OMB
.report
Search
30 CFR 784 - Underground Mining Permit Applications - Minimum Requirements for Reclamation and Operations Plan
OMB 1029-0136
OMB.report
DOI/OSMRE
OMB 1029-0136
OMB 1029-0136
Latest Forms, Documents, and Supporting Material
Document
Name
784.27 - What additional permitting requirements apply to proposed activities in or through ephemeral streams? (SRAs)
784.27 - What additional permitting requirements apply to proposed activities in or through ephemeral streams? (Industry)
784.21 - Cumulative hydrologic impact assessment updates (CHIA updates)? (SRAs)
784.21 - Cumulative hydrologic impact assessment updates (CHIA)? (Industry)
784.12(h) - Stream restoration plan. (SRA)
784.12(h) - Stream restoration plan. (Industry)
784.38 - What information must I provide concerning support facilities? (SRAs)
784.38 - What information must I provide concerning support facilities? (Industry)
784.37 - What information must I provide concerning access and haul roads? (SRAs)
784.37 - What information must I provide concerning access and haul roads? (Industry)
784.35 - What information must I provide concerning the minimization and disposal of excess spoil? (SRAs)
784.35 - What information must I provide concerning the minimization and disposal of excess spoil? (Industry)
784.33 - What information must I provide concerning the relocation or use of public roads? (SRAs)
784.33 - What information must I provide concerning the relocation or use of public roads? (Industry)
784.31 - What information must I provide concerning the protection of publicly owned parks and historic places? (SRAs)
784.31 - What information must I provide concerning the protection of publicly owned parks and historic places? (Industry)
784.30 - When must I prepare a subsidence control plan and what information must that plan include? (SRAs)
784.30 - When must I prepare a subsidence control plan and what information must that plan include? (Industry)
784.29 - What information must I include in the surface-water runoff control plan? (SRAs)
784.29 - What information must I include in the surface-water runoff control plan? (Industry)
784.28 - What additional requirements apply to activities in, through, or adjacent to streams? (SRAs)
784.28 - What additional requirements apply to activities in, through, or adjacent to streams? (Industry)
784.26 - What information must I provide if I plan to return coal processing waste to abandoned underground workings? (SRAs)
784.26 - What information must I provide if I plan to return coal processing waste to abandoned underground workings? (Industry)
784.25 - What information must I provide for siltation structures, impoundments, and refuse piles? (SRAs)
784.25 - What information must I provide for siltation structures, impoundments, and refuse piles? (Industry)
784.24 - What requirements apply to the postmining land use? (SRAs)
784.24 - What requirements apply to the postmining land use? (Industry)
784.23 - What information must I include in plans for the monitoring of groundwater, surface water, and the biological condition of streams during and after mining? (SRAs)
784.23 - What information must I include in plans for the monitoring of groundwater, surface water, and the biological condition of streams during and after mining? (Industry)
784.22 - What information must I include in the hydrologic reclamation plan and what information must I provide on alternative water sources? (SRAs)
784.22 - What information must I include in the hydrologic reclamation plan and what information must I provide on alternative water sources? (Industry)
784.21 - What requirements apply to preparation and review of the cumulative hydrologic impact assessment (CHIA)? (SRAs)
784.21 - What requirements apply to preparation and review of the cumulative hydrologic impact assessment (CHIA)? (Industry)
784.20 - How must I prepare the determination of the probable hydrologic consequences of my proposed operation (PHC determination)? (SRAs)
784.20 - How must I prepare the determination of the probable hydrologic consequences of my proposed operation (PHC determination)? (Industry)
784.19 - What baseline information on hydrology, geology, and aquatic biology must I provide? (SRAs)
784.19 - What baseline information on hydrology, geology, and aquatic biology must I provide? (industry)
784.16 - What must I include in the fish and wildlife protection and enhancement plan? (SRAs)
784.16 - What must I include in the fish and wildlife protection and enhancement plan? (Industry)
784.14 What requirements apply to the use of existing structures? (SRAs)
784.14 - What requirements apply to the use of existing structures? (Industry)
784.13 - What additional maps and plans must I include in the reclamation plan? (SRAs)
784.13 - What additional maps and plans must I include in the reclamation plan? (Industry)
784.12 - What must the reclamation plan include? (SRAs)
784.12 - What must the reclamation plan include? (Industry)
784.11 - What must I include in the general description of my proposed operations? (SRAs)
784.11 - What must I include in the general description of my proposed operations? (Industry)
All Historical Document Collections
201611-1029-001
Preapproved
New collection (Request for a new OMB Control Number)
2016-11-16
201411-1029-007
Comment filed on proposed rule
New collection (Request for a new OMB Control Number)
2015-07-29
© 2024 OMB.report |
Privacy Policy