07
Maritime
Small ( 1.00 * $ 33.07
Large ( 0.50 * $ 33.07
Construction
Small ( 1.00 * $ 33.07
State ( 0.50 * $ 33.07
Government
Local ( 1.00 * $ 33.07
SECTOR 4. Producers of Chromates
Large ( 0.50 * $ 38.68
ALL
Small ( 1.00 * $ 38.68
SECTOR 5. Chromate Pigment Procedures
Large ( 0.50 * $ 37.70
ALL
Small ( 1.00 * $ 37.70
SECTOR 6. CCA Producers
Large ( 0.50 * $ 31.94
ALL
Small ( 1.00 * $ 31.94
21.10
*
0 * 1 * 1 * 2 * 100% *
0.00%
*(
0% +
0% ) *
45
) =
$0
0
0
26.63
*
1 * 3 * 3 * 2 * 100% *
28.00%
*(
75% +
0% ) *
49
) =
$3,057
92
185
26.63
26.63
*
*
1 * 1 * 3 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *
9.00%
5.00%
*(
*(
25% +
75% +
0% ) *
0% ) *
62
326
) =
) =
$275
$404
26.63
26.63
*
*
1 * 1 * 1 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *
5.00%
8.00%
*(
*(
25% +
75% +
0% ) *
0% ) *
1,436
100
) =
) =
$1,187
$1,186
36
36
36
72
26.63
26.63
*
*
1 * 1 * 3 * 2 * 100% *
2 * 3 * 1 * 2 * 100% *
8.00%
36.00%
*(
*(
25% +
90% +
0% ) *
0% ) *
18
276
) =
) =
$72
$17,710
2
536
2
1071
26.63
26.63
*
*
0 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
36.00%
22.00%
*(
*(
10% +
75% +
0% ) *
0% ) *
476
671
) =
) =
$0
$10,980
0
332
0
664
26.63
26.63
*
*
1 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
22.00%
12.00%
*(
*(
50% +
75% +
0% ) *
0% ) *
3,566
12
) =
) =
$25,945
$104
785
3
785
6
26.63
*
1 * 1 * 1 * 2 * 100% *
12.00%
*(
75% +
0% ) *
647
) =
$3,849
116
116
31.15
*
3 * 3 * 3 * 2 * 100% *
45.00%
*(
0% +
0% ) *
2
) =
$0
0
0
31.15
*
0 * 1 * 3 * 2 * 100% *
0.00%
*(
0% +
0% ) *
0
) =
$0
0
0
30.36
*
5 * 2 * 3 * 2 * 100% *
71.00%
*(
0% +
0% ) *
2
) =
$0
0
0
30.36
*
1 * 1 * 3 * 2 * 100% *
50.00%
*(
0% +
0% ) *
1
) =
$0
0
0
25.72
*
1 * 3 * 3 * 2 * 100% *
33.00%
*(
0% +
0% ) *
2
) =
$0
0
0
25.72
*
0 * 3 * 0 * 2 * 100% *
0.00%
*(
0% +
0% ) *
0
) =
$0
0
0
%LEARN
%INHOUSE
%NOTSEMI
#PLANTS
0 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
%ABOVEAL
*
*
SHIFTS
#SAMPS
21.10
21.10
Cutting
JOBAL
Small ( 1.00 * $ 26.20
Large ( 0.50 * $ 26.20
ADMINTIME
Item 12 COST
SEMI‐ANNUALLY
NONSUPEWAGE (2003)
NONSUPEWAGE
Table 3
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Page 19
8
8
12 24.455626
SECTOR 7. Chromium Catalyst Producers
Large ( 0.50 * $ 38.68
31.15
ALL
31.15
Small ( 1.00 * $ 38.68
SECTOR 8. Paint and Coating Producers
Large ( 0.50 * $ 28.81
23.20
ALL
23.20
Small ( 1.00 * $ 28.81
SECTOR 9. Printing Ink Producers
Large ( 0.50 * $ 28.86
23.24
ALL
23.24
Small ( 0.50 * $ 28.86
SECTOR 10. Plastic Colorant Producers and Users
Large ( 0.50 * $ 31.99
25.76
Small ( 1.00 * $ 31.99
ALL
SECTOR 11. Plating Mixture Producers
Large ( 0.50 * $ 28.71
ALL
Small ( 1.00 * $ 28.71
SECTOR 13. Chromium Metal Producers
Large ( 0.5 * $ 38.80
ALL
1 * $ 38.80
Small (
SECTOR 14. Iron and Steel Mills
Large ( 0.50 * $ 38.80
Alloy and
Stainless Steel
Small ( 1.00 * $ 38.80
Large ( 0.50 * $ 38.80
Carbon Steel
Small ( 1.00 * $ 38.80
SECTOR 14B. Forging Industry
Large ( 0.50 * $ 38.80
Reshaping
Small ( 1.00 * $ 38.80
SECTOR 15. Iron and Steel Foundries
Large ( 0.50 * $ 28.31
ALL
Small ( 1.00 * $ 28.31
SECTOR 17. Chromium Dye Producers
Large ( 0.50 * $ 37.70
ALL
Small ( 1.00 * $ 37.70
SECTOR 18. Chromium Sulfate Producers
Large ( 0.5 * $ 41.50
ALL
Small ( 0.5 * $ 41.50
SECTOR 19. Chemical Distributors
Large ( 0.50 * $ 29.92
ALL
Small ( 0.50 * $ 29.92
SECTOR 20. Textile Dyeing
Large ( 0.50 * $ 19.97
RESPONSES
TOTAL HOURS
Item 12 COST
#PLANTS
%LEARN
%INHOUSE
%ABOVEAL
%NOTSEMI
SEMI‐ANNUALLY
SHIFTS
#SAMPS
JOBAL
NONSUPEWAGE (2003)
NONSUPEWAGE
ADMINTIME
Table 3
*
6 * 3 * 3 * 2 * 100% *
100.00%
*(
80% +
0% ) *
5
) =
$8,000
*
0 * 1 * 3 * 2 * 100% *
0.00%
*(
0% +
0% ) *
0
) =
$0
0
0
*
1 * 2 * 3 * 2 * 100% *
13.00%
*(
25% +
0% ) *
80
) =
$452
16
31
*
1 * 2 * 3 * 2 * 100% *
13.00%
*(
25% +
0% ) *
126
) =
$1,420
49
49
*
3 * 1 * 9 * 2 * 100% *
69.00%
*(
10% +
0% ) *
2
) =
$134
5
9
*
2 * 1 * 5 * 2 * 100% *
69.00%
*(
10% +
0% ) *
8
) =
$166
6
11
*
2 * 3 * 3 * 2 * 100% *
51.00%
*(
0
+
0
)*
81
)=
$0
0
0
25.76
*
2 * 1 * 3 * 2 * 100% *
51.00%
*(
0
+
0
)*
40
)=
$0
23.12
*
1 * 1 * 3 * 2 * 100% *
100.00%
*(
20% +
0% ) *
6
) =
$97
3
7
23.12
*
1 * 1 * 3 * 2 * 100% *
100.00%
*(
25% +
0% ) *
4
) =
$162
6
5.643502
31.25
*
2 * 3 * 3 * 2 * 100% *
100.00%
*(
0% +
0% ) *
1
) =
$0
0
0
31.25
*
0 * 1* 1* 2*
0% *
0.00%
*(
0% +
0% ) *
0
) =
$0
0
0
31.25
*
3 * 3 * 3 * 2 * 100% *
38.00%
*(
10% +
0% ) *
34
) =
$1,347
35
69
31.25
31.25
*
*
1 * 1 * 3 * 2 * 100% *
0 * 3 * 3 * 2 * 100% *
38.00%
0.00%
*(
*(
10% +
10% +
0% ) *
0% ) *
11
102
) =
) =
$96
$0
2
0
2
0
31.25
*
0 * 1 * 1 * 2 * 100% *
0.00%
*(
10% +
0% ) *
32
) =
$0
0
0
31.25
*
4 * 1 * 3 * 2 * 100% *
63.00%
*(
10% +
0% ) *
33
) =
$974
25
79
31.25
*
2 * 1 * 3 * 2 * 100% *
63.00%
*(
10% +
0% ) *
31
) =
$918
24
24
22.80
*
6 * 3 * 5 * 2 * 100% *
100.00%
*(
10% +
0% ) *
163
) =
$41,459
1,464 2928.8717
22.80
*
5 * 1 * 5 * 2 * 100% *
100.00%
*(
10% +
0% ) *
118
) =
$16,751
592 591.69126
30.36
*
6 * 1 * # * 2 * 100% *
38.00%
*(
0% +
0% ) *
3
) =
$0
0
0
30.36
*
6 * 1 * 7 * 2 * 100% *
38.00%
*(
0% +
0% ) *
1
) =
$0
0
0
33.42
*
0 * 1 * 3 * 2 * 100% *
0.00%
*(
0% +
0% ) *
0
) =
$0
0
0
33.42
*
1 * 1 * 3 * 2 * 100% *
27.00%
*(
0% +
0% ) *
5
) =
$0
0
0
24.10
*
0 * 1 * 3 * 2 * 100% *
0.00%
*(
0% +
0% ) *
216
) =
$0
0
0
24.10
*
0 * 1 * 3 * 2 * 100% *
0.00%
*(
0% +
0% ) *
1,627
) =
$0
0
0
16.08
*
0 * 3 * 3 * 2 * 100% *
0.00%
*(
10% +
0% ) *
343
) =
$0
0
0
16.08
*
0.00%
*(
10% +
0% ) *
697
) =
$0
0
0
207 413.65003
0
0
ALL
Small
(
0.50
* $ 19.97
0
* 1 * 2 * 2 * 100% *
Page 20
TOTAL HOURS
RESPONSES
*(
10% +
0% ) *
6
) =
$163
6
11
23.25
23.25
*
*
0
* 1 * 4 * 2 * 100% *
3 * 1 * 1 * 2 * 100% *
0.00%
20.00%
*(
*(
10% +
10% +
0% ) *
0% ) *
20
90
) =
) =
$0
$156
0
5
0
12
23.25
*
* 1 * 1 * 2 * 100% *
0.00%
*(
10% +
0% ) *
5
) =
$0
0
0
16.79
*
0 * 3 * 2 * 2 * 100% *
0.00%
*(
10% +
0% ) *
81
) =
$0
0
0
16.79
*
* 1 * 2 * 2 * 100% *
0.00%
*(
10% +
0% ) *
325
) =
$0
0
0
26.18
*
2 * 3 * 3 * 2 * 100% *
9.00%
*(
10% +
0% ) *
179
) =
$942
29
58
1.0 * $ 32.51
0.5 * $ 32.51
26.18
26.18
*
*
0
* 1 * 3 * 2 * 100% *
0 * 3 * 3 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
10% +
0% ) *
0% ) *
0
23
) =
) =
$0
$0
0
0
0
0
( 1.0 * $ 32.51
SECTOR 25. Refractory Brick Producers
Large ( 0.5 * $ 25.64
26.18
*
* 1 * 3 * 2 * 100% *
0.00%
*(
10% +
0% ) *
4
) =
$0
0
0
20.65
*
0 * 1 * # * 2 * 100% *
0.00%
*(
10% +
0% ) *
5
) =
$0
0
0
20.65
*
* 1 * 0 * 2 * 100% *
0.00%
*(
10% +
0% ) *
0
) =
$0
0
0
25.86
*
0 * 1 * 2 * 2 * 100% *
0.00%
*(
0% +
0% ) *
148
) =
$0
0
0
25.86
25.86
*
*
* 1 * 2 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
0% +
0% ) *
0% ) *
79
36
) =
) =
$0
$0
0
0
0
0
25.86
25.86
*
*
0 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *
0.00%
22.00%
*(
*(
0% +
0% +
0% ) *
0% ) *
32
1,162
) =
) =
$0
$0
0
0
0
0
25.86
25.86
*
*
1 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *
22.00%
22.00%
*(
*(
0% +
0% +
0% ) *
0% ) *
4,650
12
) =
) =
$0
$0
0
0
0
0
25.86
*
1 * 1 * 1 * 2 * 100% *
22.00%
*(
0% +
0% ) *
42
) =
$0
0
0
21.93
*
0 * 3 * # * 2 * 100% *
0.00%
*(
10% +
0% ) *
40
) =
$0
0
0
21.93
21.93
*
*
0
* 1 * 3 * 2 * 100% *
0 * 3 * # * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
10% +
0% ) *
0% ) *
48
0
) =
) =
$0
$0
0
0
0
0
21.93
*
0 * 1 * 3 * 2 * 100% *
0.00%
*(
10% +
0% ) *
24
) =
$0
0
0
0
%LEARN
%INHOUSE
%NOTSEMI
#PLANTS
25.00%
%ABOVEAL
1 * 3 * # * 2 * 100% *
SHIFTS
#SAMPS
*
SECTOR 21. Colored Glass Producers
Large ( 0.50 * $ 28.87
General
Industry
Small 1.00
(
* $ 28.87
Large ( 0.50 * $ 28.87
Fiber, Flat,
Container Glass
Small 1.00
(
* $ 28.87
SECTOR 22. Printing
Large ( 0.5 * $ 20.85
JOBAL
23.25
ADMINTIME
Item 12 COST
SEMI‐ANNUALLY
NONSUPEWAGE (2003)
NONSUPEWAGE
Table 3
ALL
Small
( 0.5 * $ 20.85
SECTOR 24. Chromium Catalyst Users
Large ( 0.5 * $ 32.51
0
Catalyst Users
Small
(
Large (
Chromium
Catalyst Service
Companies Small
0
ALL
Small
( 0.5 * $ 25.64
SECTOR 26. Woodworking
Large ( 0.50 * $ 32.11
General
Industry
Small
(
1 * $ 32.11
Large ( 0.50 * $ 32.11
Maritime
1 * $ 32.11
Small (
Large ( 0.50 * $ 32.11
Construction
1 * $ 32.11
Small (
State ( 0.50 * $ 32.11
Government
1 * $ 32.11
Local (
SECTOR 27. Solid Waste Incerneration
Large ( 0.50 * $ 27.23
General
Industry
Small
(
1 * $ 27.23
State ( 0.50 * $ 27.23
Government
1 * $ 27.23
Local (
0
0
Page 21
Item 12 COST
TOTAL HOURS
RESPONSES
0% ) *
19
) =
$0
0
0
* 3 * 3 * 2 * 100% *
0.00%
*(
0% +
0% ) *
0
) =
$0
0
0
*
0 * 1 * 1 * 2 * 100% *
0.00%
*(
0% +
0% ) *
51
) =
$0
0
0
22.49
*
25.88
%NOTSEMI
0 * 3 * 3 * 2 * 100% *
#PLANTS
0% +
*
%ABOVEAL
%LEARN
SEMI‐ANNUALLY
*(
22.49
SHIFTS
#SAMPS
0.00%
JOBAL
%INHOUSE
SECTOR 30. Superalloy Producers and Users
Large ( 0.5 * $ 27.93
NONSUPEWAGE (2003)
NONSUPEWAGE
ADMINTIME
Table 3
ALL
Small
(
1 * $ 27.93
SECTOR 31. Construction Cement Workers
Large ( 0.5 * $ 32.13
0
Industrial Small (
Rehabilitation State (
1.0 * $ 32.13
0.5 * $ 32.13
25.88
25.88
*
*
0 * 1 * 1 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
0% +
0% ) *
0% ) *
233
15
) =
) =
$0
$0
0
0
0
0
Local (
Large (
1.0 * $ 32.13
0.5 * $ 32.13
25.88
25.88
*
*
0 * 1 * 1 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
10% +
0% ) *
0% ) *
88
40
) =
) =
$0
$0
0
0
0
0
Small (
State (
1.0 * $ 32.13
0.5 * $ 32.13
25.88
25.88
*
*
0 * 1 * 1 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
10% +
0% ) *
0% ) *
170
1
) =
) =
$0
$0
0
0
0
0
Local (
Large (
1.0 * $ 32.13
0.5 * $ 32.13
25.88
25.88
*
*
0 * 1 * 1 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *
0.00%
60.00%
*(
*(
10% +
10% +
0% ) *
0% ) *
239
44
) =
) =
$0
$0
0
0
0
0
Small (
1.0 * $ 32.13
25.88
*
0 * 1 * 1 * 2 * 100% *
60.00%
*(
10% +
0% ) *
Total
175
) =
75,684
$0
$138,815
Hazardous
Waste‐site
Work
Refractory
Brick
Restoration
Page 22
0
0
4,463 7,336
Table 4
Semi‐Annual Exposure Monitoring (Paragraph (d)(2)(iii)); Contract Cost for an IH Technician to Perform Semi‐Annual
Exposure Monitoring
This table calculates the contract cost for the employer to have an outside industrial hygiene technician perform semi‐
annual exposure monitoring.
Cost = (SEMICONTTIME * CONTCOST * SEMI‐ANNUALLY * %NOTSEMI * %ABOVE AL *%CONT) * #PLANTS)
Variables:
* SEMICONTTIME = Time, in hours, for an outside contractor (industrial hygiene technician)
to conduct semi‐annual monitoring
* CONTCOST = Cost per hour for an outside industrial hygiene contractor
* 2 = 2 times per year semi‐annually
* %NOTSEMI = Percent of plants not performing semi‐annual monitoring requirements
* %ABOVEAL = Percent of plants that have an employee in at least one job category at or above the AL
* %CONT = Percent of plants that will continue to use an outside contractor for monitoring
* #PLANTS = Number of plants represented by the model input
Item 13 COST
# PLANTS
% CONT
% ABOVEAL
% NOTSEMI
SEMI ‐ ANNUALLY
CONTCOST
CONTCOST (2003
SEMICONTTIME
24.93%
Sector 1. Electroplating
Large
( 12 * $90.00
$ 112.44 * 2 * 100% * 49.00% * 100% ) *
883
=
$1,167,970
Small
Large
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% * 49.00% * 100% ) *
$ 112.44 * 2 * 100% * 11.00% * 100% ) *
1,662
426
=
=
$2,198,127
$126,329
* 100% * 11.00% * 100% ) *
* 100% * 14.00% * 100% ) *
801
580
=
=
$237,705
$219,176
* 100% * 14.00% * 100% ) *
* 100% * 10.00% * 100% ) *
1,092
426
=
=
$412,567
$114,845
* 100% * 10.00% * 100% ) *
* 100% * 13.00% * 100% ) *
801
503
=
=
$216,096
$176,319
* 100% * 13.00% * 100% ) *
* 100% * 16.00% * 100% ) *
946
883
=
=
$331,895
$381,378
* 100% * 16.00% * 100% ) *
1,662
=
$717,756
* 100% *
0.92%
*
)*
3,535
=
$78,994
* 100% *
* 100% *
0.92%
0.73%
* 100% ) *
* 90% ) *
3,962
2,593
=
=
$98,350
$45,978
* 100% *
* 100% *
0.73%
0.00%
* 100% ) *
* 90% ) *
2,905
786
=
=
$57,234
$0
* 100% *
0.00%
* 100% ) *
880
=
$0
Hard Chrome
Job Shop Chrome
Plater
( 12 * $90.00 $ 112.44 * 2
Small
( 12 * $90.00 $ 112.44 * 2
Large
Captive Shop Chrome
Plater
( 12 * $90.00 $ 112.44 * 2
Small
( 12 * $90.00 $ 112.44 * 2
Large
Job Shop Plater
( 12 * $90.00 $ 112.44 * 2
Small
( 12 * $90.00 $ 112.44 * 2
Large
Captive Shop Plater
( 12 * $90.00 $ 112.44 * 2
Small
( 12 * $90.00 $ 112.44 * 2
Large
Operator
( 12 * $90.00 $ 112.44 * 2
Small
Sector 2. Welding GENERAL INDUSTRY
Large
( 12 * $90.00 $ 112.44 * 2
SMAW
( 12 * $90.00 $ 112.44 * 2
Small
Large
( 12 * $90.00 $ 112.44 * 2
GMAW
( 12 * $90.00 $ 112.44 * 2
Small
Large
( 12 * $90.00 $ 112.44 * 2
TIG
( 12 * $90.00 $ 112.44 * 2
Small
Page 23
90%
90%
Item 13 COST
# PLANTS
% CONT
% ABOVEAL
% NOTSEMI
SEMI ‐ ANNUALLY
CONTCOST
CONTCOST (2003
SEMICONTTIME
Table 4
Large
( 0 * $90.00
$ 112.44 * 2 * 100% *
0.00%
*
)*
314
=
$0
Small
Large
( 0 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 90% ) *
352
78
=
=
$0
$0
Small
Large
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 90% ) *
88
78
=
=
$0
$0
Small
Large
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 90% ) *
88
472
=
=
$0
$0
Small
( 12 * $90.00
0.00%
* 100% ) *
529
=
$0
0.00%
*
50%
)*
17
=
$0
SAW
Plasma Cutting
Plasma Welding
Resistance Welding
Large
( 12 * $90.00
$ 112.44 * 2 * 100% *
MARITIME
$ 112.44 * 2 * 100% *
Small
Large
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
10
24
=
=
$0
$0
Small
Large
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
14
6
=
=
$0
$0
Small
Large
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
3
116
=
=
$0
$0
Small
Large
( 0 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
66
4
=
=
$0
$0
Small
Large
( 0 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
2
2
=
=
$0
$0
Small
Large
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
1
4
=
=
$0
$0
Small
Large
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
2
2
=
=
$0
$0
Small
Large
( 12 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
1
0
=
=
$0
$0
Small
Large
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
0
0
=
=
$0
$0
Small
( 0 * $90.00
$ 112.44 * 2 * 100% *
0.00%
*
90%
)*
0
=
$0
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray
Tungsten Cutting
Page 24
Item 13 COST
# PLANTS
% CONT
% ABOVEAL
% NOTSEMI
SEMI ‐ ANNUALLY
CONTCOST
CONTCOST (2003
SEMICONTTIME
Table 4
Large
( 0 * $90.00
$ 112.44 * 2 * 100% *
0.00%
*
50%
)*
15
=
$0
Small
( 0 * $90.00
0.00%
*
90%
)*
9
=
$0
Large
( 12 * $90.00
$ 112.44 * 2 * 100% *
CONSTRUCTION
$ 112.44 * 2 * 100% *
0.00%
*
95%
)*
201
=
$0
Small
Large
( 12 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
1,609
3
=
=
$0
$0
Small
Large
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
21
41
=
=
$0
$0
Small
Large
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
322
20
=
=
$0
$0
Small
Large
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
161
4
=
=
$0
$0
Small
( 12 * $90.00
0.00%
* 100% ) *
32
=
$0
State
( 12 * $90.00
$ 112.44 * 2 * 100% *
GOVERNMENT
$ 112.44 * 2 * 100% *
0.00%
*
)*
19
=
$0
Local
State
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
590
0
=
=
$0
$0
Local
State
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
8
4
=
=
$0
$0
Local
State
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
118
2
=
=
$0
$0
Local
State
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
59
1
=
=
$0
$0
* 100% *
0.00%
* 100% ) *
12
=
$0
* 100% *
0.00%
*
)*
4,740
=
$0
* 100% *
* 100% *
0.00%
0.00%
* 100% ) *
* 90% ) *
4,826
3,476
=
=
$0
$0
* 100% *
* 100% *
0.00%
0.00%
* 100% ) *
* 90% ) *
3,539
1,053
=
=
$0
$0
* 100% *
* 100% *
0.00%
0.00%
* 100% ) *
* 90% ) *
1,073
421
=
=
$0
$0
* 100% *
* 100% *
0.00%
0.00%
* 100% ) *
* 90% ) *
429
105
=
=
$0
$0
* 100% *
0.00%
* 100% ) *
107
=
$0
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
95%
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
( 12 * $90.00 $ 112.44 * 2
Local
Sector 2. Mild Steel Welding GENERAL INDUSTRY
Large
( 12 * $90.00 $ 112.44 * 2
SMAW
( 0 * $90.00 $ 112.44 * 2
Small
Large
( 0 * $90.00 $ 112.44 * 2
GMAW
( 0 * $90.00 $ 112.44 * 2
Small
Large
( 0 * $90.00 $ 112.44 * 2
TIG
( 0 * $90.00 $ 112.44 * 2
Small
Large
( 0 * $90.00 $ 112.44 * 2
SAW
( 0 * $90.00 $ 112.44 * 2
Small
Large
( 0 * $90.00 $ 112.44 * 2
Plasma Cutting
( 0 * $90.00 $ 112.44 * 2
Small
Page 25
90%
90%
Item 13 COST
# PLANTS
% CONT
% ABOVEAL
% NOTSEMI
SEMI ‐ ANNUALLY
CONTCOST
CONTCOST (2003
SEMICONTTIME
Table 4
Large
( 0 * $90.00
$ 112.44 * 2 * 100% *
0.00%
*
)*
105
=
$0
Small
Large
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 90% ) *
107
632
=
=
$0
$0
Small
( 0 * $90.00
0.00%
* 100% ) *
644
=
$0
0.00%
*
50%
)*
37
=
$0
Plasma Welding
Resistance Welding
Large
( 0 * $90.00
$ 112.44 * 2 * 100% *
MARITIME
$ 112.44 * 2 * 100% *
Small
Large
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
21
53
=
=
$0
$0
Small
Large
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
30
13
=
=
$0
$0
Small
Large
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
7
249
=
=
$0
$0
Small
Large
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
141
8
=
=
$0
$0
Small
Large
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
5
3
=
=
$0
$0
Small
Large
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
2
8
=
=
$0
$0
Small
Large
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
5
3
=
=
$0
$0
Small
Large
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
2
1
=
=
$0
$0
Small
Large
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
0
1
=
=
$0
$0
Small
( 0 * $90.00
$ 112.44 * 2 * 100% *
0.00%
*
90%
)*
0
=
$0
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray
Tungsten Cutting
Page 26
Item 13 COST
# PLANTS
% CONT
% ABOVEAL
% NOTSEMI
SEMI ‐ ANNUALLY
CONTCOST
CONTCOST (2003
SEMICONTTIME
Table 4
Large
( 0 * $90.00
$ 112.44 * 2 * 100% *
0.00%
*
50%
)*
33
=
$0
Small
( 0 * $90.00
0.00%
*
90%
)*
18
=
$0
Large
( 0 * $90.00
$ 112.44 * 2 * 100% *
CONSTRUCTION
$ 112.44 * 2 * 100% *
0.00%
*
95%
)*
301
=
$0
Small
Large
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
2,277
4
=
=
$0
$0
Small
Large
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
30
60
=
=
$0
$0
Small
Large
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
455
30
=
=
$0
$0
Small
State
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
228
6
=
=
$0
$0
Local
( 0 * $90.00
$ 112.44 * 2 * 100% *
0.00%
* 100% ) *
45
=
$0
Large
( 12 * $90.00
$ 112.44 * 2 * 100% * 28.00% *
25%
*
49
=
$9,239
Small
Large
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
9.00%
5.00%
*
*
75%
25%
)*
*
62
326
=
=
$11,219
$10,999
Small
Large
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
5.00%
8.00%
*
*
75%
25%
)*
*
1,436
100
=
=
$145,277
$5,377
Small
Large
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% * 8.00% *
$ 112.44 * 2 * 100% * 36.00% *
75%
10%
)*
*
18
276
=
=
$2,933
$26,764
Small
Large
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% * 36.00% *
$ 112.44 * 2 * 100% * 22.00% *
90%
25%
)*
*
476
671
=
=
$416,474
$99,567
Small
State
( 12 * $90.00
( 12 * $90.00
$ 112.44 * 2 * 100% * 22.00% *
$ 112.44 * 2 * 100% * 12.00% *
50%
25%
)*
*
3,566
12
=
=
$1,058,658
$946
( 12 * $90.00
Local
SECTOR 4. Producers of Chromates
Large
( 12 * $90.00
ALL
( 0 * $90.00
Small
$ 112.44 * 2 * 100% * 12.00% *
25%
)*
647
=
$52,349
$ 112.44 * 2 * 100% * 45.00% * 100% ) *
2
=
$2,325
$ 112.44 * 2 * 100% *
0
=
$0
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
SECTOR 3. PAINTING
AEROSPACE
General Industry
(Autobody)
General Industry (Coil
Coating)
Maritime
Construction
Government
Page 27
0.00%
*
0%
)*
SECTOR 5. Chromate Pigment Procedures
Large
( 12 * $90.00
ALL
( 12 * $90.00
Small
SECTOR 6. CCA Producers
Large
( 12 * $90.00
ALL
( 0 * $90.00
Small
SECTOR 7. Chromium Catalyst Producers
Large
( 20 * $90.00
ALL
( 0 * $90.00
Small
SECTOR 8. Paint and Coating Producers
Large
( 12 * $90.00
ALL
( 12 * $90.00
Small
SECTOR 9. Printing Ink Producers
Large
( 12 * $90.00
ALL
( 12 * $90.00
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
( 12 * $90.00
ALL
( 12 * $90.00
Small
SECTOR 11. Plating Mixture Producers
Large
( 12 * $90.00
ALL
( 12 * $90.00
Small
SECTOR 13. Chromium Metal Producers
Large
( 12 * $90.00
ALL
( 0 * $90.00
Small
SECTOR 14. Iron and Steel Mills
Large
( 12 * $90.00
Alloy and Stainless
Steel
( 12 * $90.00
Small
Large
( 0 * $90.00
Carbon Steel
( 0 * $90.00
Small
SECTOR 14B. Forging Industry
Large
( 12 * $90.00
Reshaping
( 12 * $90.00
Small
Item 13 COST
# PLANTS
% CONT
% ABOVEAL
% NOTSEMI
SEMI ‐ ANNUALLY
CONTCOST
CONTCOST (2003
SEMICONTTIME
Table 4
$ 112.44 * 2 * 100% * 71.00% * 100% ) *
2
=
$3,448
$ 112.44 * 2 * 100% * 50.00% * 100% ) *
1
=
$1,214
$ 112.44 * 2 * 100% * 33.00% * 100% ) *
2
=
$2,105
$ 112.44 * 2 * 100% *
0.00%
*
0%
)*
0
=
$0
$ 112.44 * 2 * 100% *
100%
*
20%
)*
5
=
$4,306
$ 112.44 * 2 * 100% *
0.00%
*
0%
)*
0
=
$0
$ 112.44 * 2 * 100% * 13.00% *
75%
)*
80
=
$21,162
$ 112.44 * 2 * 100% * 13.00% *
75%
)*
126
=
$33,255
$ 112.44 * 2 * 100% * 69.00% *
90%
)*
2
=
$4,186
$ 112.44 * 2 * 100% * 69.00% *
90%
)*
8
=
$13,953
$ 112.44 * 2 * 100% * 51.00% * 100% ) *
81
=
$112,133
$ 112.44 * 2 * 100% * 51.00% * 100% ) *
40
=
$54,848
$ 112.44 * 2 * 100% *
100%
*
80%
)*
6
=
$12,183
$ 112.44 * 2 * 100% *
100%
*
75%
)*
4
=
$7,614
$ 112.44 * 2 * 100% *
100%
* 100% ) *
1
=
$2,451
$ 112.44 * 2 *
0.00%
*
0%
)*
0
=
$0
$ 112.44 * 2 * 100% * 38.00% *
90%
)*
34
=
$31,233
$ 112.44 * 2 * 100% * 38.00% *
$ 112.44 * 2 * 100% * 0.00% *
90%
90%
)*
)*
11
102
=
=
$10,018
$0
$ 112.44 * 2 * 100% *
*
90%
)*
32
=
$0
$ 112.44 * 2 * 100% * 63.00% *
90%
)*
33
=
$50,803
$ 112.44 * 2 * 100% * 63.00% *
90%
)*
31
=
$47,873
Page 28
0%
*
0.00%
SECTOR 15. Iron and Steel Foundries
Large
( 20 *
ALL
( 12 *
Small
SECTOR 17. Chromium Dye Producers
Large
( 12 *
ALL
( 12 *
Small
SECTOR 18. Chromium Sulfate Producers
Large
( 0 *
ALL
( 12 *
Small
SECTOR 19. Chemical Distributors
Large
( 0 *
ALL
( 0 *
Small
SECTOR 20. Textile Dyeing
Large
( 0 *
ALL
( 0 *
Small
SECTOR 21. Colored Glass Producers
Large
( 12 *
General Industry
( 0 *
Small
Large ( 12 *
Fiber, Flat, Container
Glass
Small ( 12 *
SECTOR 22. Printing
Large
( 0 *
ALL
( 0 *
Small
SECTOR 24. Chromium Catalyst Users
Large
( 12 *
Catalyst Users
( 0 *
Small
Large
( 12 *
Chromium Catalyst
Service Companies
( 12 *
Small
SECTOR 25. Refractory Brick Producers
Large
( 0 *
ALL
( 0 *
Small
Item 13 COST
# PLANTS
% CONT
% ABOVEAL
% NOTSEMI
SEMI ‐ ANNUALLY
CONTCOST
CONTCOST (2003
SEMICONTTIME
Table 4
$90.00
$ 112.44 * 2 * 100% *
100%
*
90%
)*
163
=
$658,630
$90.00
$ 112.44 * 2 * 100% *
100%
*
90%
)*
118
=
$287,402
$90.00
$ 112.44 * 2 * 100% * 38.00% * 100% ) *
3
=
$2,768
$90.00
$ 112.44 * 2 * 100% * 38.00% * 100% ) *
1
=
$923
$90.00
$ 112.44 * 2 * 100% *
)*
0
=
$0
$90.00
$ 112.44 * 2 * 100% * 27.00% * 100% ) *
5
=
$3,488
$90.00
$ 112.44 * 2 * 100% *
0.00%
* 100% ) *
216
=
$0
$90.00
$ 112.44 * 2 * 100% *
0.00%
* 100% ) *
1,627
=
$0
$90.00
$ 112.44 * 2 * 100% *
0.00%
*
90%
)*
343
=
$0
$90.00
$ 112.44 * 2 * 100% *
0.00%
*
90%
)*
697
=
$0
$90.00
$ 112.44 * 2 * 100% * 25.00% *
90%
)*
6
=
$3,819
$90.00
$90.00
$ 112.44 * 2 * 100% * 0.00% *
$ 112.44 * 2 * 100% * 20.00% *
90%
90%
)*
)*
20
90
=
=
$0
$43,786
$90.00
$ 112.44 * 2 * 100% *
0.00%
*
90%
)*
5
=
$0
$90.00
$ 112.44 * 2 * 100% *
0.00%
*
90%
)*
81
=
$0
$90.00
$ 112.44 * 2 * 100% *
0.00%
*
90%
)*
325
=
$0
$90.00
$ 112.44 * 2 * 100% *
9.00%
*
90%
)*
179
=
$39,098
$90.00
$90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
90%
)*
)*
0
23
=
=
$0
$0
$90.00
$ 112.44 * 2 * 100% *
0.00%
*
90%
)*
4
=
$0
$90.00
$ 112.44 * 2 * 100% *
0.00%
*
90%
)*
5
=
$0
$90.00
$ 112.44 * 2 * 100% *
0.00%
*
90%
)*
0
=
$0
Page 29
0.00%
*
0%
SECTOR 26. Woodworking
Large
( 0 * $90.00
General Industry
( 0 * $90.00
Small
Large
( 0 * $90.00
Maritime
( 0 * $90.00
Small
Large
( 12 * $90.00
Construction
( 12 * $90.00
Small
State
( 12 * $90.00
Government
( 12 * $90.00
Local
SECTOR 27. Solid Waste Incerneration
Large
( 0 * $90.00
General Industry
( 0 * $90.00
Small
State
( 0 * $90.00
Government
( 0 * $90.00
Local
SECTOR 30. Superalloy Producers and Users
Large
( 0 * $90.00
ALL
( 0 * $90.00
Small
SECTOR 31. Construction
Large
( 0 * $90.00
Small
State
Item 13 COST
# PLANTS
% CONT
% ABOVEAL
% NOTSEMI
SEMI ‐ ANNUALLY
CONTCOST
CONTCOST (2003
SEMICONTTIME
Table 4
$ 112.44 * 2 * 100% *
0.00%
* 100% ) *
148
=
$0
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 100% ) *
79
36
=
=
$0
$0
$ 112.44 * 2 * 100% * 0.00% * 100% ) *
$ 112.44 * 2 * 100% * 22.00% * 100% ) *
32
1,162
=
=
$0
$689,722
$ 112.44 * 2 * 100% * 22.00% * 100% ) *
$ 112.44 * 2 * 100% * 22.00% * 100% ) *
4,650
12
=
=
$2,760,742
$6,936
$ 112.44 * 2 * 100% * 22.00% * 100% ) *
42
=
$25,077
$ 112.44 * 2 * 100% *
0.00%
*
90%
)*
40
=
$0
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
25%
)*
)*
48
0
=
=
$0
$0
$ 112.44 * 2 * 100% *
0.00%
*
90%
)*
24
=
$0
$ 112.44 * 2 * 100% *
0.00%
* 100% ) *
19
=
$0
$ 112.44 * 2 * 100% *
0.00%
*
)*
0
=
$0
$ 112.44 * 2 * 100% *
0.00%
* 100% ) *
51
=
$0
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 100% ) *
233
15
=
=
$0
$0
Local
Large
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 90% ) *
88
40
=
=
$0
$0
Hazardous Waste‐site Small
Work
State
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% *
$ 112.44 * 2 * 100% *
0.00%
0.00%
*
*
90%
90%
)*
)*
170
1
=
=
$0
$0
Local
Large
( 0 * $90.00
( 0 * $90.00
$ 112.44 * 2 * 100% * 0.00% *
$ 112.44 * 2 * 100% * 60.00% *
90%
90%
)*
)*
239
44
=
=
$0
$0
Small
( 0 * $90.00
$ 112.44 * 2 * 100% * 60.00% *
90%
Total
)*
175
75,684
=
=
$0
$13,358,026
Industrial
Rehabilitation
Refractory Brick
Restoration
Page 30
0%
Table 5
Semi‐Annual Exposure Monitoring (Paragraph (d)(2)(iii)); Contract Cost for a Laboratory to Conduct Analysis
of Semi‐Annual Exposure Monitoring Air Samples
This table calculates the contract cost for the employer to have a laboratory conduct analysis of air samples
collected during semi‐annual exposure monitoring.
Item 13 COST
#PLANTS
%ABOVEAL
%NOTSEMI
SEMI
#SAMPS
SHIFTS
JOBAL
SAMPCOST
Cost = (SAMPCOST * JOBAL * SHIFTS * #SAMPS * 2 * %NOTSEMI * %ABOVE AL) * #PLANTS
Variables:
* SAMPCOST = Variable cost per sample = $77
* JOBAL = Number of job categories exposed at or above the AL.
* SHIFTS = Number of work shifts.
* #SAMPS = Number of samples per exposure measurement.
* 2 = 2 times per year (semi‐annual).
* %NOTSEMI = Percent of plants not performing semi‐annual monitoring requirements.
* %ABOVEAL = Percent of plants that have an employee in at least one job category at or above the AL.
* #PLANTS = Number of plants represented by the model input.
Sector 1. Electroplating
Large (
$77 * 1 * 2 * 3 * 2 * 100% *
49%
) *
883
=
$399,583
Small (
Large (
$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 2 * 3 * 2 * 100% *
49%
11%
) *
1,662
426
=
$376,009
$43,219
Small (
Large (
$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 2 * 3 * 2 * 100% *
11%
14%
) *
801
580
=
Small (
Large (
$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 2 * 3 * 2 * 100% *
14%
10%
) *
1,092
426
=
Small (
Large (
$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 2 * 3 * 2 * 100% *
10%
13%
) *
801
503
=
Small (
Large (
$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 2 * 3 * 2 * 100% *
13%
16%
) *
946
883
=
) *
=
$56,774
$130,476
Small (
$77 * 1 * 1 * 3 * 2 * 100% *
16%
) *
1,662
=
$122,778
Sector 2. Welding
SMAW
Large (
$77 * 1 * 3 * 2 * 2 * 100% *
0.92%
) *
3,535
=
$30,028
Small (
Large (
$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 3 * 2 * 2 * 100% *
0.92%
0.73%
) *
3,962
2,593
=
GMAW
$16,824
$17,478
$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 3 * 2 * 2 * 100% *
0.73%
0%
) *
) *
2,905
786
=
TIG
Small (
Large (
=
$9,790
$0
Small (
$77 * 1 * 1 * 3 * 2 * 100 *
0%
) *
880
=
$0
Hard Chrome
) *
=
Job Shop Chrome Plater
Captive Shop Chrome
Plater
) *
) *
=
=
$40,662
$74,984
$70,573
$39,290
Job Shop Plater
) *
=
$36,965
$60,322
Captive Shop Plater
Operator
General Industry
Page 31
) *
=
Item 13 COST
#PLANTS
%ABOVEAL
%NOTSEMI
SEMI
#SAMPS
SHIFTS
JOBAL
SAMPCOST
Table 5
Large (
$77 * 0 * 3 * 2 * 2 * 100% *
0%
) *
314
=
$0
Small (
Large (
$77 * 0 * 1 * 3 * 2 * 100% *
$77 * 1 * 3 * 2 * 2 * 100% *
0%
0%
) *
352
78
=
$0
$0
Small (
Large (
$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 3 * 2 * 2 * 100% *
0%
0%
) *
88
78
=
Small (
Large (
$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 3 * 2 * 2 * 100% *
0%
0%
) *
88
472
=
) *
=
$0
$0
$77 * 1 * 1 * 3 * 2 * 100% *
Maritime
Large ( $77 * 1 * 3 * 1 * 2 * 100% *
0%
) *
529
=
$0
0%
) *
17
=
$0
Small (
Large (
$77 * 1 * 2 * 1 * 2 * 100% *
$77 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
10
24
=
$0
$0
Small (
Large (
$77 * 1 * 2 * 1 * 2 * 100% *
$77 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
14
6
=
Small ( $77 * 1 * 2 * 1 * 2 * 100% *
Large ( $77 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
3
116
=
Small ( $77 * 1 * 2 * 1 * 2 * 100% *
Large ( $77 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
66
4
=
Small ( $77 * 1 * 2 * 1 * 2 * 100% *
Large ( $77 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
2
2
=
Small ( $77 * 1 * 2 * 1 * 2 * 100% *
Large ( $77 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
1
4
=
Small ( $77 * 1 * 2 * 1 * 2 * 100% *
Large ( $77 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
2
2
=
Small ( $77 * 1 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
1
0
=
Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
0
0
=
Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
0
15
=
) *
=
$0
$0
Small ( $77 * 0 * 2 * 1 * 2 * 100% *
0%
) *
9
=
$0
SAW
) *
=
Plasma Cutting
) *
=
$0
$0
Plasma Welding
Resistance Welding
Small (
SMAW
) *
=
GMAW
) *
=
$0
$0
TIG
) *
=
$0
$0
FCAW
) *
=
$0
$0
Plasma Cutting
) *
=
$0
$0
Plasma Welding
) *
=
$0
$0
Oxy‐fuel Cutting
) *
=
$0
$0
Air Carbon Arc Cutting
) *
=
$0
$0
Electric Torch Cutting
Thermal Spray Tungsten
Cutting
) *
=
$0
$0
SAW
Page 32
Item 13 COST
#PLANTS
%ABOVEAL
%NOTSEMI
SEMI
#SAMPS
SHIFTS
JOBAL
SAMPCOST
Table 5
CONSTRUCTION
Large ( $77 * 1 * 3 * 1 * 2 * 100% *
0%
) *
201
=
$0
Small ( $77 * 1 * 1 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
1,609
3
=
$0
$0
Small ( $77 * 1 * 1 * 1 * 2 * 100% *
Large ( $77 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
21
41
=
Small ( $77 * 1 * 1 * 1 * 2 * 100% *
State ( $77 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
322
20
=
Local ( $77 * 1 * 1 * 1 * 2 * 100% *
State ( $77 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
161
4
=
) *
=
$0
$0
Local ( $77 * 1 * 1 * 1 * 2 * 100% *
GOVERNMENT
State ( $77 * 1 * 1 * 1 * 2 * 100% *
0%
) *
32
=
$0
0%
) *
19
=
$0
Local ( $77 * 1 * 1 * 1 * 2 * 100% *
State ( $77 * 1 * 1 * 1 * 2 * 100% *
0%
0%
) *
590
0
=
$0
$0
Local ( $77 * 1 * 1 * 1 * 2 * 100% *
State ( $77 * 1 * 1 * 1 * 2 * 100% *
0%
0%
) *
8
4
=
Local ( $77 * 1 * 1 * 1 * 2 * 100% *
State ( $77 * 1 * 1 * 1 * 2 * 100% *
0%
0%
) *
118
2
=
Local ( $77 * 1 * 1 * 1 * 2 * 100% *
State ( $77 * 1 * 1 * 1 * 2 * 100% *
0%
0%
) *
59
1
=
) *
=
$0
$0
* 100% *
0%
) *
12
=
$0
* 100% *
0%
) *
4,740
=
$0
* 100% *
0%
0%
) *
4,826
3,476
=
$0
$0
0%
0%
) *
3,539
1,053
=
) *
) *
1,073
421
=
* 100% *
0%
0%
=
$0
$0
* 100% *
0%
) *
429
=
$0
SMAW
) *
=
Plasma Cutting
) *
=
$0
$0
GMAW
) *
=
$0
$0
Brazing
Metallizing
SMAW
) *
=
Plasma Cutting
) *
=
$0
$0
GMAW
) *
=
$0
$0
Brazing
Metallizing
Local ( $77 * 1 * 1 * 1 * 2
Sector 2. Mild Steel Welding GENERAL INDUSTRY
Large ( $77 * 0 * 3 * 2 * 2
SMAW
Small ( $77 * 0 * 1 * 3 * 2
Large ( $77 * 0 * 3 * 2 * 2
GMAW
Small ( $77 * 0 * 1 * 3 * 2
Large ( $77 * 0 * 3 * 2 * 2
TIG
Small ( $77 * 0 * 1 * 3 * 2
Large ( $77 * 0 * 3 * 2 * 2
SAW
Small ( $77 * 0 * 1 * 3 * 2
Page 33
* 100% *
* 100% *
* 100% *
* 100 *
) *
) *
=
=
$0
$0
Item 13 COST
#PLANTS
%ABOVEAL
%NOTSEMI
SEMI
#SAMPS
SHIFTS
JOBAL
SAMPCOST
Table 5
Large (
$77 * 0 * 3 * 2 * 2 * 100% *
0%
) *
105
=
$0
Small (
Large (
$77 * 0 * 1 * 3 * 2 * 100% *
$77 * 0 * 3 * 2 * 2 * 100% *
0%
0%
) *
107
105
=
$0
$0
Small (
Large (
$77 * 0 * 1 * 3 * 2 * 100% *
$77 * 0 * 3 * 2 * 2 * 100% *
0%
0%
) *
107
632
=
) *
=
$0
$0
$77 * 0 * 1 * 3 * 2 * 100% *
Maritime
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
) *
644
=
$0
0%
) *
37
=
$0
Small (
Large (
$77 * 0 * 2 * 1 * 2 * 100% *
$77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
21
53
=
$0
$0
Small (
Large (
$77 * 0 * 2 * 1 * 2 * 100% *
$77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
30
13
=
Small (
Large (
$77 * 0 * 2 * 1 * 2 * 100% *
$77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
7
249
=
Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
141
8
=
Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
5
3
=
Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
2
8
=
Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
5
3
=
Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
2
1
=
Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
0
1
=
Small ( $77 * 0 * 2 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
0
33
=
) *
=
$0
$0
Small ( $77 * 0 * 2 * 1 * 2 * 100% *
0%
) *
18
=
$0
Plasma Cutting
) *
=
Plasma Welding
Resistance Welding
Small (
SMAW
) *
=
GMAW
) *
=
$0
$0
TIG
) *
=
$0
$0
FCAW
) *
=
$0
$0
Plasma Cutting
) *
=
$0
$0
Plasma Welding
) *
=
$0
$0
Oxy‐fuel Cutting
) *
=
$0
$0
Air Carbon Arc Cutting
) *
=
$0
$0
Electric Torch Cutting
Thermal Spray Tungsten
Cutting
) *
=
$0
$0
SAW
Page 34
Item 13 COST
#PLANTS
%ABOVEAL
%NOTSEMI
SEMI
#SAMPS
SHIFTS
JOBAL
SAMPCOST
Table 5
CONSTRUCTION
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
) *
301
=
$0
Small ( $77 * 0 * 1 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
2,277
4
=
$0
$0
Small ( $77 * 0 * 1 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
30
60
=
Small ( $77 * 0 * 1 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
455
30
=
Small ( $77 * 0 * 1 * 1 * 2 * 100% *
Large ( $77 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
228
6
=
) *
=
$0
$0
Small ( $77 * 0 * 1 * 1 * 2 * 100% *
0%
) *
45
=
$0
Large (
$77 * 1 * 3 * 3 * 2 * 100% *
28%
) *
49
=
$18,965
Small (
Large (
$77 * 1 * 1 * 3 * 2 * 100% *
$77 * 1 * 1 * 1 * 2 * 100% *
9%
5%
) *
62
326
=
$2,559
$2,509
Small ( $77 * 1 * 1 * 1 * 2 * 100% *
Large ( $77 * 1 * 2 * 3 * 2 * 100% *
5%
8%
) *
1,436
100
=
Small ( $77 * 1 * 1 * 3 * 2 * 100% *
Large ( $77 * 2 * 3 * 1 * 2 * 100% *
8%
36%
) *
18
276
=
Small ( $77 * 0 * 1 * 1 * 2 * 100% *
Large ( $77 * 1 * 3 * 1 * 2 * 100% *
36%
22%
) *
476
671
=
Small ( $77 * 1 * 1 * 1 * 2 * 100% *
State ( $77 * 1 * 3 * 1 * 2 * 100% *
22%
12%
) *
3,566
12
=
) *
=
$120,728
$647
* 1 * 1 * 1 * 2 * 100% *
12%
) *
647
=
$11,940
* 3 * 3 * 3 * 2 * 100% *
45%
) *
2
=
$3,580
* 0 * 1 * 3 * 2 * 100% *
0%
) *
0
=
$0
* 5 * 2 * 3 * 2 * 100% *
71%
) *
2
=
$5,898
* 1 * 1 * 3 * 2 * 100% *
50%
) *
1
=
$208
SMAW
) *
=
Plasma Cutting
) *
=
$0
$0
GMAW
) *
=
$0
$0
Brazing
Metallizing
SECTOR 3. PAINTING
AEROSPACE
General Industry
(Autobody)
General Industry (Coil
Coating)
) *
) *
) *
=
=
=
$11,045
$7,359
$669
$91,566
Maritime
) *
=
$0
$68,128
Construction
Government
Local ( $77
SECTOR 4. Producers of Chromates
Large ( $77
ALL
Small ( $77
SECTOR 5. Chromate Pigment Procedures
Large ( $77
ALL
Small ( $77
Page 35
Item 13 COST
#PLANTS
%ABOVEAL
%NOTSEMI
SEMI
#SAMPS
SHIFTS
JOBAL
SAMPCOST
Table 5
SECTOR 6. CCA Producers
Large (
$77 * 1 * 3 * 3 * 2 * 100% *
33%
) *
2
=
$1,080
*
3 * 0 * 2 * 100% *
0%
) *
0
=
$0
*
3 * 3 * 2 * 100% *
100%
) *
5
=
$39,780
*
1 * 3 * 2 * 100% *
0%
) *
0
=
$0
*
2 * 3 * 2 * 100% *
13%
) *
80
=
$9,653
*
2 * 3 * 2 * 100% *
13%
) *
126
=
$15,169
*
1 * 9 * 2 * 100% *
69%
) *
2
=
$7,161
*
1 * 5 * 2 * 100% *
69%
) *
8
=
$8,840
*
3 * 3 * 2 * 100% *
51%
) *
81
=
$115,088
*
1 * 3 * 2 * 100% *
51%
) *
40
=
$18,764
*
1 * 3 * 2 * 100% *
100%
) *
6
=
$2,605
*
1 * 3 * 2 * 100% *
100%
) *
4
=
$1,737
*
3 * 3 * 2 * 100% *
100%
) *
1
=
$2,515
*
1 * 1 * 2 *
*
0%
) *
0
=
$0
*
3 * 3 * 2 * 100% *
38%
) *
34
=
$53,426
*
1 * 3 * 2 * 100% *
3 * 3 * 2 * 100% *
38%
0%
) *
) *
11
102
=
*
=
$1,904
$0
*
1 * 1 * 2 * 100% *
0%
) *
32
=
$0
*
1 * 3 * 2 * 100% *
63%
) *
33
=
$38,624
*
1 * 3 * 2 * 100% *
63%
) *
31
=
$18,198
*
3 * 5 * 2 * 100% *
100%
) *
163
=
$2,253,289
*
1 * 5 * 2 * 100% *
100%
) *
118
=
$455,210
ALL
$77 * 0
SECTOR 7. Chromium Catalyst Producers
Large ( $77 * 6
ALL
Small ( $77 * 0
SECTOR 8. Paint and Coating Producers
Large ( $77 * 1
ALL
Small ( $77 * 1
SECTOR 9. Printing Ink Producers
Large ( $77 * 3
ALL
Small ( $77 * 2
SECTOR 10. Plastic Colorant Producers and Users
Large ( $77 * 2
ALL
Small ( $77 * 2
SECTOR 11. Plating Mixture Producers
Large ( $77 * 1
ALL
Small ( $77 * 1
SECTOR 13. Chromium Metal Producers
Large ( $77 * 2
ALL
Small ( $77 * 0
SECTOR 14. Iron and Steel Mills
Large ( $77 * 3
Alloy Stainless Steel
Small ( $77 * 1
Large ( $77 * 0
Carbon Steel
Small ( $77 * 0
14B. Forging Industry
Large ( $77 * 4
Forging Industry
Small ( $77 * 2
SECTOR 15. Iron and Steel Foundries
Large ( $77 * 6
ALL
Small ( $77 * 5
Small (
Page 36
0%
Item 13 COST
#PLANTS
%ABOVEAL
%NOTSEMI
SEMI
#SAMPS
SHIFTS
JOBAL
SAMPCOST
Table 5
SECTOR 17. Chromium Dye Producers
Large (
$77 * 6 * 1 * 21 * 2 * 100% *
38%
) *
3
=
$19,886
* 6 * 1 * 7 * 2 * 100% *
38%
) *
1
=
$2,210
* 0 * 1 * 3 * 2 * 100% *
0%
) *
0
=
$0
* 1 * 1 * 3 * 2 * 100% *
27%
) *
5
=
$597
* 0 * 1 * 3 * 2 * 100% *
0%
) *
216
=
$0
* 0 * 1 * 3 * 2 * 100% *
0%
) *
1,627
=
$0
* 0 * 3 * 3 * 2 * 100% *
0%
) *
343
=
$0
* 0 * 1 * 2 * 2 * 100% *
0%
) *
697
=
$0
* 1 * 3 * 12 * 2 * 100% *
25%
) *
6
=
$8,709
* 0 * 1 * 4 * 2 * 100% *
* 3 * 1 * 1 * 2 * 100% *
0%
20%
) *
20
90
=
) *
=
$0
$8,322
* 0 * 1 * 1 * 2 * 100% *
0%
) *
5
=
$0
* 0 * 3 * 2 * 2 * 100% *
0%
) *
81
=
$0
* 0 * 1 * 2 * 2 * 100% *
0%
) *
325
=
$0
* 2 * 3 * 3 * 2 * 100% *
9%
) *
179
=
$44,587
* 0 * 1 * 3 * 2 * 100% *
* 0 * 3 * 3 * 2 * 100% *
0%
0%
) *
=
) *
0
23
=
$0
$0
* 0 * 1 * 3 * 2 * 100% *
0%
) *
4
=
$0
* 0 * 1 * 15 * 2 * 100% *
0%
) *
5
=
$0
* 0 * 1 * 0 * 2 * 100% *
0%
) *
0
=
$0
* 0 * 1 * 2 * 2 * 100% *
0%
) *
148
=
$0
* 0 * 1 * 2 * 2 * 100% *
* 0 * 1 * 1 * 2 * 100% *
0%
0%
) *
79
36
=
) *
=
$0
$0
* 0 * 1 * 1 * 2 * 100% *
0%
) *
32
=
$0
ALL
$77
SECTOR 18. Chromium Sulfate Producers
Large ( $77
ALL
Small ( $77
SECTOR 19. Chemical Distributors
Large ( $77
ALL
Small ( $77
SECTOR 20. Textile Dyeing
Large ( $77
ALL
Small ( $77
SECTOR 21. Colored Glass Producers
Large ( $77
General Industry
Small ( $77
Large ( $77
Fiber, Flat, and Container
Glass
Small ( $77
SECTOR 22. Printing
Large ( $77
ALL
Small ( $77
SECTOR 24. Chromium Catalyst Users
Large ( $77
Catalyst User
Small ( $77
Large ( $77
Chromium Catalyst Service
Companies
Small ( $77
SECTOR 25. Refractory Brick Producers
Large ( $77
ALL
Small ( $77
SECTOR 26. Woodworking
Large ( $77
General Industry
Small ( $77
Large ( $77
Maritime
Small ( $77
Small (
Page 37
Item 13 COST
#PLANTS
%ABOVEAL
%NOTSEMI
SEMI
#SAMPS
SHIFTS
JOBAL
SAMPCOST
Table 5
Large (
$77 * 1 * 1 * 1 * 2 * 100% *
22%
) *
1,162
=
$39,328
Small (
State (
$77 * 1 * 1 * 1 * 2 * 100% *
$77 * 1 * 1 * 1 * 2 * 100% *
22%
22%
) *
4,650
12
=
) *
=
$157,416
$395
1 * 1 * 1 * 2 * 100% *
2
0 * 3 * 15 * 2 * 100% *
22%
) *
42
=
$1,430
0%
) *
40
=
$0
0 * 1 * 3 * 2 * 100% *
0 * 3 * 15 * 2 * 100% *
0%
0%
) *
48
0
=
) *
=
$0
$0
0 * 1 * 3 * 2 * 100% *
2
0 * 3 * 3 * 2 * 100% *
0%
) *
24
=
$0
0%
) *
19
=
$0
0 * 3 * 3 * 2 * 100% *
0%
) *
0
=
$0
0 * 1 * 1 * 2 * 100% *
0%
) *
51
=
$0
Small ( $77 * 0 * 1 * 1 * 2 * 100% *
State ( $77 * 0 * 1 * 1 * 2 * 100% *
0%
0%
) *
233
15
=
$0
$0
Local ( $77 * 0 * 1 * 1 * 2 * 100% *
Large ( $77 * 0 * 1 * 1 * 2 * 100% *
0%
0%
) *
88
40
=
Small ( $77 * 0 * 1 * 1 * 2 * 100% *
State ( $77 * 0 * 1 * 1 * 2 * 100% *
0%
0%
) *
170
1
=
Local ( $77 * 0 * 1 * 1 * 2 * 100% *
Large ( $77 * 0 * 1 * 1 * 2 * 100% *
0%
60%
) *
239
44
=
Small ( $77 * 0 * 1 * 1 * 2 * 100% *
60%
TOTAL
) *
Construction
Government
Local ( $77 *
SECTOR 27. Solid Waste Incerneration
Large ( $77 *
General Industry
Small ( $77 *
State ( $77 *
Government
Local ( $77 *
SECTOR 30. Superalloy Producers and Users
Large ( $77 *
ALL
Small ( $77 *
SECTOR 31. Construction
Large ( $77 *
Industrial Rehabilitation
Hazardous Waste‐site
Work
Refractory Brick
Restoration
Page 38
) *
) *
) *
) *
=
=
=
=
175
=
75,684
$0
$0
$0
$0
$0
$0
$0
$5,197,478
Table 6
Quarterly Exposure Monitoring (Paragraph (d)(2)(iv)); Employee Time and Cost to Conduct Quarterly Exposure Monitoring
When initial monitoring results exceed the PEL, periodic monitoring every three months allows the employer to maintain an accurate
profile of employee exposures. If the employer installs or upgrades controls, quarterly monitoring will demonstrate whether the controls
are working properly.
HOURS = (ADMINTIME * JOBPEL * SHIFTS * #SAMPS * 4* %NOTQUART * %ABOVEPEL * (%INHOUSE + %LEARN)) *
#PLANTS
COST = (NONSUPEWAGE * BURDEN HOURS)
Variable
*ADMINTIME =
* NONSUPEWAGE =
* JOBPEL =
* SHIFTS =
* #SAMPS =
*4 =
* %NOTQUART =
* %ABOVEPEL =
* %INHOUSE =
* %LEARN =
* #PLANTS =
In‐house administrative time
Non‐supervisory wage rate, $/hr
Number of job categories exposed above the PEL
Number of work shifts.
Number of samples per exposure measurement.
Four times per year (Quarterly).
Percent of plants not performing quarterly monitoring requirements.
Percent of plants that have an employee in at least one job category above the PEL.
Percent of plantsalready with in‐house monitoring capabilities.
Percent of plants that will develop in house monitoring capability.
Number of plants represented by the model output.
RESPONSES
=
0
0
* ( 0% + 0% )) *
* ( 0% + 0% )) *
1,662
426
=
=
$0
$0
=
=
0
0
0
0
0%
0%
* ( 0% + 0% )) *
* ( 0% + 0% )) *
801
580
=
=
$0
$0
=
=
0
0
0
0
Small ( 0.50 * $ 26.61 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $ 26.61 * 0 * 2 * 3 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 0% + 0% )) *
1,092
426
=
=
$0
$0
=
=
0
0
0
0
Small ( 0.50 * $ 26.61 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $ 26.61 * 0 * 2 * 3 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 0% + 0% )) *
801
503
=
=
$0
$0
=
=
0
0
0
0
Small ( 0.50 * $ 26.61 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $ 26.61 * 0 * 2 * 3 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 0% + 0% )) *
946
883
=
=
$0
$0
=
=
0
0
0
0
0
Small ( 0.50 * $ 26.61 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $ 26.61 * 0 * 2 * 3 * 4 * 100% *
0%
0%
Small ( 0.50 * $ 26.61 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $ 26.61 * 0 * 2 * 3 * 4 * 100% *
# SAMPS
0
SHIFTS
* ( 0% +
JOBPEL
0%
ADMINTIME
*
# PLANTS
$0
% LEARN
=
% INHOUSE
883
% ABOVEPEL
TOTAL HOURS
Item 12 COSTS
% NOTQUART
NONSUPEWAGE
24.17%
Sector 1. Electroplating
Large ( 0.50 * $ 26.61 * 0 * 2 * 3 * 4 *
)) *
Hard Chrome
Job Shop Chrome
Plater
Captive Shop
Chrome Plater
Job Shop Plater
Captive Shop Plater
Operator
Small
Sector 2. Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
( 0.50 * $ 26.61 * 1 * 1 * 3 * 4 * 100% *
0% * ( 0% + 0% )) *
GENERAL INDUSTRY
( 0.50 * $ 26.20 * 1 * 3 * 2 * 4 * 100% * 4.85% * ( 10% + 0% )) *
1,662
=
$0
=
0
3,535
=
$141,238
=
5,391
412
( 1.00 * $ 26.20 * 1 * 1 * 3 * 4 * 100% * 4.84% * ( 0% + 0% )) *
( 0.50 * $ 26.20 * 1 * 3 * 2 * 4 * 100% * 0.37% * ( 10 + 0% )) *
3,962
2,593
=
=
$0
$790,373
=
=
0
30,167
0
2,180
( 1.00 * $ 26.20 * 1 * 1 * 3 * 4 * 100% * 0.38% * ( 0% + 0% )) *
( 0.50 * $ 26.20 * 1 * 3 * 2 * 4 * 100% * 0% * ( 10% + 0% )) *
2,905
786
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 26.20 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $ 26.20 * 0 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
880
314
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 26.20 * 0 * 1 * 3 * 4 * 100% *
( 0.50 * $ 26.20 * 1 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
352
78
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 26.20 * 1 * 1 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
88
=
$0
=
0
0
Page 39
RESPONSES
0
0
Small ( 1.00 * $ 26.20 * 1 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 1 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
88
472
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 1 * 1 * 3 * 4 * 100% * 0%
MARITIME
Large ( 0.50 * $ 26.20 * 1 * 3 * 1 * 4 * 100% * 0%
* ( 0% + 0% )) *
529
=
$0
=
0
0
* ( 50% + 0% )) *
17
=
$0
=
0
0
# PLANTS
=
% LEARN
$0
% INHOUSE
=
% ABOVEPEL
78
# SAMPS
* ( 10% + 0% )) *
SHIFTS
0%
JOBPEL
Large ( 0.50 * $ 26.20 * 1 * 3 * 2 * 4 * 100% *
ADMINTIME
TOTAL HOURS
Item 12 COSTS
% NOTQUART
NONSUPEWAGE
Table 6
Plasma Welding
Resistance Welding
SMAW
Small ( 1.00 * $ 26.20 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
10
24
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
14
6
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
3
116
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
66
4
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
2
2
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
1
4
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
2
2
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
1
0
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
0
0
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
0
15
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 1 * 2 * 1 * 4 * 100% * 0%
CONSTRUCTION
Large ( 0.50 * $ 26.20 * 1 * 3 * 1 * 4 * 100% * 0%
* ( 10% + 0% )) *
9
=
$0
=
0
0
* ( 5% + 0% )) *
201
=
$0
=
0
0
Small ( 1.00 * $ 26.20 * 1 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
1,609
3
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 1 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
21
41
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 1 * 1 * 1 * 4 * 100% *
State ( 0.50 * $ 26.20 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
322
20
=
=
$0
$0
=
=
0
0
0
0
Local
State
( 1.00 * $ 26.20 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $ 26.20 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
161
4
=
=
$0
$0
=
=
0
0
0
0
Local
( 1.00 * $ 26.20 * 1 * 1 * 1 * 4 * 100% *
0%
* ( 0% + 0% )) *
32
=
$0
=
0
0
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Thermal Spray
Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Page 40
RESPONSES
0
0
Local
State
( 1.00 * $ 26.20 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $ 26.20 * 1 * 1 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
590
0
=
=
$0
$0
=
=
0
0
0
0
Local
State
( 1.00 * $ 26.20 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $ 26.20 * 1 * 1 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
8
4
=
=
$0
$0
=
=
0
0
0
0
Local
State
( 1.00 * $ 26.20 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $ 26.20 * 1 * 1 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
118
2
=
=
$0
$0
=
=
0
0
0
0
Local
State
( 1.00 * $ 26.20 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $ 26.20 * 1 * 1 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
59
1
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 26.20 * 1 * 1 * 1 * 4 * 100% *
12
=
$0
=
0
0
( 0.50 * $ 26.20 * 1 * 3 * 2 * 4 * 100% *
0% * ( 0% + 0% )) *
General Industry
0% * ( 10% + 0% )) *
4,740
=
$0
=
0
0
( 1.00 * $ 26.20 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $ 26.20 * 1 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
4,826
3,476
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 26.20 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $ 26.20 * 1 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
3,539
1,053
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 26.20 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $ 26.20 * 0 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
1,073
421
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 26.20 * 0 * 1 * 3 * 4 * 100% *
( 0.50 * $ 26.20 * 1 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
429
105
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 26.20 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $ 26.20 * 1 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
107
105
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 26.20 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $ 26.20 * 1 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
107
632
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 26.20 * 1 * 1 * 3 * 4 * 100% * 0%
MARITIME
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% * 0%
* ( 0% + 0% )) *
644
=
$0
=
0
0
* ( 50% + 0% )) *
37
=
$0
=
0
0
Small ( 1.00 * $ 26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
21
53
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
30
13
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
7
249
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
141
8
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
5
3
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 0 * 2 * 1 * 4 * 100% *
0%
* ( 10% + 0% )) *
2
=
$0
=
0
0
# PLANTS
=
% LEARN
$0
% INHOUSE
=
% ABOVEPEL
19
# SAMPS
* ( 5% + 0% )) *
SHIFTS
GOVERNMENT
( 0.50 * $ 26.20 * 1 * 1 * 1 * 4 * 100% * 0%
JOBPEL
State
ADMINTIME
TOTAL HOURS
Item 12 COSTS
% NOTQUART
NONSUPEWAGE
Table 6
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Local
Sector 2. Mild Steel Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
Small
Large
Resistance Welding
Small
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Page 41
RESPONSES
$0
=
0
0
Small ( 1.00 * $ 26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
5
3
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
2
1
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
0
1
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
0
33
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 0 * 2 * 1 * 4 * 100% * 0%
CONSTRUCTION
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% * 0%
* ( 10% + 0% )) *
18
=
$0
=
0
0
* ( 5% + 0% )) *
301
=
$0
=
0
0
Small ( 1.00 * $ 26.20 * 0 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
2,277
4
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 0 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
30
60
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 26.20 * 0 * 1 * 1 * 4 * 100% *
State ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
455
30
=
=
$0
$0
=
=
0
0
0
0
Local
State
( 1.00 * $ 26.20 * 0 * 1 * 1 * 4 * 100% *
( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
228
6
=
=
$0
$0
=
=
0
0
0
0
Local
( 1.00 * $ 26.20 * 0 * 1 * 1 * 4 * 100% *
0%
* ( 0% + 0% )) *
45
=
$0
=
0
0
Large ( 0.50 * $ 33.07 * 1 * 3 * 3 * 4 * 100% *
28%
* ( 75% + 0% )) *
49
=
$202,146
=
6,113
390
Small ( 1.00 * $ 33.07 * 1 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $ 33.07 * 0 * 1 * 1 * 4 * 100% *
9%
5%
* ( 25% + 0% )) *
* 75% + 0%
*
62
326
=
=
$18,182
$0
=
=
550
0
17
49
Small ( 1.00 * $ 33.07 * 2 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $ 33.07 * 0 * 2 * 3 * 4 * 100% *
5%
8%
*
*
25% + 0%
75% + 0%
*
*
1,436
100
=
=
$156,967
$0
=
=
4,747
0
144
150
Small ( 1.00 * $ 33.07 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $ 33.07 * 1 * 3 * 1 * 4 * 100% *
8%
36%
*
*
25% + 0%
90% + 0%
*
*
18
276
=
=
$0
$585,590
=
=
0
17,710
0
1,071
Small ( 1.00 * $ 33.07 * 1 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $ 33.07 * 1 * 3 * 1 * 4 * 100% *
36%
22%
*
*
10% + 0%
75% + 0%
*
*
476
671
=
=
$74,998
$726,160
=
=
2,268
21,961
69
2,056
Small ( 1.00 * $ 33.07 * 1 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $ 33.07 * 1 * 3 * 1 * 4 * 100% *
22%
12%
*
*
50% + 0%
75% + 0%
*
*
3,566
12
=
=
$1,715,767
$6,898
=
=
51,889
209
1,569
13
* 1 * 1 * 1 * 4 * 100% *
12%
*
75% + 0%
*
647
=
$254,524
=
7,697
233
* 0 * 3 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
2
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
0
=
$0
=
0
0
* 1 * 2 * 3 * 4 * 100% *
77%
* ( 0% + 0% )) *
2
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
1
=
$0
=
0
0
% LEARN
% INHOUSE
# PLANTS
=
% ABOVEPEL
8
# SAMPS
* ( 50% + 0% )) *
SHIFTS
0%
JOBPEL
Large ( 0.50 * $ 26.20 * 0 * 3 * 1 * 4 * 100% *
ADMINTIME
TOTAL HOURS
Item 12 COSTS
% NOTQUART
NONSUPEWAGE
Table 6
Oxy‐fuel Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Thermal Spray
Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
SECTOR 3. PAINTING
AEROSPACE
AUTOBODY
COIL COATING
MARITIME
CONSTRUCTION
GOVERNMENT
Small ( 1.00 * $ 33.07
SECTOR 4. Producers of Chromates
Large ( 0.50 * $ 38.68
ALL
Small ( 1.00 * $ 38.68
SECTOR 5. Chromate Pigment Procedures
Large ( 0.50 * $ 37.70
ALL
Small ( 1.00 * $ 37.70
Page 42
$0
=
0
0
* 0 * 3 * 0 * 4 * 100% *
0%
* ( 0% + 0% )) *
0
=
$0
=
0
0
* 0 * 3 * 3 * 4 * 100% *
0%
* ( 80% + 0% )) *
5
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
0
=
$0
=
0
0
* 0 * 2 * 3 * 4 * 100% *
0%
* ( 25% + 75% )) *
80
=
$0
=
0
0
* 0 * 2 * 3 * 4 * 100% *
0%
* ( 25% + 75% )) *
126
=
$0
=
0
0
* 0 * 1 * 9 * 4 * 100% *
0%
* ( 10% + 0% )) *
2
=
$0
=
0
0
* 0 * 1 * 5 * 4 * 100% *
0%
* ( 10% + 0% )) *
8
=
$0
=
0
0
* 3 * 3 * 3 * 4 * 100% *
36%
* ( 0% + 0% )) *
81
=
$0
=
0
0
* 5 * 1 * 3 * 4 * 100% *
36%
* ( 0% + 0% )) *
40
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 20% + 0% )) *
6
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 25% + 0% )) *
4
=
$0
=
0
0
* 0 * 3 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
1
=
$0
=
0
0
* 0 * 1 * 1 *4*
*
0%
* ( 0% + 0% )) *
0
=
$0
=
0
0
* 0 * 3 * 3 * 4 * 100% *
0%
* ( 10% + 0% )) *
34
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
* 0 * 3 * 3 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 10% + 0% )) *
11
102
=
=
$0
$0
=
=
0
0
0
0
* 0 * 1 * 1 * 4 * 100% *
0%
* ( 10% + 0% )) *
32
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
63%
* ( 10% + 0% )) *
33
=
$0
=
0
25
* 0 * 1 * 3 * 4 * 100% *
63%
* ( 10% + 0% )) *
31
=
$0
=
0
0
* 0 * 3 * 5 * 4 * 100% *
0%
* ( 10% + 0% )) *
163
=
$0
=
0
0
* 0 * 1 * 5 * 4 * 100% *
0%
* ( 10% + 0% )) *
118
=
$0
=
0
0
* 7 * 1 * 21 * 4 * 100% *
62%
* ( 0% + 0% )) *
3
=
$0
=
0
0
* 5 * 1 * 7 * 4 * 100% *
62%
* ( 0% + 0% )) *
1
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
0
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
5
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
216
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
1,627
=
$0
=
0
0
0%
Page 43
# PLANTS
=
% LEARN
2
% INHOUSE
* ( 0% + 0% )) *
% ABOVEPEL
RESPONSES
Item 12 COSTS
% NOTQUART
0%
# SAMPS
* 0 * 3 * 3 * 4 * 100% *
SHIFTS
TOTAL HOURS
SECTOR 6. CCA Producers
Large ( 0.50 * $ 31.94
ALL
Small ( 1.00 * $ 31.94
SECTOR 7. Chromium Catalyst Producers
Large ( 0.50 * $ 38.68
ALL
Small ( 1.00 * $ 38.68
SECTOR 8. Paint and Coating Producers
Large ( 0.50 * $ 28.81
ALL
Small ( 1.00 * $ 28.81
SECTOR 9. Printing Ink Producers
Large ( 0.50 * $ 28.86
ALL
Small ( 0.50 * $ 28.86
SECTOR 10. Plastic Colorant Producers and Users
Large ( 0.50 * $ 31.99
ALL
Small ( 1.00 * $ 31.99
SECTOR 11. Plating Mixture Producers
Large ( 0.50 * $ 28.71
ALL
Small ( 1.00 * $ 28.71
SECTOR 13. Chromium Metal Producers
Large ( 0.50 * $ 38.80
ALL
Small ( 1.00 * $ 38.80
SECTOR 14. Iron and Steel Mills
Large ( 0.50 * $ 38.80
Alloy and Stainless
Steel
Small ( 1.00 * $ 38.80
Large ( 0.50 * $ 38.80
Carbon Steel
Small ( 1.00 * $ 38.80
SECTOR 14B. Forging Industry
Large ( 0.50 * $ 38.80
Reshaping
Small ( 1.00 * $ 38.80
SECTOR 15. Iron and Steel Foundries
Large ( 0.50 * $ 28.31
ALL
Small ( 1 * $ 28.31
SECTOR 17. Chromium Dye Producers
Large ( 0.50 * $ 37.70
ALL
Small ( 1 * $ 37.70
SECTOR 18. Chromium Sulfate Producers
Large ( 0.50 * $ 41.50
ALL
Small ( 0.50 * $ 41.50
SECTOR 19. Chemical Distributors
Large ( 0.50 * $ 29.92
ALL
Small ( 0.50 * $ 29.92
JOBPEL
NONSUPEWAGE
ADMINTIME
Table 6
TOTAL HOURS
RESPONSES
Item 12 COSTS
0
* 0 * 1 * 2 * 4 * 100% *
0%
* ( 10% + 0% )) *
697
=
$0
=
0
0
* 0 * 3 * 12 * 4 * 100% *
0%
* ( 10% + 0% )) *
6
=
$0
=
0
0
* 0 * 1 * 4 * 4 * 100% *
* 1 * 1 * 1 * 4 * 100% *
0%
20%
* ( 10% + 0% )) *
* ( 10% + 0% )) *
20
90
=
=
$0
$3,005
=
=
0
104
0
7
* 1 * 1 * 1 * 4 * 100% *
0%
* ( 10% + 0% )) *
5
=
$0
=
0
0
* 0 * 3 * 2 * 4 * 100% *
0%
* ( 10% + 0% )) *
81
=
$0
=
0
0
* 0 * 1 * 2 * 4 * 100% *
0%
* ( 10% + 0% )) *
325
=
$0
=
0
0
* 0 * 3 * 3 * 4 * 100% *
0%
* ( 10% + 0% )) *
179
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
* 0 * 3 * 3 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 10% + 0% )) *
0
23
=
=
$0
$0
=
=
0
0
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 10% + 0% )) *
4
=
$0
=
0
0
* 0 * 1 * 15 * 4 * 100% *
0%
* ( 10% + 0% )) *
5
=
$0
=
0
0
* 0 * 1 * 0 * 4 * 100% *
0%
* ( 10% + 0% )) *
0
=
$0
=
0
0
* 0 * 1 * 2 * 4 * 100% *
0%
* ( 0% + 0% )) *
148
=
$0
=
0
0
* 0 * 1 * 2 * 4 * 100% *
* 0 * 1 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 0% + 0% )) *
79
36
=
=
$0
$0
=
=
0
0
0
0
* 0 * 1 * 1 * 4 * 100% *
* 0 * 1 * 1 * 4 * 100% *
0%
22%
* ( 0% + 0% )) *
* ( 0% + 0% )) *
32
1,162
=
=
$0
$0
=
=
0
0
0
0
* 0 * 1 * 1 * 4 * 100% *
* 0 * 1 * 1 * 4 * 100% *
22%
22%
* ( 0% + 0% )) *
* ( 0% + 0% )) *
4,650
12
=
=
$0
$0
=
=
0
0
0
0
* 0 * 1 * 1 * 4 * 100% *
22%
* ( 0% + 0% )) *
42
=
$0
=
0
0
* 0 * 3 * 15 * 4 * 100% *
0%
* ( 10% * 0% )) *
40
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
* 0 * 3 * 15 * 4 * 100% *
0%
0%
* ( 10% * 0% )) *
* ( 10% * 0% )) *
48
0
=
=
$0
$0
=
=
0
0
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 10% * 0% )) *
24
=
$0
=
0
0
* 0 * 3 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
19
=
$0
=
0
0
* 0 * 3 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
0
=
$0
=
0
0
* 0 * 1 * 1 * 4 * 100% *
0%
* ( 0% + 0% )) *
51
=
$0
=
0
0
Small ( 1.00 * $ 32.13 * 0 * 1 * 1 * 4 * 100% *
State ( 0.50 * $ 32.13 * 0 * 1 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 0% + 0% )) *
233
15
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 32.13 * 0 * 1 * 1 * 4 * 100% *
0%
* ( 0% + 0% )) *
88
=
$0
=
0
0
Local
Page 44
# PLANTS
0
% LEARN
=
% INHOUSE
$0
% ABOVEPEL
=
# SAMPS
343
SHIFTS
* ( 10% + 0% )) *
JOBPEL
0%
ADMINTIME
* 0 * 3 * 3 * 4 * 100% *
SECTOR 20. Textile Dyeing
Large ( 0.50 * $ 19.97
ALL
Small ( 0.50 * $ 19.97
SECTOR 21. Colored Glass Producers
Large ( 0.50 * $ 28.87
ALL
Small ( 1.00 * $ 28.87
Large ( 0.50 * $ 28.87
Fiber, Flat, Container
Glass
Small ( 1.00 * $ 28.87
SECTOR 22. Printing
Large ( 0.50 * $ 20.85
ALL
Small ( 0.50 * $ 20.85
SECTOR 24. Chromium Catalyst Users
Large ( 0.50 * $ 32.51
Catalyst Users
Small ( 1.00 * $ 32.51
Large ( 0.50 * $ 32.51
Chromium Catalyst
Service Companies
Small ( 1.00 * $ 32.51
SECTOR 25. Refractory Brick Producers
Large ( 0.50 * $ 25.64
ALL
Small ( 0.50 * $ 25.64
SECTOR 26. Woodworking
Large ( 0.50 * $ 32.11
General Industry
Small ( 1.00 * $ 32.11
Large ( 0.50 * $ 32.11
Maritime
Small ( 1.00 * $ 32.11
Large ( 0.50 * $ 32.11
Construction
Small ( 1.00 * $ 32.11
STATE ( 0.50 * $ 32.11
Government
LOCAL ( 1.00 * $ 32.11
SECTOR 27. Solid Waste Inceneration
Large ( 0.50 $ 27.23
GENERAL INDUSTRY
Small ( 1.00 $ 27.23
STATE ( 0.50 $ 27.23
GOVERNMENT
LOCAL ( 1.00 $ 27.23
SECTOR 30. Superalloy Producers and Users
Large ( 0.50 * $ 27.93
ALL
Small ( 1.00 * $ 27.93
SECTOR 31. Construction
Large ( 0.50 * $ 32.13
Industrial
Rehabilitation
% NOTQUART
NONSUPEWAGE
Table 6
RESPONSES
0
0
Hazardous Waste‐ Small ( 1.00 * $ 32.13 * 0 * 1 * 1 * 4 * 100% *
site Work
State ( 0.50 * $ 32.13 * 0 * 1 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 10% + 0% )) *
170
1
=
=
$0
$0
=
=
0
0
0
0
Local ( 1.00 * $ 32.13 * 0 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $ 32.13 * 0 * 1 * 1 * 4 * 100% *
0%
60%
* ( 10% + 0% )) *
* ( 10% + 0% )) *
239
44
=
=
$0
$0
=
=
0
0
0
11
Small ( 1.00 * $ 32.13 * 0 * 1 * 1 * 4 * 100% *
60%
* ( 10% + 0% )) *
175
=
Total
75,684
$0
$4,675,850
=
0
148,807
Refractory Brick
Restoration
Page 45
# PLANTS
=
% LEARN
$0
% INHOUSE
=
% ABOVEPEL
40
# SAMPS
* ( 10% + 0% )) *
SHIFTS
0%
JOBPEL
Large ( 0.50 * $ 32.13 * 0 * 1 * 1 * 4 * 100% *
ADMINTIME
TOTAL HOURS
Item 12 COSTS
% NOTQUART
NONSUPEWAGE
Table 6
0
8,394
Table 7
Quarterly Exposure Monitoring (Paragraph (d)(2)(iv)); Contract Cost for an IH Technician to Perform Quarterly
Exposure Monitoring
This table calculates the contract cost for the employer to have an outside industrial hygiene
technician perform quarterly exposure monitoring.
COST =
(QUARTCONTTIME*CONTCOST*4*%NOTQUART*%ABOVEPEL*%CONT)
* #PLANTS
Variable
* QUARTCONTTIME =
Time, in hours, for an outside contractor (industrial hygiene technician) to conduct
quarterly‐annual monitoring
Cost per hour for an outside industrial hygiene contractor
4 times per year (quarterly)
Percent of plants not performing quarterly monitoring requirements
Percent of plants that have an employee in at least one job category above the PEL
Percent of plants that will continue to use an outside contractor for monitoring
Number of plants represented by the model output
* CONTCOST =
* 4 =
* %NOTQUART =
*%ABOVEPEL=
%CONT=
#PLANTS=
Item 13 COSTS
PLANTS
%CONT
*%ABOVEPEL
%NOTQUART
QUARTERLY
CONTCOST
QUARTCONTTIME
24.93%
Sector 1. Electroplating
(
0
* $ 112.44 * 4 * 100% * ( 0.00% * 100% ) *
883
=
$0
(
(
0
0
* $ 112.44 * 4 * 100% * ( 0.00% * 100% ) * 1,662 =
* $ 112.44 * 4 * 100% * ( 0.00% * 100% ) * 426 =
$0
$0
(
(
12
0
* $ 112.44 * 4 * 100% * ( 0.00% * 100% ) *
* $ 112.44 * 4 * 100% * ( 0.00% * 100% ) *
=
=
$0
$0
(
(
0
0
* $ 112.44 * 4 * 100% * ( 0.00% * 100% ) * 1,092 =
* $ 112.44 * 4 * 100% * ( 0.00% * 100% ) * 426 =
$0
(
(
12
0
* $ 112.44 * 4 * 100% * ( 0.00% * 100% ) *
* $ 112.44 * 4 * 100% * ( 0.00% * 100% ) *
801
503
=
$0
=
$0
(
(
0
0
* $ 112.44 * 4 * 100% * ( 0.00% * 100% ) *
* $ 112.44 * 4 * 100% * ( 0.00% * 100% ) *
946
883
=
$0
=
$0
(
12
* $ 112.44 * 4 * 100% * ( 0.00% * 100% ) * 1,662 =
$0
(
12
* $ 112.44 * 4 * 100% * (
4.85% *
(
(
12
12
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
4.84% * 100% ) * 3,962 =
0.37% * 90% ) * 2,593 =
$1,034,810
(
12
* $ 112.44 * 4 * 100% * (
0.38% * 100% ) * 2,905 =
$59,587
Hard Chrome
Job Shop Chrome Plater
801
580
Captive Shop Chrome
$0
Job Shop Plater
Captive Shop Plater
Operator
Sector 2. Welding
90%
) * 3,535 =
$832,871
SMAW
$46,608
GMAW
Page 46
Item 13 COSTS
PLANTS
%CONT
*%ABOVEPEL
%NOTQUART
QUARTERLY
CONTCOST
QUARTCONTTIME
Table 7
(
12
* $ 112.44 * 4 * 100% * (
0.00% *
) *
786
=
$0
(
(
12
0
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 90% ) *
880
314
=
$0
=
$0
(
0
12
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
* $ 112.44 * 4 * 100% * (
0.00% *
352
78
=
=
$0
$0
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
(
12
12
* $ 112.44 * 4 * 100% * (
0.00% *
) *
88
78
=
=
$0
$0
(
(
12
12
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 90% ) *
88
472
=
=
$0
$0
(
12
* $ 112.44 * 4 * 100% * (
MARITIME
0.00% * 100% ) *
529
=
$0
(
12
* $ 112.44 * 4 * 100% * (
0.00% *
50%
) *
17
=
$0
(
(
12
12
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
10
24
=
=
$0
$0
(
(
12
12
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
14
6
=
$0
=
$0
(
(
12
12
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
3
116
=
=
$0
$0
(
(
12
12
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
66
4
=
=
$0
$0
(
12
12
* $ 112.44 * 4 * 100% * (
0.00% *
90%
) *
* $ 112.44 * 4 * 100% * (
0.00% *
50%
) *
2
2
=
=
$0
$0
12
12
* $ 112.44 * 4 * 100% * (
0.00% *
90%
) *
* $ 112.44 * 4 * 100% * (
0.00% *
50%
) *
1
4
=
=
$0
$0
12
12
* $ 112.44 * 4 * 100% * (
0.00% *
90%
) *
* $ 112.44 * 4 * 100% * (
0.00% *
50%
) *
2
2
=
=
$0
$0
* $ 112.44 * 4 * 100% * (
0.00% *
90%
) *
(
12
0
* $ 112.44 * 4 * 100% * (
0.00% *
50%
) *
1
0
=
=
$0
$0
(
0
* $ 112.44 * 4 * 100% * (
0.00% *
90%
) *
0
=
$0
90%
TIG
SAW
(
90%
) *
Plasma Cutting
(
90%
Plasma Welding
Resistance Welding
SMAW
GMAW
TIG
FCAW
Plasma Cutting
(
Plasma Welding
(
(
Oxy‐fuel Cutting
(
(
Air Carbon Arc Cutting
(
Electric Torch Cutting
Page 47
Thermal Spray Tungsten
Cutting
Item 13 COSTS
PLANTS
%CONT
*%ABOVEPEL
%NOTQUART
QUARTERLY
CONTCOST
QUARTCONTTIME
Table 7
(
0
* $ 112.44 * 4 * 100% * (
0.00% *
50%
) *
0
=
$0
(
(
0
0
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
0
15
=
=
$0
$0
(
0
* $ 112.44 * 4 * 100% * (
0.00% *
90%
) *
9
=
$0
(
12
* $ 112.44 * 4 * 100% * (
0.00% *
95%
) *
201
=
$0
(
(
12
0
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) * 1,609 =
0.00% * 95% ) *
3
=
$0
(
(
12
0
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 95% ) *
21
41
=
=
$0
$0
(
(
12
12
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 95% ) *
322
20
=
$0
=
$0
(
(
12
12
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 95% ) *
161
4
=
=
$0
$0
(
12
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
32
=
$0
SAW
CONSTRUCTION
SMAW
$0
Plasma Cutting
GMAW
Brazing
Metallizing
GOVERNMENT
(
12
* $ 112.44 * 4 * 100% * (
0.00% *
) *
19
=
$0
(
(
12
12
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 95% ) *
590
0
=
$0
=
$0
(
(
12
12
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 95% ) *
8
4
=
=
$0
$0
(
12
12
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
* $ 112.44 * 4 * 100% * (
0.00% *
118
2
=
=
$0
$0
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
(
12
12
* $ 112.44 * 4 * 100% * (
0.00% *
) *
59
1
=
=
$0
$0
(
12
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
12
=
$0
(
12
* $ 112.44 * 4 * 100% * (
0.00% *
) * 4,740 =
$0
(
12
12
* $ 112.44 * 4 * 100% * (
(
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) * 4,826 =
0.00% * 90% ) * 3,476 =
$0
$0
(
12
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) * 3,539 =
$0
95%
SMAW
Plasma Cutting
GMAW
(
95%
) *
Brazing
(
95%
Metallizing
Sector 2. Mild Steel Welding
90%
SMAW
GMAW
Page 48
Item 13 COSTS
PLANTS
%CONT
*%ABOVEPEL
%NOTQUART
QUARTERLY
CONTCOST
QUARTCONTTIME
Table 7
(
12
* $ 112.44 * 4 * 100% * (
0.00% *
) * 1,053 =
$0
(
(
12
0
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) * 1,073 =
0.00% * 90% ) * 421 =
$0
(
0
0
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
* $ 112.44 * 4 * 100% * (
0.00% *
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
(
0
0
* $ 112.44 * 4 * 100% * (
0.00% *
(
(
0
0
(
90%
TIG
$0
SAW
429
105
=
=
$0
$0
) *
107
105
=
=
$0
$0
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 90% ) *
107
632
=
=
$0
$0
0
* $ 112.44 * 4 * 100% * (
MARITIME
0.00% * 100% ) *
644
=
$0
(
12
* $ 112.44 * 4 * 100% * (
0.00% *
50%
) *
37
=
$0
(
(
12
12
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
21
53
=
=
$0
$0
(
(
12
0
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
30
13
=
$0
=
$0
(
(
0
0
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
7
249
=
=
$0
$0
(
(
* $ 112.44 * 4 * 100% * (
0
0.00 * $ 112.44 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
141
8
=
=
$0
$0
(
0.00 * $ 112.44 * 4 * 100% * (
0.00 * $ 112.44 * 4 * 100% * (
0.00% *
90%
) *
0.00% *
50%
) *
5
3
=
=
$0
$0
0.00 * $ 112.44 * 4 * 100% * (
0.00 * $ 112.44 * 4 * 100% * (
0.00% *
90%
) *
0.00% *
50%
) *
2
8
=
=
$0
$0
0.00 * $ 112.44 * 4 * 100% * (
0.00 * $ 112.44 * 4 * 100% * (
0.00% *
90%
) *
0.00% *
50%
) *
5
3
=
=
$0
$0
0.00% *
90%
) *
(
0.00 * $ 112.44 * 4 * 100% * (
0.00 * $ 112.44 * 4 * 100% * (
0.00% *
50%
) *
2
1
=
=
$0
$0
(
0.00 * $ 112.44 * 4 * 100% * (
0.00% *
90%
) *
0
=
$0
(
90%
) *
Plasma Cutting
(
90%
Plasma Welding
Resistance Welding
SMAW
GMAW
TIG
FCAW
Plasma Cutting
(
Plasma Welding
(
(
Oxy‐fuel Cutting
(
(
Air Carbon Arc Cutting
(
Electric Torch Cutting
Page 49
Thermal Spray Tungsten
Cutting
Item 13 COSTS
PLANTS
%CONT
*%ABOVEPEL
%NOTQUART
QUARTERLY
CONTCOST
QUARTCONTTIME
Table 7
(
0.00 * $ 112.44 * 4 * 100% * (
0.00% *
50%
) *
1
=
$0
(
(
0.00 * $ 112.44 * 4 * 100% * (
0.00 * $ 112.44 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
0
33
=
$0
=
$0
(
0.00 * $ 112.44 * 4 * 100% * (
CONSTRUCTION
0.00 * $ 112.44 * 4 * 100% * (
0.00% *
90%
) *
18
=
$0
0.00% *
95%
) *
301
=
$0
( 12.00 * $ 112.44 * 4 * 100% * (
( 0.00 * $ 112.44 * 4 * 100% * (
0.00% * 100% ) * 2,277 =
0.00% * 95% ) *
4
=
$0
(
SAW
(
SMAW
$0
Plasma Cutting
0.00 * $ 112.44 * 4 * 100% * (
0.00 * $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
(
) *
30
60
=
=
$0
$0
(
(
0.00 * $ 112.44 * 4 * 100% * (
0.00 * $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 95% ) *
455
30
=
$0
=
$0
(
(
0.00 * $ 112.44 * 4 * 100% * (
0.00 * $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 95% ) *
228
6
=
=
$0
$0
( 12.00 * $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
45
=
$0
0.00% *
95%
GMAW
Brazing
Metallizing
SECTOR 3. PAINTING
( 12.00 * $ 112.44 * 4 * 100% * (
28.00% *
25%
) *
49
=
$18,478
( 12.00 * $ 112.44 * 4 * 100% * (
( 12.00 * $ 112.44 * 4 * 100% * (
9.00% *
5.00% *
75%
25%
) *
) *
62
326
=
=
$22,438
$21,998
( 12.00 * $ 112.44 * 4 * 100% * (
( 12.00 * $ 112.44 * 4 * 100% * (
5.00% *
36.00% *
75%
10%
) * 1,436 =
) * 100 =
$290,555
$19,358
( 12.00 * $ 112.44 * 4 * 100% * (
( 12.00 * $ 112.44 * 4 * 100% * (
36.00% *
8.00% *
90%
25%
) *
) *
18
276
=
=
$31,677
$29,738
( 12.00 * $ 112.44 * 4 * 100% * (
( 12.00 * $ 112.44 * 4 * 100% * (
8.00% *
75%
) *
=
$154,250
22.00% *
25%
) *
476
671
=
$199,135
( 12.00 * $ 112.44 * 4 * 100% * (
( 12.00 * $ 112.44 * 4 * 100% * (
22.00% *
12.00% *
50%
25%
) * 3,566 =
) *
12 =
( 12.00 * $ 112.44 * 4 * 100% * (
SECTOR 4. Producers of Chromates
( 0.00 * $ 112.44 * 4 * 100% * (
ALL
( 0.00 * $ 112.44 * 4 * 100% * (
SECTOR 5. Chromate Pigment Procedures
12.00% *
25%
) *
AEROSPACE
AUTOBODY
MARITIME
COIL COATING
CONSTRUCTION
$2,117,317
$1,892
GOVERNMENT
Page 50
647
=
$104,697
0.00% * 100% ) *
2
=
$0
0.00% *
0
=
$0
0%
) *
Item 13 COSTS
PLANTS
%CONT
*%ABOVEPEL
%NOTQUART
QUARTERLY
CONTCOST
QUARTCONTTIME
Table 7
( 12.00 * $ 112.44 * 4 * 100% * (
77.00% * 100% ) *
2
=
$7,478
( 12.00 * $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
1
=
$0
( 12.00 * $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
2
=
$0
* 4 * 100% * (
0.00% *
0%
) *
0
=
$0
* 4 * 100% * (
0.00% *
20%
) *
5
=
$0
* 4 * 100% * (
0.00% *
0%
) *
0
=
$0
* 4 * 100% * (
0.00% *
75%
) *
80
=
$0
* 4 * 100% * (
0.00% *
75%
) *
126
=
$0
* 4 * 100% * (
0.00% *
90%
) *
2
=
$0
* 4 * 100% * (
0.00% *
90%
) *
8
=
$0
* 4 * 100% * (
36.00% * 100% ) *
81
=
$158,306
* 4 * 100% * (
36.00% * 100% ) *
40
=
$77,432
ALL
SECTOR 6. CCA Producers
ALL
( 12.00 * $ 112.44
SECTOR 7. Chromium Catalyst Producers
( 12.00 * $ 112.44
ALL
( 12.00 * $ 112.44
SECTOR 8. Paint and Coating Producers
( 12.00 * $ 112.44
ALL
( 12.00 * $ 112.44
SECTOR 9. Printing Ink Producers
( 0.00 * $ 112.44
ALL
( 0.00 * $ 112.44
SECTOR 10. Plastic Colorant Producers and Users
( 12.00 * $ 112.44
ALL
( 12.00 * $ 112.44
SECTOR 11. Plating Mixture Producers
( 12.00 * $ 112.44
ALL
( 12.00 * $ 112.44
SECTOR 13. Chromium Metal Producers
( 12.00 * $ 112.44
ALL
( 12.00 * $ 112.44
SECTOR 14. Iron and Steel Mills
( 0.00 * $ 112.44
ALLOY AND STAINLESS
STEEL
( 0.00 * $ 112.44
( 0.00 * $ 112.44
CARBON STEEL
( 0.00 * $ 112.44
SECTOR 14B. FORGING INDUSTRY
( 0.00 * $ 112.44
RESHAPING
( 0.00 * $ 112.44
* 4 * 100% * (
0.00% *
80%
) *
6
=
$0
* 4 * 100% * (
0.00% *
75%
) *
4
=
$0
* 4 * 100% * (
0.00% * 100% ) *
1
=
$0
* 4 *
0% * (
0.00% *
0%
) *
0
=
$0
* 4 * 100% * (
0.00% *
90%
) *
34
=
$0
* 4 * 100% * (
* 4 * 100% * (
0.00% *
0.00% *
90%
90%
) *
) *
11
102
=
$0
=
$0
* 4 * 100% * (
0.00% *
90%
) *
32
=
$0
* 4 * 100% * (
63.00% *
90%
) *
33
=
$0
* 4 * 100% * (
63.00% *
90%
) *
31
=
$0
Page 51
SECTOR 15. Iron and Steel Foundries
( 0.00 * $ 112.44
ALL
( 0.00 * $ 112.44
SECTOR 17. Chromium Dye Producers
( 12.00 * $ 112.44
ALL
( 12.00 * $ 112.44
SECTOR 18. Chromium Sulfate Producers
( 12.00 * $ 112.44
ALL
( 12.00 * $ 112.44
SECTOR 19. Chemical Distributors
( 12.00 * $ 112.44
ALL
( 12.00 * $ 112.44
SECTOR 20. Textile Dyeing
( 0.00 * $ 112.44
ALL
( 0.00 * $ 112.44
SECTOR 21. Colored Glass Producers
( 0.00
General Industry
( 0.00
( 12.00
Fiber, Flat and Container
Glass
( 12.00
SECTOR 22. Printing
( 0.00
ALL
( 0.00
SECTOR 24. Chromium Catalyst Users
( 12.00
CATALYST USER
( 12.00
( 12.00
CATALYST SERVICE
COMPANIES
Item 13 COSTS
PLANTS
%CONT
*%ABOVEPEL
%NOTQUART
QUARTERLY
CONTCOST
QUARTCONTTIME
Table 7
* 4 * 100% * (
0.00% *
90%
) *
163
=
$0
* 4 * 100% * (
0.00% *
90%
) *
118
=
$0
* 4 * 100% * (
62.00% * 100% ) *
3
=
$9,032
* 4 * 100% * (
62.00% * 100% ) *
1
=
$3,011
* 4 * 100% * (
0.00% *
) *
0
=
$0
* 4 * 100% * (
0.00% * 100% ) *
5
=
$0
* 4 * 100% * (
0.00% * 100% ) *
216
=
$0
* 4 * 100% * (
0.00% * 100% ) * 1,627 =
$0
* 4 * 100% * (
0.00% *
90%
) *
343
=
$0
* 4 * 100% * (
0.00% *
90%
) *
697
=
$0
* $ 112.44 * 4 * 100% * (
0.00% *
90%
) *
6
=
$0
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% *
20.00% *
90%
90%
) *
) *
20
90
=
$0
=
$87,572
* $ 112.44 * 4 * 100% * (
0.00% *
90%
) *
5
=
$0
* $ 112.44 * 4 * 100% * (
0.00% *
90%
) *
81
=
$0
* $ 112.44 * 4 * 100% * (
0.00% *
90%
) *
325
=
$0
* $ 112.44 * 4 * 100% * (
0.00% *
90%
) *
179
=
$0
* $ 112.44 * 4 * 100% * (
* $ 112.44 * 4 * 100% * (
0.00% *
0.00% *
90%
90%
) *
) *
0
23
=
$0
=
$0
$ 112.44 * 4 * 100% * (
0.00% *
90%
) *
4
=
$0
$ 112.44 * 4 * 100% * (
0.00% *
90%
) *
5
=
$0
$ 112.44 * 4 * 100% * (
0.00% *
90%
) *
0
=
$0
$ 112.44 * 4 * 100% * (
0.00% * 100% ) *
148
=
$0
$ 112.44 * 4 * 100% * (
0.00% * 100% ) *
79
=
$0
( 12.00 *
SECTOR 25. Refractory Brick Producers
( 0.00 *
ALL
( 0.00 *
SECTOR 26. Woodworking
( 0.00 *
ALL
( 0.00 *
Page 52
0%
(
0.00 * $ 112.44 * 4 * 100% * (
(
(
(
(
Item 13 COSTS
PLANTS
%CONT
*%ABOVEPEL
%NOTQUART
QUARTERLY
CONTCOST
QUARTCONTTIME
Table 7
0.00% * 100% ) *
36
=
$0
0.00 * $ 112.44 * 4 * 100% * (
0.00 * $ 112.44 * 4 * 100% * (
32 =
0.00% * 100% ) *
22.00% * 100% ) * 1,162 =
$0
0.00 * $ 112.44 * 4 * 100% * (
0.00 * $ 112.44 * 4 * 100% * (
22.00% * 100% ) * 4,650 =
22.00% * 100% ) *
12 =
$0
MARITIME
$0
CONSTRUCTION
$0
GOVERNMENT
( 0.00 * $ 112.44
SECTOR 27. Solid Waste Incerneration
( 0.00 * $ 112.44
GENERAL INDUSTRY
( 0.00 * $ 112.44
( 0.00 * $ 112.44
GOVERNMENT
( 0.00 * $ 112.44
SECTOR 30. Superalloy Producers and Users
( 0.00 * $ 112.44
ALL
( 0.00 * $ 112.44
SECTOR 31. Construction
( 0.00 * $ 112.44
Industrial Rehabilitation
* 4 * 100% * (
22.00% * 100% ) *
=
$0
* 4 * 100% * (
0.00% *
90%
) *
40
=
$0
* 4 * 100% * (
* 4 * 100% * (
0.00% *
0.00% *
90%
25%
) *
) *
48
0
=
=
$0
$0
* 4 * 100% * (
0.00% *
90%
) *
24
=
$0
* 4 * 100% * (
0.00% * 100% ) *
19
=
$0
* 4 * 100% * (
0.00% *
) *
0
=
$0
* 4 * 100% * (
0.00% * 100% ) *
51
=
$0
(
(
0.00 * $ 112.44 * 4 * 100% * (
0.00 * $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 100% ) *
233
15
=
=
$0
$0
(
(
0.00 * $ 112.44 * 4 * 100% * (
0.00 * $ 112.44 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 90% ) *
88
40
=
=
$0
$0
0.00% *
0.00% *
90%
90%
) *
) *
170
1
=
$0
=
$0
239
44
=
=
$0
$0
175
=
$0
$5,328,238
Hazardous Waste‐site ( 0.00 * $ 112.44 * 4 * 100% * (
Work
( 0.00 * $ 112.44 * 4 * 100% * (
Refractory Brick
Restoration
42
0%
(
(
0.00 * $ 112.44 * 4 * 100% * (
0.00 * $ 112.44 * 4 * 100% * (
0.00% *
60.00% *
90%
90%
) *
) *
(
0.00 * $ 112.44 * 4 * 100% * (
60.00% *
90%
) *
Total
75,684
Page 53
Table 8
Quarterly Exposure Monitoring (Paragraph (d)(2)(iv)); Contract Cost for a Laboratory to Conduct Analysis
of Quarterly Exposure Monitoring
This table calculates the contract cost for the employer to have a laboratory conduct analysis of air samples collected
during quarterly exposure monitoring.
(SAMPCOST * JOBPEL * SHIFTS * #SAMPS * 4 * %NOTQUART * %ABOVEPEL) * #PLANTS
QUARTERLY
%NOTQUART
%ABOVEPEL
(
$77 * 0
* 2 *
3
* 4
* 100% *
0.00%
)*
883
=
$0
Small
(
(
$77 * 0
$77 * 0
* 1 *
* 2 *
3
3
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
1,662
426
=
=
$0
$0
(
(
$77 * 0
$77 * 0
* 1 *
* 2 *
3
3
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
801
580
=
=
$0
$0
(
(
$77 * 0
$77 * 0
* 1 *
* 2 *
3
3
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
1,092
426
=
=
$0
$0
(
(
$77 * 0
$77 * 0
* 1 *
* 2 *
3
3
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
801
503
=
=
$0
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 1 *
* 2 *
3
3
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
946
883
=
=
$0
$0
Small
3
* 4
* 100% *
0.00%
)*
1,662
=
$0
Large
( $77 * 1 * 1 *
GENERAL INDUSTRY
( $77 * 1 * 3 *
2
* 4
* 100% *
4.85%
)*
3,535
=
$316,600
Small
Large
(
(
$77 * 1
$77 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
4.84%
0.37%
)*
)*
3,962
2,593
=
=
$177,013
$17,717
Small
Large
(
(
$77 * 1
$77 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.38%
0.00%
)*
)*
2,905
786
=
=
$10,193
$0
Small
Large
(
(
$77 * 1
$77 * 0
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
880
314
=
=
$0
$0
Small
Large
(
(
$77 * 0
$77 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
352
78
=
=
$0
$0
Small
(
$77 * 1
* 1 *
3
* 4
* 100% *
0.00%
)*
88
=
$0
#PLANTS
Item 13 COST
#SAMPS
Large
JOBPEL
SHIFTS
Variable cost per sample
Number of job categories exposed above the PEL
Number of work shifts
Number of samples per exposure measurement
four times per year (quarterly)
Percent of plants not performing quarterly monitoring requirements
Percent of plants that have an employee in at least one job category above the PEL
Number of plants represented by the model output
SAMPCOST
Cost =
Variables
* SAMPCOST =
* JOBPEL =
* SHIFTS =
* #SAMPS =
*4 =
* %NOTQUART =
* %ABOVEPEL =
* #PLANTS =
Sector 1. Electroplating
Hard Chrome
Job Shop Chrome Plater
Large
Small
Captive Shop Chrome Plater
Large
Small
Job Shop Plater
Large
Small
Captive Shop Plater
Large
Operator
Sector 2. Welding
SMAW
GMAW
TIG
SAW
Plasma Cutting
Page 54
QUARTERLY
%NOTQUART
%ABOVEPEL
$77 * 1
* 3 *
2
* 4
* 100% *
0.00%
)*
78
=
$0
Small
Large
(
(
$77 * 1
$77 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
88
472
=
=
$0
$0
Small
(
$77 * 1
* 4
* 100% *
0.00%
)*
529
=
$0
Large (
$77 * 1
* 1 * 3
MARITIME
* 3 * 1
* 4
* 100% *
0.00%
)*
17
=
$0
Small (
Large (
$77 * 1
$77 * 1
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
10
24
=
=
$0
$0
Small (
Large (
$77 * 1
$77 * 1
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
14
6
=
=
$0
$0
Small (
Large (
$77 * 1
$77 * 1
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
3
116
=
=
$0
$0
Small
Large
(
(
$77 * 1
$77 * 1
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
66
4
=
=
$0
$0
Small
Large
(
(
$77 * 1
$77 * 1
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
2
2
=
=
$0
$0
Small
Large
(
(
$77 * 1
$77 * 1
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
1
4
=
=
$0
$0
Small
Large
(
(
$77 * 1
$77 * 1
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
2
2
=
=
$0
$0
Small
Large
(
(
$77 * 1
$77 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
1
0
=
=
$0
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
0
0
=
=
$0
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
0
15
=
=
$0
$0
Small
(
$77 * 0
* 100% *
0.00%
)*
9
=
$0
Large
(
* 2 * 1 * 4
CONSTRUCTION
$77 * 1 * 3 * 1 * 4
* 100% *
0.00%
)*
201
=
$0
Small
Large
(
(
$77 * 1
$77 * 0
* 1 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
1,609
3
=
=
$0
$0
Small
Large
(
(
$77 * 1
$77 * 0
* 1 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
21
41
=
=
$0
$0
Small
(
$77 * 1
* 1 *
1
* 4
* 100% *
0.00%
)*
322
=
$0
#PLANTS
Item 13 COST
#SAMPS
(
JOBPEL
Large
SAMPCOST
SHIFTS
Table 8
Plasma Welding
Resistance Welding
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Page 55
QUARTERLY
%NOTQUART
%ABOVEPEL
$77 * 1
* 3 *
1
* 4
* 100% *
0.00%
)*
20
=
$0
Local
State
(
(
$77 * 1
$77 * 1
* 1 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
161
4
=
=
$0
$0
Local
(
$77 * 1
* 100% *
0.00%
)*
32
=
$0
Large
(
* 1 * 1 * 4
GOVERNMENT
$77 * 1 * 1 * 1 * 4
* 100% *
0.00%
)*
19
=
$0
Small
Large
(
(
$77 * 1
$77 * 1
* 1 *
* 1 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
590
0
=
=
$0
$0
Small
Large
(
(
$77 * 1
$77 * 1
* 1 *
* 1 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
8
4
=
=
$0
$0
Small
State
(
(
$77 * 1
$77 * 1
* 1 *
* 1 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
118
2
=
=
$0
$0
Local
State
(
(
$77 * 1
$77 * 1
* 1 *
* 1 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
59
1
=
=
$0
$0
Local
(
$77 * 1
* 1 *
1
* 4
* 100% *
0.00%
)*
12
=
$0
Large
(
$77 * 1
* 3 *
2
* 4
* 100% *
0.00%
)*
4,740
=
$0
Small
Large
(
(
$77 * 1
$77 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
4,826
3,476
=
=
$0
$0
Small
Large
(
(
$77 * 1
$77 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
3,539
1,053
=
=
$0
$0
Small
Large
(
(
$77 * 1
$77 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
1,073
421
=
=
$0
$0
Small
Large
(
(
$77 * 1
$77 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
429
105
=
=
$0
$0
Small
Large
(
(
$77 * 1
$77 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
107
105
=
=
$0
$0
Small
Large
(
(
$77 * 1
$77 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
107
632
=
=
$0
$0
Small
(
$77 * 1
* 4
* 100% *
0.00%
)*
644
=
$0
Large (
$77 * 0
* 1 * 3
MARITIME
* 3 * 1
* 4
* 100% *
0.00%
)*
37
=
$0
Small (
Large (
$77 * 0
$77 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
21
53
=
=
$0
$0
Small (
$77 * 0
* 2 *
1
* 4
* 100% *
0.00%
)*
30
=
$0
#PLANTS
Item 13 COST
#SAMPS
(
JOBPEL
State
SAMPCOST
SHIFTS
Table 8
Brazing
Metallizing
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Sector 2. Mild Steel Welding
SMAW
GMAW
TIG
SAW
Plasma Cutting
Plasma Welding
Resistance Welding
SMAW
GMAW
Page 56
QUARTERLY
%NOTQUART
%ABOVEPEL
* 3 *
1
* 4
* 100% *
0.00%
)*
13
=
$0
Small (
Large (
$77 * 0
$77 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
7
249
=
=
$0
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
141
8
=
=
$0
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
5
3
=
=
$0
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
2
8
=
=
$0
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
5
3
=
=
$0
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
2
1
=
=
$0
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
0
1
=
=
$0
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
0
33
=
=
$0
$0
Small
(
$77 * 0
* 100% *
0.00%
)*
18
=
$0
Large
(
* 2 * 1 * 4
CONSTRUCTION
$77 * 0 * 3 * 1 * 4
* 100% *
0.00%
)*
301
=
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 1 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
2,277
4
=
=
$0
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 1 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
30
60
=
=
$0
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 1 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
455
30
=
=
$0
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 1 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
228
6
=
=
$0
$0
Small
(
$77 * 0
* 1 *
1
* 4
* 100% *
0.00%
)*
45
=
$0
Large
(
$77 * 1
* 3 *
3
* 4
* 100% * 28.00% ) *
49
=
$37,930
Small
Large
(
(
$77 * 1
$77 * 0
* 1 *
* 1 *
3
1
* 4
* 4
* 100% *
* 100% *
9.00%
5.00%
)*
)*
62
326
=
=
$5,118
$0
Small
(
$77 * 2
* 1 *
1
* 4
* 100% *
5.00%
)*
1,436
=
$44,180
#PLANTS
Item 13 COST
#SAMPS
$77 * 0
JOBPEL
Large (
SAMPCOST
SHIFTS
Table 8
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
SECTOR 3. PAINTING
AEROSPACE
AUTOBODY
Page 57
QUARTERLY
%NOTQUART
%ABOVEPEL
$77 * 0
* 2 *
3
* 4
* 100% *
8.00%
)*
100
=
$0
Small
Large
(
(
$77 * 0
$77 * 1
* 1 *
* 3 *
3
1
* 4
* 4
* 100% * 8.00% ) *
* 100% * 36.00% ) *
18
276
=
=
$0
$91,566
Small
Large
(
(
$77 * 1
$77 * 1
* 1 *
* 3 *
1
1
* 4
* 4
* 100% * 36.00% ) *
* 100% * 22.00% ) *
476
671
=
=
$52,771
$136,255
Small
Large
(
(
$77 * 1
$77 * 1
* 1 *
* 3 *
1
1
* 4
* 4
* 100% * 22.00% ) *
* 100% * 12.00% ) *
3,566
12
=
=
$241,457
$1,294
Small
(
$77 * 1
* 1 *
1
* 4
* 100% * 12.00% ) *
647
=
$23,879
Large
(
$77 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
2
=
$0
Small (
SECTOR 5. Chromate Pigment Procedures
Large (
ALL
Small (
SECTOR 6. CCA Producers
Large (
ALL
Small (
SECTOR 7. Chromium Catalyst Producers
Large (
ALL
Small (
SECTOR 8. Paint and Coating Producers
Large (
ALL
Small (
SECTOR 9. Printing Ink Producers
Large (
ALL
Small (
SECTOR 10. Plastic Colorant Producers and Users
Large (
ALL
Small (
SECTOR 11. Plating Mixture Producers
Large (
ALL
Small (
SECTOR 13. Chromium Metal Producers
Large (
ALL
Small (
SECTOR 14. Iron and Steel Mills
Large (
ALLOY AND STAINLESS STEEL
Small (
$77 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
0
=
$0
$77 * 1
* 2 *
3
* 4
* 100% * 77.00% ) *
2
=
$2,558
$77 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
1
=
$0
$77 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
2
=
$0
$77 * 0
* 3 *
0
* 4
* 100% *
0.00%
)*
0
=
$0
$77 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
5
=
$0
$77 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
0
=
$0
$77 * 0
* 2 *
3
* 4
* 100% *
0.00%
)*
80
=
$0
$77 * 0
* 2 *
3
* 4
* 100% *
0.00%
)*
126
=
$0
$77 * 0
* 1 *
9
* 4
* 100% *
0.00%
)*
2
=
$0
$77 * 0
* 1 *
5
* 4
* 100% *
0.00%
)*
8
=
$0
$77 * 3
* 3 *
3
* 4
* 100% * 36.00% ) *
81
=
$243,716
$77 * 5
* 1 *
3
* 4
* 100% * 36.00% ) *
40
=
$66,227
$77 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
6
=
$0
$77 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
4
=
$0
$77 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
1
=
$0
$77 * 0
* 1 *
1
* 4
*
*
0.00%
)*
0
=
$0
$77 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
34
=
$0
$77 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
11
=
$0
#PLANTS
Item 13 COST
#SAMPS
(
JOBPEL
Large
SAMPCOST
SHIFTS
Table 8
COIL COATING
MARITIME
CONSTRUCTION
GOVERNMENT
SECTOR 4. Producers of Chromates
ALL
Page 58
0%
QUARTERLY
%NOTQUART
%ABOVEPEL
$77 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
102
=
$0
Small
(
$77 * 0
* 1 *
1
* 4
* 100% *
0.00%
)*
32
=
$0
Large
(
$77 * 0
* 1 *
3
* 4
* 100% * 63.00% ) *
33
=
$0
Small
(
$77 * 0
* 1 *
3
* 4
* 100% * 63.00% ) *
31
=
$0
Large
(
$77 * 0
* 3 *
5
* 4
* 100% *
0.00%
)*
163
=
$0
Small
(
$77 * 0
* 1 *
5
* 4
* 100% *
0.00%
)*
118
=
$0
Large
(
$77 * 7
* 1 * 21 * 4
* 100% * 62.00% ) *
3
=
$75,707
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
Chromium Users
Small
Large
Chromium Catalyst Service Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
(
$77 * 5
* 1 *
7
* 4
* 100% * 62.00% ) *
1
=
$6,009
(
$77 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
0
=
$0
(
$77 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
5
=
$0
(
$77 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
216
=
$0
(
$77 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
1,627
=
$0
(
$77 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
343
=
$0
(
$77 * 0
* 1 *
2
* 4
* 100% *
0.00%
)*
697
=
$0
(
$77 * 0
* 3 * 12 * 4
* 100% *
0.00%
)*
6
=
$0
(
(
$77 * 0
$77 * 1
* 1 *
* 1 *
4
1
* 4
* 4
* 100% * 0.00% ) *
* 100% * 20.00% ) *
20
90
=
=
$0
$5,548
(
$77 * 1
* 1 *
1
* 4
* 100% *
0.00%
)*
5
=
$0
(
$77 * 0
* 3 *
2
* 4
* 100% *
0.00%
)*
81
=
$0
(
$77 * 0
* 1 *
2
* 4
* 100% *
0.00%
)*
325
=
$0
(
$77 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
179
=
$0
(
(
$77 * 0
$77 * 0
* 1 *
* 3 *
3
3
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
0
23
=
=
$0
$0
(
$77 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
4
=
$0
(
$77 * 0
* 1 * 15 * 4
* 100% *
0.00%
)*
5
=
$0
(
$77 * 0
* 1 *
* 100% *
0.00%
)*
0
=
$0
#PLANTS
Item 13 COST
#SAMPS
(
JOBPEL
Large
SAMPCOST
SHIFTS
Table 8
CARBON STEEL
14b. FORGING INDUSTRY
Reshaping
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
Page 59
0
* 4
QUARTERLY
%NOTQUART
%ABOVEPEL
$77 * 0
* 1 *
2
* 4
* 100% *
0.00%
)*
148
=
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 1 *
* 1 *
2
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
79
36
=
=
$0
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 1 *
* 1 *
1
1
* 4
* 4
* 100% *
* 22% *
0.00%
0.00%
)*
)*
32
1,162
=
=
$0
$0
Small
State
(
(
$77 * 0
$77 * 0
* 1 *
* 1 *
1
1
* 4
* 4
*
*
22% *
22% *
0.00%
0.00%
)*
)*
4,650
12
=
=
$0
$0
Local
(
$77 * 0
* 1 *
1
* 4
*
22% *
0.00%
)*
42
=
$0
Large
(
$77 * 0
* 3 * 15 * 4
* 100% *
0.00%
)*
40
=
$0
Small
Large
(
(
$77 * 0
$77 * 0
* 1 * 3 * 4
* 3 * 15 * 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
48
0
=
=
$0
$0
Small
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
(
$77 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
24
=
$0
(
$77 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
19
=
$0
(
$77 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
0
=
$0
(
$77 * 0
* 1 *
1
* 4
* 100% *
0.00%
)*
51
=
$0
Small
State
(
(
$77 * 0
$77 * 0
* 1 *
* 1 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
233
15
=
=
$0
$0
Local
Large
(
(
$77 * 0
$77 * 0
* 1 *
* 1 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
88
40
=
=
$0
$0
Small
State
(
(
$77 * 0
$77 * 0
* 1 *
* 1 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
170
1
=
=
$0
$0
Local
Large
(
(
$77 * 0
$77 * 0
* 1 *
* 1 *
1
1
* 4
* 4
* 100% * 0.00% ) *
* 100% * 60.00% ) *
239
44
=
=
$0
$0
Small
(
$77 * 0
* 1 *
1
* 4
* 100% * 60.00% ) *
#PLANTS
Item 13 COST
#SAMPS
(
JOBPEL
Large
SAMPCOST
SHIFTS
Table 8
SECTOR 26. Woodworking
General Industry
Maritime
Construction
Government
SECTOR 27. Solid Waste Incerneration
GENERAL INDUSTRY
GOVERNMENT
Industrial Rehabilitation
Hazardous Waste‐site Work
Refractory Brick Restoration
Total
Page 60
175
=
$0
75,684
$1,555,739
Table 9
Employer Time and Cost to Notify Employees of Quarterly Monitoring Results
HOURS = ((NOTETIME * JOBPEL * SHIFTS * # SAMPS * 4) * %NOTQUART * %ABOVEPEL) * #PLANTS
COST = (SUPWAGE) * BURDEN HOURS
ASSUMPTIONS:
* SUPWAGE = Supervisory wage rate, $/hr.
* NOTETIME = Time, in hours, to notify an employee of the exposure monitoring results
* JOBPEL = Number of job categories exposed above the PEL
* SHIFTS = Number of work shifts
* #SAMPS = Number of samples per exposure measurement
* 4 = 4 times per year (quarterly)
* %NOTQUART = Percent of plants not performing quarterly monitoring requirements
* %ABOVEPEL = Percent of plants that have an employee in at least one job category above the PEL
* #PLANTS = Number of plants represented by the model input
Item 12 Cost
Responses
$0
0
0.25 * 0 *
0.25 * 0 *
1*
2*
3 * 4 * 100% *
3 * 4 * 100% *
0.00%
0.00%
*
*
1,662
426
0 $ 36.22
0 $ 36.22
$0
$0
0
0
0.25 * 0 *
0.25 * 0 *
1*
2*
3 * 4 * 100% *
3 * 4 * 100% *
0.00%
0.00%
*
*
801
580
0 $ 36.22
0 $ 36.22
$0
$0
0
0
0.25 * 0 *
0.25 * 0 *
1*
2*
3 * 4 * 100% *
3 * 4 * 100% *
0.00%
0.00%
*
*
1,092
426
0 $ 36.22
0 $ 36.22
$0
$0
0
0
0.25 * 0 *
0.25 * 0 *
1*
2*
3 * 4 * 100% *
3 * 4 * 100% *
0.00%
0.00%
*
*
801
503
0 $ 36.22
0 $ 36.22
$0
$0
0
0
0.25 * 0 *
0.25 * 0 *
1*
2*
3 * 4 * 100% *
3 * 4 * 100% *
0.00%
0.00%
*
*
946
883
0 $ 36.22
0 $ 36.22
$0
$0
0
0
0.25 * 0 *
1*
3 * 4 * 100% *
0.00%
*
1,662
0 $ 36.22
$0
0
0.25 * 1 *
3*
2 * 4 * 100% *
4.85% *
3,535
1,029 $ 35.65
$36,680
4115
0.25 * 1 *
0.25 * 1 *
1*
3*
3 * 4 * 100% *
2 * 4 * 100% *
4.84% *
0.37% *
3,962
2,593
575 $ 35.65
58 $ 35.65
$20,508
$2,053
2301
230
0.25 * 1 *
0.25 * 1 *
1*
3*
3 * 4 * 100% *
2 * 4 * 100% *
0.38% *
0.00% *
2,905
786
33 $ 35.65
0 $ 35.65
$1,181
$0
132
0
0.25 * 1 *
0.25 * 0 *
1*
3*
3 * 4 * 100% *
2 * 4 * 100% *
0.00% *
0.00% *
880
314
0 $ 35.65
0 $ 35.65
$0
$0
0
0
0.25 * 0 *
0.25 * 1 *
1*
3*
3 * 4 * 100% *
2 * 4 * 100% *
0.00% *
0.00% *
352
78
0 $ 35.65
0 $ 35.65
$0
$0
0
0
0.25 * 1 *
0.25 * 1 *
1*
3*
3 * 4 * 100% *
2 * 4 * 100% *
0.00% *
0.00% *
88
78
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Page 61
#PLANTS
SUPWAGE
0 $ 36.22
Hours
883
%ABOVEPEL
*
4
0.00%
#SAMPS
3 * 4 * 100% *
SHIFTS
2*
JOBPEL
0.25 * 0 *
NOTETIME
Sector 1. Electroplating
Large
Hard Chrome
Small
Large
Job Shop Chrome
Plater
Small
Large
Captive Shop
Chrome Plater
Small
Large
Job Shop Plater
Small
Large
Captive Shop Plater
Small
Large
Operator
Small
Sector 2. Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
%NOTQUART
20.69%
Item 12 Cost
Responses
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
0.25 * 1 *
1*
0.00% *
529
0 $ 35.65
$0
0
Large
0.25 * 1 *
1*
3 * 4 * 100% *
MARITIME
1 * 4 * 100% *
0.00% *
17
0 $ 35.65
$0
0
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
10
24
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
14
6
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
3
116
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
66
4
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
2
2
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
1
4
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
2
2
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 0 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
1
0
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 0 *
0.25 * 0 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
0
0
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 0 *
0.25 * 0 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
0
15
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
0.00% *
9
0 $ 35.65
$0
0
Large
0.25 * 0 * 1 * 1 * 4 * 100% *
CONSTRUCTION
0.25 * 1 * 3 * 1 * 4 * 100% *
0.00% *
201
0 $ 35.65
$0
0
Small
Large
0.25 * 1 *
0.25 * 0 *
1*
3*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
1,609
3
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 0 *
1*
3*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
21
41
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
State
0.25 * 1 *
0.25 * 1 *
1*
3*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
322
20
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Local
State
0.25 * 1 *
0.25 * 1 *
1*
3*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
161
4
0 $ 35.65
0 $ 35.65
$0
$0
0
0
SUPWAGE
88
472
Hours
#PLANTS
0.00% *
0.00% *
4
3 * 4 * 100% *
2 * 4 * 100% *
#SAMPS
1*
3*
SHIFTS
0.25 * 1 *
0.25 * 1 *
JOBPEL
Small
Large
NOTETIME
%ABOVEPEL
%NOTQUART
Table 9
Resistance Welding
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Thermal Spray
Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Page 62
Item 12 Cost
Responses
0.00% *
19
0 $ 35.65
$0
0
0.25 * 1 *
0.25 * 0 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
590
0
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
8
4
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
State
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
118
2
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Local
State
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
59
1
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Local
2A. Mild Steel Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
Small
Large
Resistance Welding
Small
0.25 * 1 *
1*
1 * 4 * 100% *
0.00% *
12
0 $ 35.65
$0
0
0.25 * 0 *
1*
1 * 4 * 100% *
0.00% *
4,740
0 $ 35.65
$0
0
0.25 * 1 * 1 * 1 * 4 * 100% *
0.25 * 1 * 1 * 1 * 4 * 100% *
0.00% *
0.00% *
4,826
3,476
0 $ 35.65
0 $ 35.65
$0
0
0
SHIFTS
1*
Large
0.25 * 1 *
Small
Large
SUPWAGE
0
0.25 * 1 *
Hours
#PLANTS
$0
Local
4
0 $ 35.65
#SAMPS
32
JOBPEL
0.00% *
1*
1 * 4 * 100% *
GOVERNMENT
1 * 4 * 100% *
NOTETIME
%ABOVEPEL
%NOTQUART
Table 9
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
0.25 * 1
0.25 * 1
* 1
* 1
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
3,539
1,053
0 $ 35.65
0 $ 35.65
$0
$0
0
0
0.25 * 1
0.25 * 1
* 1
* 1
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
1,073
421
0 $ 35.65
0 $ 35.65
$0
$0
0
0
0.25 * 1
0.25 * 0
* 1
* 1
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
429
105
0 $ 35.65
0 $ 35.65
$0
$0
0
0
0.25 * 1
0.25 * 1
* 1
* 1
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
107
105
0 $ 35.65
0 $ 35.65
$0
$0
0
0
0.25 * 1
0.25 * 1
* 1
* 1
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
107
632
0 $ 35.65
0 $ 35.65
$0
$0
0
0
0.25 * 1
* 1
* 1
0.00% *
644
0 $ 35.65
$0
0
Large
0.25 * 0 *
* 4 * 100% *
MARITIME
1 * 4 * 100% *
0.00% *
37
0 $ 35.65
$0
0
Small
Large
0.25 * 0 * 2 * 1 * 4 * 100% *
0.25 * 0 * 3 * 1 * 4 * 100% *
0.00% *
0.00% *
21
53
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
30
13
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
7
249
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
0.25 * 0
* 2
* 1
* 4 * 100% *
0.00% *
141
0 $ 35.65
$0
0
3*
SMAW
GMAW
TIG
FCAW
Page 63
Item 12 Cost
Responses
0.00% *
8
0 $ 35.65
$0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
5
3
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
2
8
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
5
3
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
2
1
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
0
1
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
0
33
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
0.25 * 0
* 2
* 1
0.00% *
18
0 $ 35.65
$0
0
Large
0.25 * 0
* 3
* 1
* 4 * 100% *
CONSTRUCTION
* 4 * 100% *
0.00% *
301
0 $ 35.65
$0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
2,277
4
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
30
60
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Small
State
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
455
30
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Local
State
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
228
6
0 $ 35.65
0 $ 35.65
$0
$0
0
0
Local
0.25 * 0
* 2
* 1
* 4 * 100% *
0.00% *
45
0 $ 35.65
$0
0
Large
0.25 * 1 *
3*
3 * 4 * 100% *
28.00% *
49
123 $ 44.87
$5,531
493
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
3*
3 * 4 * 100% *
3 * 4 * 100% *
9.00% *
5.00% *
62
326
17 $ 44.87
147 $ 44.87
$746
$6,585
67
587
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
3*
3 * 4 * 100% *
3 * 4 * 100% *
5.00% *
8.00% *
1,436
100
215 $ 44.87
72 $ 44.87
$9,663
$3,219
861
287
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
3*
3 * 4 * 100% *
3 * 4 * 100% *
8.00% *
36.00% *
18
276
4 $ 44.87
893 $ 44.87
$195
$40,056
17
3571
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
3*
3 * 4 * 100% *
3 * 4 * 100% *
36.00% *
22.00% *
476
671
514 $ 44.87
1,328 $ 44.87
$23,085
$59,606
2058
5313
Small
0.25 * 1 *
1*
3 * 4 * 100% *
22.00% *
3,566
2,354 $ 44.87
$105,628
9416
SHIFTS
SUPWAGE
* 4 * 100% *
Hours
#PLANTS
* 1
4
* 3
#SAMPS
0.25 * 0
JOBPEL
Large
NOTETIME
%ABOVEPEL
%NOTQUART
Table 9
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Thermal Spray
Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Sector 3. Painting
AEROSPACE
AUTOBODY
COIL COATING
MARITIME
CONSTRUCTION
Page 64
%NOTQUART
50
*
3 * 4 * 100% *
12.00% *
647
233 $ 44.87
$10,446
931
*
3 * 4 * 100% *
0.00% *
2
0 $ 52.66
$0
0
*
3 * 4 * 100% *
0.00% *
0
0 $ 52.66
$0
0
*
3 * 4 * 100% *
77.00% *
2
8 $ 51.32
$427
33
*
3 * 4 * 100% *
0.00% *
1
0 $ 51.32
$0
0
*
3 * 4 * 100% *
0.00% *
2
0 $ 43.46
$0
0
*
0 * 4 * 100% *
0.00% *
0
0 $ 43.46
$0
0
*
3 * 4 * 100% *
0.00% *
5
0 $ 52.66
$0
0
*
3 * 4 * 100% *
0.00% *
0
0 $ 52.66
$0
0
*
3 * 4 * 100% *
0.00% *
80
0 $ 39.21
$0
0
*
3 * 4 * 100% *
0.00% *
126
0 $ 39.21
$0
0
*
9 * 4 * 100% *
0.00% *
2
0 $ 39.29
$0
0
*
5 * 4 * 100% *
0.00% *
8
0 $ 39.29
$0
0
*
3 * 4 * 100% *
36.00% *
81
792 $ 43.52
$34,468
3168
*
3 * 4 * 100% *
36.00% *
40
215 $ 43.52
$9,366
861
*
3 * 4 * 100% *
0.00% *
6
0 $ 39.06
$0
0
*
3 * 4 * 100% *
0.00% *
4
0 $ 39.06
$0
0
*
3 * 4 * 100% *
0.00% *
1
0 $ 52.83
$0
0
*
1* 4*
0% *
0.00% *
0
0 $ 52.83
$0
0
*
3 * 4 * 100% *
0.00% *
34
0 $ 52.83
$0
0
*
*
3 * 4 * 100% *
3 * 4 * 100% *
0.00% *
38.00% *
11
102
0 $ 52.83
1,042 $ 52.83
$0
$55,029
0
4167
*
3 * 4 * 100% *
38.00% *
32
36 $ 52.83
$1,923
146
*
3 * 4 * 100% *
38.00% *
33
341 $ 52.83
$17,997
1363
*
3 * 4 * 100% *
38.00% *
31
36 $ 52.83
$1,884
143
SHIFTS
SUPWAGE
$566
Hours
13 $ 44.87
#PLANTS
12
%ABOVEPEL
12.00% *
3*
4
3 * 4 * 100% *
#SAMPS
Responses
0.25 * 1 *
Item 12 Cost
Large
JOBPEL
NOTETIME
Table 9
GOVERNMENT
0.25 * 1 * 1
Small
Sector 4. Producers of Chromates
Large
0.25 * 0 * 3
ALL
0.25 * 0 * 1
Small
Sector 5. Chromate Pigment Procedures
Large
0.25 * 1 * 2
ALL
0.25 * 0 * 1
Small
Sector 6. CCA Producers
Large
0.25 * 0 * 3
ALL
0.25 * 0 * 3
Small
Sector 7. Chromium Catalyst Producers
Large
0.25 * 0 * 3
ALL
0.25 * 0 * 1
Small
Sector 8. Paint and Coating Producers
Large
0.25 * 0 * 2
ALL
0.25 * 0 * 2
Small
Sector 9. Printing Ink Producers
Large
0.25 * 0 * 1
ALL
0.25 * 0 * 1
Small
Sector 10. Plastic Colorant Producers and Users
Large
0.25 * 3 * 3
ALL
0.25 * 5 * 1
Small
Sector 11. Plating Mixture Producers
Large
0.25 * 0 * 1
ALL
0.25 * 0 * 1
Small
Sector 13. Chromium Metal Producers
Large
0.25 * 0 * 3
ALL
0.25 * 0 * 1
Small
Sector 14. Iron and Steel Mills
Large
0.25 * 0 * 3
ALLOY AND
STAINLESS STEEL
0.25 * 0 * 1
Small
Large
0.25 * 3 * 3
CARBON STEEL
0.25 * 1 * 1
Small
14B. Forging Industry
Large
0.25 * 3 * 3
FORGING
INDUSTRY
0.25 * 1 * 1
Small
Page 65
Item 12 Cost
Responses
163
0 $ 38.53
$0
0
*
1*
5 * 4 * 100% *
0.00% *
118
0 $ 38.53
$0
0
*
1 * 21 * 4 * 100% *
62.00% *
3
246 $ 51.32
$12,625
984
*
1*
7 * 4 * 100% *
62.00% *
1
20 $ 51.32
$1,002
78
*
1*
3 * 4 * 100% *
0.00% *
0
0 $ 56.48
$0
0
*
1*
3 * 4 * 100% *
0.00% *
5
0 $ 56.48
$0
0
*
1*
3 * 4 * 100% *
0.00% *
216
0 $ 40.75
$0
0
*
1*
3 * 4 * 100% *
0.00% *
1,627
0 $ 40.75
$0
0
*
3*
3 * 4 * 100% *
0.00% *
343
0 $ 27.18
$0
0
0*
1*
2 * 4 * 100% *
0.00% *
697
0 $ 27.18
$0
0
0*
3 * 12 * 4 * 25% *
0.00% *
6
0 $ 39.30
$0
0
0*
1*
1*
3*
4 * 4 * 0% *
1 * 4 * 25% *
0.00% *
0.00% *
20
90
0 $ 39.30
0 $ 39.30
$0
$0
0
0
0*
1*
1* 4*
0% *
0.00% *
5
0 $ 39.30
$0
0
0*
3*
2 * 4 * 100% *
0.00% *
81
0 $ 28.36
$0
0
0*
1*
2 * 4 * 100% *
0.00% *
325
0 $ 28.36
$0
0
0*
3*
3 * 4 * 100% *
13.00% *
179
0 $ 44.23
$0
0
0*
2*
1*
3*
3 * 4 * 100% *
3 * 4 * 100% *
0.00% *
13.00% *
0
23
0 $ 44.23
54 $ 44.23
$0
$2,385
0
216
0*
1*
3 * 4 * 100% *
0.00% *
4
0 $ 44.23
$0
0
0*
1 * 15 * 4 * 100% *
0.00% *
5
0 $ 34.92
$0
0
0*
1*
0 * 4 * 100% *
0.00% *
0
0 $ 34.92
$0
0
0*
1*
2 * 4 * 100% *
0.00% *
148
0 $ 31.42
$0
0
0*
0*
1*
1*
2 * 4 * 100% *
2 * 4 * 100% *
0.00% *
0.00% *
79
36
0 $ 31.42
0 $ 31.42
$0
$0
0
0
0*
1*
1*
1*
2 * 4 * 100% *
2 * 4 * 100% *
0.00% *
0.00% *
32
1,162
0 $ 31.42
0 $ 31.42
$0
$0
0
0
1*
1*
2 * 4 * 100% *
0.00% *
4,650
0 $ 31.42
$0
0
Page 66
SHIFTS
SUPWAGE
#PLANTS
0.00% *
Hours
%ABOVEPEL
0.25 *
Small
Sector 21. Colored Glass Producers
Large
0.25 *
ALL
0.25 *
Small
Large
0.25 *
Fiber, Flat, and
Container Glass
0.25 *
Small
Sector 22. Printing
Large
0.25 *
ALL
0.25 *
Small
Sector 24. Chromium Catalyst Users
Large
0.25 *
Catalyst Users
0.25 *
Small
Large
0.25 *
Catalyst Companies
0.25 *
Small
Sector 25. Refractory Brick Producers
Large
0.25 *
ALL
0.25 *
Small
Sector 26. Woodworking
Large
0.25 *
General Industry
0.25 *
Small
Large
0.25 *
Maritime
0.25 *
Small
Large
0.25 *
Construction
0.25 *
Small
%NOTQUART
5 * 4 * 100% *
4
3*
Sector 15. Iron and Steel Foundries
Large
0.25 * 0
ALL
0.25 * 0
Small
Sector 17. Chromium Dye Producers
Large
0.25 * 7
ALL
0.25 * 5
Small
Sector 18. Chromium Sulfate Producers
Large
0.25 * 0
ALL
0.25 * 0
Small
Sector 19. Chemical Distributers
Large
0.25 * 0
ALL
0.25 * 0
Small
Sector 20. Textile Dyeing
Large
0.25 * 0
ALL
#SAMPS
*
JOBPEL
NOTETIME
Table 9
Item 12 Cost
Responses
$0
0
0.25 * 1 *
Small
Sector 27. Solid Waste Incerneration
Large
0.25 * 0 *
General Industry
0.25 * 0 *
Small
1*
2 * 4 * 100% *
0.00% *
42
0 $ 31.42
$0
0
3 * 15 * 4 * 100% *
0.00% *
40
0 $ 37.07
$0
0
SUPWAGE
0 $ 31.42
Hours
#PLANTS
12
4
0.00% *
#SAMPS
2 * 4 * 100% *
SHIFTS
1*
Large
JOBPEL
0.25 * 1 *
NOTETIME
%ABOVEPEL
%NOTQUART
Table 9
Government
1*
3 * 4 * 100% *
0.00% *
$0
0
0.25 *
0*
3*
15 * 4 * 100% *
0.00% *
48
0
0 $ 37.07
State
0 $ 37.07
$0
0
Local
0.25 *
0*
1*
3 * 4 * 100% *
0.00% *
24
0 $ 37.07
$0
0
3*
3 * 4 * 100% *
0.00% *
19
0 $ 38.01
$0
0
3*
3 * 4 * 100% *
0.00% *
0
0 $ 38.01
$0
0
1*
3 * 4 * 100% *
0.00% *
51
0 $ 43.74
$0
0
Government
Sector 30. Superalloy Producers and Users
Large
0.25 * 0 *
ALL
0.25 * 0 *
Small
Sector 31. Construction
Large
0.25 * 0 *
Small
State
0.25 * 0 *
0.25 * 0 *
1*
1*
2 * 4 * 100% *
2 * 4 * 100% *
0.00% *
0.00% *
233
15
0 $ 43.74
0 $ 43.74
$0
$0
0
0
Local
Large
0.25 * 0 *
0.25 * 0 *
1*
1*
3 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
88
40
0 $ 43.74
0 $ 43.74
$0
$0
0
0
Hazardous Waste‐ Small
site Work
State
0.25 * 0 *
0.25 * 0 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
170
1
0 $ 43.74
0 $ 43.74
$0
$0
0
0
Local
Large
0.25 * 0 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
60.00% *
239
44
0 $ 43.74
27 $ 43.74
$0
$1,163
0
106
Small
0.25 * 1 *
1*
1 * 4 * 100% *
60.00% *
Total
175
105 $ 43.74
75,684 10,529
$4,600
$468,618
421
42,114
Industrial
Rehabilitation
Refractory Brick
Restoration
Page 67
Table 9a (Remand)
Employer Time and Cost to Notify Employees of Initial Monitoring Results
Hours = (NOTETIME * JOBCAT * SHIFTS * #SAMPS * #INIT * %INITADD * #PLANTS)
Cost = BURDEN HOURS * NONSUPWAGE
* NOTETIME = Time, in hours, to notifiy an employee of the exposure monitoring results by posting .25 hours (15 minutes).
NONSUPWAGE = Non‐supervisory wage rate, $/hr.
* JOBCAT = Number of job categories (covering each work area)
* SHIFTS = Number of work shifts
* #SAMPS = Number of samples per exposure measurement
* #INIT = Equals two, reflecting that initial monitoring will have to be conducted twice — with readings below the action level
in order for the requirement of semi‐annual monitoring to be waived.
* %INITADD = Percent of plants that have not satisified initial monitoring requirement
* #PLANTS * 5% = Number of plants represented by the model output * 5%
% INITADD
# PLANTS
#PLANTS * 5%
Item 12 COSTS
HOURS
RESPONSES
* 25% *
883
44
=
$6,170
232
927
( 0.25 * $ 26.61 $ 21.43
( 0.25 * $ 26.61 $ 21.43
7 * 1 * 3 *
1 * 2 * 3 *
2
2
* 25% *
* 25% *
1,662
426
83
21
=
=
$5,806
$425
218
16
873
64
( 0.25 * $ 26.61 $ 21.43
( 0.25 * $ 26.61 $ 21.43
1 * 1 * 3 *
1 * 2 * 3 *
2
2
* 25% *
* 25% *
801
580
40
29
=
=
$400
$579
15
22
60
87
( 0.25 * $ 26.61 $ 21.43
( 0.25 * $ 26.61 $ 21.43
1 * 1 * 3 *
1 * 2 * 3 *
2
2
* 25% *
* 25% *
1,092
426
55
21
=
=
$545
$425
20
16
82
64
Job Shop Plater
Large
Small
( 0.25 * $ 26.61 $ 21.43
( 0.25 * $ 26.61 $ 21.43
1 * 1 * 3 *
1 * 2 * 3 *
2
2
* 25% *
* 25% *
801
503
40
25
=
=
$400
$502
15
19
60
75
2
2
* 25% *
* 25% *
946
883
47
44
=
=
$472
$881
18
33
71
132
2
* 25% *
1,662
83
=
$829
31
125
# SAMPS
2
SHIFTS
7 * 2 * 3 *
JOBCAT
# INIT
Job Shop
Large
Chrome Plater
Small
Large
Captive Shop
Chrome Plater
Small
NONSUPEWAGE (2003)
( 0.25 * $ 26.61 $ 21.43
NOTETIME
Sector 1. Electroplating
Large
Hard Chrome
Small
NONSUPEWAGE
24.17%
Captive Shop Large
Plater
Small ( 0.25 * $ 26.61 $ 21.43 1 * 1 * 3 *
Large ( 0.25 * $ 26.61 $ 21.43 1 * 2 * 3 *
Operator
Small ( 0.25 * $ 26.61 $ 21.43 1 * 1 * 3 *
Sector 2. Welding GENERAL INDUSTRY
Large
( 0.25 * $ 26.20 $ 21.10
1 * 3 * 2 *
2
* 25% *
3,535
177
=
$3,473
133
530
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 3 *
1 * 3 * 2 *
2
2
* 25% *
* 25% *
3,962
2,593
198
130
=
=
$1,946
$2,548
74
97
297
389
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 3 *
1 * 3 * 2 *
2
2
* 25% *
* 25% *
2,905
786
145
39
=
=
$1,427
$772
54
29
218
118
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 3 *
1 * 3 * 2 *
2
2
* 25% *
* 25% *
880
314
44
16
=
=
$432
$309
17
12
66
47
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 3 *
1 * 3 * 2 *
2
2
* 25% *
* 25% *
352
78
18
4
=
=
$173
$77
7
3
26
12
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 3 *
1 * 3 * 2 *
2
2
* 25% *
* 25% *
88
78
4
4
=
=
$43
$77
2
3
7
12
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 3 *
1 * 3 * 2 *
2
2
* 25% *
* 25% *
88
472
4
24
=
=
$43
$463
2
18
7
71
Small
( 0.25 * $ 26.20 $ 21.10
529
26
=
$260
10
40
Large
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 3 * 2 * 25% *
MARITIME
1 * 3 * 1 * 2 * 75% *
17
1
=
$26
1
4
SMAW
GMAW
TIG
SAW
Plasma Cutting
Plasma Welding
Resistance
Welding
SMAW
Page 68
% INITADD
# PLANTS
#PLANTS * 5%
Item 12 COSTS
HOURS
RESPONSES
2
2
* 75% *
* 75% *
10
24
0
1
=
=
$9
$36
0
1
1
5
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 2 * 1 *
1 * 3 * 1 *
2
2
* 75% *
* 75% *
14
6
1
0
=
=
$13
$9
1
0
2
1
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 2 * 1 *
1 * 3 * 1 *
2
2
* 75% *
* 75% *
3
116
0
6
=
=
$3
$171
0
7
0
26
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 2 * 1 *
1 * 3 * 1 *
2
2
* 75% *
* 75% *
66
4
3
0
=
=
$65
$6
2
0
10
1
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 2 * 1 *
1 * 3 * 1 *
2
2
* 75% *
* 75% *
2
2
0
0
=
=
$2
$3
0
0
0
0
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 2 * 1 *
1 * 3 * 1 *
2
2
* 75% *
* 75% *
1
4
0
0
=
=
$1
$6
0
0
0
1
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 2 * 1 *
1 * 3 * 1 *
2
2
* 75% *
* 75% *
2
2
0
0
=
=
$2
$3
0
0
0
0
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 2 * 1 *
1 * 3 * 1 *
2
2
* 75% *
* 75% *
1
0
0
0
=
=
$1
$0
0
0
0
0
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 2 * 1 *
1 * 3 * 1 *
2
2
* 75% *
* 75% *
0
0
0
0
=
=
$0
$0
0
0
0
0
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 2 * 1 *
1 * 3 * 1 *
2
2
* 75% *
* 75% *
0
15
0
1
=
=
$0
$23
0
1
0
3
Small
( 0.25 * $ 26.20 $ 21.10
9
0
=
$9
0
1
Large
( 0.25 * $ 26.20 $ 21.10
1 * 2 * 1 * 2 * 75% *
CONSTRUCTION
1 * 3 * 1 * 2 * 25% *
201
10
=
$99
4
15
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 1 *
1 * 3 * 1 *
2
2
* 25% *
* 25% *
1,609
3
80
0
=
=
$263
$1
10
0
40
0
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 1 *
1 * 3 * 1 *
2
2
* 25% *
* 25% *
21
41
1
2
=
=
$3
$20
0
1
1
3
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 1 *
1 * 3 * 1 *
2
2
* 25% *
* 25% *
322
20
16
1
=
=
$53
$10
2
0
8
2
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 1 *
1 * 3 * 1 *
2
2
* 25% *
* 25% *
161
4
8
0
=
=
$26
$2
1
0
4
0
Small
( 0.25 * $ 26.20 $ 21.10
32
2
=
$5
0
1
State
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 1 * 2 * 25% *
GOVERNMENT
1 * 1 * 1 * 2 * 25% *
19
1
=
$3
0
0
Local
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 1 *
590
30
=
$97
4
15
# SAMPS
1 * 2 * 1 *
1 * 3 * 1 *
SHIFTS
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
JOBCAT
Small
Large
NOTETIME
# INIT
NONSUPEWAGE (2003)
NONSUPEWAGE
Table 9a (Remand)
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Thermal Spray
Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
SMAW
2
Page 69
* 25% *
% INITADD
# PLANTS
#PLANTS * 5%
Item 12 COSTS
HOURS
RESPONSES
2
* 25% *
0
0
=
$0
0
0
Local
State
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 1 *
1 * 1 * 1 *
2
2
* 25% *
* 25% *
8
4
0
0
=
=
$1
$1
0
0
0
0
Local
State
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 1 *
1 * 1 * 1 *
2
2
* 25% *
* 25% *
118
2
6
0
=
=
$19
$0
1
0
3
0
Local
State
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 1 *
1 * 1 * 1 *
2
2
* 25% *
* 25% *
59
1
3
0
=
=
$10
$0
0
0
1
0
* 25% *
12
1
=
$2
0
0
* 25% *
4,740
237
=
$4,657
178
711
* 25% *
* 25% *
4,826
3,476
241
174
=
=
$2,371
$3,416
90
130
362
521
* 25% *
* 25% *
3,539
1,053
177
53
=
=
$1,739
$1,035
66
39
265
158
* 25% *
* 25% *
1,073
421
54
21
=
=
$527
$414
20
16
80
63
* 25% *
* 25% *
429
105
21
5
=
=
$211
$103
8
4
32
16
* 25% *
* 25% *
107
105
5
5
=
=
$53
$103
2
4
8
16
* 25% *
* 25% *
107
632
5
32
=
=
$53
$621
2
24
8
95
* 25% *
644
32
=
$316
12
48
* 75% *
37
2
=
$54
2
8
* 75% *
* 75% *
21
53
1
3
=
=
$21
$78
1
3
3
12
* 75% *
* 75% *
30
13
1
1
=
=
$29
$19
1
1
4
3
* 75% *
* 75% *
7
249
0
12
=
=
$7
$367
0
14
1
56
* 75% *
* 75% *
141
8
7
0
=
=
$139
$11
5
0
21
2
* 75% *
* 75% *
5
3
0
0
=
=
$5
$4
0
0
1
1
* 75% *
* 75% *
2
8
0
0
=
=
$2
$11
0
0
0
2
* 75% *
* 75% *
5
3
0
0
=
=
$5
$4
0
0
1
1
* 75% *
* 75% *
2
1
0
0
=
=
$2
$1
0
0
0
0
# SAMPS
1 * 1 * 1 *
SHIFTS
( 0.25 * $ 26.20 $ 21.10
JOBCAT
State
NOTETIME
# INIT
NONSUPEWAGE (2003)
NONSUPEWAGE
Table 9a (Remand)
Plasma Cutting
GMAW
Brazing
Metallizing
Local ( 0.25 * $ 26.20 $ 21.10 1 * 1 * 1 * 2
Sector 2. Mild Steel Welding GENERAL INDUSTRY
Large ( 0.25 * $ 26.20 $ 21.10 1 * 3 * 2 * 2
SMAW
Small ( 0.25 * $ 26.20 $ 21.10 1 * 1 * 3 * 2
Large ( 0.25 * $ 26.20 $ 21.10 1 * 3 * 2 * 2
GMAW
Small ( 0.25 * $ 26.20 $ 21.10 1 * 1 * 3 * 2
Large ( 0.25 * $ 26.20 $ 21.10 1 * 3 * 2 * 2
TIG
Small ( 0.25 * $ 26.20 $ 21.10 1 * 1 * 3 * 2
Large ( 0.25 * $ 26.20 $ 21.10 1 * 3 * 2 * 2
SAW
Small ( 0.25 * $ 26.20 $ 21.10 1 * 1 * 3 * 2
Large ( 0.25 * $ 26.20 $ 21.10 1 * 3 * 2 * 2
Plasma Cutting
Small ( 0.25 * $ 26.20 $ 21.10 1 * 1 * 3 * 2
Large ( 0.25 * $ 26.20 $ 21.10 1 * 3 * 2 * 2
Plasma Welding
Small ( 0.25 * $ 26.20 $ 21.10 1 * 1 * 3 * 2
Large ( 0.25 * $ 26.20 $ 21.10 1 * 3 * 2 * 2
Resistance
Welding
Small ( 0.25 * $ 26.20 $ 21.10 1 * 1 * 3 * 2
MARITIME
Large ( 0.25 * $ 26.20 $ 21.10 1 * 3 * 1 * 2
SMAW
Small ( 0.25 * $ 26.20 $ 21.10 1 * 2 * 1 * 2
Large ( 0.25 * $ 26.20 $ 21.10 1 * 3 * 1 * 2
GMAW
Small ( 0.25 * $ 26.20 $ 21.10 1 * 2 * 1 * 2
Large ( 0.25 * $ 26.20 $ 21.10 1 * 3 * 1 * 2
TIG
Small ( 0.25 * $ 26.20 $ 21.10 1 * 2 * 1 * 2
Large ( 0.25 * $ 26.20 $ 21.10 1 * 3 * 1 * 2
FCAW
Small ( 0.25 * $ 26.20 $ 21.10 1 * 2 * 1 * 2
Large ( 0.25 * $ 26.20 $ 21.10 1 * 3 * 1 * 2
Plasma Cutting
Small ( 0.25 * $ 26.20 $ 21.10 1 * 2 * 1 * 2
Large ( 0.25 * $ 26.20 $ 21.10 1 * 3 * 1 * 2
Plasma Welding
Small ( 0.25 * $ 26.20 $ 21.10 1 * 2 * 1 * 2
Large ( 0.25 * $ 26.20 $ 21.10 1 * 3 * 1 * 2
Oxy‐fuel Cutting
Small ( 0.25 * $ 26.20 $ 21.10 1 * 2 * 1 * 2
Large ( 0.25 * $ 26.20 $ 21.10 1 * 3 * 1 * 2
Air Carbon Arc
Cutting
Small ( 0.25 * $ 26.20 $ 21.10 1 * 2 * 1 * 2
Large ( 0.25 * $ 26.20 $ 21.10 1 * 3 * 1 * 2
Electric Torch
Page 70
# PLANTS
#PLANTS * 5%
Item 12 COSTS
HOURS
RESPONSES
1 * 2 * 1 *
1 * 3 * 1 *
2
2
* 75% *
* 75% *
0
1
0
0
=
=
$0
$1
0
0
0
0
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 2 * 1 *
1 * 3 * 1 *
2
2
* 75% *
* 75% *
0
33
0
2
=
=
$0
$48
0
2
0
7
Small
( 0.25 * $ 26.20 $ 21.10
18
1
=
$18
1
3
Large
( 0.25 * $ 26.20 $ 21.10
1 * 2 * 1 * 2 * 75% *
CONSTRUCTION
1 * 3 * 1 * 2 * 25% *
301
15
=
$148
6
23
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 1 *
1 * 3 * 1 *
2
2
* 25% *
* 25% *
2,277
4
114
0
=
=
$373
$2
14
0
57
0
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 1 *
1 * 3 * 1 *
2
2
* 25% *
* 25% *
30
60
1
3
=
=
$5
$29
0
1
1
4
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 1 *
1 * 3 * 1 *
2
2
* 25% *
* 25% *
455
30
23
1
=
=
$75
$15
3
1
11
2
Small
Large
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
1 * 1 * 1 *
1 * 3 * 1 *
2
2
* 25% *
* 25% *
228
6
11
0
=
=
$37
$3
1
0
6
0
$ 21.10
1 * 1 * 1 *
2
* 25% *
45
2
=
$7
0
1
$ 26.63
2 * 3 * 3 *
2
* 25% *
49
2
=
$182
6
22
$ 26.63
$ 26.63
1 * 1 * 3 *
2 * 2 * 3 *
2
2
* 25% *
* 25% *
62
326
3
16
=
=
$38
$809
1
24
5
98
$ 26.63
$ 26.63
2 * 1 * 3 *
2 * 2 * 3 *
2
2
* 25% *
* 25% *
1,436
100
72
5
=
=
$1,780
$247
54
7
215
30
$ 26.63
$ 26.63
2 * 1 * 3 *
3 * 3 * 1 *
2
2
* 25% *
* 25% *
18
276
1
14
=
=
$22
$512
1
15
3
62
$ 26.63
$ 26.63
3 * 1 * 1 *
3 * 3 * 1 *
2
2
* 25% *
* 25% *
476
671
24
34
=
=
$295
$1,248
9
38
36
151
$ 26.63
$ 26.63
3 * 1 * 1 *
2 * 3 * 1 *
2
2
* 25% *
* 25% *
3,566
12
178
1
=
=
$2,211
$14
67
0
267
2
$ 26.63
2 * 1 * 1 *
2
* 25% *
647
32
=
$267
8
32
$ 31.15
4 * 3 * 3 *
2
* 100% *
2
0
=
$67
2
7
$ 31.15
0 * 1 * 3 *
2
*
*
0
0
=
$0
0
0
$ 30.36
9 * 2 * 3 *
2
* 25% *
2
0
=
$23
1
2
$ 30.36
1 * 1 * 3 *
2
* 25% *
1
0
=
$1
0
0
$ 25.72
4 * 3 * 3 *
2
* 25% *
2
0
=
$17
1
2
$ 25.72
0 * 3 * 0 *
2
*
*
0
0
=
$0
0
0
$ 31.15 14 * 3 * 3 *
2
* 25% *
5
0
=
$146
4
15
$ 31.15
2
*
0
0
=
$0
0
0
# SAMPS
( 0.25 * $ 26.20 $ 21.10
( 0.25 * $ 26.20 $ 21.10
SHIFTS
Small
Large
JOBCAT
% INITADD
NONSUPEWAGE (2003)
# INIT
Thermal Spray
Tungsten Cutting
NOTETIME
Electric Torch
Cutting
NONSUPEWAGE
Table 9a (Remand)
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Small ( 0.25 * $ 26.20
SECTOR 3. PAINTING
Large ( 0.25 * $ 33.07
General Industry
(Aerospace)
Small ( 0.25 * $ 33.07
Large ( 0.25 * $ 33.07
General Industry
(Autobody)
Small ( 0.25 * $ 33.07
Large ( 0.25 * $ 33.07
General Industry
(Coil Coating)
Small ( 0.25 * $ 33.07
Large ( 0.25 * $ 33.07
Maritime
Small ( 0.25 * $ 33.07
Large ( 0.25 * $ 33.07
Construction
Small ( 0.25 * $ 33.07
State ( 0.25 * $ 33.07
Government
Local ( 0.25 * $ 33.07
SECTOR 4. Producers of Chromates
Large ( 0.25 * $ 38.68
ALL
Small ( 0.25 * $ 38.68
SECTOR 5. Chromate Pigment Procedures
Large ( 0.25 * $ 37.70
ALL
Small ( 0.25 * $ 37.70
SECTOR 6. CCA Producers
Large ( 0.25 * $ 31.94
ALL
Small ( 0.25 * $ 31.94
SECTOR 7. Chromium Catalyst Producers
Large ( 0.25 * $ 38.68
ALL
Small ( 0.25 * $ 38.68
SECTOR 8. Paint and Coating Producers
0 * 1 * 3 *
Page 71
0%
0%
0%
*
# PLANTS
#PLANTS * 5%
Item 12 COSTS
HOURS
RESPONSES
* 25% *
80
4
=
$348
12
48
$ 23.20
4 * 2 * 3 *
2
* 25% *
126
6
=
$546
19
76
$ 23.24
5 * 1 * 9 *
2
* 100% *
2
0
=
$81
3
11
$ 23.24
3 * 1 * 5 *
2
* 100% *
8
0
=
$90
3
12
$ 25.76
4 * 3 * 3 *
2
* 25% *
81
4
=
$586
18
73
$ 25.76
1 * 1 * 3 *
2
* 25% *
40
2
=
$24
1
3
$ 23.12
3 * 1 * 3 *
2
* 75% *
6
0
=
$27
1
4
$ 23.12
3 * 1 * 3 *
2
* 75% *
4
0
=
$18
1
3
$ 31.25 16 * 3 * 3 *
2
* 100% *
1
0
=
$127
3
13
$ 31.25
0 * 1 * 1 *
2
*
*
0
0
=
$0
0
0
$ 31.25
8 * 3 * 3 *
2
* 75% *
34
2
=
$1,773
46
183
$ 31.25
$ 31.25
4 * 1 * 3 *
8 * 3 * 3 *
2
2
* 75% *
* 75% *
11
102
1
5
=
=
$95
$5,318
2
137
10
548
$ 31.25
4 * 1 * 3 *
2
* 75% *
32
2
=
$279
7
29
$ 31.25
5 * 1 * 3 *
2
* 75% *
33
2
=
$362
9
37
$ 31.25
2 * 1 * 1 *
2
* 75% *
31
2
=
$46
1
5
$ 22.80
9 * 3 * 5 *
2
* 25% *
163
8
=
$3,887
137
549
$ 22.80
5 * 1 * 5 *
2
* 25% *
118
6
=
$523
18
74
$ 30.36
7 * 1 * 21 *
2
* 25% *
3
0
=
$93
2
10
$ 30.36
5 * 1 * 7 *
2
* 25% *
1
0
=
$7
0
1
$ 33.42
0 * 1 * 3 *
2
*
*
0
0
=
$0
0
0
$ 33.42
2 * 1 * 3 *
2
* 100% *
5
0
=
$30
1
3
$ 24.10
1 * 1 * 3 *
2
* 75% *
216
11
=
$363
12
49
$ 24.10
1 * 1 * 3 *
2
* 75% *
1,627
81
=
$2,739
92
366
# SAMPS
2
SHIFTS
4 * 2 * 3 *
( 0.25 * $ 28.81 $ 23.20
JOBCAT
% INITADD
NONSUPEWAGE (2003)
# INIT
Large
NONSUPEWAGE
NOTETIME
Table 9a (Remand)
ALL
Small ( 0.25 * $ 28.81
SECTOR 9. Printing Ink Producers
Large ( 0.25 * $ 28.86
ALL
Small ( 0.25 * $ 28.86
SECTOR 10. Plastic Colorant Producers and Users
Large ( 0.25 * $ 31.99
ALL
Small ( 0.25 * $ 31.99
SECTOR 11. Plating Mixture Producers
Large ( 0.25 * $ 28.71
ALL
Small ( 0.25 * $ 28.71
SECTOR 13. Chromium Metal Producers
Large ( 0.25 * $ 38.80
ALL
Small ( 0.25 * $ 38.80
SECTOR 14. Iron and Steel Mills
Large ( 0.25 * $ 38.80
Alloy Stainless
Steel
Small ( 0.25 * $ 38.80
Large ( 0.25 * $ 38.80
Carbon Steel
Small ( 0.25 * $ 38.80
14.B Forging
Large ( 0.25 * $ 38.80
Forging Industry
Small ( 0.25 * $ 38.80
SECTOR 15. Iron and Steel Foundries
Large ( 0.25 * $ 28.31
ALL
Small ( 0.25 * $ 28.31
SECTOR 17. Chromium Dye Producers
Large ( 0.25 * $ 37.70
ALL
Small ( 0.25 * $ 37.70
SECTOR 18. Chromium Sulfate Producers
Large ( 0.25 * $ 41.50
ALL
Small ( 0.25 * $ 41.50
SECTOR 19. Chemical Distributors
Large ( 0.25 * $ 29.92
ALL
Small ( 0.25 * $ 29.92
Page 72
0%
0%
% INITADD
# PLANTS
#PLANTS * 5%
Item 12 COSTS
HOURS
RESPONSES
2
* 75% *
343
17
=
$3,472
174
696
$ 16.08
2 * 1 * 2 *
2
* 75% *
697
35
=
$1,044
52
209
$ 23.25
3 * 3 * 12 *
2
* 75% *
6
0
=
$368
13
51
$ 23.25
$ 23.25
2 * 1 * 4 *
3 * 3 * 12 *
2
2
* 75% *
* 75% *
20
90
1
5
=
=
$86
$5,270
3
183
12
730
$ 23.25
2 * 1 * 4 *
2
* 75% *
5
0
=
$23
1
3
$ 16.79
3 * 3 * 2 *
2
* 75% *
81
4
=
$572
27
110
$ 16.79
2 * 1 * 2 *
2
* 75% *
325
16
=
$509
24
98
$ 26.18
2 * 3 * 3 *
2
* 75% *
179
9
=
$1,962
60
241
$ 26.18
$ 26.18
0 * 1 * 3 *
2 * 3 * 3 *
2
2
* 0% *
* 75% *
0
23
0
1
=
=
$0
$253
0
8
0
31
$ 26.18
0 * 1 * 3 *
2
*
*
4
0
=
$0
0
0
$ 20.65
9 * 1 * 15 *
2
* 75% *
5
0
=
$350
14
55
$ 20.65
0 * 1 * 0 *
2
* 75% *
0
0
=
$0
0
0
$ 18.59
1 * 1 * 1 *
2
* 75% *
148
7
=
$64
3
11
$ 18.59
$ 18.59
1 * 1 * 1 *
1 * 1 * 1 *
2
2
* 75% *
* 75% *
79
36
4
2
=
=
$34
$16
1
1
6
3
$ 18.59
$ 25.86
1 * 1 * 1 *
1 * 1 * 1 *
2
2
* 75% *
* 75% *
32
1,162
2
58
=
=
$14
$699
1
22
2
87
$ 18.59
$ 25.86
1 * 1 * 1 *
1 * 1 * 1 *
2
2
* 75% *
* 75% *
4,650
12
233
1
=
=
$2,013
$7
87
0
349
1
$ 18.59
1 * 1 * 1 *
2
* 75% *
42
2
=
$18
1
3
$ 21.93
6 * 3 * 15 *
2
* 75% *
40
2
=
$5,490
202
807
$ 21.93
$ 21.93
6 * 1 * 3 *
0 * 3 * 15 *
2
2
* 75% *
* 75% *
48
0
2
0
=
=
$439
$0
16
0
65
0
$ 21.93
6 * 1 * 3 *
2
* 75% *
24
1
=
$220
8
32
$ 22.49 12 * 3 * 3 *
2
* 75% *
19
1
=
$1,075
38
154
$ 22.49
2
*
0
0
=
$0
0
0
# SAMPS
3 * 3 * 3 *
SHIFTS
$ 16.08
JOBCAT
# INIT
SECTOR 20. Textile Dyeing
Large ( 0.25 * $ 19.97
ALL
Small ( 0.25 * $ 19.97
SECTOR 21. Colored Glass Producers
Large ( 0.25 * $ 28.87
General Industry
Small ( 0.25 * $ 28.87
Large ( 0.25 * $ 28.87
Fiber, Flat and
Container Glass
Small ( 0.25 * $ 28.87
SECTOR 22. Printing
Large ( 0.25 * $ 20.85
ALL
Small ( 0.25 * $ 20.85
SECTOR 24. Chromium Catalyst Users
Large ( 0.25 * $ 32.51
Catalyst Users
Small ( 0.25 * $ 32.51
Chromium Large ( 0.25 * $ 32.51
Catalyst Service
Small ( 0.25 * $ 32.51
Companies
SECTOR 25. Refractory Brick Producers
Large ( 0.25 * $ 25.64
ALL
Small ( 0.25 * $ 25.64
SECTOR 26. Woodworking
Large ( 0.25 * $ 23.08
General Industry
Small ( 0.25 * $ 23.08
Large ( 0.25 * $ 23.08
Maritime
Small ( 0.25 * $ 23.08
Large ( 0.25 * $ 32.11
Construction
Small ( 0.25 * $ 23.08
State ( 0.25 * $ 32.11
Government
Local ( 0.25 * $ 23.08
SECTOR 27. Solid Waste Incerneration
Large ( 0.25 * $ 27.23
General Industry
Small ( 0.25 * $ 27.23
State ( 0.25 * $ 27.23
Government
Local ( 0.25 * $ 27.23
SECTOR 30. Superalloy Producers and Users
Large ( 0.25 * $ 27.93
ALL
Small ( 0.25 * $ 27.93
NONSUPEWAGE (2003)
NONSUPEWAGE
NOTETIME
Table 9a (Remand)
0 * 3 * 3 *
Page 73
0%
0%
*
% INITADD
# PLANTS
#PLANTS * 5%
Item 12 COSTS
HOURS
RESPONSES
2
* 75% *
51
3
=
$368
11
46
# SAMPS
4 * 1 * 3 *
SHIFTS
# INIT
SECTOR 31. Construction ‐ Cement Workers
Large ( 0.25 * $ 32.13 $ 25.88
JOBCAT
NONSUPEWAGE (2003)
NONSUPEWAGE
NOTETIME
Table 9a (Remand)
Industrial
Small
rehabilitation State
( 0.25 * $ 32.13 $ 25.88
( 0.25 * $ 32.13 $ 25.88
4 * 1 * 2 *
1 * 1 * 1 *
2
2
* 75% *
* 100% *
233
15
12
1
=
=
$1,125
$12
35
0
140
1
Local
Large
( 0.25 * $ 32.13 $ 25.88
( 0.25 * $ 32.13 $ 25.88
1 * 1 * 1 *
1 * 1 * 1 *
2
2
* 100% *
* 75% *
88
40
4
2
=
=
$70
$24
2
1
9
3
Hazardous Small
Waste‐site Work State
( 0.25 * $ 32.13 $ 25.88
( 0.25 * $ 32.13 $ 25.88
1 * 1 * 1 *
1 * 1 * 1 *
2
2
* 75% *
* 75% *
170
1
8
0
=
=
$102
$0
3
0
13
0
Local
Large
( 0.25 * $ 32.13 $ 25.88
( 0.25 * $ 32.13 $ 25.88
1 * 1 * 1 *
1 * 1 * 1 *
2
2
* 75% *
* 0% *
239
44
12
2
=
=
$144
$0
4
0
18
0
Small
Large
( 0.25 * $ 32.13 $ 25.88
( 0.25 * $ 32.13 $ 25.88
1 * 1 * 1 *
4 * 1 * 3 *
2
2
* 0% *
* 75% *
175
9,592
9
480
=
=
$0
$69,351
0
2158
0
8633
Small
State
( 0.25 * $ 32.13 $ 25.88
( 0.25 * $ 32.13 $ 25.88
4 * 1 * 2 *
4 * 1 * 3 *
2
2
* 75% * 76,673
* 75% *
23
3,834
1
=
=
$369,581
$167
11501
5
46004
21
$ 25.88
4 * 1 * 2 *
2
* 75% *
616
31
=
$2,968
92
369
$ 22.21
7 * 1 * 11 *
2
* 75% *
1,330
66
=
$52,937
1920
7678
$ 22.21
5 * 1 * 6 *
2
* 75% *
2,187
109
=
$33,928
1230
4921
$ 22.21
7 * 1 * 11 *
2
* 75% *
1,994
100
=
$79,405
2879
11517
$ 22.21
5 * 1 * 6 *
2
* 75% *
4,653
172,752
233 =
8,638
$72,187
$779,227
2618
25,971
10470
103,882
Refractory Brick
Restoration
Cement Workers
Local ( 0.25 * $ 32.13
SECTOR 32. Pre‐Cast Concrete Products
Large ( 0.25 * $ 27.58
ALL
Small ( 0.25 * $ 27.58
SECTOR 32A. Ready Mix Concrete
Large ( 0.25 * $ 27.58
ALL
Small ( 0.25 * $ 27.58
Total
Page 74
Table 9b
Employer Time and Cost to Notify Employees of Semi‐Annual Monitoring Results
COST = BURDEN HOURS * NON SUPEWAGE
HOURS = (NOTETIME * NONSUPWAGE * JOBAL * SHIFTS * #SAMPS * 2 * %NOTSEMI * %ABOVEAL * #PLANTS)
Variables
* NOTETIME = Time, in hours, to notifiy an employee of the exposure monitoring results by posting .25 hours (15 mintues).
TOTAL HOURS
RESPONSES
5194
( 0.25 * $ 26.61 * 1 * 1 *
( 0.25 * $ 26.61 * 1 * 2 *
3 * 2 * 100% * 49.00% * 1,662 ) =
3 * 2 * 100% * 11.00% * 426 ) =
$32,513
$3,737
1,222
140
4887
562
( 0.25 * $ 26.61 * 1 * 1 *
( 0.25 * $ 26.61 * 1 * 2 *
3 * 2 * 100% * 11.00% *
3 * 2 * 100% * 14.00% *
)=
)=
$3,516
$6,484
132
244
529
975
( 0.25 * $ 26.61 * 1 * 1 *
( 0.25 * $ 26.61 * 1 * 2 *
3 * 2 * 100% * 14.00% * 1,092 ) =
3 * 2 * 100% * 10.00% * 426 ) =
$6,102
$3,397
229
128
917
511
( 0.25 * $ 26.61 * 1 * 1 *
( 0.25 * $ 26.61 * 1 * 2 *
3 * 2 * 100% * 10.00% *
3 * 2 * 100% * 13.00% *
801
503
)=
)=
$3,196
$5,216
120
196
480
784
( 0.25 * $ 26.61 * 1 * 1 *
( 0.25 * $ 26.61 * 1 * 2 *
3 * 2 * 100% * 13.00% *
3 * 2 * 100% * 16.00% *
946
883
)=
)=
$4,909
$11,282
184
424
738
1696
( 0.25 * $ 26.61 * 1 * 1 *
$10,616
399
1596
( 0.25 * $ 26.20 * 1 * 3 *
3 * 2 * 100% * 16.00% * 1,662 ) =
General Industry
2 * 2 * 100% * 0.92% * 3,535 ) =
$2,556
98
390
( 0.25 * $ 26.20 * 1 * 1 *
( 0.25 * $ 26.20 * 1 * 3 *
3 * 2 * 100% *
2 * 2 * 100% *
0.92%
0.73%
* 3,962 ) =
* 2,593 ) =
$1,432
$1,488
55
57
219
227
( 0.25 * $ 26.20 * 1 * 1 *
( 0.25 * $ 26.20 * 1 * 3 *
3 * 2 * 100% *
2 * 2 * 100% *
0.73%
0.00%
* 2,905 ) =
* 786 ) =
$834
$0
32
0
127
0
( 0.25 * $ 26.20 * 1 * 1 *
( 0.25 * $ 26.20 * 0 * 3 *
3 * 2 * 100% *
2 * 2 * 100% *
0.00%
0.00%
*
*
880
314
)=
)=
$0
$0
0
0
0
0
( 0.25 * $ 26.20 * 0 * 1 *
( 0.25 * $ 26.20 * 1 * 3 *
3 * 2 * 100% *
2 * 2 * 100% *
0.00%
0.00%
*
*
352
78
)=
)=
$0
$0
0
0
0
0
( 0.25 * $ 26.20 * 1 * 1 *
3 * 2 * 100% *
0.00%
*
88
)=
$0
0
0
Page 75
#PLANTS
%ABOVEAL
1,298
%NOTSEMI
ITEM 12 COST
SEMI‐ANNUALLY
$34,551
#SAMPS
)=
SHIFTS
3 * 2 * 100% * 49.00% *
JOBAL
( 0.25 * $ 26.61 * 1 * 2 *
NOTETIME
Sector 1. Electroplating
Large
Hard Chrome
Small
Large
Job Shop
Chrome Plater
Small
Large
Captive Shop
Chrome Plater
Small
Large
Job Shop Plater
Small
Large
Captive Shop
Plater
Small
Large
Operator
Small
Sector 2. Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
NONSUPEWAGE
* NONSUPEWAGE = Non‐supervisory wage rate. $/hr.
* JOBAL = Number of job categories exposed at or above the AL
* SHIFTS = Number of work shifts.
* #SAMPS = Number of samples per exposure measurement
* 2 = # times per year (semi‐annually)
* %NOTSEMI = Percent of plants not performing semi‐annual monitoring requirements.
* %ABOVEAL = Percent of plants that have an employee in at least one job category above the AL.
* #PLANTS = Number of plants represented by the model input.
24.17%
883
801
580
TOTAL HOURS
RESPONSES
)=
$0
0
0
Small ( 0.25 * $ 26.20 * 1 * 1 *
Large ( 0.25 * $ 26.20 * 1 * 3 *
3 * 2 * 100% *
2 * 2 * 100% *
0.00%
0.00%
*
*
88
472
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 1 * 1 *
0.00%
*
529
)=
$0
0
0
Large ( 0.25 * $ 26.20 * 1 * 3 *
3 * 2 * 100% *
MARITIME
1 * 2 * 100% *
0.00%
*
17
)=
$0
0
0
Small ( 0.25 * $ 26.20 * 1 * 2 *
Large ( 0.25 * $ 26.20 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
10
24
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 1 * 2 *
Large ( 0.25 * $ 26.20 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
14
6
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 1 * 2 *
Large ( 0.25 * $ 26.20 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
3
116
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 1 * 2 *
Large ( 0.25 * $ 26.20 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
66
4
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 1 * 2 *
Large ( 0.25 * $ 26.20 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
2
2
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 1 * 2 *
Large ( 0.25 * $ 26.20 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
1
4
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 1 * 2 *
Large ( 0.25 * $ 26.20 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
2
2
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 1 * 2 *
Large ( 0.25 * $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
1
0
)=
)=
$0
$0
0
0
0
0
* $ 26.20 * 0 * 2 *
* $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
0
0
)=
)=
$0
$0
0
0
0
0
* $ 26.20 * 0 * 2 *
* $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
0
15
)=
)=
$0
$0
0
0
0
0
* $ 26.20 * 0 * 2 *
*
9
)=
$0
0
0
Large ( 0.25 * $ 26.20 * 1 * 3 *
1 * 2 * 100% * 0.00%
CONSTRUCTION
1 * 2 * 100% * 0.00%
*
201
)=
$0
0
0
Small ( 0.25 * $ 26.20 * 1 * 1 *
Large ( 0.25 * $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
* 1,609 ) =
*
3
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 1 * 1 *
1 * 2 * 100% *
0.00%
*
$0
0
0
#PLANTS
%ABOVEAL
78
%NOTSEMI
ITEM 12 COST
Resistance
Welding
SEMI‐ANNUALLY
*
#SAMPS
0.00%
SHIFTS
2 * 2 * 100% *
JOBAL
Large ( 0.25 * $ 26.20 * 1 * 3 *
NOTETIME
Plasma
Welding
NONSUPEWAGE
Table 9b
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma
Welding
Oxy‐fuel
Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Small ( 0.25
Thermal Spray Large ( 0.25
Tungsten
Small ( 0.25
Cutting
Large ( 0.25
SAW
Small ( 0.25
SMAW
Plasma Cutting
Page 76
21
)=
TOTAL HOURS
RESPONSES
41
)=
$0
0
0
Small ( 0.25 * $ 26.20 * 1 * 1 *
State ( 0.25 * $ 26.20 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
322
20
)=
)=
$0
$0
0
0
0
0
Local
State
( 0.25 * $ 26.20 * 1 * 1 *
( 0.25 * $ 26.20 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
161
4
)=
)=
$0
$0
0
0
0
0
Local
( 0.25 * $ 26.20 * 1 * 1 *
*
32
)=
$0
0
0
State
( 0.25 * $ 26.20 * 1 * 1 *
1 * 2 * 100% * 0.00%
GOVERNMENT
1 * 2 * 100% * 0.00%
*
19
)=
$0
0
0
Local
State
( 0.25 * $ 26.20 * 1 * 1 *
( 0.25 * $ 26.20 * 1 * 1 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
590
0
)=
)=
$0
$0
0
0
0
0
Local
State
( 0.25 * $ 26.20 * 1 * 1 *
( 0.25 * $ 26.20 * 1 * 1 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
8
4
)=
)=
$0
$0
0
0
0
0
Local
State
( 0.25 * $ 26.20 * 1 * 1 *
( 0.25 * $ 26.20 * 1 * 1 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
118
2
)=
)=
$0
$0
0
0
0
0
Local
State
( 0.25 * $ 26.20 * 1 * 1 *
( 0.25 * $ 26.20 * 1 * 1 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
59
1
)=
)=
$0
$0
0
0
0
0
*
0.00%
*
12
)=
$0
0
0
*
0.00%
* 4,740 ) =
$0
0
0
*
*
0.00%
0.00%
* 4,826 ) =
* 3,476 ) =
$0
$0
0
0
0
0
*
*
0.00%
0.00%
* 3,539 ) =
* 1,053 ) =
$0
$0
0
0
0
0
*
*
0.00%
0.00%
* 1,073 ) =
* 421 ) =
$0
$0
0
0
0
0
*
*
0.00%
0.00%
*
*
429
105
)=
)=
$0
$0
0
0
0
0
*
*
0.00%
0.00%
*
*
107
105
)=
)=
$0
$0
0
0
0
0
*
*
0.00%
0.00%
*
*
107
632
)=
)=
$0
$0
0
0
0
0
*
0.00%
*
644
)=
$0
0
0
#PLANTS
%NOTSEMI
%ABOVEAL
*
#SAMPS
0.00%
SHIFTS
1 * 2 * 100% *
JOBAL
Large ( 0.25 * $ 26.20 * 1 * 3 *
NOTETIME
ITEM 12 COST
SEMI‐ANNUALLY
NONSUPEWAGE
Table 9b
GMAW
Brazing
Metallizing
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Local ( 0.25 * $ 26.20 * 1 * 1 * 1 * 2 * 100%
Sector 2. Mild Steel Welding GENERAL INDUSTRY
Large ( 0.25 * $ 26.20 * 0 * 3 * 2 * 2 * 100%
SMAW
Small ( 0.25 * $ 26.20 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $ 26.20 * 0 * 3 * 2 * 2 * 100%
GMAW
Small ( 0.25 * $ 26.20 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $ 26.20 * 0 * 3 * 2 * 2 * 100%
TIG
Small ( 0.25 * $ 26.20 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $ 26.20 * 0 * 3 * 2 * 2 * 100%
SAW
Small ( 0.25 * $ 26.20 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $ 26.20 * 0 * 3 * 2 * 2 * 100%
Plasma Cutting
Small ( 0.25 * $ 26.20 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $ 26.20 * 0 * 3 * 2 * 2 * 100%
Plasma
Welding
Small ( 0.25 * $ 26.20 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $ 26.20 * 0 * 3 * 2 * 2 * 100%
Resistance
Welding
Small ( 0.25 * $ 26.20 * 0 * 1 * 3 * 2 * 100%
Page 77
TOTAL HOURS
RESPONSES
)=
$0
0
0
Small ( 0.25 * $ 26.20 * 0 * 2 *
Large ( 0.25 * $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
21
53
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 0 * 2 *
Large ( 0.25 * $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
30
13
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 0 * 2 *
Large ( 0.25 * $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
7
249
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 0 * 2 *
Large ( 0.25 * $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
141
8
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 0 * 2 *
Large ( 0.25 * $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
5
3
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 0 * 2 *
Large ( 0.25 * $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
2
8
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 0 * 2 *
Large ( 0.25 * $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
5
3
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 0 * 2 *
Large ( 0.25 * $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
2
1
)=
)=
$0
$0
0
0
0
0
* $ 26.20 * 0 * 2 *
* $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
0
1
)=
)=
$0
$0
0
0
0
0
* $ 26.20 * 0 * 2 *
* $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
0
33
)=
)=
$0
$0
0
0
0
0
* $ 26.20 * 0 * 2 *
1 * 2 * 100% *
0.00%
*
18
)=
$0
0
0
301
#PLANTS
%ABOVEAL
37
%NOTSEMI
*
#SAMPS
0.00%
SHIFTS
MARITIME
1 * 2 * 100% *
JOBAL
Large ( 0.25 * $ 26.20 * 0 * 3 *
NOTETIME
ITEM 12 COST
SEMI‐ANNUALLY
NONSUPEWAGE
Table 9b
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma
Welding
Oxy‐fuel
Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Small ( 0.25
Thermal Spray Large ( 0.25
Tungsten
Cutting
Small ( 0.25
Large ( 0.25
SAW
Small ( 0.25
CONSTRUCTION
Large ( 0.25 * $ 26.20 * 0 * 3 *
1 * 2 * 100% *
0.00%
*
)=
$0
0
0
Small ( 0.25 * $ 26.20 * 0 * 1 *
Large ( 0.25 * $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
* 2,277 ) =
*
4
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 0 * 1 *
Large ( 0.25 * $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
30
60
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 0 * 1 *
Large ( 0.25 * $ 26.20 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
455
30
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 26.20 * 0 * 1 *
1 * 2 * 100% *
0.00%
*
228
)=
$0
0
0
SMAW
Plasma Cutting
GMAW
Brazing
Page 78
TOTAL HOURS
RESPONSES
)=
$0
0
0
* 1*
1 * 2 * 100% *
0.00%
*
45
)=
$0
0
0
* 3*
3 * 2 * 100% * 28.00% *
49
)=
$2,038
62
247
* 1*
* 1*
3 * 2 * 100% *
1 * 2 * 100% *
9.00%
5.00%
*
*
62
326
)=
)=
$275
$270
8
8
33
33
* 1*
* 2*
1 * 2 * 100% *
3 * 2 * 100% *
5.00%
8.00%
* 1,436 ) =
* 100 ) =
$1,187
$791
36
24
144
96
* 1*
* 3*
3 * 2 * 100% * 8.00% *
1 * 2 * 100% * 36.00% *
18
276
)=
)=
$72
$9,839
2
298
9
1190
* 1*
* 3*
1 * 2 * 100% * 36.00% *
1 * 2 * 100% * 22.00% *
476
671
)=
)=
$0
$7,320
0
221
0
886
* 1*
* 3*
1 * 2 * 100% * 22.00% * 3,566 ) =
1 * 2 * 100% * 12.00% * 12 ) =
$12,972
$70
392
2
1569
8
* 1*
1 * 2 * 100% * 12.00% *
647
)=
$1,283
39
155
* 3*
3 * 2 * 100% * 45.00% *
2
)=
$450
12
47
* 1*
3 * 2 * 100% *
*
0
)=
$0
0
0
* 2*
3 * 2 * 100% * 71.00% *
2
)=
$722
19
77
* 1*
3 * 2 * 100% * 50.00% *
1
)=
$25
1
3
* 3*
3 * 2 * 100% * 33.00% *
2
)=
$112
4
14
* 3*
0 * 2 * 100% *
*
0
)=
$0
0
0
* 3*
3 * 2 * 100% * 100.00% *
5
)=
$5,000
129
517
* 1*
3 * 2 * 100% *
*
0
)=
$0
0
0
* 2*
3 * 2 * 100% * 13.00% *
80
)=
$904
31
125
* 2*
3 * 2 * 100% * 13.00% *
126
)=
$1,420
49
197
* 1*
9 * 2 * 100% * 69.00% *
2
)=
$671
23
93
* 1*
5 * 2 * 100% * 69.00% *
8
)=
$829
29
115
* 3 * 3 * 2 * 100% * 51.00% *
81
)=
$11,962
374
1496
Small ( 0.25 * $ 31.99 * 2 * 1 * 3 * 2 * 100% * 51.00% *
ALL
SECTOR 11. Plating Mixture Producers
40
)=
$1,950
61
244
#PLANTS
%ABOVEAL
6
%NOTSEMI
*
#SAMPS
0.00%
SHIFTS
1 * 2 * 100% *
JOBAL
Large ( 0.25 * $ 26.20 * 0 * 3 *
NOTETIME
ITEM 12 COST
SEMI‐ANNUALLY
NONSUPEWAGE
Table 9b
Metallizing
Small ( 0.25 * $ 26.20 * 0
SECTOR 3. PAINTING
Large ( 0.25 * $ 33.07 * 1
AEROSPACE
Small ( 0.25 * $ 33.07 * 1
General
Large ( 0.25 * $ 33.07 * 1
Industry
(Autobody) Small ( 0.25 * $ 33.07 * 1
General
Large ( 0.25 * $ 33.07 * 1
Industry (Coil
Small ( 0.25 * $ 33.07 * 1
Coating)
Large ( 0.25 * $ 33.07 * 2
Maritime
Small ( 0.25 * $ 33.07 * 0
Large ( 0.25 * $ 33.07 * 1
Construction
Small ( 0.25 * $ 33.07 * 1
State ( 0.25 * $ 33.07 * 1
Government
Local ( 0.25 * $ 33.07 * 1
SECTOR 4. Producers of Chromates
Large ( 0.25 * $ 38.68 * 3
ALL
Small ( 0.25 * $ 38.68 * 0
SECTOR 5. Chromate Pigment Procedures
Large ( 0.25 * $ 37.70 * 5
ALL
Small ( 0.25 * $ 37.70 * 1
SECTOR 6. CCA Producers
Large ( 0.25 * $ 31.94 * 1
ALL
Small ( 0.25 * $ 31.94 * 0
SECTOR 7. Chromium Catalyst Producers
Large ( 0.25 * $ 38.68 * 6
ALL
Small ( 0.25 * $ 38.68 * 0
SECTOR 8. Paint and Coating Producers
Large ( 0.25 * $ 28.81 * 1
ALL
Small ( 0.25 * $ 28.81 * 1
SECTOR 9. Printing Ink Producers
Large ( 0.25 * $ 28.86 * 3
ALL
Small ( 0.25 * $ 28.86 * 2
SECTOR 10. Plastic Colorant Producers and Users
Large ( 0.25 * $ 31.99 * 2
Page 79
0.00%
0.00%
0.00%
TOTAL HOURS
RESPONSES
8
34
* 1 * 1*
3 * 2 * 100% * 100.00% *
4
)=
$162
6
23
* 2 * 3*
3 * 2 * 100% * 100.00% *
1
)=
$317
8
33
* 0 * 1*
1* 2*
*
0
)=
$0
0
0
* 3 * 3*
3 * 2 * 100% * 38.00% *
34
)=
$6,737
174
694
* 1 * 1*
* 0 * 3*
3 * 2 * 100% * 38.00% *
3 * 2 * 100% * 0.00% *
11
102
)=
)=
$240
$0
6
0
25
0
* 0 * 1*
1 * 2 * 100% *
*
32
)=
$0
0
0
* 4 * 1*
3 * 2 * 100% * 63.00% *
33
)=
$4,870
126
502
* 2 * 1*
3 * 2 * 100% * 63.00% *
31
)=
$2,295
59
237
* 6 * 3*
5 * 2 * 100% * 100.00% *
163
)=
$207,294
7,322
29289
* 5 * 1*
5 * 2 * 100% * 100.00% *
118
)=
$41,878
1,479
5917
* 6 * 1 * 21 * 2 * 100% * 38.00% *
3
)=
$2,436
65
258
* 6 * 1*
7 * 2 * 100% * 38.00% *
1
)=
$271
7
29
* 0 * 1*
3 * 2 * 100% *
*
0
)=
$0
0
0
* 1 * 1*
3 * 2 * 100% * 27.00% *
5
)=
$80
2
8
* 0 * 1*
3 * 2 * 100% *
0.00%
*
216
)=
$0
0
0
* 0 * 1*
3 * 2 * 100% *
0.00%
* 1,627 ) =
$0
0
0
* 0 * 3*
3 * 2 * 100% *
0.00%
*
343
)=
$0
0
0
* 0 * 1*
2 * 2 * 100% *
0.00%
*
697
)=
$0
0
0
* 1 * 3 * 12 * 2 * 100% * 25.00% *
6
)=
$817
28
113
* 0 * 1*
20
)=
$0
0
0
#PLANTS
%ABOVEAL
$243
%NOTSEMI
)=
#SAMPS
6
SHIFTS
3 * 2 * 100% * 100.00% *
JOBAL
Large ( 0.25 * $ 28.71 * 1 * 1 *
NOTETIME
ITEM 12 COST
SEMI‐ANNUALLY
NONSUPEWAGE
Table 9b
ALL
Small ( 0.25 * $ 28.71
SECTOR 13. Chromium Metal Producers
Large ( 0.25 * $ 38.80
ALL
Small ( 0.25 * $ 38.80
SECTOR 14. Iron and Steel Mills
Large ( 0.25 * $ 38.80
Alloy and
Stainless Steel
Small ( 0.25 * $ 38.80
Large ( 0.25 * $ 38.80
Carbon Steel
Small ( 0.25 * $ 38.80
SECTOR 14B. Forging Industry
Large ( 0.25 * $ 38.80
Reshaping
Small ( 0.25 * $ 38.80
SECTOR 15. Iron and Steel Foundries
Large ( 0.25 * $ 28.31
ALL
Small ( 0.25 * $ 28.31
SECTOR 17. Chromium Dye Producers
Large ( 0.25 * $ 37.70
ALL
Small ( 0.25 * $ 37.70
SECTOR 18. Chromium Sulfate Producers
Large ( 0.25 * $ 41.50
ALL
Small ( 0.25 * $ 41.50
SECTOR 19. Chemical Distributors
Large ( 0.25 * $ 29.92
ALL
Small ( 0.25 * $ 29.92
SECTOR 20. Textile Dyeing
Large ( 0.25 * $ 19.97
ALL
Small ( 0.25 * $ 19.97
SECTOR 21. Colored Glass Producers
Large ( 0.25 * $ 28.87
General
Industry
Small ( 0.25 * $ 28.87
0% *
4 * 2 * 100% *
Page 80
0.00%
0.00%
0.00%
0.00%
*
RESPONSES
27
108
* 0 * 1*
1 * 2 * 100% *
0.00%
*
5
)=
$0
0
0
* 0 * 3*
2 * 2 * 100% *
0.00%
*
81
)=
$0
0
0
* 0 * 1*
2 * 2 * 100% *
0.00%
*
325
)=
$0
0
0
* 2 * 3*
3 * 2 * 100% *
9.00%
*
1
)=
$26
1
3
* 0 * 1*
* 0 * 3*
3 * 2 * 100% *
3 * 2 * 100% *
0.00%
0.00%
*
*
0
23
)=
)=
$0
$0
0
0
0
0
* 0 * 1*
3 * 2 * 100% *
0.00%
*
4
)=
$0
0
0
* 0 * 1 * 15 * 2 * 100% *
0.00%
*
5
)=
$0
0
0
* 0 * 1*
0 * 2 * 100% *
0.00%
*
0
)=
$0
0
0
* 0 * 1*
2 * 2 * 100% *
0.00%
*
148
)=
$0
0
0
* 0 * 1*
* 0 * 1*
2 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
79
36
)=
)=
$0
$0
0
0
0
0
* 0 * 1*
* 1 * 1*
1 * 2 * 100% * 0.00% * 32 ) =
1 * 2 * 100% * 22.00% * 1,162 ) =
$0
$4,104
0
128
0
511
* 1 * 1*
* 1 * 1*
1 * 2 * 100% * 22.00% * 4,650 ) =
1 * 2 * 100% * 22.00% * 12 ) =
$16,425
$41
512
1
2046
5
* 1 * 1*
1 * 2 * 100% * 22.00% *
#PLANTS
%ABOVEAL
$781
%NOTSEMI
TOTAL HOURS
Small ( 0.25 * $ 28.87
SECTOR 22. Printing
Large ( 0.25 * $ 20.85
ALL
Small ( 0.25 * $ 20.85
SECTOR 24. Chromium Catalyst Users
Large ( 0.25 * $ 32.51
Catalyst Users
Small ( 0.25 * $ 32.51
Chromium Large ( 0.25 * $ 32.51
Catalyst Service
Small ( 0.25 * $ 32.51
Companies
SECTOR 25. Refractory Brick Producers
Large ( 0.25 * $ 25.64
ALL
Small ( 0.25 * $ 25.64
SECTOR 26. Woodworking
Large ( 0.25 * $ 32.11
General
Industry
Small ( 0.25 * $ 32.11
Large ( 0.25 * $ 32.11
Maritime
Small ( 0.25 * $ 32.11
Large ( 0.25 * $ 32.11
Construction
Small ( 0.25 * $ 32.11
State ( 0.25 * $ 32.11
Government
Local ( 0.25 * $ 32.11
SECTOR 27. Solid Waste Incerneration
Large ( 0.25 * $ 27.23
General
Industry
Small ( 0.25 * $ 27.23
State ( 0.25 * $ 27.23
Government
Local ( 0.25 * $ 27.23
SEMI‐ANNUALLY
)=
Large ( 0.25 * $ 28.87 * 3 * 1 *
#SAMPS
90
SHIFTS
1 * 2 * 100% * 20.00% *
JOBAL
ITEM 12 COST
Fiber, Flat,
Container Glass
NONSUPEWAGE
NOTETIME
Table 9b
42
)=
$149
5
19
* 0 * 3 * 15 * 2 * 100% *
0.00%
*
40
)=
$0
0
0
* 0 * 1 * 3 * 2 * 100% *
* 0 * 3 * 15 * 2 * 100% *
0.00%
0.00%
*
*
48
0
)=
)=
$0
$0
0
0
0
0
* 0 * 1*
0.00%
*
24
)=
$0
0
0
3 * 2 * 100% *
Page 81
TOTAL HOURS
RESPONSES
$0
0
0
3 * 2 * 100% *
0.00%
*
0
)=
$0
0
0
1 * 2 * 100% *
0.00%
*
51
)=
$0
0
0
Industrial Small ( 0.25 * $ 32.13 * 0 * 1 *
Rehabilitation State ( 0.25 * $ 32.13 * 0 * 1 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
233
15
)=
)=
$0
$0
0
0
0
0
Local ( 0.25 * $ 32.13 * 0 * 1 *
Large ( 0.25 * $ 32.13 * 0 * 1 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
88
40
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 32.13 * 0 * 1 *
State ( 0.25 * $ 32.13 * 0 * 1 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
170
1
)=
)=
$0
$0
0
0
0
0
Local ( 0.25 * $ 32.13 * 0 * 1 *
Large ( 0.25 * $ 32.13 * 0 * 1 *
1 * 2 * 100% * 0.00% *
1 * 2 * 100% * 60.00% *
239
44
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 32.13 * 0 * 1 *
1 * 2 * 100% * 60.00% *
$0
0
$446,607 15,447
0
61,788
Hazardous
Waste‐site
Work
Refractory
Brick
Restoration
Page 82
#PLANTS
%ABOVEAL
)=
%NOTSEMI
19
SECTOR 30. Superalloy Producers and Users
Large ( 0.25 * $ 27.93 * 0 * 3 *
ALL
Small ( 0.25 * $ 27.93 * 0 * 3 *
SECTOR 31. Construction Cement Workers
Large ( 0.25 * $ 32.13 * 0 * 1 *
#SAMPS
*
SHIFTS
0.00%
JOBAL
3 * 2 * 100% *
NOTETIME
ITEM 12 COST
SEMI‐ANNUALLY
NONSUPEWAGE
Table 9b
175 ) =
75,506
Table 10
Respiratory‐Protection Program: Qualitative Fit Testing for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2));
Employee and Industrial Hygiene Technician Time and Cost to Conduct Qualitative Fit Testing
This table calculates the burden hours and cost of employee and industrial hygienist time to conduct fit‐testing. The time, in hours, for an employee
to be qualitative fit‐tested is multiplied by the number of employees that require fit ‐testing and by the nonsupervisory wage rate.
COST = BURDEN HOURS * NONSUPEWAGE
*ASSUMPTIONS:
Item 12 COST
RESPONSES
0.25 ) *
5,341 *
71%
*
1
) =
1,896 * $ 26.61 =
$50,450
3,792
Small ( 0.25 +
0.25 ) *
1,164 *
97%
*
1
) =
565 * $ 26.61 =
$15,027
1,129
Large ( 0.25 +
0.25 ) *
2,854 *
81%
*
1
) =
1,156 * $ 26.20 =
$30,286
2,312
Small ( 0.25 +
Large ( 0.25 +
0.25 ) *
0.25 ) *
2,087 *
2,330 *
98%
55%
*
*
1
1
) =
) =
1,023 * $ 26.20 =
641 * $ 26.20 =
$26,793
$16,784
2,045
1,281
Small ( 0.25 +
Large ( 0.25 +
0.25 ) *
0.25 ) *
55 *
3,225 *
95%
88%
*
*
1
1
) =
) =
26 * $ 26.20 =
1,419 * $ 26.20
$685
$37,180
52
2,838
Small ( 0.25 +
State ( 0.25 +
0.25 ) *
0.25 ) *
2,494 *
14 *
99%
88%
*
*
1
1
) =
) =
1,234 * $ 26.20 *
6 * $ 26.20 *
$32,342
$167
2,469
13
( 0.25 +
0.25 ) *
73 *
99%
*
1
) =
36 * $ 26.20 *
$952
73
( 0.25 +
0.25 ) *
691 *
81%
*
1
) =
280 * $ 26.20 =
$7,331
560
( 0.25 +
( 0.25 +
0.25 ) *
0.25 ) *
2,087 *
16 *
98%
55%
*
*
1
1
) =
) =
1,023 * $ 26.20 =
5 * $ 26.20 =
$26,793
$118
2,045
9
( 0.25 +
( 0.25 +
0.25 ) *
0.25 ) *
0*
658 *
95%
88%
*
1
1
) =
)
0 * $ 26.20 =
290 $ 26.20
$0
$7,585
0
579
( 0.25 +
( 0.25 +
0.25 ) *
0.25 ) *
529 *
14 *
99%
88%
*
*
1
1
) =
) =
262
6
$ 26.20 =
$ 26.20 =
$6,867
$167
524
13
( 0.25 +
0.25 ) *
73 *
99%
*
1
) =
36
$ 26.20 =
$952
73
( 0.25 +
0.25 ) *
45 *
81%
*
49
) =
897 * $ 33.07 =
$29,664
1,794
( 0.25 +
0.25 ) *
0*
98%
*
62
) =
4 * $ 33.07 =
$127
8
#PLANTS
1‐%FITBASE
Large ( 0.25 +
QLFITTIME
QLFITEMP
NONSUPEWAG
24.17%
QLFITTECH
BURDEN HOURS
* QLFITTIME = Time, in hours, for an employee to be qualitative fit‐tested
* QLFITTECH = Time, in hours, for a technician to conduct one qualitative fit test
* QLFITEMP ‐ Number of employees requiring annual qualitative fit‐testing
* 1‐%FITBASE (%FITBASE is the percent of plants conducting annual respirator fit‐testing in the baseline)
* NONSUPEWAGE = Non‐Supervisory wage rate
* #PLANTS = Number of plants represented by the model input
Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Local
Sector 2A. Mild Steel Welding
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small
Large
CONSTRUCTION
Small
State
GOVERNMENT
Local
SECTOR 3. Painting
Large
GENERAL INDUSTRY
(AEROSPACE)
Small
Page 83
Item 12 COST
RESPONSES
NONSUPEWAG
1*
81%
*
) =
120 * $ 33.07 =
$3,955
239
Small ( 0.25 +
Large ( 0.25 +
0.25 ) *
0.25 ) *
0*
2*
98%
81%
* 1,436 ) =
* 100 ) =
147 * $ 33.07 =
73 * $ 33.07 =
$4,846
$2,417
293
146
Small ( 0.25 +
Large ( 0.25 +
0.25 ) *
0.25 ) *
1 * 98% *
3 * 55.00% *
Small ( 0.25 +
Large ( 0.25 +
0.25 ) *
0.25 ) *
1*
413 *
95%
0%
Small ( 0.25 +
State ( 0.25 +
0.25 ) *
0.25 ) *
520 *
31 *
*
#PLANTS
QLFITEMP
1‐%FITBASE
0.25 ) *
QLFITTECH
Large ( 0.25 +
QLFITTIME
GENERAL INDUSTRY
(AUTO BODY REPAIR)
BURDEN HOURS
Table 10
326
COIL COATING
18
276
) =
) =
8 * $ 33.07 =
206 * $ 33.07 =
$266
$6,816
16
412
*
*
476
1
) =
) =
214 * $ 33.07 =
0 * $ 33.07 =
$7,063
$0
427
0
0%
0%
*
*
1
1
) =
) =
0 * $ 33.07 =
0 * $ 33.07 =
$0
$0
0
0
133 *
0%
*
1
) =
0 * $ 33.07 =
$0
0
*
7*
37%
*
2
) =
2 * $ 38.68 =
$92
5
*
0*
93%
*
0
) =
0 * $ 38.68 =
$0
0
* 8 *
37%
*
2
) =
3 * $ 37.70 =
$102
5
* 1 *
93%
*
1
) =
0 * $ 37.70 =
$14
1
*
2*
37%
*
2
) =
1 * $ 31.94 =
$33
2
*
0*
93%
*
0
) =
0 * $ 31.94 =
$0
0
*
11 *
37%
*
5
) =
10 * $ 38.68 =
$394
20
*
0*
93%
*
0
) =
0 * $ 38.68 =
$0
0
*
1*
37%
*
80
) =
14 * $ 28.81 =
$410
28
*
0*
93%
*
126
) =
0 * $ 28.81 =
$0
0
* 10 *
37%
*
2
) =
5 * $ 28.86 =
$133
9
* 2 *
93%
*
8
) =
10 * $ 28.86 =
$279
19
*
342 *
54%
*
1
) =
92 * $ 31.99 =
$2,952
185
*
35 *
95%
*
1
) =
16 * $ 31.99 =
$525
33
*
3*
37%
*
6
) =
3 * $ 28.71 =
$85
6
*
1*
93%
*
4
) =
2 * $ 28.71 =
$47
3
MARITIME
CONSTRUCTION
Local ( 0.25 + 0.25 )
SECTOR 4. Producers of Chromates
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 5. Chromate Pigment Procedures
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 6. CCA Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 7. Chromium Catalyst Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 8. Paint and Coating Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 9. Printing Ink Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 10. Plastic Colorant Producers and Users
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 11. Plating Mixture Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
Page 84
RESPONSES
56%
*
1
) =
2 * $ 38.80 =
$72
4
0.25 ) *
0*
95%
*
0
) =
0 * $ 38.80 =
$0
0
0.25 ) *
27 *
56%
*
34
) =
254 * $ 38.80 =
$9,861
508
0.25 ) *
0.25 ) *
1*
1*
95%
56%
*
*
11
102
) =
) =
7 * $ 38.80 =
18 * $ 38.80 =
$256
$704
13
36
0.25 ) *
1*
95%
*
32
) =
19 * $ 38.80 =
$751
39
Large ( 0.25 +
0.25 ) *
3*
56%
*
33
) =
24 * $ 38.80 =
$921
47
Small ( 0.25 +
SECTOR 15. Iron and Steel Foundries
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 17. Chromium Dye Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 18. Chromium Sulfate Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 19. Chemical Distributors
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 20. Textile Dyeing
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 21. Colored Glass Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
Large ( 0.25 +
FIBER, FLAT, AND
CONTAINER GLASS
Small ( 0.25 +
SECTOR 22. Printing
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 24. Chromium Catalyst Users
Large ( 0.25 +
Chromium Catalyst
Users
Small ( 0.25 +
0.25 ) *
1*
95%
*
31
) =
9 * $ 38.80 =
$368
19
0.25 ) * 17 *
56%
*
163
) =
786 * $ 28.31 =
$22,259
1,573
0.25 ) * 4 *
95%
*
118
) =
231 * $ 28.31 =
$6,539
462
0.25 ) * 29 *
37%
*
3
) =
14 * $ 37.70 =
$542
29
0.25 ) * 7 *
93%
*
1
) =
3 * $ 37.70 =
$109
6
0.25 ) *
0*
37%
*
0
) =
0 * $ 41.50 =
$0
0
0.25 ) *
0*
93%
*
5
) =
0 * $ 41.50 =
$0
0
0.25 ) *
0*
92%
*
216
) =
0 * $ 29.92 =
$0
0
0.25 ) *
0*
99%
* 1,627 ) =
0 * $ 29.92 =
$0
0
0.25 ) *
0*
89%
*
343
) =
0 * $ 19.97 =
$0
0
0.25 ) *
0*
99%
*
697
) =
0 * $ 19.97 =
$0
0
0.25 ) *
1*
76%
*
6
) =
3 * $ 28.87 =
$72
5
0.25 ) *
0.25 ) *
0*
9*
97%
76%
*
*
20
90
) =
) =
0 * $ 28.87 =
323 * $ 28.87 =
$0
$9,329
0
646
0.25 ) *
2*
97%
*
5
) =
5 * $ 28.87 =
$154
11
0.25 ) *
0*
98%
*
81
) =
0 * $ 20.85 =
$0
0
0.25 ) *
0 * 99.70% *
325
) =
0 * $ 20.85 =
$0
0
0.25 ) *
1*
67%
*
1
) =
0 * $ 32.51 =
$12
1
0.25 ) *
0*
97%
*
0
) =
0 * $ 32.51 =
$0
0
#PLANTS
QLFITEMP
1‐%FITBASE
7*
SECTOR 13. Chromium Metal Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 14. Iron and Steel Mills
Large ( 0.25 +
ALL
Small ( 0.25 +
Large ( 0.25 +
CARBON STEEL
Small ( 0.25 +
QLFITTECH
0.25 ) *
QLFITTIME
Item 12 COST
NONSUPEWAG
BURDEN HOURS
Table 10
14b. FORGING INDUSTRY
RESHAPING INDUSTRY
Page 85
RESPONSES
0*
0%
*
1
) =
0 * $ 32.51 =
$0
0
Small ( 0.25 +
SECTOR 25. Refractory Brick Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 26. Woodworking
GENERAL INDUSTRY Large ( 0.25 +
0.25 ) *
0*
0%
*
1
) =
0 * $ 32.51 =
$0
0
0.25 ) *
0*
76%
*
5
) =
0 * $ 25.64 =
$0
0
0.25 ) *
0*
97%
*
0
) =
0 * $ 25.64 =
$0
0
0.25 ) *
0*
94%
*
1
) =
0 * $ 32.11 =
$0
0
Small ( 0.25 +
Large ( 0.25 +
0.25 ) *
0.25 ) *
0*
0*
99%
55%
*
1
36
) =
) =
0 * $ 32.11 =
0 * $ 32.11 =
$0
$0
0
MARITIME
CONSTRUCTION
Small ( 0.25 +
Large ( 0.25 +
0.25 ) *
0.25 ) *
0*
0*
95%
88%
32
1
) =
) =
0 * $ 32.11 =
0 * $ 32.11 =
$0
$0
0
Small ( 0.25 +
State ( 0.25 +
0.25 ) *
0.25 ) *
0*
0*
99%
88%
*
*
1
1
) =
) =
0 * $ 32.11 =
0 * $ 32.11 =
$0
$0
0
0
) *
0*
88%
*
1
) =
0 * $ 32.11 =
$0
0
) *
5*
59%
*
40
) =
60 * $ 27.23 =
$1,622
119
) *
) *
1*
0*
96%
59%
*
*
48
0
) =
) =
17 * $ 27.23 =
0 * $ 27.23 =
$452
$0
33
) *
0*
96%
*
24
) =
0 * $ 27.23 =
$0
0
) *
0*
56%
*
19
) =
0 * $ 27.93 =
$0
0
) *
0*
95%
*
0
) =
0 * $ 27.93 =
$0
0
) *
0*
88%
*
51
) =
0 * $ 32.13 =
$0
0
INDUSTRIAL
Small ( 0.25 +
REHABILITATION AND
State ( 0.25 +
MAINTENANCE
0.25 ) *
0.25 ) *
0*
0*
99%
88%
*
*
233
15
) =
) =
0 * $ 32.13 =
0 * $ 32.13 =
$0
$0
0
0
Local ( 0.25 +
Large ( 0.25 +
0.25 ) *
0.25 ) *
0*
0*
88%
88%
*
*
88
1
) =
) =
0 * $ 32.13 =
0 * $ 32.13 =
$0
$0
0
0
HAZARDOUS WASTE‐ Small ( 0.25 +
SITE WORK
State ( 0.25 +
0.25 ) *
0.25 ) *
0*
0*
99%
88%
*
*
1
1
) =
) =
0 * $ 32.13 =
0 * $ 32.13 =
$0
$0
0
0
Local ( 0.25 +
Large ( 0.25 +
0.25 ) *
0.25 ) *
0*
0*
88%
88%
*
*
1
44
) =
) =
0 * $ 32.13 =
0 * $ 32.13 =
$0
$0
0
0
Small ( 0.25 +
0.25 ) *
0*
99%
Total
*
175 ) =
7,772
0 * $ 32.13 =
13,506
$0
$374,725
0
27,011
#PLANTS
QLFITEMP
1‐%FITBASE
0.25 ) *
Catalyst Service
Companies
QLFITTECH
Large ( 0.25 +
QLFITTIME
Item 12 COST
NONSUPEWAG
BURDEN HOURS
Table 10
GOVERNMENT
Local ( 0.25 + 0.25
SECTOR 27. Solid Waste Incineration
Large ( 0.25 + 0.25
ALL
Small ( 0.25 + 0.25
State ( 0.25 + 0.25
GOVERNMENT
Local ( 0.25 + 0.25
SECTOR 30. Superalloy Producers and Users
Large ( 0.25 + 0.25
ALL
Small ( 0.25 + 0.25
SECTOR 31. Construction
Large ( 0.25 + 0.25
REFRACTORY BRICK
RESTORATION
Page 86
Table 11
Respiratory‐Protection Program: Cost of Materials for Qualitative Fit Testing
This table calculates the contract cost of the materials used for qualitative fit‐testing by multiplying the number of
employees who require qualitative fit‐testing by the cost of materials per fit‐test.
COST = ((QLFITMTRLS * QLFITEMP) * 1‐%FITBASE * #PLANTS)
#PLANTS
Item 13 Cost
71%
*
1
= $ 340
Small ( $ 0.09 * 1,164 ) *
97%
*
1
= $ 101
Large ( $ 0.09 * 2,854 ) *
81%
*
1
= $ 208
Small ( $ 0.09 * 2,087 ) *
Large ( $ 0.09 * 2,330 ) *
98%
55%
*
*
1
1
= $ 184
= $ 115
55 ) *
Small ( $ 0.09 *
Large ( $ 0.09 * 3,225 ) *
95%
88%
*
*
1
1
= $ 5
= $ 255
Small ( $ 0.09 * 2,494 ) *
14 ) *
State ( $ 0.09
99%
88%
*
*
1
1
= $ 222
= $ 1
Local ( $ 0.09
73
) *
99%
*
1
= $ 7
Large ( $ 0.09 *
691
) *
81%
*
1
= $ 50
Small ( $ 0.09 * 2,087 ) *
16 ) *
Large ( $ 0.09 *
98%
55%
*
*
1
1
= $ 184
= $ 1
Small ( $ 0.09 *
Large ( $ 0.09 *
0
658
) *
) *
95%
88%
*
*
1
1
=
0
= $ 52
Small ( $ 0.09 *
State ( $ 0.09 *
529
15
) *
*
99%
88%
*
*
1
1
= $ 47
= $ 1
Local ( $ 0.09 *
74
*
99%
*
1
= $ 7
Large ( $ 0.09 *
45
) *
81%
*
49
= $ 161
Small ( $ 0.09 *
Large ( $ 0.09 *
0
1
) *
) *
98%
81%
*
*
62
326
= $ 1
= $ 21
Small ( $ 0.09 *
0
) *
98%
*
1,436
= $ 26
QLFITEMP
1‐%FITBASE
Large ( $ 0.09 * 5,341 ) *
QLFITMTRLS
Variables
* QLFITMTRLS = Cost of materials per qualitative fit‐testing
* QLFITEMP ‐ Number of employees requiring annual qualitative fit‐testing
* 1‐%FITBASE (%FITBASE is the percent of plants conducting annual respirator fit‐testing in the baseline)
* #PLANTS = Number of plants represented by the model input
Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2A. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
SECTOR 3. PAINTING
GENERAL INDUSTRY (AEROSPACE)
GENERAL INDUSTRY (AUTO BODY REPAIR)
Page 87
Item 13 Cost
2
) *
*
100
= $ 13
Small ( $ 0.09 *
Large ( $ 0.09 *
1
1
) *
98%
*
) * 55.00% *
18
276
= $ 1
= $ 13
Small ( $ 0.09 *
Large ( $ 0.09 *
0
413
) *
) *
95%
0.00%
*
*
476
1
= $ 13
=
0
Small ( $ 0.09 *
State ( $ 0.09 *
520
31
) *
) *
0.00%
0.00%
*
*
1
1
=
=
0
0
Local ( $ 0.09 *
133
) *
0.00%
*
1
=
0
Large ( $ 0.09 *
7
) *
37%
*
2
= $ 0.43
Small ( $ 0.09 *
0
) *
93%
*
0
=
Large ( $ 0.09 *
8
) *
37%
*
2
= $ 0
Small ( $ 0.09 *
1
) *
93%
*
1
= $ 0
Large ( $ 0.09 *
4
) *
37%
*
2
= $ 0.31
Small ( $ 0.09 *
0
) *
93%
*
0
=
Large ( $ 0.09 *
11
) *
37%
*
5
= $ 2
Small ( $ 0.09 *
0
) *
93%
*
0
=
Large ( $ 0.09 *
1
) *
37%
*
80
= $ 3
Small ( $ 0.09 *
0
) *
93%
*
126
=
Large ( $ 0.09 *
10
) *
37%
*
2
= $ 1
( $ 0.09 *
2
) *
93%
*
8
= $ 2
( $ 0.09 *
342
) *
54%
*
1
= $ 17
( $ 0.09 *
35
) *
95%
*
1
= $ 3
( $ 0.09 *
3
) *
37%
*
6
= $ 0.53
( $ 0.09 *
1
) *
93%
*
4
= $ 0.30
QLFITEMP
1‐%FITBASE
Large ( $ 0.09 *
QLFITMTRLS
#PLANTS
Variables
Table 11
81%
COIL COATING
MARITIME
CONSTRUCTION
SECTOR 4. Producers of Chromates
ALL
0
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
0
SECTOR 7. Chromium Catalyst Producers
ALL
0
SECTOR 8. Paint and Coating Producers
ALL
0
SECTOR 9. Printing Ink Producers
ALL
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
Page 88
#PLANTS
Item 13 Cost
7
) *
56%
*
1
= $ 0.33
Small ( $ 0.09 *
0
) *
95%
*
0
=
Large ( $ 0.09 *
27
) *
56%
*
34
= $ 46
Small ( $ 0.09 *
Large ( $ 0.09 *
1
1
) *
) *
95%
56%
*
*
11
102
= $ 1
= $ 3
Small ( $ 0.09 *
1
) *
95%
*
32
= $ 3
Large ( $ 0.09 *
3
) *
56%
*
33
= $ 4
Small ( $ 0.09 *
1
) *
95%
*
31
= $ 2
Large ( $ 0.09 *
17
) *
56%
*
163
= $ 141
Small ( $ 0.09 *
4
) *
95%
*
118
= $ 41
Large ( $ 0.09 *
29
) *
37%
*
3
= $ 3
Small ( $ 0.09 *
7
) *
93%
*
1
= $ 0.52
Large ( $ 0.09 *
0
) *
37%
*
0
=
Small ( $ 0.09 *
1
) *
93%
*
5
= $ 0.38
Large ( $ 0.09 *
0
) *
92%
*
216
=
0
Small ( $ 0.09 *
0
) *
99%
*
1,627
=
0
Large ( $ 0.09 *
0
) *
89%
*
343
=
0
Small ( $ 0.09 *
0
) *
99%
*
697
=
0
Large ( $ 0.09 *
1
) *
76%
*
6
= $ 0.45
Small ( $ 0.09 *
Large ( $ 0.09 *
0
9
) *
) *
97%
76%
*
*
20
90
=
0
= $ 58.01
Small ( $ 0.09 *
2
) *
97%
*
5
= $ 1
Large ( $ 0.09 *
0
) *
98%
*
81
=
0
Small ( $ 0.09 *
0
) * 99.70% *
325
=
0
QLFITEMP
1‐%FITBASE
Large ( $ 0.09 *
QLFITMTRLS
Variables
Table 11
SECTOR 13. Chromium Metal Producers
ALL
0
SECTOR 14. Iron and Steel Mills
ALLOY AND STAINLESS STEEL
Carbon Steel
14b. FORGING INDUSTRY
RESHAPING INDUSTRY
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
SECTOR 18. Chromium Sulfate Producers
0
ALL
SECTOR 19. Chemical Distributors
ALL
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
ALL
Fiber, Flat and Container Glass
SECTOR 22. Printing
ALL
Page 89
#PLANTS
Item 13 Cost
1
) *
67%
*
1
= $ 0.07
Small ( $ 0.09 *
Large ( $ 0.09 *
0
1
) *
) *
97%
67%
*
*
0
1
=
0
= $ 0.07
Small ( $ 0.09 *
1
) *
97%
*
1
=
0.095541157
Large ( $ 0.09 *
0
) *
76%
*
5
=
0
Small ( $ 0.09 *
0
) *
97%
*
0
=
0
Large ( $ 0.09 *
0
) *
94%
*
1
=
0
Small ( $ 0.09 *
Large ( $ 0.09 *
0
0
) *
) *
99%
55%
*
*
1
36
=
=
0
0
Small ( $ 0.09 *
Large ( $ 0.09 *
0
0
) *
) *
95%
88%
*
*
32
1
=
=
0
0
Small ( $ 0.09 *
State ( $ 0.09 *
0
0
) *
) *
99%
88%
*
*
1
1
=
=
0
0
Local ( $ 0.09 *
0
) *
88%
*
1
=
0
Large ( $ 0.09 *
5
) *
59%
*
40
= $ 11
Small ( $ 0.09 *
State ( $ 0.09 *
1
0
) *
) *
96%
59%
*
*
48
0
= $ 3
=
0
Local ( $ 0.09 *
0
) *
96%
*
24
=
0
Large ( $ 0.09 +
0
) *
56%
*
19
=
0
Small ( $ 0.09 +
0
) *
95%
*
0
=
0
Large ( $ 0.09 *
0
) *
88%
*
51
=
0
Small ( $ 0.09 *
State ( $ 0.09 *
0
0
) *
) *
99%
88%
*
*
233
15
=
=
0
0
Local ( $ 0.09 *
Large ( $ 0.09 *
0
0
) *
) *
88%
88%
*
*
88
1
=
=
0
0
Small ( $ 0.09 *
State ( $ 0.09 *
0
0
) *
) *
99%
88%
*
*
1
1
=
=
0
0
Local ( $ 0.09 *
0
) *
88%
*
1
=
0
QLFITEMP
1‐%FITBASE
Large ( $ 0.09 *
QLFITMTRLS
Variables
Table 11
SECTOR 24. Chromium Catalyst Users
CHROMIUM CATALYST USERS
CHROMIUM CATALYST COMPANIES
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
SECTOR 27. Solid Waste Incineration
ALL
GOVERNMENT
SECTOR 30. Superalloy Producers and Users
ALL
SECTOR 31. Construction
INDUSTRIAL REHABILITATION AND
MAINTENANCE
HAZARDOUS WASTE‐SITE WORK
Page 90
Item 13 Cost
#PLANTS
1‐%FITBASE
QLFITEMP
QLFITMTRLS
Variables
Table 11
Large ( $ 0.09 *
0
) *
88%
*
44
=
0
Small ( $ 0.09 *
0
) *
99%
Total
*
175
=
7,772
0
$ 2,376
REFRACTORY BRICK RESTORATION
Page 91
Table 12
Respirator Protection Program: Quantitative Fit Testing for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2));
Employee Time and Cost to Conduct Quantitative Fit Testing
This table calculates the burden hour and cost of employee time to be fit‐tested. The time, in hours, for an employee to be quantitative fit‐tested is
multiplied by the number of employees that require fit ‐testing and by the nonsupervisory wage rate.
BURDEN HOURS = (QNFITTIME + QNFITTEMP) * 1‐%FITBASE * #PLANTS
COST = BURDEN HOURS * NONSUPWAGE
* QNFITTIME = Time, in hours, for an employee to be quantitative fit‐tested
* QNFITTEMP = Number of employees requiring annual quantitative fit‐testing
* 1‐%FITBASE (%FITBASE is the percent of plants conducting annual respirator fit‐testing in the baseline)
* #PLANTS = Number of plants represented by the model input
* NONSUPEWAGE = Non‐Supervisory wage rate
Item 12 COST
Responses
NONSUPEWAGE
QNFITEMP
Large
(
0.5 *
0
) *
71%
*
1
) =
0 * $ 26.61 =
$0
0
Small
(
0.5 *
0
) *
97%
*
1
) =
0 * $ 26.61 =
$0
0
Large
(
0.5 *
0
) *
81%
*
1
) =
0 * $ 26.20 =
$0
0
Small
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
98%
55%
*
*
1
1
) =
) =
0 * $ 26.20 =
0 * $ 26.20 =
$0
$0
0
0
Small
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
95%
88%
*
1
1
) =
) =
0 * $ 26.20 =
0 * $ 26.20 =
$0
$0
0
0
Small
State
(
(
0.5 *
0.5 *
0
0
) *
) *
99%
88%
1
1
) =
) =
0 * $ 26.20 =
0 * $ 26.20 =
$0
$0
0
0
Local
(
0.5 *
0
) *
99%
1
) =
0 * $ 26.20 =
$0
0
Large
(
0.5 *
0
) *
81%
*
1
) =
0 * $ 26.20 =
$0
0
Small
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
98%
55%
*
1
1
) =
) =
0 * $ 26.20 =
0 * $ 26.20 =
$0
$0
0
0
Small
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
95%
82%
1
1
) =
) =
0 * $ 26.20 =
0 * $ 26.20 =
$0
$0
0
0
Small
(
0.5 *
0
) *
99%
1
) =
0 * $ 26.20 =
$0
0
Large
(
0.5 *
0
) *
81%
*
49
) =
0 * $ 33.07 =
$0
0
Small
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
98%
81%
*
*
62
326
) =
) =
0 * $ 33.07 =
0 * $ 33.07 =
$0
$0
0
0
Small
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
98%
81%
*
*
1,436
100
) =
) =
0 * $ 33.07 =
0 * $ 33.07 =
$0
$0
0
0
Small
Large
(
(
0.5 *
0.5 *
0
0
) * 98% *
) * 55.00%
18
276
) =
) =
0 * $ 33.07 =
0 * $ 33.07 =
$0
$0
0
0
#PLANTS
1‐%FITBASE
QNFITTIME
BURDEN HOURS
24.17%
Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
SECTOR 3. PAINTING
GENERAL INDUSTRY AEROSPACE
GENERAL INDUSTRY AUTOBODY
REPAIR
COIL COATING
MARITIME
Page 92
QNFITEMP
1‐%FITBASE
#PLANTS
Item 12 COST
Responses
NONSUPEWAGE
QNFITTIME
BURDEN HOURS
Table 12
Small
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
95%
0%
476
1
) =
) =
0 * $ 33.07 =
0 * $ 33.07 =
$0
$0
0
0
Small
State
(
(
0.5 *
0.5 *
0
0
) *
) *
0%
0%
1
1
) =
) =
0 * $ 33.07 =
0 * $ 33.07 =
$0
$0
0
0
Local
(
0.5 *
0
) *
0%
1
) =
0 * $ 33.07 =
$0
0
Large
(
0.5 *
0
) *
37%
*
2
) =
0 * $ 38.68 =
$0
0
(
Small
SECTOR 5. Chromate Pigment Procedures
Large
(
ALL
(
Small
SECTOR 6. CCA Producers
Large
(
ALL
(
Small
SECTOR 7. Chromium Catalyst Producers
Large
(
ALL
(
Small
SECTOR 8. Paint and Coating Producers
Large
(
ALL
(
Small
SECTOR 9. Printing Ink Producers
Large
(
ALL
(
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
(
ALL
(
Small
SECTOR 11. Plating Mixture Producers
Large
(
ALL
(
Small
SECTOR 13. Chromium Metal Producers
Large
(
ALL
(
Small
SECTOR 14. Iron and Steel Mills
Large
(
ALLOY AND STAINLESS STEEL
(
Small
Large
(
CARBON STEEL
(
Small
14b. FORGING INDUSTRY
Large
(
RESHAPING INDUSTRY
0.5 *
0
) *
93%
*
0
) =
0 * $ 38.68 =
$0
0
0.5 *
0
) *
37%
*
2
) =
0 * $ 37.70 =
$0
0
0.5 *
0
) *
93%
*
1
) =
0 * $ 37.70 =
$0
0
0.5 *
0
) *
37%
*
2
) =
0 * $ 31.94 =
$0
0
0.5 *
0
) *
93%
*
0
) =
0 * $ 31.94 =
$0
0
0.5 *
0
) *
37%
*
5
) =
0 * $ 38.68 =
$0
0
0.5 *
0
) *
93%
*
0
) =
0 * $ 38.68 =
$0
0
0.5 *
0
) *
37%
*
80
) =
0 * $ 28.81 =
$0
0
0.5 *
0
) *
93%
*
126
) =
0 * $ 28.81 =
$0
0
0.5 *
0
) *
37%
*
2
) =
0 * $ 28.86 =
$0
0
0.5 *
*
0.5 *
0
) *
93%
*
8
) =
0 * $ 28.86 =
$0
0
0
) *
54%
*
1
) =
0 * $ 31.99 =
$0
0
0.5 *
0
) *
95%
*
1
) =
0 * $ 31.99 =
$0
0
0.5 *
0
) *
37%
*
6
) =
0 * $ 28.71 =
$0
0
0.5 *
0
) *
93%
*
4
) =
0 * $ 28.71 =
$0
0
0.5 *
0
) *
56%
*
1
) =
0 * $ 38.80 =
$0
0
0.5 *
0
) *
95%
*
0
) =
0 * $ 38.80 =
$0
0
0.5 *
0
) *
56%
*
34
) =
0 * $ 38.80 =
$0
0
0.5 *
0.5 *
0
0
) *
) *
95%
56%
*
*
11
102
) =
) =
0 * $ 38.80 =
0 * $ 38.80 =
$0
$0
0
0
0.5 *
0
) *
95%
*
32
) =
0 * $ 38.80 =
$0
0
0.5 *
0
) *
56%
*
33
) =
0 * $ 38.80 =
$0
0
CONSTRUCTION
GOVERNMENT
SECTOR 4. Producers of Chromates
ALL
Page 93
Item 12 COST
Responses
NONSUPEWAGE
QNFITEMP
Small
(
0.5 *
0
) *
95%
*
31
) =
0 * $ 38.80 =
$0
0
Large
(
0.5 *
0
) *
56%
*
163
) =
0 * $ 28.31 =
$0
0
Small
(
0.5 *
0
) *
95%
*
118
) =
0 * $ 28.31 =
$0
0
Large
(
0.5 *
0
) *
37%
*
3
) =
0 * $ 37.70 =
$0
0
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
ALL
Small
Large
Carbon, Flat, and Container Glass
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
Chromium Catalyst Users
Small
Large
Chromium Catalyst Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small
Large
CONSTRUCTION
Small
(
0.5 *
0
) *
93%
*
1
) =
0 * $ 37.70 =
$0
0
(
0.5 *
0
) *
37%
*
0
) =
0 * $ 41.50 =
$0
0
(
0.5 *
0
) *
93%
*
5
) =
0 * $ 41.50 =
$0
0
(
0.5 *
0
) *
92%
*
216
) =
0 * $ 29.92 =
$0
0
(
0.5 *
0
) *
99%
*
1,627
) =
0 * $ 29.92 =
$0
0
(
0.5 *
0
) *
89%
*
343
) =
0 * $ 19.97 =
$0
0
(
0.5 *
0
) *
99%
*
697
) =
0 * $ 19.97 =
$0
0
(
0.5 *
0
) *
76%
*
6
) =
0 * $ 28.87 =
$0
0
(
(
0.5 *
0.5 *
0
0
) *
) *
97%
76%
*
*
20
90
) =
) =
0 * $ 28.87 =
0 * $ 28.87 =
$0
$0
0
0
(
0.5 *
0
) *
97%
*
5
) =
0 * $ 28.87 =
$0
0
(
0.5 *
0
) *
98%
*
81
) =
0 * $ 20.85 =
$0
0
(
0.5 *
0
) * 99.70% *
325
) =
0 * $ 20.85 =
$0
0
(
0.5 *
0
) *
67%
*
1
) =
0 * $ 32.51 =
$0
0
(
(
0.5 *
0.5 *
0
119
) *
) *
97%
67%
*
*
0
1
) =
) =
0 * $ 32.51 =
40 * $ 32.51 =
$0
$1,291
0
79
(
0.5 *
11
) *
97%
*
1
) =
5 * $ 32.51 =
$173
11
(
0.5 *
0
) *
76%
*
5
) =
0 * $ 25.64 =
$0
0
(
0.5 *
0
) *
97%
*
0
) =
0 * $ 25.64 =
$0
0
(
0.5 *
0
) *
94%
*
1
) =
0 * $ 32.11 =
$0
0
(
(
0.5 *
0.5 *
0
0
) *
) *
99%
55%
*
*
1
36
) =
) =
0 * $ 32.11 =
0 * $ 32.11 =
$0
$0
0
0
(
(
0.5 *
0.5 *
0
0
) *
) *
95%
88%
*
*
32
1
) =
) =
0 * $ 32.11 =
0 * $ 32.11 =
$0
$0
0
0
(
0.5 *
0
) *
99%
*
1
) =
0 * $ 32.11 =
$0
0
#PLANTS
1‐%FITBASE
QNFITTIME
BURDEN HOURS
Table 12
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
Page 94
Item 12 COST
Responses
NONSUPEWAGE
QNFITEMP
State
(
0.5 *
0
) *
88%
*
1
) =
0 * $ 32.11 =
$0
0
Local
(
0.5 *
0
) *
88%
*
1
) =
0 * $ 32.11 =
$0
0
Large
(
0.5 *
0
) *
59%
*
40
) =
0 * $ 27.23 =
$0
0
Small
State
(
(
0.5 *
0.5 *
0
0
) *
) *
96%
59%
*
*
48
0
) =
) =
0 * $ 27.23 =
0 * $ 27.23 =
$0
$0
0
0
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
(
0.5 *
0
) *
96%
*
24
) =
0 * $ 27.23 =
$0
0
(
0.5 *
0
) *
56%
*
19
) =
0 * $ 27.93 =
$0
0
(
0.5 *
0
) *
95%
*
0
) =
0 * $ 27.93 =
$0
0
(
0.5 *
0
) *
88%
*
51
) =
0 * $ 32.13 =
$0
0
Small
State
(
(
0.5 *
0.5 *
0
0
) *
) *
99%
88%
*
*
233
15
) =
) =
0 * $ 32.13 =
0 * $ 32.13 =
$0
$0
0
0
Local
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
88%
88%
*
*
88
1
) =
) =
0 * $ 32.13 =
0 * $ 32.13 =
$0
$0
0
0
Small
State
(
(
0.5 *
0.5 *
0
0
) *
) *
99%
88%
*
*
1
1
) =
) =
0 * $ 32.13 =
0 * $ 32.13 =
$0
$0
0
0
Local
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
88%
88%
*
*
1
44
) =
) =
0 * $ 32.13 =
0 * $ 32.13 =
$0
$0
0
0
Small
(
0.5 *
0
) *
99%
Total
*
175
) =
7,770
0 * $ 32.13 =
45
$0
$1,464
0
90
#PLANTS
1‐%FITBASE
QNFITTIME
BURDEN HOURS
Table 12
GOVERNMENT
SECTOR 27. Solid Waste Incineration
ALL
GOVERNMENT
INDUSTRIAL REHABILITATION AND
MAINTENANCE
HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION
Page 95
Table 13
Respiratory Protection Program: Contract Cost for an Industrial Hygienist to Conduct Quantitative Fit Testing for Respirators
This table calculates the contract cost for the industrial hygiene technician to conduct quantitative fit‐testing.
COST = ((QNFITCOST * QNFITEMP) * 1‐%FITBASE * #PLANTS)
Item 13 COST
#PLANTS
1‐%FITBASE
QNFITEMP
QNFITCOST
Variables
* QNFITCOST = $38.00 hourly cost for a industrial hygiene technician * # of hours
* QNFITTEMP = # Employees requiring annual quantitative fit‐test
* 1‐%FITBASE = Percent of plants not conducting fit‐testing (%FITBASE is the percent of plants conducting annual respirator fit‐testing in
the baseline)
* #PLANTS = Number of plants represented by the model input
Sector 1. Electroplating
Large
(
$0
*
0
*
71%
*
1
) = $ ‐
Small
(
$0
*
0
*
97%
*
1
) = $ ‐
Large
(
$77
*
0
*
81%
*
1
) = $ ‐
Small
Large
(
(
$77
$0
*
*
0
0
*
*
98%
55%
*
*
1
1
) = $ ‐
) = $ ‐
Small
Large
(
(
$0
$0
*
*
0
0
*
*
95%
88%
*
*
1
1
) = $ ‐
) = $ ‐
Small
State
(
(
$0
$0
*
*
0
0
*
*
99%
88%
*
*
1
1
) = $ ‐
) = $ ‐
Local
(
$0
*
0
*
99%
*
1
) = $ ‐
Large
(
$77
*
0
*
81%
*
1
) = $ ‐
MARITIME
Small
Large
(
(
$77
$0
*
*
0
0
*
*
98%
81%
*
*
1
1
) = $ ‐
) = $ ‐
CONSTRUCTION
Small
Large
(
(
$0
$0
*
*
0
0
*
*
98%
81%
*
*
1
1
) = $ ‐
) = $ ‐
Small
(
$0
*
0
*
98%
*
1
) = $ ‐
Large
(
$0
*
0
*
81%
*
49
) = $ ‐
Small
Large
(
(
$0
$0
*
*
0
0
*
*
98%
81%
*
*
62
326
) = $ ‐
) = $ ‐
Small
Large
(
(
$0
$0
*
*
0
0
*
*
98%
81%
*
*
1,436
100
) = $ ‐
) = $ ‐
Small
Large
(
(
$0
$0
*
*
0
0
* 98% *
* 55.00% *
18
276
) = $ ‐
) = $ ‐
Small
Large
(
(
$0
$0
*
*
0
0
*
*
476
1
) = $ ‐
) = $ ‐
ALL
Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY
SECTOR 3. PAINTING
GENERAL INDUSTRY AEROSPACE
GENERAL INDUSTRY AUTOBODY
COIL COATING
MARITIME
Page 96
95%
0%
*
*
Item 13 COST
#PLANTS
1‐%FITBASE
QNFITEMP
QNFITCOST
Variables
Table 13
CONSTRUCTION
Small
(
$0
Page 97
*
0
*
0%
*
1
) = $ ‐
Item 13 COST
#PLANTS
1‐%FITBASE
QNFITEMP
QNFITCOST
Variables
Table 13
State
(
$0
*
0
*
0%
*
1
) = $ ‐
Local
(
$0
*
0
*
0%
*
1
) = $ ‐
Large
(
$0
*
0
*
37%
*
2
) = $ ‐
Small
(
$0
*
0
*
93%
*
0
) = $ ‐
Large
(
$0
*
0
*
37%
*
2
) = $ ‐
Small
(
$0
*
0
*
93%
*
1
) = $ ‐
Large
(
$0
*
0
*
37%
*
2
) = $ ‐
Small
(
$0
*
0
*
93%
*
0
) = $ ‐
Large
(
$0
*
0
*
37%
*
5
) = $ ‐
Small
(
$0
*
0
*
93%
*
0
) = $ ‐
Large
(
$0
*
0
*
37%
*
80
) = $ ‐
Small
(
$0
*
0
*
93%
*
126
) = $ ‐
Large
(
$0
*
0
*
37%
*
2
) = $ ‐
Small
(
$0
*
0
*
93%
*
8
) = $ ‐
Large
(
$0
*
0
*
54%
*
1
) = $ ‐
Small
(
$0
*
0
*
95%
*
1
) = $ ‐
Large
(
$0
*
0
*
37%
*
6
) = $ ‐
Small
(
$0
*
0
*
93%
*
4
) = $ ‐
Large
(
$0
*
0
*
56%
*
1
) = $ ‐
Small
(
$0
*
0
*
95%
*
0
) = $ ‐
Large
(
$0
*
0
*
56%
*
34
) = $ ‐
Small
Large
(
(
$0
$0
*
*
0
0
*
*
95%
56%
*
*
11
102
) = $ ‐
) = $ ‐
Small
(
$0
*
0
*
95%
*
32
) = $ ‐
Large
(
$0
*
0
*
56%
*
33
) = $ ‐
Small
(
$0
*
0
*
95%
*
31
) = $ ‐
Large
(
$0
*
0
*
56%
*
163
) = $ ‐
GOVERNMENT
SECTOR 4. Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
SECTOR 10. Plastic Colorant Producers and Users
ALL
SECTOR 11. Plating Mixture Producers
ALL
SECTOR 13. Chromium Metal Producers
ALL
SECTOR 14. Iron and Steel Mills
ALL
CARBON STEEL
14b. RESHAPING INDUSTRY
RESHAPING
SECTOR 15. Iron and Steel Foundries
Page 98
Item 13 COST
#PLANTS
1‐%FITBASE
QNFITEMP
QNFITCOST
Variables
Table 13
ALL
Small
(
$0
Page 99
*
0
*
95%
*
118
) = $ ‐
Item 13 COST
#PLANTS
1‐%FITBASE
QNFITEMP
QNFITCOST
Variables
Table 13
SECTOR 17. Chromium Dye Producers
Large
(
$0
*
0
*
37%
*
3
) = $ ‐
Small
(
$0
*
0
*
93%
*
1
) = $ ‐
Large
(
$0
*
0
*
37%
*
0
) = $ ‐
Small
(
$0
*
0
*
93%
*
5
) = $ ‐
Large
(
$0
*
0
*
92%
*
216
) = $ ‐
Small
(
$0
*
0
*
99%
*
1,627
) = $ ‐
Large
(
$0
*
0
*
89%
*
343
) = $ ‐
Small
(
$0
*
0
*
99%
*
697
) = $ ‐
Large
(
$0
*
0
*
76%
*
6
) = $ ‐
Small
Large
(
(
$0
$0
*
*
0
0
*
*
97%
76%
*
*
20
90
) = $ ‐
) = $ ‐
Small
(
$0
*
0
*
97%
*
5
) = $ ‐
Large
(
$0
*
0
*
98%
*
81
) = $ ‐
Small
(
$0
*
0
* 99.70% *
325
) = $ ‐
Large
(
$0
*
0
*
67%
*
1
) = $ ‐
Small
Large
(
(
$0
$138
*
*
0
33
*
*
97%
100%
*
*
0
1
) = $ ‐
) = $ 4,559
Small
(
$13
*
33
*
100%
*
1
) = $ 422
Large
(
$0
*
0
*
76%
*
5
) = $ ‐
Small
(
$0
*
0
*
97%
*
0
) = $ ‐
Large
(
$0
*
0
*
94%
*
1
) = $ ‐
Small
Large
(
(
$0
$0
*
*
0
0
*
*
99%
55%
*
*
1
36
) = $ ‐
) = $ ‐
Small
Large
(
(
$0
$0
*
*
0
0
*
*
95%
88%
*
*
32
1
) = $ ‐
) = $ ‐
Small
State
(
(
$0
$0
*
*
0
0
*
99%
88%
*
1
1
) = $ ‐
) = $ ‐
Local
(
$0
*
0
1
) = $ ‐
$0
*
0
40
) = $ ‐
ALL
SECTOR 18. Chromium Sulfate Producers
ALL
SECTOR 19. Chemical Distributors
ALL
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
ALL
Carbon, Flat, and Container Glass
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
Chromium Catalyst Users
Chromium Catalyst Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
88%
SECTOR 27. Solid Waste Incineration
Large
Page 100
*
59%
*
ALL
Small
(
(
$0
Page 101
*
0
*
96%
*
48
Item 13 COST
#PLANTS
1‐%FITBASE
QNFITEMP
QNFITCOST
Variables
Table 13
) = $ ‐
#PLANTS
Item 13 COST
1‐%FITBASE
State
(
$0
*
0
59%
0
) = $ ‐
Local
(
$0
*
0
96%
24
) = $ ‐
Large
(
$0
*
0
*
56%
*
19
) = $ ‐
Small
(
$0
*
0
*
95%
*
0
) = $ ‐
Large
(
$0
*
0
*
88%
*
51
) = $ ‐
Small
State
(
(
$0
$0
*
*
0
0
*
*
99%
88%
*
*
233
15
) = $ ‐
) = $ ‐
Local
Large
(
(
$0
$0
*
*
0
0
*
*
88%
88%
*
*
88
1
) = $ ‐
) = $ ‐
Small
State
(
(
$0
$0
*
*
0
0
*
*
99%
88%
*
*
1
1
) = $ ‐
) = $ ‐
Local
Large
(
(
$0
$0
*
*
0
0
*
*
88%
88%
*
*
1
44
) = $ ‐
) = $ ‐
Small
(
$0
*
0
*
99%
Total
*
175
) = $ ‐
7,770
$ 4,981
QNFITCOST
QNFITEMP
Variables
Table 13
GOVERNMENT
SECTOR 30. Superalloy Producers and Users
ALL
SECTOR 31. Construction
INDUSTRIAL REHABILITATION AND
MAINTENANCE
HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION AND
MAINTENANCE
Page 102
Table 14
Respiratory‐Protection Program: Medical Questionnaire for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2));
Employee Time and Cost to Complete the Medical Questionnaire for Respirator Use
This table calculates the burden hours and cost of employee time to complete a medical questionnaire. The hours and cost is determined by the
number of employees who are at or above the action level and at or below the PEL by the time it takes to fill our the medical questionnaire and by non‐
supervisory wage rate.
Hours = (EMPAL * MEDHISTTIME * 1‐%FITBASE * #PLANTS)
Cost = Hours x NONSUPEWAGE
Variables:
* EMPAL = Number of employees who wear respirators who are at or above the AL and at or below the PEL
in the model plant
* MEDHISTTIME = Employee time to complete medical history questionnaire
* 1‐%FITBASE = Percent of plants not conducting annual respirator fit‐test
* #PLANTS = Number of plants represented by the model output
* NONSUPEWAGE = Non‐Supervisory wage rate
RESPONSES
71%
*
1
)
=
223.11 * $ 26.61 = $ 5,937
1,312
Small (
3,478 * 0.17 *
97%
*
1
)
=
573.47 * $ 26.61 = $ 15,260
3,373
Large (
0 * 0.17 *
81%
*
1
)
=
Small (
Large (
0 * 0.17 *
2,330 * 0.17 *
98%
55%
*
*
1
1
)
)
Small (
Large (
55 * 0.17 *
3,225 * 0.17 *
95%
88%
*
*
1
1
Small (
State (
2,494 * 0.17 *
14 * 0.17 *
99%
88%
*
*
Local (
73 * 0.17 *
99%
Large (
0 * 0.17 *
Small (
Large (
Hours
#PLANTS
1‐%FITBASE
1,848 * 0.17 *
MEDHISTTIME
Large (
EMPAL
Item 12 COST
NONSUPEWAGE
Variables
24.17%
Sector 1. Electroplating
ALL
Sector 2. Welding
0.00 * $ 26.20 =
0
0
=
=
0.00 * $ 26.20 =
0
217.81 * $ 26.20 = $ 5,707
0
1,281
)
)
=
=
8.89 * $ 26.20 = $ 233
482.50 * $ 26.20 = $ 12,641
52
2,838
1
1
)
)
=
=
419.71 * $ 26.20 = $ 10,996
2.17 * $ 26.20 = $ 57
2,469
13
*
1
)
=
12.36 * $ 26.20 = $ 324
73
55%
*
1
)
=
0.00 * $ 26.20 =
0
0
0 * 0.17 *
16 * 0.17 *
95%
88%
*
*
1
1
)
)
=
=
0.00 * $ 26.20 =
0
2.46 * $ 26.20 = $ 64
0
14
Small (
Large (
0 * 0.17 *
658 * 0.17 *
99%
88%
*
*
1
1
)
)
=
=
0.00 * $ 26.20 =
0
98.44 * $ 26.20 = $ 2,579
0
579
Small (
529 * 0.17 *
99%
*
1
)
=
89.11 * $ 26.20 = $ 2,335
524
Large (
32 * 0.17 *
81%
*
49
)
=
213.51 * $ 33.07 = $ 7,060
1,256
Small (
Large (
0 * 0.17 *
1 * 0.17 *
98%
81%
*
*
62
326
)
)
=
=
0.00 * $ 33.07 =
0
40.67 * $ 33.07 = $ 1,345
0
239
Small (
Large (
0 * 0.17 *
2 * 0.17 *
98%
81%
* 1,436 )
* 100 )
=
=
0.00 * $ 33.07 =
0
24.85 * $ 33.07 = $ 822
0
146
Small (
1 * 0.17 *
98%
*
=
2.73 * $ 33.07 = $ 90
16
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
SECTOR 3. PAINTING
GENERAL INDUSTRY AEROSPACE
GENERAL INDUSTRY AUTOBODY
REPAIR
COIL COATING
Page 103
18
)
RESPONSES
1 * 0.17 * 55.00% *
NONSUPEWAGE
276
)
=
22.11 * $ 33.07 = $ 731
130
Hours
#PLANTS
1‐%FITBASE
Item 12 COST
Large (
MEDHISTTIME
EMPAL
Variables
Table 14
MARITIME
Small (
Large (
1 * 0.17 *
413 * 0.17 *
95%
0%
*
*
476
1
)
)
=
=
76.93 * $ 33.07 =
0.00 * $ 33.07 =
2543.756
0
453
0
Small (
State (
520 * 0.17 *
31 * 0.17 *
0%
0%
*
*
1
1
)
)
=
=
0.00 * $ 33.07 =
0.00 * $ 33.07 =
0
0
0
0
Local (
133 * 0.17 *
0%
*
1
)
=
0.00 * $ 33.07 =
0
0
Large (
7 * 0.17 *
37%
*
2
)
=
0.81 * $ 38.68 = $ 31
5
0 * 0.17 *
93%
*
0
)
=
0.00 * $ 38.68 =
0
0
5 * 0.17 *
37%
*
2
)
=
0.00 * $ 37.70 =
0
4
1 * 0.17 *
93%
*
1
)
=
0.00 * $ 37.70 =
0
1
2 * 0.17 *
37%
*
2
)
=
0.00 * $ 31.94 =
0
1
0 * 0.17 *
93%
*
0
)
=
0.00 * $ 31.94 =
0
0
11 * 0.17 *
37%
*
5
)
=
3.46 * $ 38.68 = $ 134
20
0 * 0.17 *
93%
*
0
)
=
0.00 * $ 38.68 =
0
0
1 * 0.17 *
37%
*
80
)
=
4.84 * $ 28.81 = $ 140
28
0 * 0.17 *
93%
*
126
)
=
0.00 * $ 28.81 =
0
0
10 * 0.17 *
37%
*
2
)
=
1.57 * $ 28.86 = $ 45
9
2 * 0.17 *
93%
*
8
)
=
3.29 * $ 28.86 = $ 95
19
342 * 0.17 *
54%
*
1
)
=
31.38 * $ 31.99 = $ 1,004
185
35 * 0.17 *
95%
*
1
)
=
5.58 * $ 31.99 = $ 178
33
3 * 0.17 *
37%
*
6
)
=
1.00 * $ 28.71 = $ 29
6
1 * 0.17 *
93%
*
4
)
=
0.56 * $ 28.71 = $ 16
3
7 * 0.17 *
56%
*
1
)
=
0.63 * $ 38.80 = $ 24
4
0 * 0.17 *
95%
*
0
)
=
0.00 * $ 38.80 =
0
0
27 * 0.17 *
56%
*
34
)
=
86.40 * $ 38.80 = $ 3,353
508
1 * 0.17 *
1 * 0.17 *
95%
56%
*
*
11
102
)
)
=
=
2.24 * $ 38.80 = $ 87
6.17 * $ 38.80 = $ 239
13
36
1 * 0.17 *
95%
*
32
)
=
6.58 * $ 38.80 = $ 256
39
3 * 0.17 *
56%
*
33
)
=
8.07 * $ 38.80 = $ 313
47
1 * 0.17 *
95%
*
31
)
=
3.23 * $ 38.80 = $ 125
19
CONSTRUCTION
GOVERNMENT
SECTOR 4. Producers of Chromates
ALL
Small (
SECTOR 5. Chromate Pigment Procedures
Large (
ALL
Small (
SECTOR 6. CCA Producers
Large (
ALL
Small (
SECTOR 7. Chromium Catalyst Producers
Large (
ALL
Small (
SECTOR 8. Paint and Coating Producers
Large (
ALL
Small (
SECTOR 9. Printing Ink Producers
Large (
ALL
Small (
SECTOR 10. Plastic Colorant Producers and Users
Large (
ALL
Small (
SECTOR 11. Plating Mixture Producers
Large (
ALL
Small (
SECTOR 13. Chromium Metal Producers
Large (
ALL
Small (
SECTOR 14. Iron and Steel Mills
Large (
ALL
Small (
Large (
CARBON STEEL
Small (
14b. RESHAPING
Large (
RESHAPING
Small (
Page 104
RESPONSES
56%
*
163
)
=
267.33 * $ 28.31 = $ 7,568
1,573
Small (
4 * 0.17 *
95%
*
118
)
=
78.53 * $ 28.31 = $ 2,223
462
Large (
29 * 0.17 *
37%
*
3
)
=
4.89 * $ 37.70 = $ 184
29
(
6 * 0.17 *
93%
*
1
)
=
0.90 * $ 37.70 = $ 34
5
(
0 * 0.17 *
37%
*
0
)
=
0.00 * $ 41.50 =
0
0
(
1 * 0.17 *
93%
*
5
)
=
0.72 * $ 41.50 = $ 30
4
(
0 * 0.17 *
92%
*
216
)
=
0.00 * $ 29.92 =
0
0
(
0 * 0.17 *
99%
* 1,627 )
=
0.00 * $ 29.92 =
0
0
(
0 * 0.17 *
89%
*
343
)
=
0.00 * $ 19.97 =
0
0
(
0 * 0.17 *
99%
*
697
)
=
0.00 * $ 19.97 =
0
0
(
1 * 0.17 *
76%
*
6
)
=
0.85 * $ 28.87 = $ 25
5
(
(
0 * 0.17 *
7 * 0.17 *
97%
76%
*
*
20
90
)
)
=
=
0.00 * $ 28.87 =
0
85.46 * $ 28.87 = $ 2,467
0
503
(
1 * 0.17 *
97%
*
5
)
=
0.91 * $ 28.87 = $ 26
5
(
0 * 0.17 *
98%
*
81
)
=
0.00 * $ 20.85 =
0
0
(
0 * 0.17 * 99.70% *
325
)
=
0.00 * $ 20.85 =
0
0
(
1 * 0.17 *
67%
*
1
)
=
0.12 * $ 32.51 = $ 4
1
(
(
0 * 0.17 *
119 * 0.17 *
97%
0%
*
*
0
1
)
)
=
=
0.00 * $ 32.51 =
0.00 * $ 32.51 =
0
0
0
0
(
0 * 0.17 *
0%
*
1
)
=
0.00 * $ 32.51 =
0
0
(
0 * 0.17 *
76%
*
5
)
=
0.00 * $ 25.64 =
0
0
(
0 * 0.17 *
97%
*
0
)
=
0.00 * $ 25.64 =
0
0
(
0 * 0.17 *
94%
*
1
)
=
0.00 * $ 32.11 =
0
0
(
(
0 * 0.17 *
0 * 0.17 *
99%
55%
*
*
1
36
)
)
=
=
0.00 * $ 32.11 =
* $ 32.11 =
0
0
0
0
(
(
0 * 0.17 *
0 * 0.17 *
95%
88%
*
*
32
1
)
)
=
=
0.00 * $ 32.11 =
0.00 * $ 32.11 =
0
0
0
0
(
(
0 * 0.17 *
0 * 0.17 *
99%
88%
*
*
1
1
)
)
=
=
0.00 * $ 32.11 =
0.00 * $ 32.11 =
0
0
0
0
(
0 * 0.17 *
88%
*
1
)
=
0.00 * $ 32.11 =
0
0
Hours
#PLANTS
1‐%FITBASE
17 * 0.17 *
MEDHISTTIME
Large (
EMPAL
Item 12 COST
NONSUPEWAGE
Variables
Table 14
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
ALL
Small
Large
FIBER, FLAT, CONTAINER GLASS
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
ALL
Small
Large
Chromium Catalyst Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small
Large
CONSTRUCTION
Small
State
GOVERNMENT
Local
Page 105
RESPONSES
59%
*
40
)
=
0.00 * $ 27.23 =
0
0
Small (
State (
0 * 0.17 *
0 * 0.17 *
96%
59%
*
*
48
0
)
)
=
=
0.00 * $ 27.23 =
0.00 * $ 27.23
0
0
0
0
(
0 * 0.17 *
96%
*
24
)
=
0.00 * $ 27.23
0
0
(
0 * 0.17 *
56%
*
19
)
=
0.00 * $ 27.93 =
0
0
(
0 * 0.17 *
95%
*
0
)
=
0.00 * $ 27.93 =
0
0
(
0 * 0.17 *
88%
*
51
)
=
0.00 * $ 32.13 =
0
0
INDUSTRIAL REHABILITATION AND Small (
MAINTENANCE
State (
0 * 0.17 *
0 * 0.17 *
99%
88%
*
*
233
15
)
)
=
=
0.00 * $ 32.13 =
0.00 * $ 32.13 =
0
0
0
0
Local (
Large (
0 * 0.17 *
0 * 0.17 *
88%
88%
*
*
88
1
)
)
=
=
0.00 * $ 32.13 =
0.00 * $ 32.13 =
0
0
0
0
Small (
State (
0 * 0.17 *
0 * 0.17 *
99%
88%
*
*
1
1
)
)
=
=
0.00 * $ 32.13 =
0.00 * $ 32.13 =
0
0
0
0
Local (
Large (
0 * 0.17 *
0 * 0.17 *
88%
88%
*
*
1
44
)
)
=
=
0.00 * $ 32.13 =
0.00 * $ 32.13 =
0
0
0
0
Small (
0 * 0.17 *
99%
*
175 )
7,770
=
0.00 * $ 32.13 =
0
3,116
$ 87,355
0
18,337
Hours
#PLANTS
1‐%FITBASE
0 * 0.17 *
MEDHISTTIME
Large (
EMPAL
Item 12 COST
NONSUPEWAGE
Variables
Table 14
SECTOR 27. Solid Waste Incineration
ALL
GOVERNMENT
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION
Total
Page 106
Table 15
Respiratory Protection Program: Medical Questionnaire for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2));
Contract Cost for a PLHCP to Review the Medical Questionnaire for Respirator Use
This table calculates the contract cost of the medical questionnaire and review by the licensed physician.
COST = (EMPAL * MEDHISTCOST * 1‐%FITBASE * #PLANTS)
Item 13 COST
(
1,848 * $ 45.56 *
71%
*
1
) = $ 59,790.08
Small
(
3,478 * $ 45.56 *
97%
*
1
) = $ 153,682.05
Large
(
0 * $ 45.56 *
81%
*
1
) = $ ‐
MARITIME
Small
Large
(
(
0 * $ 45.56 *
2,330 * $ 45.56 *
98%
55%
*
*
1
1
) = $ ‐
) = $ 58,371.26
CONSTRUCTION
Small
Large
(
(
55 * $ 45.56 *
3,225 * $ 45.56 *
95%
88%
*
*
1
1
) = $ 2,383.62
) = $ 129,302.87
Small
State
(
(
2,494 * $ 45.56 *
14 * $ 45.56 *
99%
88%
*
*
1
1
) = $ 112,476.64
) = $ 581.05
Local
(
73 * $ 45.56 *
99%
*
1
) = $ 3,311.98
Large
(
0 * $ 45.56 *
81%
*
1
) = $ ‐
MARITIME
Small
Large
(
(
0 * $ 45.56 *
16 * $ 45.56 *
98%
55%
*
*
1
1
) = $ ‐
) = $ 411.58
CONSTRUCTION
Small
Large
(
(
0 * $ 45.56 *
658 * $ 45.56 *
95%
88%
*
*
1
1
) = $ ‐
) = $ 26,379.64
Small
(
529 * $ 45.56 *
99%
*
1
) = $ 23,881.13
Large
(
32 * $ 45.56 *
81%
*
49
) = $ 57,218.62
Small
Large
(
(
0 * $ 45.56 *
1 * $ 45.56 *
98%
81%
*
*
62
326
) = $ ‐
) = $ 10,898.79
Small
Large
(
(
0 * $ 45.56 *
2 * $ 45.56 *
98%
81%
*
*
1,436
100
) = $ ‐
) = $ 6,660.37
Small
Large
(
(
1 * $ 45.56 * 98% *
1 * $ 45.56 * 55.00% *
18
276
) = $ 732.57
) = $ 6,903.28
Small
(
1
476
) = $ 20,616.00
Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY
1‐%FITBASE
Large
EMPAL
#PLANTS
MEDHISTCOST
Variables
* EMPAL = Number of employees who wear respirators who are at or above the AL and at or below the PEL
in the model plant
* MEDHISTCOST = Cost of medical history questionnaire to be reviewed by a PLHCP.
* 1‐%FITBASE = Percent of plants not conducting annual respirator fit‐test
* #PLANTS = Number of plants represented by the model output
GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY
SECTOR 3. PAINTING
GENERAL INDUSTRY (AEROSPACE)
GENERAL INDUSTRY (AUTOBODY REPAIR)
GENERAL INDUSTRY (COIL COATING)
MARITIME
$ 45.56 *
Page 107
95%
*
Item 13 COST
#PLANTS
1‐%FITBASE
MEDHISTCOST
EMPAL
Variables
Table 15
Large
(
413 * $ 45.56 *
0%
*
1
) = $ ‐
Small
State
(
(
520 * $ 45.56 *
31 * $ 45.56 *
0%
0%
*
*
1
1
) = $ ‐
) = $ ‐
Local
(
133 * $ 45.56 *
0%
*
1
) = $ ‐
Large
(
7 * $ 45.56 *
37%
*
2
) = $ 216.37
Small
(
0 * $ 45.56 *
93%
*
0
) = $ ‐
Large
(
5 * $ 45.56 *
37%
*
2
) = $ 163.76
Small
(
1 * $ 45.56 *
93%
*
1
) = $ 34.30
Large
(
2 * $ 45.56 *
37%
*
2
) = $ 62.78
Small
(
0 * $ 45.56 *
93%
*
0
Large
(
11 * $ 45.56 *
37%
*
5
) = $ ‐
$ ‐
) = $ 927.28
Small
(
0 * $ 45.56 *
93%
*
0
) = $ ‐
Large
(
1 * $ 45.56 *
37%
*
80
) = $ 1,298.20
Small
(
0 * $ 45.56 *
93%
*
126
) = $ ‐
Large
(
10 * $ 45.56 *
37%
*
2
) = $ 420.72
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
(
2 * $ 45.56 *
93%
*
8
) = $ 881.24
(
342 * $ 45.56 *
54%
*
1
) = $ 8,409.99
Small
(
35 * $ 45.56 *
95%
*
1
) = $ 1,494.87
Large
(
3 * $ 45.56 *
37%
*
6
) = $ 268.43
Small
(
1 * $ 45.56 *
93%
*
4
) = $ 149.93
Large
(
7 * $ 45.56 *
56%
*
1
) = $ 168.33
Small
(
0 * $ 45.56 *
95%
*
0
) = $ ‐
Large
(
27 * $ 45.56 *
56%
*
34
) = $ 23,154.89
Small
Large
(
(
1 * $ 45.56 *
1 * $ 45.56 *
95%
56%
*
*
11
102
) = $ 599.97
) = $ 1,653.92
Small
(
1 * $ 45.56 *
95%
*
32
) = $ 1,764.63
Large
(
3 * $ 45.56 *
56%
*
33
) = $ 2,163.62
Small
(
1 * $ 45.56 *
95%
*
31
) = $ 864.67
CONSTRUCTION
GOVERNMENT
SECTOR 4. Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
SECTOR 11. Plating Mixture Producers
ALL
SECTOR 13. Chromium Metal Producers
ALL
SECTOR 14. Iron and Steel Mills
Alloy and Stainless Steel
Carbon Steel
14b. RESHAPING INDUSTRY
Reshaping Industry
Page 108
Item 13 COST
(
17 * $ 45.56 *
56%
*
163
) = $ 71,640.46
Small
(
4 * $ 45.56 *
95%
*
118
) = $ 21,044.66
Large
(
29 * $ 45.56 *
37%
*
3
) = $ 1,310.08
Small
(
6 * $ 45.56 *
93%
*
1
) = $ 240.11
Large
(
0 * $ 45.56 *
37%
*
0
) = $ ‐
Small
(
1 * $ 45.56 *
93%
*
5
) = $ 194.23
Large
(
0 * $ 45.56 *
92%
*
216
) = $ ‐
Small
(
0 * $ 45.56 *
99%
*
1,627
) = $ ‐
Large
(
0 * $ 45.56 *
89%
*
343
) = $ ‐
Small
(
0 * $ 45.56 *
99%
*
697
) = $ ‐
Large
(
1 * $ 45.56 *
76%
*
6
) = $ 228.25
Small
Large
(
(
0 * $ 45.56 *
7 * $ 45.56 *
97%
76%
*
*
20
90
) = $ ‐
) = $ 22,900.92
Small
(
1 * $ 45.56 *
97%
*
5
) = $ 242.76
Large
(
0 * $ 45.56 *
98%
*
81
) = $ ‐
Small
(
0 * $ 45.56 * 99.70% *
325
) = $ ‐
Large
(
1 * $ 45.56 *
67%
*
1
) = $ 33.50
Small
Large
(
(
0 * $ 45.56 *
119 $ 45.56 *
97%
0%
*
*
0
1
) = $ ‐
) = $ ‐
Small
(
0
$ 45.56 *
0%
*
1
) = $ ‐
Large
(
0 * $ 45.56 *
76%
*
5
) = $ ‐
Small
(
0 * $ 45.56 *
97%
*
0
) = $ ‐
Large
(
0 * $ 45.56 *
94%
*
1
) = $ ‐
Small
Large
(
(
0 * $ 45.56 *
0 * $ 45.56 *
99%
55%
*
*
1
36
) = $ ‐
) = $ ‐
Small
Large
(
(
0 * $ 45.56 *
0 * $ 45.56 *
95%
88%
*
*
32
1
) = $ ‐
) = $ ‐
Small
(
0 * $ 45.56 *
99%
*
1
) = $ ‐
1‐%FITBASE
Large
EMPAL
#PLANTS
MEDHISTCOST
Variables
Table 15
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
SECTOR 18. Chromium Sulfate Producers
ALL
SECTOR 19. Chemical Distributors
ALL
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
ALL
FIBER, FLAT AND CONTAINER GLASS
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
ALL
Chromium Catalyst Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
Page 109
Item 13 COST
#PLANTS
1‐%FITBASE
MEDHISTCOST
EMPAL
Variables
Table 15
State
(
0 * $ 45.56 *
88%
*
1
) = $ ‐
Local
(
0 * $ 45.56 *
88%
*
1
) = $ ‐
Large
(
0
59%
40
$ ‐
Small
State
(
(
0 * $ 45.56 *
0 $ 45.56
96%
59%
48
0
) = $ ‐
$ ‐
Local
(
0
96%
24
$ ‐
Large
(
0 * $ 45.56 *
56%
*
19
) = $ ‐
Small
(
0 * $ 45.56 *
95%
*
0
) = $ ‐
Large
(
0 * $ 45.56 *
88%
*
51
) = $ ‐
Small
State
(
(
0 * $ 45.56 *
0 * $ 45.56 *
99%
88%
*
*
233
15
) = $ ‐
) = $ ‐
Local
Large
(
(
0 * $ 45.56 *
0 * $ 45.56 *
88%
88%
*
*
88
1
) = $ ‐
) = $ ‐
Small
State
(
(
0 * $ 45.56 *
0 * $ 45.56 *
99%
88%
*
*
1
1
) = $ ‐
) = $ ‐
Local
Large
(
(
0 * $ 45.56 *
0 * $ 45.56 *
88%
88%
*
*
1
44
) = $ ‐
) = $ ‐
Small
(
0 * $ 45.56 *
99%
Total
*
175
) = $ ‐
7,770
$ 836,134
Government
SECTOR 27. Solid Waste Incineration
$ 45.56
ALL
*
Government
$ 45.56
SECTOR 30. Superalloy Producers and Users
ALL
SECTOR 31. Construction
INDUSTRIAL REHABILITATION AND
MAINTENANCE
HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION
Page 110
Table 16
Respiratory Protection Program: Follow‐up Medical Examination for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2));
Employee Time and Cost to Complete the Medical Examination for Respirator Use
This table calculates the burden hour and cost estimate for employees that "fail" the medical history
questionnaire. It is estimated that 23% (EMPMEDXAM) will not pass the medial questionnaire
BURDEN HOURS = (EMPAL * RESPEXAMTIME * %EMPMEDEXAM * 1‐%FITBASE * PLANTS)
COST = BURDEN HOURS * NONSUPEWAGE
* EMPAL = Number of employees who wear respirators who are at or above the AL and at or below the PEL
in the model plant
* RESPEXAMTIME = Employee time, in hours, for medical exam for respirator use
* %EMPMEDEXAM = Percent of employees that will require a medical exam for respirator use
* 1‐%FITBASE = Percent of plants not conducting annual respirator fit‐test
* #PLANTS = Number of plants represented by the model output
* NONSUPEWAGE = Non‐Supervisory wage rate
* %EMPMEDEXAM = Percent of employees who "fail" an initial medical exam
Item 12 COST
Responses
1,848 *
3*
23% *
71%
*
1
=
905.56 * $ 26.61 $ 24,096.36
302
Small
(
3,478 *
3*
23% *
97%
*
1
=
2327.62 * $ 21.43 $ 49,880.85
776
Large
(
0*
3*
23% *
81%
*
1
=
0.00 * $ 21.10 $ ‐
Small
Large
(
(
0*
2,330 *
3*
3*
23% *
23% *
98%
55%
*
*
1
1
=
0.00 * $ 21.10 $ ‐
884.07 * $ 21.10 $ 18,653.92
0
295
Small
Large
(
(
55 *
3,225 *
3*
3*
23% *
23% *
95%
88%
*
*
1
1
=
=
36.10 * $ 21.10 $ 761.74
1958.38 * $ 21.10 $ 41,321.79
12
653
Small
State
(
(
2,494 *
14 *
3*
3*
23% *
23% *
99%
88%
*
*
1
1
=
=
1703.53 * $ 21.10 $ 35,944.57
8.80 * $ 21.10 $ 185.69
568
3
Local
(
73 *
3*
23% *
99%
*
1
=
50.16 * $ 21.10 $ 1,058.42
17
Large
(
0*
3*
23% *
81%
*
1
=
0.00 * $ 21.10 $ ‐
0
Small
Large
(
(
0*
16 *
3*
3*
23% *
23% *
98%
55%
*
*
1
1
=
0.00 * $ 21.10 $ ‐
6.23 * $ 21.10 $ 131.53
0
2
Small
Large
(
(
0*
658 *
3*
3*
23% *
23% *
95%
88%
*
*
1
1
=
=
0.00 * $ 21.10 $ ‐
399.54 * $ 21.10 $ 8,430.24
0
133
Small
(
529 *
3*
23% *
99%
*
1
=
361.70 * $ 21.10 $ 7,631.78
121
Large
(
32 *
3*
23% *
81%
*
49
=
866.61 *
26.63 $ 23,077.94
289
Small
Large
(
(
0*
1*
3*
3*
23% *
23% *
98%
81%
*
*
62
326
=
=
0.00 *
165.07 *
26.63 $ ‐
26.63 $ 4,395.80
0
55
Small
Large
(
(
0*
2*
3*
3*
23% *
23% *
98%
81%
* 1,436 =
* 100 =
0.00 *
100.88 *
26.63 $ ‐
26.63 $ 2,686.32
0
34
Small
(
1*
3*
23% *
98%
*
11.10 *
26.63 $ 295.47
4
HOURS
EMPAL
NONSUPEWAGE
(
#PLANTS
1‐%FITBASE
Large
RESPEXAMTIME
%EMPMEDEXAM
24.17%
Sector 1. Electroplating
ALL
Sector 2. Welding
0
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
SECTOR 3. PAINTING
GENERAL INDUSTRY (AEROSPACE)
GENERAL INDUSTRY (AUTOBODY
REPAIR)
GENERAL INDUSTRY (COIL
COATING)
Page 111
18
=
Responses
(
1*
3*
23% * 55.00% *
276
=
89.74 *
26.63 $ 2,389.70
30
Small
Large
(
(
1*
413 *
3*
3*
23% *
23% *
95%
0%
*
*
476
1
=
=
312.24 *
0.00 *
26.63 $ 8,315.04
26.63 $ ‐
104
0
Small
State
(
(
520 *
31
3*
3
23% *
23%
0%
0%
*
1
1
=
0.00 *
0.00
26.63 $ ‐
26.63 $ ‐
0
0
Local
(
133
3
23%
0%
0.00
26.63 $ ‐
0
Large
(
7*
3*
23% *
37%
*
2
=
3.28 *
31.15 $ 102.08
1
(
Small
SECTOR 5. Chromate Pigment Procedures
Large
(
ALL
(
Small
SECTOR 6. CCA Producers
Large
(
ALL
(
Small
SECTOR 7. Chromium Catalyst Producers
Large
(
ALL
(
Small
SECTOR 8. Paint and Coating Producers
Large
(
ALL
(
Small
SECTOR 9. Printing Ink Producers
Large
(
ALL
(
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
(
ALL
(
Small
SECTOR 11. Plating Mixture Producers
Large
(
ALL
(
Small
SECTOR 13. Chromium Metal Producers
Large
(
ALL
(
Small
SECTOR 14. Iron and Steel Mills
Large
(
Alloy and Stainless Steel
(
Small
Large
(
Carbon Steel
(
Small
0*
3*
23% *
93%
*
0
=
0.00 *
31.15 $ ‐
0
5*
3*
23% *
37%
*
2
=
2.48 *
30.36 $ 75.30
1
1*
3*
23% *
93%
*
1
=
0.52 *
30.36 $ 15.77
0
2*
3*
23% *
37%
*
2
=
0.95 *
25.72 $ 24.46
0
0*
3*
23% *
93%
*
0
=
0.00 *
25.72 $ ‐
0
11 *
3*
23% *
37%
*
5
=
14.04 *
31.15 $ 437.48
5
0*
3*
23% *
93%
*
0
=
0.00 *
31.15 $ ‐
0
1*
3*
23% *
37%
*
80
=
19.66 *
23.20 $ 456.16
7
0*
3*
23% *
93%
*
126
=
0.00 *
23.20 $ ‐
0
10 *
3*
23% *
37%
*
2
=
6.37 *
23.24 $ 148.09
2
2*
3*
23% *
93%
*
8
=
13.35 *
23.24 $ 310.18
4
342 *
3*
23% *
54%
*
1
=
127.37 *
25.76 $ 3,281.18
42
35 *
3*
23% *
95%
*
1
=
22.64 *
25.76 $ 583.23
8
3*
3*
23% *
37%
*
6
=
4.07 *
23.12 $ 94.00
1
1*
3*
23% *
93%
*
4
=
23.12 $ 52.50
1
7*
3*
23% *
56%
*
1
=
2.27 *
0.00
2.55 *
31.25 $ 79.67
1
0*
3*
23% *
95%
*
0
=
0.00 *
31.25 $ ‐
0
27 *
3*
23% *
56%
*
34
=
350.70 *
31.25 $ 10,959.26
117
1*
1*
3*
3*
23% *
23% *
95%
56%
*
*
11
102
=
=
9.09 *
25.05 *
31.25 $ 283.97
31.25 $ 782.80
3
8
1*
3*
23% *
95%
*
32
=
26.73 *
31.25 $ 835.20
9
HOURS
#PLANTS
1‐%FITBASE
Large
EMPAL
Item 12 COST
NONSUPEWAGE
%EMPMEDEXAM
RESPEXAMTIME
Table 16
MARITIME
CONSTRUCTION
GOVERNMENT
1
SECTOR 4. Producers of Chromates
ALL
Page 112
Item 12 COST
Responses
3*
3*
23% *
56%
*
33
=
32.77 *
31.25 $ 1,024.05
11
Small
(
1*
3*
23% *
95%
*
31
=
13.10 *
31.25 $ 409.25
4
Large
(
17 *
3*
23% *
56%
*
163
=
1085.04 *
22.8 $ 24,738.98
362
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
ALL
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
ALL
Small
Large
Chromium Catalyst Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small
(
4*
3*
23% *
95%
*
118
=
318.74 *
22.8 $ 7,267.17
106
(
29 *
3*
23% *
37%
*
3
=
19.84 *
30.36 $ 602.40
7
(
6*
3*
23% *
93%
*
1
=
3.64 *
30.36 $ 110.41
1
(
0*
3*
23% *
37%
*
0
=
0.00 *
33.42 $ ‐
0
(
1*
3*
23% *
93%
*
5
=
2.94 *
33.42 $ 98.31
1
(
0*
3*
23% *
92%
*
216
=
0.00 *
24.1 $ ‐
0
(
0*
3*
23% *
99%
* 1,627 =
0.00 *
24.1 $ ‐
0
(
0*
3*
23% *
89%
*
343
=
0.00 *
16.08 $ ‐
0
(
0*
3*
23% *
99%
*
697
=
0.00 *
16.08 $ ‐
0
(
1*
3*
23% *
76%
*
6
=
3.46 *
23.25 $ 80.37
1
(
(
0*
7*
3*
3*
23% *
23% *
97%
76%
*
*
20
90
=
=
0.00 *
346.85 *
23.25 $ ‐
23.25 $ 8,064.26
0
116
(
1*
3*
23% *
97%
*
5
=
3.68 *
23.25 $ 85.49
1
(
0*
3*
23% *
98%
*
81
=
0.00 *
16.79 $ ‐
0
(
0*
3*
23% * 99.70% *
325
=
0.00 *
16.79 $ ‐
0
(
1*
3*
23% *
67%
*
1
=
0.51 *
26.18 $ 13.28
0
(
(
0*
119 *
3*
3*
23% *
23% *
0%
0%
*
*
0
1
=
=
0.00 *
0.00 *
26.18 $ ‐
26.18 $ ‐
0
0
(
0*
3*
23% *
97%
*
1
=
0.00 *
26.18 $ ‐
0
(
0*
3*
23% *
76%
*
5
=
0.00 *
20.65 $ ‐
0
(
0*
3*
23% *
97%
*
0
=
0.00 *
20.65 $ ‐
0
(
0*
3*
23% *
94%
*
1
=
0.00 *
18.59 $ ‐
0
(
(
0*
0*
3*
3*
23% *
23% *
99%
55%
*
*
1
36
=
=
0.00 *
0.00 *
18.59 $ ‐
18.59 $ ‐
0
0
(
0*
3*
23% *
95%
*
32
=
0.00 *
18.59 $ ‐
0
HOURS
EMPAL
NONSUPEWAGE
(
#PLANTS
1‐%FITBASE
Large
RESPEXAMTIME
%EMPMEDEXAM
Table 16
SECTOR 14B. Forging Industry
RESHAPING INDUSTRY
SECTOR 15. Iron and Steel Foundries
ALL
Page 113
23% *
88%
*
1
=
0.00 *
18.59 $ ‐
0
Small
State
(
(
0*
0*
3*
3*
23% *
23% *
99%
88%
*
*
1
1
=
=
0.00 *
0.00 *
18.59 $ ‐
18.59 $ ‐
0
0
Local
(
0*
3*
23% *
88%
*
1
=
0.00 *
18.59 $ ‐
0
Large
(
0*
3*
23% *
59%
*
40
=
0.00 *
21.93 $ ‐
0
Small
State
(
(
0*
0*
3*
3*
23% *
23% *
96%
59%
*
*
48
0
=
=
0.00 *
0.00 *
21.93 $ ‐
21.93 $ ‐
0
0
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
(
0*
3*
23% *
96%
*
24
=
0.00 *
21.93 $ ‐
0
(
0*
3*
23% *
56%
*
19
=
0.00 *
22.49 $ ‐
0
(
0*
3*
23% *
95%
*
0
=
0.00 *
22.49 $ ‐
0
(
0*
3*
23% *
88%
*
51
=
0.00
25.88 $ ‐
0
INDUSTRIAL REHABILITATION AND Small
MAINTENANCE
State
(
(
0*
0*
3*
3*
23% *
23% *
99%
88%
*
*
233
15
=
=
0.00
0.00
25.88 $ ‐
25.88 $ ‐
0
0
Local
Large
(
(
0*
0*
3*
3*
23% *
23% *
88%
88%
*
*
88
1
=
=
0.00
0.00 *
25.88 $ ‐
25.88 $ ‐
0
0
Small
State
(
(
0*
0*
3*
3*
23% *
23% *
99%
88%
*
*
1
1
=
=
0.00 *
0.00 *
25.88 $ ‐
25.88 $ ‐
0
0
Local
Large
(
(
0*
0*
3*
3*
23% *
23% *
88%
88%
*
*
1
44
=
=
0.00 *
0.00 *
25.88 $ ‐
25.88 $ ‐
0
0
Small
(
0*
3*
23% *
99%
Total
*
175 =
7,770
0.00 *
12,649
HOURS
EMPAL
Responses
3*
Item 12 COST
0*
NONSUPEWAGE
(
#PLANTS
1‐%FITBASE
Large
RESPEXAMTIME
%EMPMEDEXAM
Table 16
CONSTRUCTION
GOVERNMENT
SECTOR 27. Solid Waste Incineration
ALL
GOVERNMENT
HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION
Page 114
25.88 $ ‐
$ 290,272
0
4,216
Table 17
Respiratory Protection Program: Follow‐up Medical Examination for Respirator Use;
Contract Cost for a PLHCP to Conduct the Medical Examination for Respirator Use
Employers must use a PLHCP to conduct the follow‐up medical examination. The follow‐up medical
examination allows PLHCPs to obtain additional information that may be useful in arriving at a final medical
recommendation regarding respirator use.
1‐%FITBASE
#PLANTS
Item 13 Cost
1,848 * $ 136.66 *
23% *
71%
*
1
$ 41,251.29
Small
3,478 * $ 136.66 *
23% *
97%
*
1
$ 106,030.66
Large
0 * $ 136.66 *
23% *
81%
*
1
$ ‐
Small
Large
0 * $ 136.66 *
2,330 * $ 136.66 *
23% *
23% *
98%
55%
*
*
1
1
$ ‐
$ 40,272.39
Small
Large
55 * $ 136.66 *
3,225 * $ 136.66 *
23% *
23% *
95%
88%
*
*
1
1
$ 1,644.55
$ 89,210.61
Small
State
2,494 * $ 136.66 *
14 * $ 136.66 *
23% *
23% *
99%
88%
*
*
1
1
$ 77,601.60
$ 400.89
Local
73 * $ 136.66 *
23% *
99%
*
1
$ 2,285.05
Large
0 * $ 136.66 *
23% *
81%
*
1
$ ‐
Small
Large
0 * $ 136.66 *
16 * $ 136.66 *
23% *
23% *
98%
55%
*
*
1
1
$ ‐
$ 283.96
Small
Large
0 * $ 136.66 *
658 * $ 136.66 *
23% *
23% *
95%
88%
*
*
1
1
$ ‐
$ 18,200.25
Small
529 * $ 136.66 *
23% *
99%
*
1
$ 16,476.43
Large
46 * $ 136.66 *
23% *
81%
*
49
$ 57,273.68
Small
0 * $ 136.66 *
23% *
98%
*
62
$ ‐
RESPEXAMCOST
Large
EMPAL
%EMPMEDEXAM
COST = (EMPAL * RESPEXAMCOST * %EMPMEDEXAM * 1‐%FITBASE * #PLANTS)
* EMPAL = Number of employees who wear respirators for more than 5 hours/week and who are at or above the AL
and at or below the PEL in the model plant
* RESPEXAMCOST = Cost for medical exam for respirator use
* %EMPMEDEXAM = Percent of employees that will require a medical exam for respirator use
* 1‐%FITBASE = Percent of plants not conducting annual respirator fit‐test
* #PLANTS = Number of plants represented by the model output
Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
SECTOR 3. PAINTING
GENERAL INDUSTRY AEROSPACE
Page 115
1‐%FITBASE
#PLANTS
Item 13 Cost
1 * $ 136.66 *
23% *
81%
*
326
$ 7,519.46
Small
Large
0 * $ 136.66 *
2 * $ 136.66 *
23% *
23% *
98%
81%
*
*
1,436
100
$ ‐
$ 4,595.22
Small
Large
1 * $ 136.66 *
1 * $ 136.66 *
23% * 98% *
23% * 55.00% *
18
276
$ 505.42
$ 4,087.81
Small
Large
1 * $ 136.66 *
413 * $ 136.66 *
23% *
23% *
95%
0%
*
*
476
1
$ 14,223.71
$ ‐
Small
State
520 * $ 136.66 *
31 * $ 136.66 *
23% *
23% *
0%
0%
*
*
1
1
$ ‐
$ ‐
Local
133 * $ 136.66 *
23% *
0%
*
1
Large
7 * $ 136.66 *
23% *
37%
*
2
$ ‐
$ ‐
$ 149.28
0 * $ 136.66 *
23% *
93%
*
0
$ ‐
5 * $ 136.66 *
23% *
37%
*
2
$ 112.98
1 * $ 136.66 *
23% *
93%
*
1
2 * $ 136.66 *
23% *
37%
*
2
$ 23.67
$ ‐
$ 43.32
0 * $ 136.66 *
23% *
93%
*
0
$ ‐
11 * $ 136.66 *
23% *
37%
*
5
$ 639.77
0 * $ 136.66 *
23% *
93%
*
0
$ ‐
1 * $ 136.66 *
23% *
37%
*
80
$ 895.67
0 * $ 136.66 *
23% *
93%
*
126
$ ‐
10 * $ 136.66 *
23% *
37%
*
2
$ 290.27
2 * $ 136.66 *
23% *
93%
*
8
$ 608.00
342 * $ 136.66 *
23% *
54%
*
1
$ 5,802.35
35 * $ 136.66 *
23% *
95%
*
1
$ 1,031.36
RESPEXAMCOST
Large
EMPAL
%EMPMEDEXAM
Table 17
GENERAL INDUSTRY AUTOBODY
COIL COATINGS
MARITIME
CONSTRUCTION
GOVERNMENT
SECTOR 4. Producers of Chromates
ALL
Small
SECTOR 5. Chromate Pigment Procedures
Large
ALL
Small
SECTOR 6. CCA Producers
Large
ALL
Small
SECTOR 7. Chromium Catalyst Producers
Large
ALL
Small
SECTOR 8. Paint and Coating Producers
Large
ALL
Small
SECTOR 9. Printing Ink Producers
Large
ALL
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
Page 116
1‐%FITBASE
#PLANTS
Item 13 Cost
3 * $ 136.66 *
23% *
37%
*
6
$ 185.20
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
Alloy and Stainless Steel
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping Industry
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
ALL
Small
Large
Fiber, Flat and Container
small
1 * $ 136.66 *
23% *
93%
*
4
7 * $ 136.66 *
23% *
56%
*
1
$ 103.44
$ ‐
$ 116.14
0 * $ 136.66 *
23% *
95%
*
0
$ ‐
27 * $ 136.66 *
23% *
56%
*
34
$ 15,975.37
1 * $ 136.66 *
1 * $ 136.66 *
23% *
23% *
95%
56%
*
*
11
102
$ 413.94
$ 1,141.10
1 * $ 136.66 *
23% *
95%
*
32
$ 1,217.48
3 * $ 136.66 *
23% *
56%
*
33
$ 1,492.76
1 * $ 136.66 *
23% *
95%
*
31
$ 596.56
17 * $ 136.66 *
23% *
56%
*
163
$ 49,427.28
4 * $ 136.66 *
23% *
95%
*
118
$ 14,519.45
29 * $ 136.66 *
23% *
37%
*
3
$ 903.87
6 * $ 136.66 *
23% *
93%
*
1
$ 165.66
0 * $ 136.66 *
23% *
37%
*
0
$ ‐
1 * $ 136.66 *
23% *
93%
*
5
$ 134.00
0 * $ 136.66 *
23% *
92%
*
216
$ ‐
0 * $ 136.66 *
23% *
99%
*
1627
$ ‐
0 * $ 136.66 *
23% *
89%
*
343
$ ‐
0 * $ 136.66 *
23% *
99%
*
697
$ ‐
1 * $ 136.66 *
23% *
76%
*
6
$ 157.48
0 * $ 136.66 *
7 * $ 136.66 *
23% *
23% *
97%
76%
*
*
20
90
$ ‐
$ 15,800.15
1 * $ 136.66 *
23% *
97%
*
5
$ 167.49
RESPEXAMCOST
Large
EMPAL
%EMPMEDEXAM
Table 17
SECTOR 11. Plating Mixture Producers
ALL
Page 117
23% *
98%
*
81
Small
0 * $ 136.66 *
23% * 99.70% *
325
Large
1 * $ 136.66 *
23% *
67%
*
1
$ ‐
$ ‐
$ 23.11
Small
Large
0 * $ 136.66 *
119 * $ 136.66 *
23% *
23% *
0%
0%
*
*
0
1
$ ‐
$ ‐
Small
0 * $ 136.66 *
23% *
0%
*
1
$ ‐
Large
0 * $ 136.66 *
23% *
76%
*
5
$ ‐
Small
0 * $ 136.66 *
23% *
97%
*
0
$ ‐
Large
0 * $ 136.66 *
23% *
94%
*
1
$ ‐
Small
Large
0 * $ 136.66 *
0 * $ 136.66 *
23% *
23% *
99%
55%
*
*
1
36
$ ‐
$ ‐
Small
Large
0 * $ 136.66 *
0 * $ 136.66 *
23% *
23% *
95%
88%
*
*
32
1
$ ‐
$ ‐
Small
State
0 * $ 136.66 *
0 * $ 136.66 *
23% *
23% *
99%
88%
*
*
1
1
$ ‐
$ ‐
Local
0 * $ 136.66 *
23% *
88%
*
1
Large
0 * $ 136.66 *
23% *
59%
*
40
$ ‐
$ ‐
$ ‐
Small
State
0 * $ 136.66 *
0 * $ 136.66 *
23% *
23% *
96%
59%
*
*
48
0
$ ‐
$ ‐
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
0 * $ 136.66 *
23% *
96%
*
24
$ ‐
0 * $ 136.66 *
23% *
56%
*
19
$ ‐
0 * $ 136.66 *
23% *
95%
*
0
$ ‐
0 * $ 136.66 *
23% *
88%
*
51
$ ‐
Small
State
0 * $ 136.66 *
0 * $ 136.66 *
23% *
23% *
99%
88%
*
*
233
15
$ ‐
$ ‐
Local
0 * $ 136.66 *
23% *
88%
*
88
$ ‐
#PLANTS
Item 13 Cost
1‐%FITBASE
0 * $ 136.66 *
RESPEXAMCOST
Large
EMPAL
%EMPMEDEXAM
Table 17
SECTOR 22. Printing
$ ‐
$ ‐
ALL
SECTOR 24. Chromium Catalyst Users
Chromium Catalyst Users
Chromium Catalyst Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
Government
SECTOR 27. Solid Waste Incineration
ALL
Government
INDUSTRIAL REHABILITATION AND
MAINTENANCE
Page 118
23% *
88%
*
1
$ ‐
HAZARDOUS WASTE‐SITE WORK
Small
State
0 * $ 136.66 *
0 * $ 136.66 *
23% *
23% *
99%
88%
*
*
1
1
$ ‐
$ ‐
Local
Large
0 * $ 136.66 *
0 * $ 136.66 *
23% *
23% *
88%
88%
*
*
1
44
$ ‐
$ ‐
Small
0 * $ 136.66 *
16,517
23% *
99%
*
175
$ ‐
7,770 $ 594,000
#PLANTS
Item 13 Cost
1‐%FITBASE
0 * $ 136.66 *
RESPEXAMCOST
Large
EMPAL
%EMPMEDEXAM
Table 17
REFRACTORY BRICK RESTORATION
Total
Page 119
Table 18
Protective Work Clothing and Equipment, Removal and Storage (§§1910.1026(h)(2)(iv),
1915.1026(g)(2)(iv), and 1926.1126(g)(2)(iv)); Contract Cost to Obtain Cr(VI) Hazard‐Warning Labels for
Bags or Containers Used to Store Cr(VI)‐Contaminated Protective Clothing or Equipment
This table calculates the contract cost for purchasing appropriate labels for glove disposal containers. OSHA estimates
that 5% of the containers will need new or replacement labels. The number of replacement gloves used throughout the
year is divided by 1,602. The factor of 1,602 is the estimated number of gloves that can fit into a thirty‐gallon garbage
bag.
Cost = GLOVERPL/1,602 * 5%*$0.32 *#PLANTS
Item 13 Cost
#PLANTS
COST
5% of containers need labels
NOGLOVESCONT
GLOVEREPL
Variables
GLOVEREPL = The number of glove replacements per year
NOGLOVESCONT = The number of gloves that can fit into a thirty‐gallon container.
5% of containers need new or replacement labels.
COST = The cost of a label
#PLANTS = Number of model plants
COST = The cost of a label
Sector 1. Electroplating
Large
54,888,821 / 1,602 1713.13 $0.41
1=
$703
Small
11,970,179 / 1,602
Large
ALL
373.60
$0.41
1=
$153
0 / 1,602
0.00
$0.41
7,857 =
$0
Small
Large
0 / 1,602
0 / 1,602
0.00
0.00
$0.41
$0.41
8,804 =
189 =
$0
$0
Small
Large
0 / 1,602
0 / 1,602
0.00
0.00
$0.41
$0.41
107 =
268 =
$0
$0
Small
State
0 / 1,602
0 / 1,602
0.00
0.00
$0.41
$0.41
2,145 =
25 =
$0
$0
Local
0 / 1,602
0.00
$0.41
787 =
$0
Large
0 / 1,602
0.00
$0.41
10,535 =
$0
Small
Large
0 / 1,602
0 / 1,602
0.00
0.00
$0.41
$0.41
10,724 =
409 =
$0
$0
Small
0 / 1,602
0.00
$0.41
232 =
$0
Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2A. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
Page 120
COST
#PLANTS
Item 13 Cost
0 / 1,602
0.00
$0.41
402 =
$0
Small
0 / 1,602
0.00
$0.41
3,037 =
$0
Large
125,000 / 1,602
3.90
$0.41
49 =
$78
Small
1,000 / 1,602
0.03
$0.41
62 =
$1
GLOVEREPL
CONSTRUCTION
SECTOR 3. Painting
GENERAL INDUSTRY
NOGLOVESCONT
Large
Variables
5% of containers need labels
Table 18
AEROSPACE
Page 121
#PLANTS
1.90
$0.41
326 =
$255
Small
Large
5,000 / 1,602
14,000 / 1,602
0.16
0.44
$0.41
$0.41
1,436 =
100 =
$92
$18
Small
Large
3,000 / 1,602
5,000 / 1,602
0.09
0.16
$0.41
$0.41
18 =
276 =
$1
$18
Small
Large
2,000 / 1,602
14,000 / 1,602
0.06
0.44
$0.41
$0.41
476 =
671 =
$12
$120
Small
State
3,000 / 1,602
5,000 / 1,602
0.09
0.16
$0.41
$0.41
3,566 =
12 =
$137
$1
Local
59,000 / 1,602
1.84
$0.41
647 =
$489
Large
75,000 / 1,602
2.34
$0.41
2=
$2
Small
0 / 1,602
0.00
$0.41
0=
$0
Large
24,000 / 1,602
0.75
$0.41
2=
$1
Small
3,000 / 1,602
0.09
$0.41
1=
$0
Large
8,760 / 1,602
0.27
$0.41
2=
$0
Small
0 / 1,602
0.00
$0.41
0=
$0
Large
57,000 / 1,602
1.78
$0.41
5=
$3
Small
0 / 1,602
0.00
$0.41
0=
$0
Large
12,000 / 1,602
0.37
$0.41
80 =
$12
Small
6,000 / 1,602
0.19
$0.41
126 =
$10
Large
24,000 / 1,602
0.75
$0.41
2=
$1
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
480 / 1,602
0.01
$0.41
8=
$0
583 / 1,602
0.02
$0.41
81 =
$1
GLOVEREPL
Item 13 Cost
COST
61,000 / 1,602
NOGLOVESCONT
Large
Variables
5% of containers need labels
Table 18
AUTO BODY
COIL COATING
MARITIME
CONSTRUCTION
GOVERNMENT
SECTOR 4. Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
Page 122
COST
#PLANTS
Item 13 Cost
120 / 1,602
0.00
$0.41
40 =
$0
Large
14,400 / 1,602
0.45
$0.41
6=
$1
Small
2,880 / 1,602
0.09
$0.41
4=
$0
Large
0 / 1,602
0.00
$0.41
1=
$0
Small
0 / 1,602
0.00
$0.41
0=
$0
Large
0 / 1,602
0.00
$0.41
34 =
$0
Small
0 / 1,602
0.00
$0.41
11 =
$0
GLOVEREPL
NOGLOVESCONT
Small
Variables
5% of containers need labels
Table 18
ALL
SECTOR 11. Plating Mixture Producers
ALL
SECTOR 13. Chromium Metal Producers
ALL
SECTOR 14. Iron and Steel Mills
GENERAL INDUSTRY
Page 123
$0.41
0=
$0
Small
SECTOR 14b. Alloy Stainless Steel Forging Industry
Large
RESHAPING INDUSTRY
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
ALL
Small
Large
FIBER, FLAT, AND CONTAINER GLASS
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
Chromium Catalyst Users
0 / 1,602
0.00
$0.41
0=
$0
0 / 1,602
0.00
$0.41
33 =
$0
0 / 1,602
0.00
$0.41
31 =
$0
0 / 1,602
0.00
$0.41
163 =
$0
0 / 1,602
0.00
$0.41
118 =
$0
3,840 / 1,602
0.12
$0.41
3=
$0
840 / 1,602
0.03
$0.41
1=
$0
0 / 1,602
0.00
$0.41
0=
$0
2,000 / 1,602
0.06
$0.41
5=
$0
0 / 1,602
0.00
$0.41
216 =
$0
0 / 1,602
0.00
$0.41
1,627 =
$0
7,580 / 1,602
0.24
$0.41
343 =
$33
240 / 1,602
0.01
$0.41
697 =
$2
1,000 / 1,602
0.03
$0.41
6=
$0
0 / 1,602
0 / 1,602
0.00
0.00
$0.41
$0.41
20 =
0=
$0
$0
0 / 1,602
0.00
$0.41
0=
$0
5,460 / 1,602
0.17
$0.41
81 =
$6
360 / 1,602
0.01
$0.41
325 =
$2
2,000 / 1,602
0.06
$0.41
179 =
$5
GLOVEREPL
Item 13 Cost
0.00
#PLANTS
COST
0 / 1,602
NOGLOVESCONT
Large
Variables
5% of containers need labels
Table 18
CARBON STEEL
Page 124
COST
#PLANTS
Item 13 Cost
0 / 1,602
30,000 / 1,602
0.00
0.94
$0.41
$0.41
0=
23 =
$0
$9
Small
15,000 / 1,602
0.47
$0.41
4=
$1
Large
11,000 / 1,602
0.34
$0.41
5=
$1
Small
0 / 1,602
0.00
$0.41
0=
$0
Large
0 / 1,602
0.00
$0.41
148 =
$0
MARITIME
Small
Large
0 / 1,602
0 / 1,602
0.00
0.00
$0.41
$0.41
79 =
36 =
$0
$0
CONSTRUCTION
Small
Large
0 / 1,602
2,000 / 1,602
0.00
0.06
$0.41
$0.41
32 =
1,162 =
$0
$30
Small
State
1,000 / 1,602
1,000 / 1,602
0.03
0.03
$0.41
$0.41
4,650 =
12 =
$60
$0
Local
1,000 / 1,602
0.03
$0.41
42 =
$1
Large
20,000 / 1,602
0.62
$0.41
40 =
$10
Small
State
3,000 / 1,602
20,000 / 1,602
0.09
0.62
$0.41
$0.41
48 =
0=
$2
$0
Local
3,000 / 1,602
0.09
$0.41
24 =
$1
Large
0 / 1,602
0.00
$0.41
19 =
$0
Small
0 / 1,602
0.00
$0.41
0=
$0
Large
0 / 1,602
0.00
$0.41
0=
$0
Small
State
0 / 1,602
0 / 1,602
0.00
0.00
$0.41
$0.41
0=
0=
$0
$0
Local
Large
0 / 1,602
14,000 / 1,602
0.00
0.44
$0.41
$0.41
0=
40 =
$0
$7
GLOVEREPL
NOGLOVESCONT
Small
Large
Variables
5% of containers need labels
Table 18
Catalyst Service Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
GENERAL INDUSTRY
GOVERNMENT
SECTOR 27. Solid Waste Incineration
ALL
GOVERNMENT
SECTOR 30. Superalloy Producers and Users
ALL
SECTOR 31. Construction
INDUSTRIAL REHABILITATION AND
MAINTENANCE
Page 125
COST
#PLANTS
Item 13 Cost
3,000 / 1,602
2,000 / 1,602
0.09
0.06
$0.41
$0.41
170
1
$7
$0
Local
Large
3,000 / 1,602
14,000 / 1,602
0.09
0.44
$0.41
$0.41
239 =
44 =
$9
$8
Small
1,000 / 1,602
0.03
$0.41
Total
175 =
64,410
$2
$2,302
GLOVEREPL
HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION
Page 126
NOGLOVESCONT
Small
State
Variables
5% of containers need labels
Table 18
Table 18a
Protective Work Clothing and Equipment, Removal and Storage (§§1910.1026(h)(2)(iv), 1915.1026(g)(2)(iv),
and 1926.1126(g)(2)(iv)); Clerical Time and Cost to Affix Cr(VI) Hazard‐Warning Labels for Bags or Containers
Used to Store Cr(VI)‐Contaminated Protective Clothing or Equipment
OSHA assumes that it will take 1 minute of clerical employee time to obtain and affix Cr(VI) hazard‐warning labels to glove
disposal containers. OSHA assumes the number of labels will be the same as the number of containers needing labels, as
calculated in Table 18.
5% of containers need new or replacement labels = see Table 18
* HCLWAGE = Highest clerical wage rate (overestimation)
* AFFIX = 1 minute for a clerical worker to obtain and affix label
#PLANTS = Number of model plants
COST = The cost to obtain and affix the label
Responses
Item 12 Cost
HCLWage
Burden Hours
AFFIX
#PLANTS
Variables
5% of containers need labels
22%
Sector 1. Electroplating
1713.13 *
1 *
0.02
=
34.26
*
$34.72 =
$1,189.71 1713.13
373.60 *
1 *
0.02
=
7.47
*
$34.72 =
$259.45
373.60
ALL
Sector 2. Welding
0.00
*
7,857 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
0.00
0.00
*
*
8,804 *
189 *
0.02
0.02
=
=
0.00
0.00
*
*
$34.72 =
$34.72 =
$0.00
$0.00
0.00
0.00
0.00
0.00
*
*
107 *
268 *
0.02
0.02
=
=
0.00
0.00
*
*
$34.72 =
$34.72 =
$0.00
$0.00
0.00
0.00
0.00
0.00
*
*
2,145 *
25 *
0.02
0.02
=
=
0.00
0.00
*
*
$34.72 =
$34.72 =
$0.00
$0.00
0.00
0.00
0.00
*
787 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
0.00
*
10,535 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
0.00
0.00
*
*
10,724 *
409 *
0.02
0.02
=
=
0.00
0.00
*
*
$34.72 =
$34.72 =
$0.00
$0.00
0.00
0.00
0.00
0.00
*
*
232 *
402 *
0.02
0.02
=
=
0.00
0.00
*
*
$34.72 =
$34.72 =
$0.00
$0.00
0.00
0.00
0.00
*
3,037 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
3.90
*
49 *
0.02
=
3.82
*
$34.72 =
$132.52
190.82
0.03
1.90
*
*
62 *
326 *
0.02
0.02
=
=
0.04
12.42
*
*
$34.72 =
$34.72 =
$1.34
$431.13
1.92
620.80
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2A. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
SECTOR 3. Painting
GENERAL INDUSTRY
AEROSPACE
Page 127
Item 12 Cost
Responses
0.16
0.44
*
*
1,436 *
100 *
0.02
0.02
=
=
4.48
0.87
*
*
$34.72 =
$34.72 =
$155.59
$30.23
224.04
43.54
0.09
0.16
*
*
18 *
276 *
0.02
0.02
=
=
0.03
0.86
*
*
$34.72 =
$34.72 =
$1.18
$29.86
1.70
42.99
0.06
0.44
*
*
476 *
671 *
0.02
0.02
=
=
0.59
5.86
*
*
$34.72 =
$34.72 =
$20.65
$203.57
29.73
293.13
0.09
*
3,566 *
0.02
=
6.68
*
$34.72 =
$231.91
333.94
HCLWage
AFFIX
Burden Hours
#PLANTS
Variables
5% of containers need labels
Table 18a
AUTO BODY
COIL COATING
MARITIME
CONSTRUCTION
Page 128
Item 12 Cost
Responses
HCLWage
Burden Hours
AFFIX
#PLANTS
Variables
5% of containers need labels
Table 18a
$1.27
1.82
0.16
*
12 *
0.02
=
0.04
*
$34.72 =
1.84
*
647 *
0.02
=
23.81
*
$34.72 =
2.34
*
2 *
0.02
=
0.09
*
$34.72 =
$3.11
4.48
0.00
*
0 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
0.75
*
2 *
0.02
=
0.03
*
$34.72 =
$0.94
1.35
0.09
*
1 *
0.02
=
0.00
*
$34.72 =
$0.06
0.08
0.27
*
2 *
0.02
=
0.01
*
$34.72 =
$0.45
0.65
0.00
*
0 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
1.78
*
5 *
0.02
=
0.17
*
$34.72 =
$5.91
8.52
0.00
*
0 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
0.37
*
80 *
0.02
=
0.60
*
$34.72 =
$20.92
30.12
0.19
*
126 *
0.02
=
0.47
*
$34.72 =
$16.44
23.67
0.75
*
2 *
0.02
=
0.04
*
$34.72 =
$1.30
1.87
0.01
SECTOR 10. Plastic Colorant Producers and Users
0.02
ALL
0.00
SECTOR 11. Plating Mixture Producers
0.45
ALL
0.09
SECTOR 13. Chromium Metal Producers
0.00
ALL
0.00
SECTOR 14. Iron and Steel Mills
0.00
GENERAL INDUSTRY
0.00
0.00
CARBON STEEL
0.00
SECTOR 14b. Alloy Stainless Steel Forging Industry
0.00
*
8 *
0.02
=
0.00
*
$34.72 =
$0.09
0.12
*
81 *
0.02
=
0.03
*
$34.72 =
$1.03
1.48
*
40 *
0.02
=
0.00
*
$34.72 =
$0.10
0.15
*
6 *
0.02
=
0.05
*
$34.72 =
$1.76
2.54
*
4 *
0.02
=
0.01
*
$34.72 =
$0.23
0.34
*
1 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
*
0 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
*
34 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
*
*
11 *
0 *
0.02
0.02
=
=
0.00
0.00
*
*
$34.72 =
$34.72 =
$0.00
$0.00
0.00
0.00
*
0 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
*
33 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
GOVERNMENT
$826.93 1190.75
SECTOR 4. Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
Page 129
Responses
31 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
0.00
*
163 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
0.00
*
118 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
0.12
*
3 *
0.02
=
0.01
*
$34.72 =
$0.22
0.32
0.03
*
1 *
0.02
=
0.00
*
$34.72 =
$0.02
0.02
HCLWage
Item 12 Cost
Burden Hours
*
AFFIX
0.00
#PLANTS
Variables
5% of containers need labels
Table 18a
RESHAPING INDUSTRY
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
Page 130
Responses
0 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
0.06
*
5 *
0.02
=
0.01
*
$34.72 =
$0.21
0.30
0.00
*
216 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
0.00
*
1,627 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
0.24
*
343 *
0.02
=
1.63
*
$34.72 =
$56.44
81.26
0.01
*
697 *
0.02
=
0.10
*
$34.72 =
$3.63
5.22
0.03
*
6 *
0.02
=
0.00
*
$34.72 =
$0.14
0.20
0.00
0.00
*
*
20 *
0 *
0.02
0.02
=
=
0.00
0.00
*
*
$34.72 =
$34.72 =
$0.00
$0.00
0.00
0.00
0.00
*
0 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
0.17
*
81 *
0.02
=
0.28
*
$34.72 =
$9.63
13.87
0.01
*
325 *
0.02
=
0.07
*
$34.72 =
$2.54
3.66
0.06
*
179 *
0.02
=
0.22
*
$34.72 =
$7.75
11.17
0.00
0.94
*
*
0 *
23 *
0.02
0.02
=
=
0.00
0.43
*
*
$34.72 =
$34.72 =
$0.00
$14.98
0.00
21.58
0.47
*
4 *
0.02
=
0.04
*
$34.72 =
$1.43
2.06
0.34
*
5 *
0.02
=
0.04
*
$34.72 =
$1.29
1.85
0.00
*
0 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
0.00
*
148 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
MARITIME
0.00
0.00
*
*
79 *
36 *
0.02
0.02
=
=
0.00
0.00
*
*
$34.72 =
$34.72 =
$0.00
$0.00
0.00
0.00
CONSTRUCTION
0.00
0.06
*
*
32 *
1,162 *
0.02
0.02
=
=
0.00
1.45
*
*
$34.72 =
$34.72 =
$0.00
$50.36
0.00
72.52
0.03
0.03
*
*
4,650 *
12 *
0.02
0.02
=
=
2.90
0.01
*
*
$34.72 =
$34.72 =
$100.79
$0.25
145.14
0.36
0.03
*
42 *
0.02
=
0.03
*
$34.72 =
$0.92
1.32
HCLWage
*
AFFIX
0.00
#PLANTS
Item 12 Cost
Burden Hours
Variables
5% of containers need labels
Table 18a
SECTOR 18. Chromium Sulfate Producers
ALL
SECTOR 19. Chemical Distributors
ALL
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
ALL
FIBER, FLAT, AND CONTAINER GLASS
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
Chromium Catalyst Users
Catalyst Service Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
GENERAL INDUSTRY
GOVERNMENT
SECTOR 27. Solid Waste Incineration
Page 131
Responses
40 *
0.02
=
0.50
*
$34.72 =
$17.27
24.86
0.09
0.62
*
*
48 *
0 *
0.02
0.02
=
=
0.09
0.00
*
*
$34.72 =
$34.72 =
$3.11
$0.00
4.48
0.00
0.09
*
24 *
0.02
=
0.04
*
$34.72 =
$1.55
2.24
0.00
*
19 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
0.00
*
0 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
HCLWage
Item 12 Cost
Burden Hours
*
AFFIX
0.62
#PLANTS
Variables
5% of containers need labels
Table 18a
ALL
GOVERNMENT
SECTOR 30. Superalloy Producers and Users
ALL
Page 132
Responses
0 *
0.02
=
0.00
*
$34.72 =
$0.00
0.00
0.00
0.00
*
*
0 *
0 *
0.02
0.02
=
=
0.00
0.00
*
*
$34.72 =
$34.72 =
$0.00
$0.00
0.00
0.00
0.00
0.44
*
*
0 *
40 *
0.02
0.02
=
=
0.00
0.35
*
*
$34.72 =
$34.72 =
$0.00
$12.20
0.00
17.57
0.09
0.06
*
*
170 *
1 *
0.02
0.02
0.32
0.00
*
*
$34.72
$34.72
$11.05
$0.04
15.92
0.05
0.09
0.44
*
*
239 *
44 *
0.02
0.02
=
=
0.45
0.39
*
*
$34.72 =
$34.72 =
$15.52
$13.45
22.34
19.36
0.03
*
175 *
64,410
0.02
=
0.11
*
112.21
$34.72 =
HCLWage
Item 12 Cost
Burden Hours
*
AFFIX
0.00
#PLANTS
Variables
5% of containers need labels
Table 18a
SECTOR 31. Construction
INDUSTRIAL REHABILITATION AND
MAINTENANCE
HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION
Total
Page 133
$3.80
5.47
$3,896.25 5610.44
Table 19
Protective Work Clothing and Equipment, Cleaning and Replacement (§§ 1910.1026(h)(3)(iii), 1915.1026(g)(3)(iii), and
1926.1126(g)(3)(iii))
Employer Time and Cost to Inform Laundry Contractor About Cr(VI)‐Contaminated Protective Clothing or Equipment
The laundering company will be informed of the presence of hexavalent chromium in the laundry at the commencement of the laundering agreement.
Laundering facilities typically collect dirty uniforms for cleaning. It is estimated that the laundering facility will assume the cost burden for labeling the
contaminated laundry and include the cost in their laundering fee. For purposes of calculating burden hours, OSHA assumes that it will take a maximum
of five minutes to notify the laundry, and that 25% of the plants will need to annually notify or reinform the laundry.
Hours = #PLANTS * NOTTIME
Cost = Hours * SUPEWAGE
#PLANTS = Number of plants represented by the model plant * 25% need to notify or reinform.
NOTIME = Time to notify the laundry.
SUPEWAGE = Supervisory Wage Rate
Item 12 Cost
RESPONSES
0.25 *
0.08
=
0.02 * $ 36.22 =
$ 0.72
1
Small
1
0.25 *
0.08
=
0.02 * $ 36.22 =
$ 0.72
1
Large
7,857 1964.3369 *
0.08
=
157.15 * $ 35.65 =
$ 5,602.74
7,857
Small
Large
8,804 2201.0622 *
189 47.345061 *
0.08
0.08
=
=
176.08 * $ 35.65 =
3.79 * $ 35.65 =
$ 6,277.94
$ 135.04
8,804
189
Small
Large
107 26.812764 *
268 66.911132 *
0.08
0.08
=
=
2.15 * $ 35.65 =
5.35 * $ 35.65 =
$ 76.48
$ 190.85
107
268
Small
State
2,145 536.25528 *
25 6.2804672 *
0.08
0.08
=
=
42.90 * $ 35.65 =
0.50 * $ 35.65 =
$ 1,529.52
$ 17.91
2,145
25
Local
787 196.86849 *
0.08
=
15.75 * $ 35.65 =
$ 561.51
787
Large
10,535 2633.6898 *
0.08
=
210.70 * $ 35.65 =
$ 7,511.89
10,535
Small
Large
10,724 2681.0348 *
409 102.17837 *
0.08
0.08
=
=
214.48 * $ 35.65 =
8.17 * $ 35.65 =
$ 7,646.93
$ 291.44
10,724
409
Small
Large
232 57.973544 *
402 100.48748 *
0.08
0.08
=
=
4.64 * $ 35.65 =
8.04 * $ 35.65 =
$ 165.35
$ 286.61
232
402
Small
3,037 759.21187 *
0.08
=
60.74 * $ 35.65 =
$ 2,165.45
3,037
Large
49 12.227813 *
0.08
=
0.98 * $ 44.87 =
$ 43.90
49
Small
Large
62 15.397987 *
326 81.518752 *
0.08
0.08
=
=
1.23 * $ 44.87 =
6.52 * $ 44.87 =
$ 55.28
$ 292.65
62
326
Small
Large
1,436 358.90895 *
100 24.908508 *
0.08
0.08
=
=
28.71 * $ 44.87 =
1.99 * $ 44.87 =
$ 1,288.45
$ 89.42
1,436
100
Small
Large
18 4.5288196 *
276 68.876701 *
0.08
0.08
=
=
0.36 * $ 44.87 =
5.51 * $ 44.87 =
$ 16.26
$ 247.26
18
276
Small
476 119.08588 *
0.08
=
9.53 * $ 44.87 =
$ 427.51
476
SUPWAGE
1
BURDEN HOURS
NOTIME
Large
#PLANTS
# of PLANTS *25%
20.69%
Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2A. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
SECTOR 3. Painting
GENERAL INDUSTRY
AEROSPACE
AUTO BODY
COIL COATING
MARITIME
Page 134
Table 19
Large
671 167.71502 *
0.08
=
13.42 * $ 44.87 =
$ 602.08
671
Small
State
3,566 891.62133 *
12 2.9208754 *
0.08
0.08
=
=
71.33 * $ 44.87 =
0.23 * $ 44.87 =
$ 3,200.84
$ 10.49
3,566
12
Local
647 161.65922 *
0.08
=
12.93 * $ 44.87 =
$ 580.34
647
Large
2 0.4787616 *
0.08
=
0.04 * $ 52.66 =
$ 2.02
2
Small
0
0*
0.08
=
0.00 * $ 52.66 =
$ ‐
0
Large
2 0.4498851 *
0.08
=
0.04 * $ 51.32 =
$ 1.85
2
Small
1 0.2249425 *
0.08
=
0.02 * $ 51.32 =
$ 0.92
1
Large
2 0.5909091 *
0.08
=
0.05 * $ 43.46 =
$ 2.05
2
Small
0
0*
0.08
=
0.00 * $ 43.46 =
$ ‐
0
Large
5
1.196904 *
0.08
=
0.10 * $ 52.66 =
$ 5.04
5
Small
0
0*
0.08
=
0.00 * $ 52.66 =
$ ‐
0
Large
80 20.107988 *
0.08
=
1.61 * $ 39.21 =
$ 63.08
80
Small
126 31.598266 *
0.08
=
2.53 * $ 39.21 =
$ 99.13
126
Large
2 0.6244898 *
0.08
=
0.05 * $ 39.29 =
$ 1.96
2
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
GENERAL INDUSTRY
Small
Large
CARBON STEEL
Small
SECTOR 14b. Alloy Stainless Steel Forging Industry
Large
RESHAPING INDUSTRY
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
8 2.0816327 *
0.08
=
0.17 * $ 39.29 =
$ 6.54
8
CONSTRUCTION
GOVERNMENT
SECTOR 4. Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
81
20.36956 *
0.08
=
1.63 * $ 43.52 =
$ 70.92
81
40
9.963372 *
0.08
=
0.80 * $ 43.52 =
$ 34.69
40
6 1.4108755 *
0.08
=
0.11 * $ 39.06 =
$ 4.41
6
4 0.9405837 *
0.08
=
0.08 * $ 39.06 =
$ 2.94
4
1 0.2270408 *
0.08
=
0.02 * $ 52.83 =
$ 0.96
1
0
0*
0.08
=
0.00 * $ 52.83 =
$ ‐
0
34 8.4605844 *
0.08
=
0.68 * $ 52.83 =
$ 35.76
34
11 2.7137723 *
0
0*
0.08
0.08
=
=
0.22 * $ 52.83 =
0.00 * $ 52.83 =
$ 11.47
$ ‐
11
0
0*
0.08
=
0.00 * $ 52.83 =
$ ‐
33 8.3009507 *
0.08
=
0.66 * $ 52.83 =
$ 35.08
33
31 7.8220497 *
0.08
=
0.63 * $ 52.83 =
$ 33.06
31
163 40.678774 *
0.08
=
3.25 * $ 38.53 =
$ 125.37
163
118 29.584563 *
0.08
=
2.37 * $ 38.53 =
$ 91.18
118
3 0.6748276 *
0.08
=
0.05 * $ 51.32 =
$ 2.77
3
1 0.2249425 *
0.08
=
0.02 * $ 51.32 =
$ 0.92
1
0
0.08
=
0.00 * $ 56.48 =
$ ‐
0
0
0*
Page 135
0
Table 19
1.196904 *
0.08
=
0.10 * $ 56.48 =
$ 5.41
5
Large
216 53.913101 *
0.08
=
4.31 * $ 40.75 =
$ 175.74
216
Small
1,627 406.79885 *
0.08
=
32.54 * $ 40.75 =
$ 1,326.04
1,627
Large
343 85.874812 *
0.08
=
6.87 * $ 27.18 =
$ 186.73
343
Small
697 174.27535 *
0.08
=
13.94 * $ 27.18 =
$ 378.95
697
Large
6 1.5722892 *
0.08
=
0.13 * $ 39.30 =
$ 4.94
6
Small
Large
20 4.9789157 *
0
0*
0.08
0.08
=
=
0.40 * $ 39.30 =
0.00 * $ 39.30 =
$ 15.65
$ ‐
20
0
0*
0.08
=
0.00 * $ 39.30 =
$ ‐
Large
81 20.340732 *
0.08
=
1.63 * $ 28.36 =
$ 46.15
81
Small
325 81.362927 *
0.08
=
6.51 * $ 28.36 =
$ 184.62
325
Large
179 44.718064 *
0.08
=
3.58 * $ 44.23 =
$ 158.25
179
Small
Large
0
0*
23 5.7612229 *
0.08
0.08
=
=
0.00 * $ 44.23 =
0.46 * $ 44.23 =
$ ‐
$ 20.39
0
23
Small
4 1.0973758 *
0.08
=
0.09 * $ 44.23 =
$ 3.88
4
Large
5 1.3486088 *
0.08
=
0.11 * $ 34.92 =
$ 3.77
5
Small
0
0*
0.08
=
0.00 * $ 34.92 =
$ ‐
0
Large
148 36.996376 *
0.08
=
2.96 * $ 43.69 =
$ 129.31
148
MARITIME
Small
Large
79 19.784159 *
36 9.0119048 *
0.08
0.08
=
=
1.58 * $ 43.69 =
0.72 * $ 43.69 =
$ 69.15
$ 31.50
79
36
CONSTRUCTION
Small
Large
32 7.939059 *
1,162 290.44838 *
0.08
0.08
=
=
0.64 * $ 43.69 =
23.24 * $ 43.69 =
$ 27.75
$ 1,015.20
32
1,162
Small
State
4,650 1162.5738 *
12 2.9208754 *
0.08
0.08
=
=
93.01 * $ 43.69 =
0.23 * $ 43.69 =
$ 4,063.53
$ 10.21
4,650
12
Local
42 10.560088 *
0.08
=
0.84 * $ 43.69 =
$ 36.91
42
Large
40 9.9568966 *
0.08
=
0.80 * $ 37.07 =
$ 29.52
40
Small
State
48 11.948276 *
0
0*
0.08
0.08
=
=
0.96 * $ 37.07 =
0.00 * $ 37.07 =
$ 35.43
$ ‐
48
0
Local
24 5.9741379 *
0.08
=
0.48 * $ 37.07 =
$ 17.71
24
Large
19 4.7510774 *
0.08
=
0.38 * $ 38.01 =
$ 14.45
19
Small
5
SECTOR 19. Chemical Distributors
ALL
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
ALL
FIBER, FLAT, AND CONTAINER GLASS
Small
0
0
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
Chromium Catalyst Users
Catalyst Service Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
GENERAL INDUSTRY
GOVERNMENT
SECTOR 27. Solid Waste Incineration
ALL
GOVERNMENT
SECTOR 30. Superalloy Producers and Users
ALL
Small
0
0*
0.08
=
0.00 * $ 38.01 =
$ ‐
0
Large
0
0*
0.08
=
0.00 * $ 43.76 =
$ ‐
0
Small
State
0
0
0*
0*
0.08
0.08
=
=
0.00 * $ 43.76 =
0.00 * $ 43.76 =
$ ‐
$ ‐
0
0
0
0*
40 10.053501 *
0.08
0.08
=
=
0.00 * $ 43.76 =
0.80 * $ 43.76 =
$ ‐
$ 35.20
SECTOR 31. Construction
INDUSTRIAL REHABILITATION AND
MAINTENANCE
Local
Large
Page 136
0
40
Table 19
HAZARDOUS WASTE‐SITE WORK
Small
State
170 42.495748 *
1 0.2051735 *
0.08
0.08
=
=
3.40 * $ 43.76 =
0.02 * $ 43.76
$ 148.78
$ 0.72
170
1
Local
Large
239 59.652416
44 11.079369 *
0.08
0.08
=
=
4.77 $ 43.76
0.89 * $ 43.76 =
$209
$ 38.79
239
44
Small
175 43.815492 *
16,102
0.08
=
3.51 * $ 43.76 =
1,288
$ 153.40
$48,524.65
175
64,410
REFRACTORY BRICK RESTORATION
Total
Page 137
Table 20
Initial Medical Examination (§§ 1910.1026(k)(1)(i)(A), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(1)(i)(A), (i)(3)(i), and (i)(3)(ii); and 1926.1126(i)(1)(i)(A), (i)(3)(i), and
(i)(3)(ii))
Employee Time and Cost to Complete the Initial Medical Examination
This table calculates the burden hours and costs of employee time to complete the initial medical examinations for those employees who are potentially
exposed to airborne hexavalent chromium at or above the action level or who show "signs or symptoms" of exposure to hexavalent chromium before
the implementation of engineering controls. For purposes of estimating the ICR costs, the Agency assumes that: all initial monitoring is completed,
existing employers will experience a 5% turnover of potentially exposed employees with initial medical examinations, and new employers will have no
employees requiring an initial medical examination.
Hours = POTEXEMP*MEDEXAMTIME * #PLANTS
Cost = POTEXEMP* MEDEXAMTIME *NONSUPWAGE * #PLANTS
* POTEXEMP * 5% = Total number of potentially exposed employees at or above the AL and workers with "signs and symptoms" before the
implementation of engineering controls.
* MEDEXAMTIME = Employee time, in hours, for a medical examination.
*NONSUPEWAGE ‐ Non‐supervisory wage rate
* #PLANTS = Number of Plants
RESPONSES
1,848 =
1,513 * $26.61
$40,269
10,089
Small
1 0.0455 * 3 *
3,478 =
475 * $26.61
$12,627
3,164
Large
2 0.0966 * 3 *
7,857 =
2,278 * $26.20
$59,672
15,184
Small
Large
0
0
* 3 *
18 0.9179 * 3 *
8,804 =
189 =
0 * $26.20
522 * $26.20
$0
$13,663
0
3,477
Small
Large
1 0.0483 * 3 *
49 2.4639 * 3 *
107 =
268 =
16 * $26.20
1,978 * $26.20
$407
$51,831
104
13,189
Small
Local
5 0.2416 * 3 *
2 0.0966 * 3 *
2,145 =
25 =
1,554 * $26.20
7 * $26.20
$40,725
$191
10,363
49
State
0
* 3 *
787 =
0 * $26.20
$0
0
Large
1 0.0483 * 3 *
10,535 =
1,527 * $26.20
$40,003
10,179
Small
Large
0
0
* 3 *
* 3 *
10,724 =
409 =
0 * $26.20
0 * $26.20
$0
$0
0
0
1 0.0483 * 3 *
18 0.9179 * 3 *
232 =
402 =
34 * $26.20
1,107 * $26.20
$881
$28,999
224
7,379
*
3,037 =
880 * $26.20
$23,063
5,869
*
49 =
339 * $33.07
$11,206
2,259
*
*
62 =
326 =
8 * $33.07
576 * $33.07
$277
$19,044
56
3,840
*
*
1,436 =
100 =
195 * $33.07
27 * $33.07
$6,450
$895
1,300
180
*
*
18 =
276 =
2 * $33.07
106 * $33.07
$81
$3,518
16
709
*
476 =
61 * $33.07
$2,028
409
Hours
5 0.2729 * 3 *
#PLANTS
Large
POTEXEMP
Item 12 Cost
NONSUPEWAGE
MEDEXAMTIME
POTEXEMP * 5%
Variables
24.17%
Sector 1. Electroplating
ALL
Sector 2. Welding
General Industry
Maritime
Construction
GOVERNMENT
0
Sector 2. Mild Steel Welding
General Industry
0
0
Maritime
Small
Large
Construction
2 0.0966 * 3
Small
SECTOR 3. PAINTING GENERAL INDUSTRY
Large
46 2.3097 * 3
AEROSPACE
1
0.0453 * 3
Small
Large
12 0.5887 * 3
Autobody
1
0.0453 * 3
Small
Large
2
0.0906 * 3
Coil Coating
1
0.0453 * 3
Small
Large
3
0.1287 * 3
Maritime
1
0.0429 * 3
Small
Page 138
RESPONSES
0.0953 * 3 *
671 =
192 * $33.07
$6,342
1,279
Small
Local
1
6
0.0318 * 3 *
0.3146 * 3 *
3,566 =
12 =
340 * $33.07
11 * $33.07
$11,238
$365
2,266
74
State
0
0.0225 * 3 *
647 =
44 * $33.07
$1,441
291
Large
7 0.3351 * 3 *
2=
2 * $38.68
$74
13
Small
0
* 3 *
0=
0 * $38.68
$0
0
Large
22 1.0797 * 3 *
2=
6 * $37.70
$220
39
Small
3 0.135 * 3 *
1=
0 * $37.70
$14
2
Large
2 0.1182 * 3 *
2=
1 * $31.94
$27
6
Small
0
* 3 *
0=
0 * $31.94
$0
0
25 1.2448 * 3 *
5=
18 * $38.68
$692
119
Hours
2
#PLANTS
Large
POTEXEMP
Item 12 Cost
NONSUPEWAGE
MEDEXAMTIME
POTEXEMP * 5%
Variables
Table 20
Construction
Government
SECTOR 4. Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
0
SECTOR 6. CCA Producers
ALL
0
SECTOR 7. Chromium Catalyst Producers
Large
ALL
Small
0
0
* 3 *
0=
0 * $38.68
$0
0
Large
5 0.2394 * 3 *
80 =
58 * $28.81
$1,664
385
Small
2 0.0958 * 3 *
126 =
36 * $28.81
$1,046
242
Large
0
0
* 3 *
2=
0 * $28.86
$0
0
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
Alloy Stainless Steel
Small
Large
Carbon Steel
Small
14B. Alloy Stainless Steel Forging Industry
Large
Reshaping
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
0
0
* 3 *
8=
0 * $28.86
$0
0
0
0
* 3 *
81 =
0 * $31.99
$0
0
0
0
* 3 *
40 =
0 * $31.99
$0
0
3 0.1411 * 3 *
6=
2 * $28.71
$69
16
2 0.0941 * 3 *
4=
1 * $28.71
$30
7
12 0.5903 * 3 *
1=
2 * $38.80
$62
11
* 3 *
0=
0 * $38.80
$0
0
36 1.8198 * 3 *
34 =
185 * $38.80
$7,169
1,232
1 0.0639 * 3 *
9 0.447 * 3 *
11 =
102 =
2 * $38.80
136 * $38.80
$81
$5,283
14
908
1 0.0639 * 3 *
32 =
6 * $38.80
$237
41
3 0.1277 * 3 *
33 =
13 * $38.80
$494
85
0
* 3 *
31 =
0 * $38.80
$0
0
25 1.2327 * 3 *
163 =
602 * $28.31
$17,035
4,012
5 0.2465 * 3 *
118 =
88 * $28.31
$2,478
583
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
0
0
0
0
0
* 3 *
3=
0 * $37.70
$0
0
0
0
* 3 *
1=
0 * $37.70
$0
0
Page 139
Item 12 Cost
RESPONSES
NONSUPEWAGE
0
* 3 *
0=
0 * $41.50
$0
0
Small
3 0.1436 * 3 *
5=
2 * $41.50
$86
14
Large
0
0
* 3 *
216 =
0 * $29.92
$0
0
Small
0
0
* 3 *
1,627 =
0 * $29.92
$0
0
Large
0
0
* 3 *
343 =
0 * $19.97
$0
0
Small
0
0
* 3 *
697 =
0 * $19.97
$0
0
Large
1 0.0524 * 3 *
6=
1 * $28.87
$29
7
Small
Large
0
0
* 3 *
12 0.5765 * 3 *
20 =
90 =
0 * $28.87
156 * $28.87
$0
$4,501
0
1,039
Small
2 0.1048 * 3 *
5=
2 * $28.87
$48
11
Large
0
0
* 3 *
81 =
0 * $20.85
$0
0
Small
0
0
* 3 *
325 =
0 * $20.85
$0
0
Large
1 0.0549 * 3 *
179 =
29 * $32.51
$957
196
Small
Large
0
0
* 3 *
11 0.5487 * 3 *
0=
23 =
0 * $32.51
38 * $32.51
$0
$1,233
0
Small
5 0.2743 * 3 *
4=
4 * $32.51
$117
24
Large
0
0
* 3 *
5=
0 * $25.64
$0
0
Small
0
0
* 3 *
0=
0 * $25.64
$0
0
Large
1 0.0396 * 3 *
148 =
18 * $32.11
$564
117
Small
Large
0
0
* 3 *
* 3 *
79 =
36 =
0 * $32.11
0 * $32.11
$0
$0
0
0
Small
Large
0
0
* 3 *
2 0.117 * 3 *
32 =
1,162 =
0 * $32.11
408 * $32.11
$0
$13,098
0
2,719
Small
State
1 0.039 * 3 *
0 0.0225 * 3 *
4,650 =
12 =
544 * $32.11
1 * $32.11
$17,476
$25
3,628
5
Local
0 0.0225 * 3 *
42 =
3 * $32.11
$91
19
Large
0
0
* 3 *
40 =
0 * $27.23
$0
0
Small
State
0
0
0
0
* 3 *
* 3 *
48 =
0=
0 * $27.23
0 * $27.23
$0
$0
0
0
Local
0
0
* 3 *
24 =
0 * $27.23
$0
0
Large
2 0.1056 * 3 *
19 =
6 * $27.93
$168
40
Small
0
0=
0 * $27.93
$0
0
Hours
0
#PLANTS
MEDEXAMTIME
Large
POTEXEMP
POTEXEMP * 5%
Variables
Table 20
SECTOR 18. Chromium Sulfate Producers
ALL
SECTOR 19. Chemical Distributors
ALL
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
ALL
Fiber, Flat and Container Glass
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
Catalyst Users
Chromium Catalyst Service Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
General Industry
0
0
Maritime
Construction
Government
SECTOR 27. Solid Waste Incineration
ALL
Government
SECTOR 30. Superalloy Producers and Users
ALL
0
* 3 *
Page 140
Item 12 Cost
RESPONSES
NONSUPEWAGE
0
0
* 3 *
51 =
0 * $32.13
$0
0
Small
State Gov't
0
0
0
0
* 3 *
* 3 *
233 =
15 =
0 * $32.13
0 * $32.13
$0
$0
0
0
Local Gov't
Large
0
0
0
0
* 3 *
* 3 *
88 =
40 =
0 * $32.13
0 * $32.13
$0
$0
0
0
Small
State Gov't
0
0
0
0
* 3 *
* 3 *
170 =
1=
0 * $32.13
0 * $32.13
$0
$0
0
0
0
0
* 3 *
11 0.5279 * 3 *
239 =
44 =
0 * $32.13
70 * $32.13
$0
$2,255
0
468
1 0.0528 * 3 *
175 =
70,349
28 * $32.13
$892
$453,431
185
108,133
Hours
#PLANTS
MEDEXAMTIME
Large
POTEXEMP
POTEXEMP * 5%
Variables
Table 20
SECTOR 31. Construction
Industrial Rehabilitation & Maintenance
Hazardous Waste Site Work
Local Gov't
Large
Refractory Brick Restoration
Small
Total
Page 141
16,258
Table 21
Initial Medical Examination (§§ 1910.1026(k)(1)(i)(A), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(1)(i)(A), (i)(3)(i), and (i)(3)(ii); and
1926.1126(i)(1)(i)(A), (i)(3)(i), and (i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Initial Medical Examination
This table calculates the cost for a contractor PLHCP to conduct initial medical examinations.
COST
#PLANTS
MEDEXAMCOST
POTEXEMP*5%
Variables
POTEXEMP
COST = POTEXEMP * MEDEXAMCOST * # PLANTS
* POTEXEMP = Total number of potentially exposed employees at or above the AL and workers with "signs and symptoms"
before the implementation of engineering controls * 5%
*MEDEXAMCOST = Cost of medical exam
* #PLANTS = Number of Plants
Sector 1. Electroplating
Large
5 0.2729 *
$160 *
1,848 =
$80,852
Small
1 0.0455 *
$160 *
3,478 =
$25,353
Large
2 0.0966 *
$160 *
7,857 =
$121,683
Small
Large
0 0.0000 *
18 0.9179 *
$160 *
$160 *
8,804 =
189 =
$0
$27,862
Small
Large
1 0.0483 *
49 2.4639 *
$160 *
$160 *
107 =
268 =
$830
$105,695
Small
State
5 0.2416 *
2 0.0966 *
$160 *
$160 *
2,145 =
25 =
$83,047
$389
Local
0 0.0000 *
$160 *
787 =
$0
Large
1 0.0483 *
$160 *
10,535 =
$81,573
Small
Large
0 0.0000 *
0 0.0000 *
$160 *
$160 *
10,724 =
409 =
$0
$0
Small
Large
1 0.0483 *
18 0.9179 *
$160 *
$160 *
232 =
402 =
$1,796
$59,136
*
$160 *
3,037 =
$47,030
*
$160 *
49 =
$18,107
*
*
$160 *
$160 *
62 =
326 =
$447
$4,807
*
*
$160 *
$160 *
1,436 =
100 =
$10,583
$1,446
*
$160 *
18 =
$131
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
2 0.0966
Small
SECTOR 3. PAINTING General Industry
Large
46 2.3097
AEROSPACE
1 0.0453
Small
Large
2 0.0920
Auto Body
1 0.0460
Small
Large
2 0.0906
Coil Coating
1 0.0453
Small
Page 142
COST
#PLANTS
MEDEXAMCOST
POTEXEMP*5%
Variables
POTEXEMP
Table 21
Large
3 0.1287 *
$160 *
276 =
$5,685
Small
Large
1 0.0429 *
2 0.0953 *
$160 *
$160 *
476 =
671 =
$3,276
$10,246
Small
State
1 0.0318 *
6 0.3146 *
$160 *
$160 *
3,566 =
12 =
$18,157
$589
Local
0 0.0225 *
$160 *
647 =
$2,329
Large
7 0.3351 *
$160 *
2=
$103
Small
0 0.0000 *
$160 *
0=
$0
Large
22 1.0797 *
$160 *
2=
$311
Small
3 0.1350 *
$160 *
1=
$19
Large
2 0.1182 *
$160 *
2=
$45
Small
0 0.0000 *
$160 *
0=
$0
Large
25 1.2448 *
$160 *
5=
$955
Small
0 0.0000 *
$160 *
0=
$0
Large
5 0.2394 *
$160 *
80 =
$3,086
Small
2 0.0958 *
$160 *
126 =
$1,940
Large
0 0.0000 *
$160 *
2=
$0
Small
0 0.0000 *
$160 *
8=
$0
Large
0 0.0000 *
$160 *
81 =
$0
Small
0 0.0000 *
$160 *
40 =
$0
Large
3 0.1411 *
$160 *
6=
$128
Small
2 0.0941 *
$160 *
4=
$57
Large
12 0.5903 *
$160 *
1=
$86
Small
0 0.0000 *
$160 *
0=
$0
Large
36 1.8198 *
$160 *
34 =
$9,871
Small
1 0.0639 *
$160 *
11 =
$111
Maritime
Construction
Government
SECTOR 4. Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
SECTOR 10. Plastic Colorant Producers and Users
ALL
SECTOR 11. Plating Mixture Producers
ALL
SECTOR 13. Chromium Metal Producers
ALL
SECTOR 14. Iron and Steel Mills
General Industry
Page 143
COST
#PLANTS
MEDEXAMCOST
POTEXEMP*5%
Variables
POTEXEMP
Table 21
Large
9 0.4470 *
$160 *
102 =
$7,273
Small
1 0.0639 *
$160 *
32 =
$327
Large
3 0.1277 *
$160 *
33 =
$680
Small
0 0.0000 *
$160 *
31 =
$0
Large
25 1.2327 *
$160 *
163 =
$32,148
Small
5 0.2465 *
$160 *
118 =
$4,676
Large
0 0.0000 *
$160 *
3=
$0
Small
0 0.0000 *
$160 *
1=
$0
Large
0 0.0000 *
$160 *
0=
$0
Small
3 0.1436 *
$160 *
5=
$110
Large
0 0.0000 *
$160 *
216 =
$0
Small
0 0.0000 *
$160 *
1,627 =
$0
Large
0 0.0000 *
$160 *
343 =
$0
Small
0 0.0000 *
$160 *
697 =
$0
Large
1 0.0524 *
$160 *
6=
$53
Small
Large
0 0.0000 *
12 0.5765 *
$160 *
$160 *
20 =
90 =
$0
$8,329
Small
2 0.1048 *
$160 *
5=
$88
Large
0 0.0000 *
$160 *
81 =
$0
Small
0 0.0000 *
$160 *
325 =
$0
Large
1 0.0549 *
$160 *
179 =
$1,573
Small
0 0.0000 *
$160 *
0=
$0
Carbon Steel
SECTOR 14B. Forging Industry
Reshaping
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
SECTOR 18. Chromium Sulfate Producers
ALL
SECTOR 19. Chemical Distributors
ALL
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
General Industry
Fiber, Flat and Container Glass
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
General Industry
Page 144
COST
#PLANTS
MEDEXAMCOST
POTEXEMP*5%
Variables
POTEXEMP
Table 21
Large
11 0.5487 *
$160 *
23 =
$2,027
Small
5 0.2743 *
$160 *
4=
$193
Large
0 0.0000 *
$160 *
5=
$0
Small
0 0.0000 *
$160 *
0=
$0
Large
1 0.0396 *
$160 *
148 =
$939
Small
Large
0 0.0000 *
0 0.0000 *
$160 *
$160 *
79 =
36 =
$0
$0
Small
Large
0 0.0000 *
2 0.1170 *
$160 *
$160 *
32 =
1,162 =
$0
$21,794
Small
State
1 0.0390 *
0 0.0225 *
$160 *
$160 *
4,650 =
12 =
$29,078
$42
Local
0 0.0225 *
$160 *
42 =
$152
Large
0 0.0000 *
$160 *
40 =
$0
Small
State
0 0.0000 *
1 0.0438 *
$160 *
$160 *
48 =
0=
$0
$0
Local
0 0.0000 *
$160 *
24 =
$0
Large
2 0.1056 *
$160 *
19 =
$322
Small
0 0.0000 *
$160 *
0=
$0
Large
0 0.0000 *
$160 *
51 =
$0
Small
State
0 0.0000 *
0 0.0000 *
$160 *
$160 *
233 =
15 =
$0
$0
Local
Large
0 0.0000 *
0 0.0000 *
$160 *
$160 *
88 =
40 =
$0
$0
Small
State
0 0.0000 *
0 0.0000 *
$160 *
$160 *
170 =
1=
$0
$0
Local
Large
0 0.0000 *
11 0.5279 *
$160 *
$160 *
239 =
44 =
$0
$3,750
Small
1 0.0528 *
$160 *
175 =
70,349
$1,483
$842,799
Chromium Service Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
General Industry
Maritime
Construction
Government
SECTOR 27. Solid Waste Incineration
ALL
Government
SECTOR 30. Superalloy Producers and Users
ALL
SECTOR 31. Construction
Industrial Rehabilitation & Maintenance
Hazardous Waste Site Work
Refractory Brick Restoration
Total
Page 145
Table 22
Annual Medical Examination (§§ 1910.1026(k)(2)(ii), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(2)(ii), (i)(3)(i), and (i)(3)(ii); and
1926.1126(i)(2)(ii), (i)(3)(i), and (i)(3)(ii))
Employee Time and Cost to Complete the Annual Medical Examination
This table calculates the burden hours and costs associated with employee time to complete the annual medical examination in the year after the initial medical
examination is completed. These hours and costs are for existing emplyoees who are potentially exposed at or above the action level or who show "signs and
symptoms" of exposure. The Agency assumes that a varying percentage of existing plants will have employees who will complete these exams; these percentages are
specific to each sector and plant size (large or small). Employees who work for employers who conduct annual examinations, %BASEMED, will incur a incremental
medical exam time of 3 hours. Employees who are not working for employers providing annual medical examinations (1‐%BASEMED) will incur three hours for a full
limited medical exam.
COST = (LIMEMPAL + MEDEXAMADDERM)*(LIMPARTIME * %BASEMED)+(LIMFULLTIME*(1‐%BASEMED))*PLANTS
Hours= Burden Hours x NONSUPEWAGE
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering controls.
* MEDEXAMADDERM = Number of employees above the AL requiring a limited medical exam b/c of dermal "signs and symptoms"
after the implementation of engineering controls.
LIMPARTIME = Incremental employee time, in hours, for a partial limited exam
%BASEMED = Percentage of employers who are providing annual medical examinations
LIMITFULLTIME = Employee time, in hours, for a full limited medical exam
*1‐%BASEMED = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants
Responses
(
3+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
1,848 =
15,133
$26.61
$402,692
5,044
(
0+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
3,478 =
0
$26.61
$0
0
Large
(
0+
0.000000 ) * ( ( 3 *
5.00%
) +(
3.00 * (
1 ‐
5.00%
) ) *
7,857 =
0
$26.20
$0
0
Small
Large
(
(
0+
14 +
0.000000 ) * ( ( 3 *
2.898677 ) * ( ( 3 *
0.00%
5.00%
) +(
) +(
3.00 * (
3.00 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
8,804 =
189 =
0
9,332
$26.20
$26.20
$0
$244,499
0
3,111
Small
Large
(
(
1+
26 +
0.000000 ) * ( ( 3 *
2.898677 ) * ( ( 3 *
0.00%
5.00%
) +(
) +(
3.00 * (
3.00 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
107 =
268 =
311
23,274
$26.20
$26.20
$8,145
$609,780
104
7,758
Small
State
(
(
3+
0+
0.000000 ) * ( ( 3 *
0.000000 ) * ( ( 3 *
0.00%
5.00%
) +(
) +(
3.00 * (
3.00 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
2,145 =
25 =
18,653
0
$26.20
$26.20
$488,705
$0
6,218
0
Local
(
0+
0.000000 ) * ( ( 3 *
0.00%
) +(
3.00 * (
1 ‐
0.00%
) ) *
787 =
0
$26.20
$0
0
Large
(
0+
0.000000 ) * ( ( 3 *
5.00%
) +(
3.00 * (
1 ‐
5.00%
) ) * 10,535 =
0
$26.20
$0
0
Small
Large
(
(
0+
0+
0.000000 ) * ( ( 3 *
0.000000 ) * ( ( 3 *
0.00%
5.00%
) +(
) +(
3.00 * (
3.00 * (
1 ‐
1 ‐
0.00%
5.00%
) ) * 10,724 =
) ) *
409 =
0
0
$26.20
$26.20
$0
$0
0
0
Small
Large
(
(
0+
10 +
0.000000 ) * ( ( 3 *
0.000000 ) * ( ( 3 *
0.00%
5.00%
) +(
) +(
3.00 * (
3.00 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
232 =
402 =
0
11,651
$26.20
$26.20
$0
$305,257
0
3,884
Small
(
1+
0.000000 ) * ( ( 3 *
0.00%
) +(
3.00 * (
1 ‐
0.00%
) ) *
3,037 =
8,803
$26.20
$230,631
2,934
Large
(
45 +
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
1 ‐
80.00% ) ) *
49 =
6,645
$33.07
$219,734
2,215
Small
Large
(
(
0+
1+
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
50.00% ) ) *
80.00% ) ) *
62 =
326 =
0
886
$33.07
$33.07
$0
$29,298
0
295
Small
Large
(
(
0+
2+
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
50.00% ) ) *
80.00% ) ) *
1,436 =
100 =
0
541
$33.07
$33.07
$0
$17,904
0
180
Small
Large
(
(
1+
2+
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
3.00 * (
1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *
18 =
276 =
49
0
$33.07
$33.07
$1,628
$0
16
473
Small
Large
(
(
1+
2+
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
3.00 * (
1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *
476 =
671 =
1,227
3,836
$33.07
$33.07
$40,556
$126,831
409
1,279
Small
State
(
(
0+
0+
0.000000 ) * ( ( 3 * 100.00% ) + (
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
3.00 * (
1 ‐ 100.00% ) ) *
1 ‐ 100.00% ) ) *
3,566 =
12 =
0
0
$33.07
$33.07
$0
$0
0
0
Local
(
6+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
647 =
12,204
$33.07
$403,545
4,068
Large
(
7+
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
2=
39
$38.68
$1,489
13
Small
(
0+
0.000000 ) * ( ( 3 *
3.00 * (
1 ‐
0.00%
0=
0
$38.68
$0
0
Hours
Large
Small
#PLANTS
Cost
NONSUPEWAGE
1‐%BASEMED
LIMPFULLTIME
%BASEMED
LIMPARTIME
MEDEXAMADDERM
LIMEMPAL
Variables
24.17%
Sector 1. Electroplating
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
SECTOR 3. PAINTING
AEROSPACE
Auto Body
Coil Coating
Maritime
Construction
Government
SECTOR 4. Producers of Chromates
ALL
0.00%
) +(
Page 146
) ) *
8+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
2=
44
$37.70
$1,648
15
(
1+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
1=
2
$37.70
$92
1
(
2+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
2=
11
$31.94
$357
4
(
0+
0.000000 ) * ( ( 3 *
) +(
3.00 * (
1 ‐
) ) *
0=
0
$31.94
$0
0
(
11 +
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
5=
165
$38.68
$6,383
55
(
0+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
0=
0
$38.68
$0
0
(
1+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
80 =
231
$28.81
$6,656
77
(
0+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
126 =
0
$28.81
$0
0
(
0+
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
1 ‐
80.00% ) ) *
2=
0
$28.86
$0
0
(
0+
0.000000 ) * ( ( 3 * 10.00% ) + (
3.00 * (
1 ‐
10.00% ) ) *
8=
0
$28.86
$0
0
(
0+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
81 =
0
$31.99
$0
0
(
0+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
40 =
0
$31.99
$0
0
( 3 +
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
6=
48
$28.71
$1,371
16
( 1 +
0.000000 ) * ( ( 3 * 30.00% ) + (
3.00 * (
1 ‐
30.00% ) ) *
4=
11
$28.71
$305
4
(
7+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
1=
20
$38.80
$768
7
(
0+
0.000000 ) * ( ( 3 *
) +(
3.00 * (
1 ‐
0.00%
) ) *
0=
0
$38.80
$0
0
(
27 +
0.005900 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
34 =
2,723
$38.80
$105,675
908
(
(
1+
1+
0.000281 ) * ( ( 3 * 30.00% ) + (
0.000140 ) * ( ( 3 * 50.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
30.00% ) ) *
50.00% ) ) *
11 =
102 =
42
195
$38.80
$38.80
$1,614
$7,548
14
65
(
1+
0.000281 ) * ( ( 3 * 30.00% ) + (
3.00 * (
1 ‐
30.00% ) ) *
32 =
122
$38.80
$4,747
41
0.00%
0.00%
0.00%
Hours
(
#PLANTS
Responses
NONSUPEWAGE
1‐%BASEMED
LIMPFULLTIME
%BASEMED
LIMPARTIME
Cost
SECTOR 5. Chromate Pigment Procedures
Large
ALL
Small
SECTOR 6. CCA Producers
Large
ALL
Small
SECTOR 7. Chromium Catalyst Producers
Large
ALL
Small
SECTOR 8. Paint and Coating Producers
Large
ALL
Small
SECTOR 9. Printing Ink Producers
Large
ALL
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
MEDEXAMADDERM
LIMEMPAL
Variables
Table 22
(
0+
0.000562 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
33 =
0
$38.80
$2
0
(
0+
0.000140 ) * ( ( 3 * 30.00% ) + (
3.00 * (
1 ‐
30.00% ) ) *
31 =
0
$38.80
$1
0
(
17 +
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
1 ‐
80.00% ) ) *
163 =
8,424
$28.31
$238,494
2,808
(
4+
0.000000 ) * ( ( 3 * 10.00% ) + (
3.00 * (
1 ‐
10.00% ) ) *
118 =
1,459
$28.31
$41,298
486
(
0+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
3=
0
$37.70
$0
0
(
0+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
1=
0
$37.70
$0
0
(
0+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
0=
0
$41.50
$0
0
(
1+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
5=
14
$41.50
$571
5
(
0+
0.000000 ) * ( ( 3 *
0.00%
) +(
3.00 * (
1 ‐
0.00%
) ) *
216 =
0
$29.92
$0
0
(
0+
0.000000 ) * ( ( 3 *
0.00%
) +(
3.00 * (
1 ‐
0.00%
) ) *
1,627 =
0
$29.92
$0
0
(
0+
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
1 ‐
80.00% ) ) *
343 =
0
$19.97
$0
0
(
0+
0.000000 ) * ( ( 3 * 10.00% ) + (
3.00 * (
1 ‐
10.00% ) ) *
697 =
0
$19.97
$0
0
(
1+
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
1 ‐
80.00% ) ) *
6=
20
$28.87
$571
7
(
(
0+
9+
0.000000 ) * ( ( 3 * 10.00% ) + (
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
10.00% ) ) *
80.00% ) ) *
20 =
90 =
0
2,551
$28.87
$28.87
$0
$73,651
0
850
(
2+
0.000000 ) * ( ( 3 * 10.00% ) + (
3.00 * (
1 ‐
10.00% ) ) *
5=
33
$28.87
$952
11
Page 147
Cost
Responses
NONSUPEWAGE
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
1 ‐
80.00% ) ) *
81 =
0
$20.85
$0
0
Small
(
0+
0.000000 ) * ( ( 3 * 10.00% ) + (
3.00 * (
1 ‐
10.00% ) ) *
325 =
0
$20.85
$0
0
Large
(
0+
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
1 ‐
80.00% ) ) *
179 =
0
$32.51
$0
0
Small
Large
(
(
0+
5+
0.000000 ) * ( ( 3 * 80.00% ) + (
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
80.00% ) ) *
80.00% ) ) *
0=
23 =
0
379
$32.51
$32.51
$0
$12,331
0
126
Small
(
3+
0.000000 ) * ( ( 3 * 30.00% ) + (
3.00 * (
1 ‐
30.00% ) ) *
4=
43
$32.51
$1,409
14
Large
(
0+
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
1 ‐
80.00% ) ) *
5=
0
$25.64
$0
0
Small
(
0+
0.000000 ) * ( ( 3 * 10.00% ) + (
3.00 * (
1 ‐
10.00% ) ) *
0=
0
$25.64
$0
0
Large
(
0+
0.000000 ) * ( ( 3 * 25.00% ) + (
3.00 * (
1 ‐
25.00% ) ) *
148 =
0
$32.11
$0
0
Small
Large
(
(
0+
0+
0.000000 ) * ( ( 3 * 0.00% ) + (
0.000000 ) * ( ( 3 * 25.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
0.00% ) ) *
25.00% ) ) *
79 =
36 =
0
0
$32.11
$32.11
$0
$0
0
0
Small
Large
(
(
0+
1+
0.000000 ) * ( ( 3 * 0.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
0.00% ) ) *
50.00% ) ) *
32 =
1,162 =
0
2,719
$32.11
$32.11
$0
$87,322
0
906
Small
State
(
(
1+
0+
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
4,650 =
12 =
10,885
16
$32.11
$32.11
$349,523
$506
3,628
5
Local
(
0+
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
42 =
57
$32.11
$1,828
19
Large
(
0+
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
40 =
0
$27.23
$0
0
Small
State
(
(
0+
1+
0.000000 ) * ( ( 3 * 30.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
30.00% ) ) *
50.00% ) ) *
48 =
0=
0
0
$27.23
$27.23
$0
$0
0
0
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
(
0+
0.000000 ) * ( ( 3 * 30.00% ) + (
3.00 * (
1 ‐
30.00% ) ) *
24 =
0
$27.23
$0
0
(
2+
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
19 =
120
$27.93
$3,362
40
(
0+
0.000000 ) * ( ( 3 * 30.00% ) + (
3.00 * (
1 ‐
30.00% ) ) *
0=
0
$27.89
$0
0
(
0+
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
51 =
0
$32.13
$0
0
Small
State
(
(
0+
0+
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
233 =
15 =
0
0
$32.13
$32.13
$0
$0
0
0
Local
Large
(
(
0+
0+
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
88 =
40 =
0
0
$32.13
$32.13
$0
$0
0
0
Small
State
(
(
0+
0+
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
170 =
1=
0
0
$32.13
$32.13
$0
$0
0
0
Local
Large
(
(
0+
1+
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
239 =
44 =
0
140
$32.13
$32.13
$0
$4,511
0
47
Small
(
1+
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
175 =
70,349
555
143,615
$32.13
Hours
#PLANTS
0+
%BASEMED
(
LIMPARTIME
Large
LIMEMPAL
1‐%BASEMED
LIMPFULLTIME
MEDEXAMADDERM
Variables
Table 22
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
General Industry
Chromium Service Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
General Industry
Maritime
Construction
Government
SECTOR 27. Solid Waste Incineration
ALL
Government
Industrial Rehabilitation & Maintenance
Hazardous Waste Site Work
Refractory Brick Restoration
Total
Page 148
$17,839
185
$4,102,028 48,345
Table 23
Annual Medical Examination (§§ 1910.1026(k)(2)(ii), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(2)(ii), (i)(3)(i), and (i)(3)(ii); and
1926.1126(i)(2)(ii), (i)(3)(i), and (i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Medical Examination
This table calculates the cost for a contractor PLHCP to conduct the annual medical examination. Employers who were providing annual examinations (%BASEMED) will incur a partial
medical exam cost per employee. Employers who were NOT providing annual medical examinations (1‐%BASEMED) will incur the full cost of a medical exam per employee.
COST = (LIMEMPAL + MEDEXAMADDERM)*((PARTFULLCOST*%BASEMED)+(LIMFULLCOST *(1‐%BASEMED))*PLANTS
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms"
after the implementation of engineering controls.
PARTFULLCOST = The cost of a partial medical exam for employers who are providing annual medical examinations.
%BASEMED = Percentage of employers who are providing annual medical examinations
COST
#PLANTS
1‐%BASEMED
LIMFULLCOST
%BASEMED
LIMPPARTCOST
MEDEXAMADDERM
LIMEMPAL
Variables
LIMITFULLCOST = The cost of a medical examination for employers who are not providing annual medical examinations
*1‐%BASEMED = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants
Sector 1. Electroplating
Large
(
3+
0.000000 ) * ( ( 136.67 *
100.00%
) +(
$160 * (
1 ‐ 100.00% ) ) *
1,848 =
$ 689,445
Small
(
0+
0.000000 ) * ( ( 136.67 *
100.00%
) +(
$160 * (
1 ‐ 100.00% ) ) *
3,478 =
$ ‐
Large
(
0+
0.000000 ) * ( ( 136.67 *
5.00%
) +(
$160 * (
1 ‐
5.00%
) ) *
7,857 =
$ ‐
Small
Large
(
(
0+
14 +
0.000000 ) * ( ( 136.67 *
2.898677 ) * ( ( 136.67 *
0.00%
5.00%
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
8,804 =
189 =
$ ‐
$ 494,912
Small
Large
(
(
1+
26 +
0.000000 ) * ( ( 136.67 *
2.898677 ) * ( ( 136.67 *
0.00%
5.00%
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
107 =
268 =
$ 16,609
$ 1,234,308
Small
State
(
(
3+
0+
0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *
0.00%
5.00%
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
2,145 =
25 =
$ 996,568
$ ‐
Local
(
0+
0.000000 ) * ( ( 136.67 *
0.00%
) +(
$160 * (
1 ‐
0.00%
) ) *
787 =
$ ‐
Large
(
0+
0.000000 ) * ( ( 136.67 *
5.00%
) +(
$160 * (
1 ‐
5.00%
) ) *
10,535 =
$ ‐
Small
Large
(
(
0+
0+
0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *
0.00%
5.00%
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
10,724 =
409 =
$ ‐
$ ‐
Small
Large
(
(
0+
10 +
0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *
0.00%
5.00%
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
232 =
402 =
$ ‐
$ 617,897
) +(
$160 * (
1 ‐
0.00%
) ) *
3,037 =
$ 470,302
) +(
$160 * (
1 ‐
80.00% ) ) *
49 =
$ 313,202
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
50.00% ) ) *
80.00% ) ) *
62 =
326 =
$ ‐
$ 41,760
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
50.00% ) ) *
80.00% ) ) *
1,436 =
100 =
$ ‐
$ 25,520
) +(
) +(
$160 * (
$160 * (
1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *
18 =
276 =
$ 2,436
$ 64,636
) +(
) +(
$160 * (
$137 * (
1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *
476 =
671 =
$ 60,702
$ 174,744
) +(
) +(
$137 * (
$137 * (
1 ‐ 100.00% ) ) *
1 ‐ 100.00% ) ) *
3,566 =
12 =
) +(
$137 * (
1 ‐ 100.00% ) ) *
647 =
$ 555,994
) +(
$160 * (
1 ‐
50.00% ) ) *
2=
$ 1,906
) +(
$160 * (
1 ‐
0.00%
0=
$ ‐
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
(
1+
0.000000 ) * ( ( 136.67 *
0.00%
Small
SECTOR 3. PAINTING General Industry
Large
( 45 +
0.000000 ) * ( ( 136.67 *
80.00%
AEROSPACE
(
0+
0.000000 ) * ( ( 136.67 *
50.00%
Small
Large
(
1+
0.000000 ) * ( ( 136.67 *
80.00%
Auto Body
(
0+
0.000000 ) * ( ( 136.67 *
50.00%
Small
Large
(
2+
0.000000 ) * ( ( 136.67 *
80.00%
Coil Coating
(
1+
0.000000 ) * ( ( 136.67 *
50.00%
Small
Large
(
2+
0.000000 ) * ( ( 136.67 * 100.00%
Maritime
(
1+
0.000000 ) * ( ( 136.67 *
50.00%
Small
(
2+
0.000000 ) * ( ( 136.67 * 100.00%
Large
Construction
(
0+
0.000000 ) * ( ( 136.67 * 100.00%
Small
(
0+
0.000000 ) * ( ( 136.67 * 100.00%
State
Government
(
6+
0.000000 ) * ( ( 136.67 * 100.00%
Local
SECTOR 4. Producers of Chromates
Large
(
7+
0.000000 ) * ( ( 136.67 *
50.00%
ALL
(
0+
0.000000 ) * ( ( 136.67 *
0.00%
Small
Page 149
) ) *
$ ‐
$ ‐
COST
#PLANTS
1‐%BASEMED
LIMFULLCOST
%BASEMED
LIMPPARTCOST
MEDEXAMADDERM
LIMEMPAL
Variables
Table 23
SECTOR 5. Chromate Pigment Procedures
Large
(
8+
0.000000 ) * ( ( 136.67 *
100.00%
) +(
$160 * (
1 ‐ 100.00% ) ) *
2=
$ 1,992
Small
(
1+
0.000000 ) * ( ( 136.67 *
100.00%
) +(
$160 * (
1 ‐ 100.00% ) ) *
1=
$ 111
Large
(
2+
0.000000 ) * ( ( 136.67 *
100.00%
) +(
$160 * (
1 ‐ 100.00% ) ) *
2=
$ 509
Small
(
0+
0.000000 ) * ( ( 136.67 *
0.00%
) +(
$160 * (
1 ‐
) ) *
0=
$ ‐
Large
(
11 +
0.000000 ) * ( ( 136.67 *
100.00%
) +(
$160 * (
1 ‐ 100.00% ) ) *
5=
$ 7,519
Small
(
0+
0.000000 ) * ( ( 136.67 *
100.00%
) +(
$160 * (
1 ‐ 100.00% ) ) *
0=
$ ‐
Large
(
1+
0.000000 ) * ( ( 136.67 *
100.00%
) +(
$160 * (
1 ‐ 100.00% ) ) *
80 =
Small
(
0+
0.000000 ) * ( ( 136.67 *
100.00%
) +(
$160 * (
1 ‐ 100.00% ) ) *
126 =
$ ‐
Large
(
0+
0.000000 ) * ( ( 136.67 *
80.00%
) +(
$160 * (
1 ‐
80.00% ) ) *
2=
$ ‐
(
0+
0.000000 ) * ( ( 136.67 *
10.00%
) +(
$160 * (
1 ‐
10.00% ) ) *
8=
$ ‐
(
0+
0.000000 ) * ( ( 136.67 *
100.00%
) +(
$160 * (
1 ‐ 100.00% ) ) *
81 =
$ ‐
(
0+
0.000000 ) * ( ( 136.67 *
100.00%
) +(
$160 * (
1 ‐ 100.00% ) ) *
40 =
$ ‐
(
3+
0.000000 ) * ( ( 136.67 *
50.00%
) +(
$160 * (
1 ‐
50.00% ) ) *
6=
$ 2,364
(
1+
0.000000 ) * ( ( 136.67 *
30.00%
) +(
$160 * (
1 ‐
30.00% ) ) *
4=
$ 542
(
7+
0.000000 ) * ( ( 136.67 *
100.00%
) +(
$160 * (
1 ‐ 100.00% ) ) *
1=
$ 902
(
0+
0.000000 ) * ( ( 136.67 *
0.00%
) +(
$160 * (
1 ‐
0.00%
) ) *
0=
$ ‐
(
27 +
0.005900 ) * ( ( 136.67 *
50.00%
) +(
$160 * (
1 ‐
50.00% ) ) *
34 =
$ 134,786
(
(
1+
1+
0.000281 ) * ( ( 136.67 *
0.000140 ) * ( ( 136.67 *
30.00%
50.00%
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
30.00% ) ) *
50.00% ) ) *
11 =
102 =
$ 2,124
$ 9,628
(
1+
0.000281 ) * ( ( 136.67 *
30.00%
) +(
$160 * (
1 ‐
30.00% ) ) *
32 =
$ 6,248
(
0+
0.000562 ) * ( ( 136.67 *
50.00%
) +(
$160 * (
1 ‐
50.00% ) ) *
33 =
$ 3
(
0+
0.000140 ) * ( ( 136.67 *
30.00%
) +(
$160 * (
1 ‐
30.00% ) ) *
31 =
$ 1
(
17 +
0.000000 ) * ( ( 136.67 *
80.00%
) +(
$160 * (
1 ‐
80.00% ) ) *
163 =
$ 397,046
(
4+
0.000000 ) * ( ( 136.67 *
10.00%
) +(
$160 * (
1 ‐
10.00% ) ) *
118 =
$ 76,787
(
0+
0.000000 ) * ( ( 136.67 *
100.00%
) +(
$160 * (
1 ‐ 100.00% ) ) *
3=
$ ‐
(
0+
0.000000 ) * ( ( 136.67 *
100.00%
) +(
$160 * (
1 ‐ 100.00% ) ) *
1=
$ ‐
(
0+
0.000000 ) * ( ( 136.67 *
100.00%
) +(
$160 * (
1 ‐ 100.00% ) ) *
0=
$ ‐
(
1+
0.000000 ) * ( ( 136.67 *
100.00%
) +(
$160 * (
1 ‐ 100.00% ) ) *
5=
$ 627
(
0+
0.000000 ) * ( ( 136.67 *
0.00%
) +(
$160 * (
1 ‐
0.00%
) ) *
216 =
$ ‐
(
0+
0.000000 ) * ( ( 136.67 *
0.00%
) +(
$160 * (
1 ‐
0.00%
) ) *
1,627 =
$ ‐
(
0+
0.000000 ) * ( ( 136.67 *
80.00%
) +(
$160 * (
1 ‐
80.00% ) ) *
343 =
$ ‐
(
0+
0.000000 ) * ( ( 136.67 *
10.00%
) +(
$160 * (
1 ‐
10.00% ) ) *
697 =
$ ‐
(
1+
0.000000 ) * ( ( 136.67 *
80.00%
) +(
$160 * (
1 ‐
80.00% ) ) *
6=
(
0+
0.000000 ) * ( ( 136.67 *
10.00%
) +(
$160 * (
1 ‐
10.00% ) ) *
20 =
ALL
SECTOR 6. CCA Producers
ALL
0.00%
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
$ 10,526
ALL
SECTOR 9. Printing Ink Producers
ALL
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
General Industry
Small
Page 150
$ 932
$ ‐
9+
0.000000 ) * ( ( 136.67 *
80.00%
) +(
$160 * (
1 ‐
80.00% ) ) *
90 =
$ 120,241
Small
(
2+
0.000000 ) * ( ( 136.67 *
10.00%
) +(
$160 * (
1 ‐
10.00% ) ) *
5=
$ 1,735
Large
(
0+
0.000000 ) * ( ( 136.67 *
80.00%
) +(
$160 * (
1 ‐
80.00% ) ) *
81 =
$ ‐
Small
(
0+
0.000000 ) * ( ( 136.67 *
10.00%
) +(
$160 * (
1 ‐
10.00% ) ) *
325 =
$ ‐
Large
(
0+
0.000000 ) * ( ( 136.67 *
80.00%
) +(
$160 * (
1 ‐
80.00% ) ) *
179 =
$ ‐
Small
Large
(
(
0+
5+
0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *
80.00%
80.00%
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
80.00% ) ) *
80.00% ) ) *
0=
23 =
$ ‐
$ 17,878
Small
(
3+
0.000000 ) * ( ( 136.67 *
30.00%
) +(
$160 * (
1 ‐
30.00% ) ) *
4=
$ 2,214
Large
(
0+
0.000000 ) * ( ( 136.67 *
80.00%
) +(
$160 * (
1 ‐
80.00% ) ) *
5=
$ ‐
Small
(
0+
0.000000 ) * ( ( 136.67 *
10.00%
) +(
$160 * (
1 ‐
10.00% ) ) *
0=
$ ‐
Large
(
0+
0.000000 ) * ( ( 136.67 *
25.00%
) +(
$160 * (
1 ‐
25.00% ) ) *
148 =
$ ‐
Small
Large
(
(
0+
0+
0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *
0.00%
25.00%
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
0.00% ) ) *
25.00% ) ) *
79 =
36 =
$ ‐
$ ‐
Small
Large
(
(
0+
1+
0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *
0.00%
50.00%
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
0.00% ) ) *
50.00% ) ) *
32 =
1,162 =
$ ‐
$ 134,592
Small
State
(
(
1+
0+
0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *
50.00%
50.00%
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
4,650 =
12 =
$ 538,728
$ 780
Local
(
0+
0.000000 ) * ( ( 136.67 *
50.00%
) +(
$160 * (
1 ‐
50.00% ) ) *
42 =
$ 2,818
Large
(
0+
0.000000 ) * ( ( 136.67 *
50.00%
) +(
$160 * (
1 ‐
50.00% ) ) *
40 =
$ ‐
Small
State
(
(
0+
1+
0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *
30.00%
50.00%
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
30.00% ) ) *
50.00% ) ) *
48 =
0=
$ ‐
$ ‐
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
(
0+
0.000000 ) * ( ( 136.67 *
30.00%
) +(
$160 * (
1 ‐
30.00% ) ) *
24 =
$ ‐
(
2+
0.000000 ) * ( ( 136.67 *
50.00%
) +(
$160 * (
1 ‐
50.00% ) ) *
19 =
$ 5,958
(
0+
0.000000 ) * ( ( 136.67 *
30.00%
) +(
$160 * (
1 ‐
30.00% ) ) *
0=
$ ‐
(
0+
0.000000 ) * ( ( 136.67 *
50.00%
) +(
$160 * (
1 ‐
50.00% ) ) *
51 =
$ ‐
Small
State
(
(
0+
0+
0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *
50.00%
50.00%
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
233 =
15 =
$ ‐
$ ‐
Local
Large
(
(
0+
0+
0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *
50.00%
50.00%
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
88 =
40 =
$ ‐
$ ‐
Small
State
(
(
0+
0+
0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *
50.00%
50.00%
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
170 =
1=
$ ‐
$ ‐
Local
Large
(
(
0+
1+
0.000000 ) * ( ( 136.67 *
0.000000 ) * ( ( 136.67 *
50.00%
50.00%
) +(
) +(
$160 * (
$160 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
239 =
44 =
$ ‐
$ 6,947
Small
(
1+
0.000000 ) * ( ( 136.67 *
50.00%
) +(
$160 * (
1 ‐
50.00% ) ) *
Total
175 =
70,349
$ 27,474
$ 7,272,952
%BASEMED
COST
#PLANTS
(
LIMFULLCOST
Large
LIMEMPAL
1‐%BASEMED
LIMPPARTCOST
MEDEXAMADDERM
Variables
Table 23
Fiber, Flat and Container Glass
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
General Industry
Chromium Service Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
General Industry
Maritime
Construction
Government
SECTOR 27. Solid Waste Incineration
ALL
Government
Industrial Rehabilitation & Maintenance
Hazardous Waste Site Work
Refractory Brick Restoration
Page 151
Table 24
Initial Medical Examination with Additional Tests (§§1910.1026(k)(1)(i)(B) and (k)(3)(i)‐(k)(3)(iii);
1915.1026(i)(1)(i)(B) and (i)(3)(i)‐(i)(3)(iii); and 1926.1126(i)(1)(i)(B) and (i)(3)(i)‐(i)(3)(iii))
Employee Time and Cost for Complete Initial Medical Examination with Additional Tests
The burden hour and cost equation is for the employee time to receive additional tests after the employee is found to have abnormal initial
medical exam results. The Agency assumes that .5% of employees potentially exposed employees at or above the AL and workers with "signs
and symptoms" will be found to have abnormal exam results and will receive additional testing.
BURDEN HOURS = POTEXEMP * 5% * %PREVABN * MEDEXAMADDAL * #PLANTS
COST = Burden Hours * NONSUPWAGE
* POTEXEMP * 5% = Total number of employees potentially exposed at or above the AL and workers with "signs and symptoms" before the
implementation of engineering controls.
* %PREVABN = Percent of previously exposed employees who will be found to have abnormal exam results.
*MEDEXAMADDAL = Employee time for medical examination with additional testing
#PLANTS = Number of Plants
NONSUPEWAGE = Nonsupervisory wage rate.
Cost
Responses
4
*
1,848 =
10 *
$26.61
$268
3
Small
0.0455 *
0.50% *
4
*
3,478 =
3*
$26.61
$84
1
Large
0.0966 *
0.50% *
4
*
7,857 =
15 *
$26.20
$398
4
Small
Large
0.0000 *
0.9179 *
0.50% *
0.50% *
4
4
*
*
8,804 =
189 =
0*
3*
$26.20
$26.20
$0
$91
0
1
Small
Large
0.0483 *
2.4639 *
0.50% *
0.50% *
4
4
*
*
107 =
268 =
0*
13 *
$26.20
$26.20
$3
$346
0
3
Small
State
0.2416 *
0.0966 *
0.50% *
0.50% *
4
4
*
*
2,145 =
25 =
10 *
0*
$26.20
$26.20
$272
$1
3
0
Local
0.0000 *
0.50% *
4
*
787 =
0*
$26.20
$0
0
Large
0.0483 *
0.50% *
4
*
10,535 =
10 *
$26.20
$267
3
Small
Large
0.0000 *
0.0000 *
0.50% *
0.50% *
4
4
*
*
10,724 =
409 =
0*
0*
$26.20
$26.20
$0
$0
0
0
Small
Large
0.0483 *
0.9179 *
0.50% *
0.50% *
4
4
*
*
232 =
402 =
0*
7
$26.20
$26.20
$6
$193
0
2
Small
0.0966 *
0.50% *
4
*
3,037 =
6
$26.20
$154
1
Large
2.3097 *
0.50% *
4
*
49 =
2*
$33.07
$75
1
Small
0.0453 *
0.50% *
4
*
62 =
0*
$33.07
$2
0
NONSUPEWAGE
0.50% *
Hours
0.2729 *
#PLANTS
MEDEXAMADDAL
Large
POTEXEMP * 5%
Sector 1. Electroplating
24.17%
%PREVABN
Variables
0.0500
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
SECTOR 3. PAINTING
General Industry AEROSPACE
Page 152
NONSUPEWAGE
Cost
Responses
0.50% *
4
*
326 =
1*
$33.07
$20
0
Small
Large
0.0460 *
0.0906 *
0.50% *
0.50% *
4
4
*
*
1,436 =
100 =
1*
0*
$33.07
$33.07
$44
$6
0
0
Small
Large
0.0453 *
0.1287 *
0.50% *
0.50% *
4
4
*
*
18 =
276 =
0*
1*
$33.07
$33.07
$1
$23
0
0
Small
Large
0.0429 *
0.0953 *
0.50% *
0.50% *
4
4
*
*
476 =
671 =
0*
1*
$33.07
$33.07
$14
$42
0
0
Small
State
0.0318 *
0.3146 *
0.50% *
0.50% *
4
4
*
*
3,566 =
12 =
2*
0*
$33.07
$33.07
$75
$2
1
0
Local
0.0225 *
0.50% *
4
*
647 =
0*
$33.07
$10
0
Large
0.3351 *
0.50% *
4
*
2=
0*
$38.68
$0
0
0.0000 *
0.50% *
4
*
0=
0*
$38.68
$0
0
1.0797 *
0.50% *
4
*
2=
0*
$37.70
$1
0
0.1350 *
0.50% *
4
*
1=
0*
$37.70
$0
0
0.1182 *
0.50% *
4
*
2=
0*
$31.94
$0
0
0.0000 *
0.50% *
4
*
0=
0*
$31.94
$0
0
1.2448 *
0.50% *
4
*
5=
0*
$38.68
$5
0
0.0000 *
0.50% *
4
*
0=
0*
$38.68
$0
0
0.2394 *
0.50% *
4
*
80 =
0*
$28.81
$11
0
0.0958 *
0.50% *
4
*
126 =
0*
$28.81
$7
0
0.0000 *
0.50% *
4
*
2=
0*
$28.86
$0
0
0.0000 *
0.50% *
4
*
8=
0*
$28.86
$0
0
0.0000 *
0.50% *
4
*
81 =
0*
$31.99
$0
0
0.0000 *
0.50% *
4
*
40 =
0*
$31.99
$0
0
0.1411 *
0.50% *
4
*
6=
0*
$28.71
$0
0
0.0941 *
0.50% *
4
*
4=
0*
$28.71
$0
0
0.5903 *
0.50% *
4
*
1=
0*
$38.80
$0
0
0.0000 *
0.50% *
4
*
0=
0*
$38.80
$0
0
Hours
0.0920 *
#PLANTS
MEDEXAMADDAL
Large
POTEXEMP * 5%
%PREVABN
Variables
Table 24
AUTOBODY REPAIR
COIL COATING
Maritime
Construction
Government
SECTOR 4. Producers of Chromates
All
Small
SECTOR 5. Chromate Pigment Procedures
Large
All
Small
SECTOR 6. CCA Producers
Large
All
Small
SECTOR 7. Chromium Catalyst Producers
Large
All
Small
SECTOR 8. Paint and Coating Producers
Large
All
Small
SECTOR 9. Printing Ink Producers
Large
All
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
All
Small
SECTOR 11. Plating Mixture Producers
Large
All
Small
SECTOR 13. Chromium Metal Producers
Large
All
Small
Page 153
NONSUPEWAGE
Cost
Responses
0.50% *
4
*
34 =
1*
$38.80
$48
0
0
Small
Large
0.0639 *
0.4470 *
0.50% *
0.50% *
4
4
*
*
11 =
102 =
0*
1*
$38.80
$38.80
$1
$35
0
0
Small
0.0639 *
0.50% *
4
*
32 =
0*
$38.80
$2
0
Large
0.1277 *
0.50% *
4
*
33 =
0*
$38.80
$3
0
Small
0.0000 *
0.50% *
4
*
31 =
0*
$38.80
$0
0
Large
1.2327 *
0.50% *
4
*
163 =
4*
$28.31
$114
1
Small
0.2465 *
0.50% *
4
*
118 =
1*
$28.31
$17
0
Large
0.0000 *
0.50% *
4
*
3=
0*
$37.70
$0
0
Small
SECTOR 18. Chromium Sulfate Producers
Large
All
Small
SECTOR 19. Chemical Distributors
Large
All
Small
SECTOR 20. Textile Dyeing
Large
All
Small
SECTOR 21. Colored Glass Producers
Large
All
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. Printing
Large
All
Small
SECTOR 24. Chromium Catalyst Users
Large
All
Small
Large
Catalyst Service Companies
Small
0.0000 *
0.50% *
4
*
1=
0*
$37.70
$0
0
0.0000 *
0.50% *
4
*
0=
0*
$41.50
$0
0
0.1436 *
0.50% *
4
*
5=
0*
$41.50
$1
0
0.0000 *
0.50% *
4
*
216 =
0*
$29.92
$0
0
0.0000 *
0.50% *
4
*
1,627 =
0*
$29.92
$0
0
0.0000 *
0.50% *
4
*
343 =
0*
$19.97
$0
0
0.0000 *
0.50% *
4
*
697 =
0*
$19.97
$0
0
0.0524 *
0.50% *
4
*
6=
0*
$28.87
$0
0
0.0000 *
0.5765 *
0.50% *
0.50% *
4
4
*
*
20 =
90 =
0*
1*
$28.87
$28.87
$0
$30
0
0
0.1048 *
0.50% *
4
*
5=
0*
$28.87
$0
0
0.0000 *
0.50% *
4
*
81 =
0*
$20.85
$0
0
0.0000 *
0.50% *
4
*
325 =
0*
$20.85
$0
0
0.0549 *
0.50% *
4
*
179 =
0*
$32.51
$6
0
0.0000 *
0.5487 *
0.50% *
0.50% *
4
4
*
*
0=
23 =
0*
0*
$32.51
$32.51
$0
$8
0
0
0.2743 *
0.50% *
4
*
4=
0*
$32.51
$1
0
Hours
1.8198 *
#PLANTS
MEDEXAMADDAL
Large
POTEXEMP * 5%
%PREVABN
Variables
Table 24
SECTOR 14. Iron and Steel Mills
All
Carbon Steel
14B.
Reshaping Industry
SECTOR 15. Iron and Steel Foundries
All
SECTOR 17. Chromium Dye Producers
All
Page 154
NONSUPEWAGE
Cost
Responses
0.50% *
4
*
5=
0*
$25.64
$0
0
Small
0.0000 *
0.50% *
4
*
0=
0*
$25.64
$0
0
Large
0.0396 *
0.50% *
4
*
148 =
0*
$32.11
$4
0
Small
Large
0.0000 *
0.0000 *
0.50% *
0.50% *
4
4
*
*
79 =
36 =
0*
0*
$32.11
$32.11
$0
$0
0
0
Small
0.0000 *
0.50% *
4
*
32 =
0*
$32.11
$0
0
Large
0.1170 *
0.50% *
4
*
1,162 =
3*
$32.11
$87
1
Small
Local
0.0390 *
0.0225 *
0.50% *
0.50% *
4
4
*
*
4,650 =
12 =
4*
0*
$32.11
$32.11
$117
$0
1
0
State
0.0225 *
0.50% *
4
*
42 =
0*
$32.11
$1
0
Large
0.0000 *
0.50% *
4
*
40 =
0*
$32.11
$0
0
Small
Local
0.0000 *
0.50% *
4
*
48 =
0*
$32.11
$0
0
0.0438 *
0.50% *
4
*
0=
0*
$27.23
$0
0
State
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
0.0000 *
0.50% *
4
*
24 =
0*
$27.23
$0
0
0.1056 *
0.50% *
4
*
19 =
0*
$27.93
$0
0
0.0000 *
0.50% *
4
*
0=
0*
$27.93
$0
0
0.0000 *
0.50% *
4
*
51 =
0*
$32.13
$0
0
Small
State Gov't
0.0000 *
0.0000 *
0.50% *
0.50% *
4
4
*
*
233 =
15 =
0*
0*
$32.13
$32.13
$0
$0
0
0
Local Gov't
Large
0.0000 *
0.0000 *
0.50% *
0.50% *
4
4
*
*
88 =
40 =
0*
0*
$32.13
$32.13
$0
$0
0
0
Small
State Gov't
0.0000 *
0.0000 *
0.50% *
0.50% *
4
4
*
*
170 =
1=
0*
0*
$32.13
$32.13
$0
$0
0
0
Local Gov't
Large
0.0000 *
0.5279 *
0.50% *
0.50% *
4
4
*
*
239 =
44 =
0*
0*
$32.13
$32.13
$0
$15
0
0
Small
0.0528 *
0.50% *
Total
4
*
175 =
70,349
0*
105
$32.13
$6
$2,915
0
26
Hours
0.0000 *
#PLANTS
MEDEXAMADDAL
Large
POTEXEMP * 5%
%PREVABN
Variables
Table 24
SECTOR 25. Refractory Brick Producers
All
SECTOR 26. Woodworking
General Industry
Maritime
Construction
Government
SECTOR 27. Solid Waste Incineration
ALL
Government
Industrial Rehabilitation &
Maintenance
Hazardous Waste Site Work
Refractory Brick Restoration &
Maintenance
Page 155
Table 25
Initial Medical Examination with Additional Tests (§§1910.1026(k)(1)(i)(B) and (k)(3)(i)‐(k)(3)(iii);
1915.1026(i)(1)(i)(B) and (i)(3)(i)‐(i)(3)(iii); and 1926.1126(i)(1)(i)(B) and (i)(3)(i)‐(i)(3)(iii))
Contract Cost for a PLHCP to Conduct the Initial Medical Examination with Additional Tests
This table calculates the cost for a contractor PLHCP to conduct additional medical testing for those employees who have abnormal annual
medical examination results.
0.2729
*
0.50% *
$273.33
*
1,848 = $689
Small
0.0455
*
0.50% *
$273.33
*
3,478 = $216
Large
0.0966
*
0.50% *
$273.33
*
7,857 = $1,038
Small
Large
0.0000
0.9179
*
*
0.50% *
0.50% *
$273.33
$273.33
*
*
8,804 = $0
189 = $238
Small
Large
0.0483
2.4639
*
*
0.50% *
0.50% *
$273.33
$273.33
*
*
107 = $7
268 = $901
Small
State
0.2416
0.0966
*
0.50% *
0.50% *
$273.33
*
2,145 = $708
*
$273.33
*
25 = $3
Local
0.0000
*
0.50% *
$273.33
*
787 = $0
Large
0.0483
*
0.50% *
$273.33
*
10,535 = $696
Small
Large
0.0000
0.0000
*
*
0.50% *
0.50% *
$273.33
$273.33
*
*
10,724 = $0
409 = $0
Small
Large
0.0483
0.9179
*
*
0.50% *
0.50% *
$273.33
$273.33
*
*
232 = $15
402 = $504
Small
0.0966
*
0.50% *
$273.33
*
3,037 = $401
Large
2.3097
*
0.50% *
$273.33
*
49 = $154
Small
Large
0.0453
0.0920
*
0.50% *
0.50% *
$273.33
*
62 = $4
$273.33
*
326 = $41
Small
Large
0.0460
0.0906
*
0.50% *
0.50% *
$273.33
*
1,436 = $90
*
$273.33
*
100 = $12
Small
0.0453
*
0.50% *
$273.33
*
18 = $1
Cost
MEDCOSTADD
Large
#PLANTS
%PREVABN
POTEXEMP * 5%
* POTEXEMP * 5% = Total number of new potentially exposed employees at or above the AL and workers with "signs and symptoms" before
the implementation of engineering controls.
* %PREVABN = Percent of previously exposed employees who will be found to have abnormal exam results.
*MEDCOSTADD = Cost for medical examination with additional testing
#PLANTS = Number of Plants
Sector 1. Electroplating
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
SECTOR 3. PAINTING
General Industry AEROSPACE
*
General Industry AUTOBODY
COIL COATING
Page 156
0.1287
*
0.50% *
$273.33
*
276 = $48
Small
Large
0.0429
0.0953
*
*
0.50% *
0.50% *
$273.33
$273.33
*
*
476 = $28
671 = $87
Small
0.0318
*
0.50% *
$273.33
*
3,566 = $155
State
0.3146
*
0.50% *
$273.33
*
12 = $5
Local
0.0225
*
0.50% *
$273.33
*
647 = $20
Large
0.3351
*
0.50% *
$273.33
*
2 = $1
Small
0.0000
*
0.50% *
$273.33
*
0 = $0
Large
1.0797
*
0.50% *
$273.33
*
2 = $3
Small
0.1350
*
0.50% *
$273.33
*
1 = $0
Large
0.1182
*
0.50% *
$273.33
*
2 = $0
Small
0.0000
*
0.50% *
$273.33
*
0 = $0
Large
1.2448
*
0.50% *
$273.33
*
5 = $8
Small
0.0000
*
0.50% *
$273.33
*
0 = $0
Large
0.2394
*
0.50% *
$273.33
*
80 = $26
Small
0.0958
*
0.50% *
$273.33
*
126 = $17
Large
0.0000
*
0.50% *
$273.33
*
2 = $0
Small
0.0000
*
0.50% *
$273.33
*
8 = $0
Large
0.0000
*
0.50% *
$273.33
*
81 = $0
Small
0.0000
*
0.50% *
$273.33
*
40 = $0
Large
0.1411
*
0.50% *
$273.33
*
6 = $1
Small
0.0941
*
0.50% *
$273.33
*
4 = $0
Large
0.5903
*
0.50% *
$273.33
*
1 = $1
Small
0.0000
*
0.50% *
$273.33
*
0 = $0
Large
1.8198
*
0.50% *
$273.33
*
34 = $84
Small
0.0639
*
0.50% *
$273.33
*
11 = $1
Cost
MEDCOSTADD
Large
#PLANTS
%PREVABN
POTEXEMP * 5%
Table 25
Maritime
Construction
Governments
SECTOR 4. Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
SECTOR 10. Plastic Colorant Producers and Users
ALL
SECTOR 11. Plating Mixture Producers
ALL
SECTOR 13. Chromium Metal Producers
ALL
SECTOR 14. Iron and Steel Mills
ALL
Page 157
0.4470
*
0.50% *
$273.33
*
102 = $62
Small
0.0639
*
0.50% *
$273.33
*
32 = $3
Large
0.1277
*
0.50% *
$273.33
*
33 = $6
Small
0.0000
*
0.50% *
$273.33
*
31 = $0
Large
1.2327
*
0.50% *
$273.33
*
163 = $274
Small
0.2465
*
0.50% *
$273.33
*
118 = $40
Large
0.0000
*
0.50% *
$273.33
*
3 = $0
Small
0.0000
*
0.50% *
$273.33
*
1 = $0
Large
0.0000
*
0.50% *
$273.33
*
0 = $0
Small
0.1436
*
0.50% *
$273.33
*
5 = $1
Large
0.0000
*
0.50% *
$273.33
*
216 = $0
Small
0.0000
*
0.50% *
$273.33
*
1,627 = $0
Large
0.0000
*
0.50% *
$273.33
*
343 = $0
Small
0.0000
*
0.50% *
$273.33
*
697 = $0
Large
0.0524
*
0.50% *
$273.33
*
6 = $0
Small
Large
0.0000
0.5765
*
*
0.50% *
0.50% *
$273.33
$273.33
*
*
20 = $0
90 = $71
Small
0.1048
*
0.50% *
$273.33
*
5 = $1
Large
0.0000
*
0.50% *
$273.33
*
81 = $0
Small
0.0000
*
0.50% *
$273.33
*
325 = $0
Large
0.0549
*
0.50% *
$273.33
*
179 = $13
Small
Large
0.0000
0.5487
*
*
0.50% *
0.50% *
$273.33
$273.33
*
*
0 = $0
23 = $17
Small
0.2743
*
0.50% *
$273.33
*
4 = $2
Large
0.0000
*
0.50% *
$273.33
*
5 = $0
Small
0.0000
*
0.50% *
$273.33
*
0 = $0
Cost
MEDCOSTADD
Large
#PLANTS
%PREVABN
POTEXEMP * 5%
Table 25
Carbon Steel
SECTOR 14B. Forging Industry
ALL
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
SECTOR 18. Chromium Sulfate Producers
ALL
SECTOR 19. Chemical Distributors
ALL
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
ALL
Fiber, Flat, Container Glass
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
ALL
Chromium Catalyst Companies
SECTOR 25. Refractory Brick Producers
ALL
Page 158
0.0396
*
0.50% *
$273.33
*
148 = $8
Small
Large
0.0000
0.0000
*
*
0.50% *
0.50% *
$273.33
$273.33
*
*
79 = $0
36 = $0
Small
Large
0.0000
0.1170
*
0.50% *
0.50% *
$273.33
*
32 = $0
$273.33
*
1,162 = $186
Small
State
0.0390
0.0225
*
0.50% *
0.50% *
$273.33
*
4,650 = $248
*
$273.33
*
12 = $0
Local
0.0225
*
0.50% *
$273.33
*
42 = $1
Large
0.0000
*
0.50% *
$273.33
*
40 = $0
Small
State
0.0000
0.0438
*
*
0.50% *
0.50% *
$273.33
$273.33
*
*
48 = $0
0 = $0
Local
0.0000
*
0.50% *
$273.33
*
24 = $0
Large
0.1056
*
0.50% *
$273.33
*
19 = $3
Small
0.0000
*
0.50% *
$273.33
*
0 = $0
Large
0.0000
*
0.50% *
$273.33
*
51 = $0
Small
State Gov't
0.0000
0.0000
*
0.50% *
0.50% *
$273.33
*
233 = $0
*
$273.33
*
15 = $0
Local Gov't
Large
0.0000
0.0000
*
*
0.50% *
0.50% *
$273.33
$273.33
*
*
88 = $0
40 = $0
Small
State Gov't
0.0000
0.0000
*
0.50% *
0.50% *
$273.33
*
170 = $0
$273.33
*
1 = $0
Local Gov't
Large
0.0000
0.5279
*
0.50% *
0.50% *
$273.33
*
239 = $0
*
$273.33
*
Small
0.0528
*
0.50% *
$273.33
*
Cost
MEDCOSTADD
Large
#PLANTS
%PREVABN
POTEXEMP * 5%
Table 25
SECTOR 26. Woodworking
General Industry
Maritime
*
Construction
Government
SECTOR 27. Solid Waste Incineration
ALL
Government
SECTOR 30. Superalloy Producers and Users
ALL
SECTOR 31. Construction
Industrial Rehabilitation & Maintenance
Hazardous Waste Site Work
*
44 = $32
Refractory Brick Restoration & Maintenance
Total
Page 159
175 = $13
70,349
$7,186
Table 26
Annual Medical Examination with Additional Tests (1910.1026(k)(2)(ii) and (k)(3)(i)‐(k)(3)(iii) and (i)(3)(i)‐(i)(3)(iii); and
1926.1126(i)(2)(ii) and (i)(3)(i)‐(i)(3)(iii))
Employee Time and Cost to Complete the Annual Medical Examination with Additional Tests
This table calculates the burden hours and costs for the time it takes an employee to receive additional tests after the employee is found to
have abnormal annual medical exam test results.
Hours = (LIMEMPAL + MEDEXAMADDERM) * %ALABN * ADDMEDTIME * #PLANTS
Cost =Hours *NONSUPWAGE
RESPONSES
Cost
NONSUPEWAGE
Hours
#PLANTS
ADDMEDTIME
%ALABN
MEDEXAMADDERM
LIMEMPAL
Variables
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the
implementation of engineering controls.
*%ALABN = Percent of employees exposed at or above the action level 30 days per year (and therefore requiring a limited or comprehensive
medical exam who will be found to have abnormal results)
*ADDMEDTIME = Three hours for an employee to receive additional testing after exam tests are abnormal.
*NONSUPEWAGE ‐ Non‐supervisory wage rate
* #PLANTS = Number of Plants
24.17%
Sector 1. Electroplating
Large
( 3 +
0.00000 ) *
0.50% * 3 *
1,848 =
76 * $26.61
$2,013
25
Small
( 0 +
0.00000 ) *
0.50% * 3 *
3,478 =
0 * $21.43
$0
0
Large
( 0 +
0.00000 ) *
0.50% * 3 *
7,857 =
0 * $26.20
$0
0
Small
Large
( 0 +
( 14 +
0.00000 ) *
2.89868 ) *
0.50% * 3 *
0.50% * 3 *
8,804 =
189 =
0 * $21.43
47 * $26.20
$0
$1,222
0
16
Small
Large
( 1 +
( 26 +
0.00000 ) *
2.89868 ) *
0.50% * 3 *
0.50% * 3 *
107 =
268 =
2 * $22.43
116 * $26.20
$35
$3,049
1
39
Small
Local
( 3 +
( 0 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
2,145 =
25 =
93 * $23.43
0 * $26.20
$2,185
$0
31
0
State
( 0 +
0.00000 ) *
0.50% * 3 *
787 =
0 * $24.43
$0
0
Large
( 0 +
0.00000 ) *
0.50% * 3 *
10,535 =
0 * $26.20
$0
0
Small
Large
( 0 +
( 0 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
10,724 =
409 =
0 * $24.43
0 * $26.20
$0
$0
0
0
Small
Large
( 0 +
( 10 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
232 =
402 =
0 * $25.43
58 * $26.20
$0
$1,526
0
19
*
3,037 =
44 * $26.43
$1,163
15
*
49 =
33 * $33.07
$1,099
11
*
*
62 =
326 =
0 * $26.43
4 * $33.07
$0
$146
0
1
*
*
1,436 =
100 =
0 * $27.43
3 * $33.07
$0
$90
0
1
*
18 =
0 * $28.43
$7
0
ALL
Sector 2. Welding
General Industry
Maritime
Construction
GOVERNMENT
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
Small ( 1 + 0.00000 ) * 0.50% * 3
SECTOR 3. PAINTING GENERAL INDUSTRY
Large ( 45 + 0.00000 ) * 0.50% * 3
AEROSPACE
Small ( 0 + 0.00000 ) * 0.50% * 3
Large ( 1 + 0.00000 ) * 0.50% * 3
Autobody
Small ( 0 + 0.00000 ) * 0.50% * 3
Large ( 2 + 0.00000 ) * 0.50% * 3
Coil Coating
Small ( 1 + 0.00000 ) * 0.50% * 3
Table 26
Large
( 2 +
0.00000 ) *
0.50% * 3 *
276 =
7 * $33.07
$235
2
Small
Large
( 1 +
( 2 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
476 =
671 =
6 * $29.43
19 * $33.07
$180
$634
2
6
Small
Local
( 0 +
( 0 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
3,566 =
12 =
0 * $30.43
0 * $33.07
$0
$0
0
0
State
( 6 +
0.00000 ) *
0.50% * 3 *
647 =
61 * $31.43
$1,918
20
Large
( 7 +
0.00000 ) *
0.50% * 3 *
2=
0 * $38.68
$7
0
Small
SECTOR 5. Chromate Pigment Procedures
ALL
Large
( 0 +
0.00000 ) *
0.50% * 3 *
0=
0 * $31.43
$0
0
( 8 +
0.00000 ) *
0.50% * 3 *
2=
0 * $37.70
$8
0
Small
( 1 +
0.00000 ) *
0.50% * 3 *
1=
0 * $31.43
$0
0
Large
( 2 +
0.00000 ) *
0.50% * 3 *
2=
0 * $31.94
$2
0
+
0.00000 ) *
0.50% * 3 *
0=
0 * $31.43
$0
0
+
0.00000 ) *
0.50% * 3 *
5=
1 * $38.68
$32
0
+
0.00000 ) *
0.50% * 3 *
0=
0 * $31.43
$0
0
+
0.00348 ) *
0.50% * 3 *
80 =
1 * $28.81
$33
0
+
0.00000 ) *
0.50% * 3 *
126 =
0 * $31.43
$0
0
+
0.00000 ) *
0.50% * 3 *
2=
0 * $28.86
$0
0
+
0.00000 ) *
0.50% * 3 *
8=
0 * $31.43
$0
0
+
0.00000 ) *
0.50% * 3 *
81 =
0 * $31.99
$0
0
+
0.00000 ) *
0.50% * 3 *
40 =
0 * $31.43
$0
0
+
0.00000 ) *
0.50% * 3 *
6=
0 * $28.71
$7
0
+
0.00000 ) *
0.50% * 3 *
4=
0 * $31.43
$2
0
+
0.00000 ) *
0.50% * 3 *
1=
0 * $38.80
$4
0
+
0.00000 ) *
0.50% * 3 *
0=
0 * $31.43
$0
0
+
0.00590 ) *
0.50% * 3 *
34 =
14 * $38.80
$528
5
+
+
0.00028 ) *
0.00014 ) *
0.50% * 3 *
0.50% * 3 *
11 =
102 =
0 * $31.43
1 * $38.80
$7
$38
0
0
+
0.00028 ) *
0.50% * 3 *
32 =
1 * $31.43
$19
0
+
0.00056 ) *
0.50% * 3 *
33 =
0 * $38.80
$0
0
+
0.00014 ) *
0.50% * 3 *
31 =
0 * $31.43
$0
0
+
0.00000 ) *
0.50% * 3 *
163 =
42 * $28.31
$1,192
14
+
0.00000 ) *
0.50% * 3 *
118 =
7 * $31.43
$229
2
+
0.00000 ) *
0.50% * 3 *
3=
0 * $37.70
$0
0
+
0.00000 ) *
0.50% * 3 *
1=
0 * $31.43
$0
0
Maritime
Construction
Government
SECTOR 4. Producers of Chromates
ALL
SECTOR 6. CCA Producers
ALL
Small ( 0
SECTOR 7. Chromium Catalyst Producers
Large ( 11
ALL
Small ( 0
SECTOR 8. Paint and Coating Producers
Large ( 1
ALL
Small ( 0
SECTOR 9. Printing Ink Producers
Large ( 0
ALL
Small ( 0
SECTOR 10. Plastic Colorant Producers and Users
Large ( 0
ALL
Small ( 0
SECTOR 11. Plating Mixture Producers
Large ( 3
ALL
Small ( 1
SECTOR 13. Chromium Metal Producers
Large ( 7
ALL
Small ( 0
SECTOR 14. Iron and Steel Mills
Large ( 27
Alloy Stainless Steel
Small ( 1
Large ( 1
Carbon Steel
Small ( 1
14B. Alloy Stainless Steel Forging Industry
Large ( 0
Reshaping
Small ( 0
SECTOR 15. Iron and Steel Foundries
Large ( 17
ALL
Small ( 4
SECTOR 17. Chromium Dye Producers
Large ( 0
ALL
Small ( 0
Table 26
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
ALL
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
Catalyst Users
Small
Large
Chromium Catalyst Service
Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27. Solid Waste Incineration
Large
ALL
Small
State
Government
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
Industrial Rehabilitation &
Maintenance
( 0 +
0.00000 ) *
0.50% * 3 *
0=
0 * $41.50
$0
0
( 1 +
0.00000 ) *
0.50% * 3 *
5=
0 * $31.43
$2
0
( 0 +
0.00000 ) *
0.50% * 3 *
216 =
0 * $29.92
$0
0
( 0 +
0.00000 ) *
0.50% * 3 *
1,627 =
0 * $31.43
$0
0
( 0 +
0.00000 ) *
0.50% * 3 *
343 =
0 * $19.97
$0
0
( 0 +
0.00000 ) *
0.50% * 3 *
697 =
0 * $31.43
$0
0
( 1 +
0.00000 ) *
0.50% * 3 *
6=
0 * $28.87
$3
0
( 0 +
( 9 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
20 =
90 =
0 * $31.43
13 * $28.87
$0
$368
0
4
( 2 +
0.00000 ) *
0.50% * 3 *
5=
0 * $31.43
$5
0
( 0 +
0.00000 ) *
0.50% * 3 *
81 =
0 * $20.85
$0
0
( 0 +
0.00000 ) *
0.50% * 3 *
325 =
0 * $31.43
$0
0
( 0 +
0.00000 ) *
0.50% * 3 *
179 =
0 * $32.51
$0
0
( 0 +
( 5 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
0=
23 =
0 * $31.43
2 * $32.51
$0
$62
0
1
( 3 +
0.00000 ) *
0.50% * 3 *
4=
0 * $31.43
$7
0
( 0 +
0.00000 ) *
0.50% * 3 *
5=
0 * $25.64
$0
0
( 0 +
0.00000 ) *
0.50% * 3 *
0=
0 * $31.43
$0
0
( 0 +
0.00000 ) *
0.50% * 3 *
148 =
0 * $32.11
$0
0
( 0 +
( 0 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
79 =
36 =
0 * $31.43
0 * $32.11
$0
$0
0
0
( 0 +
( 1 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
32 =
1,162 =
0 * $31.43
14 * $32.11
$0
$437
0
5
( 1 +
( 0 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
4,650 =
12 =
54 * $31.43
0 * $32.11
$1,711
$3
18
0
( 0 +
0.00000 ) *
0.50% * 3 *
42 =
0 * $31.43
$9
0
( 0 +
0.00000 ) *
0.50% * 3 *
40 =
0 * $27.23
$0
0
( 0 +
( 0 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
48 =
0=
0 * $31.43
0 * $27.23
$0
$0
0
0
( 0 +
0.00000 ) *
0.50% * 3 *
24 =
0 * $32.43
$0
0
( 4 +
0.00000 ) *
0.50% * 3 *
19 =
1 * $27.93
$34
0
( 0 +
0.00000 ) *
0.50% * 3 *
0=
0 * $32.43
$0
0
( 0 +
0.00000 ) *
0.50% * 3 *
51 =
0 * $32.13
$0
0
Small ( 0 +
State Go( 0 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
233 =
15 =
0 * $32.43
0 * $32.13
$0
$0
0
0
Local Go( 0 +
0.00000 ) *
0.50% * 3 *
88 =
0 * $33.43
$0
0
Table 26
Large
Hazardous Waste Site Work
( 0 +
0.00000 ) *
0.50% * 3 *
40 =
0 * $32.13
$0
0
Small ( 0 +
State Go( 0 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
170 =
1=
0 * $34.43
0 * $32.13
$0
$0
0
0
Local Go( 0 +
Large ( 1 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
239 =
44 =
0 * $35.43
1 * $32.13
$0
$23
0
0
( 1 +
0.00000 ) *
0.50% * 3 *
175 =
70,349
3 * $36.43
$101
$20,375
1
242
Refractory Brick Restoration
Small
TOTALS
726
Table 27
Annual Medical Examination with Additional Tests (§§ 1910.1026(k)(2)(ii) and (k)(3)(i)‐(k)(3)(iii);
1915.1026(i)(2)(ii) and (i)(3)(i)‐(i)(3)(iii); and 1926.1126(i)(2)(ii) and (i)(3)(i)‐(i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Annual Medical Examination with Additional Tests
This table calculates the cost for a contractor PLHCP to conduct additional medical testing for those employees who have abnormal annual medical examination
results. Abnormal results will require additional medical testing "as deemed appropriate by the physician."
COST = (LIMEMPAL + MEDEXAMADDERM) * %ALABN * MEDCOSTADD* #PLANTS
Cost
#PLANTS
MEDCOSTADD
%ALABN
MEDEXAMADDERM
Variables
LIMEMPAL
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the implementation
of engineering controls.
*%ALABN = Percent of employees exposed at or above the action level 30 days per year (and therefore requiring a limited or comprehensive
medical exam who will be found to have abnormal results
#PLANTS = Number of Plants
Sector 1. Electroplating
Large
(
3 + 0.000000 ) *
0.50% ) * $273.33 *
1,848 =
$6,894
Small
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
3,478 =
$0
Large
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
7,857 =
$0
Small
Large
(
(
0 + 0.000000 ) *
14 + 0.000000 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
8,804 =
189 =
$0
$3,501
Small
Large
(
(
1 + 0.000000 ) *
26 + 2.898677 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
107 =
268 =
$142
$10,603
Small
State
(
(
3 + 0.000000 ) *
0 + 0.000000 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
2,145 =
25 =
$8,498
$0
Local
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
787 =
$0
Large
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
10,535 =
$0
Small
Large
(
(
0 + 0.000000 ) *
0 + 0.000000 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
10,724 =
409 =
$0
$0
Small
Large
(
(
0 + 0.000000 ) *
10 + 0.000000 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
232 =
402 =
$0
$5,308
Small
(
1 + 0.000000 ) *
0.50% ) * $273.33 *
3,037 =
$4,010
Large
(
45 + 0.000000 ) *
0.50% ) * $273.33 *
49 =
$3,027
Small
Large
(
(
0 + 0.000000 ) *
1 + 0.000000 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
62 =
326 =
$0
$404
Small
Large
(
(
0 + 0.000000 ) *
2 + 0.000000 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
1,436 =
100 =
$0
$247
Small
Large
(
(
1 + 0.000000 ) *
2 + 0.000000 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
18 =
276 =
$22
$646
Small
Large
(
(
1 + 0.000000 ) *
2 + 0.000000 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
476 =
671 =
$559
$1,747
Small
State
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
3,566 =
$0
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
12 =
$0
Local
(
6 + 0.000000 ) *
0.50% ) * $273.33 *
647 =
$5,560
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
SECTOR 3. PAINTING
General Industry AEROSPACE
General Industry AUTOBODY
COIL COATING
Maritime
Construction
Governments
Page 164
Cost
#PLANTS
MEDCOSTADD
%ALABN
MEDEXAMADDERM
Variables
LIMEMPAL
Table 27
SECTOR 4. Producers of Chromates
Large
(
7 + 0.000000 ) *
0.50% ) * $273.33 *
2=
$18
Small
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
0=
$0
Large
(
8 + 0.000000 ) *
0.50% ) * $273.33 *
2=
$20
Small
(
1 + 0.000000 ) *
0.50% ) * $273.33 *
1=
$1
Large
(
2 + 0.000000 ) *
0.50% ) * $273.33 *
2=
$5
Small
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
0=
$0
Large
(
11 + 0.000000 ) *
0.50% ) * $273.33 *
5=
$75
Small
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
0=
$0
Large
(
1 + 0.003476 ) *
0.50% ) * $273.33 *
80 =
$106
Small
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
126 =
$0
Large
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
2=
$0
Small
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
8=
$0
Large
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
81 =
$0
Small
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
40 =
$0
Large
(
3 + 0.000000 ) *
0.50% ) * $273.33 *
6=
$22
Small
(
1 + 0.000000 ) *
0.50% ) * $273.33 *
4=
$5
Large
(
7 + 0.000000 ) *
0.50% ) * $273.33 *
1=
$9
Small
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
0=
$0
Large
(
27 + 0.005900 ) *
0.50% ) * $273.33 *
34 =
$1,241
Small
Large
(
(
1 + 0.000281 ) *
1 + 0.000140 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
11 =
102 =
$19
$89
Small
(
1 + 0.000281 ) *
0.50% ) * $273.33 *
32 =
$56
Large
(
0 + 0.000562 ) *
0.50% ) * $273.33 *
33 =
$0
Small
(
0 + 0.000140 ) *
0.50% ) * $273.33 *
31 =
$0
Large
(
17 + 0.000000 ) *
0.50% ) * $273.33 *
163 =
$3,838
Small
(
4 + 0.000000 ) *
0.50% ) * $273.33 *
118 =
$665
Large
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
3=
$0
Small
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
1=
$0
Large
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
0=
$0
Small
(
1 + 0.000000 ) *
0.50% ) * $273.33 *
5=
$6
Large
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
216 =
$0
Small
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
1,627 =
$0
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
SECTOR 10. Plastic Colorant Producers and Users
ALL
SECTOR 11. Plating Mixture Producers
ALL
SECTOR 13. Chromium Metal Producers
ALL
SECTOR 14. Iron and Steel Mills
ALL
Carbon Steel
SECTOR 14B. Forging Industry
ALL
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
SECTOR 18. Chromium Sulfate Producers
ALL
SECTOR 19. Chemical Distributors
ALL
Page 165
Cost
Large
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
343 =
$0
Small
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
697 =
$0
Large
(
1 + 0.000000 ) *
0.50% ) * $273.33 *
6=
$9
Small
Large
(
(
0 + 0.000000 ) *
9 + 0.000000 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
20 =
90 =
$0
$1,162
Small
(
2 + 0.000000 ) *
0.50% ) * $273.33 *
5=
$15
Large
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
81 =
$0
Small
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
325 =
$0
Large
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
179 =
$0
Small
Large
(
(
0 + 0.000000 ) *
5 + 0.000000 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
0=
23 =
$0
$173
Small
(
3 + 0.000000 ) *
0.50% ) * $273.33 *
4=
$20
Large
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
5=
$0
Small
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
0=
$0
Large
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
148 =
$0
Small
Large
(
(
0 + 0.000000 ) *
0 + 0.000000 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
79 =
36 =
$0
$0
Small
Large
(
(
0 + 0.000000 ) *
1 + 0.000000 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
32 =
1,162 =
$0
$1,239
Small
State
(
(
1 + 0.000000 ) *
0 + 0.000000 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
4,650 =
12 =
$4,959
$7
Local
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
42 =
$26
Large
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
40 =
$0
Small
State
(
(
0 + 0.000000 ) *
1 + 0.724138 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
48 =
0=
$0
$0
Local
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
24 =
$0
Large
(
2 + 2.111590 ) *
0.50% ) * $273.33 *
19 =
$110
Small
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
0=
$0
Large
(
0 + 0.000000 ) *
0.50% ) * $273.33 *
51 =
$0
(
Small
State Gov't (
0 + 0.000000 ) *
0 + 0.000000 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
233 =
15 =
$0
$0
Local Gov't (
Large
(
0 + 0.000000 ) *
0 + 0.000000 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
88 =
40 =
$0
$0
)
Small
State Gov't (
0 + 0.000000 ) *
0 + 0.000000 ) *
0.50% ) * $273.33 *
0.50% ) * $273.33 *
170 =
1=
$0
$0
Local Gov't (
0 + 0.000000 ) *
0.50% ) * $273.33 *
239 =
$0
%ALABN
#PLANTS
MEDCOSTADD
MEDEXAMADDERM
Variables
LIMEMPAL
Table 27
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
ALL
Fiber, Flat, Container Glass
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
ALL
Chromium Catalyst Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
General Industry
Maritime
Construction
Government
SECTOR 27. Solid Waste Incineration
ALL
Government
SECTOR 30. Superalloy Producers and Users
ALL
SECTOR 31. Construction
Industrial Rehabilitation & Maintenance
Hazardous Waste Site Work
Page 166
Cost
#PLANTS
MEDCOSTADD
%ALABN
MEDEXAMADDERM
Variables
LIMEMPAL
Table 27
Large
(
1 + 0.000000 ) *
0.50% ) * $273.33 *
44 =
$64
Small
(
1 + 0.000000 ) *
0.50% ) * $273.33 *
175 =
70,349
$0
$65,123
Refractory Brick Restoration & Maintenance
Total
Page 167
Table 28
Medical Examination After Initial Assignment (§§1910.1026(k)(2)(i), (k)(3)(i), and (k)(3)(ii);1915.1026(i)(2)(i), (i)(3)(i),
and (i)(3)(ii); and 1926.1126(i)(2)(i), (i)(3)(i), and (i)(3)(ii))
Employee Time and Cost to Complete the Medical Examination After Initial Assignment
This table calculates the burden hours and cost for those employees who are newly assigned to operations that involve exposure at or above the action level to receive medical
examinations. It is estimated that the employee will be provided a comprehensive medical examination.
Hours = (LIMEMPAL + MEDEXAMADDERM)*TURNOVER*COMPFULLTIME * (1‐%BASEMED) * #PLANTS
Cost =Hours *NONSUPWAGE
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the implementation of engineering controls.
RESPONSES
Cost
NONSUPEWAGE
Hours
#PLANTS
1‐%BASEMED
COMPFULLTIME
24.17%
TURNOVER
MEDEXAMADDERM
LIMEMPAL
Variables
*COMPFULLTIME = Four hours for an employee to receive a comprehensive medical examination
*NONSUPEWAGE ‐ Non‐supervisory wage rate
(1‐%BASEMED) = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants
Sector 1. Electroplating
Large
(
3
+
0.00000 ) * 23.30% *
4
* (
1
‐ 100.00% ) *
1,848 =
0 * $26.61
$0
Small
(
0
+
0.00000 ) * 23.30% *
4
* (
1
‐ 100.00%
*
3,478 =
0 * $26.61
$0
Large
(
0
+
0.00000 ) * 24.26% *
4
* (
1
‐
5.00%
*
7,857 =
0 * $26.20
$0
0
Small
Large
(
(
0
14
+
+
0.00000 ) * 24.26% *
2.89868 ) * 24.26% *
4
4
* (
* (
1
1
‐
‐
0.00%
5.00%
*
*
8,804 =
189 =
0 * $26.20
2,868 * $26.20
$0
$75,135
0
717
Small
Large
(
(
1
26
+
+
0.00000 ) * 24.26% *
2.89868 ) * 24.26% *
4
4
* (
* (
1
1
‐
‐
0.00%
5.00%
*
*
107 =
268 =
101 * $26.20
7,152 * $26.20
$2,635
$187,386
25
1,788
Small
Local
(
(
3
0
+
+
0.00000 ) * 24.26% *
0.00000 ) * 24.26% *
4
4
* (
* (
1
1
‐
‐
0.00%
5.00%
*
*
2,145 =
25 =
6,034 * $26.20
0 * $26.20
$158,084
$0
1,508
0
State
(
0
+
0.00000 ) * 24.26% *
4
* (
1
‐
0.00%
*
787 =
0 * $26.20
$0
0
Large
(
0
+
0.00000 ) * 24.26% *
4
* (
1
‐
5.00%
*
10,535 =
0 * $26.20
$0
0
Small
Large
(
(
0
0
+
+
0.00000 ) * 24.26% *
0.00000 ) * 24.26% *
4
4
* (
* (
1
1
‐
‐
0.00%
5.00%
*
*
10,724 =
409 =
0 * $26.20
0 * $26.20
$0
$0
0
0
Small
Large
(
(
0
10
+
+
0.00000 ) * 24.26% *
0.00000 ) * 24.26% *
4
4
* (
* (
1
1
‐
‐
0.00%
5.00%
*
*
232 =
402 =
0 * $26.20
3,580 * $26.20
$0
$93,806
0
942
Small
(
1
+
0.00000 ) * 24.26% *
4
* (
1
‐
0.00%
*
3,037 =
2,847 * $26.20
$74,603
712
Large
(
45
+
0.00000 ) * 24.26% *
4
* (
1
‐ 80.00%
*
49 =
430 * $33.07
$14,216
107
Small
Large
(
(
0
1
+
+
0.00000 ) * 24.26% *
0.00000 ) * 24.26% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 80.00%
*
*
62 =
326 =
0 * $33.07
57 * $33.07
$0
$1,895
0
14
Small
Large
(
(
0
2
+
+
0.00000 ) * 24.26% *
0.00000 ) * 24.26% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 80.00%
*
*
1,436 =
100 =
0 * $33.07
35 * $33.07
$0
$1,158
0
9
Small
Large
(
(
1
2
+
+
0.00000 ) * 24.26% *
0.00000 ) * 24.26% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 100.00%
*
*
18 =
276 =
8 * $33.07
0 * $33.07
$263
$0
2
0
Small
Large
(
(
1
2
+
+
0.00000 ) * 24.26% *
0.00000 ) * 24.26% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 100.00%
*
*
476 =
671 =
198 * $33.07
0 * $33.07
$6,559
$0
50
0
Small
Local
(
(
0
0
+
+
0.00000 ) * 24.26% *
0.00000 ) * 24.26% *
4
4
* (
* (
1
1
‐ 100.00%
‐ 100.00%
*
*
3,566 =
12 =
0 * $33.07
0 * $33.07
$0
$0
0
0
State
(
6
+
0.00000 ) * 24.26% *
4
* (
1
‐ 100.00%
*
647 =
0 * $33.07
$0
0
Large
(
7
+
0.00000 ) * 25.97% *
4
* (
1
‐ 50.00%
*
2=
7 * $38.68
$258
2
Small
(
0
+
0.00000 ) * 25.97% *
4
* (
1
‐
*
0=
0 * $38.68
$0
0
0
ALL
Sector 2. Welding
General Industry
Maritime
Construction
GOVERNMENT
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
SECTOR 3. PAINTING
AEROSPACE
Autobody
Coil Coating
Maritime
Construction
Government
SECTOR 4. Producers of Chromates
ALL
Page 168
0.00%
RESPONSES
Cost
NONSUPEWAGE
Hours
#PLANTS
1‐%BASEMED
COMPFULLTIME
TURNOVER
MEDEXAMADDERM
LIMEMPAL
Variables
Table 28
SECTOR 5. Chromate Pigment Procedures
Large
ALL
(
8
+
0.00000 ) * 25.97% *
4
* (
1
‐ 100.00%
*
2=
0 * $37.70
$0
0
Small
(
1
+
0.00000 ) * 25.97% *
4
* (
1
‐ 100.00%
*
1=
0 * $37.70
$0
0
Large
(
2
+
0.00000 ) * 25.97% *
4
* (
1
‐ 100.00%
*
2=
0 * $31.94
$0
0
(
0
+
0.00000 ) * 25.97% *
4
* (
1
‐
*
0=
0 * $31.94
$0
0
(
11
+
0.00000 ) * 25.97% *
4
* (
1
‐ 100.00%
*
5=
0 * $38.68
$0
0
(
0
+
0.00000 ) * 25.97% *
4
* (
1
‐ 100.00%
*
0=
0 * $38.68
$0
0
(
1
+
0.00348 ) * 25.97% *
4
* (
1
‐ 100.00%
*
80 =
0 * $28.81
$0
0
(
0
+
0.00000 ) * 25.97% *
4
* (
1
‐ 100.00%
*
126 =
0 * $28.81
$0
0
(
0
+
0.00000 ) * 25.97% *
4
* (
1
‐ 80.00%
*
2=
0 * $28.86
$0
0
(
0
+
0.00000 ) * 25.97% *
4
* (
1
‐ 10.00%
*
8=
0 * $28.86
$0
0
(
0
+
0.00000 ) * 25.97% *
4
* (
1
‐ 100.00%
*
81 =
0 * $31.99
$0
0
(
0
+
0.00000 ) * 25.97% *
4
* (
1
‐ 100.00%
*
40 =
0 * $31.99
$0
0
(
3
+
0.00000 ) * 25.97% *
4
* (
1
‐ 50.00%
*
6=
8 * $28.71
$237
2
(
1
+
0.00000 ) * 25.97% *
4
* (
1
‐ 30.00%
*
4=
3 * $28.71
$74
1
(
7
+
0.00000 ) * 23.30% *
4
* (
1
‐ 100.00%
*
1=
0 * $38.80
$0
0
(
0
+
0.00000 ) * 23.30% *
4
* (
1
‐
0.00%
*
0=
0 * $38.80
$0
0
(
27
+
0.00590 ) * 23.30% *
4
* (
1
‐ 50.00%
*
34 =
423 * $38.80
$16,414
106
(
(
1
1
+
+
0.00028 ) * 23.30% *
0.00014 ) * 23.30% *
4
4
* (
* (
1
1
‐ 30.00%
‐ 50.00%
*
*
11 =
102 =
9 * $38.80
30 * $38.80
$351
$1,172
2
8
(
1
+
0.00028 ) * 23.30% *
4
* (
1
‐ 30.00%
*
32 =
27 * $38.80
$1,032
7
(
0
+
0.00056 ) * 23.30% *
4
* (
1
‐ 50.00%
*
33 =
0 * $38.80
$0
0
(
0
+
0.00014 ) * 23.30% *
4
* (
1
‐ 30.00%
*
31 =
0 * $38.80
$0
0
(
17
+
0.00000 ) * 23.30% *
4
* (
1
‐ 80.00%
*
163 =
523 * $28.31
$14,818
131
(
4
+
0.00000 ) * 23.30% *
4
* (
1
‐ 10.00%
*
118 =
408 * $28.31
$11,546
102
(
0
+
0.00000 ) * 25.97% *
4
* (
1
‐ 100.00%
*
3=
0 * $37.70
$0
0
(
0
+
0.00000 ) * 25.97% *
4
* (
1
‐ 100.00%
*
1=
0 * $37.70
$0
0
(
0
+
0.00000 ) * 25.97% *
4
* (
1
‐ 100.00%
*
0=
0 * $41.50
$0
0
(
1
+
0.00000 ) * 25.97% *
4
* (
1
‐ 100.00%
*
5=
0 * $41.50
$0
0
(
0
+
0.00000 ) * 23.73% *
4
* (
1
‐
0.00%
*
216 =
0 * $29.92
$0
0
(
0
+
0.00000 ) * 23.73% *
4
* (
1
‐
0.00%
*
1,627 =
0 * $29.92
$0
0
(
0
+
0.00000 ) * 25.97% *
4
* (
1
‐ 80.00%
*
343 =
0 * $19.97
$0
0
(
0
+
0.00000 ) * 25.97% *
4
* (
1
‐ 10.00%
*
697 =
0 * $19.97
$0
0
(
1
+
0.00000 ) * 25.97% *
4
* (
1
‐ 80.00%
*
6=
1 * $28.87
$40
0
(
(
0
9
+
+
0.00000 ) * 25.97% *
0.00000 ) * 25.97% *
4
4
* (
* (
1
1
‐ 10.00%
‐ 80.00%
*
*
20 =
90 =
0 * $28.87
177 * $28.87
$0
$5,101
0
44
(
2
+
0.00000 ) * 25.97% *
4
* (
1
‐ 10.00%
*
5=
10 * $28.87
$297
3
SECTOR 6. CCA Producers
ALL
Small
SECTOR 7. Chromium Catalyst Producers
Large
ALL
Small
SECTOR 8. Paint and Coating Producers
Large
ALL
Small
SECTOR 9. Printing Ink Producers
Large
ALL
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
Alloy Stainless Steel
Small
Large
Carbon Steel
Small
14B. Alloy Stainless Steel Forging Industry
Large
Reshaping
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
ALL
Small
Large
Fiber, Flat and Container Glass
Small
Page 169
0.00%
RESPONSES
Cost
NONSUPEWAGE
Hours
#PLANTS
1‐%BASEMED
COMPFULLTIME
TURNOVER
MEDEXAMADDERM
LIMEMPAL
Variables
Table 28
SECTOR 22. Printing
Large
(
0
+
0.00000 ) * 25.97% *
4
* (
1
‐ 80.00%
*
81 =
0 * $20.85
$0
0
Small
(
0
+
0.00000 ) * 25.97% *
4
* (
1
‐ 10.00%
*
325 =
0 * $20.85
$0
0
Large
(
0
+
0.00000 ) * 23.30% *
4
* (
1
‐ 80.00%
*
179 =
0 * $32.51
$0
0
Small
Large
(
(
0
5
+
+
0.00000 ) * 23.30% *
0.00000 ) * 23.30% *
4
4
* (
* (
1
1
‐ 80.00%
‐ 80.00%
*
*
0=
23 =
0 * $32.51
24 * $32.51
$0
$766
0
6
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27. Solid Waste Incineration
Large
ALL
Small
State
Government
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
(
3
+
0.00000 ) * 23.30% *
4
* (
1
‐ 80.00%
*
4=
3 * $32.51
$88
1
(
0
+
0.00000 ) * 23.30% *
4
* (
1
‐ 80.00%
*
5=
0 * $25.64
$0
0
(
0
+
0.00000 ) * 23.30% *
4
* (
1
‐ 10.00%
*
0=
0 * $25.64
$0
0
(
0
+
0.00000 ) * 23.30% *
4
* (
1
‐ 25.00%
*
148 =
0 * $32.11
$0
0
(
(
0
0
+
+
0.00000 ) * 23.30% *
0.00000 ) * 23.30% *
4
4
* (
* (
1
1
‐ 0.00%
‐ 25.00%
*
*
79 =
36 =
0 * $32.11
0 * $32.11
$0
$0
0
0
(
(
0
1
+
+
0.00000 ) * 23.30% *
0.00000 ) * 23.30% *
4
4
* (
* (
1
1
‐ 0.00%
‐ 50.00%
*
*
32 =
1,162 =
0 * $32.11
422 * $32.11
$0
$13,563
0
106
(
(
1
0
+
+
0.00000 ) * 23.30% *
0.00000 ) * 23.30% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 50.00%
*
*
4,650 =
12 =
1,691 * $32.11
2 * $32.11
$54,290
$79
423
1
(
0
+
0.00000 ) * 23.30% *
4
* (
1
‐ 50.00%
*
42 =
9 * $32.11
$284
2
(
0
+
0.00000 ) * 41.79% *
4
* (
1
‐ 50.00%
*
40 =
0 * $27.23
$0
0
(
(
0
0
+
+
0.00000 ) * 41.79% *
0.00000 ) * 41.79% *
4
4
* (
* (
1
1
‐ 30.00%
‐ 50.00%
*
*
48 =
0=
0 * $27.23
0 * $27.23
$0
$0
0
0
(
0
+
0.00000 ) * 41.79% *
4
* (
1
‐ 30.00%
*
24 =
0 * $27.23
$0
0
(
4
+
0.00000 ) * 23.30% *
4
* (
1
‐ 50.00%
*
19 =
37 * $27.93
$1,044
9
(
0
+
0.00000 ) * 23.30% *
4
* (
1
‐ 30.00%
*
0=
0 * $27.93
$0
0
(
0
+
0.00000 ) * 60.38% *
4
* (
1
‐ 50.00%
*
51 =
0 * $32.13
$0
0
(
Small
State Gov't (
0
0
+
+
0.00000 ) * 60.38% *
0.00000 ) * 60.38% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 50.00%
*
*
233 =
15 =
0 * $32.13
0 * $32.13
$0
$0
0
0
Local Gov't (
Large
(
0
0
+
+
0.00000 ) * 60.38% *
0.00000 ) * 60.38% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 50.00%
*
*
88 =
40 =
0 * $32.13
0 * $32.13
$0
$0
0
0
(
Small
State Gov't (
0
0
+
+
0.00000 ) * 60.38% *
0.00000 ) * 60.38% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 50.00%
*
*
170 =
1=
0 * $32.13
0 * $32.13
$0
$0
0
0
Local Gov't (
Large
(
0
1
+
+
0.00000 ) * 60.38% *
0.00000 ) * 60.38% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 50.00%
*
*
239 =
44 =
0 * $32.13
57 * $32.13
$0
$1,816
0
14
(
1
+
0.00000 ) * 60.38% *
4
* (
1
‐ 50.00%
*
175 =
70,349
223 * $32.13
27,405
$7,181
$746,192
56
6,898
ALL
SECTOR 24. Chromium Catalyst Users
Catalyst Users
Chromium Catalyst Service
Companies
Industrial Rehabilitation &
Maintenance
Hazardous Waste Site Work
Refractory Brick Restoration
Small
TOTAL
Page 170
Table 29
Medical Examination After Initial Assignment (§§1910.1026(k)(2)(i), (k)(3)(i), and (k)(3)(ii);1915.1026(i)(2)(i), (i)(3)(i), and (i)(3)(ii);
and 1926.1126(i)(2)(i), (i)(3)(i), and (i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Medical Examination After Initial Assignment
This table calculates the cost for a contractor PLHCP to conduct medical examinations to employees newly assigned to operations that involve exposure at or above the action level.
Hours = (LIMEMPAL + MEDEXAMADDERM)*TURNOVER*COMPFULLCOST *(1‐%BASEMED)*#PLANTS
Cost =Hours *NONSUPWAGE
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the implementation of engineering controls.
Cost
#PLANTS
1 ‐%BASEMED
COMPFULLCOST
TURNOVER
TURNOVER (Old)
MEDEXAMADDERM
LIMEMPAL
Variables
*COMPFULLCOST = Cost for an employer to administer a comprehensive medical examination
1‐%BASEMED = Percentage of establishments that do not have annual medical surveillance for their employees in the baseline.
* #PLANTS = Number of Plants
Sector 1. Electroplating
Large
(
3
+
0.00000 ) * 26.16% 23.30% *
$513.87
* (
1
‐
100.00%
) *
1,848 =
$0
Small
(
0
+
0.00000 ) * 26.16% 23.30% *
$513.87
*
1
‐
100.00%
*
3,478 =
$0
Large
(
0
+
0.00000 ) * 27.24% 24.26% *
$513.87
*
1
‐
5.00%
*
7,857 =
$0
Small
Large
(
(
0
14
+
+
0.00000 ) * 27.24% 24.26% *
2.89868 ) * 27.24% 24.26% *
$513.87
$513.87
*
*
1
1
‐
‐
0.00%
5.00%
*
*
8,804 =
189 =
$0
$368,415
Small
Large
(
(
1
26
+
+
0.00000 ) * 27.24% 24.26% *
2.89868 ) * 27.24% 24.26% *
$513.87
$513.87
*
*
1
1
‐
‐
0.00%
5.00%
*
*
107 =
268 =
$12,919
$918,827
Small
Local
(
(
3
0
+
+
0.00000 ) * 27.24% 24.26% *
0.00000 ) * 27.24% 24.26% *
$513.87
$513.87
*
*
1
1
‐
‐
0.00%
5.00%
*
*
2,145 =
25 =
$775,145
$0
State
(
0
+
0.00000 ) * 27.24% 24.26% *
$513.87
*
1
‐
0.00%
*
787 =
$0
Large
(
0
+
0.00000 ) * 27.24% 24.26% *
$513.87
*
1
‐
5.00%
*
10,535 =
$0
Small
Large
(
(
0
0
+
+
0.00000 ) * 27.24% 24.26% *
0.00000 ) * 27.24% 24.26% *
$513.87
$513.87
*
*
1
1
‐
‐
0.00%
5.00%
*
*
10,724 =
409 =
$0
$0
Small
Large
(
(
0
10
+
+
0.00000 ) * 27.24% 24.26% *
0.00000 ) * 27.24% 24.26% *
$513.87
$513.87
*
*
1
1
‐
‐
0.00%
5.00%
*
*
232 =
402 =
$0
$459,966
Small
(
1
+
0.00000 ) * 27.24% 24.26% *
$513.87
*
1
‐
0.00%
*
3,037 =
$365,808
Large
(
45
+
0.00000 ) * 27.24% 24.26% *
$513.87
*
1
‐
80.00%
*
49 =
$55,230
Small
Large
(
(
0
1
+
+
0.00000 ) * 27.24% 24.26% *
0.00000 ) * 27.24% 24.26% *
$513.87
$513.87
*
*
1
1
‐
‐
50.00%
80.00%
*
*
62 =
326 =
$0
$7,364
Small
Large
(
(
0
2
+
+
0.00000 ) * 27.24% 24.26% *
0.00000 ) * 27.24% 24.26% *
$513.87
$513.87
*
*
1
1
‐
‐
50.00%
80.00%
*
*
1,436 =
100 =
$0
$4,500
Small
Large
(
(
1
2
+
+
0.00000 ) * 27.24% 24.26% *
0.00000 ) * 27.24% 24.26% *
$513.87
$513.87
*
*
1
1
‐
‐
50.00%
100.00%
*
*
18 =
276 =
$1,023
$0
Small
Large
(
(
1
2
+
+
0.00000 ) * 27.24% 24.26% *
0.00000 ) * 27.24% 24.26% *
$513.87
$513.87
*
*
1
1
‐
‐
50.00%
100.00%
*
*
476 =
671 =
$25,484
$0
Small
Local
(
(
0
0
+
+
0.00000 ) * 27.24% 24.26% *
0.00000 ) * 27.24% 24.26% *
$513.87
$513.87
*
*
1
1
‐
‐
100.00%
100.00%
*
*
3,566 =
12 =
$0
$0
State
(
6
+
0.00000 ) * 27.24% 24.26% *
$513.87
*
1
‐
100.00%
*
647 =
$0
ALL
Sector 2. Welding
General Industry
Maritime
Construction
GOVERNMENT
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
SECTOR 3. PAINTING
AEROSPACE
Autobody
Coil Coating
Maritime
Construction
Government
Page 171
Cost
#PLANTS
1 ‐%BASEMED
COMPFULLCOST
TURNOVER
TURNOVER (Old)
MEDEXAMADDERM
LIMEMPAL
Variables
Table 29
SECTOR 4. Producers of Chromates
Large
(
7
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
50.00%
*
2=
$857
Small
SECTOR 5. Chromate Pigment Procedures
ALL
Large
(
0
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
0.00%
*
0=
$0
(
8
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
100.00%
*
2=
$0
Small
(
1
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
100.00%
*
1=
$0
Large
(
2
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
100.00%
*
2=
$0
(
0
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
0.00%
*
0=
$0
(
11
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
100.00%
*
5=
$0
(
0
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
100.00%
*
0=
$0
(
1
+
0.00348 ) * 29.16% 25.97% *
$513.87
*
1
‐
100.00%
*
80 =
$0
(
0
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
100.00%
*
126 =
$0
(
0
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
80.00%
*
2=
$0
(
0
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
10.00%
*
8=
$0
(
0
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
100.00%
*
81 =
$0
(
0
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
100.00%
*
40 =
$0
(
3
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
50.00%
*
6=
$1,063
(
1
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
30.00%
*
4=
$331
(
7
+
0.00000 ) * 26.16% 23.30% *
$513.87
*
1
‐
100.00%
*
1=
$0
(
0
+
0.00000 ) * 26.16% 23.30% *
$513.87
*
1
‐
0.00%
*
0=
$0
(
27
+
0.00590 ) * 26.16% 23.30% *
$513.87
*
1
‐
50.00%
*
34 =
$54,343
(
(
1
1
+
+
0.00028 ) * 26.16% 23.30% *
0.00014 ) * 26.16% 23.30% *
$513.87
$513.87
*
*
1
1
‐
‐
30.00%
50.00%
*
*
11 =
102 =
$1,162
$3,882
(
1
+
0.00028 ) * 26.16% 23.30% *
$513.87
*
1
‐
30.00%
*
32 =
$3,418
(
0
+
0.00056 ) * 26.16% 23.30% *
$513.87
*
1
‐
50.00%
*
33 =
$1
(
0
+
0.00014 ) * 26.16% 23.30% *
$513.87
*
1
‐
30.00%
*
31 =
$0
(
17
+
0.00000 ) * 26.16% 23.30% *
$513.87
*
1
‐
80.00%
*
163 =
$67,239
(
4
+
0.00000 ) * 26.16% 23.30% *
$513.87
*
1
‐
10.00%
*
118 =
$52,394
(
0
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
100.00%
*
3=
$0
(
0
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
100.00%
*
1=
$0
(
0
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
100.00%
*
0=
$0
(
1
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
100.00%
*
5=
$0
(
0
+
0.00000 ) * 26.64% 23.73% *
$513.87
*
1
‐
0.00%
*
216 =
$0
(
0
+
0.00000 ) * 26.64% 23.73% *
$513.87
*
1
‐
0.00%
*
1,627 =
$0
ALL
SECTOR 6. CCA Producers
ALL
Small
SECTOR 7. Chromium Catalyst Producers
Large
ALL
Small
SECTOR 8. Paint and Coating Producers
Large
ALL
Small
SECTOR 9. Printing Ink Producers
Large
ALL
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
Alloy Stainless Steel
Small
Large
Carbon Steel
Small
14B. Alloy Stainless Steel Forging Industry
Large
Reshaping
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
Page 172
Cost
#PLANTS
1 ‐%BASEMED
COMPFULLCOST
TURNOVER
TURNOVER (Old)
MEDEXAMADDERM
LIMEMPAL
Variables
Table 29
SECTOR 20. Textile Dyeing
Large
(
0
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
80.00%
*
343 =
$0
Small
(
0
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
10.00%
*
697 =
$0
Large
(
1
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
80.00%
*
6=
$176
Small
Large
(
(
0
9
+
+
0.00000 ) * 29.16% 25.97% *
0.00000 ) * 29.16% 25.97% *
$513.87
$513.87
*
*
1
1
‐
‐
10.00%
80.00%
*
*
20 =
90 =
$0
$22,698
Small
(
2
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
10.00%
*
5=
$1,320
Large
(
0
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
80.00%
*
81 =
$0
Small
(
0
+
0.00000 ) * 29.16% 25.97% *
$513.87
*
1
‐
10.00%
*
325 =
$0
Large
(
0
+
0.00000 ) * 26.16% 23.30% *
$513.87
*
1
‐
80.00%
*
179 =
$0
Small
Large
(
(
0
5
+
+
0.00000 ) * 26.16% 23.30% *
0.00000 ) * 26.16% 23.30% *
$513.87
$513.87
*
*
1
1
‐
‐
80.00%
80.00%
*
*
0=
23 =
$0
$3,028
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27. Solid Waste Incineration
Large
ALL
Small
State
Government
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
(
3
+
0.00000 ) * 26.16% 23.30% *
$513.87
*
1
‐
80.00%
*
4=
$346
(
0
+
0.00000 ) * 26.16% 23.30% *
$513.87
*
1
‐
80.00%
*
5=
$0
(
0
+
0.00000 ) * 26.16% 23.30% *
$513.87
*
1
‐
10.00%
*
0=
$0
(
0
+
0.00000 ) * 26.16% 23.30% *
$513.87
*
1
‐
25.00%
*
148 =
$0
(
(
0
0
+
+
0.00000 ) * 26.16% 23.30% *
0.00000 ) * 26.16% 23.30% *
$513.87
$513.87
*
*
1
1
‐
‐
0.00%
25.00%
*
*
79 =
36 =
$0
$0
(
(
0
1
+
+
0.00000 ) * 26.16% 23.30% *
0.00000 ) * 26.16% 23.30% *
$513.87
$513.87
*
*
1
1
‐
‐
0.00%
50.00%
*
*
32 =
1,162 =
$0
$54,264
(
(
1
0
+
+
0.00000 ) * 26.16% 23.30% *
0.00000 ) * 26.16% 23.30% *
$513.87
$513.87
*
*
1
1
‐
‐
50.00%
50.00%
*
*
4,650 =
12 =
$217,204
$314
(
0
+
0.00000 ) * 26.16% 23.30% *
$513.87
*
1
‐
50.00%
*
42 =
$1,136
(
0
+
0.00000 ) * 46.92% 41.79% *
$513.87
*
1
‐
50.00%
*
40 =
$0
(
(
0
0
+
+
0.00000 ) * 46.92% 41.79% *
0.00000 ) * 46.92% 41.79% *
$513.87
$513.87
*
*
1
1
‐
‐
30.00%
50.00%
*
*
48 =
0=
$0
$0
(
0
+
0.00000 ) * 46.92% 41.79% *
$513.87
*
1
‐
30.00%
*
24 =
$0
(
4
+
0.00000 ) * 26.16% 23.30% *
$513.87
*
1
‐
50.00%
*
19 =
$4,804
(
0
+
0.00000 ) * 26.16% 23.30% *
$513.87
*
1
‐
30.00%
*
0=
$0
ALL
SECTOR 21. Colored Glass Producers
ALL
Fiber, Flat and Container Glass
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
Catalyst Users
Chromium Catalyst Service
Companies
Industrial Rehabilitation &
Maintenance
Hazardous Waste Site Work
(
0
+
0.00000 ) * 67.80% 60.38% *
$513.87
*
1
‐
50.00%
*
51 =
$0
Small
State Gov't
(
(
0
0
+
+
0.00000 ) * 67.80% 60.38% *
0.00000 ) * 67.80% 60.38% *
$513.87
$513.87
*
*
1
1
‐
‐
50.00%
50.00%
*
*
233 =
15 =
$0
$0
Local Gov't
Large
(
(
0
0
+
+
0.00000 ) * 67.80% 60.38% *
0.00000 ) * 67.80% 60.38% *
$513.87
$513.87
*
*
1
1
‐
‐
50.00%
50.00%
*
*
88 =
40 =
$0
$0
Small
State Gov't
(
(
0
0
+
+
0.00000 ) * 67.80% 60.38% *
0.00000 ) * 67.80% 60.38% *
$513.87
$513.87
*
*
1
1
‐
‐
50.00%
50.00%
*
*
170 =
1=
$0
$0
Local Gov't
Large
(
(
0
1
+
+
0.00000 ) * 67.80% 60.38% *
0.00000 ) * 67.80% 60.38% *
$513.87
$513.87
*
*
1
1
‐
‐
50.00%
50.00%
*
*
239 =
44 =
$0
$7,259
Small
(
1
+
0.00000 ) * 67.80% 60.38% *
$513.87
*
1
‐
50.00%
TOTAL
*
175 =
70,349
$28,709
$3,520,628
Refractory Brick Restoration
Page 173
Table 30
Medical Examination at the Termination of Employment (§§ 1910.1026(k)(2)(vi) and (k)(3)(i)‐(k)(3)(iii); 1915.1026(i)(2)(vi)
and (i)(3)(i)‐(i)(3)(iii); and 1926.1126(i)(2)(vi) and (i)(3)(i)‐(i)(3)(ii))
Employee Time and Cost to Complete the Medical Examination at the Termination of Employment
Employees receive a comprehensive medical examination at the termination of employment. For employers who are providing annual medical testing (%BASEMED) the additional employee time will be
3 hours (COMPARTTIME). For employers who are not providing annual medical testing (1‐%BASEMED) the time for a full comprehensive examination is 4 hours (COMPFULLTIME). The employee
turnover rate is divided by two, because medical examinations must be provided at the termination of employment ". . . unless the last examination . . . was less then six months prior to the date of
determination. It is estimated that half of the employee turnover occurs at the beginning of the year and the other half occurs a the end of the year. Therefore, based on this estimation at any time
during the year, it has been greater then six months since their last medical examination for half of the employees that are leaving, and therefore, these employees require a medical examination.
Burden hours = (LIMEMPAL + MEDEXAMADDERM)*(TURNOVER/2)* ((COMPARTTIME*%BASEMED)+(COMPFULLTIME*(1‐%BASEMED)))*#PLANTS
Cost = Burden hours x NONSUPEWAGE
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms"
after the implementation of engineering controls.
COMPARTTIME= The time an employee takes for a comprehensive exam when employed by employers already providing annual medical testing in the baseline.
%BASEMED = Percentage of employers who are providing annual medical examinations
COMPFULLTIME = The time an employee takes for a comprehensive exam when employed by employers who were not providing any annual medical testing in the baseline.
*1‐%BASEMED = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants
NONSUPEWAGE = Non‐supervisory Wage Rate
Responses
$46,911.10
588
$0.00
0
0
$26.20
$0.00
0
8,804 =
189 =
0
1,434
$26.20
$26.20
$0.00
$37,575.28
0
377
) ) *
) ) *
107 =
268 =
50
8,902
$26.20
$26.20
$1,317.36
$233,235.36
13
2,342
0.00%
5.00%
) ) *
) ) *
2,145 =
25 =
7,509
0
$26.20
$26.20
$196,734.23
$0.00
1,877
0
0
Hours
$26.61
$26.61
#PLANTS
Cost
NONSUPEWAGE
1‐%BASEMED
COMPFULLTIME
%BASEMED
COMPPARTTIME
Divide
2
TURNOVER
TURNOVER (Old)
MEDEXAMADDERM
LIMEMPAL
Variables
24.17%
Sector 1. Electroplating
Large
(
3+
0.000000 ) * ( 26.16%
23.30% /
2 ) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
1,848 =
Small
(
0+
0.000000 ) * ( 26.16%
23.30% /
2 ) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
3,478 =
Large
(
0+
0.000000 ) * ( 27.24%
24.26% /
2 ) *( (
3 *
5.00%
) +(
4 *(
1 ‐
5.00%
) ) *
7,857 =
Small
Large
(
(
0+
14 +
0.000000 ) * ( 27.24%
2.898677 ) * ( 27.24%
24.26% /
24.26% /
2 ) *( (
2 ) *( (
3 *
3 *
0.00%
5.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
Small
Large
(
(
1+
26 +
0.000000 ) * ( 27.24%
2.898677 ) * ( 67.80%
24.26% /
60.38% /
2 ) *( (
2 ) *( (
3 *
3 *
0.00%
5.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
0.00%
5.00%
Small
State
(
(
3+
0+
0.000000 ) * ( 67.80%
0.000000 ) * ( 67.80%
60.38% /
60.38% /
2 ) *( (
2 ) *( (
3 *
3 *
0.00%
5.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
1,763
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Local
(
0+
0.000000 ) * ( 67.80%
60.38% /
2 ) *( (
3 *
0.00%
) +(
4 *(
1 ‐
0.00%
) ) *
787 =
0
$26.20
$0.00
Large
(
0+
0.000000 ) * ( 27.74%
24.71% /
2 ) *( (
3 *
5.00%
) +(
4 *(
1 ‐
5.00%
) ) *
10,535 =
0
$26.20
$0.00
0
Small
Large
(
(
0+
0+
0.000000 ) * ( 27.74%
0.000000 ) * ( 27.74%
24.71% /
24.71% /
2 ) *( (
2 ) *( (
3 *
3 *
0.00%
5.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
10,724 =
409 =
0
0
$26.20
$26.20
$0.00
$0.00
0
0
Small
Large
(
(
0+
10 +
0.000000 ) * ( 27.74%
0.000000 ) * ( 67.80%
24.71% /
60.38% /
2 ) *( (
2 ) *( (
3 *
3 *
0.00%
5.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
232 =
402 =
0
4,456
$26.20
$26.20
$0.00
$116,752.26
0
1,173
) *( (
3 *
0.00%
) +(
4 *(
1 ‐
0.00%
) ) *
3,037 =
3,544
$26.20
$92,843.20
886
) *( (
3 *
80.00%
) +(
4 *(
1 ‐
80.00% ) ) *
49 =
232
$33.07
$7,682.29
274
) *( (
) *( (
3 *
3 *
50.00%
80.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
50.00% ) ) *
80.00% ) ) *
62 =
326 =
0
29
$33.07
$33.07
$0.00
$973.99
0
36
) *( (
) *( (
3 *
3 *
50.00%
80.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
50.00% ) ) *
80.00% ) ) *
1,436 =
100 =
0
18
$33.07
$33.07
$0.00
$607.55
0
22
) *( (
) *( (
3 * 50.00% ) + (
3 * 100.00% ) + (
4 *(
4 *(
1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *
18 =
276 =
4
1
$33.07
$33.07
$139.59
$21.03
2
58
) *( (
) *( (
3 * 50.00% ) + (
3 * 100.00% ) + (
4 *(
4 *(
1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *
476 =
671 =
101
2
$33.07
$33.07
$3,345.14
$57.08
51
386
) *( (
) *( (
3 * 100.00% ) + (
3 * 100.00% ) + (
4 *(
4 *(
1 ‐ 100.00% ) ) *
1 ‐ 100.00% ) ) *
3,566 =
12 =
0
0
$33.07
$33.07
$0.00
$0.00
0
0
) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
647 =
6
$33.07
$188.42
1,228
) *( (
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
2=
5
$38.68
$179.43
2
) *( (
3 *
0.00%
) +(
4 *(
1 ‐
0.00%
) ) *
0=
0
$38.62
$0.00
0
) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
2=
3
$37.70
$118.92
2
) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
1=
0
$37.70
$13.21
0
) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
2=
1
$31.94
$19.60
0
) *( (
3 *
) +(
4 *(
1 ‐
) ) *
0=
0
$31.94
$0.00
0
) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
5=
4
$38.68
$173.13
7
) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
0=
0
$38.68
$0.00
0
) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
80 =
0
$28.81
$10.75
10
) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
126 =
0
$28.81
$0.00
0
) *( (
3 *
80.00%
) +(
4 *(
1 ‐
80.00% ) ) *
2=
0
$28.86
$0.00
0
) *( (
3 *
10.00%
) +(
4 *(
1 ‐
10.00% ) ) *
8=
0
$28.86
$0.00
0
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
(
1+
0.000000 ) * ( 67.80% 60.38% / 2
Small
SECTOR 3. PAINTING
General Industry
Large
(
45 +
0.000000 ) * ( 27.74% 24.71% / 2
AEROSPACE
(
0+
0.000000 ) * ( 27.74% 24.71% / 2
Small
Large
(
1+
0.000000 ) * ( 27.74% 24.71% / 2
Auto Body
) * ( 27.74% 24.71% / 2
(
0
+
0.000000
Small
Large
(
2+
0.000000 ) * ( 27.74% 24.71% / 2
Coil Coating
(
1+
0.000000 ) * ( 27.74% 24.71% / 2
Small
Large
(
2+
0.000000 ) * ( 27.74% 24.71% / 2
Maritime
(
1+
0.000000 ) * ( 27.74% 24.71% / 2
Small
(
2+
0.000000 ) * ( 67.80% 60.38% / 2
Large
Construction
) * ( 67.80% 60.38% / 2
(
0
+
0.000000
Small
(
0+
0.000000 ) * ( 67.80% 60.38% / 2
State
Government
(
6+
0.000000 ) * ( 67.80% 60.38% / 2
Local
SECTOR 4. Producers of Chromates
Large
(
7+
0.000000 ) * ( 29.16% 25.97% / 2
ALL
) * ( 29.16% 25.97% / 2
(
0
+
0.000000
Small
SECTOR 5. Chromate Pigment Procedures
Large
(
8+
0.000000 ) * ( 29.16% 25.97% / 2
ALL
(
1+
0.000000 ) * ( 29.16% 25.97% / 2
Small
SECTOR 6. CCA Producers
Large
(
2+
0.000000 ) * ( 29.16% 25.97%
2
ALL
2
(
0+
0.000000 ) * ( 29.16% 25.97%
Small
SECTOR 7. Chromium Catalyst Producers
Large
(
11 +
0.000000 ) * ( 29.16% 25.97% / 2
ALL
(
0+
0.000000 ) * ( 29.16% 25.97% / 2
Small
SECTOR 8. Paint and Coating Producers
Large
(
1+
0.000000 ) * ( 29.16% 25.97% / 2
ALL
(
0+
0.000000 ) * ( 29.16% 25.97% / 2
Small
SECTOR 9. Printing Ink Producers
Large
(
0+
0.000000 ) * ( 29.16% 25.97% / 2
ALL
(
0+
0.000000 ) * ( 29.16% 25.97% / 2
Small
Page 174
0.00%
0.00%
Table 30
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
General Industry
Small
Large
Chromium Service Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27. Solid Waste Incineration
Large
ALL
Small
State
Government
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
(
0+
0.000000 ) * ( 29.16%
25.97% /
2 ) *( (
3 * 100.00% ) + (
(
0+
0.000000 ) * ( 29.16%
25.97% /
2 ) *( (
3 * 100.00% ) + (
(
3+
0.000000 ) * ( 29.16%
25.97% /
2 ) *( (
3 *
50.00%
) +(
(
1+
0.000000 ) * ( 29.16%
25.97% /
2 ) *( (
3 *
30.00%
) +(
4 *(
4 *(
1 ‐ 100.00% ) ) *
81 =
0
$31.99
$0.00
0
4 *(
1 ‐ 100.00% ) ) *
40 =
0
4 *(
1 ‐
50.00% ) ) *
6=
5
$31.99
$0.00
0
$28.71
$134.51
1 ‐
30.00% ) ) *
4=
1
$28.71
2
$40.09
0
(
7+
0.000000 ) * ( 26.16%
23.30% /
2 ) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
1=
0
$38.80
$0.00
1
(
0+
0.000000 ) * ( 26.16%
23.30% /
2 ) *( (
3 *
0.00%
) +(
4 *(
1 ‐
0.00%
) ) *
0=
0
$38.80
$0.00
0
(
27 +
0.005900 ) * ( 26.16%
23.30% /
2 ) *( (
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
34 =
216
$38.80
$8,388.87
106
(
(
1+
1+
0.000281 ) * ( 26.16%
0.000140 ) * ( 26.16%
23.30% /
23.30% /
2 ) *( (
2 ) *( (
3 *
3 *
30.00%
50.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
30.00% ) ) *
50.00% ) ) *
11 =
102 =
5
15
$38.80
$38.80
$180.69
$590.54
2
8
(
1+
0.000281 ) * ( 26.16%
23.30% /
2 ) *( (
3 *
30.00%
) +(
4 *(
1 ‐
30.00% ) ) *
32 =
13
$38.80
$521.36
5
0
(
0+
0.000562 ) * ( 26.16%
23.30% /
2 ) *( (
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
33 =
0
$38.80
$0.17
(
0+
0.000140 ) * ( 26.16%
23.30% /
2 ) *( (
3 *
30.00%
) +(
4 *(
1 ‐
30.00% ) ) *
31 =
0
$38.80
$0.06
0
(
17 +
0.000000 ) * ( 26.16%
23.30% /
2 ) *( (
3 *
80.00%
) +(
4 *(
1 ‐
80.00% ) ) *
163 =
267
$28.31
$7,545.41
327
(
4+
0.000000 ) * ( 26.16%
23.30% /
2 ) *( (
3 *
10.00%
) +(
4 *(
1 ‐
10.00% ) ) *
118 =
204
$28.31
$5,777.17
57
(
0+
0.000000 ) * ( 29.16%
25.97% /
2 ) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
3=
0
$37.70
$0.00
0
(
0+
0.000000 ) * ( 29.16%
25.97% /
2 ) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
1=
0
$37.70
$0.00
0
(
0+
0.000000 ) * ( 29.16%
25.97% /
2 ) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
0=
0
$41.50
$0.00
0
(
1+
0.000000 ) * ( 29.16%
25.97% /
2 ) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
5=
0
$41.50
$15.48
1
(
0+
0.000000 ) * ( 26.64%
23.73% /
2 ) *( (
3 *
0.00%
) +(
4 *(
1 ‐
0.00%
) ) *
216 =
0
$29.92
$0.00
0
(
0+
0.000000 ) * ( 26.64%
23.73% /
2 ) *( (
3 *
0.00%
) +(
4 *(
1 ‐
0.00%
) ) *
1,627 =
0
$29.92
$0.00
0
0
(
0+
0.000000 ) * ( 29.16%
25.97% /
2 ) *( (
3 *
80.00%
) +(
4 *(
1 ‐
80.00% ) ) *
343 =
0
$19.97
$0.00
(
0+
0.000000 ) * ( 29.16%
25.97% /
2 ) *( (
3 *
10.00%
) +(
4 *(
1 ‐
10.00% ) ) *
697 =
0
$19.97
$0.00
0
(
1+
0.000000 ) * ( 29.16%
25.97% /
2 ) *( (
3 *
80.00%
) +(
4 *(
1 ‐
80.00% ) ) *
6=
1
$28.87
$29.20
1
(
(
0+
9+
0.000000 ) * ( 29.16%
0.000000 ) * ( 29.16%
25.97% /
25.97% /
2 ) *( (
2 ) *( (
3 *
3 *
10.00%
80.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
10.00% ) ) *
80.00% ) ) *
20 =
90 =
0
91
$28.87
$28.87
$0.00
$2,635.23
0
110
(
2+
0.000000 ) * ( 29.16%
25.97% /
2 ) *( (
3 *
10.00%
) +(
4 *(
1 ‐
10.00% ) ) *
5=
5
$28.87
$150.63
1
(
0+
0.000000 ) * ( 29.16%
25.97% /
2 ) *( (
3 *
80.00%
) +(
4 *(
1 ‐
80.00% ) ) *
81 =
0
$20.85
$0.00
0
(
0+
0.000000 ) * ( 29.16%
25.97% /
2 ) *( (
3 *
10.00%
) +(
4 *(
1 ‐
10.00% ) ) *
325 =
0
$20.85
$0.00
0
(
0+
0.000000 ) * ( 26.16%
23.30% /
2 ) *( (
3 *
80.00%
) +(
4 *(
1 ‐
80.00% ) ) *
179 =
0
$32.51
$0.00
0
(
(
0+
5+
0.000000 ) * ( 26.16%
0.000000 ) * ( 26.16%
23.30% /
23.30% /
2 ) *( (
2 ) *( (
3 *
3 *
80.00%
80.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
80.00% ) ) *
80.00% ) ) *
0=
23 =
0
13
$32.51
$32.51
$0.00
$432.93
0
15
(
3+
0.000000 ) * ( 26.16%
23.30% /
2 ) *( (
3 *
30.00%
) +(
4 *(
1 ‐
30.00% ) ) *
4=
5
$32.51
$164.45
2
(
0+
0.000000 ) * ( 26.16%
23.30% /
2 ) *( (
3 *
80.00%
) +(
4 *(
1 ‐
80.00% ) ) *
5=
0
$25.64
$0.00
0
(
0+
0.000000 ) * ( 26.16%
23.30% /
2 ) *( (
3 *
10.00%
) +(
4 *(
1 ‐
10.00% ) ) *
0=
0
$25.64
$0.00
0
(
0+
0.000000 ) * ( 26.16%
23.30% /
2 ) *( (
3 *
25.00%
) +(
4 *(
1 ‐
25.00% ) ) *
148 =
0
$32.11
$0.00
0
(
(
0+
0+
0.000000 ) * ( 26.16%
0.000000 ) * ( 26.16%
23.30% /
23.30% /
2 ) *( (
2 ) *( (
3 *
3 *
0.00%
25.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
0.00% ) ) *
25.00% ) ) *
79 =
36 =
0
0
$32.11
$32.11
$0.00
$0.00
0
0
(
(
0+
1+
0.000000 ) * ( 26.16%
0.000000 ) * ( 67.80%
23.30% /
60.38% /
2 ) *( (
2 ) *( (
3 *
3 *
0.00%
50.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
0.00% ) ) *
50.00% ) ) *
32 =
1,162 =
0
548
$32.11
$32.11
$0.00
$17,587.66
0
274
(
(
1+
0+
0.000000 ) * ( 67.80%
0.000000 ) * ( 67.80%
60.38% /
60.38% /
2 ) *( (
2 ) *( (
3 *
3 *
50.00%
50.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
4,650 =
12 =
2,191
3
$32.11
$32.11
$70,363.81
$108.33
1,095
2
(
0+
0.000000 ) * ( 67.80%
60.38% /
2 ) *( (
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
42 =
12
$32.11
$374.57
6
(
0+
0.000000 ) * ( 46.92%
41.79% /
2 ) *( (
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
40 =
0
$27.23
$0.00
0
(
(
0+
1+
0.000000 ) * ( 46.92%
0.000000 ) * ( 46.92%
41.79% /
41.79% /
2 ) *( (
2 ) *( (
3 *
3 *
30.00%
50.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
30.00% ) ) *
50.00% ) ) *
48 =
0=
0
0
$27.23
$27.23
$0.00
$6.18
0
0
(
0+
0.000000 ) * ( 46.92%
41.79% /
2 ) *( (
3 *
30.00%
) +(
4 *(
1 ‐
30.00% ) ) *
24 =
0
$27.23
$0.00
0
(
2+
0.000000 ) * ( 26.16%
23.30% /
2 ) *( (
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
19 =
10
$27.93
$271.40
5
(
0+
0.000000 ) * ( 26.16%
23.30% /
2 ) *( (
3 *
30.00%
) +(
4 *(
1 ‐
30.00% ) ) *
0=
0
$27.93
$0.00
0
Page 175
Table 30
SECTOR 31. Construction
Large
Industrial Rehabilitation & Maintenance
(
0+
0.000000 ) * ( 67.80%
60.38% /
2 ) *( (
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
51 =
0
$32.13
$0.00
0
(
Small
State Gov't (
0+
0+
0.000000 ) * ( 67.80%
0.000000 ) * ( 67.80%
60.38% /
60.38% /
2 ) *( (
2 ) *( (
3 *
3 *
50.00%
50.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
233 =
15 =
0
0
$32.13
$32.13
$0.00
$0.00
0
0
(
(
0+
0+
0.000000 ) * ( 67.80%
0.000000 ) * ( 67.80%
60.38% /
60.38% /
2 ) *( (
2 ) *( (
3 *
3 *
50.00%
50.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
88 =
40 =
0
0
$32.13
$32.13
$0.00
$0.00
0
0
(
Small
State Gov't (
0+
0+
0.000000 ) * ( 67.80%
0.000000 ) * ( 67.80%
60.38% /
60.38% /
2 ) *( (
2 ) *( (
3 *
3 *
50.00%
50.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
170 =
1=
0
0
$32.13
$32.13
$0.00
$0.00
0
0
Local Gov't
Large
(
(
0+
1+
0.000000 ) * ( 67.80%
0.000000 ) * ( 67.80%
60.38% /
60.38% /
2 ) *( (
2 ) *( (
3 *
3 *
50.00%
50.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
239 =
44 =
0
29
$32.13
$32.13
$0.00
$923.30
0
14
Small
(
1+
0.000000 ) * ( 67.80%
60.38% /
2 ) *( (
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
Total
175 =
70,349
112
31,813
$32.13
Local Gov't
Large
Hazardous Waste Site Work
Refractory Brick Restoration
Page 176
$3,605.97
56
$858,746.95 11,422
Table 31
Medical Examination at the Termination of Employment (§§ 1910.1026(k)(2)(vi) and (k)(3)(i)‐(k)(3)(iii); 1915.1026(i)(2)(vi) and
(i)(3)(i)‐(i)(3)(iii); and 1926.1126(i)(2)(vi) and (i)(3)(i)‐(i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Medical Examination at the Termination of Employment
Employees receive a comprehensive medical examination at the termination of employment. For employers who are providing annual medical testing (%BASEMED) the additional cost will be $227.00 (COMPARTCOST). For
employers who are not providing annual medical testing (1‐%BASEMED) the cost for a full comprehensive examination will be $454.00 (COMPFULLCOST). The employee turnover rate is divided by two, because medical
examinations must be provided at the termination of employment ". . . unless the last examination . . . was less then six months prior to the date of determination. It is estimated that half of the employee turnover occurs at
the begining of the year and the other half occurs a the end of the year. Therefore, based on this estimation at any time during the year, it has been greater then six months since their last medical examination for half of
the employees that are leaving, and therefore, these employees require a medical examination.
COST = (LIMEMPAL + MEDEXAMADDDERM)*(TURNOVER/2)* ((COMPARTCOST*%BASEMED)+(COMPFULLCOST*(1‐%BASEMED)))*#PLANTS
26.16%
23.30%
/ 2) *( (
$256
* 100.00% ) + (
Small
(
0+
0.000000 ) * (
26.16%
23.30%
/ 2) *( (
$256
* 100.00% ) + (
Large
(
0+
0.000000 ) * (
27.24%
24.26%
/ 2) *( (
$256
*
5.00%
) +(
Small
Large
(
(
0+
14 +
0.000000 ) * (
2.898677 ) * (
27.24%
27.24%
24.26%
24.26%
/ 2) *( (
/ 2) *( (
$256
$256
*
*
0.00%
5.00%
) +(
) +(
Small
Large
(
(
1+
26 +
0.000000 ) * (
2.898677 ) * (
27.24%
67.80%
24.26%
60.38%
/ 2) *( (
/ 2) *( (
$256
$256
*
*
0.00%
5.00%
Small
State
(
(
3+
0+
0.000000 ) * (
0.000000 ) * (
67.80%
67.80%
60.38%
60.38%
/ 2) *( (
/ 2) *( (
$256
$256
*
*
1‐%BASEMED
COST
%BASEMED
0.000000 ) * (
#PLANTS
COMPPARTCOST
3+
COMPFULLCOST
TURNOVER
(
Divide
2
TURNOVER (Old)
Large
LIMEMPAL
MEDEXAMADDERM
Variables
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms"
after the implementation of engineering controls
TURNOVER/2 = Represents the frequency of termination exams.
COMPARTCOST= The cost of a comprehensive exam for those employers already providing annual medical testing in the baseline
%BASEMED = Percentage of employers who are providing annual medical examinations
COMPFULLCOST = The cost of a comprehensive exam for those employers who were not providing any annual medical testing in the baseline
*1‐%BASEMED = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants
Sector 1. Electroplating
$513 * (
1 ‐
100.00% ) ) *
1,848 =
$ 150,700.97
$513 * (
1 ‐
100.00% ) ) *
$513 * (
1 ‐
5.00%
) ) *
7,857 =
3,478 =
$ ‐
$ ‐
$513 * (
$513 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
8,804 =
189 =
$ ‐
$ 183,883.80
) +(
) +(
$513 * (
$513 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
107 =
268 =
$ 6,447.29
$ 1,141,417.27
0.00%
5.00%
) +(
) +(
$513 * (
$513 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
2,145 =
25 =
$ 962,833.83
$ ‐
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Local
(
0+
0.000000 ) * (
67.80%
60.38%
/ 2) *( (
$256
*
0.00%
) +(
$513 * (
1 ‐
0.00%
) ) *
787 =
$ ‐
Large
(
0+
0.000000 ) * (
27.74%
24.71%
/ 2) *( (
$256
*
5.00%
) +(
$513 * (
1 ‐
5.00%
) ) *
10,535 =
$ ‐
Small
Large
(
(
0+
0+
0.000000 ) * (
0.000000 ) * (
27.74%
27.74%
24.71%
24.71%
/ 2) *( (
/ 2) *( (
$256
$256
*
*
0.00%
5.00%
) +(
) +(
$513 * (
$513 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
10,724 =
409 =
$ ‐
$ ‐
Small
Large
(
(
0+
10 +
0.000000 ) * (
0.000000 ) * (
27.74%
67.80%
24.71%
60.38%
/ 2) *( (
/ 2) *( (
$256
$256
*
*
0.00%
5.00%
) +(
) +(
$513 * (
$513 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
232 =
402 =
$ ‐
$ 571,376.64
(
1 + 0.000000 ) * ( 67.80% 60.38%
Small
SECTOR 3. PAINTING
General Industry
Large
( 45 + 0.000000 ) * ( 27.74% 24.71%
AEROSPACE
(
0 + 0.000000 ) * ( 27.74% 24.71%
Small
Large
(
1 + 0.000000 ) * ( 27.74% 24.71%
Auto Body
(
0 + 0.000000 ) * ( 27.74% 24.71%
Small
Large
(
2 + 0.000000 ) * ( 27.74% 24.71%
Coil Coating
(
1 + 0.000000 ) * ( 27.74% 24.71%
Small
Large
(
2 + 0.000000 ) * ( 27.74% 24.71%
Maritime
(
1 + 0.000000 ) * ( 27.74% 24.71%
Small
(
2 + 0.000000 ) * ( 67.80% 60.38%
Large
Construction
(
0 + 0.000000 ) * ( 67.80% 60.38%
Small
(
0 + 0.000000 ) * ( 67.80% 60.38%
State
Government
(
6 + 0.000000 ) * ( 67.80% 60.38%
Local
SECTOR 4. Producers of Chromates
Large
(
7 + 0.000000 ) * ( 29.16% 25.97%
ALL
(
0 + 0.000000 ) * ( 29.16% 25.97%
Small
SECTOR 5. Chromate Pigment Procedures
Large
(
8 + 0.000000 ) * ( 29.16% 25.97%
ALL
(
1 + 0.000000 ) * ( 29.16% 25.97%
Small
/ 2) *( (
$256
*
0.00%
) +(
$513 * (
1 ‐
0.00%
) ) *
3,037 =
$ 454,382.39
/ 2) *( (
$256
*
80.00%
) +(
$513 * (
1 ‐
80.00%
) ) *
49 =
$ 29,216.32
/ 2) *( (
/ 2) *( (
$256
$256
*
*
50.00%
80.00%
) +(
) +(
$513 * (
$513 * (
1 ‐
1 ‐
50.00%
80.00%
) ) *
) ) *
62 =
326 =
$ ‐
$ 3,765.43
/ 2) *( (
/ 2) *( (
$256
$256
*
*
50.00%
80.00%
) +(
) +(
$513 * (
$513 * (
1 ‐
1 ‐
50.00%
80.00%
) ) *
) ) *
1,436 =
100 =
$ ‐
$ 2,332.98
/ 2) *( (
/ 2) *( (
$256
$256
* 50.00% ) + (
* 100.00% ) + (
$513 * (
$513 * (
1 ‐
1 ‐
50.00% ) ) *
100.00% ) ) *
18 =
276 =
$ 534.14
$ 54.38
/ 2) *( (
/ 2) *( (
$256
$256
* 50.00% ) + (
* 100.00% ) + (
$513 * (
$513 * (
1 ‐
1 ‐
50.00% ) ) *
100.00% ) ) *
476 =
671 =
$ 12,964.92
$ 147.56
/ 2) *( (
/ 2) *( (
$256
$256
* 100.00% ) + (
* 100.00% ) + (
$513 * (
$513 * (
1 ‐
1 ‐
100.00% ) ) *
100.00% ) ) *
3,566 =
12 =
/ 2) *( (
$256
* 100.00% ) + (
$513 * (
1 ‐
100.00% ) ) *
647 =
$ 487.10
/ 2) *( (
$256
*
50.00%
) +(
$513 * (
1 ‐
50.00%
) ) *
2=
$ 539.04
/ 2) *( (
$256
*
0.00%
) +(
$513 * (
1 ‐
0.00%
) ) *
0=
$ ‐
/ 2) *( (
$256
* 100.00% ) + (
$513 * (
1 ‐
100.00% ) ) *
2=
$ 269.66
/ 2) *( (
$256
* 100.00% ) + (
$513 * (
1 ‐
100.00% ) ) *
1=
$ 29.96
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
Page 177
$ ‐
$ ‐
* 100.00% ) + (
$513 * (
1 ‐
#PLANTS
1‐%BASEMED
COST
$256
COMPFULLCOST
25.97%
%BASEMED
29.16%
COMPPARTCOST
TURNOVER
0.000000 ) * (
Divide
2
TURNOVER (Old)
2+
LIMEMPAL
MEDEXAMADDERM
Variables
Table 31
SECTOR 6. CCA Producers
Large
(
2) *( (
100.00% ) ) *
2=
$ 52.47
ALL
Small
(
0+
0.000000 ) * (
29.16%
25.97%
2) *( (
$256
*
) +(
$513 * (
1 ‐
) ) *
0=
$ ‐
Large
(
11 +
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
* 100.00% ) + (
$513 * (
1 ‐
100.00% ) ) *
5=
$ 382.63
$ ‐
0.00%
0.00%
SECTOR 7. Chromium Catalyst Producers
ALL
Small
(
0+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
* 100.00% ) + (
$513 * (
1 ‐
100.00% ) ) *
0=
Large
(
1+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
* 100.00% ) + (
$513 * (
1 ‐
100.00% ) ) *
80 =
Small
(
0+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
* 100.00% ) + (
$513 * (
1 ‐
100.00% ) ) *
126 =
$ ‐
Large
(
0+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
*
80.00%
) +(
$513 * (
1 ‐
80.00%
) ) *
2=
$ ‐
(
0+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
*
10.00%
) +(
$513 * (
1 ‐
10.00%
) ) *
8=
$ ‐
SECTOR 8. Paint and Coating Producers
$ 31.89
ALL
SECTOR 9. Printing Ink Producers
ALL
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
General Industry
Small
Large
Chromium Service Companies
Small
(
0+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
* 100.00% ) + (
$513 * (
1 ‐
100.00% ) ) *
81 =
$ ‐
(
0+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
* 100.00% ) + (
$513 * (
1 ‐
100.00% ) ) *
40 =
(
3+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
*
50.00%
) +(
$513 * (
1 ‐
50.00%
) ) *
6=
$ ‐
29.16
$ 577.27
(
1+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
*
30.00%
) +(
$513 * (
1 ‐
30.00%
) ) *
4=
$ 174.38
100.00% ) ) *
1=
$ ‐
0=
$ ‐
(
7+
0.000000 ) * (
26.16%
23.30%
/ 2) *( (
$256
* 100.00% ) + (
$513 * (
1 ‐
(
0+
0.000000 ) * (
26.16%
23.30%
/ 2) *( (
$256
*
0.00%
) +(
$513 * (
1 ‐
0.00%
) ) *
(
27 +
0.005900 ) * (
26.16%
23.30%
/ 2) *( (
$256
*
50.00%
) +(
$513 * (
1 ‐
50.00%
) ) *
34 =
$ 27,520.55
(
(
1+
1+
0.000281 ) * (
0.000140 ) * (
26.16%
26.16%
23.30%
23.30%
/ 2) *( (
/ 2) *( (
$256
$256
*
*
30.00%
50.00%
) +(
) +(
$513 * (
$513 * (
1 ‐
1 ‐
30.00%
50.00%
) ) *
) ) *
11 =
102 =
$ 591.37
$ 1,946.67
(
1+
0.000281 ) * (
26.16%
23.30%
/ 2) *( (
$256
*
30.00%
) +(
$513 * (
1 ‐
30.00%
) ) *
32 =
$ 1,717.10
(
0+
0.000562 ) * (
26.16%
23.30%
/ 2) *( (
$256
*
50.00%
) +(
$513 * (
1 ‐
50.00%
) ) *
33 =
$ 0.57
(
0+
0.000140 ) * (
26.16%
23.30%
/ 2) *( (
$256
*
30.00%
) +(
$513 * (
1 ‐
30.00%
) ) *
31 =
$ 0.19
(
17 +
0.000000 ) * (
26.16%
23.30%
/ 2) *( (
$256
*
80.00%
) +(
$513 * (
1 ‐
80.00%
) ) *
163 =
$ 33,968.26
(
4+
0.000000 ) * (
26.16%
23.30%
/ 2) *( (
$256
*
10.00%
) +(
$513 * (
1 ‐
10.00%
) ) *
118 =
$ 26,159.66
(
0+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
* 100.00% ) + (
$513 * (
1 ‐
100.00% ) ) *
3=
$ ‐
(
0+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
* 100.00% ) + (
$513 * (
1 ‐
100.00% ) ) *
1=
$ ‐
(
0+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
* 100.00% ) + (
$513 * (
1 ‐
100.00% ) ) *
0=
$ ‐
(
1+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
* 100.00% ) + (
$513 * (
1 ‐
100.00% ) ) *
5=
$ 31.89
(
0+
0.000000 ) * (
26.64%
23.73%
/ 2) *( (
$256
*
0.00%
) +(
$513 * (
1 ‐
0.00%
) ) *
216 =
$ ‐
(
0+
0.000000 ) * (
26.64%
23.73%
/ 2) *( (
$256
*
0.00%
) +(
$513 * (
1 ‐
0.00%
) ) *
1,627 =
$ ‐
(
0+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
*
80.00%
) +(
$513 * (
1 ‐
80.00%
) ) *
343 =
$ ‐
(
0+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
*
10.00%
) +(
$513 * (
1 ‐
10.00%
) ) *
697 =
$ ‐
(
1+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
*
80.00%
) +(
$513 * (
1 ‐
80.00%
) ) *
6=
$ 115.73
(
(
0+
9+
0.000000 ) * (
0.000000 ) * (
29.16%
29.16%
25.97%
25.97%
/ 2) *( (
/ 2) *( (
$256
$256
*
*
10.00%
80.00%
) +(
) +(
$513 * (
$513 * (
1 ‐
1 ‐
10.00%
80.00%
) ) *
) ) *
20 =
90 =
$ ‐
$ 11,578.74
(
2+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
*
10.00%
) +(
$513 * (
1 ‐
10.00%
) ) *
5=
$ 665.55
(
0+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
*
80.00%
) +(
$513 * (
1 ‐
80.00%
) ) *
81 =
$ ‐
(
0+
0.000000 ) * (
29.16%
25.97%
/ 2) *( (
$256
*
10.00%
) +(
$513 * (
1 ‐
10.00%
) ) *
325 =
$ ‐
(
0+
0.000000 ) * (
26.16%
23.30%
/ 2) *( (
$256
*
80.00%
) +(
$513 * (
1 ‐
80.00%
) ) *
179 =
$ ‐
(
(
0+
5+
0.000000 ) * (
0.000000 ) * (
26.16%
26.16%
23.30%
23.30%
/ 2) *( (
/ 2) *( (
$256
$256
*
*
80.00%
80.00%
) +(
) +(
$513 * (
$513 * (
1 ‐
1 ‐
80.00%
80.00%
) ) *
) ) *
0=
23 =
$ ‐
$ 1,642.11
(
3+
0.000000 ) * (
26.16%
23.30%
/ 2) *( (
$256
*
30.00%
) +(
$513 * (
1 ‐
30.00%
) ) *
4=
$ 633.90
Page 178
0.000000 ) * (
26.16%
23.30%
/ 2) *( (
$256
*
80.00%
) +(
$513 * (
1 ‐
80.00%
) ) *
Small
(
0+
0.000000 ) * (
26.16%
23.30%
/ 2) *( (
$256
*
10.00%
) +(
$513 * (
1 ‐
10.00%
Large
(
0+
0.000000 ) * (
26.16%
23.30%
/ 2) *( (
$256
*
25.00%
) +(
$513 * (
1 ‐
25.00%
Small
Large
(
(
0+
0+
0.000000 ) * (
0.000000 ) * (
26.16%
26.16%
23.30%
23.30%
/ 2) *( (
/ 2) *( (
$256
$256
*
*
0.00%
25.00%
) +(
) +(
$513 * (
$513 * (
1 ‐
1 ‐
Small
Large
(
(
0+
1+
0.000000 ) * (
0.000000 ) * (
26.16%
67.80%
23.30%
60.38%
/ 2) *( (
/ 2) *( (
$256
$256
*
*
0.00%
50.00%
) +(
) +(
$513 * (
$513 * (
Small
State
(
(
1+
0+
0.000000 ) * (
0.000000 ) * (
67.80%
67.80%
60.38%
60.38%
/ 2) *( (
/ 2) *( (
$256
$256
*
*
50.00%
50.00%
) +(
) +(
COST
#PLANTS
1‐%BASEMED
%BASEMED
COMPFULLCOST
0+
COMPPARTCOST
TURNOVER
(
Divide
2
TURNOVER (Old)
Large
LIMEMPAL
MEDEXAMADDERM
Variables
Table 31
SECTOR 25. Refractory Brick Producers
5=
$ ‐
) ) *
0=
$ ‐
) ) *
148 =
$ ‐
0.00%
25.00%
) ) *
) ) *
79 =
36 =
$ ‐
$ ‐
1 ‐
1 ‐
0.00%
50.00%
) ) *
) ) *
32 =
1,162 =
$ ‐
$ 70,216.63
$513 * (
$513 * (
1 ‐
1 ‐
50.00%
50.00%
) ) *
) ) *
4,650 =
12 =
$ 280,964.45
$ 423.90
ALL
SECTOR 26. Woodworking
General Industry
Maritime
Construction
Government
Local
(
0+
0.000000 ) * (
67.80%
60.38%
/ 2) *( (
$256
*
50.00%
) +(
$513 * (
1 ‐
50.00%
) ) *
42 =
$ 1,487.06
Large
(
0+
0.000000 ) * (
46.92%
41.79%
/ 2) *( (
$256
*
50.00%
) +(
$513 * (
1 ‐
50.00%
) ) *
40 =
$ ‐
Small
State
(
(
0+
1+
0.000000 ) * (
0.000000 ) * (
46.92%
46.92%
41.79%
41.79%
/ 2) *( (
/ 2) *( (
$256
$256
*
*
30.00%
50.00%
) +(
) +(
$513 * (
$513 * (
1 ‐
1 ‐
30.00%
50.00%
) ) *
) ) *
48 =
0=
$ ‐
$ 19.40
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
(
0+
0.000000 ) * (
46.92%
41.79%
/ 2) *( (
$256
*
30.00%
) +(
$513 * (
1 ‐
30.00%
) ) *
24 =
$ ‐
$ 1,230.38
SECTOR 27. Solid Waste Incineration
ALL
Government
(
2+
0.000000 ) * (
26.16%
23.30%
/ 2) *( (
$256
*
50.00%
) +(
$513 * (
1 ‐
50.00%
) ) *
19 =
(
0+
0.000000 ) * (
26.16%
23.30%
/ 2) *( (
$256
*
30.00%
) +(
$513 * (
1 ‐
30.00%
) ) *
0=
$ ‐
(
0+
0.000000 ) * (
67.80%
60.38%
/ 2) *( (
$256
*
50.00%
) +(
$513 * (
1 ‐
50.00%
) ) *
51 =
$ ‐
(
Small
Industrial Rehabilitation & Maintenance
State Gov't (
0+
0+
0.000000 ) * (
0.000000 ) * (
67.80%
67.80%
60.38%
60.38%
/ 2) *( (
/ 2) *( (
$256
$256
*
*
50.00%
50.00%
) +(
) +(
$513 * (
$513 * (
1 ‐
1 ‐
50.00%
50.00%
) ) *
) ) *
233 =
15 =
$ ‐
$ ‐
Local Gov't (
Large
(
0+
0+
0.000000 ) * (
0.000000 ) * (
67.80%
67.80%
60.38%
60.38%
/ 2) *( (
/ 2) *( (
$256
$256
*
*
50.00%
50.00%
) +(
) +(
$513 * (
$513 * (
1 ‐
1 ‐
50.00%
50.00%
) ) *
) ) *
88 =
40 =
$ ‐
$ ‐
(
Small
State Gov't (
0+
0+
0.000000 ) * (
0.000000 ) * (
67.80%
67.80%
60.38%
60.38%
/ 2) *( (
/ 2) *( (
$256
$256
*
*
50.00%
50.00%
) +(
) +(
$513 * (
$513 * (
1 ‐
1 ‐
50.00%
50.00%
) ) *
) ) *
170 =
1=
$ ‐
$ ‐
Local Gov't (
Large
(
0+
1+
0.000000 ) * (
0.000000 ) * (
67.80%
67.80%
60.38%
60.38%
/ 2) *( (
/ 2) *( (
$256
$256
*
*
50.00%
50.00%
) +(
) +(
$513 * (
$513 * (
1 ‐
1 ‐
50.00%
50.00%
) ) *
) ) *
239 =
44 =
$ ‐
$ 3,663.67
(
1+
0.000000 ) * (
67.80%
60.38%
/ 2) *( (
$256
*
50.00%
) +(
$513 * (
1 ‐
50.00%
Total
) ) *
175 =
70,349
$ 14,367.94
$ 4,001,548
Hazardous Waste Site Work
Refractory Brick Restoration
Small
Page 179
Table 32
Information Provided to the PLHCP (§§ 1910.1026(k)(4), 1915.1026(i)(4), and 1926.1126(i)(4)); Clerical Time and Cost to Provide Information to the PLHCP
This table estimates the burden hours and costs for employers to update required information in worker records and provide the information to the
PLHCP. OSHA assumes that it will take 5 minutes for a clerical worker to update the worker record and provide this information. The Agency
reduced the time for this requirement from 1 hour to 5 minutes because, after the first year of medical surveillance, employers will not need to
establish files.
Hours = POTEXEMP * MEDRECORD * PLANTS
COST = BURDEN HOURS * CLWAGE
Responses
Cost
CLWAGE
Hours
#PLANTS
MEDRECORD
POTEXEMP
* POTEXEMP = Total number of potentially exposed employees at or above the AL and workers with "signs and symptoms" before the
implementation of engineering controls.
* MEDRECORD = Clerical time per employee, in hours, to maintain detailed medical records and provide to the PLHCP (.08 hour)
* CLWAGE = Clerical wage. $/hr.
* #PLANTS = Number of plants represented by the model
22.44%
Sector 1. Electroplating
Large
5 * 0.08 *
1,848 =
807 *
$18.94 =
$15,287.70 10088.999
Small
1 * 0.08 *
3,478 =
253 *
$18.94 =
Large
2 * 0.08 *
7,857 =
1,215 *
$18.65 =
$4,793.71 3163.5697
0
$22,651.04 15183.943
Small
Large
0 * 0.08 *
18 * 0.08 *
8,804 =
189 =
0 *
278 *
$18.65 =
$18.65 =
$0.00
0
$5,186.45 3476.6972
Small
Large
1 * 0.08 *
49 * 0.08 *
107 =
268 =
8 *
1,055 *
$18.65 =
$18.65 =
$154.59 103.62873
$19,674.82 13188.856
Small
State
5 * 0.08 *
2 * 0.08 *
2,145 =
25 =
829 *
4 *
$18.65 =
$18.65 =
$15,459.08 10362.873
$72.42 48.546792
Local
0 * 0.08 *
787 =
0 *
$18.65 =
Large
1 * 0.08 *
10,535 =
814 *
$18.65 =
Small
Large
0 * 0.08 *
0 * 0.08 *
10,724 =
409 =
0 *
0 *
$18.65 =
$18.65 =
Small
Large
1 * 0.08 *
18 * 0.08 *
232 =
402 =
18 *
590 *
$18.65 =
$18.65 =
$334.25 224.06212
$11,007.98 7379.1124
=
469 *
$18.65 =
$8,754.58 5868.5603
=
181 *
$23.45 =
$4,238.05 2259.4044
=
=
4 *
307 *
$23.45 =
$18.65 =
$104.64 55.787762
$5,727.69 3839.5107
=
=
104 *
14 *
$18.65 =
$18.65 =
$1,939.83 1300.3471
$269.25 180.48982
=
=
1 *
57 *
$18.65 =
$23.45 =
$24.48 16.408165
$1,330.62 709.38316
=
=
33 *
102 *
$23.45 =
$23.45 =
$766.87 408.83453
$2,398.25 1278.5604
=
=
181 *
6 *
$23.45 =
$18.65 =
$4,249.92 2265.7317
$109.65 73.502268
=
23 *
$18.65 =
$433.47 290.57627
=
1 *
$27.52 =
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Sector 2. Mild Steel Welding
$0.00
0
0
$15,184.72 10178.955
General Industry
$0.00
$0.00
0
0
Maritme
Construction
2 * 0.08 *
3,037
Small
SECTOR 3. PAINTING GENERAL INDUSTRY
Large
46 * 0.08 *
49
Aerospace
1 * 0.08 *
62
Small
Large
12 * 0.08 *
326
Auto Body
1 * 0.08 *
1,436
Small
Large
2 * 0.08 *
100
Coil Coating
1 * 0.08 *
18
Small
Large
3 * 0.08 *
276
Maritime
1 * 0.08 *
476
Small
2 * 0.08 *
671
Large
Construction
1 * 0.08 *
3,566
Small
6 * 0.08 *
12
State
Government
0 * 0.08 *
647
Local
SECTOR 4. Producers of Chromates
Large
7 * 0.08 *
2
All
Page 180
$28.26
12.83591
Cost
Responses
CLWAGE
Hours
#PLANTS
MEDRECORD
POTEXEMP
Table 32
$0.00
0
Small
0 * 0.08 *
0=
0 *
$27.52 =
Large
22 * 0.08 *
2=
3 *
$27.52 =
$85.57 38.860146
Small
3 * 0.08 *
1=
0 *
$27.52 =
$5.35 2.4287591
Large
2 * 0.08 *
2=
0 *
$22.71 =
$10.15 5.5867769
Small
0 * 0.08 *
0=
0 *
$22.71 =
Large
25 * 0.08 *
5=
10 *
$27.52 =
Small
0 * 0.08 *
0=
0 *
$27.52 =
$0.00
0
Large
5 * 0.08 *
80 =
31 *
$20.51 =
$631.78
385.0773
Small
2 * 0.08 *
126 =
19 *
$20.51 =
$397.12 242.04859
Large
0 * 0.08 *
2=
0 *
$20.53 =
$0.00
0
Small
0 * 0.08 *
8=
0 *
$20.53 =
$0.00
0
Large
0 * 0.08 *
81 =
0 *
$22.75 =
$0.00
0
Small
0 * 0.08 *
40 =
0 *
$22.75 =
$0.00
0
Large
3 * 0.08 *
6=
1 *
$20.42 =
$26.02 15.924557
Small
2 * 0.08 *
4=
1 *
$20.42 =
$11.56 7.0775811
Large
12 * 0.08 *
1
1 *
$27.61
$23.68 10.721887
Small
0 * 0.08 *
0
0 *
$27.61
Large
36 * 0.08 *
34 =
99 *
$27.61 =
$2,720.63 1231.7418
Small
Large
1 * 0.08 *
9 * 0.08 *
11 =
102 =
1 *
73 *
$27.61 =
$27.61 =
$30.62 13.862702
$2,004.68 907.59924
Small
1 * 0.08 *
32 =
3 *
$27.61 =
$90.06 40.772652
Large
3 * 0.08 *
33 =
7 *
$27.61 =
$187.32 84.807117
Small
0 * 0.08 *
31 =
0 *
$27.61 =
Large
25 * 0.08 *
163 =
321 *
$20.14 =
$6,463.70 4011.5459
Small
5 * 0.08 *
118 =
47 *
$20.14 =
$940.17 583.49758
Large
0 * 0.08 *
3=
0 *
$26.83 =
$0.00
0
Small
0 * 0.08 *
1=
0 *
$26.83 =
$0.00
Large
0 * 0.08 *
0=
0 *
$29.53 =
$0.00
0
0
0
Small
3 * 0.08 *
5=
1 *
$29.53 =
Large
0 * 0.08 *
216 =
0 *
$21.29 =
$0.00
0
Small
0 * 0.08 *
1,627 =
0 *
$21.29 =
$0.00
0
Large
0 * 0.08 *
343 =
0 *
$14.20 =
$0.00
0
SECTOR 5. Chromate Pigment Procedures
All
SECTOR 6. CCA Producers
All
$0.00
0
SECTOR 7. Chromium Catalyst Producers
$262.45 119.19059
All
SECTOR 8. Paint and Coating Producers
All
SECTOR 9. Printing Ink Producers
All
SECTOR 10. Plastic Colorant Producers and Users
All
SECTOR 11. Plating Mixture Producers
All
SECTOR 13. Chromium Metal Producers
All
$0.00
0
SECTOR 14. Iron and Steel Mills
All
Carbon Steel
SECTOR 14B. Forging Industry
All
$0.00
0
SECTOR 15. Iron and Steel Foundries
All
SECTOR 17. Chromium Dye Producers
All
SECTOR 18. Chromium Sulfate Producers
All
$32.49 13.752761
SECTOR 19. Chemical Distributors
All
SECTOR 20. Textile Dyeing
All
Page 181
Responses
697 =
0 *
$14.20 =
$0.00
0
Large
1 * 0.08 *
6=
1 *
$14.83 =
$7.82 6.5922485
Small
Large
0 * 0.08 *
12 * 0.08 *
20 =
90 =
0 *
83 *
$14.83 =
$14.83 =
$0.00
0
$1,232.88 1039.3778
Small
2 * 0.08 *
5=
1 *
$14.83 =
$13.03 10.987081
Large
0 * 0.08 *
81 =
0 *
$14.83 =
$0.00
0
Small
0 * 0.08 *
325 =
0 *
$14.83 =
$0.00
0
Large
1 * 0.08 *
179 =
16 *
$23.13 =
$363.19 196.29008
Small
Large
0 * 0.08 *
11 * 0.08 *
0=
23 =
0 *
20 *
$22.88 =
$22.88 =
$0.00
0
$462.96 252.88906
Small
5 * 0.08 *
4=
2 *
$22.88 =
$44.09 24.084673
Large
0 * 0.08 *
5=
0 *
$18.26 =
$0.00
0
Small
0 * 0.08 *
0=
0 *
$18.26 =
$0.00
0
Large
1 * 0.08 *
148 =
9 *
$22.83 =
Small
Large
0 * 0.08 *
0 * 0.08 *
79 =
36 =
0 *
0 *
$22.83 =
$22.83 =
Small
Large
0 * 0.08 *
2 * 0.08 *
32 =
1,162 =
0 *
218 *
$22.83 =
$22.83 =
$0.00
0
$4,967.83 2719.4711
Small
State
1 * 0.08 *
0 * 0.08 *
4,650 =
12 =
290 *
0 *
$22.83 =
$22.83 =
$6,628.22 3628.3966
$9.59 5.250162
Local
0 * 0.08 *
42 =
2 *
$22.83 =
$34.67 18.981355
Large
0 * 0.08 *
40 =
0 *
$19.50 =
$0.00
0
Small
State
0 * 0.08 *
0 * 0.08 *
48 =
0=
0 *
0 *
$19.50 =
$22.83 =
$0.00
$0.00
0
0
Local
0 * 0.08 *
24 =
0 *
$22.83 =
$0.00
0
Large
2 * 0.08 *
19 =
3 *
$19.87 =
Small
0 * 0.08 *
0=
0 *
$19.87 =
$0.00
0
Large
0 * 0.08 *
51 =
0 *
$22.87 =
$0.00
0
Small
State Gov't
0 * 0.08 *
0 * 0.08 *
233 =
15 =
0 *
0 *
$22.87 =
$22.87 =
$0.00
$0.00
0
0
Local Gov't
Large
0 * 0.08 *
0 * 0.08 *
88 =
40 =
0 *
0 *
$22.87 =
$22.87 =
$0.00
$0.00
0
0
Small
State Gov't
0 * 0.08 *
0 * 0.08 *
170 =
1=
0 *
0 *
$22.87 =
$22.87 =
$0.00
$0.00
0
0
Local Gov't
Large
0 * 0.08 *
11 * 0.08 *
239 =
44 =
0 *
37 *
$22.87 =
$22.87 =
$0.00
0
$856.12 467.90168
1 * 0.08 *
175 =
15 *
$22.87 =
$338.57
CLWAGE
0 * 0.08 *
Hours
Small
#PLANTS
Cost
MEDRECORD
POTEXEMP
Table 32
SECTOR 21. Colored Glass Producers
All
Fiber, Flat, and Container Glass
SECTOR 22. Printing
All
SECTOR 24. Chromium Catalyst Users
All
Chromium Catalyst Companies
SECTOR 25. Refractory Brick Producers
All
SECTOR 26. Woodworking
$213.93 117.11075
General Industry
$0.00
$0.00
0
0
Maritime
Construction
Government
SECTOR 27. Solid Waste Incineration
All
Government
SECTOR 30. Superalloy Producers and Users
$63.79 40.129309
All
SECTOR 31. Construction
Industrial Rehabilitation & Maintenance
Hazardous Waste Site Work
Refractory Brick Restoration
Small
Page 182
185.0407
Hours
70,349
8,671
Page 183
Cost
Responses
CLWAGE
#PLANTS
Total
MEDRECORD
POTEXEMP
Table 32
169,342
108,386
Table 33
Clerical Time and Cost to Provide the PLHCP’s Written Medical Opinion to Employee
and to Establish and Maintain Record for Air Monitoring Data and Medical Surveillance
The Standard requires that employers maintain exposure and medical surveillance records. As part of the medical record,
employers must maintain a copy of the PLHCP's written opinion. OSHA assumes that the 5 minutes for recordkeeping
includes the time it takes for employers to provide a copy of the PLHCP's written opinion to the employee.
HOURS = RECTIME * EMPEXP * #PLANTS
COST = Hours x CLWAGE
RECTIME = Time, 0.08 hour per record for exposed workers
EMPEXP = Exposed employees to chromium or employees exposed dermally
#PLANTS = Number of Plants
CLWAGE = Clerical wage Rate
Responses
1,848 =
2,018
$18.94 $ 38,219
25,222
Small
0.08 *
3 *
3,478 =
759
$18.94 $ 14,381
9,491
Large
0.08 *
3 *
8,339 =
1,934
$18.65 $ 36,061
24,174
Small
0.08 *
3 *
11,844 =
2,747
$18.65 $ 51,216
34,332
Large
0.08 *
4 *
11,345
3,508
$18.65 $ 65,413
43,849
Small
0.08 *
1 *
13,993
1,082
$18.65 $ 20,169
13,520
Large
0.08 *
41 * 1,433 =
4,687
$23.45 $ 109,887
58,583
Small
SECTOR 4. Producers of Chromates
Large
ALL
0.08 *
1 * 6,205 =
664
$23.45 $ 15,562
8,296
0.08 *
72 *
2=
11
$27.52 $ 303
138
Small
SECTOR 5. Chromate Pigment Procedures
Large
ALL
0.08 *
0 *
0=
0
$27.52 $ ‐
0.08 *
22 *
2=
3
$27.52 $ 86
39
Small
0.08 *
3 *
1=
0
$27.52 $ 5
2
Large
0.08 *
7 *
2=
1
$22.71 $ 30
17
0.08 *
0 *
0=
0
$22.71
0.08 *
60 *
5=
23
EMPEXP
CLWAGE
14 *
HOURS
0.08 *
#PLANTS
Large
RECTIME
COST
22.44%
Sector 1. Electroplating
ALL
Sector 2. Welding
ALL
Sector 2B. Mild Steel Welding
SECTOR 3. PAINTING
ALL
SECTOR 6. CCA Producers
ALL
Small
SECTOR 7. Chromium Catalyst Producers
Large
ALL
Page 184
0
0
0
$27.52 $ 636
289
COST
Responses
0
0
111
$20.51 $ 2,274
1,386
126 =
77
$20.51 $ 1,588
968
17 *
2=
3
$20.53 $ 68
42
0.08 *
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
0.08 *
ALL
17 *
8=
11
$20.53 $ 228
139
5 *
81 =
35
$22.75 $ 788
433
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
0.08 *
1 *
40 =
3
$22.75 $ 64
35
0.08 *
16 *
6=
7
$20.42 $ 147
90
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
0.08 *
4 *
4=
1
$20.42 $ 23
14
0.08 *
43 *
1=
3
$27.61 $ 86
39
Small
SECTOR 14. Iron and Steel Mills
Large
ALL
0.08 *
0 *
0=
0
$27.61 $ ‐
0.08 *
42 *
1,929 =
6,504
$27.61 $ 179,562
81,295
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
0.08 *
3 *
22 =
4
$27.61 $ 122
55
0.08 *
105 *
163 =
1,369
$20.14 $ 27,578
17,116
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
0.08 *
105 *
118 =
996
$20.14 $ 20,057
12,448
0.08 *
29
*
3=
6
$26.83 $ 167
78
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
0.08 *
6
*
1=
0
$26.83 $ 12
6
0.08 *
0 *
0=
0
$29.53 $ ‐
0
Small
SECTOR 19. Chemical Distributors
Large
ALL
0.08 *
2 *
5=
1
$29.53 $ 22
9
0.08 *
0 *
216 =
0
$21.29 $ ‐
Small
0.08 *
0 *
1,627 =
0
$21.29 $ ‐
Large
0.08 *
58 *
343 =
1,590
$14.20 $ 22,583
19,876
Small
0.08 *
2 *
697 =
102
$14.20 $ 1,455
1,281
HOURS
EMPEXP
#PLANTS
$27.52
RECTIME
CLWAGE
Table 33
Small
SECTOR 8. Paint and Coating Producers
Large
ALL
0.08 *
0 *
0=
0
0.08 *
17 *
80 =
Small
SECTOR 9. Printing Ink Producers
Large
ALL
0.08 *
8 *
0.08 *
SECTOR 20. Textile Dyeing
ALL
Page 185
0
0
COST
Responses
5 *
96 =
35
$14.83 $ 517
436
Small
0.08 *
1 *
25 =
2
$14.83 $ 27
23
Large
0.08 *
38 *
81 =
249
$14.83 $ 3,691
3,111
Small
SECTOR 24. Chromium Catalyst Users
Large
ALL
0.08 *
2 *
0=
0
0.08 *
33 *
179 =
471
$23.13 $ 10,896
5,889
Small
Large
0.08 *
0.08 *
16 *
1 *
0=
23
0
2
$23.13 $ ‐
$23.13 $ 47
25
0.08 *
0 *
0
0
$23.13 $ ‐
0.08 *
11 *
5=
5
$18.26 $ 85
Small
0.08 *
0 *
0=
0
$18.26 $ ‐
Large
0.08 *
0 *
1,358 =
0
$22.83 $ ‐
0
Small
SECTOR 27. Solid Waste Incarnation
Large
ALL
0.08 *
0 *
4,803 =
0
$22.83 $ ‐
0
0.08 *
0 *
40 =
0
$19.38 $ ‐
0
Small
SECTOR 30. Superalloy Producers and Users
Large
ALL
0.08 *
1 *
72 =
5
$19.38 $ 97
63
0.08 *
41 *
19 =
63
$19.87 $ 1,244
783
Small
0.08 *
0 *
0=
0
Large
0.08 *
25
51
103
$22.87 $ 2,359
1,289
Small
State Gov't
0.08 *
0.08 *
1
1
233
15
20
1
$22.87 $ 451
$22.87 $ 29
246
16
Local Gov't
Large
0.08
0.08 *
1
15
88
40
7
48
$22.87 $ 169
$22.87 $ 1,088
93
594
Small
State Gov't
0.08 *
0.08 *
3
2
170
1
43
0
$22.87 $ 985
$22.87 $ 3
538
2
Local Gov't
Large
0.08 *
0.08 *
3
15
239
44
60
52
$22.87 $ 1,383
$22.87 $ 1,199
756
655
Small
0.08 *
1
175
15
$22.87 $ 339
185
SECTOR 22. Printing
ALL
Catalyst Service Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
SECTOR 26. Woodworking
ALL
CLWAGE
HOURS
0.08 *
EMPEXP
SECTOR 21. Colored Glass Producers
Large
ALL
RECTIME
#PLANTS
Table 33
$14.83 $ ‐
0
0
58
$19.87 $ ‐
SECTOR 31. Construction
Industrial Rehabilitation &
Maintenance
Hazardous Waste Site Work
Refractory Brick Restoration &
Maintenance
Page 186
Page 187
Responses
29,442
COST
HOURS
TOTAL
CLWAGE
#PLANTS
71,728
EMPEXP
RECTIME
Table 33
$ 633,401
368,023
File Type | application/pdf |
File Title | Chromium Tables 1-34 Updated_103015.xlsx |
Author | RShowalter |
File Modified | 2015-11-13 |
File Created | 2015-11-13 |