30 CFR 784 - Underground Mining Permit Applications - Minimum Requirements for Reclamation and Operations Plan

ICR 201611-1029-001

OMB: 1029-0136

Federal Form Document

Forms and Documents
Document
Name
Status
No forms / supporting documents in this ICR. Check IC Document Collections.
IC Document Collections
IC ID
Document
Title
Status
224323
New
224322
New
224321
New
224320
New
217121
Removed
217120
Removed
213979
Modified
213978
Modified
213977
Modified
213976
Modified
213975
Modified
213974
Modified
213973
Modified
213972
Modified
213965
Modified
213964
Modified
213963
Modified
213962
Modified
213961
Modified
213960
Modified
213959
Modified
213958
Modified
213957
Modified
213956
Modified
213955
Modified
213954
Modified
213953
Modified
213952
Modified
213951
Modified
213950
Modified
213949
Modified
213948
Modified
213947
Modified
213946
Removed
213945
Modified
213944
Modified
213942
Modified
213941
Modified
213940
Modified
213939
Modified
213938
Modified
213937
Modified
213936
Modified
213935
Modified
213934
Modified
213933
Modified
213932
Modified
213931
Modified
ICR Details
1029-0136 201611-1029-001
Historical Inactive 201411-1029-007
DOI/OSMRE Part 784 - Final SPR
30 CFR 784 - Underground Mining Permit Applications - Minimum Requirements for Reclamation and Operations Plan
New collection (Request for a new OMB Control Number)   No
Regular
Preapproved 12/06/2016
Retrieve Notice of Action (NOA) 11/16/2016
  Inventory as of this Action Requested Previously Approved
12/31/2019 36 Months From Approved
1,574 0 0
25,033 0 0
5,081,139 0 0

Permit application requirements in Sections 507, 508, 510, 515 and 522 of PL 95-87 (30 USC 1201 et. seq.) require the applicant to submit the operations and reclamation plans for coal mining activities.

US Code: 30 USC 1201 et. seq. Name of Law: Surface Mining Control and Reclamation Act of 1977
  
None

1029-AC63 Final or interim final rulemaking

Yes

45
IC Title Form No. Form Name
784.16 - What must I include in the fish and wildlife protection and enhancement plan? (SRAs)
784.19 - What baseline information on hydrology, geology, and aquatic biology must I provide? (SRAs)
784.26 - What information must I provide if I plan to return coal processing waste to abandoned underground workings? (SRAs)
784.29 - What information must I include in the surface-water runoff control plan? (Industry)
784.37 - What information must I provide concerning access and haul roads? (SRAs)
784.38 - What information must I provide concerning support facilities? (SRAs)
784.12(h) - Stream restoration plan. (SRA)
784.23 - What information must I include in plans for the monitoring of groundwater, surface water, and the biological condition of streams during and after mining? (Industry)
784.26 - What information must I provide if I plan to return coal processing waste to abandoned underground workings? (Industry)
784.29 - What information must I include in the surface-water runoff control plan? (SRAs)
784.30 - When must I prepare a subsidence control plan and what information must that plan include? (Industry)
784.31 - What information must I provide concerning the protection of publicly owned parks and historic places? (Industry)
784.20 - How must I prepare the determination of the probable hydrologic consequences of my proposed operation (PHC determination)? (Industry)
784.20 - How must I prepare the determination of the probable hydrologic consequences of my proposed operation (PHC determination)? (SRAs)
784.21 - What requirements apply to preparation and review of the cumulative hydrologic impact assessment (CHIA)? (SRAs)
784.22 - What information must I include in the hydrologic reclamation plan and what information must I provide on alternative water sources? (Industry)
784.22 - What information must I include in the hydrologic reclamation plan and what information must I provide on alternative water sources? (SRAs)
784.35 - What information must I provide concerning the minimization and disposal of excess spoil? (SRAs)
784.37 - What information must I provide concerning access and haul roads? (Industry)
784.38 - What information must I provide concerning support facilities? (Industry)
784.11 - What must I include in the general description of my proposed operations? (Industry)
784.14 What requirements apply to the use of existing structures? (SRAs)
784.12 - What must the reclamation plan include? (Industry)
784.12 - What must the reclamation plan include? (SRAs)
784.13 - What additional maps and plans must I include in the reclamation plan? (Industry)
784.19 - What baseline information on hydrology, geology, and aquatic biology must I provide? (industry)
784.23 - What information must I include in plans for the monitoring of groundwater, surface water, and the biological condition of streams during and after mining? (SRAs)
784.24 - What requirements apply to the postmining land use? (Industry)
784.24 - What requirements apply to the postmining land use? (SRAs)
784.25 - What information must I provide for siltation structures, impoundments, and refuse piles? (Industry)
784.25 - What information must I provide for siltation structures, impoundments, and refuse piles? (SRAs)
784.28 - What additional requirements apply to activities in, through, or adjacent to streams? (Industry)
784.30 - When must I prepare a subsidence control plan and what information must that plan include? (SRAs)
784.28 - What additional requirements apply to activities in, through, or adjacent to streams? (SRAs)
784.31 - What information must I provide concerning the protection of publicly owned parks and historic places? (SRAs)
784.33 - What information must I provide concerning the relocation or use of public roads? (Industry)
784.33 - What information must I provide concerning the relocation or use of public roads? (SRAs)
784.35 - What information must I provide concerning the minimization and disposal of excess spoil? (Industry)
784.21 - Cumulative hydrologic impact assessment updates (CHIA)? (Industry)
784.21 - What requirements apply to preparation and review of the cumulative hydrologic impact assessment (CHIA)? (Industry)
784.21 - Cumulative hydrologic impact assessment updates (CHIA updates)? (SRAs)
784.27 - What additional permitting requirements apply to proposed activities in or through ephemeral streams? (Industry)
784.27 - What additional permitting requirements apply to proposed activities in or through ephemeral streams? (SRAs)
784.12(h) - Stream restoration plan. (Industry)
784.11 - What must I include in the general description of my proposed operations? (SRAs)
784.13 - What additional maps and plans must I include in the reclamation plan? (SRAs)
784.14 - What requirements apply to the use of existing structures? (Industry)
784.16 - What must I include in the fish and wildlife protection and enhancement plan? (Industry)

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 1,574 0 0 136 1,438 0
Annual Time Burden (Hours) 25,033 0 0 10,319 14,714 0
Annual Cost Burden (Dollars) 5,081,139 0 0 4,655,868 425,271 0
Yes
Changing Regulations
No
The Office of Surface Mining Reclamation and Enforcement (“we” or OSMRE) is submitting this request to revise its information collection authority for 30 CFR part 784. This regulation governs the minimum requirements for preparing Reclamation and Operation Plans to be submitted as part of an underground mining permit application package. OSMRE proposed a Stream Protection Rule (SPR) on July 27, 2015, (80 FR 44436) which proposed to modify the collection requirements in 30 CFR part 784. This proposed rule sought comments from the public comments on the burden estimates we identified, the availability of data, frequency of collection, the clarity of instructions and recordkeeping, disclosure, or reporting format, and on the data elements to be recorded, disclosed, and reported for the entire part associated with the information collections approved by the Office of Management and Budget (OMB) under 1029-0039. OMB assigned control number 1029-0136 to this collection, but reserved approval pending review of the information collection package associated with the final SPR. OSMRE received over 94,000 comments on the proposed rule, many of which had information collection ramifications. These comments were reviewed and the final SPR has incorporated changes, where appropriate, to reflect the comments. Likewise, this information collection request has been modified from the original request to OMB to incorporate those final rule changes and the public comments which affect this information collection request. This information collection request will increase respondent burden by 10,319 hours and $4,655,868 in non-wage costs due to program changes under the Stream Protection rule. This information collection request also demonstrates adjustments of -46,893 hours and -$18,894 in non-wage costs for a total of 25,033 hours and $5,081,139.

$58,157
No
No
No
No
No
Uncollected
John Trelease 202 208-2783 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
11/16/2016


© 2024 OMB.report | Privacy Policy