The affected entities are subject to
the General Provisions of the NESHAP at 40 CFR part 63, subpart A,
and any changes, or additions to the Provisions specified at 40 CFR
part 63, subpart YYYY. Owners or operators of the affected
facilities must submit initial notification, performance tests, and
periodic reports and results. Owners or operators are also required
to maintain records of the occurrence and duration of any startup,
shutdown, or malfunction in the operation of an affected facility,
or any period during which the monitoring system is inoperative.
Reports, at a minimum, are required semiannually.
There is an adjustment increase
in respondent labor hours in this ICR from the most-recently
approved ICR. This is due to a projected industry growth, which
results in an increase in the estimated number of sources subject
to these standards. Additionally, there is a small adjustment
decrease in the capital/startup cost due to a correction. The
previous ICR incorrectly calculated the labor cost for installing
catalyst inlet temperature monitoring device.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.