HUD-95379 HUD Representative’s Trip Report (Multifamily)

Multifamily Project Applications and Construction Prior to Initial Endorsement

HUD-95379

Multifamily Project Applications and Construction Prior to Initial Endorsement

OMB: 2502-0029

Document [doc]
Download: doc | pdf


HUD Representative’s

Trip Report (Multifamily)


U.S. Department of Housing

and Urban Development

Office of Multifamily Housing




Project Name:

     

Project No:

     

Schedule Progress:

     

Actual Progress:

     

Date of Visit:

     

No. of Buildings:

     

No. Dwelling Units:

     

Locality:

     

Contractor:

     

A. Evaluation: Details - Concerning:

1. Contractor’s organization, operations and supervision, disputes, etc.

2. Architect’s supervision and services

3. Special circumstances, occupancy, delays, claims


4. Non-compliance in the work

5. Payments to the contract; Labor and EEO Provisions.

     




B. All items must be covered in this report and all adverse findings shall be discussed with Project Architect.

C. Trip Included Examination of      

Dwelling Units in Bldgs. Nos:      

D. Arrived: (date)

     

(hour)

     

Departed: (date)

     

(hour)

     


Report No:

     

Date:

     

Name & Signature of HUD Representative: Name & Signature of Construction Manager



X X

           



Instructions - FORM HUD-95379 – HUD REPRESENTATIVE’S TRIP REPORT

(MULTIFAMILY)

(INSPECTION REPORT)


PURPOSE: Form HUD-95379 is used for documenting job site visits and evaluation of multifamily project construction.


PREPARED BY: Designated member of the Architecture and Engineering Staff, e.g., Inspector, HUD Representative, Construction Manager (CM), or others including supervisory personnel.


NUMBER: Original and additional copies as necessary to meet distribution needs.


DISTRIBUTION: The original shall be forwarded to the Construction Manager. One copy shall be retained by the designated person who prepares the report. Additional copies shall be distributed as deemed necessary to the architect, owner, or builder, etc. When inspections are conducted by an inspection contractor, copies shall be provided to the Government Technical Monitor (GTM) and Government Technical Representative (GTR) based on contract requirements.


GENERAL INSTRUCTIONS: In narrative form give full and detailed information concerning each applicable item shown on the report with reference being made to the heading and item number. Positive as well as adverse information should be included. It is essential that the analysis of contract administration by the supervisory architect, builder’s supervision of construction, and status of physical work be accurate, thorough, well considered and comprehensive. Additionally, photographs should be used to supplement comments to the maximum extent possible, especially when photographs will add to the understanding of adverse conditions.


PREPARATION: The HUD Representative, or any other person visiting the site in an official capacity, shall prepare a complete report on Form HUD-95379 for each visit to each project. Results of special assignments may also be reported on this form unless otherwise directed by the Construction Manager.


SPECIAL INSTRUCTIONS:


  1. Heading. Applicable information and dates shall be entered in the spaces provided. Scheduled progress shall be from the Builder’s Progress Schedule and actual progress shall be as estimated by the HUD Representative.


  1. Part A. Evaluation – Details. All five items under Part A must be answered. If more that one page is needed, each page shall be numbered, identified with the project name, and show the date of the visit. The HUD Representative’s observations for each item shall be reported by entering the item number followed by a clear, concise statement as to:


Item 1: Facts should be entered under this item that pertains to the Builder’s organization, operations and supervision. Observations in regard to the progress of the work, status of the work, trades and equipment working, storage of material, protection of material stored or installed, temporary job facilities and utilities, site housekeeping, job safety and security, and the quality of project supervision as to planning, direction, control, and coordination should be included. Any adverse observation(s) shall also be recorded.


Item 2: An evaluation of the Architect’s performance should be provided here. Under the terms of the Owner-Architect Agreement, the Architect is to provide construction contract administration for the Owner including on-site observation and other specific services. Comments on the Architect’s compliance or non-compliance with the Agreement should be entered. The date of the Architect’s latest site visit and any instructions to the Builder contained in the Architect’s log/field reports shall be recorded.


Item 3: All details concerning special circumstances, occupancy, delays, claims, disputes, etc., should be entered here. Include information that pertains to inspection of the work or job site visits by others; premature occupancy, permission to occupy or occupancy permits; potential and actual delays and their causes, such as strikes or unusual weather; potential change orders; potential or actual disputes between builders, subcontractors, workmen, architect, owner or others; etc. Minimum entry should provide details of observations made to determine that no adverse conditions appear to be present; e.g., Discussions with ...; details of good progress and good working relationships observed; etc.


Item 4: Observed non-compliances in the physical work with the drawings and specifications, or other failures of the Builder to perform in accordance with the provisions of the construction contract shall be detailed under this item. All such observations noted must be accurately documented and followed-up during subsequent visits. Non-compliances must continue to be entered on subsequent reports until corrected and the method of correction recorded. Minimum entry should detail what was observed and/or who was contacted to determine that no non-compliance issues appeared to be present.


Item 5: All facts in regard to payments to the Builder, labor and EEO provisions should be entered here. Actions such as the acceptance or modification of a request for payment, inventory of stored materials, wage interviews, or observations concerning display or failure to display wage decisions and EEO posters should be included. Any violations of the labor or EEO provisions of the contract that is observed shall be recorded.


  1. Parts B, C, D – The Parts are self-explanatory. Entries shall always be made in Parts C and D.


  1. The HUD Representative, or other official, visiting the site must date, print name and sign the report.


  1. Reports shall be numbered consecutively in the space provided at the bottom of the Form. If the report is other than a regular site visit, it shall be identified in this space as: Special, Final, Guarantee, etc.


REPORT EVALUATION:


  1. The Contract Manager (CM) shall be responsible for the review and evaluation of each report, and if the contents so indicate, initiate the appropriate actions necessary to accomplish any required corrections.


  1. The CM shall take appropriate steps to ensure that each report is properly prepared, containing thorough, accurate, and well-considered information.


  1. The CM or designated Deputy shall date, print name and sign the report after review and evaluation.

form HUD-95379 (6/2001)

Handbook Ref. MAP Guide


File Typeapplication/msword
File TitleMultifamilyTripReport
AuthorEdgar L. Kapfer
Last Modified ByWendy N. Carter
File Modified2011-09-21
File Created2010-11-04

© 2024 OMB.report | Privacy Policy