In accordance
with 5 CFR 1320, the information collection is approved for three
years.
Inventory as of this Action
Requested
Previously Approved
08/31/2023
36 Months From Approved
08/31/2020
131
0
131
276
0
276
0
0
0
Reliability Standard BAL-001-TRE-01
applies to entities registered as Generator Owners, Generator
Operators, and Balancing Authorities within the Texas RE region.
Regional Reliability Standard BAL-001-TRE-01 is more comprehensive
than the existing continent-wide Reliability Standards addressing
frequency response, BAL-001-0.1a and BAL-003-0.1b in that the
regional standard includes additional requirements and applies to
generator owners and generator operators as well as balancing
authorities. The expanded applicability of the regional Reliability
Standard, thus, increases the reporting burden for entities that
operate within the ERCOT Interconnection. The information
collection requirements entail the setting or configuration of the
Control System software, identification and recording of events,
data retention, and submitting frequency measurable events to the
compliance enforcement authority.
US Code:
16
USC 824o Name of Law: Federal Power Act, Energy Policy Act of
2005
Dennis Fuentes-Pedrosa 202
502-6627 dennis.fuentes-pedrosa@ferc.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.