Information Collection Request

FERC-725A, RD25-10 Mandatory Reliability Standards for the Bulk-Power System

ICR 202606-1902-005 · OMB 1902-0244 · Received in OIRA

Forms and Documents
DocumentTypeStatusAvailability
RD25-10 FERC-725A Supporting Statement.docx Supporting Statement A Uploaded 2026-06-25 Available
TOP-003-7.pdf Supplementary Document Uploaded 2025-07-29 Available
RD25-10 30-day notice(Published).pdf Supplementary Document Uploaded 2026-06-24 Available
RD25-10-000 Info Coll 30-day notice (Issued).docx Supplementary Document Uploaded 2026-06-24 Available
RD25-10 60-day (Published).pdf Supplementary Document Uploaded 2026-06-24 Available
RD25-10 DLO (Issued).docx Supplementary Document Uploaded 2026-06-24 Available
18 CFR 40.pdf Supplementary Document Uploaded 2020-11-16 Available
16 USC 824o.pdf Supplementary Document Uploaded 2020-11-16 Available
IC Document Collections
IC IDCollectionTypeStatusForm
276766 TOP-003-7 GO, GOP Modified
271979 TOP-010-1(i) Unchanged
271978 INT-009-3 Unchanged
271977 INT-006-5 Unchanged
268346 TOP-002-5 Ongoing Unchanged
264848 TOP-003-7 (formerly TOP-3-6.1) (BA) Modified
263772 FERC-725A Mandatory Reliability Standards for Bulk-Power System: Record Keeping Unchanged
219121 Rel. Stds. TOP-001-6 Unchanged
ICR Details
1902-0244 202606-1902-005
Received in OIRA 202507-1902-004
FERC FERC-725A
FERC-725A, RD25-10 Mandatory Reliability Standards for the Bulk-Power System
Revision of a currently approved collection   No
Regular 06/25/2026
  Requested Previously Approved
06/30/2028 06/30/2028
8,853 8,052
1,109,836 1,103,428
371,100 371,100

The FERC 725A contains the Transmission Operations (TOP) standards and Interchange Scheduling and Coordination (INT) Standards that pertain to operation planning for transmission providers. TOP-001, TOP-002, TOP-003, TOP-010, INT-006, and INT-009. In this ICR the DLO for RD25-10 is retiring TOP-003-6.1 and applying changes to the new standard TOP-003-7 in which Category 1 and 2 utilizing requirement 5 have been incorporated. Adding Generator Owners and Generator Operators.

US Code: 16 USC 824o Name of Law: Federal Power Act
  
None

Not associated with rulemaking

  90 FR 59809 12/22/2025
91 FR 10388 03/03/2026
No

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 8,853 8,052 0 801 0 0
Annual Time Burden (Hours) 1,109,836 1,103,428 0 6,408 0 0
Annual Cost Burden (Dollars) 371,100 371,100 0 0 0 0
Yes
Changing Regulations
No
The annual responses and burden hours resulted in a increase of 801 responses and 6,408 annual burden hrs for the addition of Generator owners and Generator Operators to Reliability Standard TOP-003-7 which had 97 responses; 388 hours.

$8,404
No
    No
    No
No
No
No
No
David O'Conner 202 502-6695

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
06/25/2026