OMB files this comment in accordance with 5 CFR 1320.11(c) of the Paperwork Reduction Act and is withholding approval of this collection at this time. This OMB action is not an approval to conduct or sponsor an information collection under the Paperwork Reduction Act of 1995. The agency shall examine public comment in response to the Notice of Proposed Rulemaking and will include in the supporting statement of the next ICR, to be submitted to OMB at the final rule stage, a description of how the agency has responded to any public comments on the ICR. This action has no effect on any current approvals.
Inventory as of this Action
Requested
Previously Approved
06/30/2018
36 Months From Approved
06/30/2018
3,802
0
3,802
31,104
0
31,104
0
0
0
The FERC-725R information collection includes requirements for Reliability Standards for the Bulk Power System: BAL Reliability Standards.
NOPR in RM16-13. Proposed Reliability Standards BAL-005-1 (FERC-725R) and FAC-001-3 (FERC-725D) will enhance the reliability of the Bulk-Power System, as compared to current Reliability Standards BAL-005-0.2b and FAC-001-2, by clarifying and consolidating existing requirements related to frequency control. The proposed Reliability Standards support more accurate and comprehensive calculation of Reporting Area Control Error (ACE) by requiring timely reporting of an inability to calculate Reporting ACE and by requiring balancing authorities to maintain minimum levels of annual availability of 99.5% for each balancing authorityâs system for calculating Reporting ACE.
Reliability Standards BAL-005-1 (FERC-725R) and FAC-001-3 (FERC-725D) and the proposed retirement (FERC-725A) addressed in the NOPR in RM16-13 clarify, consolidate, streamline, and enhance the Reliability Standards addressing frequency control. These proposed revisions streamline and clarify the current requirements related to the calculation of Reporting ACE â a key frequency control and reliability indicator factor -- including consolidating the seventeen requirements of currently-effective BAL-005-0.2b, associated with FERC-725R, into seven requirements in BAL-005-1, relocation of certain requirements related to interconnection requirements for transmission owners and generation owners into FAC-001-3, associated with FERC-725D, relocation of Requirement R3 in currently-effective BAL-006-2 into proposed BAL-005-1, and relocation of certain metrics and calculations required for calculating Reporting ACE into the NERC definition of Reporting ACE and its component definitions.
$5,481
No
No
No
No
No
Uncollected
Syed Ahmad 202 502-8718
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.