10 CFR Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants

ICR 201103-3150-004

OMB: 3150-0151

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2011-03-25
ICR Details
3150-0151 201103-3150-004
Historical Inactive 201007-3150-008
NRC
10 CFR Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants
Revision of a currently approved collection   No
Regular
Comment filed on proposed rule and continue 05/03/2011
Retrieve Notice of Action (NOA) 03/25/2011
In accordance with 5 CFR 1320, comment filed on proposed rule. Agency to address comments at final rule stage.
  Inventory as of this Action Requested Previously Approved
11/30/2013 11/30/2013 11/30/2013
11 0 11
204,075 0 204,075
0 0 0

Proposed Rule, 10 CFR Part 52, Economic Simplied Boiling Water Reactor (ESBWR) Design Certification, Appendix E The NRC proposes to amend its regulations to certify the ESBWR standard plant design under Subpart B of 10 CFR Part 52. This action is necessary so that applicants or licensees intending to construct and operate an ESBWR design may do so by referencing this DCR. The applicant for certification of the ESBWR design is GE-Hitachi Nuclear Energy.

PL: Pub.L. 83 - 703 68 Stat. 919 Name of Law: Atomic Energy Act of 1954
  
None

3150-AI85 Proposed rulemaking 76 FR 16549 03/24/2011

No

1
IC Title Form No. Form Name
10 CFR Part 52, Early Site Permits; Standard Design Certifications; and Combined Licenses for Nuclear Plants

Yes
Changing Regulations
No
The proposed rulemaking constitutes design certification for the ESBWR standard plant design through the addition of Appendix E to 10 CFR Part 52. This appendix allows interested parties to reference the ESBWR design in an application for a COL. The addition of Appendix E increases the total annual burden by 45 hours (from 204,075 to 204,120), which includes an increase by 5 burden hours for reporting (from 191,774 to 191,779) and 40 burden hours for recordkeeping (from 12,301 to 12,341). It also results in the addition of 2 respondents (from 5 to 7) and 3 responses (from 11 to 14). The new respondents are GE-Hitachi Nuclear Energy (the design certification applicant) and Detroit Edison Company (the combined license applicant). There is a corresponding cost increase of $11,655 (45 hours x $259/hr).

$0
No
No
No
No
No
Uncollected
George tartal 301 415-0016 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
03/25/2011


© 2024 OMB.report | Privacy Policy