OMB control number

10 CFR Part 52, Licenses, Certifications and Approvals for Nuclear Power Plants

OMB 3150-0151 · NRC.

OMB 3150-0151

The licensing processes in part 52 of title 10 of the Code of Federal Regulations (10 CFR), “Licenses, Certifications, and Approvals for Nuclear Power Plants,” provide for issuance of early site permits (ESPs), standard design approvals (SDAs) and certifications, manufacturing licenses (MLs), and combined licenses (COLs) for commercial nuclear power reactors. The applicants submit updated reports, applications for renewals, exemption requests and maintain records of changes to the facility and records of detailed design related information. These licensing procedures are options to the two step licensing process in 10 CFR part 50, which provides for a construction permit (CP) and an operating license (OL). The part 52 licensing process places procedural requirements in part 52 and technical requirements in part 50. Part 52 can reduce the overall paperwork burden borne by applicants for CPs and OLs because part 52 only requires a single application and provides options for referencing standardized designs. The information in 10 CFR part 52 is needed by the agency to assess the adequacy and suitability of an applicant's site, plant design, construction, training and experience, plans and procedures for the protection of public health and safety. Regulatory Guide (RG) 1.206 , “Applications for Nuclear Power Plants” (ML18131A181) provides guidance for applicants for COLs for nuclear power plants. Section C.2.1 of RG 1.206 deals with pre-application activities for respondents who intend to submit applications for COLs for nuclear power plants. Pre-application activities encompass all the communications, correspondence, meetings, document submittals/reviews, and other interactions that occur between the NRC staff and a prospective applicant before the tendering of an application under 10 CFR part 52. Participation in pre-application activities is voluntary. Potential applicants who engage in preapplication activities benefit from an early NRC staff assessment of the completeness and level of detail of the information that the applicant proposes to submit and staff identification of potential deficiencies in the application. Pre-application activities are expected to increase the efficiency of the staff's review of those applications once they are submitted. Subpart B of 10 CFR part 52 establishes the process for obtaining design certifications.

The latest form for 10 CFR Part 52, Licenses, Certifications and Approvals for Nuclear Power Plants expires 2027-05-31 and is listed under ICR 202312-3150-002.

All Historical Document Collections

Historical document collections
ReferenceFilingReceivedConcludedAction
202408-3150-006 Revision of a currently approved collection 2024-08-09
202312-3150-002 Extension without change of a currently approved collection 2023-12-04 Approved without change
202311-3150-002 Revision of a currently approved collection 2023-11-16 Approved without change
202308-3150-005 Revision of a currently approved collection 2023-08-22 Preapproved
202202-3150-005 Revision of a currently approved collection 2022-03-04 Comment filed on proposed rule and continue
202107-3150-002 Revision of a currently approved collection 2021-07-04 Comment filed on proposed rule and continue
202008-3150-006 Extension without change of a currently approved collection 2020-08-27
202005-3150-003 Revision of a currently approved collection 2020-05-12 Comment filed on proposed rule and continue
201908-3150-003 Revision of a currently approved collection 2019-08-14 Approved without change
201902-3150-006 Revision of a currently approved collection 2019-03-01 Preapproved
201707-3150-002 Extension without change of a currently approved collection 2017-07-31 Approved without change
201408-3150-001 Revision of a currently approved collection 2014-08-01 Approved with change
201311-3150-004 Extension without change of a currently approved collection 2013-11-20 Approved with change
201306-3150-004 Revision of a currently approved collection 2013-06-28 Approved without change
201205-3150-002 Revision of a currently approved collection 2012-06-04 Preapproved
201201-3150-006 Revision of a currently approved collection 2012-01-27 Approved without change
201110-3150-006 Revision of a currently approved collection 2011-10-21 Preapproved
201105-3150-003 Revision of a currently approved collection 2011-05-16 Comment filed on proposed rule and continue
201103-3150-004 Revision of a currently approved collection 2011-03-25 Comment filed on proposed rule and continue
201102-3150-003 Revision of a currently approved collection 2011-02-25 Comment filed on proposed rule and continue
201101-3150-003 Revision of a currently approved collection 2011-01-20 Comment filed on proposed rule and continue
201007-3150-008 Revision of a currently approved collection 2010-07-22 Approved without change
200802-3150-001 Revision of a currently approved collection 2008-04-11 Comment filed on proposed rule and continue
200708-3150-020 No material or nonsubstantive change to a currently approved collection 2007-08-31 Approved without change
200708-3150-015 No material or nonsubstantive change to a currently approved collection 2007-08-29 Approved without change
200708-3150-014 Revision of a currently approved collection 2007-08-28 Approved without change
200705-3150-007 Revision of a currently approved collection 2007-05-30 Preapproved
200603-3150-002 Revision of a currently approved collection 2006-03-02 Comment filed on proposed rule and continue
200601-3150-001 No material or nonsubstantive change to a currently approved collection 2006-01-19 Approved without change
200512-3150-001 Revision of a currently approved collection 2005-12-13 Approved without change
200505-3150-003 Revision of a currently approved collection 2005-05-18 Approved without change
200504-3150-001 Revision of a currently approved collection 2005-04-14 Comment filed on proposed rule and continue
200307-3150-002 Revision of a currently approved collection 2003-07-07 Approved without change
200204-3150-003 Revision of a currently approved collection 2002-04-03 Approved with change
199905-3150-011 Revision of a currently approved collection 1999-05-19 Approved without change
199903-3150-002 Revision of a currently approved collection 1999-03-04 Approved without change
199610-3150-010 No material or nonsubstantive change to a currently approved collection 1996-10-02 Approved without change
199608-3150-022 No material or nonsubstantive change to a currently approved collection 1996-08-01 Approved without change
199602-3150-002 Revision of a currently approved collection 1996-02-09 Approved without change
199509-3150-004 No material or nonsubstantive change to a currently approved collection 1995-09-30 Approved without change
199504-3150-001 Revision of a currently approved collection 1995-04-11 Approved without change
199210-3150-002 Reinstatement with change of a previously approved collection 1992-10-08 Approved without change
198906-3150-012 No material or nonsubstantive change to a currently approved collection 1989-06-28 Approved with change
198905-3150-001 New collection (Request for a new OMB Control Number) 1989-05-02 Approved without change