Download:
docx |
pdf
Analysis
of Proposed Main Construction Contract
U.S.
Department of Housing
OMB
Approval No. 2577-0157
(exp.1/31/2017)
and
Urban Development
Office
of Public and Indian Housing
Public
reporting burden for this collection of information is estimated to
average 2 hours per response, including the time for reviewing
instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the
collection of information. This agency may not collect this
information, and you are not required to complete this form, unless
it displays a currently valid OMB control number.
This
information is collected under the authority of Section 6(c) of the
U.S. Housing Act of l937. Under the ACC, Housing Agencies (HAs) must
prepare and submit main construction contracts and other contracts
for projects being developed, or proposed to be developed under the
Low-Income Housing Program HUD will use the information to approve
construction bids and budgets prior to awarding PHA’s
construction contracts. The approved pre-bid budget amounts for
various elements, the actual bid amounts and any proposed changes,
and the actual final adjusted bid amount by comparing these
elements, HUD/PHA can prepare a revised Development Cost Budget.
Responses to the collection of information are required to obtain a
benefit The information requested does not lend itself to
confidentiality.
Name
of Public Housing Agency
Project
No.
Location
of Project
No.
of Units
No.
of Rooms
Account
Classification
Pre-Bid
Estimate
Bid
Amount
Bid
Amount
Proposed
Changes in
Minus
Changes (3 + 4)
Bid
Amount Plus or
1
2
3
4
5
61
Previous
editions are obsolete.
ref.
Handbooks 7475.1 & 7417.1
form
HUD-52396 (1/2014)
Total
Nondwelling Structures
Nondwelling
Equipment (1475)
Site
Improvement (1450)
|
|
|
|
|
|
Demolition
|
|
|
|
|
|
|
Grading
|
|
|
|
|
|
Sanitary
Sewers
|
|
|
|
|
|
Storm
Sewers
|
|
|
|
|
|
Water
Distribution
|
|
|
|
|
|
Gas
Distribution System
|
|
|
|
|
|
Electric
Distribution System
|
|
|
|
|
|
All.
for Abnormal Sub-Soil Conditions
|
|
|
|
|
Excess
Dwell. & Nondwell. Foundations
|
|
|
|
|
Paved
Areas
|
|
|
|
|
|
Fin.
Grading, Lawns & Planting
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Miscellaneous
|
|
|
|
|
|
|
Total
Site Improvement
|
|
|
|
|
|
Dwelling
Structures (1460) General
|
|
|
|
|
Plumbing
|
|
|
|
|
|
Heating
(except space heaters)
|
|
|
|
|
|
Electrical
(including meters)
|
|
|
|
|
|
Elevators
|
|
|
|
|
|
Total
Dwelling Structures
|
|
|
|
|
|
Dwelling
Equipment (1465) Ranges
|
|
|
|
|
Refrigerators
|
|
|
|
|
|
Space
Heaters
|
|
|
|
|
|
Shades
|
|
|
|
|
|
Screens
|
|
|
|
|
|
Work
Tables
|
|
|
|
|
|
Other
|
|
|
|
|
|
Total
Dwelling Equipment
|
|
|
|
|
|
Nondwelling
Structures (1470) Admin. Bldgs. or Spaces
|
|
|
|
|
Maintenance
Bldgs. or Spaces
|
|
|
|
|
|
Community
Bldgs. or Spaces
|
|
|
|
|
|
|
|
|
|
|
File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
File Modified | 0000-00-00 |
File Created | 2021-01-23 |