The licensing processes in part 52 of
title 10 of the Code of Federal Regulations (10 CFR) provide for
issuance of early site permits (ESPs), standard design approvals
(SDAs) and certifications, manufacturing licenses (MLs), and
licenses which combine construction permits (CPs) and conditional
operating licenses (OLs), e.g. COLs, for commercial nuclear power
reactors. The applicants submit updated reports, applications for
renewals, exemption requests and maintain records of changes to the
facility and records of detailed design related information. These
licensing procedures are options to the two-step licensing process
in 10 CFR part 50, which provides for a CP and an OL. The part 52
licensing process places procedural requirements in part 52 and
technical requirements in part 50. Part 52 reduces the overall
paperwork burden borne by applicants for CPs and OLs because part
52 only requires a single application and provides options for
referencing standardized designs. The information in 10 CFR part 52
is needed by the agency to assess the adequacy and suitability of
an applicant's site, plant design, construction, training and
experience, plans and procedures for the protection of public
health and safety.
The estimated annual burden for
Part 52 will increase by 44,628 hours from 199,226 hours to 243,854
hours. Each year, the NRC solicits information from potential new
reactor applicants using a Regulatory Issue Summary (OMB Clearance
#3150-0228, “Voluntary Reporting of Planned New Reactor
Applications.”) The information provided assists the NRC in
determining resource and budget needs as well as aligning the
proper allocation and utilization of resources to support applicant
submittals, future construction-related activities, and other
anticipated licensing and design certification rulemaking actions.
The NRC staff used the information provided by potential applicants
to develop estimates for this clearance package. The increase in
estimated reporting burden is a result of changes in the number of
anticipated applications and other licensing actions under Part 52.
The burden for reporting increased from 195,208 hours to 220,414.00
(an increase of 25,206 hours). The largest changes in reporting
burden result from a change in the number of anticipated
applications and the number of COLs under construction.
Recordkeeping burden increased from 4,018 hours to 23,440 hours (an
increase of 19,422). One primary reason for the increase in
recordkeeping is that in this renewal, the NRC staff corrected the
method for estimating recordkeeping burden. In the previous
submission, the number of recordkeepers was “annualized,” (divided
by 3) assuming the recordkeeping was performed as a one-time
activity over the course of the three year clearance period. In
this submission, the NRC staff identified that some records require
ongoing maintenance (such as 52.63(b)(2), requiring licensees who
reference a standard DC to maintain records of all changes to the
facility). As a result, the number of recordkeepers for ongoing
activities was not annualized (divided by 3) in this submission. In
addition, staff reviewed and updated the estimated number of
ongoing recordkeepers under this section. For 52.63.(b)(2), the
number of recordkeepers increased from 4 (annualized to 1.33
recordkeepers) to 14 recordkeepers annually, with a an increase in
estimated burden of 19,000 hours. The total number of recordkeepers
for this renewal is 25, compared to 10 in the previous
submission.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.