Purpose: To maintain Interconnection steady-state frequency within defined limits.
Applicability:
4.1. Functional Entities:
1. Balancing Authority (BA)
2. Generator Owners (GO)
3. Generator Operators (GOP)
4.2. Exemptions:
4.2.1
Existing generating facilities regulated by the U.S. Nuclear Regulatory Commission
prior to the Effective Date are exempt from Standard BAL- 001-TRE-01.
4.2.2
Generating units/generating facilities while operating in synchronous condenser
mode are exempt from Standard BAL-001-TRE-01.
4.2.3
Any generators that are not required by the BA to provide primary frequency
response are exempt from this standard.
5. Background:
The ERCOT Interconnection was initially given a waiver of BAL-001 R2 (Control Performance
Standard CPS2). In FERC Order 693, NERC was directed to develop a Regional Standard as an
alternate means of assuring frequency performance in the ERCOT Interconnection. NERC was
explicitly directed to incorporate key elements of the existing Protocols, Section 5.9. This required
governors to be in service and performing with an un-muted response to assure an Interconnection
minimum Frequency Response to a Frequency Measurable Event (that starts at t(0)).
This regional standard provides requirements related to identifying Frequency Measureable Events,
calculating the Primary Frequency Response of each resource in the Region, calculating the
Interconnection minimum Frequency Response and monitoring the actual Frequency Response of
the Interconnection, setting Governor deadband and droop parameters, and providing Primary
Frequency Response performance requirements.
Under this standard, two Primary Frequency Response performance measures are calculated: “initial”
and “sustained.” The initial PFR performance (R9) measures the actual response compared to the
expected response in the period from 20 to 52 seconds after an FME starts. The sustained PFR
performance (R10) measures the best actual response between 46 and 60 seconds after t(0) compared
to the expected response based on the system frequency at a point 46 seconds after t(0).
In this regional standard the term “resource” is synonymous with “generating unit/generating
facility”.
6. (Proposed) Effective Date:
After final regulatory approval and in accordance with the 30-month Implementation Plan to
Page 1 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
allow the BA and each generating unit/generating facility time to meet the requirements. See
attached Implementation Plan (Attachment 1).
B. Requirements
R1. The BA shall identify Frequency Measurable Events (FMEs), and within 14 calendar days after each
FME the BA shall notify the Compliance Enforcement Authority and make FME information (time
of FME (t(0)), pre-perturbation average frequency, post- perturbation average frequency) publicly
available.
[Violation Risk Factor = Lower] [Time Horizon = Operations Assessment]
M1. The BA shall have evidence it reported each FME to the Compliance Enforcement
Authority and that it made FME information publicly available within 14 calendar days
after the FME as required in Requirement R1.
R2. The BA shall calculate the Primary Frequency Response of each generating unit/generating
facility in accordance with this standard and the Primary Frequency Response Reference
Document. 1 This calculation shall provide a 12-month rolling average of initial and sustained
Primary Frequency Response performance. This calculation shall be completed each month for
the preceding 12 calendar months.
2.1. The performance of a combined cycle facility will be determined using an expected
performance droop of 5.78%.
2.2. The calculation results shall be submitted to the Compliance Enforcement Authority and
made available to the GO by the end of the month in which they were completed.
2.3. If a generating unit/generating facility has not participated in a minimum of (8) eight
FMEs in a 12-month period, its performance shall be based on a rolling eight FME average
response.
[Violation Risk Factor = Lower] [Time Horizon = Operations Assessment]
M2. The BA shall have evidence it calculated and reported the rolling average initial and sustained
Primary Frequency Response performance of each generating unit/generating facility monthly
as required in Requirement R2.
R3.
The BA shall determine the Interconnection minimum Frequency Response (IMFR) in
December of each year for the following year, and make the IMFR, the methodology for
calculation and the criteria for determination of the IMFR publicly available.
[Violation Risk Factor = Lower] [Time Horizon = Operations Planning]
1
The Primary Frequency Response Reference Document contains the calculations that the BA will use to
determine Primary Frequency Response performance of generating units/generating facilities. This reference
document is a Texas RE-controlled document that is subject to revision by the Texas RE Board of Directors.
Page 2 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
M3. The BA shall demonstrate that the IMFR was determined in December of each year per
Requirement R3. The BA shall demonstrate that the IMFR, the methodology for
calculation and the criteria for determination of the IMFR are publicly available.
R4.
After each calendar month in which one or more FMEs occurs, the BA shall determine and make
publicly available the Interconnection’s combined Frequency Response performance for a rolling
average of the last six (6) FMEs by the end of the following calendar month.
[Violation Risk Factor = Medium] [Time Horizon = Operations Planning]
M4. The BA shall provide evidence that the rolling average of the Interconnection’s combined
Frequency Response performance for the last six (6) FMEs was calculated and made public
per Requirement R4.
R5.
Following any FME that causes the Interconnection’s six-FME rolling average combined
Frequency Response performance to be less than the IMFR, the BA shall direct any necessary
actions to improve Frequency Response, which may include, but are not limited to, directing
adjustment of Governor deadband and/or droop settings.
[Violation Risk Factor = Medium] [Time Horizon = Operations Planning]
M5. The BA shall provide evidence that actions were taken to improve the Interconnection’s
Frequency Response if the Interconnection’s six-FME rolling average combined Frequency
Response performance was less than the IMFR, per Requirement R5.
R6. Each GO shall set its Governor parameters as follows:
6.1. Limit Governor deadbands within those listed in Table 6.1, unless directed
otherwise by the BA.
Table 6.1 Governor Deadband Settings
Generator Type
Steam and Hydro Turbines with
Mechanical Governors
All Other Generating
Units/Generating Facilities
Max. Deadband
+/- 0.034 Hz
+/- 0.017 Hz
6.2. Limit Governor droop settings such that they do not exceed those listed in Table 6.2, unless
directed otherwise by the BA.
Table 6.2 Governor Droop Settings
Generator Type
Hydro
Nuclear
Max. Droop
% Setting
5%
5%
Page 3 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Coal and Lignite
Combustion Turbine (Simple Cycle and
Single-Shaft Combined Cycle)
Combustion Turbine (Combined Cycle)
Steam Turbine (Simple Cycle)
Steam Turbine (Combined Cycle)*
Diesel
Wind Powered Generator
DC Tie Providing Ancillary Services
Renewable (Non-Hydro)
5%
5%
4%
5%
5%
5%
5%
5%
5%
*Steam Turbines of combined cycle resources are required to comply with Requirements R6.1, R6.2 and R6.3.
Compliance with Requirements R9 and R10 will be determined through evaluation of the combined cycle
facility using an expected performance droop of 5.78%.
6.3. For digital and electronic Governors, once frequency deviation has exceeded the Governor deadband from
60.000 Hz, the Governor setting shall follow the slope derived from the formula below.
Where
MWGCS is the maximum megawatt control range of the Governor control system. For mechanical Governors,
droop will be proportional from the deadband by design.
[Violation Risk Factor = Medium] [Time Horizon = Operations Planning]
M6. Each GO shall have evidence that it set its Governor parameters in accordance with Requirement
R6. Examples of evidence include but are not limited to:
R7.
•
Governor test reports
•
Governor setting sheets
•
Performance monitoring reports
Each GO shall operate each generating unit/generating facility that is connected to the interconnected
transmission system with the Governor in service and responsive to frequency when the generating
unit/generating facility is online and released for dispatch, unless the GO has a valid reason for
operating with the Governor not in service and the GOP has been notified that the Governor is not in
service.
[Violation Risk Factor = Medium] [Time Horizon = Real-time Operations]
Page 4 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
M7. Each GO shall have evidence that it notified the GOP as soon as practical each time it
discovered a Governor not in service when the generating unit/generating facility was online and
released for dispatch. Evidence may include but not be limited to: operator logs, voice logs, or
electronic communications.
R8.
Each GOP shall notify the BA as soon as practical but within 30 minutes of the discovery of a
status change (in service, out of service) of a Governor.
[Violation Risk Factor = Medium][Time Horizon = Real-time Operations]
M8. Each GOP shall have evidence that it notified the BA within 30 minutes of each discovery of a
status change (in service, out of service) of a Governor.
R9.
Each GO shall meet a minimum 12-month rolling average initial Primary Frequency Response
performance of 0.75 on each generating unit/generating facility, based on participation in at least eight
FMEs.
9.1. The initial Primary Frequency Response performance shall be the ratio of the Actual
Primary Frequency Response to the Expected Primary Frequency Response during the
initial measurement period following the FME.
9.2. If a generating unit/generating facility has not participated in a minimum of eight FMEs in a 12month period, performance shall be based on a rolling eight-FME average.
9.3. A generating unit/generating facility’s initial Primary Frequency Response performance
during an FME may be excluded from the rolling average calculation due to a legitimate
operating condition that prevented normal Primary Frequency Response performance.
Examples of legitimate operating conditions that may support exclusion of FMEs include:
•
Operation at or near auxiliary equipment operating limits (such as boiler feed
pumps, condensate pumps, pulverizers, and forced draft fans);
•
Data telemetry failure. The Compliance Enforcement Authority may request raw
data from the GO as a substitute.
[Violation Risk Factor = Medium] [Time Horizon = Operations Assessment]
M9. Each GO shall have evidence that each of its generating units/generating facilities achieved
a minimum rolling average of initial Primary Frequency Response performance level of at
least 0.75 as described in Requirement R9. Each GO shall have documented evidence of any
FMEs where the generating unit performance should be excluded from the rolling average
calculation.
R10. Each GO shall meet a minimum 12-month rolling average sustained Primary Frequency Response
performance of 0.75 on each generating unit/generating facility, based on participation in at least eight
FMEs.
10.1.
The sustained Primary Frequency Response performance shall be the ratio of the Actual
Page 5 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Primary Frequency Response to the Expected Primary Frequency Response during the
sustained measurement period following the FME.
10.2. If a generating unit/generating facility has not participated in a minimum of eight FMEs in a
12-month period, performance shall be based on a rolling eight- FME average.
10.3. A generating unit/generating facility’s sustained Primary Frequency Response performance
during an FME may be excluded from the rolling average calculation due to a legitimate
operating condition that prevented normal Primary Frequency Response performance.
Examples of legitimate operating conditions that may support exclusion of FMEs include:
•
Operation at or near auxiliary equipment operating limits (such as boiler feed pumps,
condensate pumps, pulverizers, and forced draft fans);
•
Data telemetry failure. The Compliance Enforcement Authority may request raw data
from the GO as a substitute.
[Violation Risk Factor = Medium] [Time Horizon = Operations Assessment]
M10. Each GO shall have evidence that each of its generating units/generating facilities achieved a
minimum rolling average of sustained Primary Frequency Response performance of at least 0.75
as described in Requirement R10. Each GO shall have documented evidence of any Frequency
Measurable Events where generating unit performance should be excluded from the rolling
average calculation.
Page 6 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
C. Compliance
1. Compliance Enforcement Authority
Texas Reliability Entity
2. Compliance Monitoring Period and Reset Time Frame
2.1.
If a generating unit/generating facility completes a mitigation plan and implements corrective
action to meet requirements R9 and R10 of the standard, and if approved by the BA and
Compliance Enforcement Authority, then the generating unit/generating facility may begin a
new rolling event average performance on the next performance during an FME. This will
count as the first event in the performance calculation and the entity will have an average
frequency performance score after 12 successive months or eight events per R9 and R10.
3. Data Retention
3.1. The Balancing Authority, Generator Owner, and Generator Operator shall keep data or evidence
to show compliance, as identified below, unless directed by its Compliance Enforcement
Authority to retain specific evidence for a longer period of time as part of an investigation:
•
The BA shall retain a list of identified Frequency Measurable Events and shall retain FME
information since its last compliance audit for Requirement R1, Measure M1.
•
The BA shall retain all monthly PFR performance reports since its last compliance
audit for Requirement R2, Measure M2.
•
The BA shall retain all annual IMFR calculations, and related methodology and criteria
documents, relating to time periods since its last compliance audit for Requirement R3,
Measure M3.
•
The BA shall retain all data and calculations relating to the Interconnection’s Frequency
Response, and all evidence of actions taken to increase the Interconnection’s Frequency
Response, since its last compliance audit for Requirements R4 and R5, Measures M4 and
M5.
•
Each GOP shall retain evidence since its last compliance audit for Requirement R8,
Measure M8.
•
Each GO shall retain evidence since its last compliance audit for Requirements R6, R7,
R9 and R10, Measures M6, M7, M9 and M10.
If an entity is found non-compliant, it shall retain information related to the non- compliance
until found compliant, or for the duration specified above, whichever is longer.
The Compliance Enforcement Authority shall keep the last audit records and all requested
and submitted subsequent records.
Page 7 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
4. Compliance Monitoring and Assessment Processes
Compliance Audits
Self-Certifications
Spot Checking
Compliance Violation Investigations
Self-Reporting Complaints
D. Violation Severity Levels
R#
R1
Lower VSL
Moderate VSL
High VSL
Severe VSL
The BA reported an FME
more than 30 days but less
than 51 days after
identification of the event.
The BA reported an FME
more than 50 days but less
than 71 days after
identification of the event.
The BA reported an FME
more than 70 days after
identification of the event.
The BA submitted a
monthly report more than
50 days but less than 71
days after the end of the
reporting month.
The BA did not make the
IMFR publicly available.
The BA submitted a
monthly report more than
70 days but less than 91
days after the end of the
reporting month.
The BA did not calculate
the IMFR for the
following year in
December.
The BA did not make
public the six-FME rolling
average Interconnection
combined Frequency
Response by the end of
the following month.
The BA failed to submit a
monthly report within 90
days after the end of the
reporting month.
R4
The BA reported an FME
more than 14 days but
less than 31 days after
identification of the
event.
The BA submitted a
monthly report more than
one month but less than
51 days after the end of
the reporting month.
The BA did not make the
calculation and criteria
for determination of the
IMFR publicly available.
N/A
R5
N/A
N/A
N/A
R6
Any Governor parameter
setting was > 10% and ≤
20% outside setting
range specified in R6.
Any Governor parameter
setting was > 20% and ≤
30% outside setting range
specified in R6.
Any Governor parameter
setting was > 30% and ≤
40% outside setting range
specified in R6.
R7
N/A
N/A
N/A
R2
R3
N/A
The BA did not calculate the
IMFR for a calendar year.
The BA did not calculate the
sixFME rolling average
Interconnection combined
Frequency Response for any
month in which an FME
occurred.
The BA did not take action
to improve Frequency
Response when the
Interconnection’s rollingaverage combined
Frequency Response
performance was less than
the IMFR.
Any Governor parameter
setting was > 40% outside
setting range specified in
R6,
– OR –
an electronic or digital
Governor was set to step
into the droop curve.
The GO operated with its
Governor out of service and
did not notify the GOP upon
Page 8 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
R8
R9
R10
The GOP notified the BA
of a change in Governor
status between 31
minutes and one hour
after the GOP was
notified of the discovery
of the change.
A GO’s rolling average
initial Primary Frequency
Response performance
per R9 was < 0.75 and ≥
0.65.
A GO’s rolling average
sustained Primary
Frequency Response
performance per R10
was < 0.75 and ≥ 0.65.
The GOP notified the BA
of a change in Governor
status more than 1 hour
but within 4 hours after
the GOP was notified of
the discovery of the
change.
A GO’s rolling average
initial Primary Frequency
Response performance per
R9 was < 0.65 and ≥ 0.55.
The GOP notified the BA
of a change in Governor
status more than 4 hours
but within 24 hours after
the GOP was notified of
the discovery of the
change.
A GO’s rolling average
initial Primary Frequency
Response performance per
R9 was < 0.55 and ≥ 0.45.
A GO’s rolling average
sustained Primary
Frequency Response
performance per R10 was
< 0.65 and ≥ 0.55.
A GO’s rolling average
sustained Primary
Frequency Response
performance per R10 was
< 0.55 and ≥ 0.45.
discovery of its Governor
out of service.
The GOP failed to notify the
BA of a change in Governor
status within 24 hours after
the GOP was notified of the
discovery of the change.
A GO’s rolling average
initial Primary Frequency
Response performance per
R9 was < 0.45.
A GO’s rolling average
sustained Primary
Frequency Response
performance per R10 was <
0.45.
Page 9 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
E. Associated Documents
1. Attachment 1 – Implementation Plan.
2. Attachment 2 – Primary Frequency Response Reference Document, including Flow Charts A and B.
a.
b.
This document provides implementation details for calculating Primary Frequency Response
performance as required by Requirements R2, R9 and R10. This reference document is a Texas
RE-controlled document that is subject to revision by the Texas RE Board of Directors. It is not
part of the FERC-approved regional standard.
The following process will be used to revise the Primary Frequency Response Reference
Document. A Primary Frequency Response Reference Document revision request may be
submitted to the Texas RE Reliability Standards Manager, who will present the revision request
to the Texas RE Member Representatives Committee (MRC) for consideration. The revision
request will be posted in accordance with MRC procedures. The MRC shall discuss the revision
request in a public meeting, and will accept and consider verbal and written comments
pertaining to the request. The MRC will make a recommendation to the Texas RE Board of
Directors, which may adopt the revision request, reject it, or adopt it with modifications. Any
approved revision to the Primary Frequency Response Reference Document shall be filed with
NERC and FERC for informational purposes.
Version History
Version
1
1
Date
8/15/2013
1/16/2014
Action
Adopted by NERC Board of Trustees
FERC Order issued approving BAL-001TRE-1. (Order becomes effective April 1,
2014.)
Change Tracking
Page 10 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Attachment 1
Implementation Plan for Regional Standard BAL-001-TRE-1, Primary Frequency Response in the
ERCOT Region
Prerequisite Approvals:
None
Revisions to Approved Standards and Definitions:
None
New Definitions:
• Frequency Measurable Event (FME)
• Governor
• Primary Frequency Response (PFR)
Compliance with the Standard
The following entities are responsible for being compliant with requirements of BAL-001-TRE-1:
• Balancing Authority (BA)
• Generator Owners (GO)
• Generator Operators (GOP)
• Exemptions:
o Existing generating facilities regulated by the U.S. Nuclear Regulatory Commission prior to
the Effective Date are exempt from Standard BAL-001-TRE-01.
o Generating units/generating facilities while operating in synchronous condenser mode are
exempt from Standard BAL-001-TRE-01.
o Any generators that are not required by the BA to provide primary frequency response are
exempt from this standard.
Effective Date
The Effective Date of this standard shall be the first day of the first calendar quarter after final regulatory
approval. Registered Entities must be compliant with the Requirements in accordance with the 30-month
Implementation Plan set forth below.
•
12 months after Effective Date
o The BA must be compliant with Requirement R1
o At least 50% of the GO’s generating units/generating facilities must be compliant with
Requirement R6 (if >1 unit/facility)
o At least 50% of the GO’s generating units/generating facilities must be compliant with
Requirement R7 (if >1 unit/facility)
o The GOP must be compliant with Requirement R8
•
18 months after Effective Date
o The BA must be compliant with Requirements R2, R3, R4, and R5
o 100% of the GO’s generating units/generating facilities must be compliant with
Requirement R6
o 100% of the GO’s generating units/generating facilities must be compliant with
Requirement R7
•
24 months after Effective Date
o At least 50% of the GO’s generating units/generating facilities must be compliant with
Page 11 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
o
•
Requirement R9 (if >1 unit/facility)
At least 50% of the GO’s generating units/generating facilities must be compliant with
Requirement R10 (if >1 unit/facility)
30 months after Effective Date
o 100% of the GO’s generating units/generating facilities must be compliant with Requirement
R9
o 100% of the GO’s generating units/generating facilities must be compliant with Requirement
10
Page 12 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Attachment 2
Primary Frequency Response Reference Document
Texas Reliability Entity, Inc.
BAL-001-TRE-1
Requirements R2, R9, and R10
Performance Metric Calculations
I. Introduction
This Primary Frequency Response Reference Document provides a methodology for determining the
Primary Frequency Response (PFR) performance of individual generating units/generating facilities
following Frequency Measurable Events (FMEs) in accordance with Requirements R2, R9 and R10.
Flowcharts in Attachment A (Initial PFR) and Attachment B (Sustained PFR) show the logic and
calculations in graphical form, and they are considered part of this Primary Frequency Response
Reference Document. Several Excel spreadsheets implementing the calculations described herein for
various types of generating units are available 2 for reference and use in understanding and performing
these calculations.
This Primary Frequency Response Reference Document is not considered to be a part of the regional
standard. This document will be maintained by Texas RE and will be subject to modification as approved
by the Texas RE Board of Directors, without being required to go through the formal Standard
Development Process.
Revision Process: The following process will be used to revise the Primary Frequency Response
Reference Document. A Primary Frequency Response Reference Document revision request may be
submitted to the Texas RE Reliability Standards Manager, who will present the revision request to the
Texas RE Member Representatives Committee (MRC) for consideration. The MRC shall discuss the
revision request in a public meeting, and will accept and consider verbal and written comments pertaining
to the request. The MRC will make a recommendation to the Texas RE Board of Directors, which may
adopt the revision request, reject it, or adopt it with modifications. Any approved revision to the Primary
Frequency Response Reference Document shall be filed with NERC and FERC for informational
purposes.
As used in this document the following terms are defined as shown:
High Sustained Limit (HSL) for a generating unit/generating facility: The limit established by
the GO/GOP, continuously updatable in Real‐Time, that describes the maximum sustained
energy production capability of a generating unit/generating facility.
Low Sustained Limit (LSL) for a generating unit/generating facility: The limit established by
the GO/GOP, continuously updatable in Real‐Time, that describes the minimum sustained
energy production capability of a generating unit/generating facility.
In this regional standard, the term “resource” is synonymous with “generating unit/generating facility”.
2
These spreadsheets are available at www.TexasRE.org.
Page 13 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
II. Initial Primary Frequency Response Calculations
Requirement 9
R9.
Each GO shall meet a minimum 12‐month rolling average initial Primary Frequency
Response performance of 0.75 on each generating unit/generating facility, based on
participation in at least eight FMEs.
9.1. The initial Primary Frequency Response performance shall be the ratio of the Actual
Primary Frequency Response to the Expected Primary Frequency Response during the
initial measurement period following the FME.
9.2. If a generating unit/generating facility has not participated in a minimum of eight FMEs in a
12‐month period, performance shall be based on a rolling eight‐FME average response.
9.3. A generating unit/generating facility’s initial Primary Frequency Response performance
during an FME may be excluded from the rolling average calculation due to a legitimate
operating condition that prevented normal Primary Frequency Response performance.
Examples of legitimate operating conditions that may support exclusion of FMEs
include:
•
Operation at or near auxiliary equipment operating limits (such as boiler
feed pumps, condensate pumps, pulverizers, and forced draft fans);
•
Data telemetry failure. The Compliance Enforcement Authority may request
raw data from the GO as a substitute.
Initial Primary Frequency Response Performance Calculation Methodology
This portion of this PFR Reference Document establishes the process used to calculate initial Primary
Frequency Response performance for each Frequency Measurable Event (FME), and then average the
events over a 12 month period (or 8 event minimum) to establish whether a resource is compliant with
Requirement R9.
This process calculates the initial Per Unit Primary Frequency Response of a resource [P.U.PFR Resource ]
as a ratio between the Adjusted Actual Primary Frequency Response (APFR Adj ),adjusted for the pre‐
event ramping of the unit, and the Final Expected Primary Frequency Response (EPFR final ) as
calculated using the Pre‐perturbation and Post‐perturbation time periods of the initial measure.
This comparison of actual performance to a calculated target value establishes, for each type of
resource, the initial Per Unit Primary Frequency Response [P.U.PFR Resource ] for any Frequency
Measurable Event (FME).
Initial Primary Frequency Response performance requirement
where P.U.PFRResource is the per unit measure of the initial Primary Frequency Response of a resource
during identified FMEs.
Page 14 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
P.U.PFRResource =
Actual Pr imary Frequency Re sponseAdj
Expected Pr imary Frequency Re sponsefinal
where P.U.PFRResource for each FME is limited to values between 0.0 and 2.0.
The Adjusted Actual Primary Frequency Response (APFRAdj) and the Final Expected Primary
Frequency Response (EPFRfinal) are calculated as described below.
EPFR Calculations use droop and deadband values as stated in Requirement R6 with the exception of
combined‐cycle facilities while being evaluated as a single resource (MW production of both the
combustion turbine generator and the steam turbine generator are included in the evaluation) where the
evaluation droop will be 5.78%. 3
Actual Primary Frequency Response (APFRadj)
The adjusted Actual Primary Frequency Response (APFRadj) is the difference between Post‐
perturbation Average MW and Pre‐perturbation Average MW, including the ramp magnitude
adjustment.
where:
Pre‐perturbation Average MW: Actual MW averaged from T‐16 to T‐2
∑
=
T −2
MWpre − perturbation
T −16
MW
# Scans
Post‐perturbation Average MW: Actual MW averaged from T+20 to T+52
∑
=
T + 52
MWpost − perturbation
T + 20
MW
# Scans
3
The effective droop of a typical combined‐cycle facility with governor settings per Requirement R6 is 5.78%,
assuming a 2‐to‐1 ratio between combustion turbine capacity and steam turbine capacity. Use 5.78% effective droop
in all combined‐cycle performance calculations.
Page 15 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Ramp Adjustment: The Actual Primary Frequency Response number that is used to calculate P.U.PFR
is adjusted for the ramp magnitude of the generating unit/generating facility during the pre‐perturbation
minute. The ramp magnitude is subtracted from the APFR.
Ramp Magnitude = (MWT‐4 – MW T‐60)*0.59
(MW T‐4 – MW T‐60) represents the MW ramp of the generator resource/generator facility for
a full minute prior to the event. The factor 0.59 adjusts this full minute ramp to represent
the ramp that should have been achieved during the post‐perturbation measurement
period.
Expected Primary Frequency Response (EPFR)
For all generator types, the ideal Expected Primary Frequency Response (EPFRideal) is calculated as the
difference between the EPFRpost‐perturbation and the EPFRpre‐perturbation.
When the frequency is outside the Governor deadband and above 60Hz:
When the frequency is outside the Governor deadband and below 60Hz:
For each formula, when frequency is within the Governor deadband the appropriate EPFR value is
Page 16 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
zero. The deadbandmax and droopmax quantities come from Requirement R6.
Where:
Pre‐perturbation Average Hz: Actual Hz averaged from T‐16 to T‐2
∑
=
T −2
Hzpre − perturbation
T −16
Hz
# Scans
Post‐perturbation Average Hz: Actual Hz averaged from T+20 to T+52
∑
=
T + 52
Hzpost − perturbation
T + 20
Hz
# Scans
Capacity and NDC (Net Dependable Capacity) are used interchangeably and the term Capacity
will be used in this document. Capacity is the official reported seasonal capacity of the generating
unit/generating facility. The Capacity for wind‐powered generators is the real time HSL of the wind
plant at the time the FME occurred.
Power Augmentation: For Combined Cycle facilities, Capacity is adjusted by subtracting power
augmentation (PA) capacity, if any, from the HSL. Other generator types may also have power
augmentation that is not frequency responsive. This could be “over‐pressure” operation of a steam
turbine at valves wide open or operating with a secondary fuel in service. The GO should provide the
BA with documentation and conditions when power augmentation is to be considered in PFR
calculations.
EPFRfinal for Combustion Turbines and Combined Cycle Facilities
Note: The 0.00276 constant is the MW/0.1 Hz change per MW of Capacity and represents the MW
change in generator output due to the change in mass flow through the combustion turbine due to
the speed change of the turbine during the post‐perturbation measurement period. This factor is
based on empirical data from a major 2003 event as measured on multiple combustion turbines in
ERCOT.
EPFRfinal for Steam Turbine
where:
Page 17 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
where:
Throttle Pressure = Interpolation of Pressure curve at MW pre‐perturbation
The Rated Throttle Pressure and the Pressure curve, based on generator MW output, are provided by the
GO to the BA. This pressure curve is defined by up to six pair of Pressure and MW breakpoints where the
Rated Throttle Pressure and MW output, where Rated Throttle Pressure is achieved, is the first pair and
the Minimum Throttle Pressure and MW output, where the Minimum Throttle Pressure is achieved, as the
last pair of breakpoints. If fewer breakpoints are needed, the pair values will be repeated to complete the
six pair table.
The K factor is used to model the stored energy available to the resource. The value ranges between 0.0
and 0.6 psig per MW change when responding during a FME. The GO can measure the drop in throttle
pressure when the resource is operating near 50% output of the steam turbine during a FME and provide
this ratio of pressure change to the BA. K is then adjusted based on rated throttle pressure and resource
capacity. An additional sensitivity factor, the Steam Flow Change Factor, is based on resource loading (%
steam flow) and further modifies the MW adjustment. This sensitivity factor will decrease the adjustment at
resource outputs below 50% and increase the adjustment at outputs above 50%. The GO should
determine the fixed K factor for each resource that generally results in the best match between EPFR and
APFR (resulting in the highest P.U.PFRResource). For any generating unit, K will not change unless the
steam generator is significantly reconfigured.
EPFRfinal for Other Generating Units/Generating Facilities
where X is an adjustment factor that may be applied to properly model the delivery of PFR. The X
factor will be based on known and accepted technical or physical limitations of the resource. X may
be adjusted by the BA and may be variable across the operating range of a resource. X shall be
zero unless the BA accepts an alternative value.
Page 18 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
III. Sustained Primary Frequency Response Calculations
Requirement 10
R10.
The GO shall meet a minimum 12‐month rolling average sustained Primary Frequency
Response performance of 0.75 on each generating unit/generating facility, based on
participation in at least eight FMEs.
10.1 The sustained Primary Frequency Response performance shall be the ratio of the
Actual Primary Frequency Response to the Expected Primary Frequency Response
during the sustained measurement period following the FME.
10.2 If a generating unit/generating facility has not participated in a minimum of eight FMEs in a
12‐month period, performance shall be based on a rolling eight‐FME average.
10.3 A generating unit/generating facility’s sustained Primary Frequency Response performance
during an FME may be excluded from the rolling average calculation due to a legitimate
operating condition that prevented normal Primary Frequency Response performance.
Examples of legitimate operating conditions that may support exclusion of FMEs include:
• Operation at or near auxiliary equipment operating limits (such as boiler feed
pumps, condensate pumps, pulverizers, and forced draft fans);
•
Data telemetry failure. The Compliance Enforcement Authority may request raw
data from the GO as a substitute.
Sustained Primary Frequency Response Performance Calculation Methodology
This portion of this PFR Reference Document establishes the process used to calculate sustained Primary
Frequency Response performance for each Frequency Measurable Event (FME), and then average the
events over a 12 month period (or 8 event minimum) to establish whether a resource is compliant with
Requirement R10.
This process calculates the Per Unit Sustained Primary Frequency Response of a resource
[P.U.SPFRResource] as a ratio between the maximum actual unit response at any time during the period
from T+46 to T+60, adjusted for the pre‐event ramping of the unit, and the Final Expected Primary
Frequency Response (EPFR) value at time T+46. 4
This comparison of actual performance to a calculated target value establishes, for each type of
resource, the Per Unit Sustained Primary Frequency Response [P.U.SPFRResource] for any Frequency
Measurable Event (FME).
Sustained Primary Frequency Response performance requirement:
The standard requires an average performance over a period of 12 months (including at least 8
measured events) that is ≥ 0.75.
4
The time designations used in this section refer to relative time after an FME occurs. For example, “T+46” refers to
46 seconds after the frequency deviation occurred.
Page 19 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
•
•
the average of each resource’s sustained Primary Frequency Response performances
[P.U.SPFRResource] during all of the assessable Frequency Measurable Events (FMEs), for
the most recent rolling 12 month period; or
if the unit has not experienced at least 8 assessable FMEs in the most recent 12 month
period, the average of the unit’s last 8 sustained Primary Frequency Response
performances when the unit provided frequency response during a Frequency Measurable
Event.
Sustained Primary Frequency Response Calculation (P.U.SPFR)
P.U.PFRResource =
Actual Sustained Primary Frequency ResponseAdj
Expected Sustained Primary Frequency Responsefinal
P.U.SPFRResource is the per unit (P.U.) measure of the sustained Primary Frequency Response of a
resource during identified Frequency Measurable Events. For any given event P.U.SPFRResource for each
FME will be limited to values between 0.0 and 2.0.
Actual Sustained Primary Frequency Response (ASPFR) Calculations
where:
Pre‐perturbation Average MW: Actual MW averaged from T‐16 to T‐2.
∑
=
T −2
MWpre − perturbation
T −16
MW
# Scans
and:
MWMaximumResponse = maximum MW value telemetered by a unit from T+46 through T+60 during low
frequency events and the minimum MW value telemetered by a unit from T+46 through T+60 during a
high frequency event.
Actual Sustained Primary Frequency Response, Adjusted (ASPFRAdj)
RampMW Sustained (MW) – The Standard requires a unit/facility to sustain its response to a Frequency
Page 20 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Measureable Event. An adjustment available in determining a unit’s sustained Primary Frequency
Response performance (P.U.SPFRResource ) is to account for the direction in which a resource was moving
(increasing or decreasing output) when the event occurred T=t(0). This is the RampMW Sustained
adjustment:
RampMW Sustained = (MWT‐4 – MWT‐60) x 0.821
Note: The terminology “MW T‐4” refers to MW output at 4 seconds before the Frequency
Measurable Event (FME) occurs at T=t(0).
By subtracting a reading at 4 seconds before, from a reading at 60 seconds before, the formula
calculates the MWs a generator moved in the minute (56 seconds) prior to T=t(0). The formula is
then modified by a factor to indicate where the generator would have been at T+46, had the event
not occurred: the “RampMW Sustained.” It does this by multiplying the MW change over 56
seconds before the event (MW T‐4 – MW T‐60) by a modifier. This extrapolates to an equivalent
number of MWs the generator would have changed if it had been allowed to continue on its ramp
to T+46 unencumbered by the FME. The modifier is
Expected Sustained Primary Frequency Response (ESPFR) Calculations
The Expected Sustained Primary Frequency Response (ESPFRfinal) is calculated using the actual
frequency at T+46, HZT+46.
This ESPFRfinal is the MW value a unit should have responded with if it is properly sustaining the output of
its generating unit/generating facility in response to an FME. Determination of this value begins with
establishing where it would be in an ideal situation; considers proper droop and dead‐band values
established in Requirement R6, High Sustainable Limit (HSL), Low Sustainable Limit (LSL) and actual
frequency. It then allows for adjusting the value to compensate for the various types of Limiting Factors
each generating units / generating facilities may have and any Power Augmentation Capacity (PA
Capacity) that may be included in the HSL/LSL.
Establishing the Ideal Expected Sustained Primary Frequency Response
For all generator types, the ideal Expected Sustained Primary Frequency Response (ESPFRideal) is
calculated as the difference between the ESPFRT+46 and the EPFRpre‐perturbation. The EPFRpre‐perturbation is the
same EPFRpre-perturbation value used in the Initial measure of R9.
When the frequency is outside the Governor deadband and above 60Hz:
(HZT + 46 − 60 − deadband max )
ESPFRT + 46 =
× (HSL − PA Capacity ) × (− 1)
(droop max× 60 − deadband max )
Page 21 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
When the frequency is outside the Governor deadband and below 60Hz:
(HZT + 46 − 60 + deadband max )
ESPFRT + 46 =
× (HSL − PA Capacity ) × (− 1)
(droop max× 60 − deadband max )
Capacity and Net Dependable Capability (NDC) are used interchangeably and the term Capacity will be
used in this document. Capacity is the official reported seasonal capacity of the generating unit/generating
facility. The capacity for wind‐powered generators is the real‐time HSL of the wind plant at the time the
FME occurred. The deadbandmax and droopmax quantities come from Requirement R6.
For Combined Cycle facilities, determination of Capacity includes subtracting Power Augmentation (PA)
Capacity, if any, from the original HSL. Other generator types may also have Power Augmentation that is
not frequency responsive. This could be “over‐pressure” operation of a steam turbine at valves wide open
or operating with a secondary fuel in service. The GO is required to provide the BA with documentation
and identify conditions when this augmentation is in service.
ESPFRfinal for Combustion Turbines and Combined Cycle Facilities
ESPFR final = ESPFRIdeal + ( HZT + 46 − 60) *10 * 0.00276 * ( HSL − PACapacity )
Note: The 0.00276 constant is the MW/0.1 Hz change per MW of Capacity and represents the
MW change in generator output due to the change in mass flow through the combustion turbine
due to the speed change of the turbine at HZT+46. (This is based on empirical data from a major
2003 event as measured on multiple combustion turbines in ERCOT.)
ESPFRfinal for Steam Turbine
where:
MWAdj = ESPFRideal ×
K
× ( HSL − PACapacity ) × Steam Flow Change Factor × ( −1)
Rated Throttle Pressure
where:
Throttle Pressure = Interpolation of Pressure curve at MW pre‐perturbation
Page 22 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
The Rated Throttle Pressure and the Pressure curve, based on generator MW output, are
provided by the GO to the BA. This pressure curve is defined by up to six pair of Pressure and
MW breakpoints where the Rated Throttle Pressure and MW output where Rated Throttle
Pressure is achieved is the first pair and the Minimum Throttle Pressure and MW output where
the Minimum Throttle Pressure is achieved as the last pair of breakpoints. If fewer breakpoints
are needed, the pair values will be repeated to complete the six pair table.
The K factor is used to model the stored energy available to the resource and ranges between 0.0
and 0.6 psig per MW change when responding during a FME. The GO can measure the drop in
throttle pressure, when the resource is operating near 50% output of the steam turbine during a
FME and provide this ratio of pressure change to the BA. K is then adjusted based on rated throttle
pressure and resource capacity. An additional sensitivity factor, the Steam Flow Change Factor, is
based on resource loading (% steam flow) and further modifies the MW adjustment. This sensitivity
factor will decrease the adjustment at resource outputs below 50% and increase the adjustment at
outputs above 50%. The GO should determine the fixed K factor for each resource that generally
results in the best match between ESPFR and ASPFR (resulting in the highest P.U.SPFRResource).
For any generating unit, K will not change unless the steam generator is significantly reconfigured.
ESPFRfinal for Other Generating Units/Generating Facilities
ESPFR final = ESPFRIdeal + X
where X is an adjustment factor that may be applied to properly model the delivery of PFR. The X
factor will be based on known and accepted technical or physical limitations of the resource. X may
be adjusted by the BA and may be variable across the operating range of a resource. X shall be
zero unless the BA accepts an alternative value.
IV. Limits on Calculation of Primary Frequency Response Performance (Initial and Sustained):
If the generating unit/generating facility is operating within 2% of its (HSL – PA Capacity) or within 5 MW
(whichever is greater) from its applicable operating limit (high or low) at the time an FME occurs (pre‐
perturbation), then that resource’s Primary Frequency Response performance is not evaluated for that
FME.
For frequency deviations below 60 Hz (HzPost‐perturbation < 60 if:
then Primary Frequency Response is not evaluated for this FME.
For frequency deviations above 60 Hz (HzPost‐perturbation > 60, if:
then Primary Frequency Response is not evaluated for this FME.
Final Expected Primary Frequency Response (EPFRfinal) is greater than Operating Margin:
Caps and limits exist for resources operating with adequate reserve margin to be evaluated (at least 2%
of (HSL less PA Capacity) or 5 MW), but with Expected Primary Frequency Responsefinal greater than the
Page 23 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
actual margin available.
1. The P.U.PFRResource will be set to the greater of 0.75 or the calculated P.U.PFRResource if all of the
following conditions are met:
a. The generating unit/generating facility’s pre‐perturbation operating margin
(appropriate for the frequency deviation direction) is greater than 2% of its (HSL
less PA Capacity) and greater than 5 MW; and
b. The Expected Primary Frequency ResponseFinal is greater than the generating
unit/generating facility’s available frequency responsive Capacity 5; and
c. The generating unit/generating facility’s APFRadj response is in the correct direction.
2. When calculation of the P.U.PFRResource uses the resource’s (HSL less PA Capacity) as the
maximum expected output, the calculated P.U.PFRResource will not be greater than 1.0.
3. When calculation of the P.U.PFRResource uses the resource’s LSL as the minimum expected output,
the calculated P.U.PFRResource will not be greater than 1.0.
4. If the APFRAdj is in the wrong direction, then P.U.PFRResource is 0.0.
5. These caps and limits apply to both the Initial and Sustained Primary Frequency Response
measures.
5
In this circumstance, when frequency is below 60 Hz, the EPFRfinal is set to operating margin based on HSL
(adjusted for any augmentation capacity) AND when frequency is above 60 Hz, the EPFRfinal is set to operating
margin based on LSL for the purpose of calculating PUPFRresource.
Page 24 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Attachment A to
Primary Frequency Response Reference Document
Initial Primary Frequency Response Methodology for
BAL-001-TRE-1
Page 25 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Primary Frequency Response Measurement and Rolling Average Calculation – Initial Response
PA=Power Augmentation
HSL=High Sustained Limit
Read Deadband, Droop, HSL, PA
Capacity, Frequency and Resource
MW and Resource MW
Calculate Ramp
Magnitude
Calculate Expected
Primary Frequency
Response
Calculate Actual
Primary Frequency
Response
Calculate P.U. Primary
Frequency Response
Calculate P.U. Primary
Frequency Response
Rolling Average
Is Rolling
Average ≥ 0.75
No
Fail R9
Yes
Pass R9
End
Page 26 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Pre/Post-Perturbation Average MW and Average Frequency Calculations
Read Actual MW &
Frequency
Calculate Pre-Perturbation average for MW and
Frequency
Calculate Post-Perturbation average for MW and
Frequency
End
Page 27 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Ramp Magnitude Calculation
Ramp Magnitude = (MWT-4 – MWT-60)*0.59
End
(MW T-4 – MW T-60) represents the MW ramp of the generator resource/generator facility for a full minute prior
to the event. The factor 0.59 adjusts this full minute ramp to represent the ramp that should have been
achieved during the post-perturbation measurement period.
Actual Primary Frequency Response (APFRAdj)
APFRAdj = MWpost-perturbation – MWpre-perturbation – Ramp Magnitude
End
Page 28 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Expected Primary Frequency Response Calculation
Use the maximum droop and maximum deadband as required by R6. For Combined Cycle Facility
evaluation as a single resource (includes MW production of the steam turbine generator), the EPFR will
use 5.78% droop in all calculations.
Read Deadband, Droop, HSL, PA
Capacity and HZpre-perturbation*
No
If (HZpre – perturbation < 60)
Yes
No
Yes
No
Yes
End
Page 29 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Read Deadband, Droop, HSL, PA
Capacity and HZpost-perturbation*
No
If (HZpost – perturbation < 60)
Yes
No
Yes
No
Y
End
Page 30 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Adjustment for Steam Turbine
Read K(Limiting Factor), Throttle
Pressure curve breakpoints, HSL,
MWpre-perturbation and MWpost-perturbation
Throttle Pressure = Interpolation of Pressure curve at MWpre-perturbation
End
Page 31 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Adjustment for Combustion Turbines and Combined Cycle Facilities
Read HSL, PA Capacity, HZpost-perturbation*
End
0.00276 is the MW/0.1 Hz change per MW of Capacity and represents the MW change in generator output
due to the change in mass flow through the combustion turbine due to the speed change of the turbine
during the post‐perturbation measurement period. (This factor is based on empirical data from a major
2003 event as measured on multiple combustion turbines in ERCOT.)
Adjustment for Other Units
Read Limiting Factor
End
Page 32 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
∑
=
T + 52
* HZ post − perturbation
T + 20
HZ Actual
# of Scans
This adjustment Factor X will be developed to properly model the delivery of PFR due to known and
approved technical limitations of the resource. X may be adjusted by the BA and may be variable across
the operating range of a resource.
Page 33 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
P.U. Initial Primary Frequency Response Calculation
Page 34 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
N
**
If Unit has
Headroom* AND
MWT+0 > LSL
Y
N
Y
N
If P.U.
PFR > 2.0
Y
N
P.U.PFR = 0
Y
P.U. PFR = 2.0
Note, EPFRfinal = Headroom
If P.U. PFR <
0.0
N
Y
If P.U. PFR < 0.75
P.U.PFR = 0.75
Y
P.U.PFR = 0
N
If P.U. PFR >
1.0
Y
P.U.PFR = 1.0
N
End
Page 35 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
*Check for adequate up headroom, low frequency events. Headroom must be greater than either 5MW or
2% of (HSL less PA Capacity), whichever is larger. If a unit does not have adequate up headroom, the unit
is considered operating at full capacity and will not be evaluated for low frequency events.
Check for adequate down headroom, high frequency events. Headroom must be greater than either 5MW
or 2% of (HSL less PA Capacity), whichever is larger. If a unit does not have adequate down headroom,
the unit is considered operating at low capacity and will not be evaluated for high frequency events.
For low frequency events:
For high frequency events:
**No further evaluation is required for Sustained Primary Frequency Response. This event will not be
included in the Rolling Average calculation of either Initial or Sustained Primary Frequency Response.
T = Time in Seconds
Page 36 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Attachment B to
Primary Frequency Response Reference Document
Sustained Primary Frequency Response Methodology for
BAL-001-TRE-1
Page 37 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Primary Frequency Response Measurement and Rolling Average
Calculation–Sustained Response
Read Deadband, Droop,
HSL, PA Capacity, Frequency
and Resource
Calculate Ramp
Magnitude
Calculate Expected
Primary Frequency
Response
Calculate Actual
Primary
Calculate P.U.
Primary
Calculate P.U. Primary
Frequency Response
Rolling Average
No
Is Rolling
Average ≥
0.75
Fail R10
Yes
Pass R10
End
Page 38 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Pre/Post-Perturbation Average MW and Average Frequency Calculations
Read Actual MW &
Frequency
Calculate Pre-Perturbation average for MW and
Frequency
Calculate Post-Perturbation MW and Frequency at T+46
End
Page 39 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Ramp Magnitude Calculation - Sustained
End
(MW T-4 – MW T-60) represents the MW ramp of the generator resource/generator facility for a full minute prior
to the event. The factor 0.821 adjusts this full minute ramp to represent the ramp the generator would have
changed the system had it been allowed to continue on its ramp to T+46 unencumbered.
Actual Sustained Primary Frequency Response (ASPFRAdj)
For low frequency events:
End
For high frequency events:
End
Expected Sustained Primary Frequency Response Calculation
Page 40 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Use the droop and deadband as required by R6. For Combined Cycle Facility evaluation as a single
resource (includes MW production of the steam turbine generator), the EPFR will use 5.78% droop in all
calculations.
Read Deadband, Droop, HSL, PA
Capacity and HZpre-perturbation*
No
If (HZpre – perturbation < 60)
Yes
No
Yes
No
Yes
End
Page 41 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Read Deadband, Droop, HSL, PA
Capacity and HZpost-perturbation*
No
If (HZpost – perturbation < 60)
Yes
No
Yes
No
Yes
End
Page 42 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Adjustment for Steam Turbine
Read K(Limiting Factor), Throttle
Pressure curve breakpoints, HSL, MWpreperturbation and MWpost-perturbation
Throttle Pressure = Interpolation of Pressure curve at MWpre-perturbation
End
Page 43 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Adjustment for Combustion Turbines and Combined Cycle Facilities
Read HSL, PA Capacity, HZpost-perturbation*
End
0.00276 is the MW/0.1 Hz change per MW of Capacity and represents the MW change in generator output
due to the change in mass flow through the combustion turbine due to the speed change of the turbine
during the post‐perturbation measurement period. (This factor is based on empirical data from a major
2003 event as measured on multiple combustion turbines in ERCOT.)
Adjustment for Other Units
Read Limiting Factor
End
* HZ Actual = HZ(T + 46)
Page 44 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
This adjustment Factor X will be developed to properly model the delivery of PFR due to known and
approved technical limitations of the resource. X may be adjusted by the BA and may be variable across
the operating range of a resource.
P.U. Sustained Primary Frequency Response Calculation
* HZ Actual = HZ(T + 46)
Page 45 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
**
N
If Unit has
Headroom* AND
MWT+0 > LSL
Y
N
Y
N
If P.U. SPFR
> 2.0
N
If P.U. SPFR
< 0.0
P.U.SPFR = 0
Y
Y
P.U. SPFR = 2.0
N
Note, EPFRfinal = Headroom
Y
If P.U. SPFR <
0.75
P.U.SPFR = 0
Y
P.U.SPFR = 0.75
N
End
N
If P.U. SPFR >
1.0
Y
P.U.SPFR = 1.0
Page 46 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
*Check for adequate up headroom, low frequency events. Headroom must be greater than either 5MW or
2% of (HSL less PA Capacity), whichever is larger. If a unit does not have adequate up headroom, the unit
is considered operating at full capacity and will not be evaluated for low frequency events.
Check for adequate down headroom, high frequency events. Headroom must be greater than either 5MW
or 2% of (HSL less PA Capacity), whichever is larger. If a unit does not have adequate down headroom,
the unit is considered operating at low capacity and will not be evaluated for high frequency events.
For low frequency events:
For high frequency events:
**No further evaluation is required for Sustained Primary Frequency Response. This event will not be
included in the Rolling Average calculation of either Initial or Sustained Primary Frequency Response.
T = Time in Seconds
Page 47 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
Revision History
Version
Date
1
7/25/2011
1.1
12/7/2012
1.1
3/6/2013
1.1
4/23/2013
1.1
9/18/2013
1.1
1.2
1/16/2014
5/21/2015
Action
Approved by SDT and submitted to
Texas RE RSC for approval to post
for regional ballot
Approved by SDT for submission to
Texas RE RSC for approval to post
for second regional ballot.
Texas RE RSC approves submittal
to Texas RE Board
Texas RE Board approves submittal
to NERC and FERC
NERC and Texas RE file Petition for
approval to FERC
Approved by FERC
Texas RE Board approves revisions
to Attachment 2 Primary Frequency
Response Reference Document
Change Tracking
Changed sustained measure from
average over event recovery period to
point at 46 seconds after FME, and other
changes to respond to field trial results,
comments, and corrections.
For clarification and consistency of the
equations used in the Attachment,
changes performed to:
- “T” in the equations refers to the
start of the Frequency
Measurable Event.
- “T-2” nomenclature utilized for
clarity rather than “t(-2)”
(applicable to numerous
equations)
- Removed floating x in EPFR final
for Steam Turbine equation
- Corrected sign convention for
Expected Sustained Primary
Frequency Response to match
the calculation for expected
primary frequency response.
Corrected Adjusted MW for
ESPFR final for Steam Turbine by
multiplying -1 to calculate proper
value.
- On Steam Flow Change Factor
removed floating x and reinserted
PA Capacity.
- Clarified Footnote 5 for scenario
of high frequency event for
setting LSL as operating margin
(similar to HSL for low frequency
events).
- Clarified in flowcharts for both
P.U. Initial Primary & Sustained
Page 48 of 49
BAL-001-TRE-1 — Primary Frequency Response in the ERCOT Region
-
1.3
11/14/2016
RSC approves minor changes to
Attachment 2 Primary Frequency
Response Reference Document
1.3
12/07/2016
Texas RE Board approves minor
changes to Attachment 2 Primary
Frequency Response Reference
Document.
Frequency Response
Calculations:
o Unit needs to have
Headroom and be above
LSL to be scored.
o Cap EPFR final at value of
Headroom on unit
Per RSC 5/11/2015, all
references to “Final” were
changed to “final”.
Per RSC 5/11/2015, P.U.PFR
and P.U.S.PFR removed italics in
flowcharts.
Replaced Reliability Standards
Committee with Members
Representative Committee to conform
with changes to the Texas RE bylaws
and regional standards development
process.
Replaced Reliability Standards
Committee with Members
Representative Committee to conform
with changes to the Texas RE bylaws
and regional standards development
process.
Page 49 of 49
File Type | application/octet-stream |
File Title | NERC |
File Modified | 0000-00-00 |
File Created | 0000-00-00 |