EPA ICR No. 1249.12; OMB Control No. 2070-0074
	
	
Attachment F
Work Sheet used to Calculate EPA Labor Costs
This attachment is available as part of the electronic docket EPA-HQ-OPP-2016-0460 and is part of the ICR’s Supporting Statement
NAICS: 999100
Federal Executive Branch
Labor Category:  | 
		Formula  | 
		Managerial  | 
		Technical  | 
		Clerical  | 
	
Unloaded Hourly Rate1  | 
		= W  | 
		$57.02  | 
		$37.15  | 
		$21.19  | 
	
Benefits Percentage2  | 
		Lb = B/W  | 
		46.0%  | 
		46.0%  | 
		46.0%  | 
	
Benefits per hour  | 
		B = W*Lb  | 
		$26.24  | 
		$17.10  | 
		$9.75  | 
	
Loaded Hourly Rate  | 
		Wb = W + B = W(1+Lb)  | 
		$83.26  | 
		$54.25  | 
		$30.94  | 
	
Overhead Percentage3  | 
		Lo = OH/Wb  | 
		50%  | 
		50%  | 
		50%  | 
	
Overhead per hour  | 
		OH = Wb*Lo  | 
		$41.63  | 
		$27.12  | 
		$15.47  | 
	
Fully Loaded Hourly Rate  | 
		Wf = Wb + OH = W + B + OH  | 
		$124.89  | 
		$81.37  | 
		$46.41  | 
	
1. Data Source: BLS http://www.bls.gov/oes/current/naics4_999100.htm May 2015 data
NAICS 999100 - Federal Executive Branch
Standard Occupational Codes:
Management: 11-0000, Management Occupations
Technical: 19-0000, Life, Physical, and Social Science Occupations
Clerical: 43-0000, Office and Administrative Support Occupations
2. Fringe benefits/wage per hour.
3. U. S. Environmental Protection Agency, EPA Air Pollution Control Cost Manual, Sixth Edition, EPA-452-02-001, January 2002, pg. 2-34. The loading for indirect costs is within the range of 20-70% of the load labor rate (wage + benefits) suggested in EPA guidance.
| File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document | 
| File Title | Microsoft Word - Attachment H_Methodology for Estimating OPP ICR Wage Rates for EPA.doc | 
| Author | lnegash | 
| File Modified | 0000-00-00 | 
| File Created | 2021-01-22 |