Calculation Tables for ICR 1739.08

Copy of Calculation tables 1739 08.xlsx

NESHAP for the Printing and Publishing Industry (40 CFR part 63, subpart KK) (Renewal)

Calculation Tables for ICR 1739.08

OMB: 2060-0335

Document [xlsx]
Download: xlsx | pdf

Overview

Respondent
EPA


Sheet 1: Respondent

Burden item (A) (B) (C) (D) (E) (F) (G) (H)

Person hours per occurrence No. of occurrences per respondent per year Person hours per respondent per year Respondents per year a Technical person- hours per year Management person hours per year Clerical person hours per year Total Cost



(C=AxB)
(E=CxD) (Ex0.05) (Ex0.1) Per year b Technical 103.97
1. Applications N/A






Managerial 129.93
2. Surveys and studies N/A






Clerical 51.79
3. Reporting requirements









a. Familiarization with the regulatory requirements c 4 1 4 352 1,408 70.4 140.8 $162,828.86 all respondents must refamiliarize
b. Required activities









Initial performance test d 240 1 240 0 0 0 0 $0

Repeat performance tests d 240 1 240 0 0 0 0 $0

Install CMS d 100 1 100 0 0 0 0 $0

Develop CMS/QC program and test plan d 100 1 100 0 0 0 0 $0

Conduct CMS performance evaluation d 300 1 300 0 0 0 0 $0

Maintain, adjust, and calibrate CMS e 6 52 312 46 14,352 717.6 1,435.2 $1,659,744.22

c. Create information See 3B








d. Gather existing information See 3E








e. Write report









New Sources









Notification of initial and HAP usage d 4 1 4 0 0 0 0 $0

Notification of compliance status d 4 1 4 0 0 0 0 $0

Notification of performance test d 2 1 2 0 0 0 0 $0

Report of performance test d 40 1 40 0 0 0 0 $0

Existing Sources









Startup, shutdown, malfunction report f 2 2 4 30 120 6 12 $13,877.46

Semiannual excess emission and CMS performance report g 16 2 32 76 2,432 121.6 243.2 $281,249.86

Subtotal for Reporting Requirements



21,059 $2,117,700.40

4 Recordkeeping requirements









a. Familiarization with the regulatory requirements See 3A








b. Plan activities N/A








c. Implement activities N/A








d. Develop record system d 40 1 40 0 0 0 0 $0

e. Time to enter information









Records of maintenance h 4 52 208 105 21,840 1,092 2,184 $2,525,697.72

Records of startup, shutdown, and malfunction i 2 52 104 30 3,120 156 312 $360,813.96

Records of malfunction or inoperative CMS i 2 2 4 30 120 6 12 $13,877.46

Records of applicability determination d 2 1 2 0 0 0 0 $0

Records of CMS operation j 2 52 104 46 4,784 239.2 478.4 $553,248.07

Records of liquid-liquid material balances; HAP, volatile material, solids and materials applied, operating parameters k 2 12 24 105 2,520 126 252 $291,426.66

Records of materials used by incidental printers l 40 1 40 2 80 4 8 $9,251.64

Records of HAP usage (area sources) m & n 0.5 12 6 200 1,200 60 120 $138,774.60

f. Time to train personnel See 3A








g. Time for audits N/A








Subtotal for Recordkeeping Requirements



38,714 $3,893,090.11

TOTAL LABOR BURDEN AND COST (rounded) o



59,800 $6,010,000

Capital and O&M Cost (see Section 6(b)(iii)): o






$414,000

TOTAL COST: o






$6,420,000




















98 hr/resp











Assumptions:









a We have assumed that the average number of respondents potentially subject to this rule is 352. Of the 352 facilities, 152 are major sources, and 200 are area sources. There will be no additional new sources over the three-year period of this ICR.









b This ICR uses the following labor rates: $129.93 ($61.87+ 110%) per hour for Executive, Administrative, and Managerial labor;$103.97 ($49.51 + 110%) per hour for Technical labor, and $51.79 ($24.66 + 110%)









per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2014, Table 2. Civilian Workers, by occupational and industry group. The rates are from column 1, Total compensation. The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.









c We have assumed that two existing facilities will need to read and review instructions.









d We have assumed that there will be no new sources during the three-year period of this ICR.









e We have assumed that 30 percent of respondents (major source) will be required to maintain, adjust, and calibrate CMS.









f We have assumed that 20 percent of the respondents (major source) will have startup, shutdown, malfunction incidents with equipment or inoperative CMS reports to complete.









g We have assumed that 46 facilities are fitted with CMS control, and an additional 30 facilities that may encounter excess emissions.









h We have assumed that these facilities do not have CMS installed in them.









i We have assumed that 20 percent of respondents will enter information on startup, shutdown, malfunction problems with equipment or inoperative CMS.









j We have assumed that 46 respondents (major source) will enter information on CMS operations.









k We have assumed that these facilities do not have CMS installed in them.









l We have assumed that 2 existing facilities will be required to enter information on records of materials used by incidental printers.









m We have assumed that 200 area sources, which includes products and packaging rotogravure and wide-web flexographic printing presses, are subject to recordkeeping requirements, and are required to keep a monthly record of HAP usage to show that they are meeting the limit.









n We have assumed that it will take each respondent 0.5 hours to record HAP usage.









o Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.










Sheet 2: EPA

Activity (A) (B) (C) (D) (E) (F) (G) (H)

EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant per year Plants per year a Technical person- hours per year Management person-hours per year Clerical person-hours per year Cost, $ b



(C=AxB)
(E=CxD) (Ex0.05) (Ex0.1)


Required activities







Technical 46.67
New sources







Managerial 62.9
Initial performance tests c 24 1 24 0 0 0 0 $0 Clerical 25.25
Repeat performance tests c 24 1 24 0 0 0 0 $0

Report review









New sources









Notification of initial startup c 2 1 2 0 0 0 0 $0

Notification of compliance status c 4 1 4 0 0 0 0 $0

Notification of performance test c 1 1 1 0 0 0 0 $0

Review test results c 8 1 8 0 0 0 0 $0

Existing sources









Semiannual excess emissions and CMS performance report d 2 2 4 76 304 15.2 30.4 $15,911.36

Periodic startup, shutdown, malfunction report e 2 1 2 30 60 3 6 $3,140.40

TOTAL ANNUAL BURDEN AND COST (rounded) f



419 $19,100












Assumptions:









a We have assumed that the average number of respondents potentially subject to this rule is 352. Of the 352 facilities, 152 are major sources, and 200 are area sources. There will be no additional new sources over the three-year period of this ICR.









b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: $62.90 Managerial rate, $46.67 Technical rate, and $25.25 Clerical rate. These rates are from the Office of Personnel Management (OPM) 2015 General Schedule, which excludes locality rates of pay.









c We have assumed that there will be no new sources during the three-year period of this ICR.









d We have assumed that 46 facilities are fitted with CMS control, and an additional 30 facilities that may encounter excess emissions.









e We have assumed that 20 percent of sources will be required to submit periodic startup, shutdown, malfunction report.









f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.









File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy