NERC Implementation Plan BAL-006-2

Retirement Plan 725A.pdf

FERC-725A, (NOPR in RM16-13), Mandatory Reliability Standards for Bulk-Power Systems

NERC Implementation Plan BAL-006-2

OMB: 1902-0244

Document [pdf]
Download: pdf | pdf
Exhibit F
Implementation Plan for Retirement of BAL-006-2

Implementation Plan
Reliability Standard BAL-006-2

Project 2010-14.2.1 Balancing Authority Reliability-based Controls
Requested Approval


N/A

Requested Retirement


BAL-006-2 – Inadvertent Interchange

Prerequisite Approval


BAL-005-1 – Balancing Authority Controls

Prerequisite Events
 NERC Operating Committee approval of Inadvertent Interchange Guideline1
Revisions to Glossary Terms


None

Applicable Entities


Balancing Authority

General Considerations
To guarantee proper coordination as intended by the standard drafting team for Project 201014.2.1, BAL-006-2 will be retired concurrently with the effective date of BAL-005-1 and requisite
approval of Inadvertent Interchange Guideline, as reflected in the “Prerequisite Approvals” and
“Prerequisite Events” sections above.
Effective Dates

Reliability guidelines are documents that suggest approaches or behavior in a given technical area for the
purpose of improving reliability. Reliability guidelines are not binding norms or mandatory requirements.
Reliability guidelines may be adopted by a responsible entity in accordance with its own facts and circumstances.

1

BAL-006-2 shall be retired on the effective date of BAL-005-1 and the approval of Inadvertent
Interchange Guideline.

FAC‐001‐3 – Facility Interconnection Requirements  

2 


File Typeapplication/pdf
File TitleMicrosoft Word - Project 2010-14 2 1 FAC-001-3 Implementation Plan - Clean - 2015 10 25
Authorrichardsond
File Modified2016-10-12
File Created2015-11-09

© 2024 OMB.report | Privacy Policy